{"id":22330,"date":"2023-09-27T14:35:32","date_gmt":"2023-09-27T14:35:32","guid":{"rendered":"https:\/\/skyplanner.ai\/resursi\/razosanas-vaditaja-alga-vacija-2023\/"},"modified":"2026-10-03T09:47:34","modified_gmt":"2026-10-03T09:47:34","slug":"razosanas-vaditaja-alga-vacija-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/","title":{"rendered":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026<\/h1>\n\n\n\n<p>\u20ac64 000 bruto gad\u0101, apm\u0113ram \u20ac5 333 m\u0113nes\u012b: ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101, jaun\u0101ko un vec\u0101ko vad\u012bt\u0101ju atalgojums, piemaksas un sal\u012bdzin\u0101jums ar Poliju.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Cik V\u0101cij\u0101 pelna ra\u017eo\u0161anas vad\u012bt\u0101js?<\/h2>\n\n\n\n<p>Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 ir \u20ac64 000 bruto gad\u0101, saska\u0146\u0101 ar <a href=\"https:\/\/www.hays.de\/en\/job-profiles\/production-manager\">Hays ra\u017eo\u0161anas vad\u012bt\u0101ja algu ce\u013cvedi<\/a> (p\u0101rbaud\u012bts 2026. gada 3. oktobr\u012b). Skait\u013ci attiecas uz ra\u017eo\u0161anas vad\u012bt\u0101jiem, savuk\u0101rt jaun\u0101k\u0101 l\u012bme\u0146a un pieredz\u0113ju\u0161o augst\u0101k\u0101 l\u012bme\u0146a vad\u012bt\u0101ju atalgojums ir nor\u0101d\u012bts atsevi\u0161\u0137i.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Pieredzes l\u012bmenis<\/th><th>Bruto gada alga<\/th><th>Apr\u0113\u0137in\u0101tais m\u0113ne\u0161a ekvivalents (gad\u0101 \u00f7 12)<\/th><\/tr><\/thead><tbody><tr><td>Vid\u0113jais<\/td><td>\u20ac64 000<\/td><td>Apm\u0113ram \u20ac5 333<\/td><\/tr><tr><td>Jaun\u0101k\u0101 l\u012bme\u0146a ra\u017eo\u0161anas vad\u012bt\u0101js<\/td><td>Apm\u0113ram \u20ac46 000<\/td><td>Apm\u0113ram \u20ac3 833<\/td><\/tr><tr><td>Pieredz\u0113jis vec\u0101kais ra\u017eo\u0161anas vad\u012bt\u0101js<\/td><td>Vair\u0101k nek\u0101 \u20ac77 000<\/td><td>Vair\u0101k nek\u0101 \u20ac6 416,67<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>M\u0113ne\u0161a ekvivalenti ir apr\u0113\u0137in\u0101ti, gada algas dalot ar 12. Vid\u0113j\u0101 un jaun\u0101k\u0101 l\u012bme\u0146a summas ir noapa\u013cotas l\u012bdz tuv\u0101kajam eiro.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kas ietekm\u0113 ra\u017eo\u0161anas vad\u012bt\u0101ja atalgojumu V\u0101cij\u0101?<\/h2>\n\n\n\n<p>Ien\u0101kumus ietekm\u0113 atra\u0161an\u0101s vieta, akad\u0113misk\u0101 kvalifik\u0101cija, profesion\u0101l\u0101 pieredze un nozare. Pieredze ir \u012bpa\u0161i svar\u012bga: jaun\u0101k\u0101 l\u012bme\u0146a ra\u017eo\u0161anas vad\u012bt\u0101ji, st\u0101joties pirmaj\u0101 vad\u012bbas amat\u0101, parasti jau ir uzkr\u0101ju\u0161i vair\u0101ku gadu pieredzi ra\u017eo\u0161an\u0101. Pieaugums no aptuveni \u20ac46 000 jaun\u0101k\u0101 l\u012bmen\u012b l\u012bdz vair\u0101k nek\u0101 \u20ac77 000 pieredz\u0113ju\u0161am vec\u0101kajam vad\u012bt\u0101jam par\u0101da at\u0161\u0137ir\u012bbu starp \u0161iem karjeras posmiem.<\/p>\n\n\n\n<p>Da\u017ei uz\u0146\u0113mumi papildus fiks\u0113tajai algai maks\u0101 ar\u012b ikgad\u0113jas piemaksas no \u20ac2 000 l\u012bdz \u20ac3 000. Bruto alga ir atalgojums pirms nodok\u013ciem un atskait\u012bjumiem; neto alga ir atkar\u012bga no personas nodok\u013cu apst\u0101k\u013ciem.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">V\u0101cija sal\u012bdzin\u0101jum\u0101 ar Poliju<\/h2>\n\n\n\n<p>V\u0101cijas gada vid\u0113jais r\u0101d\u012bt\u0101js \u20ac64 000 ir augst\u0101ks par apr\u0113\u0137in\u0101to gada diapazonu \u20ac21 312\u201352 699 <a href=\"\/lv\/resursi\/razosanas-vaditaja-alga-polija-2026\/\">ra\u017eo\u0161anas vad\u012bt\u0101ja algai Polij\u0101<\/a>. Polijas diapazons aptver centr\u0101los 80% Pensjometr respondentu ra\u017eo\u0161anas direktoru un vad\u012bt\u0101ju kategorij\u0101 un izmanto NBP eiro mai\u0146as kursu 2026. gada 2. oktobr\u012b.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Valsts<\/th><th>Bruto gada alga eiro<\/th><th>Apr\u0113\u0137in\u0101tais m\u0113ne\u0161a ekvivalents<\/th><\/tr><\/thead><tbody><tr><td>V\u0101cija<\/td><td>\u20ac64 000 vid\u0113ji<\/td><td>Apm\u0113ram \u20ac5 333<\/td><\/tr><tr><td>Polija<\/td><td>Diapazons \u20ac21 312\u201352 699<\/td><td>Apm\u0113ram \u20ac1 776\u20134 392<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Ra\u017eo\u0161anas vad\u012bbas un grafiku sast\u0101d\u012b\u0161anas r\u012bki<\/h2>\n\n\n\n<p>Ra\u017eo\u0161anas vad\u012bt\u0101js koordin\u0113 ra\u017eo\u0161anas procesus, resursus, kvalit\u0101ti, person\u0101lu un bud\u017eetus; <a href=\"\/lv\/resursi\/razosanas-vaditajs-darba-apraksts\/\">ra\u017eo\u0161anas vad\u012bt\u0101ja darba aprakst\u0101<\/a> \u0161is amats ir izskaidrots s\u012bk\u0101k.<\/p>\n\n\n\n<p>SkyPlanner APS ir uz AI balst\u012bta progres\u012bv\u0101s pl\u0101no\u0161anas un grafiku sast\u0101d\u012b\u0161anas programmat\u016bra diskr\u0113t\u0101s ra\u017eo\u0161anas uz\u0146\u0113mumiem. T\u0101s <a href=\"\/lv\/funkcijas\/#visibility\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161an\u0101<\/a>, pie\u0161\u0137irot ra\u017eo\u0161anas uzdevumus darbstacij\u0101m, tiek \u0146emta v\u0113r\u0101 materi\u0101lu pieejam\u012bba, mai\u0146as, priorit\u0101tes un pieg\u0101des datumi. Lai uzzin\u0101tu, k\u0101 SkyPlanner APS pl\u0101no darbu j\u016bsu ra\u017eotn\u0113, <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">piesakiet demonstr\u0101ciju<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101: bie\u017ei uzdotie jaut\u0101jumi<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Cik ra\u017eo\u0161anas vad\u012bt\u0101js V\u0101cij\u0101 pelna m\u0113nes\u012b?<\/h3>\n\n\n\n<p>Vid\u0113ji tie ir apm\u0113ram \u20ac5 333 bruto m\u0113nes\u012b, kas apr\u0113\u0137in\u0101ti no \u20ac64 000 gad\u0101 \u00f7 12. Jaun\u0101k\u0101 l\u012bme\u0146a atalgojums apm\u0113ram \u20ac46 000 gad\u0101 atbilst aptuveni \u20ac3 833 m\u0113nes\u012b, savuk\u0101rt pieredz\u0113ju\u0161a vec\u0101k\u0101 vad\u012bt\u0101ja atalgojums, kas p\u0101rsniedz \u20ac77 000 gad\u0101, atbilst vair\u0101k nek\u0101 \u20ac6 416,67 m\u0113nes\u012b.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Cik ra\u017eo\u0161anas vad\u012bt\u0101js V\u0101cij\u0101 pelna gad\u0101?<\/h3>\n\n\n\n<p>Vid\u0113j\u0101 bruto gada alga ir \u20ac64 000. Jaun\u0101k\u0101 l\u012bme\u0146a ra\u017eo\u0161anas vad\u012bt\u0101ji pelna apm\u0113ram \u20ac46 000, bet pieredz\u0113ju\u0161i augst\u0101k\u0101 l\u012bme\u0146a ra\u017eo\u0161anas vad\u012bt\u0101ji pelna vair\u0101k nek\u0101 \u20ac77 000. Da\u017ei uz\u0146\u0113mumi papildus maks\u0101 ikgad\u0113ju piemaksu \u20ac2 000\u20133 000 apm\u0113r\u0101.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Vai ra\u017eo\u0161anas vad\u012bt\u0101ju algas V\u0101cij\u0101 ir bruto vai neto?<\/h3>\n\n\n\n<p>Algu skait\u013ci ir bruto, pirms nodok\u013ciem un atskait\u012bjumiem. Neto algu nosaka personas nodok\u013cu apst\u0101k\u013ci.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Kas ietekm\u0113 ra\u017eo\u0161anas vad\u012bt\u0101ja algu V\u0101cij\u0101?<\/h3>\n\n\n\n<p>Ra\u017eo\u0161anas vad\u012bt\u0101ja ien\u0101kumus ietekm\u0113 atra\u0161an\u0101s vieta, akad\u0113misk\u0101 kvalifik\u0101cija, profesion\u0101l\u0101 pieredze un nozare.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">K\u0101 V\u0101cija ir sal\u012bdzin\u0101ma ar Poliju?<\/h3>\n\n\n\n<p>V\u0101cijas vid\u0113j\u0101 bruto gada alga \u20ac64 000 ir augst\u0101ka par Polijas apr\u0113\u0137in\u0101to gada diapazonu \u20ac21 312\u201352 699, kas attiecas uz centr\u0101lajiem 80% ra\u017eo\u0161anas direktoru un vad\u012bt\u0101ju respondentu. Polijas eiro konvert\u0101cij\u0101 izmantots NBP mai\u0146as kurss 2026. gada 2. oktobr\u012b.<\/p>\n\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026 \u20ac64 000 bruto gad\u0101, apm\u0113ram \u20ac5 333 m\u0113nes\u012b: ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101, jaun\u0101ko un vec\u0101ko vad\u012bt\u0101ju atalgojums, piemaksas un sal\u012bdzin\u0101jums ar Poliju. Cik V\u0101cij\u0101 pelna ra\u017eo\u0161anas vad\u012bt\u0101js? Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 ir \u20ac64 000 bruto gad\u0101, saska\u0146\u0101 ar Hays ra\u017eo\u0161anas vad\u012bt\u0101ja algu ce\u013cvedi (p\u0101rbaud\u012bts 2026. gada 3. oktobr\u012b). Skait\u013ci &#8230; <a title=\"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/\" aria-label=\"Read more about Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":22166,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2687,317],"tags":[],"class_list":["post-22330","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-karjera-un-algas","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u20ac64 000 bruto gad\u0101, apm\u0113ram \u20ac5 333 m\u0113nes\u012b: ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101, jaun\u0101ko un vec\u0101ko vad\u012bt\u0101ju atalgojums, piemaksas un sal\u012bdzin\u0101jums ar Poliju.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026\" \/>\n<meta property=\"og:description\" content=\"\u20ac64 000 bruto gad\u0101, apm\u0113ram \u20ac5 333 m\u0113nes\u012b: ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101, jaun\u0101ko un vec\u0101ko vad\u012bt\u0101ju atalgojums, piemaksas un sal\u012bdzin\u0101jums ar Poliju.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-27T14:35:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-03T09:47:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-vacija-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-vacija-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026\",\"datePublished\":\"2023-09-27T14:35:32+00:00\",\"dateModified\":\"2026-10-03T09:47:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-vacija-2026\\\/\"},\"wordCount\":791,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-vacija-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Germany.png\",\"articleSection\":[\"Karjera un algas\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-vacija-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-vacija-2026\\\/\",\"name\":\"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-vacija-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-vacija-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Germany.png\",\"datePublished\":\"2023-09-27T14:35:32+00:00\",\"dateModified\":\"2026-10-03T09:47:34+00:00\",\"description\":\"\u20ac64 000 bruto gad\u0101, apm\u0113ram \u20ac5 333 m\u0113nes\u012b: ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101, jaun\u0101ko un vec\u0101ko vad\u012bt\u0101ju atalgojums, piemaksas un sal\u012bdzin\u0101jums ar Poliju.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-vacija-2026\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-vacija-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-vacija-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Germany.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Germany.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Manager Salary in Germany\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-vaditaja-alga-vacija-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026 &#8211; SkyPlanner","description":"\u20ac64 000 bruto gad\u0101, apm\u0113ram \u20ac5 333 m\u0113nes\u012b: ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101, jaun\u0101ko un vec\u0101ko vad\u012bt\u0101ju atalgojums, piemaksas un sal\u012bdzin\u0101jums ar Poliju.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/","og_locale":"lv_LV","og_type":"article","og_title":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026","og_description":"\u20ac64 000 bruto gad\u0101, apm\u0113ram \u20ac5 333 m\u0113nes\u012b: ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101, jaun\u0101ko un vec\u0101ko vad\u012bt\u0101ju atalgojums, piemaksas un sal\u012bdzin\u0101jums ar Poliju.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-09-27T14:35:32+00:00","article_modified_time":"2026-10-03T09:47:34+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026","datePublished":"2023-09-27T14:35:32+00:00","dateModified":"2026-10-03T09:47:34+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/"},"wordCount":791,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany.png","articleSection":["Karjera un algas","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/","name":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany.png","datePublished":"2023-09-27T14:35:32+00:00","dateModified":"2026-10-03T09:47:34+00:00","description":"\u20ac64 000 bruto gad\u0101, apm\u0113ram \u20ac5 333 m\u0113nes\u012b: ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101, jaun\u0101ko un vec\u0101ko vad\u012bt\u0101ju atalgojums, piemaksas un sal\u012bdzin\u0101jums ar Poliju.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany.png","width":4990,"height":3327,"caption":"Production Manager Salary in Germany"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-vaditaja-alga-vacija-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Germany.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/lv\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 2026 \u20ac64 000 bruto gad\u0101, apm\u0113ram \u20ac5 333 m\u0113nes\u012b: ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101, jaun\u0101ko un vec\u0101ko vad\u012bt\u0101ju atalgojums, piemaksas un sal\u012bdzin\u0101jums ar Poliju. Cik V\u0101cij\u0101 pelna ra\u017eo\u0161anas vad\u012bt\u0101js? Vid\u0113j\u0101 ra\u017eo\u0161anas vad\u012bt\u0101ja alga V\u0101cij\u0101 ir \u20ac64 000 bruto gad\u0101, saska\u0146\u0101 ar Hays ra\u017eo\u0161anas vad\u012bt\u0101ja algu ce\u013cvedi (p\u0101rbaud\u012bts 2026. gada 3. oktobr\u012b). Skait\u013ci&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/22330","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=22330"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/22330\/revisions"}],"predecessor-version":[{"id":94008,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/22330\/revisions\/94008"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/22166"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=22330"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=22330"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=22330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}