{"id":96590,"date":"2026-10-08T07:53:30","date_gmt":"2026-10-08T07:53:30","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96590"},"modified":"2026-10-19T14:43:24","modified_gmt":"2026-10-19T14:43:24","slug":"make-to-order","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/","title":{"rendered":"Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi"},"content":{"rendered":"<div class=\"gb-container gb-container-mto01 article-main-content-container\">\n<div class=\"gb-container gb-container-mto01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi<\/h1>\n\n<div class=\"gb-container gb-container-mto02\">\n<div class=\"gb-container gb-container-mto02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"\/lv\/resursi\/\">Resursi<\/a> &raquo; Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<\/div>\n<div class=\"gb-container gb-container-mto03\">\n<div class=\"gb-container gb-container-mto03\">\n\n<p>Klients pas\u016bta korpusu izm\u0113r\u0101, ko p\u0101rdodat reti. Ir sapr\u0101t\u012bgi to ra\u017eot tikai p\u0113c pas\u016bt\u012bjuma sa\u0146em\u0161anas: t\u0101 noliktava nepiepild\u0101s ar variantiem, kuriem pirc\u0113js var ar\u012b neatrasties. Tom\u0113r klients v\u0113las zin\u0101t pieg\u0101des datumu, bet apdarei nepiecie\u0161amais resurss jau ir aiz\u0146emts.<\/p>\n\n\n<p>Tas ir galvenais kompromiss, ko prasa <strong>make to order jeb ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma<\/strong>. Iepriek\u0161 sara\u017eot\u0101s gatav\u0101s produkcijas kr\u0101jumi ir maz\u0101ki, ta\u010du klientiem j\u0101gaida, kam\u0113r vi\u0146u pas\u016bt\u012bjumi tiek izgatavoti. Pan\u0101kumi ir atkar\u012bgi ne tikai no t\u0101, k\u0101dus produktus sp\u0113jat izgatavot, bet ar\u012b no t\u0101, kuriem pas\u016bt\u012bjumiem r\u016bpn\u012bc\u0101 pietiek jaudas.<\/p>\n\n\n<p>SkyPlanner sniedz praktisku veidu, k\u0101 p\u0101rvald\u012bt \u0161o kompromisu. T\u0101 m\u0101ksl\u012bgais intelekts Arcturus apr\u0113\u0137ina ra\u017eo\u0161anas sec\u012bbu, \u0146emot v\u0113r\u0101 jaudu, materi\u0101lus un priorit\u0101tes. Ieg\u016bto pl\u0101nu varat apskat\u012bt Gantt laika skal\u0101 un vienoties par pieg\u0101des termi\u0146iem, skaidr\u0101k p\u0101rredzot priek\u0161\u0101 eso\u0161os darbus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ko noz\u012bm\u0113 ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma?<\/h2>\n\n\n<p>Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma (MTO) ir ra\u017eo\u0161anas strat\u0113\u0123ija, kur\u0101 ra\u017eo\u0161anu s\u0101k p\u0113c klienta pas\u016bt\u012bjuma sa\u0146em\u0161anas. T\u0101 viet\u0101, lai p\u0113c piepras\u012bjuma prognozes ra\u017eotu gatavos produktus un p\u0101rdotu tos no noliktavas, j\u016bs izgatavojat klienta pas\u016bt\u012bto daudzumu atbilsto\u0161i vi\u0146a nor\u0101d\u012btajai specifik\u0101cijai.<\/p>\n\n\n<p>Produktam nav j\u0101b\u016bt unik\u0101lam izgudrojumam. Ra\u017eot\u0101js var izmantot jau izstr\u0101d\u0101tu konstrukciju, materi\u0101lu sarakstu un tehnolo\u0123isko procesu, lai p\u0113c pas\u016bt\u012bjuma izgatavotu produktus konkr\u0113t\u0101 izm\u0113r\u0101, ar noteiktu apdari vai vajadz\u012bgaj\u0101 partijas daudzum\u0101. Noteico\u0161ais ir <strong>tas, kas ierosina ra\u017eo\u0161anas s\u0101k\u0161anu<\/strong>, nevis produkta unikalit\u0101te.<\/p>\n\n\n<p>Iedom\u0101jieties lok\u0161\u0146u met\u0101la izstr\u0101d\u0101jumu ra\u017eot\u0101ju, kas pied\u0101v\u0101 iek\u0101rtu korpusus da\u017e\u0101dos izm\u0113ros un ar da\u017e\u0101du apdari. Noliktav\u0101 tas glab\u0101 bie\u017ei izmantoto lok\u0161\u0146u materi\u0101lu, bet korpusa grie\u0161anu, loc\u012b\u0161anu un apdari s\u0101k tikai p\u0113c klienta pas\u016bt\u012bjuma sa\u0146em\u0161anas. T\u0101 ir MTO pieeja: izejmateri\u0101lus var glab\u0101t kr\u0101jum\u0101, pat ja gatavus korpusus noliktavai nera\u017eo.<\/p>\n\n\n<p>Lai at\u0161\u0137irtu ra\u017eo\u0161anas strat\u0113\u0123ijas, ir noder\u012bgi pajaut\u0101t, kas v\u0113l j\u0101paveic pas\u016bt\u012bjuma sa\u0146em\u0161anas br\u012bd\u012b:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Strat\u0113\u0123ija<\/th><th>Darbi, ko s\u0101k p\u0113c klienta pas\u016bt\u012bjuma sa\u0146em\u0161anas<\/th><th>Galvenais pl\u0101no\u0161anas jaut\u0101jums<\/th><\/tr><\/thead><tbody><tr><td>Ra\u017eo\u0161ana noliktavai (MTS)<\/td><td>Pa\u0146emt no noliktavas un nos\u016bt\u012bt gatavu produktu, kas sara\u017eots atbilsto\u0161i prognoz\u0113tajam piepras\u012bjumam<\/td><td>K\u0101dus gatavos produktus un k\u0101d\u0101 daudzum\u0101 glab\u0101t noliktav\u0101?<\/td><\/tr><tr><td><a href=\"\/lv\/resursi\/montaza-pec-pasutijuma\/\">Mont\u0101\u017ea p\u0113c pas\u016bt\u012bjuma (ATO)<\/a><\/td><td>Samont\u0113t gatavo produktu no sagatavot\u0101m deta\u013c\u0101m vai mezgliem<\/td><td>Vai ir pieejamas nepiecie\u0161am\u0101s deta\u013cas un mont\u0101\u017eas jauda?<\/td><\/tr><tr><td>Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma (MTO)<\/td><td>Izgatavot pas\u016bt\u012bto produktu, izmantojot jau izstr\u0101d\u0101tu konstrukciju un tehnolo\u0123isko procesu<\/td><td>Kad ra\u017eo\u0161an\u0101 var iepl\u0101not visas nepiecie\u0161am\u0101s oper\u0101cijas?<\/td><\/tr><tr><td><a href=\"\/lv\/resursi\/projektesana-un-razosana-pec-pasutijuma\/\">Projekt\u0113\u0161ana un ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma (ETO)<\/a><\/td><td>Izstr\u0101d\u0101t produkta konstrukciju un p\u0113c tam to izgatavot<\/td><td>Kad konstrukcija b\u016bs gatava, un k\u0101di darbi b\u016bs nepiecie\u0161ami t\u0101s izgatavo\u0161anai?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>MTO nav ar\u012b tas pats, kas ra\u017eo\u0161ana p\u0113c job shop principa. MTO raksturo pas\u016bt\u012bjuma lomu ra\u017eo\u0161anas s\u0101k\u0161an\u0101, savuk\u0101rt job shop raksturo ra\u017eo\u0161anas vidi, kur\u0101 da\u017e\u0101di uzdevumi izmanto kop\u012bgus resursus, bet var iziet at\u0161\u0137ir\u012bgus tehnolo\u0123iskos procesus. Vien\u0101 r\u016bpn\u012bc\u0101 var izmantot abas pieejas. \u0160\u0101du procesu pl\u0101no\u0161anas gr\u016bt\u012bbas apl\u016bkotas m\u016bsu <a href=\"\/lv\/resursi\/individuala-un-mazseriju-razosana\/\">ce\u013cved\u012b par ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu job shop vid\u0113<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kad ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma ir pareiz\u0101 izv\u0113le?<\/h2>\n\n\n<p>MTO ir pievilc\u012bga izv\u0113le, ja visu gatav\u0101 produkta variantu glab\u0101\u0161ana noliktav\u0101 b\u016btu d\u0101rga, piepras\u012bjums p\u0113c atsevi\u0161\u0137iem variantiem ir nevienm\u0113r\u012bgs un klienti ir gatavi gaid\u012bt izgatavo\u0161anu. T\u0101 \u013cauj pied\u0101v\u0101t pla\u0161\u0101ku sortimentu, iepriek\u0161 nesara\u017eojot visus iesp\u0113jamos produktus.<\/p>\n\n\n<p>Ieguvums vislab\u0101k redzams gatav\u0101s produkcijas kr\u0101jumos: maz\u0101k produktu paliek nep\u0101rdoti t\u0101p\u0113c, ka k\u013c\u016bdaini prognoz\u0113ts piepras\u012bjums p\u0113c da\u017e\u0101diem variantiem. Darbs ir saist\u012bts ar re\u0101lu klienta pas\u016bt\u012bjumu, kur\u0101 var nor\u0101d\u012bt nepiecie\u0161amos izm\u0113rus, materi\u0101lu vai apdari.<\/p>\n\n\n<p>Par to j\u0101maks\u0101 ar pas\u016bt\u012bjuma izpildes laiku. Izmantojot MTS, produkts jau var b\u016bt gatavs nos\u016bt\u012b\u0161anai. Izmantojot MTO, klienta gaid\u012b\u0161anas laik\u0101 ietilpst gan izgatavo\u0161ana, gan gaid\u012b\u0161ana rind\u0101s starp oper\u0101cij\u0101m. Ar\u012b pas\u016bt\u012bjumu ien\u0101k\u0161ana var rad\u012bt nevienm\u0113r\u012bgu noslodzi: p\u0113c mier\u012bgas ned\u0113\u013cas var sekot vair\u0101ki pas\u016bt\u012bjumi, kuriem vienlaikus vajadz\u012bgs viens un tas pats resurss.<\/p>\n\n\n<p><strong>MTO nenoz\u012bm\u0113, ka kr\u0101jumu nav visp\u0101r vai ka kop\u0113j\u0101s izmaksas autom\u0101tiski ir zem\u0101kas.<\/strong> Joproj\u0101m var b\u016bt vajadz\u012bgi izejmateri\u0101li, iepirkt\u0101s deta\u013cas un nepabeigt\u0101 ra\u017eo\u0161ana. Ra\u017eojot neliel\u0101s partij\u0101s, iek\u0101rtas var n\u0101kties bie\u017ei p\u0101rregul\u0113t. Ja klientiem vajadz\u012bga t\u016bl\u012bt\u0113ja nos\u016bt\u012b\u0161ana un vi\u0146i regul\u0101ri p\u0113rk vienu un to pa\u0161u standarta produktu, piem\u0113rot\u0101ka var b\u016bt <a href=\"\/lv\/resursi\/razosana-noliktavai\/\">\u0161\u012b produkta ra\u017eo\u0161ana noliktavai<\/a>.<\/p>\n\n\n<p>Nav nepiecie\u0161ams vis\u0101 r\u016bpn\u012bc\u0101 izmantot tikai vienu modeli. Standarta produktus var glab\u0101t noliktav\u0101, bet variantus ar gr\u016bt\u0101k prognoz\u0113jamu piepras\u012bjumu ra\u017eot p\u0113c pas\u016bt\u012bjuma. <a href=\"\/lv\/resursi\/master-production-schedule\/\">Ra\u017eo\u0161anas pamatpl\u0101ns<\/a> pal\u012bdz sasaist\u012bt \u0161o pla\u0161\u0101ko sortimentu ar darbiem, kas ra\u017eo\u0161an\u0101 j\u0101paveic.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pas\u016bt\u012bjumam vajadz\u012bga vieta grafik\u0101, ne tikai izpildes termi\u0146\u0161<\/h2>\n\n\n<p>Atgriez\u012bsimies pie iedom\u0101t\u0101 korpusu ra\u017eot\u0101ja. Jaunajam pas\u016bt\u012bjumam nepiecie\u0161ama grie\u0161ana, loc\u012b\u0161ana un apdare. Materi\u0101ls ir pieejams, un grie\u0161anai ir br\u012bva jauda, t\u0101p\u0113c p\u0101rdo\u0161anas komandai rodas k\u0101rdin\u0101jums sol\u012bt \u0101tru izpildi. Ta\u010du apdares jauda jau ir atv\u0113l\u0113ta citu klientu pas\u016bt\u012bjumiem.<\/p>\n\n\n<p>T\u016bl\u012bt\u0113ja grie\u0161anas s\u0101k\u0161ana \u0161o konfliktu neatrisina. T\u0101 var tikai rad\u012bt v\u0113l vienu deta\u013cu, kas gaida apdari. Svar\u012bgi ir noskaidrot, vai <strong>visu tehnolo\u0123isko procesu<\/strong> var pabeigt laik\u0101, izpildot ar\u012b pas\u016bt\u012bjumus, kuru termi\u0146i jau apsol\u012bti.<\/p>\n\n\n<p>Par katru jauno pas\u016bt\u012bjumu apkopojiet \u0161\u0101du inform\u0101ciju:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Nepiecie\u0161amie darbi:<\/strong> prec\u012bza specifik\u0101cija, daudzums, oper\u0101ciju sec\u012bba, k\u0101 ar\u012b apstr\u0101des un iestat\u012b\u0161anas ilgums.<\/li><li><strong>Resursi, kas var veikt \u0161os darbus:<\/strong> piem\u0113rotie darba centri, darba mai\u0146as, operatori un nepiecie\u0161amie instrumenti.<\/li><li><strong>Materi\u0101lu pieejam\u012bba:<\/strong> eso\u0161ie kr\u0101jumi un iepirkto materi\u0101lu vai deta\u013cu paredzam\u0101 pieejam\u012bba.<\/li><li><strong>Jau uz\u0146emt\u0101s saist\u012bbas:<\/strong> oper\u0101cijas, kur\u0101m ar\u012b nepiecie\u0161ami \u0161ie resursi, un to priorit\u0101tes.<\/li><li><strong>Pieg\u0101dei nepiecie\u0161amais laiks:<\/strong> laiks atliku\u0161ajiem ra\u017eo\u0161anas posmiem, p\u0101rbaudei, iepako\u0161anai un, ja nepiecie\u0161ams, transport\u0113\u0161anai.<\/li><\/ul>\n\n\n<p><a href=\"\/lv\/resursi\/razosanas-pasutijums\/\">Ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101<\/a> ir ietverta inform\u0101cija par darba izpildi. <a href=\"\/lv\/resursi\/kas-ir-razosanas-planosana\/\">Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/a> sasaista \u0161o darbu ar pieejamo laiku. V\u0113lamais izpildes datums pats par sevi nenodro\u0161ina ne vienu, ne otru.<\/p>\n\n\n<p>Ja v\u0113lamo datumu nevar iek\u013caut grafik\u0101, jums v\u0113l j\u0101pie\u0146em l\u0113mums. Var pal\u012bdz\u0113t cits piem\u0113rots darba centrs, mai\u0146as izmai\u0146as vai cita priorit\u0101te. Ja tas nav iesp\u0113jams, vienojieties par v\u0113l\u0101ku datumu, pirms klients s\u0101k pa\u013cauties uz neizpild\u0101mu sol\u012bjumu. Ja oper\u0101cija, ko izmanto vair\u0101ki pas\u016bt\u012bjumi, atk\u0101rtoti aizkav\u0113 pieg\u0101des, izp\u0113tiet \u0161o <a href=\"\/lv\/resursi\/saura-vieta\/\">ra\u017eo\u0161anas \u0161auro vietu<\/a>, nevis pievienojiet t\u0101s rindai v\u0113l vair\u0101k darbu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">J\u016bs nosak\u0101t priorit\u0101tes, SkyPlanner apr\u0113\u0137ina pl\u0101nu<\/h2>\n\n\n<p>Gr\u016bt\u0101kais nav \u0161o inform\u0101ciju p\u0101rbaud\u012bt vienu reizi. Gr\u016bt\u0101kais ir saglab\u0101t t\u0101s savstarp\u0113jo sasaisti, kad ien\u0101k jauni pas\u016bt\u012bjumi, main\u0101s materi\u0101lu pieejam\u012bbas datumi un ra\u017eo\u0161ana aiz\u0146em vair\u0101k laika, nek\u0101 pl\u0101nots. Ja katru uzdevumu starp iek\u0101rtu rind\u0101m p\u0101rvieto manu\u0101li, pl\u0101not\u0101jam j\u0101uztur aktu\u0101li apr\u0113\u0137ini un vienlaikus j\u0101pie\u0146em l\u0113mumi.<\/p>\n\n\n<p><a href=\"\/lv\/\">SkyPlanner APS<\/a> p\u0101r\u0146em ra\u017eo\u0161anas grafika apr\u0113\u0137in\u0101\u0161anu. J\u016bs nosak\u0101t darba centrus, mai\u0146as, operatorus, materi\u0101lus un priorit\u0101tes, k\u0101 ar\u012b katram produktam nor\u0101d\u0101t procesa posmus un to ilgumu. Arcturus sast\u0101da darbu grafiku, \u0146emot v\u0113r\u0101 konfigur\u0113to jaudu un savstarp\u0113j\u0101s atkar\u012bbas. Gantt skat\u0101 redzama darbu sec\u012bba visos darba centros, t\u0101p\u0113c atsevi\u0161\u0137u rindu p\u0101rbaud\u012b\u0161anas viet\u0101 varat izsekot korpusa izgatavo\u0161anai no grie\u0161anas l\u012bdz apdarei.<\/p>\n\n\n<p>Korpusa piem\u0113r\u0101 tas noz\u012bm\u0113, ka apdares noslodze ir iek\u013cauta pl\u0101n\u0101 jau no s\u0101kuma. Ja steidzamam pas\u016bt\u012bjumam j\u0101pie\u0161\u0137ir priek\u0161roka, j\u016bs main\u0101t priorit\u0101ti un p\u0101rr\u0113\u0137in\u0101t grafiku. Pirms apstiprin\u0101t jauno pieg\u0101des sol\u012bjumu, p\u0101rbaudiet, kad tagad tiks pabeigti p\u0101r\u0113jie pas\u016bt\u012bjumi. Ieguvums nav tikai \u0101tr\u0101ka atbilde vienam klientam: j\u016bs redzat ar\u012b to, ko \u0161\u012b atbilde noz\u012bm\u0113 klientiem, kuri jau gaida.<\/p>\n\n\n<p>Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana, \u0146emot v\u0113r\u0101 materi\u0101lu pieejam\u012bbu, \u013cauj taj\u0101 pa\u0161\u0101 apr\u0113\u0137in\u0101 risin\u0101t v\u0113l vienu izplat\u012btu MTO probl\u0113mu. Ja \u0161is noteikums ir iesp\u0113jots, Arcturus \u0146em v\u0113r\u0101 materi\u0101lu pieejam\u012bbu, nevis pl\u0101no darbu t\u0101, it k\u0101 viss jau b\u016btu pieejams. Iepirkuma pas\u016bt\u012bjumu pieg\u0101des datumi nor\u0101da paredzamo pieejam\u012bbu; apstiprinot, ka pieg\u0101de ir sa\u0146emta, tiek atjaunin\u0101ti kr\u0101jumi. \u0160iem datumiem j\u0101b\u016bt aktu\u0101liem, jo pieg\u0101d\u0101t\u0101ja kav\u0113jums var main\u012bt to, kurus darbus iesp\u0113jams veikt n\u0101kamos.<\/p>\n\n\n<p>Priorit\u0101tes joproj\u0101m nosak\u0101t j\u016bs, un ar blo\u0137\u0113jumiem varat aizsarg\u0101t pie\u0146emtos pl\u0101no\u0161anas l\u0113mumus. Arcturus veic apr\u0113\u0137inus atbilsto\u0161i \u0161\u012bm nor\u0101d\u0113m. Tas nevar rad\u012bt tr\u016bksto\u0161u fizisko jaudu, ta\u010du var dot skaidr\u0101ku pamatu l\u0113mumam \u2014 main\u012bt pl\u0101nu vai klientam apsol\u012bto termi\u0146u.<\/p>\n\n\n<p>SkyPlanner integr\u0113jas ar jebkuru ERP vai MES sist\u0113mu, izmantojot atv\u0113rto REST API. Eso\u0161os pas\u016bt\u012bjumu un ra\u017eo\u0161anas datus varat sasaist\u012bt ar grafiku, nes\u0101kot MTO pl\u0101no\u0161anas uzlabo\u0161anu ar ERP nomai\u0146u.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0101 iesp\u0113ja p\u0101rredz\u0113t ra\u017eo\u0161anas jaudu main\u012bja darbu Fredman Operations<\/h2>\n\n\n<p>Fredman Operations ra\u017eo saskarei ar p\u0101rtiku dro\u0161us virtuves un iepako\u0161anas risin\u0101jumus. Pieaugot pas\u016bt\u012bjumu apjomam, uz\u0146\u0113mumam vajadz\u0113ja skaidr\u0101k p\u0101rredz\u0113t ra\u017eo\u0161anas jaudu. Darba kartes no L7 ERP uz LTR ra\u017eo\u0161anas vad\u012bbas sist\u0113mu p\u0101rnesa manu\u0101li, un pl\u0101not\u0101js noteica uzdevumu priorit\u0101tes bez prec\u012bzas inform\u0101cijas par to, kad atbr\u012bvosies iek\u0101rtas un k\u0101da jauda pieejama mai\u0146\u0101s. Steidzama grafika p\u0101rpl\u0101no\u0161ana var\u0113ja aiz\u0146emt stundu vai ilg\u0101k.<\/p>\n\n\n<p>Uz\u0146\u0113mums izv\u0113l\u0113j\u0101s SkyPlanner t\u0101 p\u0101rskat\u0101m\u0101 kop\u012bg\u0101 Gantt skata d\u0113\u013c un savienoja savas L7 un LTR sist\u0113mas. Vienuviet bija redzamas iek\u0101rtas, br\u012bv\u0101 un aiz\u0146emt\u0101 jauda, k\u0101 ar\u012b uzdevumu izpildes gaita. Ra\u017eo\u0161anas darbinieki var\u0113ja redz\u0113t pl\u0101notos s\u0101kuma un beigu laikus, savuk\u0101rt p\u0101rdo\u0161anas komandai bija lab\u0101ks pamats, lai vienotos par pieg\u0101des termi\u0146iem.<\/p>\n\n\n<p>Fredman pieredzes st\u0101st\u0101 zi\u0146ots par maz\u0101ku virsstundu apjomu un \u0101tr\u0101ku reakciju uz grafika izmai\u0146\u0101m. MTO ra\u017eot\u0101jam svar\u012bg\u0101k\u0101 atzi\u0146a ir saikne starp ra\u017eo\u0161anu un p\u0101rdo\u0161anu: pieg\u0101des sol\u012bjumu ir viegl\u0101k pamatot, ja visi redz t\u0101 izpildei pieejamo jaudu. <a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Lasiet Fredman Operations pieredzes st\u0101stu<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Noskaidrojiet, k\u0101 grafik\u0101 iek\u013cautos j\u016bsu n\u0101kamais pas\u016bt\u012bjums<\/h2>\n\n\n<p>Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma pal\u012bdz izvair\u012bties no neatbilsto\u0161u gatav\u0101s produkcijas kr\u0101jumu veido\u0161anas. Izpild\u0101ms ra\u017eo\u0161anas grafiks pal\u012bdz nepie\u013caut, ka \u0161o kr\u0101jumu probl\u0113mu aizst\u0101j neizpild\u012btu, kav\u0113tu klientu pas\u016bt\u012bjumu uzkr\u0101jums.<\/p>\n\n\n<p>Lai redz\u0113tu, k\u0101 SkyPlanner var\u0113tu pl\u0101not j\u016bsu ra\u017eo\u0161anu, <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">piesakiet demonstr\u0101ciju<\/a>. Sagatavojiet tipiska pas\u016bt\u012bjuma tehnolo\u0123isko procesu, inform\u0101ciju par resursu, par kura jaudu konkur\u0113 liel\u0101k\u0101 da\u013ca pas\u016bt\u012bjumu, un nesenu izmai\u0146u piem\u0113ru, kas izjauca pieg\u0101des termi\u0146us. Tas b\u016bs noder\u012bgs s\u0101kumpunkts, lai par\u0101d\u012btu, k\u0101 Arcturus un Gantt grafiks var\u0113tu atvieglot j\u016bsu ikdienas pl\u0101no\u0161anu.<\/p>\n\n\n<p>V\u0113laties vispirms izp\u0113t\u012bt pa\u0161i? <a href=\"\/lv\/izmeginajums\/\">Izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a> un apskatiet, k\u0101 grafik\u0101 tiek saska\u0146oti pas\u016bt\u012bjumi un ra\u017eo\u0161anas jauda.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Vai ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma noz\u012bm\u0113, ka katrs produkts tiek projekt\u0113ts individu\u0101li?<\/h3>\n\n\n<p>N\u0113. MTO produktu var ra\u017eot p\u0113c jau izstr\u0101d\u0101ta projekta un tehnolo\u0123isk\u0101 procesa, uzs\u0101kot ra\u017eo\u0161anu tikai p\u0113c klienta pas\u016bt\u012bjuma sa\u0146em\u0161anas. Ja pas\u016bt\u012bjuma izpildei nepiecie\u0161ama ar\u012b jauna produkta projekt\u0113\u0161ana, prec\u012bz\u0101ks apz\u012bm\u0113jums ir projekt\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Vai uz\u0146\u0113mums, kas ra\u017eo p\u0113c pas\u016bt\u012bjuma, var uztur\u0113t materi\u0101lu kr\u0101jumus?<\/h3>\n\n\n<p>J\u0101. MTO raksturo to, kas ierosina ra\u017eo\u0161anas uzs\u0101k\u0161anu, nevis aizliedz uztur\u0113t kr\u0101jumus. Bie\u017ei izmantot\u0101s izejvielas un iepirkt\u0101s deta\u013cas var glab\u0101t noliktav\u0101, lai ra\u017eo\u0161anu var\u0113tu s\u0101kt \u0101tr\u0101k. Gatavo produktu izgatavo konkr\u0113tam klienta pas\u016bt\u012bjumam, nevis atbilsto\u0161i prognoz\u0113tajam piepras\u012bjumam p\u0113c gatav\u0101s produkcijas.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u0101p\u0113c ra\u017eo\u0161an\u0101 p\u0113c pas\u016bt\u012bjuma var main\u012bties pieg\u0101des datumi?<\/h3>\n\n\n<p>Da\u017e\u0101du pas\u016bt\u012bjumu izpildei izmanto vienus un tos pa\u0161us resursus. Materi\u0101lu kav\u0113\u0161an\u0101s, pieejam\u0101s jaudas samazin\u0101\u0161an\u0101s vai priorit\u0101\u0161u mai\u0146a var p\u0101rcelt oper\u0101ciju un ietekm\u0113t turpm\u0101kos darbus. P\u0101rr\u0113\u0137inot grafiku, \u0161\u012bs sekas k\u013c\u016bst redzamas, un pl\u0101not\u0101js var rea\u0123\u0113t un vajadz\u012bbas gad\u012bjum\u0101 p\u0101rskat\u012bt sol\u012btos termi\u0146us.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Does make to order mean every product is custom-designed?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. An MTO product can use an established design and production route, with manufacturing starting only after the customer places an order. If that order also triggers new product engineering, engineer to order is the more appropriate description.\"}},{\"@type\":\"Question\",\"name\":\"Can a make-to-order manufacturer keep materials in stock?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. MTO describes when manufacturing is triggered, not a ban on inventory. Common raw materials and purchased parts can be stocked so production can start sooner. The finished product is made for a customer order rather than for forecast finished-goods demand.\"}},{\"@type\":\"Question\",\"name\":\"Why can make-to-order delivery dates change?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Orders share resources. A material delay, lost capacity or priority change can move an operation and affect later work. Recalculating the schedule makes those consequences visible so the planner can respond and update commitments when needed.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi S\u0101kums &raquo; Resursi &raquo; Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi Klients pas\u016bta korpusu izm\u0113r\u0101, ko p\u0101rdodat reti. Ir sapr\u0101t\u012bgi to ra\u017eot tikai p\u0113c pas\u016bt\u012bjuma sa\u0146em\u0161anas: t\u0101 noliktava nepiepild\u0101s ar variantiem, kuriem pirc\u0113js var ar\u012b neatrasties. Tom\u0113r klients v\u0113las zin\u0101t pieg\u0101des datumu, &#8230; <a title=\"Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/\" aria-label=\"Read more about Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97068,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-96590","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Make to order: maz\u0101ki kr\u0101jumi, ticam\u0101ki termi\u0146i &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"MTO mazina gatav\u0101s produkcijas kr\u0101jumus, bet prasa ticamus pieg\u0101des termi\u0146us. Uzziniet, k\u0101 SkyPlanner no pas\u016bt\u012bjumiem veido izpild\u0101mu ra\u017eo\u0161anas grafiku.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi\" \/>\n<meta property=\"og:description\" content=\"MTO mazina gatav\u0101s produkcijas kr\u0101jumus, bet prasa ticamus pieg\u0101des termi\u0146us. Uzziniet, k\u0101 SkyPlanner no pas\u016bt\u012bjumiem veido izpild\u0101mu ra\u017eo\u0161anas grafiku.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:53:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/make-to-order\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/make-to-order\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-19T14:43:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/make-to-order\\\/\"},\"wordCount\":2557,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/make-to-order\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/make-to-order\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/make-to-order\\\/\",\"name\":\"Make to order: maz\u0101ki kr\u0101jumi, ticam\u0101ki termi\u0146i &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/make-to-order\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/make-to-order\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-19T14:43:24+00:00\",\"description\":\"MTO mazina gatav\u0101s produkcijas kr\u0101jumus, bet prasa ticamus pieg\u0101des termi\u0146us. Uzziniet, k\u0101 SkyPlanner no pas\u016bt\u012bjumiem veido izpild\u0101mu ra\u017eo\u0161anas grafiku.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/make-to-order\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/make-to-order\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/make-to-order\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"One custom housing waits while another occupies the finishing resource needed to complete both orders.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/make-to-order\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Make to order: maz\u0101ki kr\u0101jumi, ticam\u0101ki termi\u0146i &#8211; SkyPlanner","description":"MTO mazina gatav\u0101s produkcijas kr\u0101jumus, bet prasa ticamus pieg\u0101des termi\u0146us. Uzziniet, k\u0101 SkyPlanner no pas\u016bt\u012bjumiem veido izpild\u0101mu ra\u017eo\u0161anas grafiku.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/","og_locale":"lv_LV","og_type":"article","og_title":"Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi","og_description":"MTO mazina gatav\u0101s produkcijas kr\u0101jumus, bet prasa ticamus pieg\u0101des termi\u0146us. Uzziniet, k\u0101 SkyPlanner no pas\u016bt\u012bjumiem veido izpild\u0101mu ra\u017eo\u0161anas grafiku.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:53:30+00:00","article_modified_time":"2026-10-19T14:43:24+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-19T14:43:24+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/"},"wordCount":2557,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/","name":"Make to order: maz\u0101ki kr\u0101jumi, ticam\u0101ki termi\u0146i &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-19T14:43:24+00:00","description":"MTO mazina gatav\u0101s produkcijas kr\u0101jumus, bet prasa ticamus pieg\u0101des termi\u0146us. Uzziniet, k\u0101 SkyPlanner no pas\u016bt\u012bjumiem veido izpild\u0101mu ra\u017eo\u0161anas grafiku.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","width":1672,"height":941,"caption":"One custom housing waits while another occupies the finishing resource needed to complete both orders."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/make-to-order\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi S\u0101kums &raquo; Resursi &raquo; Ra\u017eo\u0161ana p\u0113c pas\u016bt\u012bjuma: maz\u0101ki gatav\u0101s produkcijas kr\u0101jumi, ticam\u0101ki pieg\u0101des sol\u012bjumi Klients pas\u016bta korpusu izm\u0113r\u0101, ko p\u0101rdodat reti. Ir sapr\u0101t\u012bgi to ra\u017eot tikai p\u0113c pas\u016bt\u012bjuma sa\u0146em\u0161anas: t\u0101 noliktava nepiepild\u0101s ar variantiem, kuriem pirc\u0113js var ar\u012b neatrasties. Tom\u0113r klients v\u0113las zin\u0101t pieg\u0101des datumu,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/96590","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=96590"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/96590\/revisions"}],"predecessor-version":[{"id":96891,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/96590\/revisions\/96891"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/97068"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=96590"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=96590"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=96590"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}