{"id":49287,"date":"2025-02-13T09:50:38","date_gmt":"2025-02-13T09:50:38","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/onderhoud-aan-een-werkstation-toewijzen\/"},"modified":"2025-10-07T08:51:03","modified_gmt":"2025-10-07T08:51:03","password":"","slug":"onderhoud-aan-een-werkstation-toewijzen","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/nl\/docs\/onderhoud-aan-een-werkstation-toewijzen\/","title":{"rendered":"Onderhoud toewijzen aan een werkstation"},"content":{"rendered":"\n<p>Volg deze stappen als je onderhoud moet plannen voor een werkstation:<\/p>\n\n<p><\/p>\n\n<figure class=\"wp-block-video\"><video height=\"986\" style=\"aspect-ratio: 1904 \/ 986;\" width=\"1904\" controls=\"\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/How-to-add-maintenance.mp4\"><\/video><\/figure>\n\n<p><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Ga naar <strong>Resources<\/strong> en selecteer <strong>Workstations<\/strong>.<\/li>\n\n\n\n<li>Er wordt een nieuw paneel geopend.<strong> <\/strong>Zoek het werkstation dat onderhoud nodig heeft.<\/li>\n\n\n\n<li>Klik op het<strong> blauwe<\/strong> <strong>potloodpictogram<\/strong> aan de rechterkant.<\/li>\n\n\n\n<li>Je bent nu in het beheerpaneel voor dit werkstation. Scroll naar beneden en klik op<strong>&#8220;Uitzondering werkstation toevoegen<\/strong>&#8220;. <\/li>\n\n\n\n<li>Er verschijnen nieuwe opties. Voeg een korte beschrijving toe waarin de reden voor het onderhoud wordt uitgelegd. <\/li>\n\n\n\n<li>Selecteer een <strong>tijdsbereik<\/strong> waarin het werkstation niet beschikbaar is.<\/li>\n\n\n\n<li>Klik op <strong>Opslaan<\/strong> om de onderhoudsperiode te bevestigen.<\/li>\n<\/ul>\n\n<p>Gereed! Het werkstation is nu ingepland voor onderhoud. <\/p>\n\n<p>Ga naar de <strong>GANTT Tijdlijn<\/strong>, waar de capaciteit van het werkstation nu in <strong>zalmkleur<\/strong> zal verschijnen, wat aangeeft dat het onder onderhoud is.<\/p>\n\n<p><strong>Opmerking:<\/strong> Klik op de <strong>knop King<\/strong> om je planningsschema bij te werken.<\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Volg deze stappen als je onderhoud moet plannen voor een werkstation: Gereed! Het werkstation is nu ingepland voor onderhoud. Ga naar de GANTT Tijdlijn, waar de capaciteit van het werkstation nu in zalmkleur zal verschijnen, wat aangeeft dat het onder onderhoud is. Opmerking: Klik op de knop King om je planningsschema bij te werken.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[1817],"doc_tag":[],"class_list":["post-49287","docs","type-docs","status-publish","hentry","doc_category-werkstations"],"acf":[],"year_month":"2026-11","word_count":133,"total_views":"159","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"SkyPlanner","author_nicename":"bettina","author_url":"https:\/\/skyplanner.ai\/nl\/author\/bettina\/"},"doc_category_info":[{"term_name":"Werkstations","term_url":"https:\/\/skyplanner.ai\/nl\/docs-category\/werkstations\/"}],"doc_tag_info":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Onderhoud toewijzen aan een werkstation &#8211; SkyPlanner<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/nl\/docs\/onderhoud-aan-een-werkstation-toewijzen\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Onderhoud toewijzen aan een werkstation\" \/>\n<meta property=\"og:description\" content=\"Volg deze stappen als je onderhoud moet plannen voor een werkstation: Gereed! Het werkstation is nu ingepland voor onderhoud. Ga naar de GANTT Tijdlijn, waar de capaciteit van het werkstation nu in zalmkleur zal verschijnen, wat aangeeft dat het onder onderhoud is. Opmerking: Klik op de knop King om je planningsschema bij te werken.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/nl\/docs\/onderhoud-aan-een-werkstation-toewijzen\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-07T08:51:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/docs\\\/onderhoud-aan-een-werkstation-toewijzen\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/docs\\\/onderhoud-aan-een-werkstation-toewijzen\\\/\",\"name\":\"Onderhoud toewijzen aan een werkstation &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\"},\"datePublished\":\"2025-02-13T09:50:38+00:00\",\"dateModified\":\"2025-10-07T08:51:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/docs\\\/onderhoud-aan-een-werkstation-toewijzen\\\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/docs\\\/onderhoud-aan-een-werkstation-toewijzen\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/docs\\\/onderhoud-aan-een-werkstation-toewijzen\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Onderhoud toewijzen aan een werkstation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Onderhoud toewijzen aan een werkstation &#8211; SkyPlanner","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/nl\/docs\/onderhoud-aan-een-werkstation-toewijzen\/","og_locale":"nl_NL","og_type":"article","og_title":"Onderhoud toewijzen aan een werkstation","og_description":"Volg deze stappen als je onderhoud moet plannen voor een werkstation: Gereed! Het werkstation is nu ingepland voor onderhoud. Ga naar de GANTT Tijdlijn, waar de capaciteit van het werkstation nu in zalmkleur zal verschijnen, wat aangeeft dat het onder onderhoud is. Opmerking: Klik op de knop King om je planningsschema bij te werken.","og_url":"https:\/\/skyplanner.ai\/nl\/docs\/onderhoud-aan-een-werkstation-toewijzen\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-07T08:51:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Geschatte leestijd":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/nl\/docs\/onderhoud-aan-een-werkstation-toewijzen\/","url":"https:\/\/skyplanner.ai\/nl\/docs\/onderhoud-aan-een-werkstation-toewijzen\/","name":"Onderhoud toewijzen aan een werkstation &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/#website"},"datePublished":"2025-02-13T09:50:38+00:00","dateModified":"2025-10-07T08:51:03+00:00","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/nl\/docs\/onderhoud-aan-een-werkstation-toewijzen\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/nl\/docs\/onderhoud-aan-een-werkstation-toewijzen\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/nl\/docs\/onderhoud-aan-een-werkstation-toewijzen\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/nl\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/nl\/docs\/"},{"@type":"ListItem","position":3,"name":"Onderhoud toewijzen aan een werkstation"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/nl\/#website","url":"https:\/\/skyplanner.ai\/nl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/nl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/nl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/nl\/","logo":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/nl\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Volg deze stappen als je onderhoud moet plannen voor een werkstation: Gereed! Het werkstation is nu ingepland voor onderhoud. Ga naar de GANTT Tijdlijn, waar de capaciteit van het werkstation nu in zalmkleur zal verschijnen, wat aangeeft dat het onder onderhoud is. Opmerking: Klik op de knop King om je planningsschema bij te werken.","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/docs\/49287","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/comments?post=49287"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/docs\/49287\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media?parent=49287"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/doc_category?post=49287"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/doc_tag?post=49287"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}