{"id":99143,"date":"2026-10-15T15:53:51","date_gmt":"2026-10-15T15:53:51","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99143"},"modified":"2026-10-15T15:54:37","modified_gmt":"2026-10-15T15:54:37","slug":"rough-cut-capacity-planning","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/","title":{"rendered":"Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Resursi<\/a> &raquo; Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Ra\u017eo\u0161anas pamatpl\u0101ns nosaka, ko pl\u0101nojat sara\u017eot. Rough cut capacity planning jeb aptuven\u0101 ra\u017eo\u0161anas jaudas pl\u0101no\u0161ana \u013cauj p\u0101rbaud\u012bt, vai kritisko resursu jauda ir pietiekama \u0161\u012b pl\u0101na izpildei. Tas j\u0101p\u0101rbauda, pirms iepirkumu, ra\u017eo\u0161anas un p\u0101rdo\u0161anas komandas s\u0101k r\u012bkoties p\u0113c pl\u0101na, kuru r\u016bpn\u012bca nesp\u0113j izpild\u012bt.<\/p>\n\n\n<p>Aptuvenaj\u0101 ra\u017eo\u0161anas jaudas pl\u0101no\u0161an\u0101 (RCCP) pl\u0101notos ra\u017eo\u0161anas apjomus p\u0101rr\u0113\u0137ina galveno resursu noslodz\u0113 un sal\u012bdzina to ar pieejamo jaudu. Tas \u013cauj jau laikus izlemt: saglab\u0101t ra\u017eo\u0161anas pamatpl\u0101nu, main\u012bt apjomus vai termi\u0146us vai ar\u012b nodro\u0161in\u0101t papildu jaudu.<\/p>\n\n\n<p>Ta\u010du sabalans\u0113ta ned\u0113\u013cas noslodze v\u0113l nenoz\u012bm\u0113, ka ra\u017eo\u0161anas uzdevumus var\u0113s izpild\u012bt vajadz\u012bgaj\u0101 sec\u012bb\u0101. Iek\u0101rtai kopum\u0101 var b\u016bt pietiekami daudz darba stundu, tom\u0113r br\u012bd\u012b, kad t\u0101 vajadz\u012bga steidzamam pas\u016bt\u012bjumam, t\u0101 var neb\u016bt pieejama. Izmantojiet RCCP, lai p\u0101rbaud\u012btu, vai varat uz\u0146emties pl\u0101noto ra\u017eo\u0161anas apjomu izpildi, un p\u0113c tam ar SkyPlanner APS izveidojiet saska\u0146otu grafiku attiec\u012bgajiem ra\u017eo\u0161anas darbiem. Arcturus apr\u0113\u0137ina darbu izpildes laikus atbilsto\u0161i j\u016bsu resursiem un priorit\u0101t\u0113m, savuk\u0101rt Gantt laika skala par\u0101da, ko tas noz\u012bm\u0113 ra\u017eo\u0161anai un pieg\u0101d\u0113m.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas ir aptuven\u0101 ra\u017eo\u0161anas jaudas pl\u0101no\u0161ana?<\/h2>\n\n\n<p>RCCP p\u0101rbauda, vai jauda ir pietiekama <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/master-production-schedule\/\">ra\u017eo\u0161anas pamatpl\u0101na (MPS)<\/a> izpildei, piev\u0113r\u0161oties resursiem, kas var\u0113tu kav\u0113t t\u0101 \u012bsteno\u0161anu. T\u0101 var b\u016bt iek\u0101rtu grupa, kas veido \u0161auro vietu, specializ\u0113ta mont\u0101\u017eas komanda, kr\u0101sns vai ra\u017eo\u0161anas l\u012bnija ar ierobe\u017eotu jaudu.<\/p>\n\n\n<p>Galvenais jaut\u0101jums ir konkr\u0113ts: cik liela \u0161\u012b resursa jauda katr\u0101 pl\u0101no\u0161anas period\u0101 b\u016bs vajadz\u012bga MPS izpildei un cik re\u0101li var\u0113siet nodro\u0161in\u0101t?<\/p>\n\n\n<p>\u0160\u012b pl\u0101no\u0161ana ir aptuvena, jo b\u016btiskas neatbilst\u012bbas var konstat\u0113t, nenosakot katras oper\u0101cijas izpildes sec\u012bbu. J\u016bs izv\u0113laties kritiskos resursus un izmantojat vienk\u0101r\u0161otu modeli, lai apr\u0113\u0137in\u0101tu nepiecie\u0161amo jaudu. T\u0101p\u0113c RCCP ir noder\u012bga, kam\u0113r v\u0113l ir laiks main\u012bt ra\u017eo\u0161anas saist\u012bbas, organiz\u0113t papildu mai\u0146as vai apspriest apak\u0161uz\u0146\u0113m\u0113ju piesaisti.<\/p>\n\n\n<p>Daudziem ra\u017eot\u0101jiem ir lietder\u012bgi pl\u0101not pa ned\u0113\u013c\u0101m, ta\u010du RCCP nav noteikta univers\u0101la ned\u0113\u013cu vai m\u0113ne\u0161u skaita. Izv\u0113lieties pl\u0101no\u0161anas horizontu, kas aptver laiku, uz kuru attiecas vajadz\u012bgie l\u0113mumi, un t\u0101dus periodus, kuros ir redzamas ar \u0161iem l\u0113mumiem nov\u0113r\u0161am\u0101s p\u0101rslodzes. Jaudas izmai\u0146as, kuru ievie\u0161anai vajadz\u012bgs ilgs laiks, j\u0101paredz agr\u0101k nek\u0101 virsstundu mai\u0146a.<\/p>\n\n\n<h2 class=\"wp-block-heading\">RCCP vieta pl\u0101no\u0161an\u0101: MPS, MRP, CRP un ra\u017eo\u0161anas grafiki<\/h2>\n\n\n<p>Katrs no \u0161iem pl\u0101no\u0161anas procesiem atbild uz citu jaut\u0101jumu:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Process<\/th><th>Galvenais jaut\u0101jums<\/th><th>Tipisk\u0101 detaliz\u0101cijas pak\u0101pe<\/th><\/tr><\/thead><tbody><tr><td>Ra\u017eo\u0161anas pamatpl\u0101na sast\u0101d\u012b\u0161ana<\/td><td>K\u0101di produkti, k\u0101d\u0101 daudzum\u0101 un kuros periodos j\u0101ra\u017eo?<\/td><td>Pamatpl\u0101n\u0101 iek\u013cautie produkti un pl\u0101notais pabeigt\u0101s produkcijas daudzums<\/td><\/tr><tr><td>Aptuven\u0101 ra\u017eo\u0161anas jaudas pl\u0101no\u0161ana<\/td><td>Vai galveno resursu jauda ir pietiekama ra\u017eo\u0161anas pamatpl\u0101na izpildei?<\/td><td>Kritisko resursu noslodze pa periodiem<\/td><\/tr><tr><td>Materi\u0101lu vajadz\u012bbu pl\u0101no\u0161ana (MRP)<\/td><td>K\u0101di materi\u0101li un komponenti ir vajadz\u012bgi un kad?<\/td><td>Vajadz\u012bbas, kas apr\u0113\u0137in\u0101tas p\u0113c produktu strukt\u016bras un pieg\u0101des datiem<\/td><\/tr><tr><td>Jaudas vajadz\u012bbu pl\u0101no\u0161ana (CRP)<\/td><td>K\u0101da jauda nepiecie\u0161ama detaliz\u0113t\u0101 materi\u0101lu pl\u0101na izpildei?<\/td><td>Detaliz\u0113t\u0101kas jaudas vajadz\u012bbas oper\u0101ciju un darba centru l\u012bmen\u012b<\/td><\/tr><tr><td>Detaliz\u0113tu ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/td><td>Kur un kad tiks izpild\u012bts katrs ra\u017eo\u0161anas uzdevums?<\/td><td>Darba stacijas, oper\u0101cijas, mai\u0146as, savstarp\u0113j\u0101s atkar\u012bbas un ra\u017eo\u0161anas uzdevumu priorit\u0101tes<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>MPS un RCCP j\u0101izmanto cikliski, \u0146emot v\u0113r\u0101 p\u0101rbaudes rezult\u0101tus. Ja p\u0101rbaud\u0113 atkl\u0101jas, ka jaudas nepietiek, p\u0101rskatiet pied\u0101v\u0101to pl\u0101nu vai pieejamo jaudu un p\u0101rbaudiet v\u0113lreiz. Nenododiet p\u0101rslodzi rado\u0161u ra\u017eo\u0161anas pamatpl\u0101nu turpm\u0101kai pl\u0101no\u0161anai, cerot, ka detaliz\u0113ta grafika sast\u0101d\u012b\u0161ana rad\u012bs tr\u016bksto\u0161\u0101s stundas.<\/p>\n\n\n<p>Svar\u012bga ir ar\u012b pret\u0113j\u0101 saikne: ja, sast\u0101dot detaliz\u0113tu grafiku, atkl\u0101jas \u0161aur\u0101 vieta, kas atk\u0101rtojas, \u0146emiet to v\u0113r\u0101 jaudas pie\u0146\u0113mumos. Resurss, kas pag\u0101ju\u0161\u0101 ceturk\u0161\u0146a produktu sortimentam ne\u0161\u0137ita kritisks, n\u0101kamaj\u0101 RCCP p\u0101rbaud\u0113 var b\u016bt j\u0101iek\u013cauj.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0101 aptuveni apr\u0113\u0137in\u0101t nepiecie\u0161amo ra\u017eo\u0161anas jaudu<\/h2>\n\n\n<p>Par pamatu \u0146emiet MPS nor\u0101d\u012btos ra\u017eo\u0161anas apjomus, nepieskaitot tiem v\u0113l ar\u012b p\u0101rdo\u0161anas piepras\u012bjumu. Pamatpl\u0101n\u0101 jau j\u0101b\u016bt atspogu\u013cotam l\u0113mumam par to, cik ra\u017eot. Atk\u0101rtoti ieskaitot to pa\u0161u piepras\u012bjumu, noslodze tiek m\u0101ksl\u012bgi palielin\u0101ta.<\/p>\n\n\n<p>Modelim, kur\u0101 apr\u0113\u0137inus veic stund\u0101s:<\/p>\n\n\n<p><strong>Nepiecie\u0161am\u0101s resursa stundas = summa (MPS daudzums \u00d7 resursa stundas uz vien\u012bbu) + atsevi\u0161\u0137i model\u0113t\u0101s p\u0101rregul\u0113\u0161anas stundas, ja t\u0101das ir.<\/strong><\/p>\n\n\n<p>Veiciet \u0161o apr\u0113\u0137inu katram izv\u0113l\u0113tajam resursam un periodam. P\u0113c tam sal\u012bdziniet rezult\u0101tu ar pieejamo jaudu taj\u0101 pa\u0161\u0101 m\u0113rvien\u012bb\u0101:<\/p>\n\n\n<p><strong>Jaudas noslodze = nepiecie\u0161am\u0101s stundas \u00f7 pieejam\u0101s stundas \u00d7 100%.<\/strong><\/p>\n\n\n<p>Noslodze virs 100% nor\u0101da uz p\u0101rslodzi atbilsto\u0161i izmantotajiem pie\u0146\u0113mumiem. Noslodze zem 100% noz\u012bm\u0113, ka kop\u0113jais darba apjoms iek\u013caujas pieejamaj\u0101 jaud\u0101, ta\u010du tas nepier\u0101da, ka katru ra\u017eo\u0161anas uzdevumu var\u0113s pabeigt t\u0101 noteiktaj\u0101 termi\u0146\u0101.<\/p>\n\n\n<p>Veiciet apr\u0113\u0137inu piecos so\u013cos:<\/p>\n\n\n<p>1. <strong>Izv\u0113lieties kritiskos resursus.<\/strong> Iek\u013caujiet iek\u0101rtas, darbinieku prasmes vai l\u012bnijas, kas var ierobe\u017eot sp\u0113ju izpild\u012bt uz\u0146emt\u0101s saist\u012bbas. Neaprobe\u017eojieties ar visas r\u016bpn\u012bcas kop\u0113jo jaudu, kur viena resursa p\u0101rslodzi var pasl\u0113pt cita resursa br\u012bv\u0101 jauda.<\/p>\n\n\n<p>2. <strong>Nosakiet resursu vajadz\u012bbas.<\/strong> Katram pamatpl\u0101n\u0101 iek\u013cautajam produktam izmantojiet p\u0113c vienotiem principiem veidotu jaudas vajadz\u012bbu sarakstu vai resursu profilu. Iek\u0101rtstundas un cilv\u0113kstundas uzskaitiet atsevi\u0161\u0137i. Iek\u013caujiet attiec\u012bgos komponentu izgatavo\u0161anas darbus, neieskaitot tos atk\u0101rtoti citur.<\/p>\n\n\n<p>3. <strong>Iepl\u0101nojiet noslodzi pareizaj\u0101 period\u0101.<\/strong> Ja kritiska oper\u0101cija j\u0101veic pirms gatav\u0101 produkta nodo\u0161anas termi\u0146a, p\u0101rb\u012bdiet attiec\u012bgo jaudas vajadz\u012bbu uz agr\u0101ku laiku. Pret\u0113j\u0101 gad\u012bjum\u0101 \u0113rtais apr\u0113\u0137ins p\u0113c produkta pabeig\u0161anas ned\u0113\u013cas var pasl\u0113pt jaudas tr\u016bkumu agr\u0101k\u0101 period\u0101.<\/p>\n\n\n<p>4. <strong>Apr\u0113\u0137iniet re\u0101li pieejamo jaudu.<\/strong> \u0145emiet v\u0113r\u0101 darba kalend\u0101ru, person\u0101la pieejam\u012bbu un pl\u0101not\u0101s d\u012bkst\u0101ves. Darb\u012bbas efektivit\u0101tes korekcijas piem\u0113rojiet konsekventi un neat\u0146emiet vienu un to pa\u0161u jaudas zudumu divreiz.<\/p>\n\n\n<p>5. <strong>Izv\u0113rt\u0113jiet neatbilst\u012bbas un atk\u0101rtojiet pl\u0101na apr\u0113\u0137inu.<\/strong> Fiks\u0113jiet ierosin\u0101to r\u012bc\u012bbu, resursu un periodu, ko t\u0101 ietekm\u0113s, k\u0101 ar\u012b p\u0101rskat\u012bto noslodzi. Ja nav saska\u0146ota risin\u0101juma, p\u0101rslodze joproj\u0101m paliek p\u0101rslodze.<\/p>\n\n\n<p>Ja l\u012bniju vislab\u0101k pl\u0101not produkcijas vien\u012bb\u0101s, izmantojiet sal\u012bdzin\u0101jumu p\u0113c ra\u017e\u012bguma: sal\u012bdziniet pl\u0101noto vien\u012bbu skaitu ar attiec\u012bgaj\u0101 period\u0101 sasniedzamo apjomu. P\u0101rliecinieties, ka ra\u017e\u012bguma r\u0101d\u012bt\u0101js atbilst produktu sortimentam, jo da\u017e\u0101dus produktus ne vienm\u0113r var uzskat\u012bt par l\u012bdzv\u0113rt\u012bg\u0101m vien\u012bb\u0101m.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kuru RCCP metodi izv\u0113l\u0113ties?<\/h3>\n\n\n<p>Tr\u012bs izplat\u012btas pieejas pied\u0101v\u0101 izv\u0113li starp apr\u0113\u0137ina vienk\u0101r\u0161\u012bbu un prec\u012bz\u0101ku noslodzes ainu:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Jaudas pl\u0101no\u0161an\u0101 ar kop\u0113jiem koeficientiem (CPOF)<\/strong> MPS p\u0101rr\u0113\u0137ina kop\u0113j\u0101 darba apjom\u0101 un p\u0113c tam sadala p\u0113c resursu v\u0113sturiskaj\u0101m noslodzes proporcij\u0101m. Tas ir \u0101trs aptuvens apr\u0113\u0137ins, ta\u010du, mainoties produktu sortimentam, v\u0113sturisk\u0101s proporcijas var b\u016bt maldino\u0161as.<\/li><li><strong>Jaudas vajadz\u012bbu saraksti<\/strong> nosaka katram produktam nepiecie\u0161am\u0101s kritisko resursu stundas. Tie par\u0101da, k\u0101p\u0113c divi ra\u017eo\u0161anas pamatpl\u0101ni ar vien\u0101du kop\u0113jo apjomu var rad\u012bt \u013coti at\u0161\u0137ir\u012bgas \u0161aur\u0101s vietas.<\/li><li><strong>Resursu profili<\/strong> \u0161\u012bs vajadz\u012bbas ar\u012b sadala laik\u0101, \u0146emot v\u0113r\u0101, cik ilgi pirms produkta pabeig\u0161anas katrs resurss b\u016bs vajadz\u012bgs. Tie pal\u012bdz atkl\u0101t kritiskas oper\u0101cijas, kas j\u0101veic agr\u0101k\u0101 period\u0101 nek\u0101 tas, kur\u0101 paredz\u0113ta gatav\u0101 produkta pabeig\u0161ana.<\/li><\/ul>\n\n\n<p>Izmantojiet vienk\u0101r\u0161\u0101ko modeli, kas sniedz pietiekami skaidru priek\u0161statu vajadz\u012bg\u0101 l\u0113muma pie\u0146em\u0161anai. Apr\u0113\u0137ins p\u0113c jaudas vajadz\u012bbu saraksta ir labs s\u0101kumpunkts, ja da\u017e\u0101diem produktiem vajadz\u012bga at\u0161\u0137ir\u012bga kop\u012bgo resursu jauda. Ja ra\u017eo\u0161anas mar\u0161ruts aptver vair\u0101kus pl\u0101no\u0161anas periodus, iek\u013caujiet attiec\u012bg\u0101s laika nob\u012bdes.<\/p>\n\n\n<h2 class=\"wp-block-heading\">RCCP piem\u0113rs: ned\u0113\u013ca, kur\u0101 tr\u016bkst 19 iek\u0101rtstundu<\/h2>\n\n\n<p>Iedom\u0101jieties ra\u017eot\u0101ju, kas izgatavo divus s\u016bk\u0146u mezglus \u2014 A un B. Abiem izmanto vienu un to pa\u0161u meh\u0101nisk\u0101s apstr\u0101des iek\u0101rtu grupu un mont\u0101\u017eas komandu. \u0160aj\u0101 vienk\u0101r\u0161otaj\u0101 piem\u0113r\u0101 kritiskos darbus veic taj\u0101 pa\u0161\u0101 ned\u0113\u013c\u0101, kur\u0101 produktu pabeidz, un laika normas uz vien\u012bbu jau ietver pie\u0146emto p\u0101rregul\u0113\u0161anas laika da\u013cu.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Produkts<\/th><th>Meh\u0101nisk\u0101s apstr\u0101des iek\u0101rtstundas uz vien\u012bbu<\/th><th>Mont\u0101\u017eas cilv\u0113kstundas uz vien\u012bbu<\/th><th>1. ned\u0113\u013cas MPS<\/th><th>2. ned\u0113\u013cas MPS<\/th><th>3. ned\u0113\u013cas MPS<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>0,40<\/td><td>0,25<\/td><td>120<\/td><td>180<\/td><td>100<\/td><\/tr><tr><td>B<\/td><td>0,75<\/td><td>0,50<\/td><td>80<\/td><td>100<\/td><td>80<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Meh\u0101nisk\u0101s apstr\u0101des iek\u0101rtu grup\u0101 ir divas iek\u0101rtas. Katra no t\u0101m darbojas piecas dienas ned\u0113\u013c\u0101 div\u0101s asto\u0146u stundu mai\u0146\u0101s. Jauda atbilsto\u0161i darba kalend\u0101ram ir 2 iek\u0101rtas \u00d7 2 mai\u0146as dien\u0101 \u00d7 8 stundas mai\u0146\u0101 \u00d7 5 dienas = 160 ma\u0161\u012bnstundas. Piem\u0113rojot pl\u0101no\u0161anas koeficientu 80%, ned\u0113\u013c\u0101 izmantojam\u0101 jauda ir 128 ma\u0161\u012bnstundas. \u0160aj\u0101 koeficient\u0101 jau ir \u0146emti v\u0113r\u0101 paredzamie jaudas zudumi, t\u0101p\u0113c tos atk\u0101rtoti neatskaita.<\/p>\n\n\n<p>Mont\u0101\u017eas komandai pieejam\u0101 jauda ir 96 cilv\u0113kstundas ned\u0113\u013c\u0101; t\u0101 apr\u0113\u0137in\u0101ta atsevi\u0161\u0137i, \u0146emot v\u0113r\u0101 komandas person\u0101lu un darba kalend\u0101ru.<\/p>\n\n\n<p>2. ned\u0113\u013c\u0101 meh\u0101niskajai apstr\u0101dei nepiecie\u0161ams:<\/p>\n\n\n<p><strong>(180 \u00d7 0,40) + (100 \u00d7 0,75) = 147 iek\u0101rtstundas.<\/strong><\/p>\n\n\n<p>Tas ir par 19 stund\u0101m vair\u0101k nek\u0101 pieejam\u0101s 128 stundas. Jaudas noslodze, noapa\u013cojot l\u012bdz vienai z\u012bmei aiz komata, ir 114,8%.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kritiskais resurss<\/th><th>Ned\u0113\u013c\u0101 pieejam\u0101s stundas<\/th><th>1. ned\u0113\u013c\u0101 nepiecie\u0161am\u0101s stundas<\/th><th>2. ned\u0113\u013c\u0101 nepiecie\u0161am\u0101s stundas<\/th><th>3. ned\u0113\u013c\u0101 nepiecie\u0161am\u0101s stundas<\/th><\/tr><\/thead><tbody><tr><td>Meh\u0101nisk\u0101s apstr\u0101des iek\u0101rtu grupa<\/td><td>128<\/td><td>108<\/td><td>147<\/td><td>100<\/td><\/tr><tr><td>Mont\u0101\u017eas komanda<\/td><td>96<\/td><td>70<\/td><td>95<\/td><td>65<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Mont\u0101\u017eai jaudas pietiek katr\u0101 ned\u0113\u013c\u0101, ta\u010du t\u0101s br\u012bv\u0101s cilv\u0113kstundas nevar aizst\u0101t meh\u0101nisk\u0101s apstr\u0101des ma\u0161\u012bnstundas. Ar\u012b 3. ned\u0113\u013cas br\u012bv\u0101 iek\u0101rtu jauda nepal\u012bdz izpild\u012bt 2. ned\u0113\u013c\u0101 sol\u012bto pieg\u0101di, ja vien netiek main\u012bts pieg\u0101des datums.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Konstat\u0113ta p\u0101rslodze \u2014 j\u0101pie\u0146em l\u0113mums<\/h3>\n\n\n<p>Viena iesp\u0113ja ir 2. ned\u0113\u013c\u0101 nodro\u0161in\u0101t v\u0113l 19 izmantojamas meh\u0101nisk\u0101s apstr\u0101des stundas. V\u0113l j\u0101p\u0101rbauda izmaksas un person\u0101la pieejam\u012bba, ta\u010du vajadz\u012bgais jaudas palielin\u0101jums ir skaidrs.<\/p>\n\n\n<p>Otra iesp\u0113ja ir 50 izstr\u0101d\u0101juma A vien\u012bbas sara\u017eot 1. ned\u0113\u013c\u0101, nevis 2. ned\u0113\u013c\u0101. T\u0101d\u0113j\u0101di uz agr\u0101ku laiku tiek p\u0101rceltas 20 meh\u0101nisk\u0101s apstr\u0101des ma\u0161\u012bnstundas un 12,5 mont\u0101\u017eas cilv\u0113kstundas:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kritiskais resurss<\/th><th>P\u0101rskat\u012bt\u0101 1. ned\u0113\u013cas slodze<\/th><th>P\u0101rskat\u012bt\u0101 2. ned\u0113\u013cas slodze<\/th><th>Ned\u0113\u013cas jauda<\/th><\/tr><\/thead><tbody><tr><td>Meh\u0101nisk\u0101s apstr\u0101des iek\u0101rtu grupa<\/td><td>128<\/td><td>127<\/td><td>128<\/td><\/tr><tr><td>Mont\u0101\u017eas komanda<\/td><td>82,5<\/td><td>82,5<\/td><td>96<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>P\u0101rskat\u012btaj\u0101 MPS izstr\u0101d\u0101juma A daudzumi ir 170, 130, 100; izstr\u0101d\u0101juma B daudzumi nemain\u0101s: 80, 100, 80. Kop\u0113jais ra\u017eo\u0161anas apjoms tr\u012bs ned\u0113\u013c\u0101s paliek nemain\u012bgs. \u0160aj\u0101 model\u012b p\u0101rslodze ir nov\u0113rsta, ta\u010du 1. ned\u0113\u013c\u0101 meh\u0101niskajai apstr\u0101dei nav papildu rezerves zudumiem, kas p\u0101rsniegtu jaudas apr\u0113\u0137in\u0101 jau \u0146emtos v\u0113r\u0101.<\/p>\n\n\n<p>T\u0101p\u0113c ra\u017eo\u0161ana agr\u0101k par pl\u0101noto ir uz\u0146\u0113muma saimniecisks l\u0113mums, nevis risin\u0101jums bez papildu izmaks\u0101m. Materi\u0101li vajadz\u012bgi agr\u0101k, j\u0101atrod vieta mezglu glab\u0101\u0161anai, un izstr\u0101d\u0101juma piepras\u012bjumam un specifik\u0101cijai j\u0101attaisno agr\u0101ka ra\u017eo\u0161ana. Sal\u012bdziniet \u0161\u012bs izmaksas ar virsstundu darbu, apak\u0161uz\u0146\u0113m\u0113ju piesaisti vai vieno\u0161anos par pieg\u0101des termi\u0146a mai\u0146u.<\/p>\n\n\n<p>RCCP \u013cauj konkr\u0113ti izv\u0113rt\u0113t alternat\u012bvas. Ta\u010du t\u0101 neizlemj, kuru saist\u012bbu izpilde j\u016bsu uz\u0146\u0113mumam ir v\u0113rt\u012bg\u0101k\u0101.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0101p\u0113c pozit\u012bvs RCCP p\u0101rbaudes rezult\u0101ts negarant\u0113 savlaic\u012bgu pieg\u0101di<\/h2>\n\n\n<p>P\u0101rskat\u012btaj\u0101 piem\u0113r\u0101 slodze nep\u0101rsniedz neviena no abiem resursiem pieejamo ned\u0113\u013cas jaudu. Tagad iedom\u0101jieties, ka materi\u0101ls vienam no 1. ned\u0113\u013cas pas\u016bt\u012bjumiem pien\u0101ks tikai ceturtdien, bet vair\u0101kiem citiem pas\u016bt\u012bjumiem t\u0101 pati meh\u0101nisk\u0101s apstr\u0101des iek\u0101rtu grupa ir vajadz\u012bga pirms piektdienas mont\u0101\u017eas darbiem.<\/p>\n\n\n<p>Visas ned\u0113\u013c\u0101 pieejam\u0101s 128 stundas nav tas pats, kas stundas, kuras v\u0113l atliku\u0161as p\u0113c materi\u0101lu sa\u0146em\u0161anas. Tagad noz\u012bme ir ra\u017eo\u0161anas uzdevumu sec\u012bbai, mai\u0146u s\u0101kuma un beigu laikam un darbu nodo\u0161anai mont\u0101\u017e\u0101. Aptuven\u0101 jaudas p\u0101rbaude nevar noteikt \u0161o laika sadal\u012bjumu, balstoties tikai uz kopsumm\u0101m.<\/p>\n\n\n<p>Piev\u0113rsiet uzman\u012bbu \u010detriem iemesliem, kuru d\u0113\u013c pat sabalans\u0113ts jaudas pl\u0101ns izpildes laik\u0101 var izr\u0101d\u012bties ne\u012bstenojams:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Darbu laiks perioda ietvaros:<\/strong> vair\u0101kiem ra\u017eo\u0161anas uzdevumiem viens un tas pats resurss ir vajadz\u012bgs vien\u0101 dien\u0101.<\/li><li><strong>Oper\u0101ciju savstarp\u0113j\u0101 atkar\u012bba:<\/strong> mont\u0101\u017e\u0101 nevar izmantot br\u012bvo jaudu, kam\u0113r meh\u0101niskaj\u0101 apstr\u0101d\u0113 nav pabeigtas vajadz\u012bg\u0101s deta\u013cas.<\/li><li><strong>Resursa piem\u0113rot\u012bba:<\/strong> citai iek\u0101rtai ir br\u012bvas stundas, ta\u010du t\u0101 nevar veikt vajadz\u012bgo oper\u0101ciju.<\/li><li><strong>Apst\u0101k\u013cu mai\u0146a:<\/strong> p\u0113c pl\u0101na p\u0101rskat\u012b\u0161anas materi\u0101lu kav\u0113jums, iek\u0101rtas boj\u0101jums vai steidzams pas\u016bt\u012bjums liek pl\u0101nu main\u012bt.<\/li><\/ul>\n\n\n<p>\u0160aj\u0101 posm\u0101 j\u0101p\u0101riet no <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">kop\u0113j\u0101s slodzes p\u0101rbaudes uz ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu ar ierobe\u017eotu jaudu<\/a>. Izmantojiet RCCP s\u0101kotn\u0113jam l\u0113mumam par saist\u012bbu uz\u0146em\u0161anos, bet detaliz\u0113tu grafiku \u2014 lai p\u0101rbaud\u012btu, k\u0101 darbus re\u0101li iesp\u0113jams savstarp\u0113ji saska\u0146ot.<\/p>\n\n\n<h2 class=\"wp-block-heading\">No l\u0113muma par jaudu l\u012bdz grafikam SkyPlanner vid\u0113<\/h2>\n\n\n<p>SkyPlanner APS ir ieteicamais n\u0101kamais solis, ja j\u016bsu pl\u0101not\u0101ji velta laiku tam, lai \u0161os l\u0113mumus p\u0101rv\u0113rstu darbu rind\u0101s pie iek\u0101rt\u0101m un p\u0113c katr\u0101m ra\u017eo\u0161anas izmai\u0146\u0101m \u0161\u012bs rindas veidotu no jauna. Saglab\u0101jiet RCCP galven\u0101 ra\u017eo\u0161anas pl\u0101na izstr\u0101des proces\u0101 un izmantojiet SkyPlanner turpm\u0101kai detaliz\u0113tu ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai.<\/p>\n\n\n<p>Saglab\u0101jiet ERP k\u0101 uz\u0146\u0113m\u0113jdarb\u012bbas un ra\u017eo\u0161anas datu avotu. SkyPlanner <a href=\"https:\/\/skyplanner.ai\/lv\/integracija\/\">integr\u0113jas ar jebkuru ERP vai MES, izmantojot savu atv\u0113rto REST API<\/a>. \u0160ie dati tiek izmantoti ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161an\u0101, t\u0101p\u0113c pl\u0101not\u0101jam nav atk\u0101rtoti j\u0101atjauno pl\u0101ns manu\u0101li.<\/p>\n\n\n<p>Defin\u0113jiet darba centrus, procesa posmus, mai\u0146as, operatorus un priorit\u0101tes. Arcturus apr\u0113\u0137ina grafiku, izmantojot iestat\u012bto jaudu, oper\u0101ciju savstarp\u0113j\u0101s atkar\u012bbas un noteikumus. Ja ir iesl\u0113gta materi\u0101lu pieejam\u012bbas iev\u0113ro\u0161ana, darbu laiku ietekm\u0113 ar\u012b pieejamie materi\u0101li un gaid\u0101m\u0101s pieg\u0101des. Izveidotos ra\u017eo\u0161anas uzdevumus un to savstarp\u0113j\u0101s saites varat apskat\u012bt Gantt laika skal\u0101.<\/p>\n\n\n<p>S\u016bk\u0146u piem\u0113r\u0101 n\u0101kamais praktiskais solis ir sast\u0101d\u012bt grafiku p\u0101rskat\u012btajiem ra\u017eo\u0161anas apjomiem un p\u0101rbaud\u012bt, kad beigsies meh\u0101nisk\u0101 apstr\u0101de un mont\u0101\u017ea. Ja main\u0101s materi\u0101lu sa\u0146em\u0161anas laiks, atjauniniet pieg\u0101des inform\u0101ciju un p\u0101rr\u0113\u0137iniet grafiku. Gantt skats sniedz konkr\u0113tu pamatu l\u0113mumam: saglab\u0101t sol\u012bto termi\u0146u, main\u012bt priorit\u0101tes vai nodro\u0161in\u0101t papildu jaudu.<\/p>\n\n\n<p>Tas samazina pl\u0101no\u0161anas darbu, ko aptuvenais apr\u0113\u0137ins neaptver: darbu saska\u0146o\u0161anu starp resursiem un to piel\u0101go\u0161anu, mainoties apst\u0101k\u013ciem. Pl\u0101not\u0101js nosaka priorit\u0101tes, bet Arcturus apr\u0113\u0137ina grafiku. Ja vajadz\u012bgos darbus joproj\u0101m nav iesp\u0113jams pabeigt l\u012bdz noteiktajiem termi\u0146iem, nepiecie\u0161am\u012bba pie\u0146emt saimniecisku l\u0113mumu paliek skaidri redzama, nevis pasl\u0113pjas aiz sabalans\u0113tas ned\u0113\u013cas kopsummas.<\/p>\n\n\n<h3 class=\"wp-block-heading\">KJH-Comp: no aptuvenas ned\u0113\u013cas slodzes uz detaliz\u0113tu grafiku<\/h3>\n\n\n<p>Somijas lok\u0161\u0146u met\u0101la izstr\u0101d\u0101jumu l\u012bgumra\u017eot\u0101js KJH-Comp jau izmantoja aptuvenu ned\u0113\u013cas noslodzes pl\u0101nu sav\u0101 C9000 ERP sist\u0113m\u0101 un izkl\u0101jlap\u0101s. Gr\u016bt\u012bbas rad\u012bja n\u0101kamais solis: klientu pas\u016bt\u012bjumi bija j\u0101izpilda konkr\u0113t\u0101s dien\u0101s, bet meistari joproj\u0101m manu\u0101li sadal\u012bja ra\u017eo\u0161anas uzdevumus pa iek\u0101rt\u0101m. Divi meistari katrs velt\u012bja vismaz pusi sava laika jaudas sadales pl\u0101no\u0161anai.<\/p>\n\n\n<p>Uz\u0146\u0113mums saglab\u0101ja savu ERP un ieviesa SkyPlanner ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar ierobe\u017eotu jaudu. Public\u0113taj\u0101 klienta pieredzes st\u0101st\u0101 KJH-Comp apraksta autom\u0101tisku uzdevumu pie\u0161\u0137ir\u0161anu iek\u0101rt\u0101m, agr\u0101ku \u0161auro vietu paman\u012b\u0161anu un maz\u0101ku manu\u0101l\u0101 darba apjomu grafiku sast\u0101d\u012b\u0161an\u0101. Atbild\u012bbu par grafiku sast\u0101d\u012b\u0161anu divu meistaru viet\u0101 p\u0101r\u0146\u0113ma viens, bet otrs p\u0101rg\u0101ja pie citiem uzdevumiem.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/klientu-stasti\/kjh-comp\/\">KJH-Comp zi\u0146o<\/a>, ka pieg\u0101\u017eu savlaic\u012bgums no aptuveni 50% pieaudzis l\u012bdz pat 98% 2026. gad\u0101. T\u0101 ir uz\u0146\u0113muma pieredze ar pa\u0161a ieviesto risin\u0101jumu. RCCP p\u0101rbaudes kontekst\u0101 b\u016btiski ir tas, k\u0101du praktisku probl\u0113mu izdev\u0101s atrisin\u0101t: inform\u0101ciju par ned\u0113\u013cas noslodzi s\u0101ka izmantot saska\u0146otai ikdienas darbu pl\u0101no\u0161anai, nevis atst\u0101ja meistaru zi\u0146\u0101 v\u0113l vienu darbu rindu manu\u0101lu veido\u0161anu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0101rv\u0113rtiet n\u0101kamo jaudas p\u0101rbaudi praktisk\u0101 r\u012bc\u012bb\u0101<\/h2>\n\n\n<p>N\u0101kamaj\u0101 MPS p\u0101rskat\u012b\u0161an\u0101 nosakiet kritisko resursu ar liel\u0101ko jaudas iztr\u016bkumu. Vienojieties, vai p\u0101rcelt ra\u017eo\u0161anu, palielin\u0101t izmantojamo jaudu vai main\u012bt sol\u012btos nosac\u012bjumus, un tad p\u0101rr\u0113\u0137iniet aptuveno slodzi. Pirms p\u0101rskat\u012bto darbu nodo\u0161anas izpildei p\u0101rbaudiet to detaliz\u0113to laika sadal\u012bjumu, \u0146emot v\u0113r\u0101 citus ra\u017eo\u0161anas uzdevumus un materi\u0101lu pieejam\u012bbu.<\/p>\n\n\n<p>Izmantojiet SkyPlanner, lai \u0161o p\u0113d\u0113jo soli paveiktu \u0101tr\u0101k un ar liel\u0101ku ieguvumu. <a href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu ar demonstr\u0101cijas datiem<\/a>, lai iepaz\u012btu grafiku sast\u0101d\u012b\u0161anas procesu, vai <a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">piesakiet demonstr\u0101ciju<\/a>, kur\u0101 piev\u0113rsties j\u016bsu \u0161aurajai vietai, mai\u0146\u0101m un sol\u012btajiem pieg\u0101des termi\u0146iem. Sagatavojiet ra\u017eo\u0161anas pl\u0101nu, kuru v\u0113laties \u012bstenot, un uzziniet, k\u0101 Arcturus un Gantt laika skala pal\u012bdz to p\u0101rv\u0113rst grafik\u0101, ko j\u016bsu komanda var izmantot darb\u0101.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP S\u0101kums &raquo; Resursi &raquo; Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP Ra\u017eo\u0161anas pamatpl\u0101ns nosaka, ko pl\u0101nojat sara\u017eot. Rough cut capacity planning jeb aptuven\u0101 ra\u017eo\u0161anas jaudas pl\u0101no\u0161ana \u013cauj p\u0101rbaud\u012bt, vai kritisko resursu jauda ir pietiekama \u0161\u012b pl\u0101na izpildei. Tas j\u0101p\u0101rbauda, pirms iepirkumu, ra\u017eo\u0161anas un p\u0101rdo\u0161anas komandas s\u0101k &#8230; <a title=\"Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/\" aria-label=\"Read more about Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99179,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-99143","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP<\/title>\n<meta name=\"description\" content=\"Vai kritisko resursu jauda ir pietiekama MPS izpildei? Ar \u0161o RCCP piem\u0113ru atkl\u0101jiet p\u0101rslodzes un p\u0113c tam p\u0101rv\u0113rtiet pl\u0101nu izpild\u0101m\u0101 ra\u017eo\u0161anas grafik\u0101.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP\" \/>\n<meta property=\"og:description\" content=\"Vai kritisko resursu jauda ir pietiekama MPS izpildei? Ar \u0161o RCCP piem\u0113ru atkl\u0101jiet p\u0101rslodzes un p\u0113c tam p\u0101rv\u0113rtiet pl\u0101nu izpild\u0101m\u0101 ra\u017eo\u0161anas grafik\u0101.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T15:53:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T15:54:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/rough-cut-capacity-planning\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/rough-cut-capacity-planning\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP\",\"datePublished\":\"2026-10-15T15:53:51+00:00\",\"dateModified\":\"2026-10-15T15:54:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/rough-cut-capacity-planning\\\/\"},\"wordCount\":3179,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/rough-cut-capacity-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/rough-cut-capacity-planning\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/rough-cut-capacity-planning\\\/\",\"name\":\"Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/rough-cut-capacity-planning\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/rough-cut-capacity-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"datePublished\":\"2026-10-15T15:53:51+00:00\",\"dateModified\":\"2026-10-15T15:54:37+00:00\",\"description\":\"Vai kritisko resursu jauda ir pietiekama MPS izpildei? Ar \u0161o RCCP piem\u0113ru atkl\u0101jiet p\u0101rslodzes un p\u0113c tam p\u0101rv\u0113rtiet pl\u0101nu izpild\u0101m\u0101 ra\u017eo\u0161anas grafik\u0101.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/rough-cut-capacity-planning\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/rough-cut-capacity-planning\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/rough-cut-capacity-planning\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/rough-cut-capacity-planning\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP","description":"Vai kritisko resursu jauda ir pietiekama MPS izpildei? Ar \u0161o RCCP piem\u0113ru atkl\u0101jiet p\u0101rslodzes un p\u0113c tam p\u0101rv\u0113rtiet pl\u0101nu izpild\u0101m\u0101 ra\u017eo\u0161anas grafik\u0101.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/","og_locale":"lv_LV","og_type":"article","og_title":"Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP","og_description":"Vai kritisko resursu jauda ir pietiekama MPS izpildei? Ar \u0161o RCCP piem\u0113ru atkl\u0101jiet p\u0101rslodzes un p\u0113c tam p\u0101rv\u0113rtiet pl\u0101nu izpild\u0101m\u0101 ra\u017eo\u0161anas grafik\u0101.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T15:53:51+00:00","article_modified_time":"2026-10-15T15:54:37+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP","datePublished":"2026-10-15T15:53:51+00:00","dateModified":"2026-10-15T15:54:37+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/"},"wordCount":3179,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/","name":"Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","datePublished":"2026-10-15T15:53:51+00:00","dateModified":"2026-10-15T15:54:37+00:00","description":"Vai kritisko resursu jauda ir pietiekama MPS izpildei? Ar \u0161o RCCP piem\u0113ru atkl\u0101jiet p\u0101rslodzes un p\u0113c tam p\u0101rv\u0113rtiet pl\u0101nu izpild\u0101m\u0101 ra\u017eo\u0161anas grafik\u0101.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/rough-cut-capacity-planning\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP S\u0101kums &raquo; Resursi &raquo; Rough cut capacity planning: p\u0101rbaudiet MPS ar RCCP Ra\u017eo\u0161anas pamatpl\u0101ns nosaka, ko pl\u0101nojat sara\u017eot. Rough cut capacity planning jeb aptuven\u0101 ra\u017eo\u0161anas jaudas pl\u0101no\u0161ana \u013cauj p\u0101rbaud\u012bt, vai kritisko resursu jauda ir pietiekama \u0161\u012b pl\u0101na izpildei. Tas j\u0101p\u0101rbauda, pirms iepirkumu, ra\u017eo\u0161anas un p\u0101rdo\u0161anas komandas s\u0101k&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/99143","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=99143"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/99143\/revisions"}],"predecessor-version":[{"id":99202,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/99143\/revisions\/99202"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/99179"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=99143"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=99143"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=99143"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}