{"id":111231,"date":"2026-10-27T16:31:21","date_gmt":"2026-10-27T16:31:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111231"},"modified":"2026-10-27T16:32:15","modified_gmt":"2026-10-27T16:32:15","slug":"krajumu-segums","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/","title":{"rendered":"Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Resursi<\/a> &raquo; Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Kr\u0101jumu p\u0101rskats r\u0101da, ka komponentu pietiks septi\u0146\u0101m darbdien\u0101m. N\u0101kam\u0101 pieg\u0101de gaid\u0101ma piektdien. Tom\u0113r ceturtdienas ra\u017eo\u0161anas pas\u016bt\u012bjumu nevar s\u0101kt, jo tam nepietiek komponentu.<\/p>\n\n\n<p>Pretrunas te nav: kr\u0101jumi septi\u0146\u0101m dien\u0101m p\u0113c vid\u0113j\u0101 pat\u0113ri\u0146a v\u0113l nenoz\u012bm\u0113, ka pietiks materi\u0101lu faktiskajiem ra\u017eotnes pas\u016bt\u012bjumiem. Liela partija, kvalit\u0101tes p\u0101rbaudes d\u0113\u013c blo\u0137\u0113ti materi\u0101li vai citiem darbiem jau rezerv\u0113ti kr\u0101jumi var main\u012bt rezult\u0101tu.<\/p>\n\n\n<p>Kr\u0101jumu seguma apr\u0113\u0137ins pal\u012bdz atkl\u0101t \u0161o iztr\u016bkumu, pirms tas izraisa d\u012bkst\u0101vi. Ra\u017eo\u0161an\u0101 b\u016btisks ir konkr\u0113ts jaut\u0101jums: <strong>kurai no gaid\u0101maj\u0101m materi\u0101lu vajadz\u012bb\u0101m kr\u0101jumu vairs nepietiks, un vai papildin\u0101jums b\u016bs pieejams lieto\u0161anai pirms \u0161\u012b br\u012b\u017ea?<\/strong> SkyPlanner APS sasaista materi\u0101lu pieejam\u012bbu ar ra\u017eo\u0161anas grafiku, t\u0101p\u0113c, izv\u0113loties r\u012bc\u012bbu, varat \u0146emt v\u0113r\u0101 ne tikai kr\u0101jumus, bet ar\u012b iek\u0101rtu jaudu un sol\u012btos pieg\u0101des termi\u0146us.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas ir kr\u0101jumu segums ra\u017eo\u0161an\u0101?<\/h2>\n\n\n<p>Kr\u0101jumu segums ir laiks, cik ilgi ar noteiktu kr\u0101jumu daudzumu var apmierin\u0101t piepras\u012bjumu. To bie\u017ei izsaka dien\u0101s vai ned\u0113\u013c\u0101s. Ra\u017eo\u0161an\u0101 piepras\u012bjumu var veidot gaid\u0101majiem ra\u017eo\u0161anas uzdevumiem nepiecie\u0161amie komponenti vai izejvielas, nevis klientiem p\u0101rdodam\u0101 gatav\u0101 produkcija.<\/p>\n\n\n<p>Ir skaidri j\u0101nosaka, uz ko apr\u0113\u0137ins balst\u0101s. Viena komponenta segums vien\u0101 ra\u017eotn\u0113 nav tas pats, kas kr\u0101jumu r\u0101d\u012bt\u0101js visam uz\u0146\u0113mumam. Ar\u012b segums, ko nodro\u0161ina pa\u0161laik pieejamie kr\u0101jumi, at\u0161\u0137iras no seguma, kura apr\u0113\u0137in\u0101 iek\u013cautas gaid\u0101m\u0101s pieg\u0101des.<\/p>\n\n\n<p>Ja pat\u0113ri\u0146\u0161 ir vienm\u0113r\u012bgs, \u0101tram nov\u0113rt\u0113jumam izmantojiet \u0161\u0101du formulu:<\/p>\n\n\n<p><strong>Kr\u0101jumu segums = izmantojamo kr\u0101jumu daudzums \u00f7 pat\u0113ri\u0146\u0161 dien\u0101<\/strong><\/p>\n\n\n<p>Izmantojiet saskan\u012bgas m\u0113rvien\u012bbas un vien\u0101du dienu uzskaites principu. Ja pieejami 420 izmantojami komponenti un vid\u0113jais pat\u0113ri\u0146\u0161 ir 60 komponentu darbdien\u0101, apr\u0113\u0137in\u0101tais segums ir septi\u0146as darbdienas. Nesal\u012bdziniet to tie\u0161i ar pieg\u0101d\u0101t\u0101ja pas\u016bt\u012bjuma izpildes laiku, kas nor\u0101d\u012bts kalend\u0101raj\u0101s dien\u0101s, vispirms nesaska\u0146ojot kalend\u0101rus.<\/p>\n\n\n<p>\u0160\u0101ds nov\u0113rt\u0113jums pal\u012bdz atlas\u012bt materi\u0101lus, kuriem j\u0101piev\u0113r\u0161 uzman\u012bba. Ja pat\u0113ri\u0146\u0161 katr\u0101 pas\u016bt\u012bjum\u0101 at\u0161\u0137iras, apr\u0113\u0137iniet segumu uz priek\u0161u p\u0113c materi\u0101lu vajadz\u012bb\u0101m konkr\u0113tos datumos. Komponentus, ko pat\u0113r\u0113 liel\u0101s partij\u0101s, no noliktavas neizsniedz tik vienm\u0113r\u012bgi katru dienu, k\u0101 liecina vid\u0113jais pat\u0113ri\u0146\u0161.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kr\u0101jumu segums nav kr\u0101jumu aprite vai DIO<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-aprites-koeficients\/\">Kr\u0101jumu aprites koeficients<\/a> un kr\u0101jumu aprites ilgums dien\u0101s jeb DIO raksturo kr\u0101jumu kust\u012bbu vai glab\u0101\u0161anas ilgumu, balstoties uz noteikta perioda finan\u0161u datiem. Tie pal\u012bdz nov\u0113rt\u0113t kr\u0101jumu p\u0101rvald\u012bbu, ta\u010du pl\u0101not\u0101jam neatkl\u0101j, vai konkr\u0113tais komponents b\u016bs pieejams ceturtdienas ra\u017eo\u0161anas uzdevumam.<\/p>\n\n\n<p>Lai to noteiktu, izmantojiet vienas un t\u0101s pa\u0161as kr\u0101jumu poz\u012bcijas daudzumus un datumus, kad tie ir vajadz\u012bgi. Nedaliet komponentu daudzumu ar p\u0101rdot\u0101s produkcijas pa\u0161izmaksu un neuzskatiet, ka v\u0113sturisks kr\u0101jumu aprites ilgums dien\u0101s apliecina materi\u0101lu pieejam\u012bbu n\u0101kotn\u0113.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u0101ciet ar kr\u0101jumiem, kurus ra\u017eo\u0161an\u0101 tie\u0161\u0101m var izmantot<\/h2>\n\n\n<p>Pirms seguma apr\u0113\u0137ina p\u0101rbaudiet un preciz\u0113jiet s\u0101kuma atlikumu. Fiziskaj\u0101 kr\u0101jumu uzskait\u0113 var b\u016bt iek\u013cauti materi\u0101li, kas atrodas noliktav\u0101, bet nav pieejami darbiem, kurus izv\u0113rt\u0113jat.<\/p>\n\n\n<p>No\u0161\u0137iriet \u010detras kategorijas:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Faktiskie kr\u0101jumi:<\/strong> daudzums, kas attiec\u012bgaj\u0101 atra\u0161an\u0101s viet\u0101 uzskait\u012bts k\u0101 fiziski eso\u0161s.<\/li><li><strong>Neizmantojamie kr\u0101jumi:<\/strong> kvalit\u0101tes p\u0101rbaudes d\u0113\u013c blo\u0137\u0113ti materi\u0101li, boj\u0101ti kr\u0101jumi, materi\u0101li ar beigu\u0161os der\u012bguma termi\u0146u vai t\u0101di, kuru specifik\u0101cija neatbilst ra\u017eo\u0161anas uzdevumam.<\/li><li><strong>Rezerv\u0113tie kr\u0101jumi:<\/strong> citiem darbiem pie\u0161\u0137irtie materi\u0101li, kuru rezerv\u0113jums j\u0101\u0146em v\u0113r\u0101 apr\u0113\u0137in\u0101.<\/li><li><strong>Gaid\u0101m\u0101s pieg\u0101des:<\/strong> daudzumi, kas var k\u013c\u016bt pieejami v\u0113l\u0101k, nevis kr\u0101jumi, kas jau atrodas noliktav\u0101.<\/li><\/ul>\n\n\n<p>Svar\u012bgi, lai s\u0101kuma atlikums un apr\u0113\u0137in\u0101 iek\u013cauto materi\u0101lu vajadz\u012bbu saraksts b\u016btu savstarp\u0113ji saska\u0146oti. Ja rezerv\u0113tais daudzums jau ir atskait\u012bts no s\u0101kuma atlikuma, v\u0113l\u0101k neat\u0146emiet to pa\u0161u vajadz\u012bbu v\u0113lreiz. Savuk\u0101rt, ja s\u0101kat ar izmantojamiem kr\u0101jumiem pirms rezerv\u0113jumu atskait\u012b\u0161anas, iek\u013caujiet v\u0113l neizpild\u012bt\u0101s materi\u0101lu vajadz\u012bbas, kur\u0101m \u0161ie kr\u0101jumi tiks pat\u0113r\u0113ti.<\/p>\n\n\n<p>Piem\u0113ram, ja sist\u0113ma r\u0101da \u201cbr\u012bvos kr\u0101jumus\u201d, p\u0101rbaudiet, kas jau ir atskait\u012bts, lai ieg\u016btu \u0161o skaitli. Ja no atlikuma, kur\u0101 neizpild\u012btie pas\u016bt\u012bjumi jau \u0146emti v\u0113r\u0101, v\u0113lreiz atskait\u012bsiet katra \u0161\u0101da pas\u016bt\u012bjuma vajadz\u012bbas, apr\u0113\u0137ins uzr\u0101d\u012bs neeso\u0161u iztr\u016bkumu.<\/p>\n\n\n<p>No\u0161\u0137iriet ar\u012b br\u012bdin\u0101jumu par <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/\">dro\u0161\u012bbas kr\u0101jumiem<\/a> no faktiska materi\u0101lu iztr\u016bkuma. Ja atlikums nokr\u012btas zem aizsarg\u0101jam\u0101s rezerves l\u012bme\u0146a, r\u012bc\u012bba var b\u016bt vajadz\u012bga v\u0113l pirms k\u0101dam ra\u017eo\u0161anas uzdevumam pietr\u016bkst materi\u0101lu. Nor\u0101diet, l\u012bdz kuram br\u012bdim apr\u0113\u0137in\u0101ts segums: l\u012bdz rezerves l\u012bme\u0146a sasnieg\u0161anai vai l\u012bdz pirmajai vajadz\u012bbai, kuru vairs nevar piln\u012bb\u0101 nodro\u0161in\u0101t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Apr\u0113\u0137iniet segumu gaid\u0101majiem ra\u017eo\u0161anas uzdevumiem<\/h2>\n\n\n<p>Ja materi\u0101la pat\u0113ri\u0146\u0161 ra\u017eo\u0161an\u0101 ir main\u012bgs, p\u0101rskatiet vajadz\u012bbas hronolo\u0123isk\u0101 sec\u012bb\u0101. S\u0101ciet ar p\u0101rbaud\u012bto izmantojamo atlikumu un at\u0146emiet katru apr\u0113\u0137in\u0101 iek\u013cauto vajadz\u012bgo daudzumu br\u012bd\u012b, kad materi\u0101ls ir nepiecie\u0161ams. Sa\u0146emamo daudzumu pieskaitiet tikai taj\u0101 br\u012bd\u012b, kad to paredz\u0113ts izmantot ra\u017eo\u0161an\u0101.<\/p>\n\n\n<p>Prognoz\u0113to atlikumu katr\u0101 br\u012bd\u012b apr\u0113\u0137ina \u0161\u0101di:<\/p>\n\n\n<p><strong>Prognoz\u0113tais atlikums = s\u0101kotn\u0113jie izmantojamie kr\u0101jumi + l\u012bdz attiec\u012bgajam br\u012bdim sa\u0146emtie izmantojamie daudzumi \u2212 l\u012bdz attiec\u012bgajam br\u012bdim apr\u0113\u0137in\u0101 iek\u013caut\u0101s materi\u0101lu vajadz\u012bbas<\/strong><\/p>\n\n\n<p>Atrodiet pirmo materi\u0101la vajadz\u012bbu, kuru pieejamais daudzums nesp\u0113j piln\u012bb\u0101 segt. Tie\u0161i \u0161is br\u012bdis ir svar\u012bgs, lai nov\u0113rstu iztr\u016bkumu, pat ja v\u0113l\u0101kas pieg\u0101des d\u0113\u013c kop\u0113jais atlikums ned\u0113\u013cas beig\u0101s izskat\u0101s pietiekams.<\/p>\n\n\n<p>Izmantojiet datumu, kad materi\u0101ls ir vajadz\u012bgs, nevis autom\u0101tiski pie\u0146emiet gatav\u0101 pas\u016bt\u012bjuma nos\u016bt\u012b\u0161anas datumu. Iepirktai sagatavei, kas otrdien nepiecie\u0161ama meh\u0101niskajai apstr\u0101dei, j\u0101b\u016bt pieejamai jau tad, nevis tikai piektdien, kad nos\u016bta samont\u0113to izstr\u0101d\u0101jumu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Piem\u0113rs: p\u0113c vid\u0113j\u0101 pat\u0113ri\u0146a kr\u0101jumu pietiek septi\u0146\u0101m dien\u0101m, bet ceturtdien rodas iztr\u016bkums<\/h3>\n\n\n<p>Iedom\u0101jieties ra\u017eot\u0101ju, kas pirmdienas r\u012bt\u0101 p\u0101rbauda viena iepirkta komponenta kr\u0101jumus. Noliktav\u0101 fiziski ir 600 gabali. No tiem 100 v\u0113l nav at\u013cauts izmantot kvalit\u0101tes p\u0101rbaudes d\u0113\u013c, bet 80 ir rezerv\u0113ti citiem darbiem, kuri \u0161aj\u0101 piem\u0113r\u0101 nav iek\u013cauti. T\u0101tad t\u0101l\u0101k nor\u0101d\u012btajiem ra\u017eo\u0161anas uzdevumiem s\u0101kotn\u0113ji ir pieejami 420 izmantojami gabali.<\/p>\n\n\n<p>Apr\u0113\u0137in\u0101 iek\u013cautajiem ra\u017eo\u0161anas uzdevumiem pirmdien vajadz\u012bgi 120 gabali, otrdien \u2014 180 un ceturtdien \u2014 160. \u0160ie daudzumi v\u0113l nav at\u0146emti no s\u0101kotn\u0113j\u0101 420 gabalu atlikuma. Paredz\u0113ts, ka iepirktie 200 gabali b\u016bs pieejami izmanto\u0161anai piektdienas r\u012bt\u0101.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Br\u012bdis pl\u0101n\u0101<\/th><th>Vajadz\u012bgais daudzums vai sa\u0146emtais izmantojamais daudzums<\/th><th>Prognoz\u0113tais atlikums<\/th><\/tr><\/thead><tbody><tr><td>Pirmdienas s\u0101kum\u0101<\/td><td>S\u0101kotn\u0113jie izmantojamie kr\u0101jumi<\/td><td>420 gabali<\/td><\/tr><tr><td>Pirmdienas ra\u017eo\u0161anas uzdevums<\/td><td>Vajadz\u012bgi 120 gabali<\/td><td>300 gabali<\/td><\/tr><tr><td>Otrdienas ra\u017eo\u0161anas uzdevums<\/td><td>Vajadz\u012bgi 180 gabali<\/td><td>120 gabali<\/td><\/tr><tr><td>Ceturtdienas ra\u017eo\u0161anas uzdevums<\/td><td>Vajadz\u012bgi 160 gabali<\/td><td>Tr\u016bkst 40 gabalu<\/td><\/tr><tr><td>Piektdienas pieg\u0101de<\/td><td>200 gabali k\u013c\u016bst pieejami izmanto\u0161anai<\/td><td>160 gabali p\u0113c visu nor\u0101d\u012bto vajadz\u012bbu seg\u0161anas<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0145emot v\u0113r\u0101 p\u0113d\u0113j\u0101 laika vid\u0113jo pat\u0113ri\u0146u \u2014 60 gabalu darbdien\u0101 \u2014, \u0161\u0137iet, ka s\u0101kotn\u0113jo kr\u0101jumu pietiek septi\u0146\u0101m darbdien\u0101m. Ta\u010du konkr\u0113tie ra\u017eo\u0161anas uzdevumi atkl\u0101j steidzam\u0101ku probl\u0113mu: ceturtdienas vajadz\u012bbai tr\u016bkst 40 gabalu. Piektdienas pieg\u0101de \u0161o vajadz\u012bbu laikus nenosedz.<\/p>\n\n\n<p>P\u0113d\u0113j\u0101 rind\u0101 redzama pl\u0101no\u0161anas prognoze, nevis apgalvojums, ka materi\u0101lus ra\u017eo\u0161anai var izsniegt no negat\u012bva kr\u0101jumu atlikuma. Taj\u0101 pie\u0146emts, ka ceturtdien nenosegt\u0101 vajadz\u012bba joproj\u0101m b\u016bs j\u0101apmierina. P\u0101rce\u013cot ra\u017eo\u0161anas uzdevumu, attiec\u012bgi j\u0101maina ar\u012b datums, kad tam faktiski vajadz\u012bgi materi\u0101li, un uzdevuma pabeig\u0161anas datums.<\/p>\n\n\n<p>Tagad iepirkumu noda\u013cai var nodot prec\u012bzu un noder\u012bgu uzdevumu: sag\u0101d\u0101t vismaz tr\u016bksto\u0161os 40 izmantojamos gabalus pirms ceturtdienas oper\u0101cijas, kur\u0101 tos pat\u0113r\u0113s, vai vienoties par citu ra\u017eo\u0161anas pl\u0101nu. Fr\u0101ze \u201eMums kr\u0101jumu pietiek septi\u0146\u0101m dien\u0101m\u201d \u0161o steidzam\u012bbu nepar\u0101d\u012btu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pieskaitiet papildin\u0101jumu tad, kad tas k\u013c\u016bst izmantojams<\/h2>\n\n\n<p>Iepirkuma pas\u016bt\u012bjums var nodro\u0161in\u0101t n\u0101kotn\u0113 tr\u016bksto\u0161o daudzumu, bet ne vajadz\u012bgaj\u0101 laik\u0101. P\u0101rbaudiet, vai paredzamais datums apz\u012bm\u0113 kravas iera\u0161anos uz\u0146\u0113mum\u0101, sa\u0146em\u0161anas pabeig\u0161anu vai br\u012bdi, kad materi\u0101lu ir at\u013cauts izmantot ra\u017eo\u0161an\u0101. Pie\u0146em\u0161ana, p\u0101rbaude un iek\u0161\u0113j\u0101 p\u0101rvieto\u0161ana var rad\u012bt laika starp\u012bbu starp \u0161iem notikumiem.<\/p>\n\n\n<p>Kritiskam ra\u017eo\u0161anas uzdevumam pat pl\u0101no\u0161ana pa dien\u0101m var neb\u016bt pietiekami prec\u012bza. Pieg\u0101di, kas gaid\u0101ma v\u0113lu ceturtdien\u0101, nevar izmantot ceturtdienas r\u012bta oper\u0101cij\u0101. Izmantojiet prec\u012bz\u0101ku laika sadal\u012bjumu, ja \u0161\u012b at\u0161\u0137ir\u012bba ietekm\u0113 l\u0113mumu.<\/p>\n\n\n<p>Skaidri nodaliet divus skat\u012bjumus: k\u0101das vajadz\u012bbas sedz tikai pa\u0161reiz\u0113jie izmantojamie kr\u0101jumi un k\u0101das vajadz\u012bbas pl\u0101ns sedz, ieskaitot ticamas gaid\u0101m\u0101s pieg\u0101des. T\u0101 var redz\u0113t gan atkar\u012bbu no kr\u0101jumu papildin\u0101\u0161anas, gan kav\u0113juma sekas.<\/p>\n\n\n<p>Ja vajadz\u012bbas ir segtas vis\u0101 apl\u016bkotaj\u0101 period\u0101, nor\u0101diet: \u201cvajadz\u012bbas segtas l\u012bdz pl\u0101no\u0161anas horizonta beig\u0101m\u201d. Tas nenoz\u012bm\u0113, ka kr\u0101jumu pietiks neierobe\u017eoti ilgi. Ja pat\u0113ri\u0146\u0161 nav paredz\u0113ts, ar\u012b dal\u012b\u0161ana ar nulli nedod j\u0113gpilnu pamatu l\u0113mumam par kr\u0101jumu papildin\u0101\u0161anu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u0101ds kr\u0101jumu segums ir pietiekams?<\/h3>\n\n\n<p>Nav viena m\u0113r\u0137a r\u0101d\u012bt\u0101ja, kas der\u0113tu visiem ra\u017eo\u0161an\u0101 izmantotajiem materi\u0101liem. Vajadz\u012bg\u0101 rezerve ir atkar\u012bga no kr\u0101jumu papildin\u0101\u0161anas laika, sv\u0101rst\u012bb\u0101m, materi\u0101la kritiskuma, der\u012bguma termi\u0146a un tr\u016bkuma sek\u0101m.<\/p>\n\n\n<p>Vispirms ir v\u0113rts p\u0101rbaud\u012bt, vai izmantojamais materi\u0101lu daudzums sedz piepras\u012bjumu l\u012bdz br\u012bdim, kad var\u0113s izmantot n\u0101kamo ticami paredzamo papildin\u0101jumu, saglab\u0101jot kr\u0101jumu politik\u0101 noteikto rezervi. L\u0113ts komponents, kura tr\u016bkums var aptur\u0113t visu mont\u0101\u017eu, var pras\u012bt vair\u0101k uzman\u012bbas nek\u0101 daudz d\u0101rg\u0101ka, bet viegli aizst\u0101jama poz\u012bcija.<\/p>\n\n\n<p>Nep\u0113rciet vair\u0101k katras poz\u012bcijas tikai t\u0101p\u0113c, lai uzlabotu seguma r\u0101d\u012bt\u0101ju. Noskaidrojiet, vai \u0161\u0137ietamo risku rada re\u0101ls pieg\u0101des iztr\u016bkums, nepareizi kr\u0101jumu dati, novecoju\u0161i vajadz\u012bbu dati vai nere\u0101ls materi\u0101la sa\u0146em\u0161anas datums.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izv\u0113lieties r\u012bc\u012bbu, kas pal\u012bdz nodro\u0161in\u0101t ra\u017eo\u0161anu un pieg\u0101des<\/h2>\n\n\n<p>Kad ir zin\u0101ma pirm\u0101 nenosegt\u0101 vajadz\u012bba, izlemiet, k\u0101das izmai\u0146as to nov\u0113rs\u012bs. \u0160aj\u0101 piem\u0113r\u0101 agr\u0101ka da\u013c\u0113ja pieg\u0101de var\u0113tu nov\u0113rst 40 vien\u012bbu iztr\u016bkumu. Cit\u0101s situ\u0101cij\u0101s var b\u016bt vajadz\u012bgs apstiprin\u0101ts alternat\u012bvs materi\u0101ls, cits partijas apjoms vai cita ra\u017eo\u0161anas uzdevumu sec\u012bba.<\/p>\n\n\n<p>Katrs risin\u0101jums ietekm\u0113 ra\u017eo\u0161anu. Alternat\u012bvam materi\u0101lam vajadz\u012bgs atbilsto\u0161s tehniskais apstiprin\u0101jums. Maz\u0101ka partija var pras\u012bt papildu iestat\u012b\u0161anas darbus. P\u0101rce\u013cot citu pas\u016bt\u012bjumu uz agr\u0101ku laiku, iek\u0101rtu var saglab\u0101t noslogotu, ta\u010du vienlaikus var aizkav\u0113t pieg\u0101di klientam, kura materi\u0101lu s\u0101kotn\u0113ji bija pl\u0101nots apstr\u0101d\u0101t \u0161aj\u0101 laika interv\u0101l\u0101.<\/p>\n\n\n<p>T\u0101p\u0113c kr\u0101jumu seguma izv\u0113rt\u0113jumam j\u0101turpin\u0101s ar <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/kas-ir-razosanas-planosana\/\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu<\/a>, nevis j\u0101beidzas ar iepirkuma darb\u012bbu. Pat ja pieg\u0101d\u0101t\u0101js pa\u0101trina tr\u016bksto\u0161o vien\u012bbu pieg\u0101di, paredz\u0113tais iek\u0101rtas laiks jau var b\u016bt aiz\u0146emts un turpm\u0101kos darbus vairs var nepag\u016bt paveikt l\u012bdz nos\u016bt\u012b\u0161anai.<\/p>\n\n\n<p>V\u0113rt\u0113jiet abus jaut\u0101jumus kop\u0101: <strong>vai materi\u0101ls b\u016bs gatavs lieto\u0161anai un vai atliku\u0161os darbus v\u0113l var\u0113s pabeigt laikus?<\/strong> Tas nov\u0113r\u0161 situ\u0101ciju, kur\u0101 atsevi\u0161\u0137i v\u0113rt\u0113ts, sapr\u0101t\u012bgs l\u0113mums par kr\u0101jumiem neman\u0101mi rada citu pieg\u0101des probl\u0113mu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izveidojiet izpild\u0101mu SkyPlanner grafiku, \u0146emot v\u0113r\u0101 materi\u0101lu pieejam\u012bbu<\/h2>\n\n\n<p>SkyPlanner APS grafika apr\u0113\u0137in\u0101 l\u012bdz\u0101s darba centriem, mai\u0146\u0101m, priorit\u0101t\u0113m un oper\u0101ciju savstarp\u0113j\u0101m atkar\u012bb\u0101m \u0146em v\u0113r\u0101 ar\u012b materi\u0101lus un iepirkumu pieg\u0101des. Ja ar noteikumu \u201c\u0145emt v\u0113r\u0101 materi\u0101lus\u201d ir iesp\u0113jota materi\u0101lu pieejam\u012bbas iev\u0113ro\u0161ana, SkyPlanner, pl\u0101nojot ra\u017eo\u0161anas uzdevumus, p\u0101rbauda tiem nor\u0101d\u012bto materi\u0101lu pieejam\u012bbu.<\/p>\n\n\n<p>Ieguvums ir tas, ka l\u0113mums par materi\u0101liem nepaliek tikai atsevi\u0161\u0137\u0101 kr\u0101jumu sarakst\u0101. Arcturus, SkyPlanner m\u0101ksl\u012bgais intelekts ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai, apr\u0113\u0137ina grafiku atbilsto\u0161i ievad\u012btajiem pieejam\u012bbas datiem un konfigur\u0113tajai jaudai. Ganta laika skala par\u0101da ieg\u016bto darbu sec\u012bbu un pal\u012bdz saskat\u012bt ietekmi uz pieg\u0101d\u0113m, nep\u0101rk\u0101rtojot katras iek\u0101rtas darbu rindu manu\u0101li.<\/p>\n\n\n<p>\u0160aj\u0101 pl\u0101n\u0101 iepirkumu datumiem ir praktiska noz\u012bme. SkyPlanner iepirkuma pas\u016bt\u012bjum\u0101 ievad\u012bto pieg\u0101des datumu uzskata par paredzamo materi\u0101la pieejam\u012bbas datumu. Kad materi\u0101ls pien\u0101k, iepirkuma pas\u016bt\u012bjuma apstiprin\u0101\u0161ana status\u0101 \u201cPieg\u0101d\u0101ts\u201d atjaunina kr\u0101jumu datus. T\u0101d\u0113j\u0101di gaid\u0101m\u0101s pieg\u0101des un sa\u0146emtie kr\u0101jumi paliek nodal\u012bti.<\/p>\n\n\n<p>Atgriez\u012bsimies pie ceturtdienas iztr\u016bkuma. Ja materi\u0101la sa\u0146em\u0161ana gaid\u0101ma piektdien, uzturiet \u0161o pieg\u0101des inform\u0101ciju aktu\u0101lu un p\u0101rr\u0113\u0137iniet grafiku. P\u0101rskatiet, kur skartais darbs tagad iek\u013caujas l\u012bdz\u0101s citiem pas\u016bt\u012bjumiem, \u0146emot v\u0113r\u0101 ar\u012b tam sekojo\u0161\u0101s oper\u0101cijas. Ja iepirkumu noda\u013ca nodro\u0161ina agr\u0101ku pieg\u0101di, izv\u0113rt\u0113jiet ieg\u016bto grafiku p\u0113c atjaunin\u0101t\u0101s pieejam\u012bbas, nevis pie\u0146emiet, ka s\u0101kotn\u0113ji sol\u012btais pieg\u0101des termi\u0146\u0161 atkal ir autom\u0101tiski izpild\u0101ms.<\/p>\n\n\n<p>J\u016bs nosak\u0101t priorit\u0101tes, bet Arcturus veic grafika apr\u0113\u0137inu. Tas dod pl\u0101no\u0161anas un iepirkumu komand\u0101m kop\u012bgu pamatu r\u012bc\u012bbas izv\u0113lei un \u013cauj maz\u0101k laika t\u0113r\u0113t kr\u0101jumu sarakstu un atsevi\u0161\u0137u iek\u0101rtu pl\u0101nu saska\u0146o\u0161anai.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kas main\u012bj\u0101s uz\u0146\u0113mum\u0101 Eskomatic<\/h3>\n\n\n<p>Uz\u0146\u0113mum\u0101 Eskomatic, kas veic meh\u0101nisko apstr\u0101di p\u0113c pas\u016bt\u012bjuma, iepriek\u0161\u0113j\u0101 ra\u017eo\u0161anas vad\u012bbas vid\u0113 darbu rindas liel\u0101koties veidoja manu\u0101li, un materi\u0101lu pieejam\u012bbu bija gr\u016bti p\u0101rskat\u012bt. Materi\u0101la tr\u016bkums var\u0113ja atkl\u0101ties \u012bsi pirms pl\u0101not\u0101 ra\u017eo\u0161anas uzdevuma s\u0101kuma, kad r\u012bc\u012bbas iesp\u0113jas jau bija ierobe\u017eotas.<\/p>\n\n\n<p>P\u0113c SkyPlanner ievie\u0161anas vizu\u0101la darbu rinda Gantt diagramm\u0101, automatiz\u0113ta noslodzes pl\u0101no\u0161ana un lab\u0101ka materi\u0101lu tr\u016bkuma p\u0101rskat\u0101m\u012bba padar\u012bja ikdienas pl\u0101no\u0161anu skaidr\u0101ku. <a href=\"https:\/\/skyplanner.ai\/lv\/klientu-stasti\/eskomatic\/\">Eskomatic zi\u0146o<\/a> par ret\u0101kiem ra\u017eo\u0161anas p\u0101rtraukumiem materi\u0101lu tr\u016bkuma d\u0113\u013c un prec\u012bz\u0101ku pieg\u0101des datumu noteik\u0161anu.<\/p>\n\n\n<p>\u0160\u012b pieredze par\u0101da, k\u0101p\u0113c ir svar\u012bgi sasaist\u012bt materi\u0101lu pieejam\u012bbu ar ra\u017eo\u0161anas pl\u0101nu: pl\u0101not\u0101ji var r\u012bkoties, \u0146emot v\u0113r\u0101 tr\u016bkuma ietekmi uz darbu izpildi un klientiem dotajiem sol\u012bjumiem, nevis atkl\u0101t tr\u016bkumu tikai pie iek\u0101rtas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uzziniet, ko materi\u0101la pieg\u0101des kav\u0113jums main\u012btu j\u016bsu ra\u017eotn\u0113<\/h2>\n\n\n<p>SkyPlanner ar atv\u0113rtas REST API pal\u012bdz\u012bbu integr\u0113jas ar jebkuru ERP vai MES sist\u0113mu. Varat sasaist\u012bt eso\u0161os pas\u016bt\u012bjumu un materi\u0101lu datus ar ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu, kur\u0101 \u0146emta v\u0113r\u0101 ierobe\u017eota jauda, nevis uztur\u0113t atsevi\u0161\u0137as darbu rindas un manu\u0101li t\u0101s saska\u0146ot.<\/p>\n\n\n<p>Lai SkyPlanner demonstr\u0101cija b\u016btu m\u0113r\u0137tiec\u012bga, sagatavojiet piem\u0113ru ar vienu svar\u012bgu komponentu, ra\u017eo\u0161anas uzdevumiem, kuros to pat\u0113r\u0113, un nesenu kr\u0101jumu papildin\u0101\u0161anas kav\u0113jumu. L\u016bdziet par\u0101d\u012bt, k\u0101 ievad\u012btais pieg\u0101des datums ietekm\u0113 kop\u0113jo grafiku un pieg\u0101des datumus klientiem. Tas ir praktisks veids, k\u0101 nov\u0113rt\u0113t ieguvumu, kas sniedzas t\u0101l\u0101k par kr\u0101jumu seguma r\u0101d\u012bt\u0101ju.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Piesakieties SkyPlanner demonstr\u0101cijai<\/a>, lai izskat\u012btu situ\u0101ciju sav\u0101 ra\u017eotn\u0113, vai <a href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a>, lai vispirms iepaz\u012btu grafiku sast\u0101d\u012b\u0161anas darbpl\u016bsmu.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks? S\u0101kums &raquo; Resursi &raquo; Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks? Kr\u0101jumu p\u0101rskats r\u0101da, ka komponentu pietiks septi\u0146\u0101m darbdien\u0101m. N\u0101kam\u0101 pieg\u0101de gaid\u0101ma piektdien. Tom\u0113r ceturtdienas ra\u017eo\u0161anas pas\u016bt\u012bjumu nevar s\u0101kt, jo tam nepietiek komponentu. Pretrunas te nav: kr\u0101jumi septi\u0146\u0101m dien\u0101m p\u0113c vid\u0113j\u0101 pat\u0113ri\u0146a v\u0113l nenoz\u012bm\u0113, ka pietiks materi\u0101lu faktiskajiem ra\u017eotnes pas\u016bt\u012bjumiem. &#8230; <a title=\"Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/\" aria-label=\"Read more about Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111252,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-111231","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?<\/title>\n<meta name=\"description\" content=\"Atkl\u0101jiet pirmo iztr\u016bkumu pirms ra\u017eo\u0161anas apst\u0101\u0161an\u0101s. Apr\u0113\u0137iniet kr\u0101jumu segumu gaid\u0101majiem darbiem un sasaistiet materi\u0101lu pieejam\u012bbu ar SkyPlanner grafiku.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?\" \/>\n<meta property=\"og:description\" content=\"Atkl\u0101jiet pirmo iztr\u016bkumu pirms ra\u017eo\u0161anas apst\u0101\u0161an\u0101s. Apr\u0113\u0137iniet kr\u0101jumu segumu gaid\u0101majiem darbiem un sasaistiet materi\u0101lu pieejam\u012bbu ar SkyPlanner grafiku.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T16:31:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T16:32:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/krajumu-segums\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/krajumu-segums\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:32:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/krajumu-segums\\\/\"},\"wordCount\":2933,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/krajumu-segums\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/krajumu-segums\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/krajumu-segums\\\/\",\"name\":\"Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/krajumu-segums\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/krajumu-segums\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:32:15+00:00\",\"description\":\"Atkl\u0101jiet pirmo iztr\u016bkumu pirms ra\u017eo\u0161anas apst\u0101\u0161an\u0101s. Apr\u0113\u0137iniet kr\u0101jumu segumu gaid\u0101majiem darbiem un sasaistiet materi\u0101lu pieejam\u012bbu ar SkyPlanner grafiku.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/krajumu-segums\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/krajumu-segums\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/krajumu-segums\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/krajumu-segums\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?","description":"Atkl\u0101jiet pirmo iztr\u016bkumu pirms ra\u017eo\u0161anas apst\u0101\u0161an\u0101s. Apr\u0113\u0137iniet kr\u0101jumu segumu gaid\u0101majiem darbiem un sasaistiet materi\u0101lu pieejam\u012bbu ar SkyPlanner grafiku.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/","og_locale":"lv_LV","og_type":"article","og_title":"Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?","og_description":"Atkl\u0101jiet pirmo iztr\u016bkumu pirms ra\u017eo\u0161anas apst\u0101\u0161an\u0101s. Apr\u0113\u0137iniet kr\u0101jumu segumu gaid\u0101majiem darbiem un sasaistiet materi\u0101lu pieejam\u012bbu ar SkyPlanner grafiku.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T16:31:21+00:00","article_modified_time":"2026-10-27T16:32:15+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:32:15+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/"},"wordCount":2933,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/","name":"Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:32:15+00:00","description":"Atkl\u0101jiet pirmo iztr\u016bkumu pirms ra\u017eo\u0161anas apst\u0101\u0161an\u0101s. Apr\u0113\u0137iniet kr\u0101jumu segumu gaid\u0101majiem darbiem un sasaistiet materi\u0101lu pieejam\u012bbu ar SkyPlanner grafiku.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","width":1672,"height":941,"caption":"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-segums\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks? S\u0101kums &raquo; Resursi &raquo; Kr\u0101jumu segums ra\u017eo\u0161an\u0101: vai kr\u0101jumu pietiks? Kr\u0101jumu p\u0101rskats r\u0101da, ka komponentu pietiks septi\u0146\u0101m darbdien\u0101m. N\u0101kam\u0101 pieg\u0101de gaid\u0101ma piektdien. Tom\u0113r ceturtdienas ra\u017eo\u0161anas pas\u016bt\u012bjumu nevar s\u0101kt, jo tam nepietiek komponentu. Pretrunas te nav: kr\u0101jumi septi\u0146\u0101m dien\u0101m p\u0113c vid\u0113j\u0101 pat\u0113ri\u0146a v\u0113l nenoz\u012bm\u0113, ka pietiks materi\u0101lu faktiskajiem ra\u017eotnes pas\u016bt\u012bjumiem.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/111231","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=111231"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/111231\/revisions"}],"predecessor-version":[{"id":111295,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/111231\/revisions\/111295"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/111252"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=111231"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=111231"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=111231"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}