{"id":99754,"date":"2026-10-16T07:53:34","date_gmt":"2026-10-16T07:53:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99754"},"modified":"2026-10-16T10:12:25","modified_gmt":"2026-10-16T10:12:25","slug":"capable-to-promise","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/","title":{"rendered":"Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"\/lv\/resursi\/\">Resursi<\/a> &raquo; Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">7<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Capable to promise (CTP) ir metode, ar kuru p\u0101rbauda, vai un kad iesp\u0113jams sara\u017eot piepras\u012bto daudzumu, \u0146emot v\u0113r\u0101 gan materi\u0101lu pieejam\u012bbu, gan darbam nepiecie\u0161amo ra\u017eo\u0161anas jaudu. T\u0101 dod p\u0101rdo\u0161anas komandai pamatu apsol\u012bt pieg\u0101des termi\u0146u situ\u0101cij\u0101s, kad preces nevar vienk\u0101r\u0161i nos\u016bt\u012bt no noliktavas.<\/p>\n\n\n<p>\u0160\u012b p\u0101rbaude ir svar\u012bga, pirms sak\u0101t klientam \u00abj\u0101\u00bb. Klienta v\u0113lamais datums par\u0101da, k\u0101ds termi\u0146\u0161 pal\u012bdz\u0113tu ieg\u016bt pas\u016bt\u012bjumu. Standarta pas\u016bt\u012bjuma izpildes laiks raksturo ierasto situ\u0101ciju. Ta\u010du ne viens, ne otrs neatkl\u0101j, vai tie\u0161i \u0161o darbu var\u0113s paveikt l\u012bdztekus jau apsol\u012btajiem darbiem.<\/p>\n\n\n<p>SkyPlanner APS pal\u012bdz to p\u0101rbaud\u012bt ar funkciju Job Prospects jeb potenci\u0101lajiem pas\u016bt\u012bjumiem: varat model\u0113t re\u0101listiskus pieg\u0101des datumus, pirms ap\u0146ematies pas\u016bt\u012bjumus izpild\u012bt. Iepl\u0101nojiet potenci\u0101los ra\u017eo\u0161anas uzdevumus, \u0146emot v\u0113r\u0101 pa\u0161reiz\u0113jo noslodzi, p\u0101rskatiet to pl\u0101notos pabeig\u0161anas laikus un apl\u016bkojiet l\u012bdz\u0101s iepl\u0101notos darbus Gantt grafik\u0101. Lai atbild\u0113tu p\u0101rdo\u0161anas kol\u0113\u0123iem, vairs nav no jauna j\u0101izseko iek\u0101rtu darbu rind\u0101m \u2014 varat koncentr\u0113ties uz pied\u0101v\u0101jumu, ko j\u016bsu ra\u017eotne sp\u0113j izpild\u012bt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Capable to promise un available to promise: k\u0101da ir at\u0161\u0137ir\u012bba?<\/h2>\n\n\n<p>Available to promise (ATP) nosaka, cik daudz pre\u010du v\u0113l ir pieejams jauniem pas\u016bt\u012bjumiem, \u0146emot v\u0113r\u0101 eso\u0161o piepras\u012bjumu. Tas ietver gan citiem pas\u016bt\u012bjumiem nepie\u0161\u0137irtos kr\u0101jumus, gan pl\u0101not\u0101s ien\u0101ko\u0161\u0101s pieg\u0101des, ne tikai preces, kas \u0161obr\u012bd fiziski atrodas noliktav\u0101.<\/p>\n\n\n<p>CTP papildus izv\u0113rt\u0113 ra\u017eo\u0161anas iesp\u0113jas: ja gatavo pre\u010du nav, vai t\u0101s var sara\u017eot vajadz\u012bgaj\u0101 laik\u0101 ar pieejamajiem materi\u0101liem un jaudu?<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Jaut\u0101jums<\/th><th>Available to promise (ATP)<\/th><th>Capable to promise (CTP)<\/th><\/tr><\/thead><tbody><tr><td>Uz ko balst\u0101s atbilde?<\/td><td>Citiem pas\u016bt\u012bjumiem nepie\u0161\u0137irtie kr\u0101jumi un pl\u0101not\u0101s pieg\u0101des<\/td><td>Materi\u0101lu pieejam\u012bba un ra\u017eo\u0161anai nepiecie\u0161am\u0101 jauda<\/td><\/tr><tr><td>Ko tas pal\u012bdz pied\u0101v\u0101t p\u0101rdo\u0161anas komandai?<\/td><td>Daudzumu un termi\u0146u, ko nodro\u0161ina pieejamie kr\u0101jumi un pl\u0101not\u0101s pieg\u0101des<\/td><td>Daudzumu un termi\u0146u, ko var nodro\u0161in\u0101t, papildus sara\u017eojot vajadz\u012bg\u0101s preces<\/td><\/tr><tr><td>Kad \u0161\u012b at\u0161\u0137ir\u012bba ir noder\u012bga?<\/td><td>Preces var pieg\u0101d\u0101t no eso\u0161ajiem kr\u0101jumiem vai p\u0113c gaid\u0101mo pieg\u0101\u017eu sa\u0146em\u0161anas<\/td><td>Pas\u016bt\u012bjums v\u0113l j\u0101ra\u017eo vai j\u0101mont\u0113, izmantojot resursus, kas vajadz\u012bgi ar\u012b citiem pas\u016bt\u012bjumiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>ATP ir noder\u012bga, ja pas\u016bt\u012bjumu var izpild\u012bt no pieejamajiem kr\u0101jumiem un pl\u0101notaj\u0101m pieg\u0101d\u0113m. CTP ir \u012bpa\u0161i v\u0113rt\u012bga <a href=\"\/lv\/resursi\/make-to-order\/\">ra\u017eo\u0161an\u0101 p\u0113c pas\u016bt\u012bjuma<\/a> un <a href=\"\/lv\/resursi\/montaza-pec-pasutijuma\/\">mont\u0101\u017e\u0101 p\u0113c pas\u016bt\u012bjuma<\/a>, kur p\u0101rdo\u0161anas dar\u012bjuma apstiprin\u0101\u0161ana rada jaunus darbus, kuriem j\u0101atrod vieta ra\u017eo\u0161anas grafik\u0101.<\/p>\n\n\n<p>Tas, ka visi komponenti ir pieejami, v\u0113l nenoz\u012bm\u0113, ka ir br\u012bva jauda to mont\u0101\u017eai. T\u0101pat gatavo pre\u010du tr\u016bkums noliktav\u0101 nenoz\u012bm\u0113, ka klientam j\u0101atsaka. CTP pal\u012bdz atrast iesp\u0113jas, ko \u0161ie abi pie\u0146\u0113mumi var aiz\u0113not.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Jauns sol\u012bjums var apdraud\u0113t jau doto<\/h2>\n\n\n<p>Iedom\u0101jieties met\u0101lapstr\u0101des uz\u0146\u0113mumu, kas gatavo pied\u0101v\u0101jumu v\u0101rpstu un mont\u0101\u017eas pl\u0101k\u0161\u0146u komplekta izgatavo\u0161anai. Materi\u0101li ir pieejami, un p\u0101rdo\u0161anas komanda v\u0113l\u0113tos pied\u0101v\u0101t nos\u016bt\u012b\u0161anu piektdien.<\/p>\n\n\n<p>V\u0101rpstas var izvirpot un p\u0101rbaud\u012bt l\u012bdz ceturtdienai. Pl\u0101ksnes j\u0101fr\u0113z\u0113 apstr\u0101des centr\u0101, kas jau ir noslogots ar apstiprin\u0101tiem pas\u016bt\u012bjumiem. Saglab\u0101jot pa\u0161reiz\u0113jo darbu sec\u012bbu, t\u0101s b\u016bs gatavas tikai n\u0101kamaj\u0101 ned\u0113\u013c\u0101.<\/p>\n\n\n<p>Pas\u016bt\u012bjums nav gatavs br\u012bd\u012b, kad pabeigta visvienk\u0101r\u0161\u0101k izgatavojam\u0101 deta\u013ca. Ja klientam vajadz\u012bgs viss komplekts, tie\u0161i pl\u0101k\u0161\u0146u pabeig\u0161anas laiks nosaka, kad to var\u0113s nos\u016bt\u012bt. Kr\u0101jumu p\u0101rbaude neatkl\u0101tu rindu uz fr\u0113z\u0113\u0161anu, bet standarta pas\u016bt\u012bjuma izpildes laiks neatspogu\u013cotu pa\u0161reiz\u0113jo noslodzi \u0161aj\u0101 rind\u0101.<\/p>\n\n\n<p>P\u0101rce\u013cot pl\u0101ksnes rind\u0101 uz priek\u0161u, var\u0113tu izdoties t\u0101s sagatavot l\u012bdz piektdienai, ta\u010du tas var\u0113tu aizkav\u0113t eso\u0161a klienta darbu. T\u0101 nav br\u012bva jauda. T\u0101 ir izv\u0113le, kuram no dotajiem sol\u012bjumiem pie\u0161\u0137irt priek\u0161roku.<\/p>\n\n\n<p>T\u0101p\u0113c lietder\u012bga CTP p\u0101rbaude vienlaikus atbild uz diviem jaut\u0101jumiem: <strong>kad \u0161o pas\u016bt\u012bjumu var pabeigt, un k\u0101 vietas atv\u0113l\u0113\u0161ana tam ietekm\u0113s jau apsol\u012btos darbus?<\/strong> Redzot abus aspektus, rodas iesp\u0113ja ieg\u016bt jaunu pas\u016bt\u012bjumu, t\u0101 patieso cenu neuzzinot tikai p\u0113c apstiprin\u0101\u0161anas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0101rbaudiet iesp\u0113jamo pas\u016bt\u012bjumu ar SkyPlanner<\/h2>\n\n\n<p>SkyPlanner pal\u012bdz atbild\u0113t uz \u0161o jaut\u0101jumu, iepl\u0101nojot darbus grafik\u0101. T\u0101 m\u0101ksl\u012bgais intelekts Arcturus apr\u0113\u0137ina oper\u0101ciju izvietojumu, izmantojot j\u016bsu iestat\u012btos <a href=\"\/lv\/resursi\/kas-ir-razosanas-planosana\/\">ra\u017eo\u0161anas resursus, atkar\u012bbas un priorit\u0101tes<\/a>. J\u016bs redzat ieg\u016bto grafiku, nevis manu\u0101li iepl\u0101nojat katru oper\u0101ciju.<\/p>\n\n\n<p>Lai izlemtu, k\u0101du pas\u016bt\u012bjuma izpildes termi\u0146u apsol\u012bt, darb\u012bbu sec\u012bba ir vienk\u0101r\u0161a.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Iepl\u0101nojiet tie\u0161i tos darbus, ko p\u0101rdo\u0161anas komanda pied\u0101v\u0101 klientam<\/h3>\n\n\n<p>Izveidojiet pas\u016bt\u012bjumu un atz\u012bm\u0113jiet pied\u0101v\u0101t\u0101s pas\u016bt\u012bjuma poz\u012bcijas k\u0101 potenci\u0101las. Nor\u0101diet piepras\u012btos izstr\u0101d\u0101jumus, daudzumus un nepiecie\u0161am\u0101s oper\u0101cijas, nevis p\u0101rbaudiet visp\u0101r\u012bgu ra\u017eo\u0161anas uzdevumu ar vid\u0113jo ilgumu. Iepl\u0101nojiet darbus un pirms pl\u0101na pie\u0146em\u0161anas p\u0101rskatiet to pied\u0101v\u0101to izvietojumu laika skal\u0101. T\u0101 varat nov\u0113rt\u0113t re\u0101listisku pabeig\u0161anas datumu, kam\u0113r pas\u016bt\u012bjums v\u0113l ir potenci\u0101ls un dar\u012bjums nav apstiprin\u0101ts.<\/p>\n\n\n<p>Svar\u012bgi ir dati, kas var main\u012bt atbildi: kuri resursi sp\u0113j veikt darbu, cik ilgas ir oper\u0101cijas un iek\u0101rtu iestat\u012b\u0161ana, k\u0101das ir darba mai\u0146as, kad b\u016bs pieejami materi\u0101li un kuri pas\u016bt\u012bjumi jau aiz\u0146em jaudu. Ja ir iesl\u0113gta pl\u0101no\u0161ana, kas \u0146em v\u0113r\u0101 materi\u0101lus, Arcturus apr\u0113\u0137in\u0101 iev\u0113ro ar\u012b to pieejam\u012bbu.<\/p>\n\n\n<p>Met\u0101lapstr\u0101des uz\u0146\u0113muma piem\u0113r\u0101 tas noz\u012bm\u0113 iepl\u0101not gan v\u0101rpstas, gan pl\u0101ksnes. Izlai\u017eot ilg\u0101ko ra\u017eo\u0161anas mar\u0161rutu, pied\u0101v\u0101tais datums izskat\u012btos pievilc\u012bgs, ta\u010du visu pas\u016bt\u012bjumu \u0161aj\u0101 termi\u0146\u0101 joproj\u0101m nevar\u0113tu pieg\u0101d\u0101t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">V\u0113rt\u0113jiet pabeig\u0161anas laikus, ne tikai v\u0113lamo termi\u0146u<\/h3>\n\n\n<p>Kad potenci\u0101lais pas\u016bt\u012bjums ir iepl\u0101nots, p\u0101rskatiet katras pas\u016bt\u012bjuma poz\u012bcijas pl\u0101noto beigu laiku. Poz\u012bcija, kuras izgatavo\u0161ana beidzas p\u0113d\u0113j\u0101, nosaka visa pas\u016bt\u012bjuma ra\u017eo\u0161anas pabeig\u0161anas laiku pie pa\u0161reiz\u0113j\u0101s noslodzes. Uz \u0161o laiku varat balst\u012bt sol\u012bjumu par visa pas\u016bt\u012bjuma izpildi.<\/p>\n\n\n<p>Nejauciet \u0161o rezult\u0101tu ar datumu, kad klients sa\u0146ems preces. Pieskaitiet p\u0101rbaud\u0113m, iepako\u0161anai, nos\u016bt\u012b\u0161anai vai transport\u0113\u0161anai vajadz\u012bgo laiku, ja tas jau nav ietverts pl\u0101n\u0101. P\u0101rdo\u0161anas un ra\u017eo\u0161anas komand\u0101m j\u0101b\u016bt vienotai izpratnei par to, vai pied\u0101v\u0101taj\u0101 datum\u0101 preces b\u016bs gatavas sa\u0146em\u0161anai, nos\u016bt\u012btas vai jau pieg\u0101d\u0101tas.<\/p>\n\n\n<p>Tie\u0161i ar to v\u0113lam\u0101 datuma ievad\u012b\u0161ana at\u0161\u0137iras no p\u0101rbaudes, vai ra\u017eo\u0161ana to \u013cauj izpild\u012bt. Par klientam doto sol\u012bjumu atbildat j\u016bs; SkyPlanner sniedz grafik\u0101 apr\u0113\u0137in\u0101tos pabeig\u0161anas laikus, kas pal\u012bdz \u0161o sol\u012bjumu pamatot.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u0101rskatiet ar\u012b jau uz\u0146emt\u0101s saist\u012bbas<\/h3>\n\n\n<p>Izmantojiet <a href=\"\/lv\/resursi\/ganta-diagramma-razosanas-planosanai\/\">Gantt grafiku<\/a>, lai apskat\u012btu pied\u0101v\u0101tos darbus l\u012bdz\u0101s eso\u0161ajiem pas\u016bt\u012bjumiem. Ja main\u0101t jaun\u0101 pas\u016bt\u012bjuma priorit\u0101ti, lai to pabeigtu agr\u0101k, p\u0101rr\u0113\u0137iniet grafiku un pirms pied\u0101v\u0101juma saska\u0146o\u0161anas p\u0101rbaudiet, kuri citi darbi p\u0101rvietojas.<\/p>\n\n\n<p>J\u016bs nosak\u0101t priorit\u0101tes un varat izmantot blo\u0137\u0113\u0161anu, lai saglab\u0101tu pie\u0146emtos pl\u0101no\u0161anas l\u0113mumus. Arcturus veic apr\u0113\u0137inus, iev\u0113rojot \u0161os nor\u0101d\u012bjumus. T\u0101d\u0113j\u0101di sarun\u0101 varat lemt, vai ir v\u0113rts pie\u0146emt steidzamo pas\u016bt\u012bjumu, nevis manu\u0101li p\u0101rk\u0101rtot darbu rindas, lai noskaidrotu, kurus darbus tas nob\u012bd\u012btu.<\/p>\n\n\n<p>SkyPlanner var integr\u0113t ar jebkuru ERP vai MES sist\u0113mu, izmantojot t\u0101 <a href=\"\/lv\/integracija\/\">atv\u0113rto REST API<\/a>. Varat saglab\u0101t eso\u0161o pas\u016bt\u012bjumu p\u0101rvald\u012bbas sist\u0113mu un savienot to ar ra\u017eo\u0161anas grafiku, kas vajadz\u012bgs \u0161o pieg\u0101des l\u0113mumu pie\u0146em\u0161anai.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0101rv\u0113rtiet rezult\u0101tu pied\u0101v\u0101jum\u0101, ne tikai atbild\u0113 \u00abj\u0101\u00bb vai \u00abn\u0113\u00bb<\/h2>\n\n\n<p>Ja piepras\u012bto daudzumu var sara\u017eot v\u0113lamaj\u0101 termi\u0146\u0101, neradot nepie\u0146emamu ietekmi uz eso\u0161ajiem darbiem, jums ir dro\u0161\u0101ks pamats pas\u016bt\u012bjuma apstiprin\u0101\u0161anai. Ja tas nav iesp\u0113jams, noder\u012bg\u0101k ir pied\u0101v\u0101t alternat\u012bvu, ko klients var pie\u0146emt.<\/p>\n\n\n<p>Iedom\u0101t\u0101 met\u0101lapstr\u0101des pas\u016bt\u012bjuma gad\u012bjum\u0101 iesp\u0113jas var\u0113tu b\u016bt \u0161\u0101das:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Pied\u0101v\u0101jiet visa pas\u016bt\u012bjuma pieg\u0101di v\u0113l\u0101k.<\/strong> Saglab\u0101jiet jau apsol\u012btos termi\u0146us un pied\u0101v\u0101jiet datumu, ko \u013cauj nodro\u0161in\u0101t ilg\u0101kais pl\u0101k\u0161\u0146u ra\u017eo\u0161anas mar\u0161ruts.<\/li><li><strong>Apspriediet pieg\u0101di pa da\u013c\u0101m.<\/strong> Ja klients v\u0101rpstas var izmantot neatkar\u012bgi no pl\u0101ksn\u0113m, pied\u0101v\u0101jiet vispirms pieg\u0101d\u0101t t\u0101s, bet pl\u0101ksnes \u2014 v\u0113l\u0101k. Pirms organiz\u0113jat papildu kravu apstr\u0101di un p\u0101rvad\u0101jumus, p\u0101rliecinieties, ka da\u013c\u0113ja pieg\u0101de klientam ir noder\u012bga.<\/li><li><strong>Izv\u0113rt\u0113jiet agr\u0101ku termi\u0146u, mainot pl\u0101nu.<\/strong> Var pal\u012bdz\u0113t apstiprin\u0101ta papildu mai\u0146a vai cits darbam piem\u0113rots resurss. Pirms pied\u0101v\u0101t agr\u0101ku datumu, atjauniniet jaudas pie\u0146\u0113mumus un p\u0101rr\u0113\u0137iniet grafiku.<\/li><li><strong>Skaidri vienojieties, ko upur\u0113siet, mainot priorit\u0101tes.<\/strong> Ja vad\u012bba nolemj \u0161o pas\u016bt\u012bjumu izpild\u012bt agr\u0101k, nosakiet, kuras jau uz\u0146emt\u0101s saist\u012bbas tas skars, un apzin\u0101ti risiniet sekas.<\/li><\/ul>\n\n\n<p>Tie ir komerci\u0101li l\u0113mumi, ne tikai grafika korekcijas. Steidzams pas\u016bt\u012bjums, kas rada cen\u0101 neiek\u013cautas virsstundas, d\u0101rg\u0101kus p\u0101rvad\u0101jumus vai darba trauc\u0113jumus, var b\u016bt maz\u0101k ienes\u012bgs, nek\u0101 s\u0101kum\u0101 \u0161\u0137iet. P\u0101rbaude pirms pas\u016bt\u012bjuma pie\u0146em\u0161anas \u013cauj iek\u013caut papildu darbu cen\u0101 vai vienoties par piem\u0113rot\u0101ku termi\u0146u.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Balstiet sol\u012bjumu uz aktu\u0101lo noslodzi<\/h2>\n\n\n<p>Pied\u0101v\u0101jums, kas balst\u012bts uz vakardienas grafiku, var vairs neb\u016bt izpild\u0101ms p\u0113c cita pas\u016bt\u012bjuma pie\u0146em\u0161anas vai materi\u0101lu pieg\u0101des aizkav\u0113\u0161an\u0101s. Ja pirms klienta apstiprin\u0101juma main\u0101s pie\u0146\u0113mumi, uz kuriem balst\u012bts termi\u0146\u0161, p\u0101rbaudiet iesp\u0113jamo pas\u016bt\u012bjumu v\u0113lreiz.<\/p>\n\n\n<p>Iepl\u0101notie potenci\u0101lie pas\u016bt\u012bjumi tiek ieskait\u012bti pl\u0101notaj\u0101 noslodz\u0113 un rezerv\u0113 jaudu. T\u0101d\u0113j\u0101di p\u0101rdo\u0161anas komanda var \u0146emt tos v\u0113r\u0101, nevis katr\u0101 jaunaj\u0101 pied\u0101v\u0101jum\u0101 pa\u013cauties uz vienu un to pa\u0161u \u0161\u0137ietami br\u012bvo vietu grafik\u0101. Vienojieties, kurus potenci\u0101los pas\u016bt\u012bjumus iepl\u0101not, kur\u0161 tos uztur\u0113s aktu\u0101lus un kad neapstiprin\u0101tam pied\u0101v\u0101jumam vairs nevajadz\u0113tu ietekm\u0113t pl\u0101nu. Kad klients apstiprina pas\u016bt\u012bjumu, no\u0146emiet potenci\u0101l\u0101 pas\u016bt\u012bjuma atz\u012bmi un iepl\u0101nojiet darbus k\u0101 apstiprin\u0101tu pas\u016bt\u012bjumu. T\u0101 pied\u0101v\u0101jums paliek sasaist\u012bts ar ra\u017eo\u0161anas saist\u012bb\u0101m, bet novecoju\u0161i pied\u0101v\u0101jumi neaizsedz faktiski pieejamo jaudu.<\/p>\n\n\n<p>Kad pas\u016bt\u012bjums ir apstiprin\u0101ts, uzturiet aktu\u0101las priorit\u0101tes, resursu pieejam\u012bbu un inform\u0101ciju par materi\u0101liem. Apr\u0113\u0137in\u0101 pamatots sol\u012bjums ir v\u0113rt\u012bgs tad, ja p\u0101rbaude atspogu\u013co faktiskos ra\u017eo\u0161anas apst\u0101k\u013cus, nevis pl\u0101nu, kur\u0101 pie\u0146emts, ka katra mai\u0146a un pieg\u0101de notiks tie\u0161i t\u0101, k\u0101 s\u0101kotn\u0113ji paredz\u0113ts.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prec\u012bz\u0101ka pieg\u0101des termi\u0146u noteik\u0161ana ikdien\u0101<\/h2>\n\n\n<p>Somijas met\u0101lapstr\u0101des uz\u0146\u0113mums Eskomatic, kas izgatavo deta\u013cas p\u0113c klientu pas\u016bt\u012bjuma, iepriek\u0161 darbu rindas uztur\u0113ja galvenok\u0101rt manu\u0101li vec\u0101k\u0101 ERP un ra\u017eo\u0161anas vad\u012bbas sist\u0113m\u0101. Kopainas izveido\u0161ana pras\u012bja laiku, un ierobe\u017eot\u0101 p\u0101rskat\u0101m\u012bba p\u0101r materi\u0101liem noz\u012bm\u0113ja, ka to tr\u016bkumu var\u0113ja atkl\u0101t tikai \u012bsi pirms darba s\u0101kuma.<\/p>\n\n\n<p>Ar SkyPlanner uz\u0146\u0113muma komanda ieguva vizu\u0101lu darbu rindu Gantt grafik\u0101 un autom\u0101tisku noslodzes pl\u0101no\u0161anu, kas savienota ar eso\u0161ajiem ERP datiem. <a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Eskomatic nor\u0101da<\/a>, ka skaidr\u0101k p\u0101rskat\u0101ma ra\u017eo\u0161anas noslodze \u013cauj viegl\u0101k noteikt re\u0101listiskus pieg\u0101des termi\u0146us un pazi\u0146ot klientiem prec\u012bz\u0101kus datumus. Ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js Tommi M\u00e4nnist\u00f6 pieg\u0101des termi\u0146u noteik\u0161anu izce\u013c k\u0101 \u012bpa\u0161i sp\u0113c\u012bgu risin\u0101juma pusi ikdienas darb\u0101.<\/p>\n\n\n<p>Tas ir praktisks iemesls \u0161im uzdevumam izv\u0113l\u0113ties SkyPlanner: sniegt p\u0101rdo\u0161anas komandai atbildi, kas balst\u012bta iepl\u0101notajos darbos, un atbr\u012bvot pl\u0101not\u0101ju no nepiecie\u0161am\u012bbas to sagatavot manu\u0101li.<\/p>\n\n\n<p><a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Piesakieties SkyPlanner demonstr\u0101cijai<\/a> un sagatavojiet iesp\u0113jama pas\u016bt\u012bjuma piem\u0113ru, v\u0113lamo termi\u0146u un inform\u0101ciju par resursu, kas, visticam\u0101k, kav\u0113tu t\u0101 izpildi. Sarun\u0101 izp\u0113tiet, k\u0101 pirms pied\u0101v\u0101juma apstiprin\u0101\u0161anas var\u0113tu p\u0101rbaud\u012bt, vai tas ir izpild\u0101ms, iev\u0113rojot jau uz\u0146emt\u0101s saist\u012bbas. Ja vispirms v\u0113laties iepaz\u012bties ar risin\u0101jumu patst\u0101v\u012bgi, <a href=\"\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas S\u0101kums &raquo; Resursi &raquo; Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas Capable to promise (CTP) ir metode, ar kuru p\u0101rbauda, vai un kad iesp\u0113jams sara\u017eot piepras\u012bto daudzumu, \u0146emot v\u0113r\u0101 gan materi\u0101lu pieejam\u012bbu, gan darbam nepiecie\u0161amo ra\u017eo\u0161anas jaudu. T\u0101 dod p\u0101rdo\u0161anas komandai pamatu apsol\u012bt pieg\u0101des termi\u0146u situ\u0101cij\u0101s, &#8230; <a title=\"Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/\" aria-label=\"Read more about Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99840,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-99754","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms apstiprin\u0101\u0161anas<\/title>\n<meta name=\"description\" content=\"Vai jaunais pas\u016bt\u012bjums nekav\u0113s citus? Ar capable to promise un SkyPlanner p\u0101rbaudiet jaudu, pirms apstiprin\u0101t pieg\u0101des datumu.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas\" \/>\n<meta property=\"og:description\" content=\"Vai jaunais pas\u016bt\u012bjums nekav\u0113s citus? Ar capable to promise un SkyPlanner p\u0101rbaudiet jaudu, pirms apstiprin\u0101t pieg\u0101des datumu.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T07:53:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T10:12:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/capable-to-promise\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/capable-to-promise\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/capable-to-promise\\\/\"},\"wordCount\":2381,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/capable-to-promise\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/capable-to-promise\\\/\",\"name\":\"Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms apstiprin\u0101\u0161anas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/capable-to-promise\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"description\":\"Vai jaunais pas\u016bt\u012bjums nekav\u0113s citus? Ar capable to promise un SkyPlanner p\u0101rbaudiet jaudu, pirms apstiprin\u0101t pieg\u0101des datumu.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/capable-to-promise\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/capable-to-promise\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/capable-to-promise\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"width\":1536,\"height\":864,\"caption\":\"Turned shafts await a mounting plate beside a milling machine before the complete order can ship.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/capable-to-promise\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms apstiprin\u0101\u0161anas","description":"Vai jaunais pas\u016bt\u012bjums nekav\u0113s citus? Ar capable to promise un SkyPlanner p\u0101rbaudiet jaudu, pirms apstiprin\u0101t pieg\u0101des datumu.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/","og_locale":"lv_LV","og_type":"article","og_title":"Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas","og_description":"Vai jaunais pas\u016bt\u012bjums nekav\u0113s citus? Ar capable to promise un SkyPlanner p\u0101rbaudiet jaudu, pirms apstiprin\u0101t pieg\u0101des datumu.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T07:53:34+00:00","article_modified_time":"2026-10-16T10:12:25+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/"},"wordCount":2381,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/","name":"Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms apstiprin\u0101\u0161anas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","description":"Vai jaunais pas\u016bt\u012bjums nekav\u0113s citus? Ar capable to promise un SkyPlanner p\u0101rbaudiet jaudu, pirms apstiprin\u0101t pieg\u0101des datumu.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","width":1536,"height":864,"caption":"Turned shafts await a mounting plate beside a milling machine before the complete order can ship."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/capable-to-promise\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas S\u0101kums &raquo; Resursi &raquo; Capable to Promise: p\u0101rbaudiet pas\u016bt\u012bjumu pirms t\u0101 apstiprin\u0101\u0161anas Capable to promise (CTP) ir metode, ar kuru p\u0101rbauda, vai un kad iesp\u0113jams sara\u017eot piepras\u012bto daudzumu, \u0146emot v\u0113r\u0101 gan materi\u0101lu pieejam\u012bbu, gan darbam nepiecie\u0161amo ra\u017eo\u0161anas jaudu. T\u0101 dod p\u0101rdo\u0161anas komandai pamatu apsol\u012bt pieg\u0101des termi\u0146u situ\u0101cij\u0101s,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/99754","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=99754"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/99754\/revisions"}],"predecessor-version":[{"id":99877,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/99754\/revisions\/99877"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/99840"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=99754"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=99754"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=99754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}