{"id":110587,"date":"2026-10-26T03:51:55","date_gmt":"2026-10-26T03:51:55","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110587"},"modified":"2026-10-26T03:52:44","modified_gmt":"2026-10-26T03:52:44","slug":"cikliska-inventarizacija","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/","title":{"rendered":"Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Resursi<\/a> &raquo; Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Kr\u0101jumu uzskaite r\u0101da, ka komponenti ir pieejami. Ta\u010du operators atver konteineru un konstat\u0113, ka to nepietiek ra\u017eo\u0161anas uzdevuma pabeig\u0161anai. Noliktavas darbinieki s\u0101k mekl\u0113\u0161anu, iepirkumu speci\u0101listi steidz sag\u0101d\u0101t tr\u016bksto\u0161o, bet ra\u017eo\u0161anas pl\u0101not\u0101js p\u0101rstr\u0101d\u0101 grafiku, kas bija sast\u0101d\u012bts, pie\u0146emot, ka deta\u013cas ir pieejamas.<\/p>\n\n\n<p>Ciklisk\u0101 inventariz\u0101cija pal\u012bdz \u0161\u0101das neatbilst\u012bbas atkl\u0101t agr\u0101k. T\u0101 viet\u0101, lai gaid\u012btu visas noliktavas inventariz\u0101ciju, j\u016bs regul\u0101ri p\u0101rskait\u0101t atlas\u012btus kr\u0101jumus, izp\u0113t\u0101t at\u0161\u0137ir\u012bbas un nov\u0113r\u0161at tr\u016bkumus procesos, kas t\u0101s rad\u012bju\u0161i. Ieguvums nav tikai prec\u012bz\u0101ka kr\u0101jumu atskaite. Ret\u0101k tiek pie\u0146emti ra\u017eo\u0161anas l\u0113mumi, pa\u013caujoties uz materi\u0101liem, kuri past\u0101v tikai uzskait\u0113.<\/p>\n\n\n<p>Preciz\u0113tajai inform\u0101cijai j\u0101non\u0101k ar\u012b ra\u017eo\u0161anas pl\u0101n\u0101. SkyPlanner APS sasaista materi\u0101lu pieejam\u012bbu ar pas\u016bt\u012bjumiem, iek\u0101rt\u0101m un mai\u0146\u0101m, kas no t\u0101s atkar\u012bgas. T\u0101d\u0113j\u0101di pl\u0101not\u0101js var rea\u0123\u0113t uz iztr\u016bkumu, manu\u0101li nep\u0101rk\u0101rtojot katru darbu rindu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas ir ciklisk\u0101 inventariz\u0101cija?<\/h2>\n\n\n<p>Ciklisk\u0101 inventariz\u0101cija ir atlas\u012btu kr\u0101jumu atk\u0101rtota fiziska p\u0101rskait\u012b\u0161ana, p\u0113c pl\u0101na sec\u012bgi p\u0101rbaudot da\u017e\u0101das kr\u0101jumu da\u013cas. Faktisko daudzumu sal\u012bdzina ar uzskait\u012bto daudzumu tai pa\u0161ai precei, taj\u0101 pa\u0161\u0101 glab\u0101\u0161anas viet\u0101, ar t\u0101du pa\u0161u kr\u0101jumu statusu un uz vienu un to pa\u0161u laika br\u012bdi. P\u0113c tam izp\u0113ta un nov\u0113r\u0161 konstat\u0113t\u0101s neatbilst\u012bbas.<\/p>\n\n\n<p>Inventariz\u0101cijas pl\u0101n\u0101 var sec\u012bgi ietvert glab\u0101\u0161anas vietas, pre\u010du grupas vai atsevi\u0161\u0137as preces konkr\u0113t\u0101s glab\u0101\u0161anas viet\u0101s. Da\u013cu kr\u0101jumu p\u0101rbauda bie\u017e\u0101k, jo k\u013c\u016bdas to uzskait\u0113 rada liel\u0101ku finansi\u0101lo vai ra\u017eo\u0161anas risku. M\u0113r\u0137is ir past\u0101v\u012bga, regul\u0101ra p\u0101rbaude, nevis atsevi\u0161\u0137as mekl\u0113\u0161anas reizes p\u0113c tam, kad iztr\u016bkums jau aptur\u0113jis darbu.<\/p>\n\n\n<p>\u0160\u012bm trim saist\u012btaj\u0101m darb\u012bb\u0101m ir at\u0161\u0137ir\u012bgi uzdevumi:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Nep\u0101rtraukt\u0101 kr\u0101jumu uzskaite<\/strong> uztur aktu\u0101lo atlikumu, pamatojoties uz sa\u0146em\u0161anu, izsnieg\u0161anu, pat\u0113ri\u0146u un citiem dar\u012bjumiem. T\u0101 par\u0101da, k\u0101diem kr\u0101jumiem p\u0113c sist\u0113mas datiem vajadz\u0113tu b\u016bt pieejamiem.<\/li><li><strong>Cikliskaj\u0101 inventariz\u0101cij\u0101<\/strong> gada gait\u0101 fiziski p\u0101rbauda atlas\u012btus kr\u0101jumus un to atbilst\u012bbu uzskaitei. Tas pal\u012bdz atkl\u0101t nere\u0123istr\u0113tus dar\u012bjumus, nepareizus daudzumus un citas neatbilst\u012bbas, kam\u0113r to izcelsmei v\u0113l ir viegli izsekot.<\/li><li><strong>Piln\u0101 fiziskaj\u0101 inventariz\u0101cij\u0101<\/strong> noteikt\u0101 laik\u0101 p\u0101rbauda visu defin\u0113to kr\u0101jumu kopumu. Savuk\u0101rt ciklisk\u0101 inventariz\u0101cija sadala p\u0101rbaudi maz\u0101k\u0101s da\u013c\u0101s, nevis koncentr\u0113 to vien\u0101 reiz\u0113.<\/li><\/ul>\n\n\n<p>Uzskaites atlikums nepier\u0101da, ka kr\u0101jumi fiziski past\u0101v. T\u0101pat ciklisk\u0101s inventariz\u0101cijas k\u0101rt\u012bba pati par sevi neaizst\u0101j uz\u0146\u0113mumam noteikt\u0101s finan\u0161u p\u0101rskatu vai rev\u012bzijas pras\u012bbas. \u0160\u012bs pras\u012bbas noskaidrojiet atsevi\u0161\u0137i no ikdienas darbam paredz\u0113t\u0101s p\u0101rbaudes k\u0101rt\u012bbas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vispirms no\u0161\u0137iriet kr\u0101jumu neatbilst\u012bbu no pieg\u0101des probl\u0113mas<\/h2>\n\n\n<p>Ja deta\u013cas nav darba centr\u0101, tas v\u0113l nenoz\u012bm\u0113, ka kr\u0101jumu uzskaite ir nepareiza. Deta\u013ca joproj\u0101m var atrasties uzskait\u0113 nor\u0101d\u012btaj\u0101 noliktavas viet\u0101 un gaid\u012bt iek\u0161\u0113jo pieg\u0101di. T\u0101d\u0101 gad\u012bjum\u0101 probl\u0113ma ir <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/pfep\/\">materi\u0101lu nog\u0101d\u0101\u0161ana darba veik\u0161anas viet\u0101<\/a>, nevis daudzums, kas b\u016btu j\u0101noraksta.<\/p>\n\n\n<p>Pirms daudzumu sal\u012bdzin\u0101\u0161anas p\u0101rliecinieties, ka abi attiecas uz vienu un to pa\u0161u tv\u0113rumu. Kop\u0113jo daudzumu vis\u0101 \u0113k\u0101 nevar tie\u0161i sal\u012bdzin\u0101t ar vienas kastes saturu pie ra\u017eo\u0161anas l\u012bnijas. Kr\u0101jumus, kas jau izsniegti ra\u017eo\u0161anas uzdevumam, nedr\u012bkst v\u0113lreiz ieskait\u012bt k\u0101 neizsniegtus noliktavas kr\u0101jumus. Deta\u013cas, kas gaida kvalit\u0101tes apstiprin\u0101jumu, var b\u016bt fiziski pieejamas, bet v\u0113l neb\u016bt izmantojamas ra\u017eo\u0161an\u0101.<\/p>\n\n\n<p>Ja sal\u012bdzin\u0101jums tie\u0161\u0101m atkl\u0101j neatbilst\u012bbu, izsekojiet dar\u012bjumiem un materi\u0101lu apstr\u0101des darb\u012bb\u0101m, kas to var\u0113tu b\u016bt rad\u012bju\u0161as:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Iesp\u0113jamais c\u0113lonis<\/th><th>Kas j\u0101p\u0101rbauda<\/th><\/tr><\/thead><tbody><tr><td>Sa\u0146em\u0161ana iegr\u0101matota ar nepareizu daudzumu<\/td><td>Sal\u012bdziniet pieg\u0101di, pie\u0146em\u0161anas p\u0101rbaudes datus un iegr\u0101matoto sa\u0146em\u0161anu.<\/td><\/tr><tr><td>Kastes sajauktas ar gabaliem<\/td><td>P\u0101rbaudiet iepirk\u0161anas, glab\u0101\u0161anas un pat\u0113ri\u0146a m\u0113rvien\u012bbas, k\u0101 ar\u012b to p\u0101rr\u0113\u0137ina koeficientus.<\/td><\/tr><tr><td>Materi\u0101ls p\u0101rvietots, neatjauninot glab\u0101\u0161anas vietu uzskait\u0113<\/td><td>P\u0101rbaudiet s\u0101kotn\u0113jo un galam\u0113r\u0137a vietu, k\u0101 ar\u012b p\u0101rvieto\u0161anas dar\u012bjumu.<\/td><\/tr><tr><td>Faktiskais pat\u0113ri\u0146\u0161 at\u0161\u0137iras no uzskait\u012bt\u0101<\/td><td>P\u0101rskatiet izsnieg\u0161anas metodi, materi\u0101lu specifik\u0101cij\u0101 nor\u0101d\u012btos daudzumus, br\u0101\u0137i un atgrieztos materi\u0101lus.<\/td><\/tr><tr><td>Sajauktas l\u012bdz\u012bgas deta\u013cas vai to versijas<\/td><td>P\u0101rbaudiet eti\u0137etes, identifikatorus un konteineru faktisko saturu.<\/td><\/tr><tr><td>Boj\u0101ti vai blo\u0137\u0113ti kr\u0101jumi uzskat\u012bti par izmantojamiem<\/td><td>Sal\u012bdziniet kr\u0101jumu faktisko st\u0101vokli ar uzskait\u0113 nor\u0101d\u012bto pieejam\u012bbu.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0160\u012bs p\u0101rbaudes nor\u0101da uz at\u0161\u0137ir\u012bgiem risin\u0101jumiem. R\u016bp\u012bg\u0101ka pre\u010du pie\u0146em\u0161ana neizlabos nepareizu pat\u0113ri\u0146a daudzumu, un papildu kr\u0101jumu ieg\u0101de neaizst\u0101s nere\u0123istr\u0113tu p\u0101rvieto\u0161anas dar\u012bjumu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izv\u0113lieties, ko un cik bie\u017ei p\u0101rskait\u012bt<\/h2>\n\n\n<p>S\u0101ciet ar p\u0101rvald\u0101mu ra\u017eo\u0161anas zonu vai materi\u0101lu grupu, kur neatbilst\u012bbas rada re\u0101lus trauc\u0113jumus. Nosakiet par inventariz\u0101ciju atbild\u012bgo, rezerv\u0113jiet tai laiku un skaidri paredziet, k\u0101 risin\u0101t konstat\u0113t\u0101s probl\u0113mas. Neliela, regul\u0101ra p\u0101rbaude, kur\u0101 neatbilst\u012bbas tiek atrisin\u0101tas, ir noder\u012bg\u0101ka par garu p\u0101rskait\u0101mo kr\u0101jumu sarakstu, kura izp\u0113tei nevienam neatliek laika.<\/p>\n\n\n<p>Nosakot p\u0101rskait\u012b\u0161anas bie\u017eumu, \u0146emiet v\u0113r\u0101 vair\u0101kus r\u0101d\u012bt\u0101jus. Pat\u0113ri\u0146a v\u0113rt\u012bba pal\u012bdz noteikt finan\u0161u kontroles priorit\u0101tes, izmantojot <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/krajumu-abc-analize\/\">kr\u0101jumu ABC anal\u012bzi<\/a>. Dar\u012bjumu bie\u017eums un iepriek\u0161 konstat\u0113t\u0101s neatbilst\u012bbas par\u0101da, kur uzskaites dati var \u0101tri zaud\u0113t precizit\u0101ti. Svar\u012bga ir ar\u012b noz\u012bme ra\u017eo\u0161an\u0101: l\u0113ta iepirkta deta\u013ca var aptur\u0113t d\u0101rga izstr\u0101d\u0101juma mont\u0101\u017eu.<\/p>\n\n\n<p>Nep\u0101r\u0146emiet univers\u0101lu noteikumu, ka katra A grupas prece j\u0101p\u0101rskaita ik m\u0113nesi, bet katra C grupas prece \u2014 reizi gad\u0101. Izv\u0113lieties interv\u0101lus atbilsto\u0161i saviem riskiem un p\u0101rskait\u012b\u0161anai un izp\u0113tei pieejamajam laikam. Veltiet vair\u0101k uzman\u012bbas viet\u0101m, kur k\u013c\u016bdas atk\u0101rtojas, un p\u0113c tam izv\u0113rt\u0113jiet, vai c\u0113lo\u0146a nov\u0113r\u0161ana ir padar\u012bjusi uzskaiti uzticam\u0101ku.<\/p>\n\n\n<p>P\u0101rskait\u012b\u0161ana pa glab\u0101\u0161anas viet\u0101m var atvieglot fizisko darbu, jo tuvum\u0101 eso\u0161os kr\u0101jumus p\u0101rbauda kop\u0101. Savuk\u0101rt p\u0101rskait\u012b\u0161ana pa prec\u0113m pal\u012bdz izsekot vienai deta\u013cai vair\u0101k\u0101s viet\u0101s. Neatkar\u012bgi no izv\u0113l\u0113t\u0101s pieejas nosakiet p\u0101rbaudes aptv\u0113rumu t\u0101, lai ne\u0113rtas glab\u0101\u0161anas vietas, l\u0113nas aprites preces un negaid\u012bti tuk\u0161as kastes nepaliktu \u0101rpus inventariz\u0101cijas. Tuk\u0161a kaste, kurai uzskait\u0113 ir pozit\u012bvs atlikums, ir konstat\u0113ta neatbilst\u012bba, nevis iemesls izlaist p\u0101rskait\u012b\u0161anu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ciklisk\u0101s inventariz\u0101cijas k\u0101rt\u012bba neatbilst\u012bbu nov\u0113r\u0161anai<\/h2>\n\n\n<h3 class=\"wp-block-heading\">1. Nosakiet p\u0101rskait\u012b\u0161anas tv\u0113rumu<\/h3>\n\n\n<p>Nor\u0101diet preci un glab\u0101\u0161anas vietu, k\u0101 ar\u012b partiju, versiju vai kr\u0101jumu statusu, ja j\u016bsu uz\u0146\u0113mum\u0101 tos iz\u0161\u0137ir. Nosakiet kr\u0101jumu uzskaites m\u0113rvien\u012bbu un to, k\u0101 p\u0101rskait\u012bt neatv\u0113rtus iepakojumus vai da\u013c\u0113ji izlietotu konteineru saturu. Defin\u0113jiet robe\u017eas pietiekami skaidri, lai p\u0101rskait\u012b\u0161anu var\u0113tu atk\u0101rtot cits cilv\u0113ks.<\/p>\n\n\n<p>Iek\u013caujiet ar\u012b p\u0101rbaudes tv\u0113rum\u0101 negaid\u012bti atrastos kr\u0101jumus. P\u0101rbaudot tikai sarakst\u0101 nor\u0101d\u012bt\u0101s preces, nere\u0123istr\u0113ta sa\u0146em\u0161ana vai nepareiz\u0101 viet\u0101 novietota deta\u013ca var palikt nepaman\u012bta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Nosakiet dro\u0161u dar\u012bjumu nodal\u012b\u0161anas br\u012bdi<\/h3>\n\n\n<p>Fizisk\u0101s p\u0101rskait\u012b\u0161anas rezult\u0101tam un sist\u0113mas atlikumam j\u0101attiecas uz vienu un to pa\u0161u br\u012bdi. Pret\u0113j\u0101 gad\u012bjum\u0101 pat pareizi re\u0123istr\u0113ta pre\u010du pa\u0146em\u0161ana p\u0101rskait\u012b\u0161anas laik\u0101 var izskat\u012bties p\u0113c iztr\u016bkuma.<\/p>\n\n\n<p>Neliel\u0101 izm\u0113\u0123in\u0101jum\u0101 vienk\u0101r\u0161\u0101kais kontroles veids var b\u016bt \u012bslaic\u012bgi aptur\u0113t kr\u0101jumu kust\u012bbu izv\u0113l\u0113taj\u0101 glab\u0101\u0161anas viet\u0101. Ja darbs j\u0101turpina, izmantojiet noteiktu k\u0101rt\u012bbu, lai p\u0101rskait\u012b\u0161anas laik\u0101 re\u0123istr\u0113tu sa\u0146em\u0161anu, pa\u0146em\u0161anu un p\u0101rvieto\u0161anu un saska\u0146otu \u0161o dar\u012bjumu laiku ar p\u0101rskait\u012b\u0161anas br\u012bdi. Inform\u0113jiet materi\u0101lu aprit\u0113 iesaist\u012btos darbiniekus par to, kas tiek p\u0101rskait\u012bts un kur\u0161 at\u013cauj iz\u0146\u0113mumus. J\u016bs kontrol\u0113jat izv\u0113l\u0113to tv\u0113rumu \u2014 tas ne vienm\u0113r noz\u012bm\u0113 visas noliktavas sl\u0113g\u0161anu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. P\u0101rskaitiet neatkar\u012bgi no sagaid\u0101m\u0101 daudzuma<\/h3>\n\n\n<p>Ja tas ir praktiski iesp\u0113jams, s\u0101kotn\u0113ji ner\u0101diet p\u0101rskait\u012bt\u0101jam uzskaites atlikumu. L\u016bdziet nor\u0101d\u012bt faktiski konstat\u0113to daudzumu, nevis apstiprin\u0101t ekr\u0101n\u0101 redzamo skaitli.<\/p>\n\n\n<p>P\u0101rbaudiet faktisko saturu, nevis tikai konteinera eti\u0137eti. Re\u0123istr\u0113jiet p\u0101rskait\u012b\u0161anas laiku, m\u0113rvien\u012bbu, glab\u0101\u0161anas vietu un p\u0101rskait\u012bt\u0101ju. Atz\u012bm\u0113jiet ar\u012b neskaidru mar\u0137\u0113jumu vai boj\u0101tu iepakojumu, kam j\u0101piev\u0113r\u0161 uzman\u012bba. Ja izmantojat sv\u0113r\u0161anu vai citu netie\u0161u metodi, p\u0101rbaudiet t\u0101s pareiz\u012bbu un piem\u0113rot\u012bbu konkr\u0113tajam materi\u0101lam.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. P\u0101rskaitiet atk\u0101rtoti un noskaidrojiet neatbilst\u012bbas<\/h3>\n\n\n<p>Pirms atlikuma main\u012b\u0161anas p\u0101rbaudiet preci, m\u0113rvien\u012bbu, glab\u0101\u0161anas vietu un dar\u012bjumu nodal\u012b\u0161anas br\u012bdi. Ja at\u0161\u0137ir\u012bba ir b\u016btiska vai neizskaidrota, uzdodiet otram cilv\u0113kam veikt neatkar\u012bgu atk\u0101rtotu p\u0101rskait\u012b\u0161anu. P\u0113c tam izp\u0113tiet sa\u0146em\u0161anu, p\u0101rvieto\u0161anu, izsnieg\u0161anu ra\u017eo\u0161anai, pat\u0113ri\u0146u, atgrie\u0161anu un br\u0101\u0137i laik\u0101 ap p\u0101rskait\u012b\u0161anas br\u012bdi.<\/p>\n\n\n<p>Nep\u0101rskaitiet atkal un atkal, l\u012bdz k\u0101ds ieg\u016bst gaid\u012bto rezult\u0101tu. Saglab\u0101jiet pirm\u0101s p\u0101rskait\u012b\u0161anas rezult\u0101tu un v\u0113l\u0101k ieg\u016btos pier\u0101d\u012bjumus. Ja daudzuma at\u0161\u0137ir\u012bbu izskaidro pamatota kr\u0101jumu kust\u012bba p\u0113c p\u0101rskait\u012b\u0161anas br\u012b\u017ea, saska\u0146ojiet \u0161o kust\u012bbu ar p\u0101rskait\u012b\u0161anas datiem, nevis iegr\u0101matojiet par to papildu atlikuma korekciju.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Apstipriniet atbilsto\u0161o korekciju<\/h3>\n\n\n<p>No\u0161\u0137iriet p\u0101rskait\u012b\u0161anas rezult\u0101ta re\u0123istr\u0113\u0161anu no at\u013caujas main\u012bt kr\u0101jumu uzskaiti. Nosakiet atbild\u012bbu par apstiprin\u0101\u0161anu un robe\u017ev\u0113rt\u012bbas, kuras p\u0101rsniedzot nepiecie\u0161ams augst\u0101ka l\u012bme\u0146a l\u0113mums, atbilsto\u0161i preces v\u0113rt\u012bbai un ra\u017eo\u0161anas riskam.<\/p>\n\n\n<p>Re\u0123istr\u0113jiet apstiprin\u0101to daudzumu, neatbilst\u012bbu, t\u0101s iemeslu, apstiprin\u0101t\u0101ju un pamatojo\u0161os pier\u0101d\u012bjumus. Labojiet pa\u0161u k\u013c\u016bdu: ja nepareizi nor\u0101d\u012bta atra\u0161an\u0101s vieta vai kr\u0101jumu statuss, var b\u016bt vajadz\u012bgs cits dar\u012bjums, nevis daudzuma korekcija. Pirms korekcijas iegr\u0101mato\u0161anas p\u0101rbaudiet, vai nav nere\u0123istr\u0113tu s\u0101kotn\u0113jo dar\u012bjumu, lai v\u0113l\u0101k iegr\u0101matota sa\u0146em\u0161ana vai pat\u0113ri\u0146\u0161 nenov\u0113rstu vienu un to pa\u0161u starp\u012bbu divreiz.<\/p>\n\n\n<p>Ja p\u0101rbaud\u0113 apstiprin\u0101ts iztr\u016bkums apdraud pa\u0161reiz\u0113jo darbu izpildi, nekav\u0113joties inform\u0113jiet ra\u017eo\u0161anas pl\u0101not\u0101ju. Neatst\u0101jiet pieg\u0101des risku nepaman\u012btu, kam\u0113r turpin\u0101s ilg\u0101ka pamatc\u0113lo\u0146a izp\u0113te.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Nov\u0113rsiet k\u013c\u016bdas c\u0113loni proces\u0101<\/h3>\n\n\n<p>Apstiprin\u0101ta korekcija izlabo pa\u0161reiz\u0113jos uzskaites datus. T\u0101 neizskaidro k\u013c\u016bdas ra\u0161an\u0101s iemeslu un nenov\u0113r\u0161 t\u0101s atk\u0101rto\u0161anos.<\/p>\n\n\n<p>Nosakiet korekt\u012bv\u0101s darb\u012bbas izpildes termi\u0146u un atbild\u012bgo. Iesp\u0113jams, j\u0101maina p\u0101rbaude pre\u010du sa\u0146em\u0161anas laik\u0101, j\u0101izlabo m\u0113rvien\u012bbu p\u0101rr\u0113\u0137ins, j\u0101re\u0123istr\u0113 br\u0101\u0137is taj\u0101 oper\u0101cij\u0101, kur\u0101 tas rodas, vai j\u0101sak\u0101rto neizmantoto komponentu atgrie\u0161ana noliktav\u0101. P\u0113c n\u0101kam\u0101s attiec\u012bg\u0101 procesa norises atk\u0101rtoti p\u0101rbaudiet \u0161os kr\u0101jumus. V\u0113rt\u0113jiet, vai neatbilst\u012bba atk\u0101rtojas, nevis to, vai korekcija ir veiksm\u012bgi iegr\u0101matota.<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. Izmantojiet preciz\u0113tos pieejam\u012bbas datus ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161an\u0101<\/h3>\n\n\n<p>P\u0101rliecinieties, ka apstiprin\u0101t\u0101 korekcija non\u0101k sist\u0113m\u0101, kas nodro\u0161ina materi\u0101lu datus ra\u017eo\u0161anas grafika sast\u0101d\u012b\u0161anai. P\u0113c tam atk\u0101rtoti izv\u0113rt\u0113jiet pas\u016bt\u012bjumus, kuros izmanto \u0161o materi\u0101lu, to priorit\u0101tes un resursus, kurus tie dala ar citiem darbiem.<\/p>\n\n\n<p>Par kr\u0101jumiem atbild\u012bg\u0101 komanda ir preciz\u0113jusi s\u0101kotn\u0113jo daudzumu. Ta\u010du pl\u0101not\u0101jam joproj\u0101m vajadz\u012bga atbilde uz citu jaut\u0101jumu: <strong>ko tagad varam sara\u017eot, k\u0101d\u0101 sec\u012bb\u0101 un k\u0101 tas ietekm\u0113s pieg\u0101des datumus?<\/strong><\/p>\n\n\n<h2 class=\"wp-block-heading\">Piem\u0113rs: skait\u012b\u0161ana ir pabeigta, bet deta\u013cas joproj\u0101m vajadz\u012bgas diviem pas\u016bt\u012bjumiem<\/h2>\n\n\n<p>Iedom\u0101jieties ra\u017eot\u0101ju, kura uzskait\u0113 noliktav\u0101 ir 120 izmantojami korpusi. Diviem gaid\u0101majiem pas\u016bt\u012bjumiem vajag pa 60 korpusiem katram. Kontrol\u0113t\u0101 skait\u012b\u0161an\u0101 konstat\u0113 90 korpusus, un neatkar\u012bga atk\u0101rtota skait\u012b\u0161ana \u0161o daudzumu apstiprina.<\/p>\n\n\n<p>Komanda p\u0101rbauda, vai korpusi nav p\u0101rvietoti uz citu vietu vai jau izsniegti. Izp\u0113tot starp\u012bbu, t\u0101 noskaidro, ka iepriek\u0161, str\u0101d\u0101jot ar kr\u0101jumiem, boj\u0101tie korpusi ir iz\u0146emti, nere\u0123istr\u0113jot br\u0101\u0137a norakst\u012b\u0161anu. P\u0113c apstiprin\u0101t\u0101s korekcijas izmantojamais atlikums ir 90 korpusi, un komanda skaidri nosaka, kur\u0161 turpm\u0101k b\u016bs atbild\u012bgs par \u0161\u0101das iz\u0146em\u0161anas re\u0123istr\u0113\u0161anu.<\/p>\n\n\n<p>Ar to konkr\u0113t\u0101 daudzuma neatbilst\u012bba ir nov\u0113rsta. Ta\u010du korpusu joproj\u0101m nepietiek abiem pas\u016bt\u012bjumiem: kop\u0101 tiem vajag 120. Iepirkumu noda\u013ca p\u0101rbauda iesp\u0113jas sag\u0101d\u0101t tr\u016bksto\u0161os korpusus, bet pl\u0101not\u0101js nosaka, kuram pas\u016bt\u012bjumam ir priorit\u0101te.<\/p>\n\n\n<p>Attiec\u012bg\u0101 pas\u016bt\u012bjuma p\u0101rcel\u0161ana uz citu laiku ietekm\u0113 ne tikai materi\u0101lu sarakstu. T\u0101 meh\u0101nisk\u0101s apstr\u0101des un mont\u0101\u017eas oper\u0101cij\u0101s izmanto tos pa\u0161us resursus, ko citos pas\u016bt\u012bjumos, tostarp darbos, kuriem \u0161ie korpusi nav vajadz\u012bgi. T\u0101d\u0113\u013c preciz\u0113ts kr\u0101jumu atlikums var main\u012bt vair\u0101kas darbu rindas un pieg\u0101des datumus. \u0160\u0101d\u0101 situ\u0101cij\u0101 kr\u0101jumu datu sasaist\u012b\u0161ana ar <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/kas-ir-razosanas-planosana\/\">vienotu ra\u017eo\u0161anas grafiku<\/a> \u013cauj ietaup\u012bt manu\u0101lu pl\u0101no\u0161anas darbu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V\u0113rt\u0113jiet pirm\u0101s skait\u012b\u0161anas rezult\u0101tu, ne tikai izlaboto atlikumu<\/h2>\n\n\n<p>Skaidri defin\u0113jiet, ko noz\u012bm\u0113 kr\u0101jumu uzskaites precizit\u0101te. Praktiskam atbilst\u012bbas r\u0101d\u012bt\u0101jam p\u0101rbaudiet, vai katras preces uzskaites ieraksts konkr\u0113taj\u0101 glab\u0101\u0161anas viet\u0101 atbilst pirm\u0101s skait\u012b\u0161anas rezult\u0101tam. Atbilsto\u0161o ierakstu skaitu daliet ar visu p\u0101rbaud\u012bto \u0161\u0101du ierakstu skaitu un rezult\u0101tu izsakiet procentos. Nor\u0101diet, vai atbilst\u012bba noz\u012bm\u0113 prec\u012bzu sakrit\u012bbu vai iek\u013cau\u0161anos saska\u0146ot\u0101 pielaid\u0113, un konsekventi iev\u0113rojiet \u0161o defin\u012bciju.<\/p>\n\n\n<p>Precizit\u0101tes nov\u0113rt\u0113\u0161anai izmantojiet skait\u012b\u0161anas rezult\u0101tus pirms korekcij\u0101m. P\u0101rskats, kas sagatavots tikai p\u0113c visu starp\u012bbu izlabo\u0161anas, neatspogu\u013co skait\u012b\u0161an\u0101 faktiski konstat\u0113to st\u0101vokli.<\/p>\n\n\n<p>Izv\u0113rt\u0113jiet \u0161o procentu\u0101lo r\u0101d\u012bt\u0101ju kop\u0101 ar neatrisin\u0101taj\u0101m neatbilst\u012bb\u0101m, c\u0113lo\u0146iem, kas atk\u0101rtojas, skait\u012b\u0161anas aptv\u0113rumu un materi\u0101lu izrais\u012btiem ra\u017eo\u0161anas p\u0101rtraukumiem. Augsts kop\u0113jais r\u0101d\u012bt\u0101js var sl\u0113pt vienas kritiski svar\u012bgas sast\u0101vda\u013cas iztr\u016bkumu. Ar\u012b uz risku balst\u012bta skait\u012b\u0161anas programma, kur\u0101 apzin\u0101ti p\u0101rbauda problem\u0101tisk\u0101s preces, nesniedz nenob\u012bd\u012btu nov\u0113rt\u0113jumu par visu r\u016bpn\u012bcas kr\u0101jumu uzskaites ierakstu precizit\u0101ti.<\/p>\n\n\n<p>Svar\u012bgi, lai samazin\u0101tos atk\u0101rtotu k\u013c\u016bdu un neparedz\u0113tu situ\u0101ciju skaits ra\u017eo\u0161anas uzdevumu pl\u0101notajos s\u0101kuma br\u012b\u017eos, nevis tikai pieaugtu skait\u012b\u0161anas bie\u017eums.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ar SkyPlanner p\u0101rv\u0113rtiet preciz\u0113tos kr\u0101jumu datus \u012bstenojam\u0101 pl\u0101n\u0101<\/h2>\n\n\n<p>Izv\u0113lieties SkyPlanner, ja j\u016bsu komanda sp\u0113j noteikt materi\u0101lu pieejam\u012bbu, ta\u010du joproj\u0101m t\u0113r\u0113 p\u0101r\u0101k daudz laika, saska\u0146ojot to ar pas\u016bt\u012bjumu vajadz\u012bb\u0101m un p\u0101rk\u0101rtojot darbu rindas pie iek\u0101rt\u0101m. SkyPlanner apvieno \u0161os l\u0113mumus vien\u0101 ra\u017eo\u0161anas grafik\u0101.<\/p>\n\n\n<p>Ar produktu saist\u012btie materi\u0101li tiek piesaist\u012bti ar\u012b attiec\u012bgaj\u0101m pas\u016bt\u012bjuma poz\u012bcij\u0101m. Kr\u0101jumu datus var uztur\u0113t, izmantojot integr\u0101ciju vai SkyPlanner Warehouse moduli. Ja ir iesp\u0113jota materi\u0101lu pieejam\u012bbas iev\u0113ro\u0161ana, sast\u0101dot grafiku, SkyPlanner m\u0101ksl\u012bg\u0101 intelekta pl\u0101no\u0161anas r\u012bks Arcturus \u0146em v\u0113r\u0101 materi\u0101lu pieejam\u012bbu l\u012bdztekus darba centru jaudai, mai\u0146\u0101m, oper\u0101ciju savstarp\u0113j\u0101m atkar\u012bb\u0101m un j\u016bsu iestat\u012btajiem noteikumiem.<\/p>\n\n\n<p>Kad apstiprin\u0101t\u0101 kr\u0101jumu korekcija ir non\u0101kusi pl\u0101no\u0161anas datos, p\u0101rr\u0113\u0137iniet grafiku un p\u0101rskatiet rezult\u0101tu Ganta diagrammas laika skal\u0101. Varat redz\u0113t, k\u0101 izmai\u0146u skartie darbi iek\u013caujas starp citiem pas\u016bt\u012bjumiem, nevis atsevi\u0161\u0137i labot katra resursa darbu rindu. J\u016bs nosak\u0101t priorit\u0101tes, bet Arcturus veic grafika apr\u0113\u0137inus. Tas noz\u012bm\u0113 maz\u0101k manu\u0101las saska\u0146o\u0161anas un agr\u0101ku iesp\u0113ju paman\u012bt, kuru pieg\u0101des saist\u012bbu izpildei j\u0101piev\u0113r\u0161 uzman\u012bba.<\/p>\n\n\n<p>SkyPlanner var integr\u0113t ar jebkuru ERP vai MES sist\u0113mu, izmantojot atv\u0113rto REST API. Saglab\u0101jiet savai ra\u017eotnei piem\u0113roto pre\u010du sa\u0146em\u0161anas, skait\u012b\u0161anas un neatbilst\u012bbu apstiprin\u0101\u0161anas darbpl\u016bsmu un sasaistiet taj\u0101 uztur\u0113tos materi\u0101lu datus ar detaliz\u0113tu ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu. Skait\u012b\u0161ana \u013cauj p\u0101rbaud\u012bt faktisko situ\u0101ciju, savuk\u0101rt SkyPlanner pal\u012bdz r\u012bkoties atbilsto\u0161i t\u0101s ietekmei uz ra\u017eo\u0161anu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ko uz\u0146\u0113mum\u0101 Eskomatic main\u012bja skaidr\u0101ks p\u0101rskats par materi\u0101liem<\/h3>\n\n\n<p>Meh\u0101nisk\u0101s apstr\u0101des pakalpojumu sniedz\u0113js Eskomatic iepriek\u0161 izmantoja vec\u0101ku ra\u017eo\u0161anas vad\u012bbas vidi, kur\u0101 darbu rindas liel\u0101koties veidoja manu\u0101li. Ierobe\u017eot\u0101 p\u0101rskata par materi\u0101lu statusu d\u0113\u013c iztr\u016bkums var\u0113ja atkl\u0101ties p\u0101r\u0101k v\u0113lu \u2014 neilgi pirms ra\u017eo\u0161anas uzdevuma pl\u0101not\u0101 s\u0101kuma.<\/p>\n\n\n<p>Savienojot SkyPlanner ar eso\u0161o ERP sist\u0113mu, komanda ieguva vizu\u0101lu darbu rindu, autom\u0101tisku slodzes pl\u0101no\u0161anu un skaidr\u0101ku p\u0101rskatu par materi\u0101liem. <a href=\"https:\/\/skyplanner.ai\/lv\/klientu-stasti\/eskomatic\/\">Eskomatic nor\u0101da<\/a>, ka materi\u0101lu tr\u016bkuma izrais\u012btu ra\u017eo\u0161anas apst\u0101\u0161anos ir maz\u0101k un pieg\u0101des datumus var noteikt prec\u012bz\u0101k. Uz\u0146\u0113muma pieredze par\u0101da, cik v\u0113rt\u012bgi ir sasaist\u012bt materi\u0101lu datus ar grafiku sast\u0101d\u012b\u0161anu, nevis atst\u0101t pl\u0101not\u0101jam seku risin\u0101\u0161anu p\u0113d\u0113j\u0101 br\u012bd\u012b.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u0101ciet ar vienu neatbilst\u012bbu, kas atk\u0101rtojas<\/h2>\n\n\n<p>Izv\u0113lieties deta\u013cu, kuru regul\u0101ri n\u0101kas mekl\u0113t vai kurai negaid\u012bti atkl\u0101jas iztr\u016bkums. Nosakiet skait\u012b\u0161anas aptv\u0113rumu, kontrol\u0113jiet kr\u0101jumu kust\u012bbu p\u0101rbaudes laik\u0101, izp\u0113tiet starp\u012bbu un uzticiet atbild\u012bgajam veikt korekt\u012bvo darb\u012bbu. P\u0113c tam izsekojiet, k\u0101 apstiprin\u0101t\u0101s pieejam\u012bbas izmai\u0146as ietekm\u0113 pas\u016bt\u012bjumus, kuriem \u0161\u012b deta\u013ca vajadz\u012bga.<\/p>\n\n\n<p>Lai redz\u0113tu p\u0113d\u0113jo soli praks\u0113, <a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">piesakieties SkyPlanner demonstr\u0101cijai<\/a>. Sagatavojiet vienu apstr\u012bd\u0113tu materi\u0101la atlikumu, pas\u016bt\u012bjumus, kuros \u0161o deta\u013cu izmanto, un inform\u0101ciju par \u0161o pas\u016bt\u012bjumu izpildei vajadz\u012bgaj\u0101m iek\u0101rt\u0101m, ko izmanto ar\u012b citiem darbiem. Tas dos sarunai konkr\u0113tu m\u0113r\u0137i: redz\u0113t, k\u0101 preciz\u0113ti materi\u0101lu dati var p\u0101rtapt j\u016bsu komandai izmantojam\u0101 ra\u017eo\u0161anas pl\u0101n\u0101. Ja vispirms v\u0113laties izp\u0113t\u012bt pa\u0161i, <a href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas S\u0101kums &raquo; Resursi &raquo; Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas Kr\u0101jumu uzskaite r\u0101da, ka komponenti ir pieejami. Ta\u010du operators atver konteineru un konstat\u0113, ka to nepietiek ra\u017eo\u0161anas uzdevuma pabeig\u0161anai. Noliktavas darbinieki s\u0101k mekl\u0113\u0161anu, iepirkumu speci\u0101listi steidz sag\u0101d\u0101t tr\u016bksto\u0161o, bet ra\u017eo\u0161anas pl\u0101not\u0101js p\u0101rstr\u0101d\u0101 grafiku, kas bija sast\u0101d\u012bts, pie\u0146emot, ka deta\u013cas &#8230; <a title=\"Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/\" aria-label=\"Read more about Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110607,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-110587","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rst kr\u0101jumu neatbilst\u012bbas<\/title>\n<meta name=\"description\" content=\"Uzskait\u0113 kr\u0101jumi ir, bet ra\u017eo\u0161ana gaida? Ciklisk\u0101 inventariz\u0101cija pal\u012bdz nov\u0113rst neatbilst\u012bbas un iek\u013caut preciz\u0113tos kr\u0101jumu datus ra\u017eo\u0161anas pl\u0101n\u0101.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas\" \/>\n<meta property=\"og:description\" content=\"Uzskait\u0113 kr\u0101jumi ir, bet ra\u017eo\u0161ana gaida? Ciklisk\u0101 inventariz\u0101cija pal\u012bdz nov\u0113rst neatbilst\u012bbas un iek\u013caut preciz\u0113tos kr\u0101jumu datus ra\u017eo\u0161anas pl\u0101n\u0101.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-26T03:51:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T03:52:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/cikliska-inventarizacija\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/cikliska-inventarizacija\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas\",\"datePublished\":\"2026-10-26T03:51:55+00:00\",\"dateModified\":\"2026-10-26T03:52:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/cikliska-inventarizacija\\\/\"},\"wordCount\":3398,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/cikliska-inventarizacija\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/cikliska-inventarizacija\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/cikliska-inventarizacija\\\/\",\"name\":\"Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rst kr\u0101jumu neatbilst\u012bbas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/cikliska-inventarizacija\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/cikliska-inventarizacija\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"datePublished\":\"2026-10-26T03:51:55+00:00\",\"dateModified\":\"2026-10-26T03:52:44+00:00\",\"description\":\"Uzskait\u0113 kr\u0101jumi ir, bet ra\u017eo\u0161ana gaida? Ciklisk\u0101 inventariz\u0101cija pal\u012bdz nov\u0113rst neatbilst\u012bbas un iek\u013caut preciz\u0113tos kr\u0101jumu datus ra\u017eo\u0161anas pl\u0101n\u0101.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/cikliska-inventarizacija\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/cikliska-inventarizacija\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/cikliska-inventarizacija\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A gloved finger checks metal parts arranged beside an open bin during a selected physical inventory count.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/cikliska-inventarizacija\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rst kr\u0101jumu neatbilst\u012bbas","description":"Uzskait\u0113 kr\u0101jumi ir, bet ra\u017eo\u0161ana gaida? Ciklisk\u0101 inventariz\u0101cija pal\u012bdz nov\u0113rst neatbilst\u012bbas un iek\u013caut preciz\u0113tos kr\u0101jumu datus ra\u017eo\u0161anas pl\u0101n\u0101.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/","og_locale":"lv_LV","og_type":"article","og_title":"Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas","og_description":"Uzskait\u0113 kr\u0101jumi ir, bet ra\u017eo\u0161ana gaida? Ciklisk\u0101 inventariz\u0101cija pal\u012bdz nov\u0113rst neatbilst\u012bbas un iek\u013caut preciz\u0113tos kr\u0101jumu datus ra\u017eo\u0161anas pl\u0101n\u0101.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-26T03:51:55+00:00","article_modified_time":"2026-10-26T03:52:44+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas","datePublished":"2026-10-26T03:51:55+00:00","dateModified":"2026-10-26T03:52:44+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/"},"wordCount":3398,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/","name":"Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rst kr\u0101jumu neatbilst\u012bbas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","datePublished":"2026-10-26T03:51:55+00:00","dateModified":"2026-10-26T03:52:44+00:00","description":"Uzskait\u0113 kr\u0101jumi ir, bet ra\u017eo\u0161ana gaida? Ciklisk\u0101 inventariz\u0101cija pal\u012bdz nov\u0113rst neatbilst\u012bbas un iek\u013caut preciz\u0113tos kr\u0101jumu datus ra\u017eo\u0161anas pl\u0101n\u0101.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","width":1672,"height":941,"caption":"A gloved finger checks metal parts arranged beside an open bin during a selected physical inventory count."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/cikliska-inventarizacija\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas S\u0101kums &raquo; Resursi &raquo; Ciklisk\u0101 inventariz\u0101cija ra\u017eo\u0161an\u0101: nov\u0113rsiet kr\u0101jumu neatbilst\u012bbas Kr\u0101jumu uzskaite r\u0101da, ka komponenti ir pieejami. Ta\u010du operators atver konteineru un konstat\u0113, ka to nepietiek ra\u017eo\u0161anas uzdevuma pabeig\u0161anai. Noliktavas darbinieki s\u0101k mekl\u0113\u0161anu, iepirkumu speci\u0101listi steidz sag\u0101d\u0101t tr\u016bksto\u0161o, bet ra\u017eo\u0161anas pl\u0101not\u0101js p\u0101rstr\u0101d\u0101 grafiku, kas bija sast\u0101d\u012bts, pie\u0146emot, ka deta\u013cas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/110587","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=110587"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/110587\/revisions"}],"predecessor-version":[{"id":110650,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/110587\/revisions\/110650"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/110607"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=110587"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=110587"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=110587"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}