{"id":23052,"date":"2023-09-29T08:03:57","date_gmt":"2023-09-29T08:03:57","guid":{"rendered":"https:\/\/skyplanner.ai\/resursi\/razosanas-vaditaja-alga-lietuva-2023\/"},"modified":"2026-06-19T20:49:25","modified_gmt":"2026-06-19T20:49:25","slug":"razosanas-vaditaja-alga-lietuva-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/","title":{"rendered":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-manager-salary-in-lithuania-2026\">Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> \u00bb <a href=\"\/lv\/resursi\/\">Resursi<\/a> \u00bb Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Paredzamais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026. gad\u0101 ir aptuveni 35<strong>499<\/strong> eiro gad\u0101, kas ir aptuveni 2958 eiro m\u0113nes\u012b.  <\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Lietuvas apstr\u0101des r\u016bpniec\u012bba ir stabila, pateicoties t\u0101s daudzveid\u012bgaj\u0101m jom\u0101m, tostarp elektronikai, ma\u0161\u012bnb\u016bvei, tekstilr\u016bpniec\u012bbai un p\u0101rtikas r\u016bpniec\u012bbai. Pieaugot tehnolo\u0123isk\u0101s integr\u0101cijas un darb\u012bbas izcil\u012bbas tendencei, pieaug piepras\u012bjums p\u0113c prasm\u012bgiem <a href=\"\/lv\/resursi\/razosanas-vaditajs-darba-apraksts\/\">ra\u017eo\u0161anas vad\u012bt\u0101jiem<\/a>. \u0160iem speci\u0101listiem ir iz\u0161\u0137iro\u0161a noz\u012bme netrauc\u0113tu ra\u017eo\u0161anas procesu organiz\u0113\u0161an\u0101, dro\u0161\u012bbas nodro\u0161in\u0101\u0161an\u0101 un kop\u0113j\u0101s efektivit\u0101tes uzlabo\u0161an\u0101.    <\/p>\n\n\n\n<p>Tagad, piev\u0113r\u0161oties \u0161\u012bs profesijas finansi\u0101lajam atspogu\u013cojumam, k\u0101das ir ra\u017eo\u0161anas vad\u012bt\u0101ja algas perspekt\u012bvas Lietuv\u0101, s\u0101kot ar 2026. gadu?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Ra\u017eo\u0161anas vad\u012bt\u0101ja algas ieskats<\/h2>\n\n\n\n<p>Tipisk\u0101 atalgojuma situ\u0101cija Lietuv\u0101 ir pietic\u012bga. Lietuv\u0101 vid\u0113j\u0101 alga ir aptuveni <strong>1651 eiro m\u0113nes\u012b<\/strong>, un l\u012bdztekus augo\u0161aj\u0101m r\u016bpniec\u012bbas nozar\u0113m, jo \u012bpa\u0161i apstr\u0101des r\u016bpniec\u012bb\u0101, \u0161eit ir vid\u0113ji m\u0113renas dz\u012bves izmaksas.<\/p>\n\n\n\n<p>Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026. gad\u0101 b\u016bs aptuveni <strong>35 499 eiro gad\u0101<\/strong>, kas ir aptuveni <strong>2 958 eiro m\u0113nes\u012b<\/strong>. \u0160is skaitlis iev\u0113rojami p\u0101rsniedz vid\u0113jo algu valst\u012b, atspogu\u013cojot \u0161o speci\u0101listu iz\u0161\u0137iro\u0161o lomu un zin\u0101\u0161anas, ko vi\u0146i sniedz ra\u017eo\u0161anas nozarei. Tom\u0113r t\u0101di faktori k\u0101 izgl\u012bt\u012bba, atra\u0161an\u0101s vieta un citi faktori ir iz\u0161\u0137iro\u0161i, nosakot ra\u017eo\u0161anas vad\u012bt\u0101ju algas Lietuv\u0101.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Sal\u012bdzino\u0161\u0101 finan\u0161u anal\u012bze p\u0101ri robe\u017e\u0101m<\/h2>\n\n\n\n<p>Izp\u0113tot ra\u017eo\u0161anas vad\u012bt\u0101ju algu strukt\u016bru Eirop\u0101, paveras intri\u0123\u0113jo\u0161s skat\u012bjums. Piem\u0113ram, <a href=\"\/lv\/resursi\/razosanas-vaditaja-alga-danija-2026\/\">D\u0101nij\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga<\/a> ir augst\u0101ka, jo valst\u012b ir augst\u0101kas dz\u012bves d\u0101rdz\u012bbas izmaksas, savuk\u0101rt <a href=\"\/lv\/resursi\/razosanas-vaditaja-alga-latvija-2026\/\">Latvij\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga<\/a> ir zem\u0101ka. \u0160ie sal\u012bdzin\u0101jumi Lietuvu pozicion\u0113 k\u0101 sam\u0113r\u0101 l\u012bdzsvarotu vietu person\u0101m, kas virz\u0101s uz priek\u0161u ra\u017eo\u0161anas vad\u012bbas jom\u0101.  <\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eo\u0161anas vad\u012bt\u0101ja algu ietekm\u0113jo\u0161ie faktori Lietuv\u0101<\/h2>\n\n\n\n<p>Ra\u017eo\u0161anas vad\u012bt\u0101ja algu Lietuv\u0101 ietekm\u0113 vair\u0101ki noteico\u0161ie faktori:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Izgl\u012bt\u012bba un pieredze: <\/strong>Augst\u0101ka izgl\u012bt\u012bba apvienojum\u0101 ar lielu pieredzi \u0161aj\u0101 jom\u0101 bie\u017ei vien nodro\u0161ina lab\u0101kas algas izredzes. Ra\u017eo\u0161anas vad\u012bt\u0101ji ar stabiliem vad\u012bbas principu pamatiem un ilggad\u0113ju praktisko pieredzi var sa\u0146emt liel\u0101ku atalgojumu. <\/li>\n\n\n\n<li><strong>Prasmes: <\/strong>Prasmes un iema\u0146as: t\u0101du prasmju apg\u016b\u0161ana un demonstr\u0113\u0161ana k\u0101 probl\u0113mu risin\u0101\u0161ana, bud\u017eeta p\u0101rvald\u012bba un zin\u0101\u0161anas par ra\u017eo\u0161anas procesiem iev\u0113rojami palielina pe\u013c\u0146as potenci\u0101lu. Darba dev\u0113ji nov\u0113rt\u0113 prasmju kopumu, kas var veicin\u0101t darb\u012bbas efektivit\u0101ti un nodro\u0161in\u0101t veiksm\u012bgu ra\u017eo\u0161anas strat\u0113\u0123iju \u012bsteno\u0161anu. <\/li>\n\n\n\n<li><strong>Atra\u0161an\u0101s vieta: <\/strong>Ra\u017eo\u0161anas vad\u012bt\u0101ju atalgojums Lietuv\u0101 b\u016btiski at\u0161\u0137iras atkar\u012bb\u0101 no darba vietas. T\u0101di r\u016bpniec\u012bbas centri k\u0101 Vi\u013c\u0146a, Kau\u0146a un Klaip\u0113da bie\u017ei vien pied\u0101v\u0101 augst\u0101kas algas, jo tur ir liel\u0101ka ra\u017eo\u0161anas uz\u0146\u0113mumu koncentr\u0101cija un augst\u0101kas dz\u012bves izmaksas. Turpret\u012b maz\u0101k\u0101s pils\u0113t\u0101s atalgojums var b\u016bt zem\u0101ks, jo taj\u0101s ir maz\u0101ka r\u016bpniecisk\u0101 aktivit\u0101te un zem\u0101kas dz\u012bves d\u0101rdz\u012bba, kas atspogu\u013co pla\u0161\u0101kas ekonomisk\u0101s at\u0161\u0137ir\u012bbas Lietuv\u0101.  <\/li>\n\n\n\n<li><strong>Uz\u0146\u0113muma lielums: <\/strong>Liel\u0101ki uz\u0146\u0113mumi ar pla\u0161\u0101m ra\u017eo\u0161anas l\u012bnij\u0101m pied\u0101v\u0101 lab\u0101ku kompens\u0101ciju nek\u0101 maz\u0101ki uz\u0146\u0113mumi. Liel\u0101kos uz\u0146\u0113mumos atbild\u012bbas un nepiecie\u0161am\u0101s p\u0101rraudz\u012bbas apjoms bie\u017ei vien attaisno liel\u0101ku atalgojumu. <\/li>\n\n\n\n<li><strong>Uz\u0146\u0113muma veids: <\/strong>Atalgojuma strukt\u016bru ietekm\u0113 ar\u012b nozares segments, pie kura uz\u0146\u0113mums pieder. Piem\u0113ram, tehnolo\u0123iju, farm\u0101cijas vai tekstilizstr\u0101d\u0101jumu ra\u017eo\u0161anas vad\u012bt\u0101jiem var b\u016bt at\u0161\u0137ir\u012bgas algu skalas, jo \u0161aj\u0101s nozar\u0113s ir at\u0161\u0137ir\u012bgas pras\u012bbas un nepiecie\u0161am\u0101s zin\u0101\u0161anas. Uz\u0146\u0113mumi ar moderniz\u0113tu darb\u012bbu un starptautisku p\u0101rkl\u0101jumu bie\u017ei vien pied\u0101v\u0101 konkur\u0113tsp\u0113j\u012bg\u0101kas algas, atspogu\u013cojot to, ka tiek augstu nov\u0113rt\u0113ti vad\u012bt\u0101ji, kas sp\u0113j orient\u0113ties m\u016bsdienu glob\u0101li integr\u0113to ra\u017eo\u0161anas ekosist\u0113mu sare\u017e\u0123\u012bt\u012bb\u0101.  <\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner Uzlabota pl&#x101;no&#x161;ana un grafiku veido&#x161;ana Risin&#x101;jumi ra&#x17E;o&#x161;anas probl&#x113;m&#x101;m\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Ra\u017eo\u0161anas vad\u012bt\u0101ja lomas defin\u0113\u0161ana<\/h2>\n\n\n\n<p>Ra\u017eo\u0161anas vad\u012bt\u0101js nodro\u0161ina ra\u017eo\u0161anas procesu raitu norisi un nepiecie\u0161amo m\u0113r\u0137u sasnieg\u0161anu. Vi\u0146i pl\u0101no, koordin\u0113 un p\u0101rrauga ra\u017eo\u0161anas darb\u012bbas, p\u0101rvalda bud\u017eetu, lai kontrol\u0113tu izmaksas, un nodro\u0161ina dro\u0161\u012bbas noteikumu iev\u0113ro\u0161anu, lai nov\u0113rstu nelaimes gad\u012bjumus. Vi\u0146i sadarbojas ar da\u017e\u0101d\u0101m noda\u013c\u0101m, piem\u0113ram, iepirkumu, lo\u0123istikas un p\u0101rdo\u0161anas noda\u013c\u0101m, lai nodro\u0161in\u0101tu, ka ra\u017eo\u0161anas pl\u0101ns ir saska\u0146ots ar citiem darb\u012bbas m\u0113r\u0137iem. Nep\u0101rtraukti sekojot l\u012bdzi jaunaj\u0101m tehnolo\u0123ij\u0101m, vi\u0146i pal\u012bdz uzlabot ra\u017eo\u0161anas efektivit\u0101ti, nodro\u0161inot, ka produkti tiek ra\u017eoti laik\u0101 un bud\u017eeta ietvaros. Vi\u0146u lomas ir \u0161\u0101das:    <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Rentabilit\u0101te: <\/strong>Ra\u017eo\u0161anas vad\u012bt\u0101jiem ir iz\u0161\u0137iro\u0161a noz\u012bme, lai nodro\u0161in\u0101tu, ka ra\u017eo\u0161anas oper\u0101cijas atbilst noteiktajam bud\u017eetam. Vi\u0146i r\u016bp\u012bgi uzrauga resursu pie\u0161\u0137ir\u0161anu un izlietojumu, lai nov\u0113rstu izmaksu p\u0101rsnieg\u0161anu. Papildus bud\u017eeta ierobe\u017eojumu iev\u0113ro\u0161anai vi\u0146i nep\u0101rtraukti mekl\u0113 iesp\u0113jas, k\u0101 uzlabot darb\u012bbas efektivit\u0101ti un rentabilit\u0101ti. Analiz\u0113jot ra\u017eo\u0161anas procesus, vi\u0146i var identific\u0113t uzlabojam\u0101s jomas un \u012bstenot izmaksu taup\u012b\u0161anas pas\u0101kumus, nodro\u0161inot optim\u0101lu resursu izmanto\u0161anu, lai sasniegtu ra\u017eo\u0161anas m\u0113r\u0137us.   <\/li>\n\n\n\n<li><strong>Dro\u0161\u012bbas protokola izpilde: <\/strong>Ra\u017eo\u0161anas vad\u012bt\u0101ju galven\u0101 priorit\u0101te ir uztur\u0113t dro\u0161u un nekait\u012bgu darba vidi. Vi\u0146i ir atbild\u012bgi par noteikto dro\u0161\u012bbas vadl\u012bniju iev\u0113ro\u0161anu ra\u017eotn\u0113. Tas ietver regul\u0101ru dro\u0161\u012bbas treni\u0146u r\u012bko\u0161anu, apr\u012bkojuma apkopes uzraudz\u012bbu un darbinieku dro\u0161\u012bbas apm\u0101c\u012bbu. Proakt\u012bva pieeja dro\u0161\u012bbas protokolu ievie\u0161an\u0101 mazina nelaimes gad\u012bjumu risku, veicinot dro\u0161\u012bbas un atbilst\u012bbas kult\u016bru organiz\u0101cij\u0101.   <\/li>\n\n\n\n<li><strong>Sadarb\u012bba un koordin\u0101cija: <\/strong>Ra\u017eo\u0161anas vad\u012bt\u0101ji kalpo k\u0101 saikne starp da\u017e\u0101diem departamentiem, piem\u0113ram, iepirkumu, lo\u0123istiku un p\u0101rdo\u0161anu. Vi\u0146u uzdevums ir sadarboties ar \u0161iem departamentiem, lai nodro\u0161in\u0101tu netrauc\u0113tu produktu p\u0101reju no ra\u017eo\u0161anas uz tirgu. Veicinot atkl\u0101tu sazi\u0146u un koordin\u0101ciju, vi\u0146i pal\u012bdz saska\u0146ot da\u017e\u0101du noda\u013cu m\u0113r\u0137us ar visp\u0101r\u0113jiem ra\u017eo\u0161anas m\u0113r\u0137iem. \u0160\u012b kop\u012bg\u0101 pieeja nodro\u0161ina savlaic\u012bgu materi\u0101lu ieg\u0101di, efekt\u012bvus ra\u017eo\u0161anas grafikus un vienm\u0113r\u012bgu gatavo pre\u010du pieg\u0101di tirgum.   <\/li>\n\n\n\n<li><strong>Moderno r\u012bku integr\u0101cija: <\/strong>L\u012bdz ar straujo tehnolo\u0123iju att\u012bst\u012bbu moderno r\u012bku integr\u0113\u0161ana ra\u017eo\u0161anas proces\u0101 ir k\u013cuvusi par b\u016btisku ra\u017eo\u0161anas vad\u012bt\u0101ja pien\u0101kumu aspektu. Vi\u0146i p\u0101rrauga m\u016bsdien\u012bgu r\u012bku ievie\u0161anu, kas pal\u012bdz racionaliz\u0113t darb\u012bbu un uzlabot ra\u017eo\u0161anas pl\u0101no\u0161anu. <a href=\"\/lv\/\">T\u0101di r\u012bki k\u0101 APS (progres\u012bv\u0101 pl\u0101no\u0161ana un grafiku sast\u0101d\u012b\u0161ana) sist\u0113mas<\/a> var iev\u0113rojami palielin\u0101t ra\u017eo\u0161anas procesa efektivit\u0101ti un produktivit\u0101ti, nodro\u0161inot lab\u0101ku pl\u0101no\u0161anu, grafiku sast\u0101d\u012b\u0161anu un ra\u017eo\u0161anas darb\u012bbu uzraudz\u012bbu re\u0101laj\u0101 laik\u0101. <\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Ra\u017eo\u0161anas vad\u012bt\u0101ju pamatprasmju kopums<\/h4>\n\n\n\n<p>Lai b\u016btu prasm\u012bgs ra\u017eo\u0161anas vad\u012bt\u0101js, ir j\u0101apvieno tehnisk\u0101s un vad\u012bbas prasmes. Da\u017eas no svar\u012bg\u0101kaj\u0101m sp\u0113j\u0101m ir: <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Sp\u0113c\u012bga vad\u012bba<\/li>\n\n\n\n<li>Efekt\u012bva probl\u0113mu risin\u0101\u0161ana<\/li>\n\n\n\n<li>R\u016bp\u012bgas zin\u0101\u0161anas par ra\u017eo\u0161anas procesiem<\/li>\n\n\n\n<li>Bud\u017eeta p\u0101rvald\u012bba<\/li>\n\n\n\n<li>Laika vad\u012bba<\/li>\n\n\n\n<li>Vesel\u012bbas un dro\u0161\u012bbas noteikumu iev\u0113ro\u0161ana<\/li>\n\n\n\n<li>Tehnisk\u0101s zin\u0101\u0161anas<\/li>\n\n\n\n<li>Efekt\u012bva sazi\u0146a<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Papildus algai: Papildu priek\u0161roc\u012bbas ra\u017eo\u0161anas vad\u012bt\u0101jiem Lietuv\u0101<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Karjeras att\u012bst\u012bbas iesp\u0113jas: <\/strong>Ra\u017eo\u0161anas vad\u012bt\u0101ja amats Lietuv\u0101 paver karjeras iesp\u0113jas virz\u012bties uz augst\u0101kiem vado\u0161iem vai vado\u0161iem amatiem ra\u017eo\u0161anas nozar\u0113.<\/li>\n\n\n\n<li><strong>T\u012bklo\u0161anas izredzes: <\/strong>amats nodro\u0161ina iesp\u0113ju veidot kontaktus ar da\u017e\u0101du nozaru profesion\u0101\u013ciem, veicinot karjeras izaugsmi un m\u0101c\u012bbu iesp\u0113jas.<\/li>\n\n\n\n<li><strong>Darba stabilit\u0101te: <\/strong>\u0145emot v\u0113r\u0101 Lietuvas stabilit\u0101ti ra\u017eo\u0161anas nozar\u0113, ra\u017eo\u0161anas vad\u012bt\u0101ji var cer\u0113t uz darba stabilit\u0101ti, jo vi\u0146u zin\u0101\u0161anas joproj\u0101m ir iz\u0161\u0137iro\u0161as darb\u012bbas pan\u0101kumu nodro\u0161in\u0101\u0161anai.<\/li>\n\n\n\n<li><strong>Daudzveid\u012bga darba vide: <\/strong>Lietuvas daudzveid\u012bg\u0101 ra\u017eo\u0161anas vide \u013cauj ra\u017eo\u0161anas vad\u012bt\u0101jiem orient\u0113ties da\u017e\u0101d\u0101s r\u016bpniec\u012bbas strukt\u016br\u0101s, bag\u0101tinot vi\u0146u profesion\u0101lo pieredzi.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Ra\u017eo\u0161anas vad\u012bt\u0101ju n\u0101kotnes perspekt\u012bvas Lietuv\u0101<\/h2>\n\n\n\n<p>T\u0101 k\u0101 Lietuvas ra\u017eo\u0161anas nozar\u0113 nep\u0101rtraukti notiek inov\u0101cijas, joproj\u0101m ir vajadz\u012bgi pieredz\u0113ju\u0161i ra\u017eo\u0161anas vad\u012bt\u0101ji. Moderno r\u012bku, piem\u0113ram, APS sist\u0113mas, ievie\u0161ana, jo \u012bpa\u0161i, ja t\u0101 ir integr\u0113ta ar m\u0101ksl\u012bg\u0101 intelekta platform\u0101m, piem\u0113ram, Skyplanner, paver ce\u013cu efekt\u012bv\u0101kai efektivit\u0101tei un produktivit\u0101tei, padarot \u0161o r\u012bku par ra\u017eo\u0161anas vad\u012bt\u0101ju lab\u0101ko draugu. <\/p>\n\n\n\n<p>Izp\u0113tot da\u017e\u0101dus aspektus, kas ietekm\u0113 ra\u017eo\u0161anas vad\u012bt\u0101ja algu Lietuv\u0101 2026. gad\u0101, k\u0101 ar\u012b \u0161\u012bs profesijas b\u016btisko lomu un n\u0101kotnes perspekt\u012bvas, potenci\u0101lie pretendenti un nozares dal\u012bbnieki g\u016bst skaidr\u0101ku priek\u0161statu par daudzsolo\u0161aj\u0101m perspekt\u012bv\u0101m Lietuvas ra\u017eo\u0161anas nozar\u0113.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026 S\u0101kums \u00bb Resursi \u00bb Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026 Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026. gad\u0101 ir aptuveni 35499 eiro gad\u0101, kas ir aptuveni 2958 eiro m\u0113nes\u012b. Lietuvas apstr\u0101des r\u016bpniec\u012bba ir stabila, pateicoties t\u0101s daudzveid\u012bgaj\u0101m jom\u0101m, tostarp elektronikai, ma\u0161\u012bnb\u016bvei, tekstilr\u016bpniec\u012bbai un p\u0101rtikas r\u016bpniec\u012bbai. Pieaugot tehnolo\u0123isk\u0101s integr\u0101cijas un darb\u012bbas izcil\u012bbas tendencei, &#8230; <a title=\"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/\" aria-label=\"Read more about Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":23019,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2687,317],"tags":[],"class_list":["post-23052","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-karjera-un-algas","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026 \u2013 SkyPlanner<\/title>\n<meta name=\"description\" content=\"Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026. gad\u0101 ir aptuveni 35 499 eiro gad\u0101, kas ir aptuveni 2958 eiro m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026\" \/>\n<meta property=\"og:description\" content=\"Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026. gad\u0101 ir aptuveni 35 499 eiro gad\u0101, kas ir aptuveni 2958 eiro m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-29T08:03:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T20:49:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-lietuva-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-lietuva-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026\",\"datePublished\":\"2023-09-29T08:03:57+00:00\",\"dateModified\":\"2026-06-19T20:49:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-lietuva-2026\\\/\"},\"wordCount\":1735,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-lietuva-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Lithuania.png\",\"articleSection\":[\"Karjera un algas\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-lietuva-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-lietuva-2026\\\/\",\"name\":\"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026 \u2013 SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-lietuva-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-lietuva-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Lithuania.png\",\"datePublished\":\"2023-09-29T08:03:57+00:00\",\"dateModified\":\"2026-06-19T20:49:25+00:00\",\"description\":\"Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026. gad\u0101 ir aptuveni 35 499 eiro gad\u0101, kas ir aptuveni 2958 eiro m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-lietuva-2026\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-lietuva-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-lietuva-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Lithuania.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Lithuania.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Manager Salary in Lithuania\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-lietuva-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026 \u2013 SkyPlanner","description":"Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026. gad\u0101 ir aptuveni 35 499 eiro gad\u0101, kas ir aptuveni 2958 eiro m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/","og_locale":"lv_LV","og_type":"article","og_title":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026","og_description":"Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026. gad\u0101 ir aptuveni 35 499 eiro gad\u0101, kas ir aptuveni 2958 eiro m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-09-29T08:03:57+00:00","article_modified_time":"2026-06-19T20:49:25+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026","datePublished":"2023-09-29T08:03:57+00:00","dateModified":"2026-06-19T20:49:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/"},"wordCount":1735,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania.png","articleSection":["Karjera un algas","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/","name":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026 \u2013 SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania.png","datePublished":"2023-09-29T08:03:57+00:00","dateModified":"2026-06-19T20:49:25+00:00","description":"Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026. gad\u0101 ir aptuveni 35 499 eiro gad\u0101, kas ir aptuveni 2958 eiro m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania.png","width":4990,"height":3327,"caption":"Production Manager Salary in Lithuania"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-lietuva-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/lv\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026 S\u0101kums \u00bb Resursi \u00bb Ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026 Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga Lietuv\u0101 2026. gad\u0101 ir aptuveni 35499 eiro gad\u0101, kas ir aptuveni 2958 eiro m\u0113nes\u012b. Lietuvas apstr\u0101des r\u016bpniec\u012bba ir stabila, pateicoties t\u0101s daudzveid\u012bgaj\u0101m jom\u0101m, tostarp elektronikai, ma\u0161\u012bnb\u016bvei, tekstilr\u016bpniec\u012bbai un p\u0101rtikas r\u016bpniec\u012bbai. Pieaugot tehnolo\u0123isk\u0101s integr\u0101cijas un darb\u012bbas izcil\u012bbas tendencei,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/23052","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=23052"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/23052\/revisions"}],"predecessor-version":[{"id":94086,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/23052\/revisions\/94086"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/23019"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=23052"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=23052"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=23052"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}