{"id":43038,"date":"2024-09-25T12:23:33","date_gmt":"2024-09-25T12:23:33","guid":{"rendered":"https:\/\/skyplanner.ai\/resursi\/klientu-neapmierinatibas-noversana-ar-aps-sistemu\/"},"modified":"2026-03-21T18:36:20","modified_gmt":"2026-03-21T18:36:20","slug":"noversiet-klientu-nepatiku-ar-aps-sistemu","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/","title":{"rendered":"Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-prevent-customer-dissatisfaction-with-an-aps-system\">Klientu neapmierin\u0101t\u012bbas nov\u0113r\u0161ana ar APS sist\u0113mu<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p>S\u0101kumlapa \u00bb Resursi \u00bb Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Paredzamais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">13<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\"><strong>Klientu neapmierin\u0101t\u012bba ir tad, ja klients j\u016btas v\u012blies vai neapmierin\u0101ts ar uz\u0146\u0113mumu kav\u0113\u0161an\u0101s, sliktas apkalpo\u0161anas, zemas kvalit\u0101tes produktu vai nepiepild\u012btu cer\u012bbu d\u0113\u013c.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Klientu lojalit\u0101te ir trausla.\nTikl\u012bdz t\u0101 ir apdraud\u0113ta, uz\u0146\u0113mumiem var b\u016bt gr\u016bti notur\u0113t klientus un samazin\u0101t to skaita samazin\u0101\u0161anos.\nKlientu neapmierin\u0101t\u012bbu bie\u017ei izraisa kav\u0113jumi, slikts serviss vai nepiepild\u012btas cer\u012bbas, un tas var nopietni ietekm\u0113t j\u016bsu uz\u0146\u0113mumu.  <\/p>\n\n\n\n<p>Klientu apmierin\u0101t\u012bbas un notur\u012bbas veido\u0161ana prasa p\u016bles; tas nenotiek br\u012bnumain\u0101 k\u0101rt\u0101 vai pateicoties veiksmei.\nJ\u016bsu procesiem j\u0101b\u016bt efekt\u012bviem, j\u016bsu komandai &#8211; proakt\u012bvai, bet ra\u017eo\u0161anai &#8211; labi organiz\u0113tai.\nTurpiniet las\u012bt, lai uzzin\u0101tu, k\u0101 mazin\u0101t klientu neapmierin\u0101t\u012bbu un papla\u0161in\u0101t savu uz\u0146\u0113mumu.  <\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-3df69bf8      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#klientu-neapmierin\u0101t\u012bbas-nov\u0113r\u0161ana-ar-aps-sist\u0113mu\" class=\"uagb-toc-link__trigger\">Klientu neapmierin\u0101t\u012bbas nov\u0113r\u0161ana ar APS sist\u0113mu<\/a><ul class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#kas-ir-klientu-neapmierin\u0101t\u012bba\" class=\"uagb-toc-link__trigger\">Kas ir klientu neapmierin\u0101t\u012bba?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#neapmierin\u0101to-klientu-veidi\" class=\"uagb-toc-link__trigger\">Neapmierin\u0101to klientu veidi<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#kas-var-samazin\u0101t-klientu-apmierin\u0101t\u012bbu\" class=\"uagb-toc-link__trigger\">Kas var samazin\u0101t klientu apmierin\u0101t\u012bbu?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#k\u0101-palielin\u0101t-apmierin\u0101t\u012bbu-un-aiztur\u0113t-darbiniekus\" class=\"uagb-toc-link__trigger\">K\u0101 palielin\u0101t apmierin\u0101t\u012bbu un aiztur\u0113t darbiniekus<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#aps-un-klientu-apmierin\u0101t\u012bba\" class=\"uagb-toc-link__trigger\">APS un klientu apmierin\u0101t\u012bba<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#skyplanner-gudra-pl\u0101no\u0161ana-lai-mazin\u0101tu-klientu-neapmierin\u0101t\u012bbu\" class=\"uagb-toc-link__trigger\">SkyPlanner: Gudra pl\u0101no\u0161ana, lai mazin\u0101tu klientu neapmierin\u0101t\u012bbu<\/a><\/ul><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-is-customer-dissatisfaction\">Kas ir klientu neapmierin\u0101t\u012bba?<\/h2>\n\n\n\n<p><strong>Klientu neapmierin\u0101t\u012bba ir tad, ja klients j\u016btas v\u012blies vai neapmierin\u0101ts ar uz\u0146\u0113mumu kav\u0113\u0161an\u0101s, sliktas apkalpo\u0161anas, zemas kvalit\u0101tes produktu vai nepiepild\u012btu cer\u012bbu d\u0113\u013c<\/strong>.\nJa v\u0113laties, lai klienti atgrieztos un paliktu pie jums, jums ir j\u0101atrod risin\u0101jums \u0161\u012bm probl\u0113m\u0101m.\nJ\u016bs nevarat t\u0101s ignor\u0113t un izlikties, ka \u0161\u012bs probl\u0113mas izzud\u012bs vienas pa\u0161as, vai cer\u0113t, ka j\u016bsu ra\u017eo\u0161ana ma\u0123iski uzlabosies.\nJums tas ir j\u0101pan\u0101k!   <\/p>\n\n\n\n<p><strong>Kopum\u0101 klientu neapmierin\u0101t\u012bba<\/strong> <strong>ir tas, kas notiek, ja uz\u0146\u0113mums neatbilst klientu vajadz\u012bb\u0101m vai gaid\u0101m, izraisot neapmierin\u0101t\u012bbu un, iesp\u0113jams, zaud\u0113jot klientu uztic\u012bbu.<\/strong> To var izrais\u012bt l\u0113na pieg\u0101de, slikta klientu apkalpo\u0161ana vai produkti, kas neatbilst sol\u012btajam.\nT\u0101 ir nopietna probl\u0113ma, jo neapmierin\u0101tie klienti ir daudz maz\u0101k tend\u0113ti palikt. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Neapmierin\u0101to klientu veidi<\/h2>\n\n\n\n<p>Run\u0101jot par klientu neapmierin\u0101t\u012bbu, ir svar\u012bgi apzin\u0101ties, ka ne visi neapmierin\u0101tie klienti ir vien\u0101di, jo da\u017e\u0101das situ\u0101cijas izraisa da\u017e\u0101da veida neapmierin\u0101t\u012bbu, un \u0161o veidu izpratne pal\u012bdz uz\u0146\u0113mumiem efekt\u012bvi risin\u0101t katru situ\u0101ciju.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Klusais neapmierin\u0101tais klients<\/h4>\n\n\n\n<p>\u0160\u0101ds klients neizsaka neapmierin\u0101t\u012bbu, ar ko vi\u0146\u0161, iesp\u0113jams, ir sask\u0101ries ar jums, bet klusi aiziet un vairs neatgrie\u017eas.\nPat ja vi\u0146i tie\u0161i nes\u016bdzas, j\u016bs redz\u0113siet vi\u0146u neapmierin\u0101t\u012bbu vi\u0146u darb\u012bb\u0101s, piem\u0113ram, vi\u0146i vairs nepirks no jums vai neiesaka j\u016bsu uz\u0146\u0113mumu. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Bals\u012bgais neapmierin\u0101tais klients<\/h4>\n\n\n\n<p>At\u0161\u0137ir\u012bb\u0101 no klus\u0101 tipa klienti atkl\u0101ti s\u016bdzas, ja ir neapmierin\u0101ti, vai nu ar tie\u0161u s\u016bdz\u012bbu, negat\u012bvu atsauksmju vai soci\u0101lo mediju starpniec\u012bbu.\nLai gan vi\u0146i var b\u016bt izaicino\u0161i, tie dod jums iesp\u0113ju risin\u0101t vi\u0146u probl\u0113mas un uzlabot situ\u0101ciju. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Hronisks s\u016bdz\u0113t\u0101js<\/h4>\n\n\n\n<p>\u0160is klients vienm\u0113r \u0161\u0137iet neapmierin\u0101ts, lai ko j\u016bs dar\u012btu.\nVi\u0146i parasti atrod, par ko s\u016bdz\u0113ties.\nLai gan vi\u0146u s\u016bdz\u012bbas var \u0161\u0137ist p\u0101rlieku lielas vai p\u0101r\u0146emo\u0161as, tom\u0113r to risin\u0101\u0161ana var pal\u012bdz\u0113t uzlabot apkalpo\u0161anu un nov\u0113rst turpm\u0101kas probl\u0113mas ar vi\u0146iem un citiem klientiem.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Apjucis klients<\/h4>\n\n\n\n<p>Da\u017ek\u0101rt klienti ir neapmierin\u0101ti nevis t\u0101p\u0113c, ka produkts vai pakalpojums ir briesm\u012bgs, bet gan p\u0101rpratumu vai inform\u0101cijas tr\u016bkuma d\u0113\u013c.\n\u0160\u0101da veida klienti, iesp\u0113jams, nezina, k\u0101 pareizi lietot produktu, vai ir nepareizi sapratu\u0161i, ko vi\u0146i sa\u0146em.\nSkaidra sazi\u0146a un laba pal\u012bdz\u012bba jau no pa\u0161a s\u0101kuma var pal\u012bdz\u0113t nov\u0113rst un atrisin\u0101t \u0161\u0101das probl\u0113mas.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Klients, kas ir jut\u012bgs pret cenu<\/h4>\n\n\n\n<p>\u0160iem klientiem galvenais ir v\u0113rt\u012bba.\nVi\u0146i sagaida augstas kvalit\u0101tes produktus un pakalpojumus un sal\u012bdzina cenas ar konkurentiem.\nJa vi\u0146i uzskata, ka maks\u0101 p\u0101r\u0101k d\u0101rgi, vi\u0146i izteiks savu neapmierin\u0101t\u012bbu.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Nepast\u0101v\u012bgs neapmierin\u0101ts klients<\/h4>\n\n\n\n<p>\u0160ie klienti ir neprognoz\u0113jami, ta\u010du ar tiem ir iesp\u0113jams tikt gal\u0101.\nVienu dienu vi\u0146i ir apmierin\u0101ti, bet n\u0101kamaj\u0101 &#8211; n\u0113.\nVi\u0146u neapmierin\u0101t\u012bbu parasti izraisa nelielas, specifiskas probl\u0113mas vai produkta vai pakalpojuma kvalit\u0101tes izmai\u0146as.\nGalvenais, lai vi\u0146i b\u016btu apmierin\u0101ti?\nP\u0101rliecinieties, ka viss paliek uzticams un konsekvents.    <\/p>\n\n\n\n<p>Katram neapmierin\u0101t\u0101 klienta tipam ir nepiecie\u0161ama piel\u0101gota pieeja.\n\u0100tra un efekt\u012bva vi\u0146u probl\u0113mu risin\u0101\u0161ana pal\u012bdz atjaunot uztic\u012bbu un palielina klientu apmierin\u0101t\u012bbu un notur\u012bbu.\nKad uz\u0146\u0113mumi saprot, k\u0101p\u0113c klienti ir neapmierin\u0101ti, tie var \u0161os neapmierin\u0101tos klientus p\u0101rv\u0113rst par loj\u0101liem klientiem.  <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kas var samazin\u0101t klientu apmierin\u0101t\u012bbu?<\/h2>\n\n\n\n<p>Izkl\u0101st\u012bsim to s\u012bk\u0101k.\n\u0160ie ir galvenie iemesli, k\u0101p\u0113c klienti ir neapmierin\u0101ti, un, kad tos uzzin\u0101siet, j\u016bs var\u0113siet ar tiem tikt gal\u0101 k\u0101 profesion\u0101lis. <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Nov\u0113lotas pieg\u0101des<\/strong>: Ja klienti nesa\u0146em savus produktus laik\u0101, tas ir t\u016bl\u012bt\u0113js sign\u0101ls.\nNov\u0113lotas pieg\u0101des rada neapmierin\u0101t\u012bbu, un nevienam nepat\u012bk gaid\u012bt ilg\u0101k, nek\u0101 gaid\u012bts. <\/li>\n\n\n\n<li><strong>Slikta produktu kvalit\u0101te<\/strong>: Ja produkts neatbilst klienta v\u0113lm\u0113m, jums ir probl\u0113mas.\nKvalit\u0101tes probl\u0113mas liek klientiem zaud\u0113t uztic\u012bbu j\u016bsu uz\u0146\u0113mumam. <\/li>\n\n\n\n<li><strong>Slikts klientu apkalpo\u0161anas serviss<\/strong>: Rupj\u0161 vai nelietder\u012bgs serviss ir \u0101trs veids, k\u0101 zaud\u0113t klientus.\nCilv\u0113ki sagaida draudz\u012bgu un efekt\u012bvu pal\u012bdz\u012bbu; ja vi\u0146i to nesa\u0146em, vi\u0146i mekl\u0113s citu pakalpojumu. <\/li>\n\n\n\n<li><strong>Neviendab\u012bga pieredze<\/strong>: Klienti v\u0113las vien\u0101du un labu pieredzi ikreiz, kad vi\u0146i mijiedarbojas ar j\u016bsu uz\u0146\u0113mumu.\nVi\u0146i s\u0101ks mekl\u0113t alternat\u012bvas, ja vienu reizi sa\u0146ems izcilu apkalpo\u0161anu, bet n\u0101kamaj\u0101 reiz\u0113 &#8211; sliktu. <\/li>\n\n\n\n<li><strong>Neskaidra sazi\u0146a:<\/strong> Klientiem ir j\u0101zina, kas notiek ar vi\u0146u pas\u016bt\u012bjumiem vai pakalpojumiem.\nJa vi\u0146i j\u016btas nezi\u0146\u0101, vi\u0146u neapmierin\u0101t\u012bba pieaugs. <\/li>\n\n\n\n<li><strong>Augstas cenas bez v\u0113rt\u012bbas<\/strong>: Klienti neiebilst maks\u0101t vair\u0101k, ja vi\u0146i j\u016bt, ka sa\u0146em v\u0113rt\u012bbu.\nTa\u010du vi\u0146i jut\u012bsies apkr\u0101pti, ja cena neatbild\u012bs kvalit\u0101tei. <\/li>\n\n\n\n<li><strong>Sare\u017e\u0123\u012bti procesi<\/strong>: Klienti zaud\u0113s paciet\u012bbu, ja b\u016bs p\u0101r\u0101k gr\u016bti veikt pas\u016bt\u012bjumu vai atrisin\u0101t k\u0101du probl\u0113mu.\nDariet visu vienk\u0101r\u0161i, vai ar\u012b vi\u0146i atrad\u012bs citu uz\u0146\u0113mumu, kas to dara. <\/li>\n\n\n\n<li><strong>Nesp\u0113ja izpild\u012bt gaid\u012bto<\/strong>: Klienti j\u016btas v\u012blu\u0161ies, ja produkts vai pakalpojums neatbilst sol\u012btajam.\nEsiet skaidri, izvirziet re\u0101listiskas cer\u012bbas un jau s\u0101kum\u0101 nov\u0113rsiet jebk\u0101das \u0161aubas. <\/li>\n<\/ul>\n\n\n\n<p>Nov\u0113r\u0161ot un risinot \u0161\u012bs probl\u0113mas, j\u016bs iev\u0113rojami paaugstin\u0101siet klientu apmierin\u0101t\u012bbu.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"h-how-to-increase-satisfaction-and-retention\">K\u0101 palielin\u0101t apmierin\u0101t\u012bbu un aiztur\u0113t darbiniekus<\/h2>\n\n\n\n<p>Ja v\u0113laties, lai j\u016bsu klienti paliktu pie jums, jums ir j\u0101iegulda darbs.\nL\u016bk, da\u017eas gudras strat\u0113\u0123ijas, k\u0101 palielin\u0101t klientu lojalit\u0101ti: <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Skaidri un bie\u017ei sazinieties<\/h4>\n\n\n\n<p>Klientiem vienm\u0113r j\u0101j\u016btas inform\u0113tiem.\nSniedziet jaun\u0101ko inform\u0101ciju par vi\u0146u pas\u016bt\u012bjumiem, inform\u0113jiet vi\u0146us par jebk\u0101d\u0101m izmai\u0146\u0101m un \u0101tri atbildiet uz vi\u0146u jaut\u0101jumiem.\nKlienti bie\u017e\u0101k piekrit\u012bs kav\u0113jumiem, ja j\u016bs vi\u0146iem par to pazi\u0146osiet iepriek\u0161 un pied\u0101v\u0101siet labu klientu apkalpo\u0161anu.\nSkaidra sazi\u0146a liecina, ka jums r\u016bp, un vairo uztic\u012bbu.   <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Nodro\u0161in\u0101t konsekventu kvalit\u0101ti<\/h4>\n\n\n\n<p>Iedz\u012bvot\u0101ji katru reizi, kad vi\u0146i no jums p\u0113rk, sagaida t\u0101du pa\u0161u labu kvalit\u0101ti.\nP\u0101rliecinieties, ka j\u016bsu ra\u017eo\u0161anas process ir uzticams, lai produkti vienm\u0113r atbilstu gaid\u012btajam.\nTas nov\u0113r\u0161 neapmierin\u0101t\u012bbu un \u013cauj klientiem atgriezties.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Procesa vienk\u0101r\u0161o\u0161ana<\/h4>\n\n\n\n<p>Nesare\u017e\u0123\u012bjiet klientiem situ\u0101ciju.\nNeatkar\u012bgi no t\u0101, vai tas ir pas\u016bt\u012bjums, pal\u012bdz\u012bbas l\u016bgums vai probl\u0113mas atrisin\u0101\u0161ana, procesam j\u0101b\u016bt p\u0113c iesp\u0113jas vienk\u0101r\u0161\u0101kam.\nSare\u017e\u0123\u012bti procesi apgr\u016btina klientus, un neapmierin\u0101ti klienti nepaliek.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Apm\u0101ciet savu komandu, lai t\u0101 b\u016btu orient\u0113ta uz klientu<\/h4>\n\n\n\n<p>J\u016bsu komandai j\u0101b\u016bt draudz\u012bgai, zino\u0161ai un gatavai risin\u0101t probl\u0113mas.\nLieliska apkalpo\u0161ana liek klientiem justies nov\u0113rt\u0113tiem un ir daudz liel\u0101ka iesp\u0113ja, ka vi\u0146i paliks loj\u0101li.\nRegul\u0101ras apm\u0101c\u012bbas nodro\u0161ina, ka j\u016bsu komanda sp\u0113j efekt\u012bvi risin\u0101t klientu probl\u0113mas.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Izvirziet re\u0101listiskas cer\u012bbas<\/h4>\n\n\n\n<p>Sniedziet skaidru inform\u0101ciju par to, ko varat sniegt.\nJa paredzat kav\u0113\u0161anos, inform\u0113jiet par to klientus laikus.\nSkaidras, re\u0101listiskas gaidas nov\u0113r\u0161 vil\u0161anos un pal\u012bdz veidot uztic\u012bbu.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">L\u016bdziet atgriezenisko saiti<\/h4>\n\n\n\n<p>Klientiem pat\u012bk zin\u0101t, ka vi\u0146u viedoklis ir svar\u012bgs.\nRegul\u0101ri l\u016bdziet atgriezenisko saiti par vi\u0146u pieredzi un izmantojiet \u0161o inform\u0101ciju, lai uzlabotu savus pakalpojumus.\nTas par\u0101da, ka j\u016bs uzklaus\u0101t un vienm\u0113r cen\u0161aties str\u0101d\u0101t lab\u0101k.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Loj\u0101lo klientu apbalvo\u0161ana<\/h4>\n\n\n\n<p>Izr\u0101diet atzin\u012bbu klientiem, kuri ir ar jums kop\u0101.\nPied\u0101v\u0101jot atlaides, \u012bpa\u0161us pied\u0101v\u0101jumus vai personaliz\u0113tu uzman\u012bbu, palieliniet klientu notur\u012bbu un \u013caujiet vi\u0146iem justies nov\u0113rt\u0113tiem. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Izv\u0113lieties pareizos r\u012bkus<\/h4>\n\n\n\n<p>Pa\u013cau\u0161an\u0101s uz <a href=\"https:\/\/skyplanner.ai\/resources\/excel-production-planning-challenges-and-the-superior-alternative-skyplanner-aps\/\">manu\u0101lo pl\u0101no\u0161anu<\/a> noved pie k\u013c\u016bd\u0101m, kav\u0113jumiem un neapmierin\u0101tiem klientiem. Piem\u0113roti r\u012bki, piem\u0113ram, <a href=\"https:\/\/skyplanner.ai\/resources\/advanced-planning-and-scheduling\/\">APS sist\u0113ma (progres\u012bv\u0101 pl\u0101no\u0161ana un grafiku sast\u0101d\u012b\u0161ana)<\/a>, <a href=\"https:\/\/skyplanner.ai\/resources\/what-is-erp\/\">ERP (Enterprise Resource Planning)<\/a> vai CRM (Customer Relationship Management) sist\u0113ma, padara visu darbu efekt\u012bv\u0101ku. \u0160\u012bs sist\u0113mas uzlabo komunik\u0101ciju, p\u0101rvalda grafikus un savlaic\u012bgi apmierina klientu vajadz\u012bbas.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">APS un klientu apmierin\u0101t\u012bba<\/h2>\n\n\n\n<p>APS programmat\u016bra ne tikai uzlabo pieg\u0101des laiku, bet ar\u012b nodro\u0161ina kvalit\u0101ti, organiz\u0113jot visu ra\u017eo\u0161anas procesu j\u016bsu uz\u0146\u0113mum\u0101.\nPamat\u012bga ra\u017eo\u0161anas pl\u0101no\u0161ana pal\u012bdz izvair\u012bties no resursu p\u0101rslodzes un saglab\u0101t produktu kvalit\u0101ti. <\/p>\n\n\n\n<p>Ar <a href=\"https:\/\/skyplanner.ai\/resources\/aps-software-features\/\">APS<\/a> funkcij\u0101m j\u016bs varat nov\u0113rst sastr\u0113gumus, identific\u0113jot iesp\u0113jam\u0101s pl\u0101no\u0161anas probl\u0113mas pat pirms t\u0101s rodas, kas noz\u012bm\u0113 maz\u0101k r\u016bpju, p\u0101rsteigumu un vienm\u0113r\u012bg\u0101ku darb\u012bbu. Uzlabota komunik\u0101cija starp noda\u013c\u0101m ar\u012b nodro\u0161ina, ka visi ir inform\u0113ti, samazinot p\u0101rpratumus, kas var novest pie klientu neapmierin\u0101t\u012bbas.<\/p>\n\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/resources\/aps-system-benefits\/\">APS<\/a> priek\u0161roc\u012bbas p\u0101rsniedz pieg\u0101des termi\u0146us. J\u016bs optimiz\u0113siet pieejamos resursus un jaudu uz\u0146\u0113mum\u0101, samazinot d\u012bkst\u0101ves un nov\u0113r\u0161ot neefektivit\u0101ti. Tas noved pie uzticam\u0101kas ra\u017eo\u0161anas, ko j\u016bsu klienti paman\u012bs.<\/p>\n\n\n\n<p>Kvalitat\u012bvu produktu laic\u012bga pieg\u0101de un efekt\u012bvas sazi\u0146as uztur\u0113\u0161ana vairo uztic\u0113\u0161anos un palielina klientu apmierin\u0101t\u012bbu un notur\u012bbu.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-skyplanner-smart-scheduling-to-reduce-customer-dissatisfaction\">SkyPlanner: Gudra pl\u0101no\u0161ana, lai mazin\u0101tu klientu neapmierin\u0101t\u012bbu<\/h2>\n\n\n\n<p>M\u0113s zin\u0101m, ka j\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161anas vajadz\u012bbas ir unik\u0101las, un SkyPlanner <a href=\"https:\/\/skyplanner.ai\/features\/\">APS<\/a> ir apr\u012bkots ar unik\u0101l\u0101m funkcij\u0101m, kas pal\u012bdz optimiz\u0113t izpildes laikus, uzlabot jaudu un kr\u0101jumu p\u0101rvald\u012bbu, un nodro\u0161in\u0101t visu vienm\u0113r\u012bgu darb\u012bbu. M\u0113s pied\u0101v\u0101jam ar\u012b piel\u0101go\u0161anas pakalpojumus j\u016bsu specifiskaj\u0101m ra\u017eo\u0161anas pras\u012bb\u0101m.<\/p>\n\n\n\n<p>Kas padara SkyPlanner ra\u017eo\u0161anas pl\u0101no\u0161anu un grafiku veido\u0161anu \u012bpa\u0161u? Ma\u0161\u012bnas av\u0101rijas vai negaid\u012btas probl\u0113mas gad\u012bjum\u0101 m\u016bsu AI vad\u012btais pl\u0101no\u0161anas r\u012bks var atk\u0101rtoti optimiz\u0113t j\u016bsu ra\u017eo\u0161anas pl\u0101nu ar vienu klik\u0161\u0137i, saglab\u0101jot liel\u0101ko da\u013cu pas\u016bt\u012bjumu grafik\u0101. Steidzams pas\u016bt\u012bjums? Nav probl\u0113mu! Izmantojiet m\u016bsu \u0101tr\u0101s izpildes funkciju, lai prioritiz\u0113tu steidzamus uzdevumus, vispirms izpildot svar\u012bg\u0101kos darbus. \u0160\u012b iesp\u0113ja ir centr\u0101la a\u0123entiskajai ra\u017eo\u0161anas pl\u0101no\u0161anai, kur atk\u0101rtota optimiz\u0101cija notiek autom\u0101tiski visu diennakti.<\/p> You can also adjust dynamic priorities to decide what matters most on the fly.\n\n\n\n<p>Vai esat gatavs p\u0101r\u0146emt kontroli p\u0101r savu ra\u017eo\u0161anu k\u0101 nekad agr\u0101k? <a href=\"https:\/\/skyplanner.ai\/contact-sales\/\">Rezerv\u0113t demonstr\u0101ciju<\/a> ar mums jau \u0161odien un uzziniet, k\u0101 SkyPlanner var p\u0101rveidot j\u016bsu darb\u012bbu un uztur\u0113t klientus apmierin\u0101tus!<\/p>\n\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Klientu neapmierin\u0101t\u012bbas nov\u0113r\u0161ana ar APS sist\u0113mu S\u0101kumlapa \u00bb Resursi \u00bb Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu Klientu neapmierin\u0101t\u012bba ir tad, ja klients j\u016btas v\u012blies vai neapmierin\u0101ts ar uz\u0146\u0113mumu kav\u0113\u0161an\u0101s, sliktas apkalpo\u0161anas, zemas kvalit\u0101tes produktu vai nepiepild\u012btu cer\u012bbu d\u0113\u013c. Klientu lojalit\u0101te ir trausla. Tikl\u012bdz t\u0101 ir apdraud\u0113ta, uz\u0146\u0113mumiem var b\u016bt gr\u016bti notur\u0113t klientus un samazin\u0101t to &#8230; <a title=\"Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/\" aria-label=\"Read more about Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":42375,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-43038","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Klientu neapmierin\u0101t\u012bba ir situ\u0101cija, kad klients j\u016btas v\u012blies uz\u0146\u0113muma darb\u012bb\u0101 kav\u0113\u0161an\u0101s, sliktas apkalpo\u0161anas vai neattaisnotu cer\u012bbu d\u0113\u013c.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu\" \/>\n<meta property=\"og:description\" content=\"Klientu neapmierin\u0101t\u012bba ir situ\u0101cija, kad klients j\u016btas v\u012blies uz\u0146\u0113muma darb\u012bb\u0101 kav\u0113\u0161an\u0101s, sliktas apkalpo\u0161anas vai neattaisnotu cer\u012bbu d\u0113\u013c.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-09-25T12:23:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-21T18:36:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1333\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/noversiet-klientu-nepatiku-ar-aps-sistemu\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/noversiet-klientu-nepatiku-ar-aps-sistemu\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu\",\"datePublished\":\"2024-09-25T12:23:33+00:00\",\"dateModified\":\"2026-03-21T18:36:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/noversiet-klientu-nepatiku-ar-aps-sistemu\\\/\"},\"wordCount\":2149,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/noversiet-klientu-nepatiku-ar-aps-sistemu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Prevent-Customer-Dissatisfaction.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/noversiet-klientu-nepatiku-ar-aps-sistemu\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/noversiet-klientu-nepatiku-ar-aps-sistemu\\\/\",\"name\":\"Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/noversiet-klientu-nepatiku-ar-aps-sistemu\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/noversiet-klientu-nepatiku-ar-aps-sistemu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Prevent-Customer-Dissatisfaction.png\",\"datePublished\":\"2024-09-25T12:23:33+00:00\",\"dateModified\":\"2026-03-21T18:36:20+00:00\",\"description\":\"Klientu neapmierin\u0101t\u012bba ir situ\u0101cija, kad klients j\u016btas v\u012blies uz\u0146\u0113muma darb\u012bb\u0101 kav\u0113\u0161an\u0101s, sliktas apkalpo\u0161anas vai neattaisnotu cer\u012bbu d\u0113\u013c.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/noversiet-klientu-nepatiku-ar-aps-sistemu\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/noversiet-klientu-nepatiku-ar-aps-sistemu\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/noversiet-klientu-nepatiku-ar-aps-sistemu\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Prevent-Customer-Dissatisfaction.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Prevent-Customer-Dissatisfaction.png\",\"width\":2000,\"height\":1333,\"caption\":\"Prevent Customer Dissatisfaction. Image for illustrative purposes.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/noversiet-klientu-nepatiku-ar-aps-sistemu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu &#8211; SkyPlanner","description":"Klientu neapmierin\u0101t\u012bba ir situ\u0101cija, kad klients j\u016btas v\u012blies uz\u0146\u0113muma darb\u012bb\u0101 kav\u0113\u0161an\u0101s, sliktas apkalpo\u0161anas vai neattaisnotu cer\u012bbu d\u0113\u013c.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/","og_locale":"lv_LV","og_type":"article","og_title":"Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu","og_description":"Klientu neapmierin\u0101t\u012bba ir situ\u0101cija, kad klients j\u016btas v\u012blies uz\u0146\u0113muma darb\u012bb\u0101 kav\u0113\u0161an\u0101s, sliktas apkalpo\u0161anas vai neattaisnotu cer\u012bbu d\u0113\u013c.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/","og_site_name":"SkyPlanner","article_published_time":"2024-09-25T12:23:33+00:00","article_modified_time":"2026-03-21T18:36:20+00:00","og_image":[{"width":2000,"height":1333,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu","datePublished":"2024-09-25T12:23:33+00:00","dateModified":"2026-03-21T18:36:20+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/"},"wordCount":2149,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/","name":"Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png","datePublished":"2024-09-25T12:23:33+00:00","dateModified":"2026-03-21T18:36:20+00:00","description":"Klientu neapmierin\u0101t\u012bba ir situ\u0101cija, kad klients j\u016btas v\u012blies uz\u0146\u0113muma darb\u012bb\u0101 kav\u0113\u0161an\u0101s, sliktas apkalpo\u0161anas vai neattaisnotu cer\u012bbu d\u0113\u013c.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png","width":2000,"height":1333,"caption":"Prevent Customer Dissatisfaction. Image for illustrative purposes."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/noversiet-klientu-nepatiku-ar-aps-sistemu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png",2000,1333,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction-1024x682.png",1024,682,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png",2000,1333,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/lv\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Klientu neapmierin\u0101t\u012bbas nov\u0113r\u0161ana ar APS sist\u0113mu S\u0101kumlapa \u00bb Resursi \u00bb Nov\u0113rsiet klientu neapmierin\u0101t\u012bbu ar APS sist\u0113mu Klientu neapmierin\u0101t\u012bba ir tad, ja klients j\u016btas v\u012blies vai neapmierin\u0101ts ar uz\u0146\u0113mumu kav\u0113\u0161an\u0101s, sliktas apkalpo\u0161anas, zemas kvalit\u0101tes produktu vai nepiepild\u012btu cer\u012bbu d\u0113\u013c. Klientu lojalit\u0101te ir trausla. Tikl\u012bdz t\u0101 ir apdraud\u0113ta, uz\u0146\u0113mumiem var b\u016bt gr\u016bti notur\u0113t klientus un samazin\u0101t to&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/43038","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=43038"}],"version-history":[{"count":5,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/43038\/revisions"}],"predecessor-version":[{"id":87260,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/43038\/revisions\/87260"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/42375"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=43038"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=43038"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=43038"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}