{"id":111234,"date":"2026-10-27T16:31:21","date_gmt":"2026-10-27T16:31:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111234"},"modified":"2026-10-27T16:32:28","modified_gmt":"2026-10-27T16:32:28","slug":"voorraaddekking","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/","title":{"rendered":"Voorraaddekking in de productie: is de voorraad toereikend?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Voorraaddekking in de productie: is de voorraad toereikend?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/nl\/\">Home<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/\">Bronnen<\/a> &raquo; Voorraaddekking in de productie: is de voorraad toereikend?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Geschatte leestijd: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minuten<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Volgens het voorraadoverzicht heeft u genoeg onderdelen voor zeven werkdagen. De volgende levering wordt vrijdag verwacht. Toch kan de productieorder van donderdag niet starten met de benodigde hoeveelheid.<\/p>\n\n\n<p>Dat is niet tegenstrijdig: genoeg voorraad voor zeven dagen bij een gemiddeld verbruik is iets anders dan genoeg voorraad voor de orders die daadwerkelijk door uw fabriek gaan. Een grote batch, materiaal dat op kwaliteitsvrijgave wacht of voorraad die al elders is toegewezen, kan de uitkomst veranderen.<\/p>\n\n\n<p>Met voorraaddekking spoort u zo&#8217;n tekort op voordat het tot stilstand leidt. In de productie draait het om een concrete vraag: <strong>in welke komende materiaalbehoefte kunnen we niet meer voorzien, en komt de aanvulling v\u00f3\u00f3r die tijd beschikbaar voor gebruik?<\/strong> SkyPlanner APS koppelt de beschikbaarheid van materiaal aan het productieschema. Zo kunt u bij uw aanpak niet alleen rekening houden met de voorraad, maar ook met de machinecapaciteit en leverafspraken.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Wat is voorraaddekking in de productie?<\/h2>\n\n\n<p>Voorraaddekking geeft aan hoelang een bepaalde hoeveelheid voorraad in de vraag kan voorzien. Meestal wordt dit uitgedrukt in dagen of weken. In de productie kan die vraag betrekking hebben op onderdelen of grondstoffen voor komende productietaken, in plaats van op eindproducten die aan klanten worden verkocht.<\/p>\n\n\n<p>Het cijfer heeft een duidelijke grondslag nodig. De voorraaddekking van \u00e9\u00e9n onderdeel in \u00e9\u00e9n fabriek is iets anders dan een voorraadcijfer voor het hele bedrijf. Ook maakt het verschil of u alleen rekent met voorraad die al beschikbaar is, of verwachte ontvangsten meeneemt.<\/p>\n\n\n<p>Bij een gelijkmatig verbruik kunt u voor een snelle schatting deze formule gebruiken:<\/p>\n\n\n<p><strong>Voorraaddekking = bruikbare voorraad \u00f7 verbruik per dag<\/strong><\/p>\n\n\n<p>Gebruik steeds dezelfde eenheden en tijdsbasis. Bij een bruikbare voorraad van 420 onderdelen en een gemiddeld verbruik van 60 onderdelen per werkdag komt de schatting uit op zeven werkdagen. Vergelijk die uitkomst niet rechtstreeks met een doorlooptijd van een leverancier in kalenderdagen zonder beide eerst naar dezelfde kalender om te rekenen.<\/p>\n\n\n<p>Deze schatting helpt u te bepalen welke materialen aandacht nodig hebben. Wisselt het verbruik per order, reken dan vooruit op basis van de hoeveelheden en de datums waarop ze nodig zijn. Een onderdeel dat in grote batches wordt verbruikt, verlaat het magazijn niet in het gelijkmatige dagelijkse tempo dat het gemiddelde suggereert.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Voorraaddekking is niet hetzelfde als voorraadrotatie of DIO<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/voorraadrotatie\/\">Voorraadrotatie<\/a> en de gemiddelde voorraadduur, oftewel DIO, beschrijven de voorraadbeweging of de tijd dat voorraad wordt aangehouden op basis van financi\u00eble gegevens over een bepaalde periode. Ze helpen het voorraadbeheer te beoordelen, maar vertellen een planner niet of een bepaald onderdeel beschikbaar zal zijn voor de taak van donderdag.<\/p>\n\n\n<p>Gebruik voor die beslissing de hoeveelheden van hetzelfde artikel en de datums waarop ze nodig zijn. Deel een hoeveelheid onderdelen niet door de kostprijs van de omzet. Ga er ook niet van uit dat een historisch cijfer voor de voorraadduur aantoont dat materiaal in de toekomst op tijd beschikbaar is.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Begin met voorraad die de productie daadwerkelijk kan gebruiken<\/h2>\n\n\n<p>Controleer en corrigeer de beginvoorraad voordat u de voorraaddekking berekent. Bij een fysieke telling kan ook materiaal worden meegeteld dat wel aanwezig is, maar niet beschikbaar is voor het werk dat u beoordeelt.<\/p>\n\n\n<p>Maak onderscheid tussen vier categorie\u00ebn:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Aanwezige voorraad:<\/strong> de hoeveelheid die op de betreffende locatie als fysiek aanwezig is geregistreerd.<\/li><li><strong>Niet-beschikbare voorraad:<\/strong> materiaal dat op kwaliteitsvrijgave wacht, beschadigde voorraad, materiaal waarvan de houdbaarheid is verstreken of materiaal met een specificatie die niet geschikt is voor de taak.<\/li><li><strong>Toegewezen voorraad:<\/strong> materiaal dat voor ander werk is gereserveerd en waarmee u in de berekening rekening moet houden.<\/li><li><strong>Verwachte ontvangsten:<\/strong> hoeveelheden die later beschikbaar kunnen komen en dus nog niet tot de aanwezige voorraad behoren.<\/li><\/ul>\n\n\n<p>Het belangrijkste is dat uw beginvoorraad en uw lijst met materiaalbehoeften op elkaar aansluiten. Is een reservering al van de beginvoorraad afgetrokken, trek diezelfde behoefte dan later niet nogmaals af. Begint u daarentegen met de bruikbare voorraad v\u00f3\u00f3r aftrek van reserveringen, neem dan alle openstaande behoeften mee die uit die voorraad worden verbruikt.<\/p>\n\n\n<p>Geeft een systeem bijvoorbeeld \u2018vrije voorraad\u2019 weer, controleer dan welke hoeveelheden al zijn afgetrokken om tot dat cijfer te komen. Als u alle openstaande orders aftrekt van een voorraad waarin die orders al zijn verrekend, cre\u00ebert u op papier een tekort dat er niet is.<\/p>\n\n\n<p>Maak ook onderscheid tussen een waarschuwing voor de <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/veiligheidsvoorraad\/\">veiligheidsvoorraad<\/a> en een fysiek tekort. Als de voorraad onder een vastgelegde buffer komt, kan actie nodig zijn terwijl er nog genoeg materiaal voor alle taken is. Vermeld welk eindpunt u voor de voorraaddekking gebruikt: het bereiken van de buffer of het moment waarop u niet meer volledig in een behoefte kunt voorzien.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bereken de toekomstige voorraaddekking op basis van komende taken<\/h2>\n\n\n<p>Bij materiaal waarvoor de productiebehoefte wisselt, loopt u de behoeften in chronologische volgorde na. Begin met de gecontroleerde, bruikbare voorraad. Trek elke meegenomen behoefte af op het moment dat het materiaal nodig is en tel een ontvangst pas op wanneer die hoeveelheid naar verwachting bruikbaar is.<\/p>\n\n\n<p>De verwachte voorraad op elk moment berekent u als volgt:<\/p>\n\n\n<p><strong>Verwachte voorraad = bruikbare beginvoorraad + bruikbare ontvangsten tot dat moment \u2212 meegenomen behoeften tot dat moment<\/strong><\/p>\n\n\n<p>Zoek de eerste behoefte waarin de beschikbare hoeveelheid niet volledig kan voorzien. Dat is het moment waar het om draait als u een tekort wilt voorkomen, ook als een latere ontvangst ervoor zorgt dat de voorraad aan het einde van de week weer ruim voldoende lijkt.<\/p>\n\n\n<p>Gebruik de datum waarop het materiaal nodig is, niet automatisch de verzenddatum van de afgeronde order. Een ingekocht halffabricaat dat dinsdag nodig is voor verspaning, kan niet wachten tot het samengestelde product vrijdag wordt verzonden.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Voorbeeld: gemiddeld zeven dagen voorraaddekking, maar donderdag al een tekort<\/h3>\n\n\n<p>Stel dat een fabrikant op maandagochtend de voorraad van \u00e9\u00e9n ingekocht onderdeel controleert. Er zijn fysiek 600 stuks aanwezig. Daarvan wachten er 100 op kwaliteitsvrijgave en zijn er 80 toegewezen aan ander werk dat buiten dit voorbeeld valt. De bruikbare beginvoorraad voor de onderstaande taken is dus 420 stuks.<\/p>\n\n\n<p>Voor de meegenomen taken zijn maandag 120 stuks nodig, dinsdag 180 en donderdag 160. Deze behoeften zijn nog niet van de beginvoorraad van 420 stuks afgetrokken. Naar verwachting zijn de 200 stuks van een inkooplevering vrijdagochtend bruikbaar.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Moment in de planning<\/th><th>Behoefte of bruikbare ontvangst<\/th><th>Verwachte voorraad<\/th><\/tr><\/thead><tbody><tr><td>Begin maandag<\/td><td>Bruikbare beginvoorraad<\/td><td>420 stuks<\/td><\/tr><tr><td>Taak op maandag<\/td><td>120 stuks nodig<\/td><td>300 stuks<\/td><\/tr><tr><td>Taak op dinsdag<\/td><td>180 stuks nodig<\/td><td>120 stuks<\/td><\/tr><tr><td>Taak op donderdag<\/td><td>160 stuks nodig<\/td><td>Tekort van 40 stuks<\/td><\/tr><tr><td>Ontvangst op vrijdag<\/td><td>200 stuks worden bruikbaar<\/td><td>160 stuks nadat in alle vermelde behoeften is voorzien<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Bij het recente gemiddelde verbruik van 60 stuks per werkdag lijkt de beginvoorraad voldoende voor zeven werkdagen. De werkelijke taken laten een urgenter probleem zien: voor de behoefte van donderdag ontbreken 40 stuks. De ontvangst op vrijdag komt daarvoor te laat.<\/p>\n\n\n<p>De laatste rij is een prognose voor de planning en betekent niet dat de productie materiaal kan uitgeven dat niet op voorraad is. De berekening gaat ervan uit dat de onvervulde behoefte van donderdag alsnog moet worden gedekt. Zodra de taak verschuift, moeten ook het moment waarop het materiaal daadwerkelijk nodig is en de einddatum van de taak meeschuiven.<\/p>\n\n\n<p>De boodschap aan inkoop is nu concreet: zorg dat ten minste de ontbrekende 40 stuks bruikbaar zijn v\u00f3\u00f3r de bewerking die ze donderdag verbruikt, of spreek een ander productieplan af. \u2018We hebben voor zeven dagen voorraad\u2019 zou die urgentie niet overbrengen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tel aanvullingen pas mee wanneer ze bruikbaar worden<\/h2>\n\n\n<p>Een inkooporder kan een toekomstig tekort in hoeveelheid oplossen, zonder dat het materiaal daarmee op tijd beschikbaar is. Controleer of de verwachte datum staat voor aankomst bij de poort, een volledig afgehandelde ontvangst of vrijgave voor productie. Door ontvangstverwerking, inspectie en intern transport kan er tijd tussen die momenten zitten.<\/p>\n\n\n<p>Voor een kritieke taak kan zelfs een indeling per dag nog te grof zijn. Een levering die laat op donderdag wordt verwacht, kan niet worden gebruikt voor een bewerking op donderdagochtend. Plan nauwkeuriger in de tijd als dat verschil bepalend is voor de beslissing.<\/p>\n\n\n<p>Houd twee overzichten duidelijk uit elkaar: welke behoefte alleen de huidige bruikbare voorraad dekt, en welke behoefte gedekt is als u ook de betrouwbaar verwachte ontvangsten meerekent. Zo ziet u zowel hoe afhankelijk de planning is van aanvulling als wat de gevolgen van vertraging zijn.<\/p>\n\n\n<p>Als de behoefte gedurende de hele onderzochte periode gedekt is, vermeld dan: \u201cgedekt tot het einde van de planningshorizon\u201d. Dat betekent niet dat de voorraad onbeperkt meegaat. Als er geen verbruik wordt verwacht, levert delen door nul evenmin een zinvolle basis op voor een besluit over aanvulling.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hoeveel voorraaddekking is voldoende?<\/h3>\n\n\n<p>Er is geen streefwaarde die voor alle productiematerialen past. Hoeveel buffer nodig is, hangt af van de aanvultijd, de variatie, het belang van het materiaal voor de productie, de houdbaarheid en de gevolgen van een tekort.<\/p>\n\n\n<p>Een zinvolle eerste controle is of de bruikbare voorraad en toevoer de behoefte dekken totdat de volgende betrouwbaar verwachte aanvulling inzetbaar is, inclusief de buffer die uw voorraadbeleid voorschrijft. Een goedkoop onderdeel dat de hele assemblage kan stilleggen, verdient mogelijk meer aandacht dan een veel duurder artikel dat eenvoudig te vervangen is.<\/p>\n\n\n<p>Koop niet van elk artikel meer in alleen om het dekkingscijfer te verbeteren. Onderzoek of het vermeende risico voortkomt uit een werkelijk tekort in de toevoer, een onjuiste voorraadstand, verouderde behoeftegegevens of een onrealistische ontvangstdatum.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kies een maatregel die productie en leveringen veiligstelt<\/h2>\n\n\n<p>Zodra u weet welke behoefte als eerste niet volledig gedekt is, bepaalt u welke aanpassing uitkomst biedt. In het voorbeeld zou een eerdere deellevering het tekort van 40 stuks kunnen opheffen. In andere situaties kan een goedgekeurd alternatief materiaal, een aangepaste batchgrootte of een andere taakvolgorde nodig zijn.<\/p>\n\n\n<p>Elke optie heeft gevolgen voor de productie. Een alternatief vereist de juiste technische goedkeuring. Een kleinere batch kan extra omstelwerk opleveren. Door een andere order naar voren te halen, kunt u een machine aan het werk houden, maar tegelijk de levering vertragen aan de klant voor wie dat tijdvak oorspronkelijk was ingepland.<\/p>\n\n\n<p>Daarom moet inzicht in de voorraaddekking doorwerken in het <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/wat-is-productieplanning\/\">productieschema<\/a> en niet eindigen bij een inkoopactie. Zelfs als de leverancier de ontbrekende stuks met spoed levert, kan het geplande tijdvak op de machine inmiddels vervallen zijn en passen de vervolgbewerkingen mogelijk niet meer v\u00f3\u00f3r het verzendmoment.<\/p>\n\n\n<p>Beoordeel beide vragen samen: <strong>is het materiaal op tijd beschikbaar en kan het resterende werk dan nog op tijd worden afgerond?<\/strong> Zo voorkomt u dat een op zichzelf verstandige voorraadbeslissing ongemerkt een ander leveringsprobleem veroorzaakt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vertaal materiaalbeschikbaarheid naar een uitvoerbaar productieschema in SkyPlanner<\/h2>\n\n\n<p>SkyPlanner APS neemt materialen en verwachte inkoopleveringen mee in dezelfde planningsberekening als werkstations, ploegendiensten, prioriteiten en afhankelijkheden tussen bewerkingen. Als u via de regel Rekening houden met materialen de materiaalbeschikbaarheid laat meewegen, controleert SkyPlanner bij het inplannen van taken of de daarvoor vastgelegde materialen beschikbaar zijn.<\/p>\n\n\n<p>Het voordeel is dat uw beslissing over materialen niet in een aparte voorraadlijst blijft staan. Arcturus, de AI-planningsengine van SkyPlanner, berekent het productieschema op basis van de bijgehouden beschikbaarheid en de ingestelde capaciteit. De Gantt-tijdlijn toont de resulterende werkvolgorde. Zo ziet u de gevolgen voor leveringen zonder de wachtrij van elke machine handmatig opnieuw op te bouwen.<\/p>\n\n\n<p>De leverdatums op inkooporders spelen een concrete rol in die planning. SkyPlanner beschouwt de ingevulde leverdatum als het moment waarop het materiaal naar verwachting beschikbaar is. Door de inkooporder bij aankomst van het materiaal als Geleverd te bevestigen, wordt de voorraad bijgewerkt. Verwachte toevoer en daadwerkelijk ontvangen voorraad blijven dus van elkaar gescheiden.<\/p>\n\n\n<p>Neem opnieuw het tekort op donderdag. Leg vast dat de ontvangst op vrijdag wordt verwacht en bereken het schema opnieuw. Bekijk waar het getroffen werk nu tussen de andere orders past, inclusief de daaropvolgende bewerkingen. Regelt inkoop een eerdere levering, beoordeel dan het schema op basis van de aangepaste beschikbaarheid. Ga er niet van uit dat de oorspronkelijke leverbelofte daarmee automatisch weer haalbaar is.<\/p>\n\n\n<p>U bepaalt de prioriteiten; Arcturus voert de planningsberekening uit. Zo hebben planning en inkoop een gezamenlijke basis om een maatregel te kiezen en zijn ze minder tijd kwijt aan het op elkaar afstemmen van voorraadlijsten en afzonderlijke machineplanningen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Wat dit voor Eskomatic veranderde<\/h3>\n\n\n<p>Bij Eskomatic, een toeleverancier voor verspaning, werden de werkwachtrijen grotendeels handmatig beheerd. De oudere omgeving voor productiebeheersing bood bovendien weinig zicht op de materiaalbeschikbaarheid. Een tekort kwam soms pas vlak voor de geplande start van een taak aan het licht, wanneer er nauwelijks nog ruimte was om bij te sturen.<\/p>\n\n\n<p>Met de invoering van SkyPlanner werd de dagelijkse planning overzichtelijker dankzij een visuele werkwachtrij in een Gantt-diagram, automatische planning van de bezetting en beter zicht op materiaaltekorten. <a href=\"https:\/\/skyplanner.ai\/nl\/klantverhalen\/eskomatic\/\">Eskomatic meldt<\/a> minder productiestilstand door ontbrekend materiaal en een nauwkeurigere bepaling van leverdatums.<\/p>\n\n\n<p>Deze ervaring laat zien waarom het belangrijk is materialen aan het productieplan te koppelen: planners kunnen de gevolgen voor het werk en de afspraken met klanten aanpakken, in plaats van het tekort pas bij de machine te ontdekken.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bekijk wat een vertraagde materiaallevering in uw fabriek zou veranderen<\/h2>\n\n\n<p>SkyPlanner kan via zijn open REST API met elk ERP- of MES-systeem worden ge\u00efntegreerd. Zo kunt u uw bestaande order- en materiaalgegevens koppelen aan een productieschema dat rekening houdt met eindige capaciteit, in plaats van aparte werkwachtrijen bij te houden en handmatig op elkaar af te stemmen.<\/p>\n\n\n<p>Neem voor een gerichte SkyPlanner-demo een belangrijk onderdeel als uitgangspunt, samen met de taken die het verbruiken en een recente vertraging in de aanvulling. Vraag om te laten zien hoe de vastgelegde aankomstdatum doorwerkt in het gezamenlijke schema en de leverdatums. Zo beoordeelt u de praktische waarde die verder gaat dan alleen een cijfer voor voorraaddekking.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/nl\/contact-verkoop\/\">Plan een SkyPlanner-demo<\/a> om uw productiesituatie te bespreken, of <a href=\"https:\/\/skyplanner.ai\/nl\/proef\/\">probeer SkyPlanner met demogegevens<\/a> om eerst te zien hoe het plannen werkt.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Voorraaddekking in de productie: is de voorraad toereikend? Home &raquo; Bronnen &raquo; Voorraaddekking in de productie: is de voorraad toereikend? Volgens het voorraadoverzicht heeft u genoeg onderdelen voor zeven werkdagen. De volgende levering wordt vrijdag verwacht. Toch kan de productieorder van donderdag niet starten met de benodigde hoeveelheid. Dat is niet tegenstrijdig: genoeg voorraad voor &#8230; <a title=\"Voorraaddekking in de productie: is de voorraad toereikend?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/\" aria-label=\"Lees meer over Voorraaddekking in de productie: is de voorraad toereikend?\">Lees meer<\/a><\/p>\n","protected":false},"author":3,"featured_media":111252,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2520,309],"tags":[],"class_list":["post-111234","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-en-planning","category-middelen","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Voorraaddekking in de productie: is de voorraad toereikend?<\/title>\n<meta name=\"description\" content=\"Vind het eerste materiaaltekort v\u00f3\u00f3r productiestilstand. Bereken voorraaddekking voor komende taken en koppel beschikbaarheid aan de planning in SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Voorraaddekking in de productie: is de voorraad toereikend?\" \/>\n<meta property=\"og:description\" content=\"Vind het eerste materiaaltekort v\u00f3\u00f3r productiestilstand. Bereken voorraaddekking voor komende taken en koppel beschikbaarheid aan de planning in SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T16:31:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T16:32:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Geschreven door\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/voorraaddekking\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/voorraaddekking\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Voorraaddekking in de productie: is de voorraad toereikend?\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:32:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/voorraaddekking\\\/\"},\"wordCount\":2264,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/voorraaddekking\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"articleSection\":[\"APS en planning\",\"middelen\"],\"inLanguage\":\"nl-NL\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/voorraaddekking\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/voorraaddekking\\\/\",\"name\":\"Voorraaddekking in de productie: is de voorraad toereikend?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/voorraaddekking\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/voorraaddekking\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:32:28+00:00\",\"description\":\"Vind het eerste materiaaltekort v\u00f3\u00f3r productiestilstand. Bereken voorraaddekking voor komende taken en koppel beschikbaarheid aan de planning in SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/voorraaddekking\\\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/voorraaddekking\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/voorraaddekking\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/voorraaddekking\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Voorraaddekking in de productie: is de voorraad toereikend?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Voorraaddekking in de productie: is de voorraad toereikend?","description":"Vind het eerste materiaaltekort v\u00f3\u00f3r productiestilstand. Bereken voorraaddekking voor komende taken en koppel beschikbaarheid aan de planning in SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/","og_locale":"nl_NL","og_type":"article","og_title":"Voorraaddekking in de productie: is de voorraad toereikend?","og_description":"Vind het eerste materiaaltekort v\u00f3\u00f3r productiestilstand. Bereken voorraaddekking voor komende taken en koppel beschikbaarheid aan de planning in SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T16:31:21+00:00","article_modified_time":"2026-10-27T16:32:28+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Geschreven door":"Jussi M\u00e4ntyl\u00e4","Geschatte leestijd":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Voorraaddekking in de productie: is de voorraad toereikend?","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:32:28+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/"},"wordCount":2264,"publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","articleSection":["APS en planning","middelen"],"inLanguage":"nl-NL"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/","url":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/","name":"Voorraaddekking in de productie: is de voorraad toereikend?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:32:28+00:00","description":"Vind het eerste materiaaltekort v\u00f3\u00f3r productiestilstand. Bereken voorraaddekking voor komende taken en koppel beschikbaarheid aan de planning in SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/"]}]},{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","width":1672,"height":941,"caption":"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/voorraaddekking\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/nl\/"},{"@type":"ListItem","position":2,"name":"Voorraaddekking in de productie: is de voorraad toereikend?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/nl\/#website","url":"https:\/\/skyplanner.ai\/nl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/nl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/nl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/nl\/","logo":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/nl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Voorraaddekking in de productie: is de voorraad toereikend? Home &raquo; Bronnen &raquo; Voorraaddekking in de productie: is de voorraad toereikend? Volgens het voorraadoverzicht heeft u genoeg onderdelen voor zeven werkdagen. De volgende levering wordt vrijdag verwacht. Toch kan de productieorder van donderdag niet starten met de benodigde hoeveelheid. Dat is niet tegenstrijdig: genoeg voorraad voor&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/111234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/comments?post=111234"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/111234\/revisions"}],"predecessor-version":[{"id":111298,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/111234\/revisions\/111298"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media\/111252"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media?parent=111234"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/categories?post=111234"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/tags?post=111234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}