{"id":96561,"date":"2026-10-08T07:20:14","date_gmt":"2026-10-08T07:20:14","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96561"},"modified":"2026-10-19T14:43:17","modified_gmt":"2026-10-19T14:43:17","slug":"smed","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/","title":{"rendered":"SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, vair\u0101k laika pas\u016bt\u012bjumiem"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, vair\u0101k laika pas\u016bt\u012bjumiem<\/h1>\n\n\n<p>N\u0101kamais pas\u016bt\u012bjums ir gatavs ra\u017eo\u0161anai, bet iek\u0101rta v\u0113l nav. Operatoram v\u0113l j\u0101sa\u0146em atbilsto\u0161ie instrumenti, j\u0101p\u0101rbauda iestat\u012bjumi un j\u0101sa\u0146em pirmo deta\u013cu apstiprin\u0101jums. Tikm\u0113r p\u0101r\u0113jie pas\u016bt\u012bjumi gaida rind\u0101.<\/p>\n\n\n<p>Ilga p\u0101rregul\u0113\u0161ana sad\u0101rdzina katru l\u0113mumu, ko pie\u0146emat, sast\u0101dot ra\u017eo\u0161anas grafiku. P\u0101rejot uz cita produkta ra\u017eo\u0161anu, lai iev\u0113rotu pieg\u0101des termi\u0146u, j\u016bs zaud\u0113jat ra\u017eo\u0161anas laiku. Savuk\u0101rt, ilg\u0101k nemainot iek\u0101rtas regul\u0113jumu, j\u016bs varat sara\u017eot deta\u013cas, kas v\u0113l nav vajadz\u012bgas, kam\u0113r steidzam\u0101ks pas\u016bt\u012bjums gaida. <a href=\"\/lv\/resursi\/razosana-partijas\/\">Ra\u017eojot partij\u0101s<\/a>, \u0161is kompromiss nosaka gan partijas lielumu, gan ra\u017eo\u0161anas sec\u012bbu.<\/p>\n\n\n<p>SMED pal\u012bdz mazin\u0101t \u0161o pretrunu, sa\u012bsinot pa\u0161u p\u0101rregul\u0113\u0161anu. SkyPlanner pal\u012bdz izmantot atg\u016bto laiku: sast\u0101dot ra\u017eo\u0161anas grafiku, tas \u0146em v\u0113r\u0101 p\u0101rregul\u0113\u0161anu un var grup\u0113t savstarp\u0113ji sader\u012bgus ra\u017eo\u0161anas uzdevumus, vienlaikus \u0146emot v\u0113r\u0101 ar\u012b pieg\u0101des priorit\u0101tes. Kop\u0101 tie sniedz liel\u0101ku br\u012bv\u012bbu izv\u0113l\u0113ties pas\u016bt\u012bjumu izpildes sec\u012bbu atbilsto\u0161i klientu faktiskaj\u0101m vajadz\u012bb\u0101m. \u012as\u0101ks p\u0101rregul\u0113\u0161anas laiks ar\u012b atvieglo maz\u0101ku partiju atk\u0101rtotu ra\u017eo\u0161anu, \u012bstenojot <a href=\"\/lv\/resursi\/heijunka\/\">ra\u017eo\u0161anas izl\u012bdzin\u0101\u0161anu<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas ir SMED ra\u017eo\u0161an\u0101?<\/h2>\n\n\n<p>SMED ir ang\u013cu nosaukuma Single-Minute Exchange of Die sa\u012bsin\u0101jums. T\u0101 ir metode, ar kuru samazina laiku, kas vajadz\u012bgs ra\u017eo\u0161anas iek\u0101rtas p\u0101rregul\u0113\u0161anai no viena uzdevuma vai produkta uz citu. Nosaukums nor\u0101da uz m\u0113r\u0137i veikt p\u0101rregul\u0113\u0161anu maz\u0101k nek\u0101 desmit min\u016bt\u0113s, nevis sola to paveikt vien\u0101 min\u016bt\u0113.<\/p>\n\n\n<p>Metodes pamat\u0101 ir no\u0161\u0137\u012brums starp <strong>iek\u0161\u0113jo sagatavo\u0161anu<\/strong>, kurai iek\u0101rta j\u0101aptur, un <strong>\u0101r\u0113jo sagatavo\u0161anu<\/strong>, ko var veikt, kam\u0113r iek\u0101rta darbojas. Komanda p\u0101rce\u013c piem\u0113rotus sagatavo\u0161anas darbus \u0101rpus iek\u0101rtas d\u012bkst\u0101ves un vienk\u0101r\u0161o darbus, kurus var veikt tikai aptur\u0113\u0161anas laik\u0101.<\/p>\n\n\n<p>\u0160is princips noder ne tikai \u0161tan\u010du nomai\u0146ai. Ra\u017eot\u0101js to var izmantot ar\u012b cit\u0101s regul\u0101r\u0101s p\u0101rej\u0101s starp produktiem, piem\u0113ram, mainot instrumentus vai form\u0101tu.<\/p>\n\n\n<p>SMED ir uzlabo\u0161anas metode, savuk\u0101rt p\u0101rregul\u0113\u0161anas laiks ir ilgums, ko cen\u0161aties samazin\u0101t. Grafiku sast\u0101d\u012b\u0161ana ir atsevi\u0161\u0137s risin\u0101jums: t\u0101 var samazin\u0101t p\u0101reju skaitu starp nesader\u012bgiem ra\u017eo\u0161anas uzdevumiem. Labs pl\u0101ns izmanto abas pieejas, nevis pa\u013caujas, ka uzdevumu grup\u0113\u0161ana atrisin\u0101s nevajadz\u012bgi ilgas p\u0101rregul\u0113\u0161anas probl\u0113mu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u0101ciet tur, kur \u012bs\u0101ka p\u0101rregul\u0113\u0161ana pal\u012bdz\u0113tu izpild\u012bt pas\u016bt\u012bjumu<\/h2>\n\n\n<p>Izv\u0113lieties darba centru, kur p\u0101rregul\u0113\u0161an\u0101 zaud\u0113tais laiks trauc\u0113 pieg\u0101d\u0113m, nevis vienk\u0101r\u0161i iek\u0101rtu ar ilg\u0101ko re\u0123istr\u0113to p\u0101rregul\u0113\u0161anu. Noskaidrojiet, kura darbu rinda regul\u0101ri liek izv\u0113l\u0113ties starp instrumentu nomai\u0146u un steidzamu darbu pabeig\u0161anu.<\/p>\n\n\n<p>Labs piem\u0113rs ir noslogota loc\u012b\u0161anas iek\u0101rta. Ja vair\u0101ki pas\u016bt\u012bjumi pirms nos\u016bt\u012b\u0161anas j\u0101apstr\u0101d\u0101 \u0161aj\u0101 iek\u0101rt\u0101, taj\u0101 atg\u016btais laiks var pal\u012bdz\u0113t darbiem virz\u012bties uz priek\u0161u. Tikpat daudz ietaup\u012btu min\u016b\u0161u uz maz noslogotas iek\u0101rtas \u0161oned\u0113\u013c var b\u016bt maz\u0101k noder\u012bgas. J\u016bsu <a href=\"\/lv\/resursi\/razosanas-marsruts\/\">tehnolo\u0123iskais process<\/a> par\u0101da, kuri pas\u016bt\u012bjumi ir atkar\u012bgi no \u0161\u012b darba centra un kur tie non\u0101k p\u0113c tam.<\/p>\n\n\n<p>Izv\u0113lieties vienu regul\u0101ri veiktu p\u0101rregul\u0113\u0161anu, ko operatori labi p\u0101rzina. Izv\u0113rt\u0113jiet to kop\u0101 ar darba veic\u0113jiem un iesaistiet apkopes vai kvalit\u0101tes speci\u0101listus, ja vi\u0146u uzdevumi ietekm\u0113 gatav\u012bbu ra\u017eo\u0161anai. Noder\u012bgais jaut\u0101jums nav \u201eK\u0101p\u0113c tas aiz\u0146em tik ilgu laiku?\u201d, bet gan \u201eKas ir j\u0101izdara, lai \u0161\u012b iek\u0101rta var\u0113tu sara\u017eot n\u0101kamo pras\u012bb\u0101m atbilsto\u0161o deta\u013cu?\u201d<\/p>\n\n\n<p>\u0160\u0101ds jaut\u0101jums novirza sarunu no \u0101truma uz sagatavo\u0161anos, darbu sec\u012bbu un atk\u0101rtojam\u012bbu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izstr\u0101d\u0101jiet SMED pieeju, ko komanda var atk\u0101rtot<\/h2>\n\n\n<h3 class=\"wp-block-heading\">1. Nov\u0113rojiet visu p\u0101rregul\u0113\u0161anas procesu<\/h3>\n\n\n<p>M\u0113riet laiku p\u0113c vienota principa: no iepriek\u0161\u0113j\u0101s partijas p\u0113d\u0113j\u0101s kvalitat\u012bv\u0101s deta\u013cas, kas sara\u017eota norm\u0101l\u0101 ra\u017eo\u0161anas \u0101trum\u0101, l\u012bdz n\u0101kam\u0101s partijas pirmajai kvalitat\u012bvajai deta\u013cai, kas sara\u017eota norm\u0101l\u0101 ra\u017eo\u0161anas \u0101trum\u0101. Iek\u0101rta, kas ir ats\u0101kusi darboties, bet v\u0113l ra\u017eo izm\u0113\u0123in\u0101juma deta\u013cas vai br\u0101\u0137i, v\u0113l nav atgriezusies pilnv\u0113rt\u012bg\u0101 ra\u017eo\u0161an\u0101.<\/p>\n\n\n<p>Pierakstiet visus darbus un gaid\u012b\u0161anas posmus starp \u0161iem diviem br\u012b\u017eiem. Atz\u012bm\u0113jiet, kas veic katru darbu, kas tam nepiecie\u0161ams un vai iek\u0101rtai tie\u0161\u0101m j\u0101b\u016bt aptur\u0113tai. Ja iesp\u0113jams, nov\u0113rojiet vair\u0101kas p\u0101rregul\u0113\u0161anas reizes: viena neparasti veiksm\u012bga reize nav dro\u0161s pamats n\u0101kamajam sol\u012bjumam par ra\u017eo\u0161anas termi\u0146u.<\/p>\n\n\n<p>Sekojiet diviem r\u0101d\u012bt\u0101jiem: iek\u0101rtas d\u012bkst\u0101ves ilgumam un darbasp\u0113ka pat\u0113ri\u0146am, kas vajadz\u012bgs n\u0101kam\u0101s partijas sagatavo\u0161anai. Veicot sagatavo\u0161anu agr\u0101k, tiek atbr\u012bvots iek\u0101rtas laiks, ta\u010du tas ne vienm\u0113r nov\u0113r\u0161 pa\u0161u sagatavo\u0161anas darbu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. No\u0161\u0137iriet darbus, kam iek\u0101rta j\u0101aptur, no darbiem, kam tas nav vajadz\u012bgs<\/h3>\n\n\n<p>Darbs, ko pa\u0161laik veic iek\u0101rtas d\u012bkst\u0101ves laik\u0101, ne vienm\u0113r ir iek\u0161\u0113j\u0101 sagatavo\u0161ana. Iesp\u0113jams, komanda s\u0101k v\u0101kt n\u0101kam\u0101 ra\u017eo\u0161anas uzdevuma dokumentus tikai p\u0113c iek\u0101rtas aptur\u0113\u0161anas t\u0101p\u0113c, ka neviens iepriek\u0161 nezin\u0101ja, kur\u0161 uzdevums b\u016bs n\u0101kamais.<\/p>\n\n\n<p>Iedom\u0101jieties regul\u0101ru p\u0101rregul\u0113\u0161anu ar \u0161\u0101du vienk\u0101r\u0161otu darbu uzskaiti. Pa\u0161laik visus \u010detrus darbus veic sec\u012bgi p\u0113c ra\u017eo\u0161anas aptur\u0113\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Darbs<\/th>\n<th>Pa\u0161reiz\u0113j\u0101 d\u012bkst\u0101ve<\/th>\n<th>D\u012bkst\u0101ve p\u0113c uzlabojumiem<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Sag\u0101d\u0101t un p\u0101rbaud\u012bt n\u0101kamos instrumentus<\/td>\n<td>8 min\u016btes<\/td>\n<td>0 min\u016btes: sagatavots iepriek\u0161<\/td>\n<\/tr>\n<tr>\n<td>Sa\u0146emt un p\u0101rbaud\u012bt ra\u017eo\u0161anas uzdevuma instrukcijas<\/td>\n<td>7 min\u016btes<\/td>\n<td>0 min\u016btes: sagatavots iepriek\u0161<\/td>\n<\/tr>\n<tr>\n<td>No\u0146emt un uzst\u0101d\u012bt instrumentus<\/td>\n<td>18 min\u016btes<\/td>\n<td>15 min\u016btes<\/td>\n<\/tr>\n<tr>\n<td>Noregul\u0113t iek\u0101rtu un apstiprin\u0101t pirmo pras\u012bb\u0101m atbilsto\u0161o produkciju<\/td>\n<td>12 min\u016btes<\/td>\n<td>10 min\u016btes<\/td>\n<\/tr>\n<tr>\n<td><strong>Kop\u0113j\u0101 iek\u0101rtas d\u012bkst\u0101ve<\/strong><\/td>\n<td><strong>45 min\u016btes<\/strong><\/td>\n<td><strong>25 min\u016btes<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>\u0160ie skait\u013ci ir piem\u0113rs, nevis klienta rezult\u0101ts. Pirmie divi uzlabojumi p\u0101rce\u013c piecpadsmit min\u016btes sagatavo\u0161anas darbu \u0101rpus d\u012bkst\u0101ves. Atliku\u0161\u0101s piecas min\u016btes ietaupa, uzlabojot iek\u0161\u0113j\u0101s sagatavo\u0161anas metodi.<\/p>\n\n\n<p>\u0100r\u0113j\u0101s sagatavo\u0161anas darbi joproj\u0101m k\u0101dam ir j\u0101veic. Vienojieties, kur\u0161 un kad sagatavos n\u0101kamos instrumentus un instrukcijas. Rati\u0146i ar uzrakstu \u201eGatavs\u201d ir noder\u012bgi tikai tad, ja viss n\u0101kamajam ra\u017eo\u0161anas uzdevumam nepiecie\u0161amais apr\u012bkojums tie\u0161\u0101m ir nokomplekt\u0113ts un p\u0101rbaud\u012bts.<\/p>\n\n\n<p>Mekl\u0113jiet ar\u012b iek\u0161\u0113j\u0101s sagatavo\u0161anas darbus, kurus, mainot darba organiz\u0101ciju, var\u0113tu veikt, kam\u0113r iek\u0101rta darbojas. Piem\u0113ram, rezerves stiprin\u0101\u0161anas ier\u012bce var \u013caut komandai \u0101rpus str\u0101d\u0101jo\u0161\u0101s iek\u0101rtas sagatavot n\u0101kamo ra\u017eo\u0161anas uzdevumu un veikt vajadz\u012bgo pozicion\u0113\u0161anu, d\u012bkst\u0101ves laik\u0101 atst\u0101jot tikai stiprin\u0101\u0161anas ier\u012bces nomai\u0146u. Pirms \u0161\u0101d\u0101m izmai\u0146\u0101m izv\u0113rt\u0113jiet izmaksas, apr\u012bkojuma piem\u0113rot\u012bbu un dro\u0161u darba metodi.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Uzlabojiet iek\u0161\u0113j\u0101s sagatavo\u0161anas darbus, nevis steidziniet tos<\/h3>\n\n\n<p>Darbiem, kas paliek iek\u0161\u0113j\u0101 sagatavo\u0161an\u0101, mekl\u0113jiet atk\u0101rtojamus pa\u0146\u0113mienus, k\u0101 nov\u0113rst mekl\u0113\u0161anu, dubultas p\u0101rbaudes un nevajadz\u012bgu regul\u0113\u0161anu. Par iek\u0101rtu atbild\u012bgajiem speci\u0101listiem j\u0101izv\u0113rt\u0113 visas izmai\u0146as pal\u012bgier\u012bc\u0113s, stiprin\u0101jumos vai darbu sec\u012bb\u0101. Laika m\u0113r\u0137is nedr\u012bkst k\u013c\u016bt par at\u013cauju neiev\u0113rot dro\u0161as aptur\u0113\u0161anas proced\u016bras vai izlaist kvalit\u0101tes apstiprin\u0101\u0161anu.<\/p>\n\n\n<p>Piem\u0113r\u0101 uzlabot\u0101 uzst\u0101d\u012b\u0161anas un regul\u0113\u0161anas metode aiz\u0146em divdesmit piecas min\u016btes. Tas ir v\u0113rt\u012bgs ieguvums, lai gan v\u0113l nav sasniegts laiks, kas \u012bs\u0101ks par desmit min\u016bt\u0113m. Pirmais m\u0113r\u0137is ir uzticams, atk\u0101rtojams uzlabojums, nevis iespaid\u012bgs skaitlis no vienas iz\u0146\u0113muma reizes.<\/p>\n\n\n<p>Dokument\u0113jiet uzlaboto metodi, nodro\u0161iniet visu nepiecie\u0161amo un p\u0101rbaudiet turpm\u0101k\u0101s p\u0101rregul\u0113\u0161anas reizes. Ja darbu sec\u012bbai ir svar\u012bgi laikus zin\u0101t n\u0101kamo pas\u016bt\u012bjumu, ra\u017eo\u0161anas grafiks k\u013c\u016bst par da\u013cu no \u0161\u012bs metodes \u012bsteno\u0161anas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u012as\u0101ka p\u0101rregul\u0113\u0161ana \u013cauj elast\u012bg\u0101k izv\u0113l\u0113ties ra\u017eo\u0161anas uzdevumu sec\u012bbu<\/h2>\n\n\n<p>Apl\u016bkosim to pa\u0161u iek\u0101rtu p\u0113c uzlabojuma. Iedom\u0101jieties \u010detrus ra\u017eo\u0161anai gatavus uzdevumus: A1, B1, A2 un B2. Katram vajadz\u012bgas divdesmit min\u016btes apstr\u0101des. A uzdevumiem izmanto vienu instrumentu grupu, bet B uzdevumiem \u2014 citu. P\u0101reja starp grup\u0101m abos virzienos aiz\u0146em divdesmit piecas min\u016btes, savuk\u0101rt sec\u012bgiem vienas grupas uzdevumiem papildu p\u0101rregul\u0113\u0161ana starp grup\u0101m nav vajadz\u012bga.<\/p>\n\n\n<p>\u0160aj\u0101 piem\u0113r\u0101 iek\u0101rta s\u0101k darbu 08:00 ar jau uzst\u0101d\u012btiem A grupas instrumentiem. Visi materi\u0101li un operators ir pieejami; nav p\u0101rtraukumu vai papildu sagatavo\u0161anas darbu. B1 apstr\u0101de \u0161aj\u0101 iek\u0101rt\u0101 j\u0101pabeidz l\u012bdz 09:10. P\u0101r\u0113jiem uzdevumiem ir v\u0113l\u0101ki izpildes termi\u0146i, kas pie\u013cauj t\u0101l\u0101k nor\u0101d\u012bt\u0101s sec\u012bbas.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Sec\u012bba<\/th>\n<th>P\u0101reju skaits starp grup\u0101m<\/th>\n<th>Kop\u0113jais p\u0101rregul\u0113\u0161anas laiks starp grup\u0101m<\/th>\n<th>B1 pabeig\u0161anas laiks<\/th>\n<th>P\u0113d\u0113j\u0101 uzdevuma pabeig\u0161anas laiks<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>A1 \u2192 B1 \u2192 A2 \u2192 B2<\/td>\n<td>3<\/td>\n<td>75 min\u016btes<\/td>\n<td>09:05<\/td>\n<td>10:35<\/td>\n<\/tr>\n<tr>\n<td>A1 \u2192 A2 \u2192 B1 \u2192 B2<\/td>\n<td>1<\/td>\n<td>25 min\u016btes<\/td>\n<td>09:25<\/td>\n<td>09:45<\/td>\n<\/tr>\n<tr>\n<td>A1 \u2192 B1 \u2192 B2 \u2192 A2<\/td>\n<td>2<\/td>\n<td>50 min\u016btes<\/td>\n<td>09:05<\/td>\n<td>10:10<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Vispirms sagrup\u0113jot visus A uzdevumus un p\u0113c tam visus B uzdevumus, visu darbu kopumu var pabeigt visagr\u0101k, ta\u010du B1 nokav\u0113 noteikto pabeig\u0161anas laiku. Atst\u0101jot B1 sec\u012bbas s\u0101kum\u0101 un veicot B2 uzreiz p\u0113c t\u0101, sal\u012bdzin\u0101jum\u0101 ar grupu p\u0101rmai\u0146us apstr\u0101di var ietaup\u012bt vienu p\u0101rregul\u0113\u0161anu un joproj\u0101m iev\u0113rot B1 termi\u0146u.<\/p>\n\n\n<p>Tie\u0161i \u0161eit pl\u0101no\u0161ana var pal\u012bdz\u0113t. Nav j\u0101izv\u0113las starp visu uzdevumu grup\u0113\u0161anu un p\u0101rregul\u0113\u0161anas ignor\u0113\u0161anu. Uzdevumi j\u0101grup\u0113 t\u0101d\u0101 apjom\u0101, kas atbilst pa\u0161reiz\u0113jo pas\u016bt\u012bjumu vajadz\u012bb\u0101m.<\/p>\n\n\n<p>Svar\u012bgs ir ar\u012b fizisk\u0101 darba uzlabojums. Pirms SMED, apstr\u0101d\u0101jot grupas p\u0101rmai\u0146us, bija vajadz\u012bgas tr\u012bs \u010detrdesmit piecu min\u016b\u0161u p\u0101rregul\u0113\u0161anas \u2014 kop\u0101 135 min\u016btes d\u012bkst\u0101ves. P\u0113c SMED ievie\u0161anas ar t\u0101du pa\u0161u sec\u012bbu \u0161is laiks samazin\u0101s l\u012bdz 75 min\u016bt\u0113m. Tre\u0161\u0101 sec\u012bba, kas \u013cauj iev\u0113rot termi\u0146u, to samazina v\u0113l l\u012bdz 50 min\u016bt\u0113m. Metode ietaupa se\u0161desmit min\u016btes, bet p\u0101rskat\u012bt\u0101 sec\u012bba \u2014 v\u0113l divdesmit piecas.<\/p>\n\n\n<p>Re\u0101los pas\u016bt\u012bjumos j\u0101r\u0113\u0137in\u0101s ar oper\u0101ciju savstarp\u0113jo atkar\u012bbu, <a href=\"\/lv\/resursi\/razosanas-cikla-laiks\/\">at\u0161\u0137ir\u012bgu apstr\u0101des ilgumu<\/a> un citiem resursiem. Kad darbs pie \u0161\u012bs iek\u0101rtas ir pabeigts, pirms nos\u016bt\u012b\u0161anas v\u0113l var b\u016bt vajadz\u012bga metin\u0101\u0161ana vai p\u0101rbaude. <a href=\"\/lv\/resursi\/make-to-order\/\">Ra\u017eo\u0161an\u0101 p\u0113c pas\u016bt\u012bjuma<\/a> v\u0113rt\u012bgs rezult\u0101ts ir laikus atbr\u012bvota jauda klienta pas\u016bt\u012bjuma izpildei, nevis tikai sak\u0101rtota darbu rinda pie iek\u0101rtas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">L\u012bdzsvarojiet p\u0101rregul\u0113\u0161anu un pieg\u0101\u017eu priorit\u0101tes ar SkyPlanner<\/h2>\n\n\n<p>Vienreiz izveidot \u0161\u0101du sec\u012bbu \u010detriem uzdevumiem ir vienk\u0101r\u0161i. Gr\u016bt\u0101k ir saglab\u0101t pareizo l\u012bdzsvaru, kad pas\u016bt\u012bjumi main\u0101s. Jauns steidzams pas\u016bt\u012bjums, materi\u0101lu kav\u0113\u0161an\u0101s vai nepieejama iek\u0101rta var padar\u012bt tikko izveidoto sec\u012bbu neder\u012bgu.<\/p>\n\n\n<p>SkyPlanner APS iek\u013cauj uzdevumu sec\u012bbas veido\u0161anu, \u0146emot v\u0113r\u0101 p\u0101rregul\u0113\u0161anu, <a href=\"\/lv\/resursi\/kas-ir-razosanas-planosana\/\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161an\u0101<\/a>. T\u0101 m\u0101ksl\u012bgais intelekts Arcturus apr\u0113\u0137ina grafiku atbilsto\u0161i konfigur\u0113tajai jaudai, oper\u0101ciju atkar\u012bb\u0101m un priorit\u0101t\u0113m. J\u016bs nosak\u0101t, kas ir svar\u012bgs, bet m\u0101ksl\u012bgais intelekts sast\u0101da grafiku saska\u0146\u0101 ar \u0161iem nor\u0101d\u012bjumiem.<\/p>\n\n\n<p>Ja darba centr\u0101 p\u0101rregul\u0113\u0161anu nosaka instrumentu nomai\u0146a, produktu datos defin\u0113jiet attiec\u012bgo instrumentu \u012bpa\u0161\u012bbu. Ra\u017eo\u0161anas uzdevumiem, kurus var veikt ar vienu regul\u0113jumu, j\u0101b\u016bt atbilsto\u0161ai vien\u0101dai \u0161\u012bs \u012bpa\u0161\u012bbas v\u0113rt\u012bbai. Iesp\u0113jojiet l\u012bdz\u012bbas funkciju \u0161im darba centram un Dynamic Priorities iestat\u012bjumos pie\u0161\u0137iriet svaru l\u012bdz\u012bgiem uzdevumiem. SkyPlanner l\u012bdz\u012bbas noteikums \u013cauj izv\u0113l\u0113ties \u012bpa\u0161\u012bbu, ievad\u012bt p\u0101rregul\u0113\u0161anas ilgumu at\u0161\u0137ir\u012bgiem uzdevumiem un noteikt, cik svar\u012bgi ir l\u012bdz\u012bgus uzdevumus veikt sec\u012bgi.<\/p>\n\n\n<p>Praktiskais ieguvums ir tas, ka, apr\u0113\u0137inot pl\u0101nu, sist\u0113ma var \u0146emt v\u0113r\u0101 v\u0113lamo uzdevumu grup\u0113\u0161anu un jums nav manu\u0101li j\u0101p\u0101rk\u0101rto katra uzdevumu rinda. L\u012bdz\u012bbas noteik\u0161anai var izmantot ar\u012b \u012bpa\u0161\u012bbu, kas atspogu\u013co citu b\u016btisku p\u0101rregul\u0113\u0161anas iemeslu, piem\u0113ram, kr\u0101su vai materi\u0101lu, ja tas atbilst konkr\u0113tajam procesam. Izv\u0113lieties \u012bpa\u0161\u012bbu, kas atspogu\u013co, <a href=\"\/lv\/resursi\/pariestatisanas-laiku-matrica\/\">kas paties\u012bb\u0101 izraisa p\u0101rregul\u0113\u0161anu<\/a> attiec\u012bgaj\u0101 darba centr\u0101.<\/p>\n\n\n<p>P\u0113c tam izv\u0113rt\u0113jiet ieg\u016bto Gantt grafiku atbilsto\u0161i pieg\u0101\u017eu priorit\u0101t\u0113m. Ja grup\u0113\u0161ana aiz\u0146em steidzamiem darbiem vajadz\u012bgo laiku, piel\u0101gojiet priorit\u0101tes, nevis uzskatiet l\u012bdz\u012bbu par beznosac\u012bjuma nor\u0101di. Noteikumi un fiks\u0113\u0161ana \u013cauj saglab\u0101t tos pl\u0101no\u0161anas l\u0113mumus, kurus nedr\u012bkst main\u012bt.<\/p>\n\n\n<p>Uzlabojot darbu ceh\u0101, atjauniniet ar\u012b pl\u0101no\u0161an\u0101 izmantotos laika pie\u0146\u0113mumus. Tehnolo\u0123isk\u0101 procesa oper\u0101cij\u0101m ir savs p\u0101rregul\u0113\u0161anas laiks, savuk\u0101rt l\u012bdz\u012bbas noteikum\u0101 ir nor\u0101d\u012bts laiks p\u0101rejai starp at\u0161\u0137ir\u012bgiem ra\u017eo\u0161anas uzdevumiem. P\u0101rbaudiet, vai katrs no tiem atbilst paredz\u0113tajam darbam un viens un tas pats laiks nav ieskait\u012bts divreiz. Gantt skat\u0101 p\u0101rregul\u0113\u0161anas laiks ir iek\u013cauts ra\u017eo\u0161anas uzdevuma kop\u0113j\u0101 ilgum\u0101, nevis att\u0113lots k\u0101 atsevi\u0161\u0137s kr\u0101sains segments.<\/p>\n\n\n<p>SkyPlanner neaizst\u0101j komandas praktisko darbu, ievie\u0161ot SMED. Tas \u013cauj izmantot \u0161\u012b darba rezult\u0101tus pl\u0101no\u0161an\u0101: \u012bs\u0101ks paredz\u0113tais p\u0101rregul\u0113\u0161anas laiks un j\u0113gpilnas l\u012bdz\u012bbas paz\u012bmes k\u013c\u016bst par ievaddatiem grafikam, kur\u0101 \u0146emta v\u0113r\u0101 ar\u012b p\u0101r\u0113j\u0101 ra\u017eo\u0161ana. <a href=\"\/lv\/funkcijas\/\">Iepaz\u012bstiet SkyPlanner iesp\u0113jas ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161an\u0101<\/a>, lai uzzin\u0101tu, k\u0101 jauda, priorit\u0101tes un Gantt pl\u0101ns darbojas kop\u0101.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0101 tas darbojas uz\u0146\u0113mum\u0101 KJH-Comp<\/h2>\n\n\n<p>Somijas uz\u0146\u0113mums KJH-Comp, kas p\u0113c pas\u016bt\u012bjuma ra\u017eo lok\u0161\u0146u met\u0101la izstr\u0101d\u0101jumus, ned\u0113\u013cas noslodzes pl\u0101no\u0161anai izmantoja C9000 ERP un izkl\u0101jlapas. Savuk\u0101rt ceha vad\u012bt\u0101ji katras dienas ra\u017eo\u0161anas uzdevumus iek\u0101rt\u0101m sadal\u012bja manu\u0101li. Papla\u0161inoties produktu kl\u0101stam, \u0161\u0101di sast\u0101d\u012bt grafikus k\u013cuva arvien gr\u016bt\u0101k.<\/p>\n\n\n<p>Izmantojot SkyPlanner, pas\u016bt\u012bjumi joproj\u0101m tiek ievad\u012bti eso\u0161aj\u0101 ERP sist\u0113m\u0101, bet grafiku sast\u0101d\u012b\u0161ana, \u0146emot v\u0113r\u0101 pieejam\u0101s jaudas ierobe\u017eojumus, un uzdevumu sadale iek\u0101rt\u0101m notiek autom\u0101tiski. Uz\u0146\u0113muma pieredzes st\u0101st\u0101 aprakst\u012bts noder\u012bgs rezult\u0101ts liek\u0161anas oper\u0101cij\u0101s: ra\u017eo\u0161anas uzdevumi ar vien\u0101diem instrumentiem un materi\u0101la biezumu tiek izpild\u012bti cits p\u0113c cita, sa\u012bsinot p\u0101rregul\u0113\u0161anas laiku un samazinot d\u012bkst\u0101vi.<\/p>\n\n\n<p>\u0160is pieredzes st\u0101sts ar\u012b par\u0101da, k\u0101p\u0113c ar grup\u0113\u0161anu vien nepietiek. Darbs, kas j\u0101pabeidz p\u0113c div\u0101m ned\u0113\u013c\u0101m, vairs neizstumj no grafika pas\u016bt\u012bjumu, kas j\u0101nos\u016bta r\u012bt, un ceha vad\u012bt\u0101js var p\u0101rskat\u012bt \u010detrus metrus gar\u0101s liek\u0161anas iek\u0101rtas noslodzi. P\u0101rregul\u0113\u0161anas efektivit\u0101te un pieg\u0101des termi\u0146i ir j\u0101\u0146em v\u0113r\u0101 vien\u0101 un taj\u0101 pa\u0161\u0101 ra\u017eo\u0161anas l\u0113mum\u0101.<\/p>\n\n\n<p>KJH-Comp pieredze \u0161eit ir v\u0113rt\u012bga, jo t\u0101 par\u0101da p\u0101rmai\u0146as ikdienas darb\u0101, nevis tikai grafiku sast\u0101d\u012b\u0161anas principu: maz\u0101k manu\u0101la darba noslodzes pl\u0101no\u0161an\u0101, skaidr\u0101k saskat\u0101mas \u0161aur\u0101s vietas un uzdevumu sec\u012bba, kas \u013cauj lab\u0101k izmantot jau uzst\u0101d\u012btos instrumentus. <a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Lasiet par KJH-Comp pieredzi ar SkyPlanner<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izmantojiet ietaup\u012bto laiku lietder\u012bgi<\/h2>\n\n\n<p>P\u0113c p\u0101rregul\u0113\u0161anas procesa uzlabo\u0161anas sal\u012bdziniet l\u012bdzv\u0113rt\u012bgus darbus, izmantojot vien\u0101das m\u0113r\u012bjuma s\u0101kuma un beigu robe\u017eas. P\u0101rbaudiet, cik laika aiz\u0146em nepiecie\u0161am\u0101s p\u0101rregul\u0113\u0161anas, cik p\u0101reju starp produktu grup\u0101m prasa uzdevumu sec\u012bba un vai steidzamie pas\u016bt\u012bjumi joproj\u0101m tiek pabeigti vajadz\u012bgaj\u0101 laik\u0101. Izv\u0113rt\u0113jum\u0101 iek\u013caujiet ar\u012b kvalit\u0101ti ra\u017eo\u0161anas s\u0101kum\u0101 un \u0101r\u0113j\u0101s sagatavo\u0161anas darba slodzi.<\/p>\n\n\n<p>\u012as\u0101ks vid\u0113jais p\u0101rregul\u0113\u0161anas laiks ir progress. Ta\u010du praktisko ieguvumu ra\u017eo\u0161an\u0101 tas sniedz tad, ja atbr\u012bvo laiku n\u0101kam\u0101 svar\u012bg\u0101 pas\u016bt\u012bjuma pabeig\u0161anai.<\/p>\n\n\n<p>SkyPlanner var integr\u0113t ar jebkuru ERP vai MES, izmantojot t\u0101 atv\u0113rto REST API. T\u0101d\u0113j\u0101di varat saglab\u0101t sist\u0113mas, kur\u0101s glab\u0101jas j\u016bsu pas\u016bt\u012bjumi, un izmantot to ra\u017eo\u0161anas datus, sast\u0101dot grafikus ar p\u0101rregul\u0113\u0161anas laiku. Nav j\u0101s\u0101k ar t\u0101das ERP sist\u0113mas nomai\u0146u, kas jau labi kalpo j\u016bsu uz\u0146\u0113mumam.<\/p>\n\n\n<p>Lai izv\u0113rt\u0113tu \u0161o ieguvumu sav\u0101 ra\u017eo\u0161an\u0101, <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">piesakieties SkyPlanner demonstr\u0101cijai<\/a>. Sagatavojiet piem\u0113ru ar noslogotu darba centru, paz\u012bmi, kas nosaka t\u0101 p\u0101rregul\u0113\u0161anas nepiecie\u0161am\u012bbu, izm\u0113r\u012btu p\u0101rregul\u0113\u0161anas laiku un da\u017eiem pas\u016bt\u012bjumiem ar at\u0161\u0137ir\u012bgiem termi\u0146iem. Tas \u013caus j\u0113gpilni apspriest, kur grup\u0113\u0161ana pal\u012bdz un kur priek\u0161roka j\u0101dod pieg\u0101des termi\u0146iem.<\/p>\n\n\n<p>Ja vispirms v\u0113laties iepaz\u012bt pl\u0101no\u0161anas skatu, <a href=\"\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a>.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, vair\u0101k laika pas\u016bt\u012bjumiem N\u0101kamais pas\u016bt\u012bjums ir gatavs ra\u017eo\u0161anai, bet iek\u0101rta v\u0113l nav. Operatoram v\u0113l j\u0101sa\u0146em atbilsto\u0161ie instrumenti, j\u0101p\u0101rbauda iestat\u012bjumi un j\u0101sa\u0146em pirmo deta\u013cu apstiprin\u0101jums. Tikm\u0113r p\u0101r\u0113jie pas\u016bt\u012bjumi gaida rind\u0101. Ilga p\u0101rregul\u0113\u0161ana sad\u0101rdzina katru l\u0113mumu, ko pie\u0146emat, sast\u0101dot ra\u017eo\u0161anas grafiku. P\u0101rejot uz cita produkta ra\u017eo\u0161anu, lai iev\u0113rotu pieg\u0101des termi\u0146u, j\u016bs zaud\u0113jat ra\u017eo\u0161anas laiku. &#8230; <a title=\"SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, vair\u0101k laika pas\u016bt\u012bjumiem\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/\" aria-label=\"Read more about SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, vair\u0101k laika pas\u016bt\u012bjumiem\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97692,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-96561","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, laiks pas\u016bt\u012bjumiem &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Ilga p\u0101rregul\u0113\u0161ana at\u0146em laiku pas\u016bt\u012bjumiem. SMED un SkyPlanner grafiki, kas \u0146em v\u0113r\u0101 p\u0101rregul\u0113\u0161anu, pal\u012bdz atg\u016bt ra\u017eo\u0161anas laiku, iev\u0113rojot pieg\u0101\u017eu priorit\u0101tes.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, vair\u0101k laika pas\u016bt\u012bjumiem\" \/>\n<meta property=\"og:description\" content=\"Ilga p\u0101rregul\u0113\u0161ana at\u0146em laiku pas\u016bt\u012bjumiem. SMED un SkyPlanner grafiki, kas \u0146em v\u0113r\u0101 p\u0101rregul\u0113\u0161anu, pal\u012bdz atg\u016bt ra\u017eo\u0161anas laiku, iev\u0113rojot pieg\u0101\u017eu priorit\u0101tes.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:20:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/smed\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/smed\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, vair\u0101k laika pas\u016bt\u012bjumiem\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-19T14:43:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/smed\\\/\"},\"wordCount\":3068,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/smed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/smed\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/smed\\\/\",\"name\":\"SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, laiks pas\u016bt\u012bjumiem &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/smed\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/smed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-19T14:43:17+00:00\",\"description\":\"Ilga p\u0101rregul\u0113\u0161ana at\u0146em laiku pas\u016bt\u012bjumiem. SMED un SkyPlanner grafiki, kas \u0146em v\u0113r\u0101 p\u0101rregul\u0113\u0161anu, pal\u012bdz atg\u016bt ra\u017eo\u0161anas laiku, iev\u0113rojot pieg\u0101\u017eu priorit\u0101tes.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/smed\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/smed\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/smed\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"width\":1672,\"height\":941,\"caption\":\"Bending machine beside tooling prepared on a cart for the next production changeover\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/smed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, vair\u0101k laika pas\u016bt\u012bjumiem\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, laiks pas\u016bt\u012bjumiem &#8211; SkyPlanner","description":"Ilga p\u0101rregul\u0113\u0161ana at\u0146em laiku pas\u016bt\u012bjumiem. SMED un SkyPlanner grafiki, kas \u0146em v\u0113r\u0101 p\u0101rregul\u0113\u0161anu, pal\u012bdz atg\u016bt ra\u017eo\u0161anas laiku, iev\u0113rojot pieg\u0101\u017eu priorit\u0101tes.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/","og_locale":"lv_LV","og_type":"article","og_title":"SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, vair\u0101k laika pas\u016bt\u012bjumiem","og_description":"Ilga p\u0101rregul\u0113\u0161ana at\u0146em laiku pas\u016bt\u012bjumiem. SMED un SkyPlanner grafiki, kas \u0146em v\u0113r\u0101 p\u0101rregul\u0113\u0161anu, pal\u012bdz atg\u016bt ra\u017eo\u0161anas laiku, iev\u0113rojot pieg\u0101\u017eu priorit\u0101tes.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:20:14+00:00","article_modified_time":"2026-10-19T14:43:17+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, vair\u0101k laika pas\u016bt\u012bjumiem","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-19T14:43:17+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/"},"wordCount":3068,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/","name":"SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, laiks pas\u016bt\u012bjumiem &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-19T14:43:17+00:00","description":"Ilga p\u0101rregul\u0113\u0161ana at\u0146em laiku pas\u016bt\u012bjumiem. SMED un SkyPlanner grafiki, kas \u0146em v\u0113r\u0101 p\u0101rregul\u0113\u0161anu, pal\u012bdz atg\u016bt ra\u017eo\u0161anas laiku, iev\u0113rojot pieg\u0101\u017eu priorit\u0101tes.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/smed\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","width":1672,"height":941,"caption":"Bending machine beside tooling prepared on a cart for the next production changeover"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/smed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, vair\u0101k laika pas\u016bt\u012bjumiem"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"SMED: \u012bs\u0101ka p\u0101rregul\u0113\u0161ana, vair\u0101k laika pas\u016bt\u012bjumiem N\u0101kamais pas\u016bt\u012bjums ir gatavs ra\u017eo\u0161anai, bet iek\u0101rta v\u0113l nav. Operatoram v\u0113l j\u0101sa\u0146em atbilsto\u0161ie instrumenti, j\u0101p\u0101rbauda iestat\u012bjumi un j\u0101sa\u0146em pirmo deta\u013cu apstiprin\u0101jums. Tikm\u0113r p\u0101r\u0113jie pas\u016bt\u012bjumi gaida rind\u0101. Ilga p\u0101rregul\u0113\u0161ana sad\u0101rdzina katru l\u0113mumu, ko pie\u0146emat, sast\u0101dot ra\u017eo\u0161anas grafiku. P\u0101rejot uz cita produkta ra\u017eo\u0161anu, lai iev\u0113rotu pieg\u0101des termi\u0146u, j\u016bs zaud\u0113jat ra\u017eo\u0161anas laiku.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/96561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=96561"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/96561\/revisions"}],"predecessor-version":[{"id":96760,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/96561\/revisions\/96760"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/97692"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=96561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=96561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=96561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}