{"id":111603,"date":"2026-10-28T00:43:16","date_gmt":"2026-10-28T00:43:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111603"},"modified":"2026-10-28T00:44:03","modified_gmt":"2026-10-28T00:44:03","slug":"mtm-metode","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/","title":{"rendered":"MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Resursi<\/a> &raquo; MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Jauna mezgla ra\u017eo\u0161anu jau var pl\u0101not, ta\u010du tas v\u0113l nav izgatavots pietiekami daudz rei\u017eu, lai b\u016btu zin\u0101ms uzticams vid\u0113jais izgatavo\u0161anas laiks. Tom\u0113r jums ir j\u0101sal\u012bdzina darba centru izk\u0101rtojuma varianti, j\u0101nov\u0113rt\u0113 noslodze un j\u0101izlemj, vai pirmajiem pas\u016bt\u012bjumiem pietiks jaudas.<\/p>\n\n\n<p>MTM metode \u013cauj analiz\u0113t roku darba metodi v\u0113l pirms regul\u0101ras ra\u017eo\u0161anas s\u0101kuma. Nav j\u0101gaida, l\u012bdz uzkr\u0101jas dati par paveiktajiem ra\u017eo\u0161anas uzdevumiem: laiku nosaka, balstoties uz defin\u0113t\u0101m kust\u012bb\u0101m un iepriek\u0161 noteiktiem laika datiem. Vispirms j\u0101izstr\u0101d\u0101 pati darba metode. \u012as\u0101ks izpildes laiks ir noder\u012bgs tikai tad, ja tas raksturo darbu, ko cilv\u0113ki patie\u0161\u0101m var paveikt dro\u0161i un pareizi.<\/p>\n\n\n<p>Kad \u0161is laiks ir apstiprin\u0101ts izmanto\u0161anai pl\u0101no\u0161an\u0101, SkyPlanner APS pal\u012bdz to likt liet\u0101. Sist\u0113mas m\u0101ksl\u012bgais intelekts Arcturus iek\u013cauj oper\u0101ciju ilgumus kop\u0113j\u0101 ra\u017eo\u0161anas grafik\u0101. T\u0101d\u0113j\u0101di uzlabota darba metode k\u013c\u016bst par pamatu lab\u0101k pamatotam pl\u0101nam, nevis paliek tikai atsevi\u0161\u0137s skaitlis tehniskaj\u0101 dokument\u0101cij\u0101.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas ir MTM metode?<\/h2>\n\n\n<p>MTM ir iepriek\u0161 noteiktu kust\u012bbu laiku sist\u0113ma roku darba aprakst\u012b\u0161anai, anal\u012bzei un nov\u0113rt\u0113\u0161anai. Anal\u012bti\u0137is sadala defin\u0113to darba metodi kust\u012bb\u0101s vai procesa pamatelementos, piem\u0113ro attiec\u012bgos laika datus un noteikumus un nosaka \u0161\u012bs metodes izpildes laiku pie atsauces darba tempa.<\/p>\n\n\n<p>Detaliz\u0113t\u0101 MTM-1 anal\u012bz\u0113 iz\u0161\u0137ir t\u0101das kust\u012bbas k\u0101 snieg\u0161an\u0101s, satver\u0161ana, p\u0101rvieto\u0161ana, pozicion\u0113\u0161ana un atlai\u0161ana. B\u016btiski ir ar\u012b apst\u0101k\u013ci: pa\u0146emt viegli pieejamu deta\u013cu nav tas pats, kas atlas\u012bt un pozicion\u0113t gr\u016bti apstr\u0101d\u0101jamu komponentu. MTM \u0161\u012bs at\u0161\u0137ir\u012bbas skaidri par\u0101da, nevis pasl\u0113pj vien\u0101 kop\u0113j\u0101 apl\u0113s\u0113.<\/p>\n\n\n<p>MTM laika v\u0113rt\u012bbas izsaka laika m\u0113rvien\u012bb\u0101s TMU. Viena TMU ir 0,036 sekundes, t\u0101tad 1 000 TMU ir 36 sekundes. TMU ir laika m\u0113rvien\u012bba, nevis efektivit\u0101tes procentu\u0101ls r\u0101d\u012bt\u0101js.<\/p>\n\n\n<p>Svar\u012bgs ir ar\u012b atsauces darba temps. MTM pamat\u0101 nav \u0101tr\u0101k\u0101 operatora darba hronometr\u0113\u0161ana un \u0161\u012b rezult\u0101ta pasludin\u0101\u0161ana par normu. Sist\u0113mas laika dati jau ir noteikti konkr\u0113tam darba tempam. Nepiem\u0113rojiet tiem v\u0113lreiz hronometr\u0101\u017e\u0101 izmantotu darba tempa nov\u0113rt\u0113jumu tikai t\u0101p\u0113c, ka tas lietots cit\u0101 p\u0113t\u012bjum\u0101.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kad izv\u0113l\u0113ties MTM, nevis citu laika noteik\u0161anas metodi?<\/h2>\n\n\n<p>MTM ir \u012bpa\u0161i noder\u012bga, ja j\u0101izlemj, k\u0101 organiz\u0113t roku darbu: ievie\u0161ot jaunu produktu, mainot pal\u012bgier\u012bci vai materi\u0101lu izvietojumu, k\u0101 ar\u012b izv\u0113loties starp div\u0101m mont\u0101\u017eas sec\u012bb\u0101m. Nepiecie\u0161amo darba apjomu var sal\u012bdzin\u0101t v\u0113l pirms konkr\u0113tas metodes izv\u0113les.<\/p>\n\n\n<p>Tom\u0113r MTM nav piem\u0113rot\u0101k\u0101 atbilde uz ikvienu jaut\u0101jumu par laiku. Izv\u0113lieties datus atbilsto\u0161i pie\u0146emamajam l\u0113mumam:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>MTM:<\/strong> Cik laika b\u016btu nepiecie\u0161ams darbam ar \u0161o defin\u0113to roku darba metodi? Noder darba meto\u017eu izstr\u0101dei un sal\u012bdzin\u0101\u0161anai, kam\u0113r v\u0113l nav uzkr\u0101ts pietiekami daudz ra\u017eo\u0161anas datu.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/\">Darba laika izp\u0113te ar hronometr\u0101\u017eu<\/a>:<\/strong> Cik laika noteiktos apst\u0101k\u013cos aiz\u0146em nov\u0113rotie darba elementi, un k\u0101du pamatotu laika normu no t\u0101 var ieg\u016bt? Noder, ja oper\u0101cija jau tiek veikta un to var izp\u0113t\u012bt.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/momentnoverojumu-metode\/\">Momentnov\u0113rojumu metode<\/a>:<\/strong> K\u0101da laika da\u013ca tiek velt\u012bta mont\u0101\u017eai, iestat\u012b\u0161anai, gaid\u012b\u0161anai vai cit\u0101m darb\u012bb\u0101m? Noder, lai izprastu darba perioda sadal\u012bjumu, nevis noteiktu katras \u012bs\u0101s kust\u012bbas ilgumu.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-darba-laika-uzskaite\/\">Laika uzskaite pa ra\u017eo\u0161anas uzdevumiem<\/a>:<\/strong> Kas faktiski notika, izpildot konkr\u0113to pas\u016bt\u012bjumu vai oper\u0101ciju? Noder ra\u017eo\u0161anas pieredzes izv\u0113rt\u0113\u0161anai un novir\u017eu no pl\u0101na skaidro\u0161anai.<\/li><\/ul>\n\n\n<p>\u0160\u012bs pieejas var cita citu papildin\u0101t. Ar MTM anal\u012bzi var noteikt pied\u0101v\u0101t\u0101s darba metodes izpildes laiku, savuk\u0101rt v\u0113l\u0101kie nov\u0113rojumi ra\u017eo\u0161an\u0101 var atkl\u0101t izlaistu darba elementu vai main\u012btus apst\u0101k\u013cus. Ta\u010du vid\u0113jais re\u0123istr\u0113tais stundu skaits, kur\u0101 ietilpst ar\u012b materi\u0101lu gaid\u012b\u0161ana, nav tas pats, kas iepriek\u0161 noteikts roku darba apjoms.<\/p>\n\n\n<p>Autom\u0101tiskam iek\u0101rtas ciklam atsevi\u0161\u0137i nosakiet tehnolo\u0123isk\u0101 procesa dikt\u0113to laiku. Ar MTM var aprakst\u012bt operatora veikto iekrau\u0161anu, izkrau\u0161anu un deta\u013cu p\u0101rvieto\u0161anu, ta\u010du t\u0101 nep\u0101rv\u0113r\u0161 iek\u0101rtas grie\u0161anas programmu vai ciet\u0113\u0161anai nepiecie\u0161amo laiku par rokas kust\u012bbu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM-1, MTM-2 un MTM-UAS: izv\u0113lieties piem\u0113rotu detaliz\u0101cijas pak\u0101pi<\/h2>\n\n\n<p>MTM ietver vair\u0101kas sist\u0113mas ar at\u0161\u0137ir\u012bgu detaliz\u0101cijas pak\u0101pi. Izv\u0113l\u0113t\u0101 sist\u0113ma nosaka gan anal\u012bzes saturu, gan t\u0101s sagatavo\u0161anai nepiecie\u0161amo darbu.<\/p>\n\n\n<p><strong>MTM-1<\/strong> analiz\u0113 darbu pamatkust\u012bbu l\u012bmen\u012b. T\u0101 ir piem\u0113rota \u012bsa, atk\u0101rtota roku darba detaliz\u0113tai izp\u0113tei, ja atsevi\u0161\u0137u kust\u012bbu apst\u0101k\u013ci ir b\u016btiski darba metodes izstr\u0101d\u0113.<\/p>\n\n\n<p><strong>MTM-2<\/strong> apvieno pamatkust\u012bbas liel\u0101k\u0101s grup\u0101s. Piem\u0113rotiem darbiem t\u0101 \u013cauj veikt maz\u0101k detaliz\u0113tu anal\u012bzi, nere\u0123istr\u0113jot katru MTM-1 kust\u012bbu atsevi\u0161\u0137i.<\/p>\n\n\n<p><strong>MTM-UAS<\/strong> jeb Universal Analyzing System izmanto augst\u0101ka l\u012bme\u0146a procesa pamatelementus un ir saist\u012bta ar ra\u017eo\u0161anu partij\u0101s. Tas nav vienk\u0101r\u0161i cits MTM-1 nosaukums.<\/p>\n\n\n<p>Izv\u0113lieties sist\u0113mu kop\u0101 ar apm\u0101c\u012btu anal\u012bti\u0137i, \u0146emot v\u0113r\u0101 procesu, t\u0101 atk\u0101rtojam\u012bbu un main\u012bgumu, k\u0101 ar\u012b l\u0113mumu, kura pie\u0146em\u0161anai vajadz\u012bgs anal\u012bzes rezult\u0101ts. Liel\u0101ka detaliz\u0101cija ir lietder\u012bga, ja t\u0101 var ietekm\u0113t \u0161o l\u0113mumu. Pareizai lieto\u0161anai nepiecie\u0161ama apm\u0101c\u012bba izv\u0113l\u0113taj\u0101 sist\u0113m\u0101, aktu\u0101lie dati un noteikumi; visp\u0101r\u012bgs ce\u013cvedis tos nevar aizst\u0101t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0101 no MTM anal\u012bzes ieg\u016bt pl\u0101no\u0161an\u0101 izmantojamu laiku<\/h2>\n\n\n<p>Noder\u012bgs rezult\u0101ts nav tikai ilgums. T\u0101 ir dokument\u0113ta darba metode un laiks, kura noz\u012bmi saprat\u012bs ar\u012b n\u0101kamais pl\u0101not\u0101js.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Defin\u0113jiet darbu un t\u0101 apst\u0101k\u013cus<\/h3>\n\n\n<p>Izv\u0113lieties produkta variantu, oper\u0101ciju un darba metodes versiju. Aprakstiet instrumentus, pal\u012bgier\u012bci, komponentu izvietojumu, darba sec\u012bbu, kvalit\u0101tes p\u0101rbaudes un to, kas nosaka darba s\u0101kumu un beigas. Nor\u0101diet, vai anal\u012bze attiecas uz vienu vien\u012bbu, vienu ciklu vai partiju.<\/p>\n\n\n<p>Iesaistiet cilv\u0113kus, kuri veic vai veiks \u0161o darbu. Vi\u0146i var paman\u012bt ne\u0113rtu snieg\u0161an\u0101s kust\u012bbu, nepiecie\u0161amu p\u0101rbaudi vai konteinera nomai\u0146u, kas gl\u012bt\u0101 ras\u0113jum\u0101 palikusi neiev\u0113rota. Darba metod\u0113 saglab\u0101jiet dro\u0161ai r\u012bc\u012bbai un produkta kvalit\u0101tei nepiecie\u0161am\u0101s darb\u012bbas: b\u016btiska darba izsv\u012btro\u0161ana nav uzlabojums.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Analiz\u0113jiet darba sec\u012bbu ar izv\u0113l\u0113to sist\u0113mu<\/h3>\n\n\n<p>Apm\u0101c\u012bts anal\u012bti\u0137is apraksta darbu, izmantojot atbilsto\u0161os pamatelementus un \u0146emot v\u0113r\u0101 ietekm\u0113jo\u0161os apst\u0101k\u013cus. Anal\u012bz\u0113 j\u0101atspogu\u013co faktisk\u0101s darb\u012bbas, tostarp darbs, kas j\u0101veic tikai noteiktos interv\u0101los.<\/p>\n\n\n<p>Iev\u0113rojiet sist\u0113mas noteikumus par darb\u012bbu sec\u012bbu un vienlaic\u012bgu izpildi. Divu roku vienlaic\u012bga kust\u012bba ne vienm\u0113r noz\u012bm\u0113 divus sec\u012bgus laika posmus. T\u0101pat nedr\u012bkst izdom\u0101t kust\u012bbas laiku, lai aizpild\u012btu robu nepiln\u012bg\u0101 darba metodes aprakst\u0101.<\/p>\n\n\n<p>Skaidri nodaliet iestat\u012b\u0161anu no atk\u0101rtot\u0101 darba. Pal\u012bgier\u012bces sagatavo\u0161anu vienreiz visai partijai nedr\u012bkst ieskait\u012bt katras vien\u012bbas izgatavo\u0161anas laik\u0101.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Sal\u012bdziniet darba metodes, nevis tikai kop\u0113jos laikus<\/h3>\n\n\n<p>Izmantojiet anal\u012bzi, lai noskaidrotu, k\u0101p\u0113c viena metode prasa maz\u0101k darba. Vai komponentus var\u0113tu novietot vienm\u0113r vien\u0101d\u0101 orient\u0101cij\u0101? Vai pal\u012bgier\u012bce \u013cautu izvair\u012bties no atk\u0101rtotas pozicion\u0113\u0161anas? Vai cita darb\u012bbu sec\u012bba \u013cautu atteikties no liekas deta\u013cu p\u0101rvieto\u0161anas, saglab\u0101jot p\u0101rbaudi?<\/p>\n\n\n<p>Sal\u012bdziniet variantus ar vien\u0101d\u0101m anal\u012bzes robe\u017e\u0101m un kvalit\u0101tes pras\u012bb\u0101m. Ja metode \u0161\u0137iet \u0101tr\u0101ka tikai t\u0101p\u0113c, ka kr\u0101jumu papildin\u0101\u0161ana vai p\u0101rbaude ir atst\u0101ta \u0101rpus anal\u012bzes, darba apjoms ne vienm\u0113r ir samazin\u0101jies. Tie\u0161i \u0161eit MTM k\u013c\u016bst par darba meto\u017eu izstr\u0101des r\u012bku, nevis tikai form\u0101li noform\u0113tu apl\u0113si.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Nosakiet, kas ietilpst izmanto\u0161anai apstiprin\u0101taj\u0101 laik\u0101<\/h3>\n\n\n<p>Pirms rezult\u0101tu pasludin\u0101t par ra\u017eo\u0161anas laika normu, p\u0101rbaudiet t\u0101 apr\u0113\u0137ina pamatu. Apziniet regul\u0101ros pal\u012bgdarbus un nosakiet, k\u0101 \u0146emt v\u0113r\u0101 personisk\u0101s vajadz\u012bbas, atp\u016btu un nenov\u0113r\u0161amus kav\u0113jumus. Dokument\u0113jiet, k\u0101di papildu laiki ir iek\u013cauti un k\u0101 tie apr\u0113\u0137in\u0101ti; nepie\u0146emiet, ka visur der viens un tas pats procents.<\/p>\n\n\n<p>Skaidri nor\u0101diet nov\u0113r\u0161amus p\u0101rtraukumus k\u0101 risin\u0101mas probl\u0113mas. Tr\u016bksto\u0161a komponenta gaid\u012b\u0161anu nedr\u012bkst neman\u0101mi iek\u013caut katr\u0101 snieg\u0161an\u0101s un satver\u0161anas darb\u012bbu sec\u012bb\u0101. Savuk\u0101rt, ja pl\u0101no\u0161an\u0101 izmantotaj\u0101 ilgum\u0101 nav ietverts pamatoti nepiecie\u0161ams atk\u0101rtots darbs, jaun\u0101s metodes iek\u013cau\u0161ana grafik\u0101 \u0161\u0137it\u012bs viegl\u0101ka, nek\u0101 t\u0101 paties\u012bb\u0101 ir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. P\u0101rbaudiet un apstipriniet darba metodi izmanto\u0161anai<\/h3>\n\n\n<p>Pirms metodes ievie\u0161anas p\u0101rbaudiet, vai to var \u012bstenot ar paredz\u0113taj\u0101m iek\u0101rt\u0101m un materi\u0101lu izvietojumu, iev\u0113rojot kvalit\u0101tes pras\u012bbas. Kad ir pieejami izm\u0113\u0123in\u0101juma vai pirm\u0101s ra\u017eo\u0161anas partijas rezult\u0101ti, izp\u0113tiet at\u0161\u0137ir\u012bbas, sal\u012bdzinot ar l\u012bdzv\u0113rt\u012bgu darbu. Darba apg\u016b\u0161ana, main\u012bta pal\u012bgier\u012bce un anal\u012bz\u0113 izlaists elements prasa at\u0161\u0137ir\u012bgu r\u012bc\u012bbu.<\/p>\n\n\n<p>Saglab\u0101jiet anal\u012bzi un inform\u0101ciju par izmantoto sist\u0113mu, metodes redakciju, pie\u0146\u0113mumiem, iek\u013cautajiem papildu laikiem, apstiprin\u0101jumu un sp\u0113k\u0101 st\u0101\u0161an\u0101s datumu. P\u0101rskatiet laiku, ja main\u0101s metode vai t\u0101s izpildes apst\u0101k\u013ci. M\u0113r\u0137is nav bezgal\u012bgi saglab\u0101t iespaid\u012bgu skaitli, bet gan uztur\u0113t uzticamu saikni starp veicamo darbu un pl\u0101nu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Piem\u0113rs: lab\u0101ka mont\u0101\u017eas metode pati par sevi grafiku nemaina<\/h2>\n\n\n<p>Iedom\u0101simies manu\u0101l\u0101s mont\u0101\u017eas vietu, kur deta\u013cas tiek pieg\u0101d\u0101tas da\u017e\u0101d\u0101 orient\u0101cij\u0101. Pied\u0101v\u0101taj\u0101 metod\u0113 izmanto uzlabotu deta\u013cu padeves papl\u0101ti un pozicion\u0113\u0161anas pal\u012bgier\u012bci, t\u0101d\u0113j\u0101di samazinot vajadz\u012bbu deta\u013cas atlas\u012bt un p\u0101rvietot pareizaj\u0101 poz\u012bcij\u0101. Komanda p\u0101rbauda metodi un apstiprina t\u0101s izmanto\u0161anu.<\/p>\n\n\n<p>Pie\u0146emsim, ka rezult\u0101t\u0101 pl\u0101no\u0161an\u0101 izmantojamais laiks vienai deta\u013cai samazin\u0101s no div\u0101m min\u016bt\u0113m l\u012bdz pusotrai min\u016btei. Tie ir ilustrat\u012bvi, apstiprin\u0101ti pl\u0101no\u0161anas ievaddati, nevis v\u0113rt\u012bbas no MTM datu kartes. Pie\u0146emsim ar\u012b, ka viens cilv\u0113ks vien\u0101 darba viet\u0101 veic darbus sec\u012bgi, bez vienlaikus notieko\u0161a iek\u0101rtas cikla, un ka papildu laiks personiskaj\u0101m vajadz\u012bb\u0101m, atp\u016btai un kav\u0113jumiem ir saska\u0146oti \u0146emts v\u0113r\u0101 gan nor\u0101d\u012btajos ilgumos, gan pieejam\u0101 darba laika kalend\u0101r\u0101.<\/p>\n\n\n<p>Pas\u016bt\u012bjumam ar 120 deta\u013c\u0101m, ja sagatavo\u0161anas laiks nemain\u0101s un ir 30 min\u016btes:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Iepriek\u0161\u0113j\u0101 metode:<\/strong> 120 \u00d7 2 min\u016btes + 30 min\u016btes = 270 min\u016btes jeb \u010detrarpus stundas.<\/li><li><strong>Jaun\u0101 metode:<\/strong> 120 \u00d7 1,5 min\u016btes + 30 min\u016btes = 210 min\u016btes jeb tr\u012bsarpus stundas.<\/li><\/ul>\n\n\n<p>\u0160\u012b pas\u016bt\u012bjuma izpildei attiec\u012bgaj\u0101 darba viet\u0101 vajag par vienu stundu maz\u0101k. T\u0101 ir izmantojama jauda, ta\u010du tas autom\u0101tiski nenoz\u012bm\u0113 nos\u016bt\u012b\u0161anu par stundu agr\u0101k. Samont\u0113tajam izstr\u0101d\u0101jumam joproj\u0101m var n\u0101kties gaid\u012bt uz p\u0101rbaudes stendu, n\u0101kamajai oper\u0101cijai vajadz\u012bgos resursus var aiz\u0146emt cits pas\u016bt\u012bjums, vai ar\u012b atbr\u012bvot\u0101 stunda var nesakrist ar laika posmu, kas vajadz\u012bgs citam ra\u017eo\u0161anas uzdevumam.<\/p>\n\n\n<p>T\u0101p\u0113c n\u0101kamais solis nav p\u0101rcelt pieg\u0101des termi\u0146u par stundu agr\u0101k. Ir j\u0101p\u0101rr\u0113\u0137ina, k\u0101 \u0161o pas\u016bt\u012bjumu un p\u0101r\u0113jos darbus izpild\u012bt ar pieejamajiem resursiem. \u0160o apr\u0113\u0137inu j\u016bsu viet\u0101 veic SkyPlanner.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izmantojiet apstiprin\u0101tos metodes izpildes laikus pl\u0101no\u0161an\u0101 ar SkyPlanner<\/h2>\n\n\n<p>SkyPlanner \u013cauj noteikt oper\u0101cijas ilgumu k\u0101 laiku vienai deta\u013cai, ra\u017eo\u0161anas tempu vai fiks\u0113tu laiku. Sagatavo\u0161anas un nosl\u0113guma darbu laiku ievada atsevi\u0161\u0137i. T\u0101p\u0113c piem\u0113r\u0101, kur viss darbs tiek veikts manu\u0101li, apstiprin\u0101to pl\u0101no\u0161anas laiku vienai deta\u013cai un partijas sagatavo\u0161anas laiku var saglab\u0101t atsevi\u0161\u0137i ar\u012b tad, ja main\u0101s pas\u016bt\u012bjuma daudzums.<\/p>\n\n\n<p>Vispirms p\u0101rbaudiet, kuri resursi un uz cik ilgu laiku ir j\u0101rezerv\u0113. Cilv\u0113ka darba apjoms, iek\u0101rtas aiz\u0146emt\u012bbas laiks un kop\u0113jais oper\u0101cijas ilgums ir at\u0161\u0137ir\u012bgi lielumi. Ja iek\u0101rta darbojas, kam\u0113r operators sagatavo citu deta\u013cu, visu darb\u012bbu ilgumu saskait\u012b\u0161ana var rad\u012bt p\u0101r\u0101k ilgu iek\u0101rtas rezerv\u0101ciju. Savuk\u0101rt, \u0146emot v\u0113r\u0101 tikai manu\u0101lo darbu, var palikt neuzskait\u012bts laiks, kur\u0101 iek\u0101rta nav pieejama citam ra\u017eo\u0161anas uzdevumam. Sasaistiet metodi ar resursiem, kas oper\u0101cijai patie\u0161\u0101m nepiecie\u0161ami.<\/p>\n\n\n<p>Saska\u0146ojiet ar kalend\u0101ru ar\u012b ilgum\u0101 iek\u013cauto papildu laiku. Ja p\u0101rtraukums jau ir izsl\u0113gts no pieejam\u0101s jaudas, to nedr\u012bkst atskait\u012bt v\u0113lreiz, paredzot papildu laiku tam pa\u0161am p\u0101rtraukumam. Saglab\u0101jiet apstiprin\u0101to izp\u0113tes dokument\u0101ciju un dokument\u0113jiet, k\u0101 t\u0101s sast\u0101vda\u013cas tiek izmantotas pl\u0101no\u0161anas ievaddatos.<\/p>\n\n\n<p>Arcturus iepl\u0101no \u0161os oper\u0101ciju ilgumus, \u0146emot v\u0113r\u0101 konfigur\u0113tos darba centrus, mai\u0146as, savstarp\u0113j\u0101s atkar\u012bbas un priorit\u0101tes. Ganta diagramm\u0101 redzams, k\u0101 darbi ir savstarp\u0113ji saska\u0146oti. Ievie\u0161ot apstiprin\u0101tas metodes izmai\u0146as, atjauniniet attiec\u012bgos pl\u0101no\u0161anas ievaddatus un <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/kas-ir-razosanas-planosana\/\">p\u0101rr\u0113\u0137iniet grafiku<\/a>, lai redz\u0113tu ietekmi uz turpm\u0101kaj\u0101m oper\u0101cij\u0101m un citiem pas\u016bt\u012bjumiem, kam vajadz\u012bgi tie pa\u0161i resursi.<\/p>\n\n\n<p>P\u0113c katras izmai\u0146as jums vairs nav manu\u0101li j\u0101p\u0101rveido atsevi\u0161\u0137as darbu rindas. V\u0113l svar\u012bg\u0101k \u2014 n\u0101kotnes darbu pl\u0101no\u0161an\u0101 varat izmantot pamatotu jaun\u0101s metodes izpildes laiku, pirms v\u0113l ir uzkr\u0101ta pla\u0161a pabeigto ra\u017eo\u0161anas uzdevumu v\u0113sture. J\u016bs izlemjat, kura metode ir apstiprin\u0101ta un kur\u0101m saist\u012bb\u0101m ir priek\u0161roka; SkyPlanner apr\u0113\u0137ina vienotu, savstarp\u0113ji saska\u0146otu grafiku.<\/p>\n\n\n<p>V\u0113l\u0101k faktisk\u0101 ra\u017eo\u0161ana sniedz papildu datus. SkyPlanner \u013cauj ar\u012b apl\u0113st oper\u0101ciju ilgumu p\u0113c iepriek\u0161 re\u0123istr\u0113tajiem darba laika uzskaites datiem. \u0160is datu avots j\u0101no\u0161\u0137ir no MTM: vien\u0101 gad\u012bjum\u0101 apl\u0113ses balst\u0101s uz re\u0123istr\u0113to ra\u017eo\u0161anas darbu, bet otr\u0101 \u2014 noteiktu manu\u0101l\u0101 darba metodi nov\u0113rt\u0113, izmantojot iepriek\u0161 noteiktus datus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u0101p\u0113c ir svar\u012bgs vienots grafiks<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/klientu-stasti\/utu\/\">Somijas elektrisko sadales pane\u013cu un sadales iek\u0101rtu ra\u017eot\u0101js UTU<\/a> iepriek\u0161 pl\u0101noja darbu atsevi\u0161\u0137\u0101s noda\u013cu izkl\u0101jlap\u0101s. ERP sist\u0113m\u0101 veikt\u0101s darbu sec\u012bbas izmai\u0146as ne vienm\u0113r non\u0101ca l\u012bdz ra\u017eo\u0161anas ceham, un bija gr\u016bti g\u016bt priek\u0161statu par re\u0101li pieejamo jaudu.<\/p>\n\n\n<p>Savienojot SkyPlanner ar Oracle NetSuite, UTU apvienoja Ulvilas r\u016bpn\u012bcas l\u012bnijas un noda\u013cas vien\u0101 sist\u0113m\u0101. P\u0113c komandas teikt\u0101, atjaunin\u0101t\u0101 darbu rinda sasniedz montierus da\u017eu sekun\u017eu laik\u0101, un ar\u012b projektu pieg\u0101des tiek pl\u0101notas prec\u012bz\u0101k. \u0160\u012b pieredze par\u0101da, k\u0101du ieguvumu dod visas noslodzes iek\u013cau\u0161ana vienot\u0101 pl\u0101n\u0101 t\u0101 viet\u0101, lai katra noda\u013ca pati saska\u0146otu savu darbu rindu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">No pamatota metodes izpildes laika l\u012bdz uzticamam ra\u017eo\u0161anas pl\u0101nam<\/h2>\n\n\n<p>Izmantojiet MTM, ja manu\u0101l\u0101 darba veik\u0161anas metode ir j\u0101izstr\u0101d\u0101 un j\u0101pamato, pirms atbildi var sniegt ra\u017eo\u0161anas v\u0113sturiskie dati. Savuk\u0101rt SkyPlanner izv\u0113lieties tad, kad \u0161im apstiprin\u0101tajam laikam j\u0101atrod re\u0101la vieta eso\u0161o pas\u016bt\u012bjumu pl\u0101n\u0101. Pamatota metode nosaka, kas vajadz\u012bgs darba izpildei; pl\u0101no\u0161ana ierobe\u017eotas jaudas apst\u0101k\u013cos par\u0101da, kur un kad \u0161o darbu var veikt.<\/p>\n\n\n<p>SkyPlanner var integr\u0113t ar jebkuru ERP vai MES sist\u0113mu, izmantojot t\u0101 atv\u0113rto REST API, t\u0101p\u0113c lab\u0101ku ra\u017eo\u0161anas grafiku var veidot, balstoties uz j\u016bsu eso\u0161ajiem ra\u017eo\u0161anas datiem.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Piesakieties SkyPlanner demonstr\u0101cijai<\/a> un sagatavojiet vienu apstiprin\u0101tu metodes izpildes laiku, attiec\u012bgo oper\u0101ciju mar\u0161rutu un citus pas\u016bt\u012bjumus, kuriem vajadz\u012bga t\u0101 pati jauda. Apskatiet, k\u0101 metodes izmai\u0146as ietekm\u0113 ra\u017eo\u0161anas pl\u0101nu un pieg\u0101des termi\u0146us, nevis tikai vienas oper\u0101cijas ilgumu. Ja vispirms v\u0113laties izp\u0113t\u012bt pa\u0161i, <a href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a> vai asistenta darba s\u0101k\u0161anas ce\u013cvedi ar m\u0101ksl\u012bg\u0101 intelekta atbalstu.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma S\u0101kums &raquo; Resursi &raquo; MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma Jauna mezgla ra\u017eo\u0161anu jau var pl\u0101not, ta\u010du tas v\u0113l nav izgatavots pietiekami daudz rei\u017eu, lai b\u016btu zin\u0101ms uzticams vid\u0113jais izgatavo\u0161anas laiks. Tom\u0113r jums ir j\u0101sal\u012bdzina darba centru izk\u0101rtojuma varianti, j\u0101nov\u0113rt\u0113 noslodze un j\u0101izlemj, vai pirmajiem pas\u016bt\u012bjumiem pietiks &#8230; <a title=\"MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/\" aria-label=\"Read more about MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111623,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2559,317],"tags":[],"class_list":["post-111603","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-razosanas-efektivitate","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma<\/title>\n<meta name=\"description\" content=\"J\u0101nosaka jaunas roku darba metodes ilgums? Uzziniet, k\u0101 MTM to nosaka pirms ra\u017eo\u0161anas. Ar SkyPlanner veidojiet \u012bstenojamu grafiku no apstiprin\u0101tiem laikiem.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma\" \/>\n<meta property=\"og:description\" content=\"J\u0101nosaka jaunas roku darba metodes ilgums? Uzziniet, k\u0101 MTM to nosaka pirms ra\u017eo\u0161anas. Ar SkyPlanner veidojiet \u012bstenojamu grafiku no apstiprin\u0101tiem laikiem.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T00:43:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T00:44:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtm-metode\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtm-metode\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:44:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtm-metode\\\/\"},\"wordCount\":2878,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtm-metode\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"articleSection\":[\"Ra\u017eo\u0161anas efektivit\u0101te\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtm-metode\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtm-metode\\\/\",\"name\":\"MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtm-metode\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtm-metode\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:44:03+00:00\",\"description\":\"J\u0101nosaka jaunas roku darba metodes ilgums? Uzziniet, k\u0101 MTM to nosaka pirms ra\u017eo\u0161anas. Ar SkyPlanner veidojiet \u012bstenojamu grafiku no apstiprin\u0101tiem laikiem.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtm-metode\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtm-metode\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtm-metode\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtm-metode\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma","description":"J\u0101nosaka jaunas roku darba metodes ilgums? Uzziniet, k\u0101 MTM to nosaka pirms ra\u017eo\u0161anas. Ar SkyPlanner veidojiet \u012bstenojamu grafiku no apstiprin\u0101tiem laikiem.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/","og_locale":"lv_LV","og_type":"article","og_title":"MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma","og_description":"J\u0101nosaka jaunas roku darba metodes ilgums? Uzziniet, k\u0101 MTM to nosaka pirms ra\u017eo\u0161anas. Ar SkyPlanner veidojiet \u012bstenojamu grafiku no apstiprin\u0101tiem laikiem.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T00:43:16+00:00","article_modified_time":"2026-10-28T00:44:03+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:44:03+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/"},"wordCount":2878,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","articleSection":["Ra\u017eo\u0161anas efektivit\u0101te","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/","name":"MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:44:03+00:00","description":"J\u0101nosaka jaunas roku darba metodes ilgums? Uzziniet, k\u0101 MTM to nosaka pirms ra\u017eo\u0161anas. Ar SkyPlanner veidojiet \u012bstenojamu grafiku no apstiprin\u0101tiem laikiem.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","width":1774,"height":887,"caption":"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtm-metode\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma S\u0101kums &raquo; Resursi &raquo; MTM metode: pl\u0101nojiet darbu pirms ra\u017eo\u0161anas s\u0101kuma Jauna mezgla ra\u017eo\u0161anu jau var pl\u0101not, ta\u010du tas v\u0113l nav izgatavots pietiekami daudz rei\u017eu, lai b\u016btu zin\u0101ms uzticams vid\u0113jais izgatavo\u0161anas laiks. Tom\u0113r jums ir j\u0101sal\u012bdzina darba centru izk\u0101rtojuma varianti, j\u0101nov\u0113rt\u0113 noslodze un j\u0101izlemj, vai pirmajiem pas\u016bt\u012bjumiem pietiks&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/111603","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=111603"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/111603\/revisions"}],"predecessor-version":[{"id":111667,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/111603\/revisions\/111667"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/111623"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=111603"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=111603"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=111603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}