{"id":105006,"date":"2026-10-21T12:03:28","date_gmt":"2026-10-21T12:03:28","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105006"},"modified":"2026-10-21T12:04:30","modified_gmt":"2026-10-21T12:04:30","slug":"zelf-maken-of-inkopen","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/","title":{"rendered":"Zelf maken of inkopen: vergelijk kosten en capaciteit"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Zelf maken of inkopen: vergelijk kosten en capaciteit<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/nl\/\">Home<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/\">Bronnen<\/a> &raquo; Zelf maken of inkopen: vergelijk kosten en capaciteit<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Geschatte leestijd: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minuten<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Bij de keuze tussen zelf maken en inkopen bepaalt u of u een onderdeel zelf produceert of een bewerking intern uitvoert, of dit bij een externe leverancier inkoopt. Voor de juiste keuze kijkt u zowel naar de kosten die per optie verschillen als naar de capaciteit, kwaliteit en leverprestaties die elke optie biedt.<\/p>\n\n\n<p>Twee stukprijzen vinden is zelden het lastigste. Het gaat erom te weten welke kosten wegvallen als u het onderdeel niet meer zelf maakt, welk ander werk u in de vrijgekomen uren kunt doen en of het ingekochte onderdeel op tijd beschikbaar is voor de assemblage.<\/p>\n\n\n<p>Daarom moet u de kostenvergelijking naast de productieplanning leggen. SkyPlanner APS maakt uw interne bezetting en samenhangende bewerkingen zichtbaar, zodat een goedkoper onderdeel niet ongemerkt tot een te late klantorder leidt. Zodra een externe bewerking is goedgekeurd, kan die in dezelfde planning blijven staan als het werk dat eraan voorafgaat en erop volgt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ga uit van hetzelfde onderdeel, dezelfde hoeveelheid en dezelfde levereisen<\/h2>\n\n\n<p>Spreek v\u00f3\u00f3r de kostenvergelijking precies af wat u gaat inkopen of maken. Hanteer dezelfde tekeningrevisie, materiaalspecificatie, hoeveelheid goedgekeurde onderdelen, kwaliteitseisen en datum waarop de volgende bewerking ze nodig heeft. Een offerte voor onbewerkte halffabricaten is niet vergelijkbaar met de kosten van gecontroleerde, afgewerkte onderdelen.<\/p>\n\n\n<p>Bepaal ook op welke periode de beslissing betrekking heeft. E\u00e9n spoedserie inkopen omdat een machine overbelast is, is iets anders dan een intern proces stopzetten en het volledige jaarvolume uitbesteden. In het eerste geval blijven de leasekosten van een machine mogelijk gelijk. In het tweede geval kunnen toekomstige vervanging van machines, personeelsbezetting en het behoud van expertise de uitkomst wezenlijk veranderen.<\/p>\n\n\n<p>Laat engineering en de kwaliteitsafdeling vaststellen aan welke eisen beide opties zonder meer moeten voldoen. Als een leverancier de vereiste tolerantie of goedkeuring niet kan halen, maakt een lage offerte die optie nog niet haalbaar. Toets uw eigen productie op dezelfde manier: een machine bezitten bewijst niet dat uw proces het onderdeel met constante kwaliteit kan maken.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vergelijk relevante kosten, niet de kostprijs inclusief toegerekende kosten<\/h2>\n\n\n<p>Relevante kosten zijn toekomstige kosten en baten die tussen de alternatieven verschillen. Vraag u bij een kortetermijnvergelijking tussen zelf maken en inkopen af: <strong>welke kasstromen veranderen doordat we voor deze optie kiezen?<\/strong><\/p>\n\n\n<p>Een toegerekend deel van de huur of managementsalarissen kan een onderdeel duur doen lijken, zonder dat u die kosten kunt laten vervallen. Blijven deze uitgaven na uitbesteding bestaan, dan komt er bij inkoop een leveranciersfactuur bij zonder dat die overhead verdwijnt.<\/p>\n\n\n<p>Het omgekeerde is ook van belang. Een productspecifieke opspanmal, een extra ploegendienst of een opzegbaar servicecontract is wel relevant als de beslissing die uitgaven veroorzaakt of wegneemt. Vaste kosten zijn dus niet automatisch irrelevant. En ook bij variabele kosten moet u de onderliggende aanname toetsen.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kosten of baten<\/th><th>Wat u moet vaststellen voordat u ze meeneemt<\/th><\/tr><\/thead><tbody><tr><td>Materiaal- en bewerkingskosten<\/td><td>Welke uitgaven voor materialen, verbruiksartikelen, energie en overige zaken daadwerkelijk veranderen bij interne productie.<\/td><\/tr><tr><td>Arbeid<\/td><td>Of u extra betaalde uren, tijdelijke krachten of overwerk nodig hebt, of medewerkers inzet die toch al worden betaald. Vrijgekomen uren leveren niet automatisch een loonbesparing op.<\/td><\/tr><tr><td>Seriespecifieke en vaste kosten<\/td><td>Welke uitgaven voor omstellen, gereedschappen, contracten of andere zaken in de gekozen periode ontstaan of daadwerkelijk vermijdbaar zijn.<\/td><\/tr><tr><td>Ingekochte onderdelen<\/td><td>De leveranciersprijs voor de benodigde hoeveelheid goedgekeurde onderdelen, plus extra kosten voor transport, invoerrechten, inspectie, afhandeling en overige inkoopkosten.<\/td><\/tr><tr><td>Bestaande toegerekende overhead<\/td><td>Of de totale uitgaven veranderen. Laat toerekeningen die gelijk blijven buiten de vergelijking van de kostenverschillen.<\/td><\/tr><tr><td>Alternatief gebruik van capaciteit<\/td><td>Het extra nettovoordeel van uitvoerbaar werk dat u anders zou moeten laten liggen, niet alleen de omzet ervan.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Eerdere uitgaven verdient u niet terug door nog een serie zelf te maken. Baseer de vergelijking op de toekomstige gevolgen van de beslissing, niet op de boekwaarde van een bestaande machine. Als u een bedrijfsmiddel ook kunt verkopen of elders winstgevend kunt inzetten, telt dat misgelopen voordeel w\u00e9l mee.<\/p>\n\n\n<p>Laat de financi\u00eble afdeling de vergelijking toetsen, vooral de manier waarop doorlopende loonkosten en overhead zijn verwerkt. Productie geeft aan hoeveel uren en welke productiemiddelen nodig zijn; inkoop zorgt voor vergelijkbare offertes en leveringsvoorwaarden. Samen maken zij van een verleidelijk prijsverschil een bruikbare businesscase.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rekenvoorbeeld: een goedkoper onderdeel kan waardevollere uren opslokken<\/h2>\n\n\n<p>Stel dat u voor de volgende productieperiode <strong>2.000 afgewerkte onderdelen<\/strong> nodig hebt. De onderstaande bedragen dienen als voorbeeld en zijn geen klantresultaten of marktprijzen. Beide opties voldoen aan dezelfde specificaties en levereisen.<\/p>\n\n\n<p>Zelf produceren kost per onderdeel $6 aan materiaal, $4 aan extra arbeid en $2 aan variabele bewerkingskosten. Met arbeid bedoelen we hier tijdelijke inzet of overuren die u alleen betaalt als u deze serie zelf maakt. Daarnaast zijn er $3.000 aan seriespecifieke uitgaven die bij inkoop vervallen.<\/p>\n\n\n<p>Een leverancier biedt de onderdelen aan voor $15 per stuk. Voor de serie komt daar $1.000 aan transportkosten en nog eens $1.000 voor ingangscontrole bij.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Relevante kosten voor 2.000 onderdelen<\/th><th>Zelf maken<\/th><th>Inkopen<\/th><\/tr><\/thead><tbody><tr><td>Materiaal<\/td><td>$12.000<\/td><td>Inbegrepen in de leveranciersprijs<\/td><\/tr><tr><td>Extra arbeid<\/td><td>$8.000<\/td><td>Inbegrepen in de leveranciersprijs<\/td><\/tr><tr><td>Variabele bewerkingskosten<\/td><td>$4.000<\/td><td>Inbegrepen in de leveranciersprijs<\/td><\/tr><tr><td>Vermijdbare seriespecifieke uitgaven<\/td><td>$3.000<\/td><td>$0<\/td><\/tr><tr><td>Leveranciersprijs<\/td><td>$0<\/td><td>$30.000<\/td><\/tr><tr><td>Transport en ingangscontrole<\/td><td>$0<\/td><td>$2.000<\/td><\/tr><tr><td><strong>Totale relevante kosten<\/strong><\/td><td><strong>$27.000<\/strong><\/td><td><strong>$32.000<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Als er bruikbare vrije capaciteit is en geen betere alternatieve inzet, bespaart zelf maken $5.000. Stel dat de administratie ook $6.000 aan ongewijzigde fabrieksoverhead aan deze serie toerekent. Met deze gemeenschappelijke kosten erbij komt zelf maken op $33.000 en inkopen op $38.000. Het verschil blijft $5.000. Wie de interne kostprijs van $33.000 inclusief toegerekende overhead vergelijkt met de inkoopkosten van $32.000, zou ten onrechte voor inkopen kiezen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Wat als de serie capaciteit op het knelpunt vraagt?<\/h3>\n\n\n<p>Stel dat de productie van deze onderdelen <strong>100 uur op een bewerkingscentrum met schaarse capaciteit<\/strong> vergt. Andere bevestigde orders zouden diezelfde uren kunnen benutten en <strong>$7.000 extra nettobijdrage<\/strong> opleveren, na aftrek van alle extra kosten. De overige productiemiddelen en materialen zijn beschikbaar en die orders kunnen binnen de periode daadwerkelijk worden afgerond en verkocht.<\/p>\n\n\n<p>Inkopen kost nu $5.000 meer voor de onderdelen, maar maakt een extra bijdrage van $7.000 mogelijk. Onder deze aannames is het bedrijf met <strong>inkopen $2.000 beter af<\/strong>.<\/p>\n\n\n<p>U kunt dezelfde uitkomst ook laten zien door de $7.000 aan opportuniteitskosten bij zelf maken op te tellen: $27.000 wordt dan $34.000, tegenover $32.000 voor inkopen. Kies een van beide berekeningswijzen en tel het alternatieve voordeel niet dubbel mee.<\/p>\n\n\n<p>De doorslaggevende vraag is niet of de fabriek het druk heeft. Het gaat erom of juist die uren op juist dat productiemiddel elders meer opleveren. Als voor de alternatieve orders materiaal ontbreekt, de verzenddata niet haalbaar zijn of het werk alleen naar een ander knelpunt verschuift, moet u het veronderstelde voordeel opnieuw beoordelen.<\/p>\n\n\n<p>SkyPlanner helpt u deze operationele kant van de vergelijking te onderbouwen. De <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/wat-is-productieplanning\/\">planning met eindige capaciteit<\/a> koppelt de bewerkingen van het onderdeel aan de beschikbare productiemiddelen en aan ander werk dat dezelfde capaciteit nodig heeft. Zo ziet u de gevolgen voor de productie voordat u een beslissing neemt die alleen op de kosten van het onderdeel is gebaseerd.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Wanneer helpt het om het kostenomslagpunt te berekenen?<\/h2>\n\n\n<p>Bij een vergelijking op basis van een stabiel volume kunt u de relevante kosten van elke optie als volgt uitdrukken:<\/p>\n\n\n<p><strong>Kosten zelf maken = Fm + vm \u00d7 Q<\/strong><\/p>\n\n\n<p><strong>Kosten inkopen = Fb + vb \u00d7 Q<\/strong><\/p>\n\n\n<p>Hierbij is Q de hoeveelheid, F de relevante vaste uitgaven over dezelfde beslisperiode en v de relevante kosten per eenheid. De subscripten m en b staan voor respectievelijk zelf maken en inkopen.<\/p>\n\n\n<p>Als inkopen per stuk duurder is, ligt het omslagpunt van de kosten bij:<\/p>\n\n\n<p><strong>Q = (Fm \u2212 Fb) \u00f7 (vb \u2212 vm)<\/strong><\/p>\n\n\n<p>In dit voorbeeld is het omslagpunt ($3.000 \u2212 $2.000) \u00f7 ($15 \u2212 $12), oftewel ongeveer <strong>333 onderdelen<\/strong>. Vanaf 334 hele onderdelen is zelf maken goedkoper als we uitsluitend naar deze kosten kijken. Deze berekening gaat ervan uit dat beide opties beschikbaar blijven en dat de opgegeven tarieven en batchkosten geldig blijven.<\/p>\n\n\n<p>Dit is het kostenomslagpunt tussen twee alternatieven, geen break-evenpunt voor de verkoop of garantie dat er voldoende capaciteit is. Minimale afnamehoeveelheden, prijsstaffels, extra ploegen en opportuniteitskosten kunnen de vergelijking veranderen. Bij een meerjarige investering moet de financi\u00eble afdeling ook beoordelen wanneer de kasstromen plaatsvinden en welke bredere gevolgen de investering heeft.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Beoordeel kwaliteit, leveringsrisico en de expertise die u wilt behouden<\/h2>\n\n\n<p>Een financieel voordeel telt alleen als de gekozen optie onderdelen van aanvaardbare kwaliteit oplevert. Maak risico&#8217;s concreet genoeg om ze te kunnen onderzoeken, in plaats van elke optie een vage score voor \u2018betrouwbaarheid\u2019 te geven.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Beslisfactor<\/th><th>Vragen die de keuze kunnen veranderen<\/th><\/tr><\/thead><tbody><tr><td>Kwaliteit en acceptatie<\/td><td>Kan het proces consequent aan de specificaties voldoen? Wie keurt de eerste batch goed en wie betaalt voor gebreken of herstelwerk?<\/td><\/tr><tr><td>Levering en flexibiliteit<\/td><td>Omvat de doorlooptijd ook productie, transport en inspectie? Wat gebeurt er als de hoeveelheid verandert of de tekening wordt herzien?<\/td><\/tr><tr><td>Leveringscontinu\u00efteit<\/td><td>Is er een gekwalificeerde alternatieve leverancier? Wat zijn de gevolgen voor de assemblage als een leverancier uitvalt of een interne machine defect raakt?<\/td><\/tr><tr><td>Kennis en zeggenschap<\/td><td>Draagt dit proces bij aan uw onderscheidend vermogen? Welke expertise, toegang tot gereedschappen of ontwerpkennis moet u behouden?<\/td><\/tr><tr><td>Vraag en omkeerbaarheid<\/td><td>Zijn de volumes zeker genoeg om capaciteits- of afnameverplichtingen aan te gaan? Hoe moeilijk zou het zijn om het werk weer intern uit te voeren?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Inkoop moet de toezeggingen van de leverancier verifi\u00ebren, de kwaliteitsafdeling moet het acceptatieplan goedkeuren en engineering moet beoordelen wat de keuze betekent voor de benodigde kennis en vaardigheden. Een gewogen beslismatrix kan hun bevindingen samenvatten. Die mag er echter niet toe leiden dat meerdere kleine voordelen zwaarder wegen dan een harde kwaliteits- of leveringseis.<\/p>\n\n\n<p>Ook een combinatie is mogelijk: een kritieke bewerking intern houden, een specialistische behandeling inkopen of een goedgekeurde leverancier inschakelen bij piekvraag. Leg vast welke hoeveelheden en bewerkingen waar worden ondergebracht. Ook bij het verdelen van werk blijven er verplichtingen rond gereedschappen, afstemming en kwaliteit; het is niet automatisch de optie met het laagste risico.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Verbind de beslissing met de productieplanning via SkyPlanner<\/h2>\n\n\n<p>Een vergelijking tussen zelf maken en inkopen vraagt om een geloofwaardig antwoord op de vraag: \u2018Past dit werk nog in onze planning?\u2019 SkyPlanner brengt <a href=\"https:\/\/skyplanner.ai\/nl\/functies\/\">werkcentra, ploegendiensten, operators, materialen en prioriteiten<\/a> samen in \u00e9\u00e9n planningsomgeving. Arcturus, de AI voor de planning, berekent de volgorde op basis van de capaciteit en afhankelijkheden die u vastlegt. De Gantt-weergave laat zien welk werk aan welke productiemiddelen is toegewezen en hoe het samenhangt met latere bewerkingen.<\/p>\n\n\n<p>Beoordeel voor interne productie welke processtappen nodig zijn en hoeveel omstel- en bewerkingstijd ze vragen op de productiemiddelen die ze kunnen uitvoeren. Controleer de gereeddatums van het onderdeel \u00e9n van de andere orders die door de capaciteitsbelasting worden geraakt. Vrije uren n\u00e1 het moment waarop de assemblage het onderdeel nodig heeft, lossen het tekort van vandaag niet op.<\/p>\n\n\n<p>Voor een <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/uitbesteden-van-productie\/\">goedgekeurde uitbestede bewerking<\/a> kan SkyPlanner de toeleverancier als werkcentrum weergeven, met een eigen geplande werkvolgorde. Zo blijft de externe stap verbonden met het interne werk ervoor en erna, in plaats van te verdwijnen in een aparte opvolglijst. Leg realistische tijden vast en werk de voortgang bij, zodat de planning de werkelijke situatie weergeeft.<\/p>\n\n\n<p>Koopt u in plaats daarvan het complete onderdeel in, dan kan een planning die rekening houdt met materiaalbeschikbaarheid de beschikbaarheid ervan koppelen aan de interne bewerkingen waarvoor het nodig is. Een onderdeel inkopen en \u00e9\u00e9n bewerking uitbesteden zijn verschillende routes; modelleer de route die daadwerkelijk is goedgekeurd.<\/p>\n\n\n<p>U bepaalt de prioriteiten en legt vast welke beslissingen niet mogen worden gewijzigd; Arcturus voert de planningsberekening uit. Dat vermindert het handmatige afstemmen van werkvolgordes en maakt de gevolgen voor leveringen inzichtelijker. Houd naast dit operationele overzicht ook de door de financi\u00eble afdeling goedgekeurde kostenvergelijking bij de hand: voor de keuze tussen zelf maken en inkopen zijn beide nodig.<\/p>\n\n\n<p>SkyPlanner kan via de open REST API ook met elk ERP- of MES-systeem worden ge\u00efntegreerd. U kunt uw bestaande bedrijfssystemen behouden en tegelijk de productie voorzien van een samenhangende planning op basis van eindige capaciteit.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Wat inzicht in capaciteit veranderde bij Fredman Operations<\/h3>\n\n\n<p>Voordat Fredman Operations SkyPlanner gebruikte, stelde deze fabrikant van voedselverpakkingen de prioriteiten van het werk handmatig vast, zonder precies te weten wanneer machines vrijkwamen of hoeveel capaciteit er per ploegendienst beschikbaar was. Bij spoed kon het herplannen een uur of langer duren.<\/p>\n\n\n<p>Dankzij de integratie van SkyPlanner met L7 en LTR kreeg het team een gedeelde Gantt-weergave van de vrije en ingeplande capaciteit. <a href=\"https:\/\/skyplanner.ai\/nl\/klantverhalen\/fredman-operations\/\">Fredman meldt sneller te kunnen reageren op planningswijzigingen<\/a> en minder overwerk nodig te hebben. Als een klant vraagt om alle openstaande orders naar voren te halen, kan het team binnen enkele seconden antwoorden in plaats van urenlang handmatig te rekenen.<\/p>\n\n\n<p>Die ervaring laat zien waarom de productieplanning thuishoort in de afweging tussen zelf maken en inkopen: het management moet weten wat de productie daadwerkelijk kan toezeggen, niet alleen wat een onderdeel op papier kost.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Keur de keuze goed en toets daarna de aannames opnieuw<\/h2>\n\n\n<p>Leg het gekozen onderdeel of de gekozen bewerking vast, samen met de hoeveelheid, de periode, het relevante kostenverschil, de gevolgen voor de capaciteit en de goedkeuring door de kwaliteitsafdeling. Benoem wie verantwoordelijk is voor de toezegging van de leverancier of de interne gereeddatum. Spreek af wanneer u de keuze opnieuw beoordeelt, bijvoorbeeld bij een volumewijziging, een herziene offerte, aanhoudende gebreken of een verschoven knelpunt.<\/p>\n\n\n<p>Een goed onderbouwde keuze tussen zelf maken en inkopen maakt duidelijk waarom de gekozen optie nu in het belang van het bedrijf is en welke veranderingen tot een andere keuze zouden leiden. SkyPlanner houdt de gevolgen voor de productie zichtbaar terwijl de orderportefeuille verandert.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/nl\/contact-verkoop\/\">Boek een demo van SkyPlanner<\/a> en neem \u00e9\u00e9n representatief onderdeel mee, met de interne bewerkingsroute en een goedgekeurd extern alternatief. Bespreek welke capaciteit elke route vraagt en welke andere leveringen erdoor worden be\u00efnvloed. Wilt u eerst zelf verkennen, <a href=\"https:\/\/skyplanner.ai\/nl\/proef\/\">probeer SkyPlanner dan met demodata<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Zelf maken of inkopen: vergelijk kosten en capaciteit Home &raquo; Bronnen &raquo; Zelf maken of inkopen: vergelijk kosten en capaciteit Bij de keuze tussen zelf maken en inkopen bepaalt u of u een onderdeel zelf produceert of een bewerking intern uitvoert, of dit bij een externe leverancier inkoopt. Voor de juiste keuze kijkt u zowel &#8230; <a title=\"Zelf maken of inkopen: vergelijk kosten en capaciteit\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/\" aria-label=\"Lees meer over Zelf maken of inkopen: vergelijk kosten en capaciteit\">Lees meer<\/a><\/p>\n","protected":false},"author":3,"featured_media":105029,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[309,2548],"tags":[],"class_list":["post-105006","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-middelen","category-productie-efficientie","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Zelf maken of inkopen: vergelijk kosten en capaciteit<\/title>\n<meta name=\"description\" content=\"Een lagere stukprijs kan duurder uitpakken. Zelf maken of inkopen? Vergelijk eerst relevante kosten, schaarse capaciteit en leveranciersrisico\u2019s.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Zelf maken of inkopen: vergelijk kosten en capaciteit\" \/>\n<meta property=\"og:description\" content=\"Een lagere stukprijs kan duurder uitpakken. Zelf maken of inkopen? Vergelijk eerst relevante kosten, schaarse capaciteit en leveranciersrisico\u2019s.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T12:03:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T12:04:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Geschreven door\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/zelf-maken-of-inkopen\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/zelf-maken-of-inkopen\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Zelf maken of inkopen: vergelijk kosten en capaciteit\",\"datePublished\":\"2026-10-21T12:03:28+00:00\",\"dateModified\":\"2026-10-21T12:04:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/zelf-maken-of-inkopen\\\/\"},\"wordCount\":2255,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/zelf-maken-of-inkopen\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-or-buy-decision-hero.png\",\"articleSection\":[\"middelen\",\"Productie-effici\u00ebntie\"],\"inLanguage\":\"nl-NL\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/zelf-maken-of-inkopen\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/zelf-maken-of-inkopen\\\/\",\"name\":\"Zelf maken of inkopen: vergelijk kosten en capaciteit\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/zelf-maken-of-inkopen\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/zelf-maken-of-inkopen\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-or-buy-decision-hero.png\",\"datePublished\":\"2026-10-21T12:03:28+00:00\",\"dateModified\":\"2026-10-21T12:04:30+00:00\",\"description\":\"Een lagere stukprijs kan duurder uitpakken. Zelf maken of inkopen? Vergelijk eerst relevante kosten, schaarse capaciteit en leveranciersrisico\u2019s.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/zelf-maken-of-inkopen\\\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/zelf-maken-of-inkopen\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/zelf-maken-of-inkopen\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-or-buy-decision-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-or-buy-decision-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Internal machining and supplier-delivered components offer two routes to the same assembly requirement.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/zelf-maken-of-inkopen\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Zelf maken of inkopen: vergelijk kosten en capaciteit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Zelf maken of inkopen: vergelijk kosten en capaciteit","description":"Een lagere stukprijs kan duurder uitpakken. Zelf maken of inkopen? Vergelijk eerst relevante kosten, schaarse capaciteit en leveranciersrisico\u2019s.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/","og_locale":"nl_NL","og_type":"article","og_title":"Zelf maken of inkopen: vergelijk kosten en capaciteit","og_description":"Een lagere stukprijs kan duurder uitpakken. Zelf maken of inkopen? Vergelijk eerst relevante kosten, schaarse capaciteit en leveranciersrisico\u2019s.","og_url":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-21T12:03:28+00:00","article_modified_time":"2026-10-21T12:04:30+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Geschreven door":"Jussi M\u00e4ntyl\u00e4","Geschatte leestijd":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Zelf maken of inkopen: vergelijk kosten en capaciteit","datePublished":"2026-10-21T12:03:28+00:00","dateModified":"2026-10-21T12:04:30+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/"},"wordCount":2255,"publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero.png","articleSection":["middelen","Productie-effici\u00ebntie"],"inLanguage":"nl-NL"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/","url":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/","name":"Zelf maken of inkopen: vergelijk kosten en capaciteit","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero.png","datePublished":"2026-10-21T12:03:28+00:00","dateModified":"2026-10-21T12:04:30+00:00","description":"Een lagere stukprijs kan duurder uitpakken. Zelf maken of inkopen? Vergelijk eerst relevante kosten, schaarse capaciteit en leveranciersrisico\u2019s.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/"]}]},{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero.png","width":1672,"height":941,"caption":"Internal machining and supplier-delivered components offer two routes to the same assembly requirement."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/zelf-maken-of-inkopen\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/nl\/"},{"@type":"ListItem","position":2,"name":"Zelf maken of inkopen: vergelijk kosten en capaciteit"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/nl\/#website","url":"https:\/\/skyplanner.ai\/nl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/nl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/nl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/nl\/","logo":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-or-buy-decision-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/nl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Zelf maken of inkopen: vergelijk kosten en capaciteit Home &raquo; Bronnen &raquo; Zelf maken of inkopen: vergelijk kosten en capaciteit Bij de keuze tussen zelf maken en inkopen bepaalt u of u een onderdeel zelf produceert of een bewerking intern uitvoert, of dit bij een externe leverancier inkoopt. Voor de juiste keuze kijkt u zowel&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/105006","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/comments?post=105006"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/105006\/revisions"}],"predecessor-version":[{"id":105069,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/105006\/revisions\/105069"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media\/105029"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media?parent=105006"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/categories?post=105006"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/tags?post=105006"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}