{"id":110955,"date":"2026-10-27T10:47:38","date_gmt":"2026-10-27T10:47:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110955"},"modified":"2026-10-27T10:48:31","modified_gmt":"2026-10-27T10:48:31","slug":"piegadataju-darbibas-raditaji","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/","title":{"rendered":"Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Resursi<\/a> &raquo; Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Pieg\u0101d\u0101t\u0101ja m\u0113ne\u0161a v\u0113rt\u0113jums var \u0161\u0137ist iepriecino\u0161s, kam\u0113r viena tr\u016bksto\u0161a deta\u013ca aizkav\u0113 j\u016bsu steidzam\u0101ko pas\u016bt\u012bjumu. Iepirkumu noda\u013ca redz pie\u0146emamu vid\u0113jo rezult\u0101tu. Ra\u017eo\u0161an\u0101 tikm\u0113r st\u0101v iek\u0101rta, mont\u0101\u017eu nevar pabeigt un klientam dotais sol\u012bjums ir apdraud\u0113ts.<\/p>\n\n\n<p>P\u0101rdom\u0101ti pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji pal\u012bdz ab\u0101m komand\u0101m pie\u0146emt lab\u0101kus l\u0113mumus. Tie par\u0101da, vai pieg\u0101d\u0101t\u0101ji pilda savas saist\u012bbas, kur rezult\u0101ti pasliktin\u0101s un kuras probl\u0113mas j\u0101risina. Ta\u010du skait\u013ciem j\u0101b\u016bt apr\u0113\u0137in\u0101tiem p\u0113c skaidriem, vienotiem principiem, un uz pa\u0161reiz\u0113jo materi\u0101lu tr\u016bkumu j\u0101rea\u0123\u0113 jau pirms n\u0101kam\u0101s v\u0113rt\u0113\u0161anas kartes p\u0101rskat\u012b\u0161anas.<\/p>\n\n\n<p>Tie\u0161i \u0161eit m\u0113r\u012bjumi sasaist\u0101s ar ra\u017eo\u0161anas pl\u0101no\u0161anu. Izmantojiet v\u0113rt\u0113\u0161anas karti, lai uzlabotu pieg\u0101d\u0101t\u0101ju sniegumu, bet SkyPlanner APS \u2014 lai p\u0113c atjaunin\u0101t\u0101s inform\u0101cijas par materi\u0101lu pieejam\u012bbu izveidotu ra\u017eo\u0161anas pl\u0101nu, kur\u0101 \u0146emti v\u0113r\u0101 ar\u012b p\u0101r\u0113jie pas\u016bt\u012bjumi. J\u016bs maz\u0101k laika pavad\u0101t, labojot atsevi\u0161\u0137u iek\u0101rtu darbu rindas, un agr\u0101k redzat, k\u0101 izmai\u0146as ietekm\u0113s pieg\u0101des.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas ir pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji?<\/h2>\n\n\n<p>Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji par\u0101da, cik labi pieg\u0101d\u0101t\u0101js izpilda saska\u0146ot\u0101s pras\u012bbas attiec\u012bb\u0101 uz pieg\u0101di, kvalit\u0101ti, izmaks\u0101m un apkalpo\u0161anu. Pieg\u0101d\u0101t\u0101ja v\u0113rt\u0113\u0161anas kart\u0113 apkopoti atlas\u012bti r\u0101d\u012bt\u0101ji, lai iepirkumu noda\u013ca var\u0113tu konsekventi izv\u0113rt\u0113t sniegumu un vienoties par uzlabojumiem.<\/p>\n\n\n<p>Ra\u017eot\u0101jiem visnoder\u012bg\u0101kie ir r\u0101d\u012bt\u0101ji, kas atbild uz praktiskiem jaut\u0101jumiem: vai vajadz\u012bgais daudzums pien\u0101ca norun\u0101taj\u0101 laik\u0101, vai to dr\u012bkst\u0113ja izmantot ra\u017eo\u0161an\u0101, vai var\u0113ja pa\u013cauties uz sol\u012bto pas\u016bt\u012bjuma izpildes laiku un cik efekt\u012bvi pieg\u0101d\u0101t\u0101js rea\u0123\u0113ja uz izmai\u0146\u0101m?<\/p>\n\n\n<p>\u0160ie r\u0101d\u012bt\u0101ji attiecas uz ien\u0101ko\u0161aj\u0101m pieg\u0101d\u0113m. Tie at\u0161\u0137iras no <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/savlaiciga-piegade\/\">j\u016bsu r\u016bpn\u012bcas savlaic\u012bgas pieg\u0101des saviem klientiem<\/a>, lai gan probl\u0113mas ar ien\u0101ko\u0161aj\u0101m pieg\u0101d\u0113m var ietekm\u0113t ar\u012b \u0161o rezult\u0101tu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u0101ciet ar r\u0101d\u012bt\u0101jiem, kas ietekm\u0113 l\u0113mumus<\/h2>\n\n\n<p>Izv\u0113lieties nelielu r\u0101d\u012bt\u0101ju kopumu, kas atspogu\u013co, k\u0101 pieg\u0101d\u0101t\u0101js var trauc\u0113t j\u016bsu darbu. T\u0101l\u0101k min\u0113tie r\u0101d\u012bt\u0101ji ir noder\u012bgs s\u0101kumpunkts gan iepirkumu noda\u013cai, gan ra\u017eo\u0161anai.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>R\u0101d\u012bt\u0101js<\/th><th>Skaidrs apr\u0113\u0137ina pamats<\/th><th>K\u0101du l\u0113mumu tas pal\u012bdz pie\u0146emt<\/th><\/tr><\/thead><tbody><tr><td>Pieg\u0101d\u0101t\u0101ja savlaic\u012bga pieg\u0101de<\/td><td>Pieg\u0101des rindas, kas izpild\u012btas saska\u0146otaj\u0101 laika interv\u0101l\u0101 \u00f7 pieg\u0101des rindas, kuru termi\u0146\u0161 ir attiec\u012bgaj\u0101 period\u0101 \u00d7 100<\/td><td>Kuri pieg\u0101d\u0101t\u0101ji atk\u0101rtoti nepilda saist\u012bbas?<\/td><\/tr><tr><td>Savlaic\u012bga pieg\u0101de piln\u0101 apjom\u0101<\/td><td>Pieg\u0101des rindas, kuru viss vajadz\u012bgais daudzums sa\u0146emts noteiktaj\u0101 laika interv\u0101l\u0101 \u00f7 pieg\u0101des rindas, kuru termi\u0146\u0161 ir attiec\u012bgaj\u0101 period\u0101 \u00d7 100<\/td><td>Vai ar sol\u012bto daudzumu pietiek pl\u0101notajam darbam?<\/td><\/tr><tr><td>Sa\u0146emto materi\u0101lu kvalit\u0101te<\/td><td>Noraid\u012bt\u0101s vien\u012bbas \u00f7 sa\u0146emt\u0101s vien\u012bbas \u00d7 100, atsevi\u0161\u0137i nor\u0101dot v\u0113l nenov\u0113rt\u0113tos materi\u0101lus<\/td><td>Vai sa\u0146emtie materi\u0101li ir der\u012bgi ra\u017eo\u0161anai?<\/td><\/tr><tr><td>Faktiskais pas\u016bt\u012bjuma izpildes laiks un t\u0101 sv\u0101rst\u012bbas<\/td><td>Laiks no saska\u0146ot\u0101 pas\u016bt\u012bjuma nodo\u0161anas izpildei br\u012b\u017ea l\u012bdz sa\u0146em\u0161anai, visos gad\u012bjumos izmantojot vien\u0101du kalend\u0101ro uzskaiti<\/td><td>Cik savlaic\u012bgi \u0161ie materi\u0101li paties\u012bb\u0101 j\u0101pas\u016bta?<\/td><\/tr><tr><td>Reakcija uz novirz\u0113m<\/td><td>Laiks no noteikt\u0101 pazi\u0146ojuma par novirzi l\u012bdz atbildei ar risin\u0101jumu, p\u0113c kura var r\u012bkoties<\/td><td>Vai pl\u0101not\u0101ji var laikus izlemt, k\u0101 nov\u0113rst trauc\u0113jumus?<\/td><\/tr><tr><td>Pieg\u0101d\u0101t\u0101ja izrais\u012bto trauc\u0113jumu izmaksas<\/td><td>Uzskait\u012bt\u0101s papildu transporta, \u0161\u0137iro\u0161anas, izstr\u0101d\u0101jumu labo\u0161anas un citas attiecin\u0101m\u0101s izmaksas saska\u0146\u0101 ar saska\u0146otajiem noteikumiem<\/td><td>Vai aiz iepirkuma cenas nesl\u0113pjas d\u0101rga pieg\u0101des probl\u0113ma?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0160\u012bs ir ieteicam\u0101s defin\u012bcijas, nevis univers\u0101li v\u0113rt\u0113\u0161anas noteikumi. Vienojieties par apr\u0113\u0137inu pamatu ar datu atbild\u012bgajiem un inform\u0113jiet par to pieg\u0101d\u0101t\u0101jus. Pievienojiet atbilst\u012bbas, sertifik\u0101cijas vai citus konkr\u0113tajai materi\u0101lu kategorijai svar\u012bgus r\u0101d\u012bt\u0101jus, ja tie ietekm\u0113 pieg\u0101d\u0101t\u0101ja apstiprin\u0101\u0161anu vai to, kurus materi\u0101lus dr\u012bkstat izmantot.<\/p>\n\n\n<p>Kritiskai neatbilst\u012bbai apstiprin\u0101\u0161anas pras\u012bb\u0101m j\u0101paliek skaidri redzamai atsevi\u0161\u0137i. Zema cena nedr\u012bkst vid\u0113j\u0101 v\u0113rt\u0113jum\u0101 nosl\u0113pt t\u0101das pras\u012bbas neizpildi, kuras d\u0113\u013c materi\u0101ls nav pie\u0146emams.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pirms sal\u012bdzin\u0101t pieg\u0101d\u0101t\u0101jus, nosakiet uzskaites vien\u012bbu un datumu<\/h2>\n\n\n<p>Savlaic\u012bgo pieg\u0101\u017eu \u012bpatsvars maz ko pasaka, kam\u0113r nav skaidrs, ko skaita k\u0101 vienu pieg\u0101di. Iepirkuma pas\u016bt\u012bjum\u0101 var b\u016bt vair\u0101kas rindas ar da\u017e\u0101diem termi\u0146iem un da\u013c\u0113j\u0101m pieg\u0101d\u0113m. Skaitot veselus pas\u016bt\u012bjumus, rezult\u0101ts at\u0161\u0137irsies no t\u0101, ko ieg\u016bst, skaitot katru pl\u0101noto pieg\u0101des rindu vai katru faktisko sa\u0146em\u0161anu.<\/p>\n\n\n<p>Praktiskai ra\u017eo\u0161anas uz\u0146\u0113muma v\u0113rt\u0113\u0161anas kartei par uzskaites vien\u012bbu bie\u017ei der pl\u0101not\u0101 pieg\u0101des rinda: viena deta\u013ca, daudzums un pieg\u0101des termi\u0146\u0161. Saglab\u0101jiet \u0161o vien\u012bbu ar\u012b tad, ja pieg\u0101d\u0101t\u0101js s\u016bt\u012bjumu sadala. Pret\u0113j\u0101 gad\u012bjum\u0101 vair\u0101ki nelieli sa\u0146emtie s\u016bt\u012bjumi var rad\u012bt iespaidu par vair\u0101k\u0101m veiksm\u012bg\u0101m pieg\u0101d\u0113m, lai gan viena saist\u012bba joproj\u0101m nav piln\u012bb\u0101 izpild\u012bta.<\/p>\n\n\n<p>No\u0161\u0137iriet \u0161\u0101dus datumus:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Piepras\u012btais datums nor\u0101da, kad j\u016bsu uz\u0146\u0113mumam materi\u0101ls bija vajadz\u012bgs.<\/li><li>S\u0101kotn\u0113ji apstiprin\u0101tais datums fiks\u0113 pieg\u0101d\u0101t\u0101ja uz\u0146emt\u0101s saist\u012bbas.<\/li><li>P\u0113d\u0113jais apstiprin\u0101tais datums ir pa\u0161reiz\u0113jais sol\u012btais termi\u0146\u0161, ko izmanto, pl\u0101nojot trauc\u0113jumu nov\u0113r\u0161anu.<\/li><li>Faktiskais sa\u0146em\u0161anas datums fiks\u0113 iera\u0161anos norun\u0101taj\u0101 sa\u0146em\u0161anas viet\u0101.<\/li><li>Datums, no kura materi\u0101lu dr\u012bkst izmantot, nor\u0101da, kad vajadz\u012bgo materi\u0101lu var nodot ra\u017eo\u0161an\u0101 p\u0113c visu nepiecie\u0161amo at\u013cauju sa\u0146em\u0161anas.<\/li><\/ul>\n\n\n<p>V\u0113rt\u0113jiet, cik uzticami pieg\u0101d\u0101t\u0101js pilda saist\u012bbas, sal\u012bdzinot faktisko izpildi ar saglab\u0101tu atskaites punktu, piem\u0113ram, s\u0101kotn\u0113ji apstiprin\u0101to datumu. Ja tas ir svar\u012bgi, atsevi\u0161\u0137i sekojiet ar\u012b piepras\u012bt\u0101 datuma iev\u0113ro\u0161anai: pieg\u0101d\u0101t\u0101js var tur\u0113t sol\u012bjumu, bet apstiprin\u0101tais datums jau s\u0101kotn\u0113ji var b\u016bt par v\u0113lu j\u016bsu vajadz\u012bb\u0101m. Ikreiz, kad sol\u012bjums main\u0101s, nep\u0101rrakstiet atskaites datumu bez paskaidrojuma. Ja termi\u0146\u0161 saska\u0146oti p\u0101rcelts p\u0113c klienta iniciat\u012bvas, j\u0101fiks\u0113 iemesls un skaidri j\u0101nosaka, k\u0101 to \u0146ems v\u0113r\u0101 v\u0113rt\u0113\u0161anas kart\u0113.<\/p>\n\n\n<p>Savuk\u0101rt ra\u017eo\u0161anai vajadz\u012bga visuzticam\u0101k\u0101 aktu\u0101l\u0101 inform\u0101cija par pieejam\u012bbu. S\u0101kotn\u0113jais sol\u012bjums pal\u012bdz izskaidrot neizpildi, bet jaun\u0101kais ticamais materi\u0101lu pieejam\u012bbas datums pal\u012bdz izlemt, ko ra\u017eot t\u0101l\u0101k.<\/p>\n\n\n<p>Nosakiet ar\u012b pie\u013caujamo pieg\u0101des laika interv\u0101lu. P\u0101ragra pieg\u0101de var rad\u012bt p\u0101rkrau\u0161anas un uzglab\u0101\u0161anas probl\u0113mas, t\u0101p\u0113c \u00absavlaic\u012bgi\u00bb autom\u0101tiski nenoz\u012bm\u0113 jebkur\u0101 br\u012bd\u012b pirms termi\u0146a. Izv\u0113lieties pie\u013caujam\u0101s novirzes atbilsto\u0161i materi\u0101lam un sa\u0146em\u0161anas k\u0101rt\u012bbai, nevis p\u0101r\u0146emiet k\u0101du it k\u0101 standarta procentu vai dienu skaitu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V\u0113rt\u0113jiet pieg\u0101di kop\u0101 ar kvalit\u0101ti<\/h2>\n\n\n<p>Savlaic\u012bgas pieg\u0101des r\u0101d\u012bt\u0101js par\u0101da, vai pieg\u0101de atbilda noteiktajiem laika krit\u0113rijiem. Tas ne vienm\u0113r par\u0101da, vai pien\u0101ca pietiekams daudzums ra\u017eo\u0161an\u0101 izmantojama materi\u0101la.<\/p>\n\n\n<p>V\u0113rt\u0113jot savlaic\u012bgu pieg\u0101di piln\u0101 apjom\u0101, vienai un tai pa\u0161ai pieg\u0101dei j\u0101atbilst gan termi\u0146a, gan apsol\u012bt\u0101 daudzuma pras\u012bbai. Atsevi\u0161\u0137i nor\u0101diet, vai materi\u0101ls ir pie\u0146emts k\u0101 kvalit\u0101tes pras\u012bb\u0101m atbilsto\u0161s, vai skaidri defin\u0113jiet apvienotu r\u0101d\u012bt\u0101ju, kas ietver ar\u012b \u0161o nosac\u012bjumu. OTD, OTIF un materi\u0101la pie\u0146em\u0161ana p\u0113c kvalit\u0101tes nov\u0113rt\u0113\u0161anas nav savstarp\u0113ji aizst\u0101jami apz\u012bm\u0113jumi.<\/p>\n\n\n<p>Iedom\u0101jieties pieg\u0101des rindu ar 100 deta\u013c\u0101m. Asto\u0146desmit pien\u0101k saska\u0146otaj\u0101 laika interv\u0101l\u0101, bet atliku\u0161\u0101s 20 \u2014 ar kav\u0113jumu. Ja v\u0113rt\u0113 visu rindu, t\u0101 neatbilst pras\u012bbai par savlaic\u012bgu pieg\u0101di piln\u0101 apjom\u0101. Ar 80 deta\u013c\u0101m, iesp\u0113jams, pietiktu maz\u0101kai ra\u017eo\u0161anas partijai, ta\u010du tas ir ra\u017eo\u0161anas pl\u0101no\u0161anas l\u0113mums, nevis pamats atz\u012bm\u0113t s\u0101kotn\u0113jo saist\u012bbu k\u0101 piln\u012bb\u0101 izpild\u012btu.<\/p>\n\n\n<p>Tikpat r\u016bp\u012bgi j\u0101v\u0113rt\u0113 sa\u0146emto materi\u0101lu kvalit\u0101te. Noraid\u012bto vien\u012bbu \u012bpatsvars m\u0113ra ko citu nek\u0101 to pieg\u0101\u017eu \u012bpatsvars, par kur\u0101m iesniegta pretenzija. Gan vienai noraid\u012btai deta\u013cai, gan piln\u012bb\u0101 neder\u012bgai partijai j\u0101b\u016bt redzamai, nevis j\u0101pasl\u0113pjas aiz nedefin\u0113ta \u00abkvalit\u0101tes v\u0113rt\u0113juma\u00bb. Ja konkr\u0113tajai kategorijai noder r\u0101d\u012bt\u0101js uz miljonu, tas izsaka noraid\u012bto vien\u012bbu skaitu uz miljonu sa\u0146emto vien\u012bbu; iev\u0113rojiet vien\u0101das m\u0113rvien\u012bbas un p\u0101rbaudes aptv\u0113rumu.<\/p>\n\n\n<p>Materi\u0101ls, kas gaida p\u0101rbaudi, nav autom\u0101tiski ne pie\u0146emts, ne noraid\u012bts. Par\u0101diet v\u0113l nepie\u0146emtos l\u0113mumus, lai \u0161\u0137ietami labs kvalit\u0101tes rezult\u0101ts neizr\u0101d\u012btos tikai nepabeigtu p\u0101rbau\u017eu sekas. Ra\u017eo\u0161anas vajadz\u012bb\u0101m noskaidrojiet, kad nepiecie\u0161amo daudzumu patie\u0161\u0101m dr\u012bkst\u0113s izmantot, nevis tikai to, kad pie v\u0101rtiem gaid\u0101ma kravas automa\u0161\u012bna.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Neatst\u0101jiet nesa\u0146emt\u0101s pieg\u0101des \u0101rpus v\u0113rt\u0113juma<\/h2>\n\n\n<p>Sauc\u0113js var nosl\u0113pt tie\u0161i to probl\u0113mu, kuru cen\u0161aties risin\u0101t. Ja skait\u0101t tikai m\u0113ne\u0161a laik\u0101 sa\u0146emt\u0101s pieg\u0101des, s\u016bt\u012bjums, kas t\u0101 ar\u012b nepien\u0101ca, var visp\u0101r neiek\u013c\u016bt apr\u0113\u0137in\u0101.<\/p>\n\n\n<p>Pie\u0146emsim, ka m\u0113nes\u012b bija j\u0101izpilda 20 pieg\u0101des rindas. L\u012bdz m\u0113ne\u0161a beig\u0101m tika sa\u0146emtas asto\u0146padsmit, un 16 no t\u0101m atbilda saska\u0146otajam laika interv\u0101lam. Atliku\u0161\u0101s divas joproj\u0101m nebija sa\u0146emtas.<\/p>\n\n\n<p>Ja apr\u0113\u0137in\u0101 iek\u013cauj visas pieg\u0101des poz\u012bcijas, kuru termi\u0146\u0161 iest\u0101jies attiec\u012bgaj\u0101 period\u0101, pieg\u0101d\u0101t\u0101ja OTD ir <strong>16 \u00f7 20 \u00d7 100 = 80%<\/strong>. Iek\u013caujot tikai sa\u0146emt\u0101s poz\u012bcijas, rezult\u0101ts b\u016btu <strong>16 \u00f7 18 \u00d7 100 = 88,9%<\/strong>, noapa\u013cojot l\u012bdz vienai z\u012bmei aiz komata. Abi apr\u0113\u0137ini var raksturot noteiktu poz\u012bciju kopu, ta\u010du tie atbild uz at\u0161\u0137ir\u012bgiem jaut\u0101jumiem. R\u0101d\u012bt\u0101js, kas balst\u012bts tikai uz sa\u0146emtaj\u0101m poz\u012bcij\u0101m, neatkl\u0101j, cik uzticami pieg\u0101d\u0101t\u0101js izpild\u012bjis visas saist\u012bbas, kuru termi\u0146\u0161 bija attiec\u012bgaj\u0101 m\u0113nes\u012b.<\/p>\n\n\n<p>Neizsl\u0113dziet no p\u0101rskata kav\u0113t\u0101s, v\u0113l neizpild\u012bt\u0101s poz\u012bcijas; nor\u0101diet ar\u012b kav\u0113juma ilgumu un attiec\u012bgo materi\u0101lu. Atceltiem pas\u016bt\u012bjumiem, izmai\u0146\u0101m un p\u0101rskata periodu robe\u017e\u0101m piem\u0113rojiet dokument\u0113tu noteikumu. Visiem sal\u012bdzin\u0101majiem pieg\u0101d\u0101t\u0101jiem izmantojiet vienu un to pa\u0161u noteikumu un saglab\u0101jiet poz\u012bciju s\u0101kotn\u0113jos ierakstus, lai apstr\u012bd\u0113ta rezult\u0101ta gad\u012bjum\u0101 var\u0113tu izsekot t\u0101 apr\u0113\u0137inam.<\/p>\n\n\n<p>L\u012bdz\u0101s procentu\u0101lajam r\u0101d\u012bt\u0101jam nor\u0101diet ar\u012b v\u0113rt\u0113to pieg\u0101des poz\u012bciju skaitu. Viena neizpild\u012bta saist\u012bba starp da\u017e\u0101m pieg\u0101d\u0113m ir v\u0113rt\u0113jama cit\u0101di nek\u0101 ilgsto\u0161a probl\u0113ma simtiem pieg\u0101\u017eu. Sal\u012bdziniet l\u012bdz\u012bgas materi\u0101lu kategorijas un pieg\u0101des nosac\u012bjumus, nevis sarindojiet visus pieg\u0101d\u0101t\u0101jus t\u0101, it k\u0101 tiem b\u016btu vien\u0101ds uzdevums.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V\u0113rt\u0113jiet, cik dro\u0161i var pa\u013cauties uz pas\u016bt\u012bjuma izpildes laiku, k\u0101 pieg\u0101d\u0101t\u0101js rea\u0123\u0113 un k\u0101das ir faktisk\u0101s izmaksas<\/h2>\n\n\n<p>\u012ass sol\u012btais pas\u016bt\u012bjuma izpildes laiks ir pievilc\u012bgs, ta\u010du ra\u017eo\u0161anas pl\u0101ns ir atkar\u012bgs no t\u0101, kas notiek praks\u0113. Nosakiet, no kura notikuma s\u0101ksiet laika uzskaiti, piem\u0113ram, no piln\u012bb\u0101 noform\u0113ta iepirkuma pas\u016bt\u012bjuma nos\u016bt\u012b\u0161anas, un m\u0113riet laiku l\u012bdz sa\u0146em\u0161anai, konsekventi izmantojot vai nu kalend\u0101r\u0101s dienas, vai darbdienas. V\u0113rt\u0113jiet ne tikai vid\u0113jo laiku, bet ar\u012b izkliedi: stabila pieg\u0101\u017eu norise nav tas pats, kas p\u0101rmai\u0146us \u013coti agras un \u013coti v\u0113las pieg\u0101des.<\/p>\n\n\n<p>Sol\u012bto pas\u016bt\u012bjuma izpildes laiku uzskaitiet atsevi\u0161\u0137i no faktisk\u0101. Atk\u0101rtota sol\u012bt\u0101 termi\u0146a pagarin\u0101\u0161ana nedr\u012bkst rad\u012bt iespaidu, ka faktisk\u0101s pieg\u0101des k\u013cuvu\u0161as uzticam\u0101kas. Ja transport\u0113\u0161ana un ien\u0101ko\u0161\u0101 kvalit\u0101tes kontrole paildzina laiku l\u012bdz materi\u0101la izmanto\u0161anai ra\u017eo\u0161an\u0101, nor\u0101diet ar\u012b \u0161os laika interv\u0101lus, nevis pie\u0146emiet, ka sa\u0146emts materi\u0101ls jau ir gatavs lieto\u0161anai.<\/p>\n\n\n<p>Lai v\u0113rt\u0113tu rea\u0123\u0113\u0161anu, nosakiet, kas uzskat\u0101ms par noder\u012bgu atbildi. Pazi\u0146ojums \u00abm\u0113s p\u0101rbaud\u0101m\u00bb nav tas pats, kas atbilde par pieg\u0101des atjauno\u0161anu ar ticamu daudzumu un datumu. M\u0113riet laiku l\u012bdz \u0161\u0101dai atbildei un sekojiet, vai saska\u0146ot\u0101s korekt\u012bv\u0101s darb\u012bbas tiek izpild\u012btas un ir iedarb\u012bgas. Iepirkumu speci\u0101listiem vajadz\u012bgs pamats r\u012bc\u012bbai, nevis tikai apliecin\u0101jums, ka uz e-pastu ir atbild\u0113ts.<\/p>\n\n\n<p>Izmaksu r\u0101d\u012bt\u0101jiem j\u0101pal\u012bdz skaidr\u0101k izv\u0113rt\u0113t da\u017e\u0101du risin\u0101jumu priek\u0161roc\u012bbas un tr\u016bkumus. Konsekventi uzskaitiet papildu transport\u0113\u0161anas, \u0161\u0137iro\u0161anas, izstr\u0101d\u0101jumu labo\u0161anas un citas ar trauc\u0113jumiem saist\u012bt\u0101s izmaksas, no\u0161\u0137irot pieg\u0101d\u0101t\u0101ja izrais\u012bt\u0101s probl\u0113mas no j\u016bsu uz\u0146\u0113muma ierosin\u0101t\u0101m izmai\u0146\u0101m. V\u0113rt\u0113jiet \u0161\u012bs izmaksas l\u012bdz\u0101s cenai. L\u0113t\u0101ka deta\u013ca var izr\u0101d\u012bties d\u0101rg\u0101ka izv\u0113le, ja katra pieg\u0101de prasa steidzamus pas\u0101kumus situ\u0101cijas labo\u0161anai.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izveidojiet nov\u0113rt\u0113juma karti, kas pal\u012bdz r\u012bkoties<\/h2>\n\n\n<p>Noder\u012bg\u0101 pieg\u0101d\u0101t\u0101ja nov\u0113rt\u0113juma kart\u0113 katram izv\u0113l\u0113tajam r\u0101d\u012bt\u0101jam nor\u0101da pa\u0161reiz\u0113jo rezult\u0101tu, m\u0113r\u0137i, tendenci un v\u0113rt\u0113to gad\u012bjumu skaitu. Taj\u0101 nor\u0101da ar\u012b probl\u0113mu apliecino\u0161os datus, par n\u0101kamo darb\u012bbu atbild\u012bgo personu un datumu, kad p\u0101rskat\u012bs progresu.<\/p>\n\n\n<p>Nosakiet robe\u017ev\u0113rt\u012bbas atbilsto\u0161i kategorijai un ra\u017eo\u0161anas riskam. Ja tr\u016bkst l\u0113tas deta\u013cas, ko pieg\u0101d\u0101 tikai viens pieg\u0101d\u0101t\u0101js, mont\u0101\u017ea var apst\u0101ties; pie \u0161\u012b pieg\u0101d\u0101t\u0101ja veikto iepirkumu v\u0113rt\u012bba nav uzticams \u0161\u0101da riska m\u0113rs. Ja izmantojat sv\u0113rtu kop\u0113jo v\u0113rt\u0113jumu, saglab\u0101jiet redzamus ar\u012b atsevi\u0161\u0137os r\u0101d\u012bt\u0101jus un nosakiet kritisk\u0101s neatbilst\u012bbas, kuru gad\u012bjum\u0101 j\u0101r\u012bkojas neatkar\u012bgi no vid\u0113j\u0101 v\u0113rt\u0113juma.<\/p>\n\n\n<p>Vienojieties par regul\u0101ru p\u0101rrunu grafiku pieg\u0101d\u0101t\u0101ju darb\u012bbas pilnveido\u0161anai, vair\u0101k uzman\u012bbas veltot tiem, kuru risks vai rezult\u0101tu pasliktin\u0101\u0161an\u0101s to prasa. P\u0101rrun\u0101s nosakiet atk\u0101rtotu probl\u0113mu c\u0113lo\u0146us un vienojieties par konkr\u0113tu uzlabojumu, piem\u0113ram, agr\u0101ku pazi\u0146o\u0161anu par nenotiku\u0161u nos\u016bt\u012b\u0161anu, p\u0101rskat\u012btu apstiprin\u0101\u0161anas procesu vai korekt\u012bvu darb\u012bbu atk\u0101rtotu defektu nov\u0113r\u0161anai.<\/p>\n\n\n<p>Negaidiet \u0161\u012bs p\u0101rrunas, lai risin\u0101tu pa\u0161reiz\u0113ju materi\u0101lu tr\u016bkumu. Nov\u0113rt\u0113juma karte izskaidro tendenci. Ra\u017eo\u0161anai jau tagad vajadz\u012bgs l\u0113mums par to, k\u0101 nov\u0113rst trauc\u0113jumu sekas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Piel\u0101gojiet ra\u017eo\u0161anas grafiku pieg\u0101des novirzei<\/h2>\n\n\n<p>Ja pieg\u0101de main\u0101s, vispirms noskaidrojiet, kuru deta\u013cu un daudzumu izmai\u0146as skar un k\u0101ds ir ticams pieejam\u012bbas datums. P\u0101rbaudiet, kuri ra\u017eo\u0161anas pas\u016bt\u012bjumi no t\u0101s ir atkar\u012bgi un vai pie\u0146emtais da\u013c\u0113jais daudzums \u013cauj turpin\u0101t da\u013cu darbu. P\u0113c tam saska\u0146ojiet \u0161os ra\u017eo\u0161anas uzdevumus ar p\u0101r\u0113jo darbu r\u016bpn\u012bc\u0101.<\/p>\n\n\n<p>SkyPlanner APS ir piem\u0113rots r\u012bks tie\u0161i \u0161im pl\u0101no\u0161anas posmam. T\u0101 iepirkuma pas\u016bt\u012bjumos glab\u0101jas paredzamie, apstiprin\u0101tie un faktiskie pieg\u0101des datumi, un iepirkuma pas\u016bt\u012bjumu poz\u012bcijas var sasaist\u012bt ar ra\u017eo\u0161anas pas\u016bt\u012bjumiem. Ja ir konfigur\u0113ta pl\u0101no\u0161ana, kas \u0146em v\u0113r\u0101 materi\u0101lu pieejam\u012bbu, uztur\u0113tie dati par pieg\u0101\u017eu iera\u0161anos tiek izmantoti grafika apr\u0113\u0137in\u0101. Arcturus, SkyPlanner m\u0101ksl\u012bgais intelekts ra\u017eo\u0161anas pl\u0101no\u0161anai, pl\u0101no darbus, \u0146emot v\u0113r\u0101 materi\u0101lus, jaudu, priorit\u0101tes un oper\u0101ciju savstarp\u0113jo atkar\u012bbu, savuk\u0101rt Gantt skat\u0101 ir redzama ieg\u016bt\u0101 darbu sec\u012bba.<\/p>\n\n\n<p>Tas maina pl\u0101not\u0101ja darbu. T\u0101 viet\u0101, lai manu\u0101li p\u0101rvietotu katru skarto oper\u0101ciju un saska\u0146otu n\u0101kam\u0101s iek\u0101rtas darbu rindu, j\u016bs atjaunin\u0101t materi\u0101lu inform\u0101ciju, <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/kas-ir-razosanas-planosana\/\">p\u0101rr\u0113\u0137in\u0101t ra\u017eo\u0161anas grafiku<\/a> un izv\u0113rt\u0113jat ietekmi uz sol\u012btajiem pieg\u0101des termi\u0146iem. Priorit\u0101tes un pl\u0101no\u0161anas noteikumi \u013cauj saglab\u0101t kontroli.<\/p>\n\n\n<p>Pie\u0146emsim, ka kav\u0113ta l\u0113juma pieg\u0101dei tiek apstiprin\u0101ts v\u0113l\u0101ks datums. T\u0101 meh\u0101nisk\u0101s apstr\u0101des un mont\u0101\u017eas oper\u0101cijas j\u0101p\u0101rce\u013c, ta\u010du tos pa\u0161us resursus izmanto ar\u012b citi pas\u016bt\u012bjumi. SkyPlanner iek\u013cauj \u0161o konkur\u0113jo\u0161o noslodzi vien\u0101 apr\u0113\u0137in\u0101, pal\u012bdzot saskat\u012bt, kurus darbus var turpin\u0101t un kuriem sol\u012btajiem termi\u0146iem j\u0101piev\u0113r\u0161 uzman\u012bba. Jaunais pieg\u0101d\u0101t\u0101ja datums tiek iestr\u0101d\u0101ts visas r\u016bpn\u012bcas pl\u0101n\u0101, nevis paliek k\u0101 atsevi\u0161\u0137a piez\u012bme iepirkuma pas\u016bt\u012bjum\u0101.<\/p>\n\n\n<p>Paredzam\u0101 pieejam\u012bba un fizisk\u0101 sa\u0146em\u0161ana joproj\u0101m ir at\u0161\u0137ir\u012bgi notikumi. SkyPlanner atjaunina kr\u0101jumus, kad iepirkuma pas\u016bt\u012bjumam apstiprina statusu \u00abPieg\u0101d\u0101ts\u00bb. Ja materi\u0101la izmanto\u0161anai ra\u017eo\u0161an\u0101 nepiecie\u0161ams kvalit\u0101tes apstiprin\u0101jums, pl\u0101no\u0161an\u0101 izmantotaj\u0101 pieejam\u012bbas datum\u0101 \u0146emiet v\u0113r\u0101 ar\u012b t\u0101 sa\u0146em\u0161anas laiku, lai grafiks nebalst\u012btos uz materi\u0101lu, kuru v\u0113l nav at\u013cauts izmantot.<\/p>\n\n\n<p>SkyPlanner <a href=\"https:\/\/skyplanner.ai\/lv\/integracija\/\">var integr\u0113t ar jebkuru ERP vai MES, izmantojot t\u0101 atv\u0113rto REST API<\/a>. Eso\u0161o iepirkumu un ra\u017eo\u0161anas inform\u0101ciju varat izmantot pl\u0101no\u0161an\u0101 ar ierobe\u017eotu jaudu, nevis nomain\u012bt str\u0101d\u0101jo\u0161u ERP sist\u0113mu tikai t\u0101d\u0113\u013c, lai uzlabotu ra\u017eo\u0161anas pl\u0101nu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ko Eskomatic main\u012bja p\u0101rskat\u0101ma inform\u0101cija par materi\u0101liem<\/h2>\n\n\n<p>Somijas uz\u0146\u0113mums Eskomatic, kas veic meh\u0101nisko apstr\u0101di p\u0113c pas\u016bt\u012bjuma, iepriek\u0161 darbu rindas liel\u0101koties k\u0101rtoja manu\u0101li novecoju\u0161\u0101 ERP un ra\u017eo\u0161anas vad\u012bbas sist\u0113m\u0101. Materi\u0101lu tr\u016bkums var\u0113ja atkl\u0101ties p\u0101r\u0101k \u012bsi pirms pl\u0101not\u0101 ra\u017eo\u0161anas uzdevuma s\u0101kuma, un komandai n\u0101c\u0101s risin\u0101t t\u0101 rad\u012bt\u0101s sekas.<\/p>\n\n\n<p>SkyPlanner vizu\u0101l\u0101s darbu rindas un automatiz\u0113t\u0101 noslodzes pl\u0101no\u0161ana \u013c\u0101va skaidr\u0101k p\u0101rskat\u012bt gaid\u0101mos darbus. Eskomatic zi\u0146o par prec\u012bz\u0101ku pieg\u0101des datumu noteik\u0161anu un ret\u0101k\u0101m ra\u017eo\u0161anas apst\u0101\u0161an\u0101s reiz\u0113m materi\u0101lu tr\u016bkuma d\u0113\u013c. Ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js Tommi M\u00e4nnist\u00f6 \u012bpa\u0161i augstu v\u0113rt\u0113 \u0161o r\u012bku pieg\u0101des datumu noteik\u0161an\u0101.<\/p>\n\n\n<p>Pieg\u0101d\u0101t\u0101ju nov\u0113rt\u0113\u0161an\u0101 no t\u0101 var g\u016bt praktisku atzi\u0146u: ir v\u0113rt\u012bgi identific\u0113t neuzticamas pieg\u0101des, ta\u010du r\u016bpn\u012bcai rea\u0123\u0113t pal\u012bdz izpratne par to ietekmi uz re\u0101lajiem darbiem. <a href=\"https:\/\/skyplanner.ai\/lv\/klientu-stasti\/eskomatic\/\">Eskomatic pieredze<\/a> par\u0101da, k\u0101du v\u0113rt\u012bbu dod p\u0101rskat\u0101mas materi\u0101lu inform\u0101cijas sasaiste ar ra\u017eo\u0161anas pl\u0101no\u0161anu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Noskaidrojiet n\u0101kam\u0101 pieg\u0101des kav\u0113juma ietekmi<\/h2>\n\n\n<p>S\u0101ciet ar nov\u0113rt\u0113juma karti, kuras defin\u012bcijas saprot j\u016bsu iepirkumu speci\u0101listi, pieg\u0101d\u0101t\u0101ji un pl\u0101not\u0101ji. Saglab\u0101jiet v\u0113rt\u0113jamo saist\u012bbu s\u0101kotn\u0113jos datus, neizsl\u0113dziet no p\u0101rskata nepiln\u012bgas un izmanto\u0161anai neder\u012bgas pieg\u0101des un katrai novirzei nosakiet turpm\u0101ko r\u012bc\u012bbu.<\/p>\n\n\n<p>P\u0113c tam nodro\u0161iniet ra\u017eo\u0161anai pl\u0101nu, kas atbilst pa\u0161reiz\u0113jai situ\u0101cijai. <a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Piesakieties SkyPlanner demonstr\u0101cijai<\/a> un sagatavojiet piem\u0113ru ar vienu materi\u0101lu, kura pieg\u0101de kav\u0113jas, t\u0101 jauno apstiprin\u0101to pieg\u0101des datumu un pas\u016bt\u012bjumiem, kas konkur\u0113 par tiem pa\u0161iem resursiem. Demonstr\u0101cij\u0101 var\u0113siet redz\u0113t, k\u0101 SkyPlanner var samazin\u0101t manu\u0101lo p\u0101rpl\u0101no\u0161anu un par\u0101d\u012bt kav\u0113juma ietekmi uz j\u016bsu r\u016bpn\u012bcas pieg\u0101d\u0113m.<\/p>\n\n\n<p>Ja v\u0113laties vispirms patst\u0101v\u012bgi iepaz\u012bt ra\u017eo\u0161anas pl\u0101no\u0161anu, <a href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu S\u0101kums &raquo; Resursi &raquo; Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu Pieg\u0101d\u0101t\u0101ja m\u0113ne\u0161a v\u0113rt\u0113jums var \u0161\u0137ist iepriecino\u0161s, kam\u0113r viena tr\u016bksto\u0161a deta\u013ca aizkav\u0113 j\u016bsu steidzam\u0101ko pas\u016bt\u012bjumu. Iepirkumu noda\u013ca redz pie\u0146emamu vid\u0113jo rezult\u0101tu. Ra\u017eo\u0161an\u0101 tikm\u0113r st\u0101v iek\u0101rta, mont\u0101\u017eu nevar pabeigt un klientam dotais sol\u012bjums ir apdraud\u0113ts. P\u0101rdom\u0101ti pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji pal\u012bdz ab\u0101m &#8230; <a title=\"Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/\" aria-label=\"Read more about Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110975,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2559,317],"tags":[],"class_list":["post-110955","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-razosanas-efektivitate","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu<\/title>\n<meta name=\"description\" content=\"Izv\u0113lieties god\u012bgi sal\u012bdzin\u0101mus pieg\u0101d\u0101t\u0101ju KPI, veidojiet v\u0113rt\u0113\u0161anas karti un ar SkyPlanner piel\u0101gojiet ra\u017eo\u0161anas grafiku materi\u0101lu kav\u0113jumiem.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu\" \/>\n<meta property=\"og:description\" content=\"Izv\u0113lieties god\u012bgi sal\u012bdzin\u0101mus pieg\u0101d\u0101t\u0101ju KPI, veidojiet v\u0113rt\u0113\u0161anas karti un ar SkyPlanner piel\u0101gojiet ra\u017eo\u0161anas grafiku materi\u0101lu kav\u0113jumiem.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T10:47:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T10:48:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/piegadataju-darbibas-raditaji\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/piegadataju-darbibas-raditaji\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu\",\"datePublished\":\"2026-10-27T10:47:38+00:00\",\"dateModified\":\"2026-10-27T10:48:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/piegadataju-darbibas-raditaji\\\/\"},\"wordCount\":3630,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/piegadataju-darbibas-raditaji\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/supplier-performance-metrics-hero.png\",\"articleSection\":[\"Ra\u017eo\u0161anas efektivit\u0101te\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/piegadataju-darbibas-raditaji\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/piegadataju-darbibas-raditaji\\\/\",\"name\":\"Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/piegadataju-darbibas-raditaji\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/piegadataju-darbibas-raditaji\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/supplier-performance-metrics-hero.png\",\"datePublished\":\"2026-10-27T10:47:38+00:00\",\"dateModified\":\"2026-10-27T10:48:31+00:00\",\"description\":\"Izv\u0113lieties god\u012bgi sal\u012bdzin\u0101mus pieg\u0101d\u0101t\u0101ju KPI, veidojiet v\u0113rt\u0113\u0161anas karti un ar SkyPlanner piel\u0101gojiet ra\u017eo\u0161anas grafiku materi\u0101lu kav\u0113jumiem.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/piegadataju-darbibas-raditaji\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/piegadataju-darbibas-raditaji\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/piegadataju-darbibas-raditaji\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/supplier-performance-metrics-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/supplier-performance-metrics-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"A missing incoming casting and a clock connect to machining and assembly work affected by a supplier delay.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/piegadataju-darbibas-raditaji\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu","description":"Izv\u0113lieties god\u012bgi sal\u012bdzin\u0101mus pieg\u0101d\u0101t\u0101ju KPI, veidojiet v\u0113rt\u0113\u0161anas karti un ar SkyPlanner piel\u0101gojiet ra\u017eo\u0161anas grafiku materi\u0101lu kav\u0113jumiem.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/","og_locale":"lv_LV","og_type":"article","og_title":"Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu","og_description":"Izv\u0113lieties god\u012bgi sal\u012bdzin\u0101mus pieg\u0101d\u0101t\u0101ju KPI, veidojiet v\u0113rt\u0113\u0161anas karti un ar SkyPlanner piel\u0101gojiet ra\u017eo\u0161anas grafiku materi\u0101lu kav\u0113jumiem.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T10:47:38+00:00","article_modified_time":"2026-10-27T10:48:31+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu","datePublished":"2026-10-27T10:47:38+00:00","dateModified":"2026-10-27T10:48:31+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/"},"wordCount":3630,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","articleSection":["Ra\u017eo\u0161anas efektivit\u0101te","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/","name":"Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","datePublished":"2026-10-27T10:47:38+00:00","dateModified":"2026-10-27T10:48:31+00:00","description":"Izv\u0113lieties god\u012bgi sal\u012bdzin\u0101mus pieg\u0101d\u0101t\u0101ju KPI, veidojiet v\u0113rt\u0113\u0161anas karti un ar SkyPlanner piel\u0101gojiet ra\u017eo\u0161anas grafiku materi\u0101lu kav\u0113jumiem.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","width":1774,"height":887,"caption":"A missing incoming casting and a clock connect to machining and assembly work affected by a supplier delay."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/piegadataju-darbibas-raditaji\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu S\u0101kums &raquo; Resursi &raquo; Pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji, kas pasarg\u0101 ra\u017eo\u0161anu Pieg\u0101d\u0101t\u0101ja m\u0113ne\u0161a v\u0113rt\u0113jums var \u0161\u0137ist iepriecino\u0161s, kam\u0113r viena tr\u016bksto\u0161a deta\u013ca aizkav\u0113 j\u016bsu steidzam\u0101ko pas\u016bt\u012bjumu. Iepirkumu noda\u013ca redz pie\u0146emamu vid\u0113jo rezult\u0101tu. Ra\u017eo\u0161an\u0101 tikm\u0113r st\u0101v iek\u0101rta, mont\u0101\u017eu nevar pabeigt un klientam dotais sol\u012bjums ir apdraud\u0113ts. P\u0101rdom\u0101ti pieg\u0101d\u0101t\u0101ju darb\u012bbas r\u0101d\u012bt\u0101ji pal\u012bdz ab\u0101m&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/110955","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=110955"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/110955\/revisions"}],"predecessor-version":[{"id":111018,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/110955\/revisions\/111018"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/110975"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=110955"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=110955"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=110955"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}