{"id":8284,"date":"2022-10-28T07:54:22","date_gmt":"2022-10-28T07:54:22","guid":{"rendered":"https:\/\/skyplanner.ai\/resursi\/ka-optimizet-izpildes-laiku-razosana\/"},"modified":"2026-10-19T14:41:33","modified_gmt":"2026-10-19T14:41:33","slug":"ka-optimizet-izpildes-laiku-razosana","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/","title":{"rendered":"Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu starp uzdevumiem"},"content":{"rendered":"<div class=\"gb-container gb-container-leadtime01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu starp uzdevumiem<\/h1>\n\n\n<p>Tehnolo\u0123iskaj\u0101 proces\u0101 paredz\u0113tas divpadsmit stundas. Klientam sol\u012btas asto\u0146as dienas. No pirm\u0101s oper\u0101cijas l\u012bdz gatavam pas\u016bt\u012bjumam gaid\u012b\u0161ana aiz\u0146em daudz vair\u0101k laika nek\u0101 pati apstr\u0101de.<\/p>\n\n\n<p>Lai sa\u012bsin\u0101tu pas\u016bt\u012bjuma izpildes laiku ra\u017eo\u0161an\u0101, pl\u0101not\u0101jam vispirms j\u0101saprot, k\u0101p\u0113c rodas \u0161\u012b starp\u012bba. \u0100tr\u0101ka meh\u0101nisk\u0101 apstr\u0101de var pal\u012bdz\u0113t, ta\u010du t\u0101 neatrisin\u0101s situ\u0101ciju, kad ra\u017eo\u0161anas uzdevums divas dienas gaida n\u0101kamo br\u012bvo vietu grafik\u0101.<\/p>\n\n\n<p>V\u0113rts jaut\u0101t: <strong>kas un k\u0101d\u0101 sec\u012bb\u0101 j\u0101paveic, lai \u0161is pas\u016bt\u012bjums b\u016btu gatavs?<\/strong> SkyPlanner sasaista \u0161\u012bs oper\u0101cijas ar t\u0101m pieejamo jaudu un noteiktaj\u0101m priorit\u0101t\u0113m. Ieg\u016btais grafiks pal\u012bdz sa\u012bsin\u0101t nevajadz\u012bgos p\u0101rtraukumus un nosaukt klientiem termi\u0146us, kas balst\u012bti v\u0113l paveicamaj\u0101 darb\u0101.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas ir pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101?<\/h2>\n\n\n<p>Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101 ir kop\u0113jais laiks, kur\u0101 produkts vai pas\u016bt\u012bjums iziet noteiktu ra\u017eo\u0161anas procesu. Tas ietver gan apstr\u0101di un iek\u0101rtu iestat\u012b\u0161anu, gan gaid\u012b\u0161anu rind\u0101s, p\u0101rvieto\u0161anu, p\u0101rbaudes un citu gaid\u012b\u0161anu \u0161aj\u0101 proces\u0101.<\/p>\n\n\n<p>\u0160eit to m\u0113r\u0101m <strong>no pas\u016bt\u012bjuma nodo\u0161anas ra\u017eo\u0161an\u0101 l\u012bdz br\u012bdim, kad tas ir pabeigts un gatavs nos\u016bt\u012b\u0161anai<\/strong>. Tas ietver ar\u012b gaid\u012b\u0161anu p\u0113c nodo\u0161anas ra\u017eo\u0161an\u0101, pirms s\u0101kas pirm\u0101 oper\u0101cija. Materi\u0101lu ieg\u0101de pirms nodo\u0161anas ra\u017eo\u0161an\u0101 un gatav\u0101s produkcijas transport\u0113\u0161ana l\u012bdz klientam \u0161aj\u0101 laik\u0101 autom\u0101tiski neietilpst.<\/p>\n\n\n<p>Uz\u0146\u0113mumos un pl\u0101no\u0161anas sist\u0113m\u0101s izpildes laiku defin\u0113 da\u017e\u0101di. Pirms sal\u012bdzin\u0101t skait\u013cus, nosakiet, kur\u0161 notikums iez\u012bm\u0113 m\u0113r\u012bjuma s\u0101kumu un kur\u0161 \u2014 beigas:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>R\u0101d\u012bt\u0101js<\/th><th>S\u0101kums un beigas<\/th><th>Uz k\u0101du jaut\u0101jumu tas pal\u012bdz atbild\u0113t<\/th><\/tr><\/thead><tbody><tr><td>Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101 \u0161\u012b raksta izpratn\u0113<\/td><td>No nodo\u0161anas ra\u017eo\u0161an\u0101 l\u012bdz gatav\u012bbai nos\u016bt\u012b\u0161anai<\/td><td>Cik ilgi pas\u016bt\u012bjums atrodas m\u016bsu ra\u017eo\u0161anas proces\u0101?<\/td><\/tr><tr><td>Klienta pas\u016bt\u012bjuma izpildes laiks<\/td><td>No pas\u016bt\u012bjuma pie\u0146em\u0161anas l\u012bdz br\u012bdim, kad klients to sa\u0146em<\/td><td>Cik ilgi klientam b\u016bs j\u0101gaida?<\/td><\/tr><tr><td>Pieg\u0101d\u0101t\u0101ja pieg\u0101des laiks<\/td><td>No iepirkuma pas\u016bt\u012bjuma veik\u0161anas l\u012bdz materi\u0101lu sa\u0146em\u0161anai<\/td><td>Kad varam sagaid\u012bt pas\u016bt\u012bto materi\u0101lu?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0160ie laika posmi var p\u0101rkl\u0101ties. Ja materi\u0101lu pas\u016bta, kam\u0113r tehnisk\u0101 noda\u013ca v\u0113l sagatavo pas\u016bt\u012bjumu, abu posmu pilnu ilgumu saskait\u012b\u0161ana noz\u012bm\u0113tu, ka da\u013ca gaid\u012b\u0161anas laika tiek ieskait\u012bta divreiz. Vadieties p\u0113c faktisk\u0101s notikumu sec\u012bbas laik\u0101, nevis saskaitiet visu noda\u013cu apl\u0113stos izpildes laikus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Izpildes laiks nav tas pats, kas cikla laiks vai caurlaidsp\u0113ja<\/h3>\n\n\n<p><a href=\"\/lv\/resursi\/razosanas-cikla-laiks\/\">Ra\u017eo\u0161anas cikla laiks<\/a> raksturo laiku, kas vajadz\u012bgs vienas vien\u012bbas izgatavo\u0161anai vai noteiktas oper\u0101cijas pabeig\u0161anai. Savuk\u0101rt pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101 aptver pla\u0161\u0101ku produkta ce\u013cu proces\u0101, ieskaitot gaid\u012b\u0161anu starp oper\u0101cij\u0101m.<\/p>\n\n\n<p><a href=\"\/lv\/resursi\/razosanas-caurlaidspeja\/\">Ra\u017eo\u0161anas caurlaidsp\u0113ja<\/a> raksturo sara\u017eoto daudzumu laika vien\u012bb\u0101, piem\u0113ram, pie\u0146emto mezglu skaitu mai\u0146\u0101. Tas ir ra\u017eo\u0161anas \u0101truma, nevis ilguma r\u0101d\u012bt\u0101js. Iek\u0101rtas cikla laiks var b\u016bt \u012bss, bet pas\u016bt\u012bjuma, kuram \u0161\u012bs deta\u013cas paredz\u0113tas, izpildes laiks ra\u017eo\u0161an\u0101 joproj\u0101m var b\u016bt ilgs.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0101 apr\u0113\u0137in\u0101t pas\u016bt\u012bjuma izpildes laiku ra\u017eo\u0161an\u0101<\/h2>\n\n\n<p>Pabeigtam pas\u016bt\u012bjumam izmantojiet re\u0123istr\u0113tos notikumu laikus:<\/p>\n\n\n<p><strong>Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101 = gatav\u012bbas nos\u016bt\u012b\u0161anai datums un laiks \u2212 nodo\u0161anas ra\u017eo\u0161an\u0101 datums un laiks<\/strong><\/p>\n\n\n<p>Iedom\u0101simies pas\u016bt\u012bjumu, kas nodots ra\u017eo\u0161an\u0101 pirmdien plkst. 08:00 un ir gatavs nos\u016bt\u012b\u0161anai ceturtdien plkst. 08:00. T\u0101 izpildes laiks ra\u017eo\u0161an\u0101 ir <strong>72 kalend\u0101r\u0101s stundas<\/strong>, pat ja iek\u0101rtu iestat\u012b\u0161anai un apstr\u0101dei vajadz\u012bgas tikai divpadsmit stundas.<\/p>\n\n\n<p>Atliku\u0161\u0101s <strong>60 stundas<\/strong> nav pat\u0113r\u0113tas ne iestat\u012b\u0161anai, ne apstr\u0101dei. Taj\u0101s var ietilpt gaid\u012b\u0161ana rind\u0101s, p\u0101rvieto\u0161ana, p\u0101rbaudes, nakts stundas, kad ra\u017eo\u0161ana nenotiek, un nepiecie\u0161amais atdzi\u0161anas laiks. Neuzskatiet visas se\u0161desmit stundas par nov\u0113r\u0161amiem zudumiem \u2014 noskaidrojiet, kas notiek katr\u0101 starplaik\u0101.<\/p>\n\n\n<p>Lai izskaidrotu kop\u0113jo ilgumu, sadaliet laiku kategorij\u0101s, kas nep\u0101rkl\u0101jas:<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Iestat\u012b\u0161ana un apstr\u0101de:<\/strong> iek\u0101rtu sagatavo\u0161ana un oper\u0101ciju veik\u0161ana.<\/li>\n\n<li><strong>Gaid\u012b\u0161ana rind\u0101:<\/strong> gaid\u012b\u0161ana, l\u012bdz b\u016bs pieejama iek\u0101rta, operators vai laiks p\u0101rbaudei.<\/li>\n\n<li><strong>P\u0101rvieto\u0161ana un p\u0101rbaudes:<\/strong> p\u0101rvieto\u0161ana un kvalit\u0101tes p\u0101rbaudes noteiktaj\u0101s procesa robe\u017e\u0101s.<\/li>\n\n<li><strong>P\u0101r\u0113jais laiks:<\/strong> nepiecie\u0161amie gaid\u012b\u0161anas posmi, laiks \u0101rpus darba mai\u0146\u0101m un p\u0101rtraukumi, kas v\u0113l nav ieskait\u012bti cit\u0101s kategorij\u0101s.<\/li>\n<\/ul>\n\n\n<p>Kop\u0113jo ilgumu nosakiet p\u0113c re\u0123istr\u0113tajiem notikumu laikiem, bet kategorijas izmantojiet t\u0101 anal\u012bzei. Ja divas oper\u0101cijas notiek paral\u0113li, to ilgumus nevar vienk\u0101r\u0161i saskait\u012bt, lai ieg\u016btu faktiski pag\u0101ju\u0161o izpildes laiku.<\/p>\n\n\n<p>Konsekventi izmantojiet ar\u012b vienu laika uzskaites veidu. Kalend\u0101r\u0101s stundas raksturo visu pag\u0101ju\u0161o laiku, bet darba stundas \u2014 laiku noteiktaj\u0101 mai\u0146u kalend\u0101r\u0101. Abi r\u0101d\u012bt\u0101ji var b\u016bt noder\u012bgi, ta\u010du divpadsmit darba stundas un septi\u0146desmit divas kalend\u0101r\u0101s stundas nav savstarp\u0113ji aizst\u0101jamas. Inform\u0113jiet p\u0101rdo\u0161anas kol\u0113\u0123us, p\u0113c k\u0101das laika uzskaites apr\u0113\u0137in\u0101ts klientam pied\u0101v\u0101tais termi\u0146\u0161.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0101p\u0113c \u012bss tehnolo\u0123iskais process var noz\u012bm\u0113t ilgu pas\u016bt\u012bjuma izpildi<\/h2>\n\n\n<p>Tehnolo\u0123iskais process nosaka, kas pas\u016bt\u012bjumam vajadz\u012bgs. Rinda nosaka, kad tas b\u016bs pieejams.<\/p>\n\n\n<p>Iedom\u0101simies, ka meh\u0101nisk\u0101 apstr\u0101de beidzas otrdienas r\u012bt\u0101, bet piem\u0113rota jauda gala apstr\u0101des darba centr\u0101 ir pieejama tikai ceturtdien. Ja gala apstr\u0101des laiks grafik\u0101 nemain\u0101s, meh\u0101nisk\u0101s apstr\u0101des pa\u0101trin\u0101\u0161ana par stundu ne\u013caus pas\u016bt\u012bjumu pabeigt agr\u0101k. Grafiku var uzlabot, saska\u0146ojot abas oper\u0101cijas, nevis vienk\u0101r\u0161i s\u0101kot pirmo oper\u0101ciju agr\u0101k.<\/p>\n\n\n<p>\u0160\u0101di starplaiki rodas vair\u0101ku ikdienas l\u0113mumu d\u0113\u013c:<\/p>\n\n\n<p><strong>Darbu s\u0101k, pirms p\u0101r\u0113jie tehnolo\u0123isk\u0101 procesa posmi sp\u0113j to uz\u0146emt.<\/strong> Pirmais darba centrs ir noslogots, ta\u010du turpm\u0101kajos posmos kr\u0101jas nepabeigti ra\u017eo\u0161anas uzdevumi. Nododot darbus ra\u017eo\u0161an\u0101, \u0146emiet v\u0113r\u0101 ar\u012b n\u0101kamos procesa posmus. \u0160is princips atbalsta ar\u012b <a href=\"\/lv\/resursi\/razosana-tiesi-laika\/\">ra\u017eo\u0161anu tie\u0161i laik\u0101<\/a>: darb\u012bba pati par sevi v\u0113l neliecina par lietder\u012bgu ra\u017eo\u0161anas pl\u016bsmu.<\/p>\n\n\n<p><strong>Grafiku pl\u0101no, balstoties uz jaudu, kas paties\u012bb\u0101 nav pieejama.<\/strong> \u0160\u0137ietami br\u012bvai iek\u0101rtai var b\u016bt vajadz\u012bgs operators, kur\u0161 str\u0101d\u0101 citur. Var tr\u016bkt nepiecie\u0161am\u0101 instrumenta vai materi\u0101la. Pl\u0101notajam s\u0101kuma laikam j\u0101atbilst to resursu pieejam\u012bbai, kuri oper\u0101cijai tie\u0161\u0101m vajadz\u012bgi.<\/p>\n\n\n<p><strong>Priorit\u0101tes maina katr\u0101 rind\u0101 atsevi\u0161\u0137i.<\/strong> Steidzams uzdevums rind\u0101 tiek p\u0101rcelts uz priek\u0161u, bet t\u0101 n\u0101kam\u0101 oper\u0101cija \u2014 ne. Cits pas\u016bt\u012bjums zaud\u0113 savu vietu grafik\u0101, un neviens nep\u0101rbauda, k\u0101 tas ietekm\u0113s t\u0101 pabeig\u0161anas termi\u0146u.<\/p>\n\n\n<p><strong>Nepiecie\u0161amos gaid\u012b\u0161anas posmus uzskata par br\u012bvu laiku.<\/strong> Produktam var b\u016bt j\u0101\u017e\u016bst, j\u0101atdziest vai j\u0101sa\u0146em kvalit\u0101tes apstiprin\u0101jums. Iek\u013caujiet \u0161os posmus tehnolo\u0123iskaj\u0101 proces\u0101, lai n\u0101kam\u0101 oper\u0101cija netiktu iepl\u0101nota, pirms produkts tai ir gatavs.<\/p>\n\n\n<p><a href=\"\/lv\/resursi\/lean-manufacturing-efektivitate-atbloketa\/\">Lean ra\u017eo\u0161ana<\/a> pal\u012bdz atkl\u0101t nevajadz\u012bgu gaid\u012b\u0161anu un p\u0101rvieto\u0161anu. Saska\u0146ots grafiks \u013cauj \u0161os uzlabojumus izmantot ikdienas pas\u016bt\u012bjumu izpild\u0113. Pla\u0161\u0101ku uzlabo\u0161anas meto\u017eu kl\u0101stu atrad\u012bsiet m\u016bsu ce\u013cved\u012b par <a href=\"\/lv\/resursi\/sagatavosanas-laika-samazinasana-gudraka-biznesa-noslepums\/\">pas\u016bt\u012bjuma izpildes laika sa\u012bsin\u0101\u0161anu<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Samaziniet starplaikus starp oper\u0101cij\u0101m ar SkyPlanner<\/h2>\n\n\n<p>SkyPlanner APS no pas\u016bt\u012bjumu oper\u0101cij\u0101m izveido ra\u017eo\u0161anas grafiku, iev\u0113rojot pieejam\u0101s jaudas ierobe\u017eojumus. T\u0101 m\u0101ksl\u012bg\u0101 intelekta pl\u0101no\u0161anas dzin\u0113js Arcturus \u0146em v\u0113r\u0101 iestat\u012bto darba centru jaudu, mai\u0146as, oper\u0101ciju savstarp\u0113j\u0101s atkar\u012bbas un priorit\u0101tes. Ja ir iesl\u0113gta pl\u0101no\u0161ana, kas \u0146em v\u0113r\u0101 materi\u0101lu pieejam\u012bbu, ar\u012b t\u0101 ietekm\u0113 darbu izpildes laiku.<\/p>\n\n\n<p>Pl\u0101not\u0101jam tas dod noder\u012bg\u0101ku atskaites punktu nek\u0101 nemain\u012bgs sol\u012bjums, piem\u0113ram, \u201cvisam vajag asto\u0146as dienas\u201d. Gantt diagramm\u0101 redzama darbu sec\u012bba da\u017e\u0101dos darba centros, t\u0101p\u0113c varat p\u0101rbaud\u012bt, kad paredz\u0113ts s\u0101kt pas\u016bt\u012bjuma izpildi, kur v\u0113l paliek starplaiki un kad b\u016btu j\u0101beidzas p\u0113d\u0113jai oper\u0101cijai.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Iek\u013caujiet \u012bs\u0101ku izpildes laiku ra\u017eo\u0161an\u0101 sav\u0101s priorit\u0101t\u0113s<\/h3>\n\n\n<p>SkyPlanner pied\u0101v\u0101 \u012bpa\u0161u <strong>izpildes laika priorit\u0101ti<\/strong>: Arcturus cen\u0161as samazin\u0101t laiku starp katras pas\u016bt\u012bjuma poz\u012bcijas pirmo un p\u0113d\u0113jo procesa soli. Tas ir noder\u012bgi, ja pats darbs ir sal\u012bdzino\u0161i \u012bss, bet starp so\u013ciem ir ilgi p\u0101rtraukumi.<\/p>\n\n\n<p>\u0160\u0101di optimiz\u0113tais laika posms ir \u0161aur\u0101ks par iepriek\u0161 aprakst\u012bto m\u0113r\u012bjumu no nodo\u0161anas ra\u017eo\u0161an\u0101 l\u012bdz gatav\u012bbai nos\u016bt\u012b\u0161anai. Tas neietver visu gaid\u012b\u0161anu pirms pirm\u0101 so\u013ca un nesola sa\u012bsin\u0101t iepirkumu vai transport\u0113\u0161anu l\u012bdz klientam.<\/p>\n\n\n<p>\u0160o priorit\u0101ti j\u016bs nosak\u0101t l\u012bdz\u0101s pabeig\u0161anas termi\u0146u, klientu un ra\u017eo\u0161anas uzdevumu priorit\u0101t\u0113m. Sa\u012bsinot vienas poz\u012bcijas ra\u017eo\u0161anas laika posmu, j\u0101r\u0113\u0137in\u0101s ar\u012b ar p\u0101r\u0113jo pas\u016bt\u012bjumu pieg\u0101des saist\u012bb\u0101m. T\u0101 viet\u0101, lai visas priorit\u0101tes pasludin\u0101tu par vienl\u012bdz steidzam\u0101m, nor\u0101diet pl\u0101no\u0161anas sist\u0113mai t\u0101s, kuras j\u016bsu uz\u0146\u0113mumam patie\u0161\u0101m j\u0101iev\u0113ro.<\/p>\n\n\n<p><a href=\"\/lv\/resursi\/vadibas-laika-parvaldibas-funkcija-optimizet-katru-minuti\/\">Uzziniet vair\u0101k par SkyPlanner izpildes laika p\u0101rvald\u012bbas funkciju<\/a> un t\u0101s pied\u0101v\u0101taj\u0101m pl\u0101no\u0161anas iesp\u0113j\u0101m.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u0101rr\u0113\u0137iniet grafiku, kad main\u0101s apst\u0101k\u013ci<\/h3>\n\n\n<p>Kad pien\u0101k steidzams pas\u016bt\u012bjums vai main\u0101s mai\u0146a, Arcturus var p\u0101rr\u0113\u0137in\u0101t grafiku atbilsto\u0161i jaunajai situ\u0101cijai. P\u0101rbaudiet ieg\u016btos pabeig\u0161anas termi\u0146us, nevis tikai p\u0101rcelto oper\u0101ciju. Ar fiks\u0113\u0161anas iesp\u0113j\u0101m varat saglab\u0101t nemain\u012bgus tos pl\u0101no\u0161anas l\u0113mumus, kurus nevajadz\u0113tu main\u012bt.<\/p>\n\n\n<p>T\u0101d\u0113j\u0101di maz\u0101k laika j\u0101velta atsevi\u0161\u0137u rindu p\u0101rk\u0101rto\u0161anai, un izmai\u0146u sekas ir skaidr\u0101k redzamas. V\u0113l pirms paredz\u0113t\u0101s pas\u016bt\u012bjuma nos\u016bt\u012b\u0161anas varat izlemt, vai main\u012bt jaudu, piel\u0101got priorit\u0101ti vai p\u0101rrun\u0101t jaunu termi\u0146u.<\/p>\n\n\n<p>J\u016bsu eso\u0161\u0101s sist\u0113mas joproj\u0101m ir noder\u012bgas. <a href=\"\/lv\/resursi\/razosanas-erp-visaptveross-celvedis\/\">ERP sist\u0113ma<\/a> nodro\u0161ina pas\u016bt\u012bjuma datus, savuk\u0101rt <a href=\"\/lv\/resursi\/mes-sistema-kas-ta-ir-un-ko-ta-dara\/\">MES sist\u0113ma<\/a> var sniegt inform\u0101ciju par ra\u017eo\u0161anas izpildi. <strong>SkyPlanner integr\u0113jas ar jebkuru ERP vai MES, izmantojot atv\u0113rto REST API<\/strong>, un sasaista \u0161o inform\u0101ciju ar ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ko skaidr\u0101ks p\u0101rskats main\u012bja uz\u0146\u0113mum\u0101 Eskomatic<\/h2>\n\n\n<p>Somijas uz\u0146\u0113mums Eskomatic, kas veic meh\u0101nisko apstr\u0101di p\u0113c pas\u016bt\u012bjuma, iepriek\u0161 darbu rindas liel\u0101koties k\u0101rtoja manu\u0101li vec\u0101k\u0101 ERP un ra\u017eo\u0161anas vad\u012bbas sist\u0113m\u0101. Kopainas ieg\u016b\u0161ana pras\u012bja p\u016bles, un materi\u0101lu tr\u016bkums var\u0113ja atkl\u0101ties p\u0101r\u0101k \u012bsi pirms pl\u0101not\u0101 darba s\u0101kuma.<\/p>\n\n\n<p>Ar SkyPlanner uz\u0146\u0113muma pl\u0101not\u0101ji ieguva p\u0101rskat\u0101m\u0101ku, vizu\u0101li att\u0113lotu darbu rindu un m\u0101ksl\u012bg\u0101 intelekta veidotu gaid\u0101m\u0101s noslodzes grafiku. Eskomatic ieviestaj\u0101 risin\u0101jum\u0101 materi\u0101lu tr\u016bkums ir redzams jau ra\u017eo\u0161anas pl\u0101no\u0161an\u0101, pal\u012bdzot komandai izvair\u012bties no t\u0101 izrais\u012bt\u0101m d\u012bkst\u0101v\u0113m.<\/p>\n\n\n<p>Autom\u0101tiska noslodzes pl\u0101no\u0161ana ar\u012b pal\u012bdz Eskomatic saskat\u012bt re\u0101lus darbu pabeig\u0161anas termi\u0146us un prec\u012bz\u0101k noteikt pieg\u0101des datumus klientiem. T\u0101 praks\u0113 izpau\u017eas saikne starp izpildes laiku un grafiku sast\u0101d\u012b\u0161anu: termi\u0146\u0161 izriet no p\u0101rskata par darbu un t\u0101 ierobe\u017eojumiem, nevis no standarta laika rezerves, ko pieskaita katram pas\u016bt\u012bjumam.<\/p>\n\n\n<p><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Lasiet pilnu st\u0101stu par Eskomatic pieredzi ar SkyPlanner<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sa\u012bsiniet faktisko izpildes laiku, nevis tikai uzlabojiet r\u0101d\u012bt\u0101ju<\/h2>\n\n\n<p>S\u0101ciet ar vienu produktu saimi, kuras pas\u016bt\u012bjumu izpilde regul\u0101ri aiz\u0146em vair\u0101k laika, nek\u0101 paredz\u0113ts. Sal\u012bdziniet laika atz\u012bmes, kad pas\u016bt\u012bjums nodots ra\u017eo\u0161an\u0101, kad veiktas oper\u0101cijas un kad tas bijis gatavs nos\u016bt\u012b\u0161anai. Atrodiet atk\u0101rtotu gaid\u012b\u0161anas posmu, kas visbie\u017e\u0101k aizkav\u0113 pabeig\u0161anu, un p\u0101rbaudiet, vai izmai\u0146as ra\u017eo\u0161anas grafik\u0101 vai proces\u0101 pal\u012bdz to sa\u012bsin\u0101t.<\/p>\n\n\n<p>L\u012bdztekus pas\u016bt\u012bjuma izpildes laikam v\u0113rt\u0113jiet ar\u012b pieg\u0101des termi\u0146u iev\u0113ro\u0161anu. \u012as\u0101ks ra\u017eo\u0161anas laiks nav uzlabojums, ja t\u0101 d\u0113\u013c kav\u0113jas citi pas\u016bt\u012bjumi ar apsol\u012btiem pieg\u0101des termi\u0146iem. Ar\u012b p\u0101rce\u013cot nodo\u0161anas ra\u017eo\u0161an\u0101 laika atz\u012bmi uz v\u0113l\u0101ku br\u012bdi, laiks no nodo\u0161anas ra\u017eo\u0161an\u0101 l\u012bdz gatav\u012bbai nos\u016bt\u012b\u0161anai var izskat\u012bties \u012bs\u0101ks, lai gan klienta kop\u0113jais gaid\u012b\u0161anas laiks paliek tie\u0161i t\u0101ds pats. Uzskaitiet gaid\u012b\u0161anu pirms nodo\u0161anas ra\u017eo\u0161an\u0101 atsevi\u0161\u0137i, nevis \u013caujiet tai pazust no uzskaites.<\/p>\n\n\n<p>SkyPlanner ir \u012bpa\u0161i piem\u0113rots, ja j\u0101saska\u0146o daudzu pas\u016bt\u012bjumu izpilde, izmantojot kop\u012bgus ra\u017eo\u0161anas resursus. Arcturus veic ra\u017eo\u0161anas grafika apr\u0113\u0137inus, bet priorit\u0101tes un l\u0113mumi, kurus esat fiks\u0113ju\u0161i, paliek j\u016bsu kontrol\u0113. Varat str\u0101d\u0101t pie \u012bs\u0101kiem gaid\u012b\u0161anas posmiem un uzticam\u0101kiem pabeig\u0161anas termi\u0146iem, nep\u0101rvaldot katru rindu manu\u0101li.<\/p>\n\n\n<p><a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Piesakieties SkyPlanner demonstr\u0101cijai<\/a> un sagatavojiet piem\u0113ru ar pas\u016bt\u012bjumu, kuram vajadz\u0113ja da\u017eas stundas darba, bet kura pabeig\u0161ana aiz\u0146\u0113ma vair\u0101kas dienas. T\u0101 tehnolo\u0123iskais process, gaid\u012b\u0161anas posmi un visvair\u0101k noslogotais resurss ir labs s\u0101kumpunkts, lai saprastu, ko var\u0113tu main\u012bt saska\u0146ots ra\u017eo\u0161anas grafiks. Ja vispirms v\u0113laties izp\u0113t\u012bt pa\u0161i, <a href=\"\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a>.<\/p>\n\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu starp uzdevumiem Tehnolo\u0123iskaj\u0101 proces\u0101 paredz\u0113tas divpadsmit stundas. Klientam sol\u012btas asto\u0146as dienas. No pirm\u0101s oper\u0101cijas l\u012bdz gatavam pas\u016bt\u012bjumam gaid\u012b\u0161ana aiz\u0146em daudz vair\u0101k laika nek\u0101 pati apstr\u0101de. Lai sa\u012bsin\u0101tu pas\u016bt\u012bjuma izpildes laiku ra\u017eo\u0161an\u0101, pl\u0101not\u0101jam vispirms j\u0101saprot, k\u0101p\u0113c rodas \u0161\u012b starp\u012bba. \u0100tr\u0101ka meh\u0101nisk\u0101 apstr\u0101de var pal\u012bdz\u0113t, ta\u010du t\u0101 neatrisin\u0101s situ\u0101ciju, kad ra\u017eo\u0161anas &#8230; <a title=\"Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu starp uzdevumiem\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/\" aria-label=\"Read more about Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu starp uzdevumiem\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":98259,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-8284","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu<\/title>\n<meta name=\"description\" content=\"Stundu darbs var ilgt dien\u0101m. Izprotiet pas\u016bt\u012bjuma izpildes laiku ra\u017eo\u0161an\u0101, atkl\u0101jiet gaid\u012b\u0161anu starp oper\u0101cij\u0101m un pl\u0101nojiet dro\u0161\u0101kus termi\u0146us ar SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu starp uzdevumiem\" \/>\n<meta property=\"og:description\" content=\"Stundu darbs var ilgt dien\u0101m. Izprotiet pas\u016bt\u012bjuma izpildes laiku ra\u017eo\u0161an\u0101, atkl\u0101jiet gaid\u012b\u0161anu starp oper\u0101cij\u0101m un pl\u0101nojiet dro\u0161\u0101kus termi\u0146us ar SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-28T07:54:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:41:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jesse Sinisalo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jesse Sinisalo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/ka-optimizet-izpildes-laiku-razosana\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/ka-optimizet-izpildes-laiku-razosana\\\/\"},\"author\":{\"name\":\"Jesse Sinisalo\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\"},\"headline\":\"Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu starp uzdevumiem\",\"datePublished\":\"2022-10-28T07:54:22+00:00\",\"dateModified\":\"2026-10-19T14:41:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/ka-optimizet-izpildes-laiku-razosana\\\/\"},\"wordCount\":2445,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/ka-optimizet-izpildes-laiku-razosana\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/ka-optimizet-izpildes-laiku-razosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/ka-optimizet-izpildes-laiku-razosana\\\/\",\"name\":\"Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/ka-optimizet-izpildes-laiku-razosana\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/ka-optimizet-izpildes-laiku-razosana\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"datePublished\":\"2022-10-28T07:54:22+00:00\",\"dateModified\":\"2026-10-19T14:41:33+00:00\",\"description\":\"Stundu darbs var ilgt dien\u0101m. Izprotiet pas\u016bt\u012bjuma izpildes laiku ra\u017eo\u0161an\u0101, atkl\u0101jiet gaid\u012b\u0161anu starp oper\u0101cij\u0101m un pl\u0101nojiet dro\u0161\u0101kus termi\u0146us ar SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/ka-optimizet-izpildes-laiku-razosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/ka-optimizet-izpildes-laiku-razosana\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/ka-optimizet-izpildes-laiku-razosana\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"width\":1280,\"height\":720,\"caption\":\"Parts waiting between manufacturing stations illustrate the gaps within manufacturing lead time\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/ka-optimizet-izpildes-laiku-razosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Raksti\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu starp uzdevumiem\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\",\"name\":\"Jesse Sinisalo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"caption\":\"Jesse Sinisalo\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu","description":"Stundu darbs var ilgt dien\u0101m. Izprotiet pas\u016bt\u012bjuma izpildes laiku ra\u017eo\u0161an\u0101, atkl\u0101jiet gaid\u012b\u0161anu starp oper\u0101cij\u0101m un pl\u0101nojiet dro\u0161\u0101kus termi\u0146us ar SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu starp uzdevumiem","og_description":"Stundu darbs var ilgt dien\u0101m. Izprotiet pas\u016bt\u012bjuma izpildes laiku ra\u017eo\u0161an\u0101, atkl\u0101jiet gaid\u012b\u0161anu starp oper\u0101cij\u0101m un pl\u0101nojiet dro\u0161\u0101kus termi\u0146us ar SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/","og_site_name":"SkyPlanner","article_published_time":"2022-10-28T07:54:22+00:00","article_modified_time":"2026-10-19T14:41:33+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","type":"image\/png"}],"author":"Jesse Sinisalo","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jesse Sinisalo","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/"},"author":{"name":"Jesse Sinisalo","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd"},"headline":"Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu starp uzdevumiem","datePublished":"2022-10-28T07:54:22+00:00","dateModified":"2026-10-19T14:41:33+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/"},"wordCount":2445,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/","name":"Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","datePublished":"2022-10-28T07:54:22+00:00","dateModified":"2026-10-19T14:41:33+00:00","description":"Stundu darbs var ilgt dien\u0101m. Izprotiet pas\u016bt\u012bjuma izpildes laiku ra\u017eo\u0161an\u0101, atkl\u0101jiet gaid\u012b\u0161anu starp oper\u0101cij\u0101m un pl\u0101nojiet dro\u0161\u0101kus termi\u0146us ar SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","width":1280,"height":720,"caption":"Parts waiting between manufacturing stations illustrate the gaps within manufacturing lead time"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/ka-optimizet-izpildes-laiku-razosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Raksti","item":"https:\/\/skyplanner.ai\/lv\/resursi\/"},{"@type":"ListItem","position":3,"name":"Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu starp uzdevumiem"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd","name":"Jesse Sinisalo","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","caption":"Jesse Sinisalo"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jesse Sinisalo","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jesse\/"},"uagb_comment_info":0,"uagb_excerpt":"Pas\u016bt\u012bjuma izpildes laiks ra\u017eo\u0161an\u0101: atkl\u0101jiet gaid\u012b\u0161anu starp uzdevumiem Tehnolo\u0123iskaj\u0101 proces\u0101 paredz\u0113tas divpadsmit stundas. Klientam sol\u012btas asto\u0146as dienas. No pirm\u0101s oper\u0101cijas l\u012bdz gatavam pas\u016bt\u012bjumam gaid\u012b\u0161ana aiz\u0146em daudz vair\u0101k laika nek\u0101 pati apstr\u0101de. Lai sa\u012bsin\u0101tu pas\u016bt\u012bjuma izpildes laiku ra\u017eo\u0161an\u0101, pl\u0101not\u0101jam vispirms j\u0101saprot, k\u0101p\u0113c rodas \u0161\u012b starp\u012bba. \u0100tr\u0101ka meh\u0101nisk\u0101 apstr\u0101de var pal\u012bdz\u0113t, ta\u010du t\u0101 neatrisin\u0101s situ\u0101ciju, kad ra\u017eo\u0161anas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/8284","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=8284"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/8284\/revisions"}],"predecessor-version":[{"id":93106,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/8284\/revisions\/93106"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/98259"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=8284"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=8284"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=8284"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}