{"id":99667,"date":"2026-10-16T05:16:05","date_gmt":"2026-10-16T05:16:05","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99667"},"modified":"2026-10-16T05:16:46","modified_gmt":"2026-10-16T05:16:46","slug":"konfiguresana-pec-pasutijuma","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/","title":{"rendered":"Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Resursi<\/a> &raquo; Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma (CTO) noz\u012bm\u0113 izgatavot produktu atbilsto\u0161i klienta izv\u0113lei no iepriek\u0161 noteiktiem, savstarp\u0113ji sader\u012bgiem variantiem. Klients ieg\u016bst sav\u0101m vajadz\u012bb\u0101m piem\u0113rotu kombin\u0101ciju, savuk\u0101rt ra\u017eot\u0101js izmanto jau izstr\u0101d\u0101tus risin\u0101jumus un produkta konfigur\u0113\u0161anas noteikumus, nevis katru pas\u016bt\u012bjumu projekt\u0113 no jauna.<\/p>\n\n\n<p>\u0160\u012bs pieejas priek\u0161roc\u012bba ir izv\u0113les iesp\u0113jas bez atk\u0101rtot\u0101m izmaks\u0101m par vieniem un tiem pa\u0161iem projekt\u0113\u0161anas risin\u0101jumiem. Tom\u0113r ar\u012b apstiprin\u0101tai kombin\u0101cijai vajadz\u012bgi atbilsto\u0161i materi\u0101li, ra\u017eo\u0161anas oper\u0101cijas un laiks ra\u017eo\u0161an\u0101. Tas, ka produktu dr\u012bkst p\u0101rdot, v\u0113l nenoz\u012bm\u0113, ka to var\u0113s pieg\u0101d\u0101t jau n\u0101kamaj\u0101 piektdien\u0101.<\/p>\n\n\n<p>SkyPlanner APS pal\u012bdz risin\u0101t \u0161o otro uzdevumu. T\u0101 m\u0101ksl\u012bgais intelekts Arcturus sast\u0101da ra\u017eo\u0161anas grafiku un apr\u0113\u0137ina, kad nepiecie\u0161amos darbus var veikt l\u012bdztekus p\u0101r\u0113jiem pas\u016bt\u012bjumiem. Rezult\u0101ts ir redzams Gantt grafik\u0101, un j\u016bs nosak\u0101t priorit\u0101tes, nevis p\u0101rveidojat katra darba centra darbu rindu ikreiz, kad main\u0101s pas\u016bt\u012bto variantu sast\u0101vs.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas rakstur\u012bgs produktam, ko konfigur\u0113 p\u0113c pas\u016bt\u012bjuma?<\/h2>\n\n\n<p>CTO s\u0101kas v\u0113l pirms klients veic pas\u016bt\u012bjumu. Konstruktori nosaka produkta modu\u013cus, pie\u013caujamos variantus un noteikumus, kas nodro\u0161ina to savstarp\u0113jo sader\u012bbu. P\u0113c tam p\u0101rdo\u0161anas komanda izv\u0113las no \u0161\u012b apstiprin\u0101t\u0101 kl\u0101sta.<\/p>\n\n\n<p>Iedom\u0101simies modul\u0101ro konveijeru ra\u017eot\u0101ju. Klienti izv\u0113las standarta platumu un garumu, lentes veidu, r\u0101mja materi\u0101lu, piedzi\u0146u un sensoru komplektu. Noteikumi nosaka, kuras piedzi\u0146as atbilst katrai slodzei un \u0101trumam, kuras lentes ir piem\u0113rotas konkr\u0113tajam lietojumam un k\u0101di sensoru izvietojuma varianti ir pieejami. Noteikumiem atbilsto\u0161a izv\u0113le noz\u012bm\u0113 jau izstr\u0101d\u0101tu risin\u0101jumu, nevis v\u0113l neatrisin\u0101tu projekt\u0113\u0161anas jaut\u0101jumu.<\/p>\n\n\n<p>Ar\u012b \u0161\u0101da izv\u0113le var pras\u012bt iev\u0113rojamu ra\u017eo\u0161anas darbu. Pirms konveijera mont\u0101\u017eas ner\u016bs\u0113jo\u0161\u0101 t\u0113rauda r\u0101mis var b\u016bt j\u0101izgatavo un j\u0101nopul\u0113. CTO nenoz\u012bm\u0113, ka visas deta\u013cas jau atrodas noliktav\u0101 vai ka pas\u016bt\u012bjumam vajadz\u012bga tikai gala mont\u0101\u017ea.<\/p>\n\n\n<p>Robe\u017eu nosaka apstiprin\u0101to konstrukcijas variantu kl\u0101sts. Ja klients pieprasa slodzi vai sl\u012bpumu \u0101rpus \u0161\u012bm robe\u017e\u0101m, piepras\u012bjums j\u0101izv\u0113rt\u0113 konstruktoriem. Varat pied\u0101v\u0101t standarta alternat\u012bvu vai iz\u0146\u0113mumu nodot projekt\u0113\u0161anai, nevis neuzkr\u012bto\u0161i m\u0113\u0123in\u0101t to iek\u013caut konfigur\u0113\u0161anas proces\u0101.<\/p>\n\n\n<h3 class=\"wp-block-heading\">CTO, ETO, MTO un ATO raksturo da\u017e\u0101dus aspektus<\/h3>\n\n\n<p>\u0160ie termini pal\u012bdz raksturot pas\u016bt\u012bjumu, ta\u010du tie ne vienm\u0113r ir savstarp\u0113ji izsl\u0113dzo\u0161i:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma:<\/strong> ko klients var izv\u0113l\u0113ties? Produktu izv\u0113las no iepriek\u0161 noteiktiem, savstarp\u0113ji sader\u012bgiem variantiem.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/projektesana-un-razosana-pec-pasutijuma\/\">Projekt\u0113\u0161ana un ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma (ETO)<\/a>:<\/strong> vai piepras\u012bjumam vajadz\u012bgs jauns konstrukcijas risin\u0101jums? J\u0101izstr\u0101d\u0101 klientam specifisks risin\u0101jums, kur\u0101 var izmantot ar\u012b standarta deta\u013cas.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/\">Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma (MTO)<\/a>:<\/strong> kas ierosina ra\u017eo\u0161anu? Ra\u017eo\u0161ana s\u0101kas p\u0113c klienta pas\u016bt\u012bjuma sa\u0146em\u0161anas, un taj\u0101 var izmantot jau izstr\u0101d\u0101tu konstrukciju.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/montaza-pec-pasutijuma\/\">Mont\u0101\u017ea p\u0113c pas\u016bt\u012bjuma (ATO)<\/a>:<\/strong> kas ir sagatavots iepriek\u0161? Deta\u013cas vai mezgli ir gatavi pirms pas\u016bt\u012bjuma sa\u0146em\u0161anas; izv\u0113l\u0113to galaproduktu samont\u0113 p\u0113c tam.<\/li><\/ul>\n\n\n<p>Konveijeru var konfigur\u0113t p\u0113c pas\u016bt\u012bjuma un p\u0113c tam ar\u012b ra\u017eot p\u0113c pas\u016bt\u012bjuma. Cit\u0101 produktu grup\u0101 var izmantot to pa\u0161u konfigur\u0113\u0161anas principu, bet p\u0113c pas\u016bt\u012bjuma veikt mont\u0101\u017eu no noliktav\u0101 eso\u0161iem modu\u013ciem. Konfigur\u0113\u0161ana raksturo izv\u0113li, savuk\u0101rt ra\u017eo\u0161anas strat\u0113\u0123ija nosaka, k\u0101di darbi j\u0101veic p\u0113c \u0161\u012bs izv\u0113les.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kad konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma atmaks\u0101jas?<\/h2>\n\n\n<p>CTO ir \u012bpa\u0161i piem\u0113rota, ja klientiem vajadz\u012bgi da\u017e\u0101di produktu varianti, kas atbilst vi\u0146u vajadz\u012bb\u0101m, bet liela da\u013ca projekt\u0113\u0161anas darba atk\u0101rtojas. Vispiem\u0113rot\u0101k\u0101s ir produktu grupas, kur\u0101s ar p\u0101rvald\u0101mu modu\u013cu un noteikumu kopumu var apmierin\u0101t pietiekami lielu piepras\u012bjuma da\u013cu.<\/p>\n\n\n<p>P\u0101rskatiet nesenos pas\u016bt\u012bjumus. Kuras at\u0161\u0137ir\u012bbas patie\u0161\u0101m rada v\u0113rt\u012bbu klientam? Kuru at\u0161\u0137ir\u012bbu d\u0113\u013c konstruktoriem atkal un atkal j\u0101atbild uz tiem pa\u0161iem jaut\u0101jumiem? Atk\u0101rtotas izm\u0113ra, materi\u0101la, veiktsp\u0113jas vai papildapr\u012bkojuma izv\u0113les var standartiz\u0113t, ja to kombin\u0101cijas iesp\u0113jams p\u0101rbaud\u012bt un apstiprin\u0101t iepriek\u0161.<\/p>\n\n\n<p>Ieguvumus rada atk\u0101rtota darba nov\u0113r\u0161ana. P\u0101rdo\u0161anas komanda var pied\u0101v\u0101t apstiprin\u0101tas kombin\u0101cijas, maz\u0101k laika t\u0113r\u0113jot saska\u0146o\u0161anai. Konstruktori var vair\u0101k piev\u0113rsties jauniem risin\u0101jumiem un \u012bstiem iz\u0146\u0113mumiem. Iepirkumiem un ra\u017eo\u0161anai pras\u012bbas k\u013c\u016bst vienveid\u012bg\u0101kas. J\u016bs varat pied\u0101v\u0101t pla\u0161\u0101ku kl\u0101stu, neuztverot katru p\u0101rdo\u0161anas dar\u012bjumu k\u0101 jaunu izstr\u0101des projektu.<\/p>\n\n\n<p>Lai g\u016btu \u0161os ieguvumus, ir j\u0101iegulda darbs. K\u0101dam j\u0101izstr\u0101d\u0101 modu\u013ci, j\u0101uztur sader\u012bbas noteikumi un j\u0101nodro\u0161ina ra\u017eo\u0161anas inform\u0101cijas atbilst\u012bba, mainoties deta\u013c\u0101m vai konstrukcij\u0101m. Variants, ko p\u0113rk reti, bet kam vajadz\u012bga atsevi\u0161\u0137a pieg\u0101des \u0137\u0113de un unik\u0101ls ra\u017eo\u0161anas mar\u0161ruts, var izmaks\u0101t vair\u0101k, nek\u0101 tas nopelna. Pla\u0161\u0101ka izv\u0113le pati par sevi nenoz\u012bm\u0113 lab\u0101ku pied\u0101v\u0101jumu.<\/p>\n\n\n<p>S\u0101ciet ar vienu produktu grupu, kur\u0101 atk\u0101rto\u0161an\u0101s ir skaidri redzama. Nosakiet pied\u0101v\u0101jamos variantus un iz\u0146\u0113mumu izskat\u012b\u0161anas k\u0101rt\u012bbu, p\u0113c tam p\u0101rbaudiet, vai p\u0101rdo\u0161anas komanda, konstruktori un ra\u017eo\u0161ana vienu un to pa\u0161u izv\u0113li saprot vien\u0101di. Standartiz\u0113jiet to, ko klienti p\u0113rk atk\u0101rtoti, nevis visus \u012bpa\u0161os piepras\u012bjumus, ko jebkad esat sa\u0146\u0113mu\u0161i.<\/p>\n\n\n<p>CTO ir maz\u0101k piem\u0113rota, ja liel\u0101kajai da\u013cai pas\u016bt\u012bjumu patie\u0161\u0101m vajadz\u012bga jauna konstrukcijas izstr\u0101de vai ja klienti nav gatavi gaid\u012bt, l\u012bdz tiks pabeigti atliku\u0161ie ra\u017eo\u0161anas darbi. Popul\u0101rus produktus, kas vajadz\u012bgi uzreiz, var b\u016bt lietder\u012bg\u0101k pieg\u0101d\u0101t no gatav\u0101s produkcijas kr\u0101jumiem. Da\u017e\u0101d\u0101m produktu grup\u0101m var izmantot at\u0161\u0137ir\u012bgas pieejas, nezaud\u0113jot r\u016bpn\u012bcas kop\u0113j\u0101s strat\u0113\u0123ijas konsekvenci.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0101rv\u0113rtiet izv\u0113l\u0113tos variantus ra\u017eo\u0161anai gatav\u0101 pas\u016bt\u012bjum\u0101<\/h2>\n\n\n<p>Konfigur\u0101cij\u0101 j\u0101b\u016bt skaidri nor\u0101d\u012btam, kas j\u0101izgatavo, lai pl\u0101not\u0101jam tas neb\u016btu j\u0101izsecina no cenu pied\u0101v\u0101juma. Nododot pas\u016bt\u012bjumu ra\u017eo\u0161anai, j\u0101nor\u0101da izv\u0113l\u0113t\u0101 specifik\u0101cija, tai nepiecie\u0161amie materi\u0101li, oper\u0101ciju sec\u012bba un ilgums, k\u0101 ar\u012b piem\u0113rotie resursi.<\/p>\n\n\n<p>Produktu konfigurators p\u0101rbauda izv\u0113l\u0113to variantu sader\u012bbu. Konfigur\u0113\u0161anas, cenu noteik\u0161anas un pied\u0101v\u0101jumu sagatavo\u0161anas programmat\u016bra (CPQ) var pal\u012bdz\u0113t ar\u012b noteikt cenu un sagatavot pied\u0101v\u0101jumu. ERP sist\u0113m\u0101 var glab\u0101t apstiprin\u0101to pas\u016bt\u012bjumu un ra\u017eo\u0161anas datus. P\u0113c tam, sast\u0101dot detaliz\u0113tu grafiku, nepiecie\u0161amos darbus iepl\u0101no pieejamaj\u0101 laik\u0101. Tie ir savstarp\u0113ji saist\u012bti uzdevumi: kombin\u0101cijas apstiprin\u0101\u0161ana pati par sevi nerezerv\u0113 ra\u017eo\u0161anas jaudu.<\/p>\n\n\n<p>Iedom\u0101tajam konveijeru ra\u017eot\u0101jam ietekme uz pl\u0101no\u0161anu var\u0113tu b\u016bt \u0161\u0101da:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Klienta izv\u0113le<\/th><th>Ietekme uz darbiem vai pieg\u0101d\u0113m<\/th><th>Kas j\u0101\u0146em v\u0113r\u0101 grafik\u0101<\/th><\/tr><\/thead><tbody><tr><td>Ner\u016bs\u0113jo\u0161\u0101 t\u0113rauda r\u0101mis<\/td><td>Cits materi\u0101ls, izgatavo\u0161ana un pul\u0113\u0161ana<\/td><td>Attiec\u012bg\u0101 materi\u0101la pieejam\u012bba un nepiecie\u0161am\u0101s oper\u0101cijas<\/td><\/tr><tr><td>T\u0113rauda r\u0101mis ar p\u0101rkl\u0101jumu<\/td><td>Izgatavo\u0161ana un p\u0113c tam apstiprin\u0101tais p\u0101rkl\u0101juma uzkl\u0101\u0161anas process<\/td><td>Apstr\u0101des, iestat\u012b\u0161anas un nepiecie\u0161am\u0101s gaid\u012b\u0161anas laiks<\/td><\/tr><tr><td>Liel\u0101ka apstiprin\u0101ta piedzi\u0146a<\/td><td>Cita iep\u0113rkam\u0101 komponente un mont\u0101\u017eas pras\u012bbas<\/td><td>Komponentes gatav\u012bba lieto\u0161anai un attiec\u012bgo oper\u0101ciju ilgums<\/td><\/tr><tr><td>Papildus izv\u0113lams sensoru komplekts<\/td><td>Papildu uzst\u0101d\u012b\u0161ana un p\u0101rbaude<\/td><td>Papildu darbi un resursi, kas vajadz\u012bgi l\u012bdz pabeig\u0161anai<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pas\u016bt\u012bjum\u0101 atspogu\u013cojiet katra varianta ietekmi. Ja main\u0101t tikai aprakstu, bet noklus\u0113juma ra\u017eo\u0161anas mar\u0161rutu atst\u0101jat neskartu, tikko p\u0101rdotais darbs paliek neredzams.<\/p>\n\n\n<p>Nodro\u0161iniet, lai izv\u0113l\u0113to konfigur\u0101ciju var\u0113tu identific\u0113t gan pas\u016bt\u012bjuma nodo\u0161anas br\u012bd\u012b ra\u017eo\u0161anai, gan p\u0113c v\u0113l\u0101k\u0101m izmai\u0146\u0101m. Vienojieties, kur\u0161 atjaunina materi\u0101lu un darbu pras\u012bbas, ja klients maina k\u0101du variantu. Cita lentes vai r\u0101mja izv\u0113le var ietekm\u0113t iepirkt\u0101s deta\u013cas, jau s\u0101ktos darbus un pabeig\u0161anas datumu. Uztveriet to k\u0101 izv\u0113rt\u0113jamas pas\u016bt\u012bjuma izmai\u0146as, nevis tikai jaunu rindu cenu pied\u0101v\u0101jum\u0101.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pl\u0101nojiet konkr\u0113to variantu, nevis vid\u0113jo produktu<\/h2>\n\n\n<p>Atgriez\u012bsimies pie konveijeru ra\u017eot\u0101ja. P\u0101rdo\u0161anas komanda sa\u0146em vair\u0101kus pas\u016bt\u012bjumus ner\u016bs\u0113jo\u0161\u0101 t\u0113rauda variantam. Konveijeru skaits ir ierastais, ta\u010du tagad liel\u0101kai da\u013cai vajadz\u012bga pul\u0113\u0161ana. R\u016bpn\u012bcas standarta pas\u016bt\u012bjuma izpildes laiks nav main\u012bjies, bet pul\u0113\u0161anas resursa slodze gan ir.<\/p>\n\n\n<p>Ja pl\u0101not\u0101js visiem konveijeriem paredz vid\u0113jam produktam rakstur\u012bgo darbu apjomu, \u0161\u012bs papildu oper\u0101cijas var palikt nepaman\u012btas l\u012bdz br\u012bdim, kad t\u0101s j\u0101s\u0101k ra\u017eo\u0161an\u0101. R\u0101mjus var izgatavot \u0101tri, ta\u010du p\u0113c tam tie gaida uz pul\u0113\u0161anu. S\u0101kot izgatavot v\u0113l vair\u0101k r\u0101mju, pul\u0113\u0161anas jauda nepalielin\u0101s.<\/p>\n\n\n<p>T\u0101p\u0113c par pieg\u0101di j\u0101uzdod praktisks jaut\u0101jums: kad var pabeigt \u0161im pas\u016bt\u012bjumam faktiski vajadz\u012bgos darbus, \u0146emot v\u0113r\u0101 materi\u0101lus un <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">citiem klientiem jau rezerv\u0113to jaudu<\/a>?<\/p>\n\n\n<p>SkyPlanner \u0161os darbus iek\u013cauj vienot\u0101 ra\u017eo\u0161anas grafik\u0101. J\u016bs nosak\u0101t procesa so\u013cus, to ilgumu, darba centrus, mai\u0146as un vajadz\u012bgos resursus. Atk\u0101rtoti ra\u017eojamiem produktiem var izmantot jau noteiktus ra\u017eo\u0161anas mar\u0161rutus, savuk\u0101rt pas\u016bt\u012bjuma poz\u012bcijas atspogu\u013co iepl\u0101nojamo darbu. Konfigur\u0113tajam pas\u016bt\u012bjumam j\u0101non\u0101k pl\u0101no\u0161an\u0101 ar izv\u0113l\u0113tajam variantam atbilsto\u0161\u0101m oper\u0101cij\u0101m un materi\u0101liem.<\/p>\n\n\n<p>Arcturus apr\u0113\u0137ina darbu sec\u012bbu visiem pas\u016bt\u012bjumiem, izmantojot j\u016bsu noteikto jaudu, savstarp\u0113j\u0101s atkar\u012bbas un grafika sast\u0101d\u012b\u0161anas noteikumus. Gantt skat\u0101 varat sekot darbu gaitai da\u017e\u0101dos resursos un redz\u0113t, k\u0101 to ietekm\u0113 citi pas\u016bt\u012bjumi. T\u0101d\u0113j\u0101di pul\u0113\u0161anas rinda tiek \u0146emta v\u0113r\u0101, izv\u0113rt\u0113jot pieg\u0101des termi\u0146u, pirms t\u0101 k\u013c\u016bst par p\u0101rsteigumu ra\u017eo\u0161anas ceh\u0101.<\/p>\n\n\n<p>Ja ir iesl\u0113gta pl\u0101no\u0161ana, kas \u0146em v\u0113r\u0101 materi\u0101lu pieejam\u012bbu, apr\u0113\u0137in\u0101 iek\u013cauj ar\u012b \u0161o inform\u0101ciju. Iep\u0113rkamu piedzi\u0146u, kuras pieg\u0101de gaid\u0101ma v\u0113l\u0101k, nevar uzskat\u012bt par jau pieejamu. Uzturiet pieg\u0101\u017eu inform\u0101ciju aktu\u0101lu un p\u0101rr\u0113\u0137iniet grafiku, kad t\u0101 main\u0101s.<\/p>\n\n\n<p>J\u016bs nosak\u0101t priorit\u0101tes un fiks\u0113jat pie\u0146emtos pl\u0101no\u0161anas l\u0113mumus, lai p\u0101rr\u0113\u0137ins tos nemain\u012btu. Ja steidzamam konveijera pas\u016bt\u012bjumam tiek dota priek\u0161roka, Arcturus p\u0101rr\u0113\u0137ina grafiku atbilsto\u0161i \u0161iem nor\u0101d\u012bjumiem, bet j\u016bs p\u0101rskat\u0101t ar\u012b p\u0101r\u0113jo pas\u016bt\u012bjumu jaunos datumus. Ieguvums ir maz\u0101k manu\u0101la darba, uzturot darbu rindas, un skaidr\u0101ks pamats izv\u0113lei, kuru klientiem doto saist\u012bbu izpildei dot priek\u0161roku.<\/p>\n\n\n<p>SkyPlanner integr\u0113jas ar jebkuru ERP vai MES sist\u0113mu, izmantojot savu <a href=\"https:\/\/skyplanner.ai\/lv\/integracija\/\">atv\u0113rto REST API<\/a>. Savienojiet eso\u0161os pas\u016bt\u012bjumu, produktu un ra\u017eo\u0161anas datus ar detaliz\u0113tu grafiku sast\u0101d\u012b\u0161anu, nevis s\u0101ciet ar ERP nomai\u0146u. Ievie\u0161ot CTO, nosakiet, k\u0101 izv\u0113l\u0113tais variants \u0161aj\u0101 datu pl\u016bsm\u0101 p\u0101rtop pareizos materi\u0101lu un oper\u0101ciju datos. T\u0101 ir praktisk\u0101 saikne starp p\u0101rdoto produktu un darbiem, ko iepl\u0101no Arcturus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ko vienota grafiku sast\u0101d\u012b\u0161ana main\u012bja UTU<\/h2>\n\n\n<p>UTU ra\u017eo elektriskos sadales pane\u013cus un sadales iek\u0101rtas. Pirms SkyPlanner ievie\u0161anas t\u0101 noda\u013cas uztur\u0113ja atsevi\u0161\u0137us Excel pl\u0101nus, un ERP veikt\u0101s darbu sec\u012bbas izmai\u0146as ne vienm\u0113r non\u0101ca l\u012bdz ra\u017eo\u0161anas ceham. Bija gr\u016bti saskat\u012bt re\u0101li pieejamo jaudu, t\u0101p\u0113c pieg\u0101des sol\u012bjumu izpilde pras\u012bja atk\u0101rtotu p\u0101rpl\u0101no\u0161anu.<\/p>\n\n\n<p>Integr\u0113jot SkyPlanner ar Oracle NetSuite un algu apr\u0113\u0137ina sist\u0113mu, UTU apvienoja r\u016bpn\u012bcas l\u012bnijas un noda\u013cas vien\u0101 pl\u0101no\u0161anas sist\u0113m\u0101. Komanda \u012bpa\u0161i izce\u013c autom\u0101tisk\u0101s grafiku sast\u0101d\u012b\u0161anas un Gantt skata apvienojumu: jauda, slodze un darbu sec\u012bba ir redzamas vienuviet.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/klientu-stasti\/utu\/\">UTU atsauksm\u0113 par SkyPlanner<\/a> uz\u0146\u0113mums nor\u0101da, ka ned\u0113\u013c\u0101 ietaupa aptuveni divas stundas, kas iepriek\u0161 tika velt\u012btas izkl\u0101jlapu atjaunin\u0101\u0161anai. Tas ar\u012b apraksta prec\u012bz\u0101ku projektu pieg\u0101\u017eu pl\u0101no\u0161anu un to, ka atjaunin\u0101t\u0101s darbu rindas ra\u017eo\u0161anas l\u012bnij\u0101 ir pieejamas da\u017eu sekun\u017eu laik\u0101. Tie\u0161i t\u0101ds ir ieguvums, sasaistot pas\u016bt\u012bjumu ar faktiski veicamajiem darbiem: maz\u0101k p\u016b\u013cu atsevi\u0161\u0137u pl\u0101nu uztur\u0113\u0161anai un skaidr\u0101ka darbu saska\u0146o\u0161ana, mainoties to sec\u012bbai.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Atvieglojiet klienta izv\u0113l\u0113t\u0101 risin\u0101juma izgatavo\u0161anu un pieg\u0101di<\/h2>\n\n\n<p>CTO v\u0113rt\u012bba ir iesp\u0113ja p\u0101rv\u0113rst klientu atk\u0101rtot\u0101s vajadz\u012bbas standartiz\u0113t\u0101s izv\u0113les iesp\u0113j\u0101s. Saglab\u0101jiet \u0161o priek\u0161roc\u012bbu vis\u0101 ra\u017eo\u0161anas proces\u0101: pl\u0101nojot izmantojiet datus par izv\u0113l\u0113tajam variantam nepiecie\u0161amajiem darbiem un izv\u0113rt\u0113jiet pieg\u0101des iesp\u0113jas, \u0146emot v\u0113r\u0101 resursus, kas nepiecie\u0161ami ar\u012b citiem pas\u016bt\u012bjumiem.<\/p>\n\n\n<p>Izv\u0113lieties SkyPlanner, ja \u0161\u012b saska\u0146o\u0161ana jau k\u013cuvusi par ikdienas p\u0101rpl\u0101no\u0161anas slogu. Arcturus veic grafika apr\u0113\u0137inus, Gantt skat\u0101 ir redzamas izmai\u0146u sekas, bet priorit\u0101tes joproj\u0101m nosak\u0101t j\u016bs. T\u0101 varat vair\u0101k laika velt\u012bt faktisk\u0101 ierobe\u017eojuma nov\u0113r\u0161anai un maz\u0101k \u2014 darbu p\u0101rb\u012bd\u012b\u0161anai, lai savstarp\u0113ji saska\u0146otu atsevi\u0161\u0137as darbu rindas.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Piesakieties SkyPlanner demonstr\u0101cijai<\/a> un sagatavojiet divu bie\u017ei izmantotu konfigur\u0101ciju piem\u0113rus, nor\u0101dot at\u0161\u0137ir\u012bg\u0101s oper\u0101cijas un vienu resursu, ko izmanto abas konfigur\u0101cijas. Tas b\u016bs noder\u012bgs s\u0101kumpunkts, lai apskat\u012btu, k\u0101 j\u016bsu produktu varianti iek\u013cautos re\u0101li izpild\u0101m\u0101 ra\u017eo\u0161anas grafik\u0101. Ja vispirms v\u0113laties izp\u0113t\u012bt pa\u0161i, <a href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei S\u0101kums &raquo; Resursi &raquo; Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma (CTO) noz\u012bm\u0113 izgatavot produktu atbilsto\u0161i klienta izv\u0113lei no iepriek\u0161 noteiktiem, savstarp\u0113ji sader\u012bgiem variantiem. Klients ieg\u016bst sav\u0101m vajadz\u012bb\u0101m piem\u0113rotu kombin\u0101ciju, savuk\u0101rt ra\u017eot\u0101js izmanto jau izstr\u0101d\u0101tus risin\u0101jumus un produkta konfigur\u0113\u0161anas noteikumus, nevis katru pas\u016bt\u012bjumu &#8230; <a title=\"Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/\" aria-label=\"Read more about Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99687,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-99667","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei<\/title>\n<meta name=\"description\" content=\"Pied\u0101v\u0101jiet produktu izv\u0113li, neprojekt\u0113jot katru pas\u016bt\u012bjumu no nulles. Uzziniet, kad der CTO un k\u0101 SkyPlanner pl\u0101no katras konfigur\u0101cijas darbus.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei\" \/>\n<meta property=\"og:description\" content=\"Pied\u0101v\u0101jiet produktu izv\u0113li, neprojekt\u0113jot katru pas\u016bt\u012bjumu no nulles. Uzziniet, kad der CTO un k\u0101 SkyPlanner pl\u0101no katras konfigur\u0101cijas darbus.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T05:16:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T05:16:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/konfiguresana-pec-pasutijuma\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/konfiguresana-pec-pasutijuma\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:16:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/konfiguresana-pec-pasutijuma\\\/\"},\"wordCount\":2554,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/konfiguresana-pec-pasutijuma\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/konfiguresana-pec-pasutijuma\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/konfiguresana-pec-pasutijuma\\\/\",\"name\":\"Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/konfiguresana-pec-pasutijuma\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/konfiguresana-pec-pasutijuma\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:16:46+00:00\",\"description\":\"Pied\u0101v\u0101jiet produktu izv\u0113li, neprojekt\u0113jot katru pas\u016bt\u012bjumu no nulles. Uzziniet, kad der CTO un k\u0101 SkyPlanner pl\u0101no katras konfigur\u0101cijas darbus.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/konfiguresana-pec-pasutijuma\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/konfiguresana-pec-pasutijuma\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/konfiguresana-pec-pasutijuma\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/konfiguresana-pec-pasutijuma\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei","description":"Pied\u0101v\u0101jiet produktu izv\u0113li, neprojekt\u0113jot katru pas\u016bt\u012bjumu no nulles. Uzziniet, kad der CTO un k\u0101 SkyPlanner pl\u0101no katras konfigur\u0101cijas darbus.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/","og_locale":"lv_LV","og_type":"article","og_title":"Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei","og_description":"Pied\u0101v\u0101jiet produktu izv\u0113li, neprojekt\u0113jot katru pas\u016bt\u012bjumu no nulles. Uzziniet, kad der CTO un k\u0101 SkyPlanner pl\u0101no katras konfigur\u0101cijas darbus.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T05:16:05+00:00","article_modified_time":"2026-10-16T05:16:46+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:16:46+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/"},"wordCount":2554,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/","name":"Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:16:46+00:00","description":"Pied\u0101v\u0101jiet produktu izv\u0113li, neprojekt\u0113jot katru pas\u016bt\u012bjumu no nulles. Uzziniet, kad der CTO un k\u0101 SkyPlanner pl\u0101no katras konfigur\u0101cijas darbus.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","width":1672,"height":941,"caption":"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/konfiguresana-pec-pasutijuma\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei S\u0101kums &raquo; Resursi &raquo; Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma: no klienta izv\u0113les l\u012bdz pieg\u0101dei Konfigur\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma (CTO) noz\u012bm\u0113 izgatavot produktu atbilsto\u0161i klienta izv\u0113lei no iepriek\u0161 noteiktiem, savstarp\u0113ji sader\u012bgiem variantiem. Klients ieg\u016bst sav\u0101m vajadz\u012bb\u0101m piem\u0113rotu kombin\u0101ciju, savuk\u0101rt ra\u017eot\u0101js izmanto jau izstr\u0101d\u0101tus risin\u0101jumus un produkta konfigur\u0113\u0161anas noteikumus, nevis katru pas\u016bt\u012bjumu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/99667","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=99667"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/99667\/revisions"}],"predecessor-version":[{"id":99725,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/99667\/revisions\/99725"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/99687"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=99667"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=99667"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=99667"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}