{"id":108933,"date":"2026-10-24T16:49:56","date_gmt":"2026-10-24T16:49:56","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=108933"},"modified":"2026-10-24T16:50:47","modified_gmt":"2026-10-24T16:50:47","slug":"mttr","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/","title":{"rendered":"Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Resursi<\/a> &raquo; Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Vid\u0113jais remonta laiks (MTTR) ir noteikta remonta vai darbsp\u0113jas atjauno\u0161anas procesa vid\u0113jais ilgums p\u0113c iek\u0101rtas atteices.<\/strong> Lai to apr\u0113\u0137in\u0101tu, saskaitiet savstarp\u0113ji sal\u012bdzin\u0101mu, pabeigtu gad\u012bjumu ilgumus un izdaliet summu ar \u0161o gad\u012bjumu skaitu:<\/p>\n\n\n<p><strong>MTTR = kop\u0113jais remonta vai darbsp\u0113jas atjauno\u0161anas laiks \u00f7 pabeigto gad\u012bjumu skaits<\/strong><\/p>\n\n\n<p>Tas, k\u0101du laiku uzskait\u0101t, ir tikpat svar\u012bgi k\u0101 pats dal\u012bjums. Deta\u013cas nomai\u0146a var aiz\u0146emt 40 min\u016btes, bet iek\u0101rta var b\u016bt nepieejama tr\u012bs stundas. Noder\u012bg\u0101 p\u0101rskat\u0101 \u0161\u012b at\u0161\u0137ir\u012bba ir skaidri redzama, lai tehnisk\u0101s apkopes komanda var\u0113tu uzlabot attiec\u012bgo procesa posmu un ra\u017eo\u0161anu var\u0113tu pl\u0101not atbilsto\u0161i faktiski pieejamajai jaudai.<\/p>\n\n\n<p>MTTR pal\u012bdz izprast iepriek\u0161\u0113j\u0101s atteices. Tas nepasaka, kad tiks nov\u0113rsta pa\u0161reiz\u0113j\u0101 atteice. Lai noteiktu paredzamo iek\u0101rtas atgrie\u0161an\u0101s laiku darb\u0101, vajadz\u012bgs tehnisk\u0101s apkopes komandas aktu\u0101lais v\u0113rt\u0113jums. Ja tas main\u0101s, izmai\u0146as j\u0101atspogu\u013co ar\u012b ra\u017eo\u0161anas grafik\u0101. SkyPlanner iek\u013cauj atjaunin\u0101to inform\u0101ciju par iek\u0101rtas pieejam\u012bbu kop\u012bg\u0101 grafik\u0101, lai j\u016bs redz\u0113tu ietekmi uz klientu pas\u016bt\u012bjumiem, nep\u0101rk\u0101rtojot katru saist\u012bto darbu rindu manu\u0101li.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vispirms nosakiet, k\u0101du laika interv\u0101lu m\u0113r\u012bsiet ar MTTR<\/h2>\n\n\n<p>Sa\u012bsin\u0101jumu MTTR lieto, run\u0101jot par vid\u0113jo remonta, atkop\u0161anas vai darbsp\u0113jas atjauno\u0161anas laiku, ta\u010du \u0161ie apz\u012bm\u0113jumi ne vienm\u0113r noz\u012bm\u0113 vien\u0101dus interv\u0101lus. IEC dro\u0161uma terminolo\u0123ij\u0101 MTTR noz\u012bm\u0113 <strong>vid\u0113jo darbsp\u0113jas atjauno\u0161anas laiku<\/strong>. P\u0101rskats, kur\u0101 uzskaita tikai akt\u012bv\u0101 remonta laiku, atbild uz \u0161aur\u0101ku jaut\u0101jumu nek\u0101 p\u0101rskats, kur\u0101 iek\u013cauj ar\u012b tehni\u0137a vai rezerves da\u013cas gaid\u012b\u0161anu.<\/p>\n\n\n<p>\u0160aj\u0101 ce\u013cved\u012b apl\u016bkotaj\u0101 ra\u017eo\u0161anas p\u0101rskata piem\u0113r\u0101 <strong>MTTR m\u0113ra visu laiku no iek\u0101rtas atteices l\u012bdz br\u012bdim, kad ir p\u0101rbaud\u012bts un apstiprin\u0101ts, ka t\u0101 ir pieejama ra\u017eo\u0161anai<\/strong>. Laika uzskaite turpin\u0101s ar\u012b rea\u0123\u0113\u0161anas aizkav\u0113\u0161an\u0101s, diagnostikas, gaid\u012b\u0161anas, remonta, test\u0113\u0161anas un nepiecie\u0161am\u0101s at\u013caujas sa\u0146em\u0161anas laik\u0101, l\u012bdz iek\u0101rta atkal ir pieejama. Akt\u012bv\u0101 remonta laiku uzskait\u0101m atsevi\u0161\u0137i.<\/p>\n\n\n<p>Nor\u0101diet \u0161o noteikumu virs p\u0101rskata kop\u0101 ar to, k\u0101das iek\u0101rtas tas aptver un par k\u0101du periodu ir sagatavots. Ja j\u016bsu uz\u0146\u0113mums, l\u012bgums vai p\u0101rskatu standarts nosaka citu interv\u0101lu, izmantojiet \u0161o defin\u012bciju un skaidri to nor\u0101diet. Nesal\u012bdziniet p\u0113c \u0161\u012bs defin\u012bcijas ieg\u016bto r\u0101d\u012bt\u0101ju ar \u0161eit apr\u0113\u0137in\u0101to, kam\u0113r uzskaites robe\u017eas nesakr\u012bt.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tr\u012bs stundu p\u0101rtraukum\u0101 akt\u012bvais remonts var aiz\u0146emt daudz maz\u0101k laika<\/h3>\n\n\n<p>Iedom\u0101jieties apstr\u0101des centru, kuram atteice notiek plkst. 08:00 un kuru plkst. 11:00 at\u013cauj atkal izmantot ra\u017eo\u0161an\u0101. \u0160\u0101 gad\u012bjuma uzskait\u0113 ir nodal\u012bti \u0161\u0101di posmi:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Posms<\/th><th>Laika interv\u0101ls<\/th><th>Ilgums<\/th><\/tr><\/thead><tbody><tr><td>Gaid\u012b\u0161ana, l\u012bdz rea\u0123\u0113 tehnisk\u0101s apkopes komanda<\/td><td>08:00\u201308:30<\/td><td>30 min\u016btes<\/td><\/tr><tr><td>Diagnostika<\/td><td>08:30\u201308:50<\/td><td>20 min\u016btes<\/td><\/tr><tr><td>Nepiecie\u0161am\u0101s deta\u013cas gaid\u012b\u0161ana<\/td><td>08:50\u201309:50<\/td><td>60 min\u016btes<\/td><\/tr><tr><td>Remontdarbi<\/td><td>09:50\u201310:30<\/td><td>40 min\u016btes<\/td><\/tr><tr><td>Darb\u012bbas p\u0101rbaude<\/td><td>10:30\u201310:40<\/td><td>10 min\u016btes<\/td><\/tr><tr><td>Oblig\u0101t\u0101s p\u0101rbaudes pirms at\u013caujas ats\u0101kt ra\u017eo\u0161anu<\/td><td>10:40\u201311:00<\/td><td>20 min\u016btes<\/td><\/tr><tr><td>Kop\u0113jais laiks l\u012bdz darbsp\u0113jas atjauno\u0161anai<\/td><td>08:00\u201311:00<\/td><td>180 min\u016btes<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0160aj\u0101 piem\u0113r\u0101 atsevi\u0161\u0137i uzskait\u012btais akt\u012bv\u0101 remonta laiks ietver diagnostiku, remontdarbus un darb\u012bbas p\u0101rbaudi: <strong>20 + 40 + 10 = 70 min\u016btes<\/strong>. Kop\u0113jais laiks l\u012bdz darbsp\u0113jas atjauno\u0161anai ir <strong>180 min\u016btes<\/strong>. Abi skait\u013ci ir pareizi \u2014 tie atbild uz da\u017e\u0101diem jaut\u0101jumiem.<\/p>\n\n\n<p>\u0160is no\u0161\u0137\u012brums par\u0101da, kur vajadz\u012bgi uzlabojumi. Uzlabojot deta\u013cas nomai\u0146u, kas aiz\u0146em 40 min\u016btes, nevar\u0113s nov\u0113rst stundu ilgo deta\u013cas gaid\u012b\u0161anu. Savuk\u0101rt lab\u0101ka deta\u013cu pieejam\u012bba neatrisin\u0101s sare\u017e\u0123\u012btu diagnostiku.<\/p>\n\n\n<p>Piem\u0113r\u0101 \u0161ie posmi seko cits citam. Re\u0101l\u0101 gad\u012bjum\u0101 da\u013ca darbu var notikt vienlaikus. Pag\u0101ju\u0161o laiku uzskaitiet tikai vienreiz: ja divi tehni\u0137i str\u0101d\u0101 kop\u0101 40 min\u016btes, tas nenoz\u012bm\u0113 80 min\u016b\u0161u p\u0101rtraukumu. Cilv\u0113kstundas var noder\u0113t tehnisk\u0101s apkopes izmaksu anal\u012bz\u0113, ta\u010du t\u0101s nevar piel\u012bdzin\u0101t iek\u0101rtas faktisk\u0101 p\u0101rtraukuma ilgumam.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Neiek\u013caujiet ar atteici nesaist\u012btus laika zudumus<\/h3>\n\n\n<p>Gad\u012bjuma laika uzskaite beidzas, kad iek\u0101rta atbilst saska\u0146otajiem nosac\u012bjumiem darba ats\u0101k\u0161anai, nevis tad, kad k\u0101ds v\u0113l\u0101k nosl\u0113dz tehnisk\u0101s apkopes darbu pas\u016bt\u012bjumu. Ja iek\u0101rta ir pieejama plkst. 11:00, bet n\u0101kamajam pas\u016bt\u012bjumam materi\u0101lu nav l\u012bdz pusdienlaikam, \u0161\u012b papildu stunda ir materi\u0101lu gaid\u012b\u0161anas laiks, nevis v\u0113l viena darbsp\u0113jas atjauno\u0161anas stunda.<\/p>\n\n\n<p>Ar\u012b pl\u0101nota apkope, parasta p\u0101rregul\u0113\u0161ana un operatora gaid\u012b\u0161ana nav autom\u0101tiski uzskat\u0101ma par remontu atteices nov\u0113r\u0161anai. Uzskaitiet \u0161os laika zudumus atbilsto\u0161aj\u0101s kategorij\u0101s, nevis iek\u013caujiet MTTR katru d\u012bkst\u0101ves min\u016bti. \u0160aj\u0101 p\u0101rskat\u0101 m\u0113ra darbsp\u0113jas atjauno\u0161anu p\u0113c defin\u0113t\u0101s iek\u0101rtas atteices, nevis visu r\u016bpn\u012bcas d\u012bkst\u0101vi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Atlasiet sal\u012bdzin\u0101mus pabeigtos gad\u012bjumus<\/h2>\n\n\n<p>S\u0101ciet ar vienu iek\u0101rtu vai t\u0101du iek\u0101rtu grupu, kur\u0101 gan iek\u0101rtas, gan attei\u010du veidi patie\u0161\u0101m ir sal\u012bdzin\u0101mi. Gan neliela sensora nomai\u0146a, gan kapit\u0101lais remonts var b\u016bt pamatoti iek\u013caujami gad\u012bjumi, ta\u010du, apr\u0113\u0137inot to vid\u0113jo ilgumu un nepar\u0101dot sadal\u012bjumu, var pasl\u0113pt probl\u0113mu, kas j\u0101risina.<\/p>\n\n\n<p>M\u0113ne\u0161a p\u0101rskatam var izmantot \u0161\u0101du noteikumu: iek\u013caut <strong>m\u0113ne\u0161a laik\u0101 pabeigtos darbsp\u0113jas atjauno\u0161anas gad\u012bjumus<\/strong>, katram uzskaitot pilnu ilgumu, pat ja tas s\u0101cies iepriek\u0161\u0113j\u0101 m\u0113nes\u012b. Dal\u012bt\u0101js ir \u0161o pabeigto gad\u012bjumu skaits, nevis visas m\u0113nes\u012b re\u0123istr\u0113t\u0101s atteices vai visas tehnisk\u0101s apkopes darbu pas\u016bt\u012bjumu poz\u012bcijas.<\/p>\n\n\n<p>Katru m\u0113nesi piem\u0113rojiet vienu un to pa\u0161u noteikumu un saglab\u0101jiet apr\u0113\u0137ina pamat\u0101 eso\u0161os ierakstus. \u012apa\u0161i iev\u0113rojiet t\u0101l\u0101k min\u0113to:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Vienai nenov\u0113rstai atteicei izmantojiet vienu gad\u012bjuma identifikatoru.<\/strong> Vair\u0101ki trauksmes sign\u0101li, tehni\u0137i vai tehnisk\u0101s apkopes darbu pas\u016bt\u012bjuma uzdevumi ne vienm\u0113r noz\u012bm\u0113 vair\u0101kus darbsp\u0113jas atjauno\u0161anas gad\u012bjumus.<\/li><li><strong>Par\u0101diet ar\u012b nepabeigtos gad\u012bjumus.<\/strong> Ja remonts m\u0113ne\u0161a beig\u0101s v\u0113l nav pabeigts, t\u0101 gal\u012bgais darbsp\u0113jas atjauno\u0161anas ilgums v\u0113l nav zin\u0101ms. Atsevi\u0161\u0137i nor\u0101diet, cik ilgi gad\u012bjums turpin\u0101s un k\u0101ds ir t\u0101 statuss; neuzskaitiet to k\u0101 pabeigtu remontu ar nulles stundu ilgumu.<\/li><li><strong>P\u0101rbaudiet laika atz\u012bmes.<\/strong> Datu ievades laiks ne vienm\u0113r sakr\u012bt ar atteices, rea\u0123\u0113\u0161anas vai darbsp\u0113jas atjauno\u0161anas laiku. Ja atteices laiks nav zin\u0101ms, nor\u0101diet faktiski pieejamo t\u0101s konstat\u0113\u0161anas laika atz\u012bmi, nevis izdom\u0101jiet agr\u0101ku laiku.<\/li><li><strong>Skaidri nor\u0101diet iz\u0146\u0113mumus.<\/strong> Paskaidrojiet tr\u016bksto\u0161\u0101s laika atz\u012bmes, atceltos ierakstus un gad\u012bjumu kategorijas, kas nav iek\u013cautas apr\u0113\u0137in\u0101. Neizsl\u0113dziet pamatoti iek\u013caujamu ilgu remontu tikai t\u0101p\u0113c, ka tas pasliktina vid\u0113jo r\u0101d\u012bt\u0101ju.<\/li><\/ul>\n\n\n<p>Pabeigto gad\u012bjumu p\u0101rskats var izskat\u012bties neparasti labv\u0113l\u012bgs, kam\u0113r ilgsto\u0161a boj\u0101juma nov\u0113r\u0161ana v\u0113l turpin\u0101s. T\u0101p\u0113c l\u012bdz\u0101s vid\u0113jam r\u0101d\u012bt\u0101jam j\u0101par\u0101da ar\u012b nepabeigto gad\u012bjumu saraksts. Ja t\u0101 viet\u0101 atlas\u0101t atteices, kas s\u0101ku\u0161\u0101s p\u0101rskata period\u0101, sekojiet \u0161ai gad\u012bjumu kopai l\u012bdz darbsp\u0113jas atjauno\u0161anai un paskaidrojiet, k\u0101 uzskait\u0101t nepabeigtos gad\u012bjumus. Nemainiet \u0161\u012bs divas metodes bez paskaidrojuma.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTTR apr\u0113\u0137ina piem\u0113rs<\/h2>\n\n\n<p>Iedom\u0101jieties, ka p\u0101rskata m\u0113nes\u012b vienai un tai pa\u0161ai iek\u0101rtai ir pabeigti \u010detri darbsp\u0113jas atjauno\u0161anas gad\u012bjumi. Katr\u0101 gad\u012bjum\u0101 laiku uzskaita p\u0113c iepriek\u0161 aprakst\u012bt\u0101 noteikuma. Akt\u012bv\u0101 remonta laika aile ir saglab\u0101ta, lai par\u0101d\u012btu at\u0161\u0137ir\u012bbu, nevis lai to pieskait\u012btu kop\u0113jam pag\u0101ju\u0161ajam laikam.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Pabeigtais gad\u012bjums<\/th><th>Laiks no atteices l\u012bdz pieejam\u012bbas atjauno\u0161anai<\/th><th>Akt\u012bv\u0101 remonta laiks<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>90 min\u016btes<\/td><td>60 min\u016btes<\/td><\/tr><tr><td>B: piem\u0113rs ar interv\u0101lu 08:00\u201311:00<\/td><td>180 min\u016btes<\/td><td>70 min\u016btes<\/td><\/tr><tr><td>C<\/td><td>150 min\u016btes<\/td><td>110 min\u016btes<\/td><\/tr><tr><td>D<\/td><td>420 min\u016btes<\/td><td>240 min\u016btes<\/td><\/tr><tr><td>Kop\u0101<\/td><td>840 min\u016btes<\/td><td>480 min\u016btes<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Galvenais apr\u0113\u0137ins ir \u0161\u0101ds:<\/p>\n\n\n<p><strong>MTTR, r\u0113\u0137inot pilno darbsp\u0113jas atjauno\u0161anas laiku = 840 min\u016btes \u00f7 4 gad\u012bjumi = 210 min\u016btes jeb 3,5 stundas.<\/strong><\/p>\n\n\n<p>Atsevi\u0161\u0137i apr\u0113\u0137in\u0101tais vid\u0113jais akt\u012bv\u0101 remonta laiks ir:<\/p>\n\n\n<p><strong>480 min\u016btes \u00f7 4 gad\u012bjumi = 120 min\u016btes jeb 2 stundas.<\/strong><\/p>\n\n\n<p>Ja p\u0101rskat\u0101 nor\u0101d\u012btu \u201cMTTR: 2 stundas\u201d, nepreciz\u0113jot, ka tas ir tikai akt\u012bv\u0101 remonta laiks, \u0161aj\u0101 piem\u0113r\u0101 tiktu uzr\u0101d\u012bts maz\u0101ks laiks nek\u0101 izm\u0113r\u012btais pilnais atjauno\u0161anas laiks. Savuk\u0101rt, nor\u0101dot 3,5 stundas bez defin\u012bcijas, las\u012bt\u0101jam paliktu neskaidrs, kas apr\u0113\u0137in\u0101 iek\u013cauts.<\/p>\n\n\n<p>Pirms ilgumu summ\u0113\u0161anas p\u0101rv\u0113rtiet tos vien\u0101d\u0101s m\u0113rvien\u012bb\u0101s. Devi\u0146desmit min\u016btes ir 1,5 stundas, nevis 0,90 stundas. Ja nav pabeigts neviens atlases krit\u0113rijiem atbilsto\u0161s atjauno\u0161anas gad\u012bjums, \u0161ai gad\u012bjumu kopai nav nov\u0113rot\u0101 vid\u0113j\u0101 r\u0101d\u012bt\u0101ja. Nor\u0101diet, ka gad\u012bjumu skaits ir nulle un vid\u0113jais r\u0101d\u012bt\u0101js nav pieejams, nevis nor\u0101diet nulles min\u016b\u0161u MTTR.<\/p>\n\n\n<p>Lai ieg\u016btu r\u0101d\u012bt\u0101ju iek\u0101rtu grupai, saskaitiet iek\u013cauto gad\u012bjumu ilgumus un daliet summu ar \u0161o gad\u012bjumu kopskaitu. Ja iek\u0101rt\u0101m ir at\u0161\u0137ir\u012bgs remontu skaits, nedr\u012bkst vienk\u0101r\u0161i apr\u0113\u0137in\u0101t to vid\u0113jo r\u0101d\u012bt\u0101ju vid\u0113jo v\u0113rt\u012bbu. Saglab\u0101jiet iesp\u0113ju skat\u012bt datus pa iek\u0101rt\u0101m un attei\u010du veidiem, lai kop\u0113jais r\u0101d\u012bt\u0101js nenosl\u0113ptu nopietnu probl\u0113mu k\u0101d\u0101 atsevi\u0161\u0137\u0101 iek\u0101rt\u0101.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0101ds MTTR ir uzskat\u0101ms par labu?<\/h2>\n\n\n<p>Labs rezult\u0101ts noz\u012bm\u0113 j\u0113gpilnu uzlabojumu atjauno\u0161anas proces\u0101, kuru m\u0113ra p\u0113c nemain\u012bgiem principiem, neapdraudot pras\u012bto izn\u0101kumu. Nav viena stund\u0101s izteikta m\u0113r\u0137a, kas b\u016btu piem\u0113rots vis\u0101m ra\u017eo\u0161anas iek\u0101rt\u0101m un visiem attei\u010du veidiem.<\/p>\n\n\n<p>Sal\u012bdziniet iek\u0101rtas r\u0101d\u012bt\u0101jus ar t\u0101s pa\u0161as iepriek\u0161\u0113jiem r\u0101d\u012bt\u0101jiem l\u012bdz\u012bgos apst\u0101k\u013cos. Pirms secin\u0101t, ka zem\u0101ks vid\u0113jais r\u0101d\u012bt\u0101js liecina par efekt\u012bv\u0101ku remontu, p\u0101rbaudiet, vai nav main\u012bjies gad\u012bjumu sast\u0101vs, person\u0101la pieejam\u012bba mai\u0146\u0101s, tehnisk\u0101s apkopes metode vai uzskaites noteikumi. M\u0113nesis ar vair\u0101kiem vienk\u0101r\u0161iem boj\u0101jumiem var izskat\u012bties lab\u0101k nek\u0101 m\u0113nesis ar vienu sare\u017e\u0123\u012btu atteici, lai gan komanda abos str\u0101d\u0101jusi vienl\u012bdz labi.<\/p>\n\n\n<p>V\u0113rt\u0113jiet vid\u0113jo r\u0101d\u012bt\u0101ju kop\u0101 ar gad\u012bjumu skaitu, kop\u0113jo zaud\u0113to laiku, atsevi\u0161\u0137u gad\u012bjumu ilgumu un posmiem, kas rada aizkav\u0113\u0161anos. Piem\u0113r\u0101 ar \u010detriem gad\u012bjumiem pilnie atjauno\u0161anas laiki augo\u0161\u0101 sec\u012bb\u0101 ir 90, 150, 180 un 420 min\u016btes. Medi\u0101na ir <strong>165 min\u016btes<\/strong>, bet vid\u0113jais r\u0101d\u012bt\u0101js \u2014 210 min\u016btes. \u0160is p\u0113d\u0113jais, ilg\u0101kais gad\u012bjums ir j\u0101izp\u0113ta, nevis j\u0101izdz\u0113\u0161, lai abi r\u0101d\u012bt\u0101ji sakristu.<\/p>\n\n\n<p>MTTR pats par sevi ar\u012b neatkl\u0101j, cik bie\u017ei iek\u0101rta atsak\u0101s darboties. <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/\">Vid\u0113jais laiks starp atteic\u0113m<\/a> jeb MTBF raksturo remont\u0113jamas iek\u0101rtas darb\u012bbas laiku uz vienu atteici. Bie\u017e\u0101m, \u012bslaic\u012bg\u0101m atteic\u0113m un ret\u0101m, ilgsto\u0161\u0101m atteic\u0113m vajadz\u012bgi at\u0161\u0137ir\u012bgi uzlabojumi, pat ja to kop\u0113jais zaud\u0113tais laiks ir l\u012bdz\u012bgs.<\/p>\n\n\n<p>Svar\u012bg\u0101kais: <strong>3,5 stundas nav n\u0101kam\u0101 remonta pabeig\u0161anas termi\u0146\u0161<\/strong>. Pa\u0161reiz\u0113j\u0101 boj\u0101juma nov\u0113r\u0161anai var b\u016bt vajadz\u012bga cita deta\u013ca, cits speci\u0101lists vai cita p\u0101rbaude. Izmantojiet sal\u012bdzin\u0101mus v\u0113sturiskos datus k\u0101 pamatu sarunai, p\u0113c tam l\u016bdziet tehnisk\u0101s apkopes komandai pa\u0161reiz\u0113j\u0101s situ\u0101cijas nov\u0113rt\u0113jumu un vienojieties par n\u0101kamo izv\u0113rt\u0113\u0161anas br\u012bdi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Samaziniet aizkav\u0113\u0161anos, kas paties\u012bb\u0101 ne\u013cauj ats\u0101kt ra\u017eo\u0161anu<\/h2>\n\n\n<p>Pirms izv\u0113l\u0113ties r\u012bc\u012bbu, sadaliet ilg\u0101kos gad\u012bjumus pa posmiem. Lab\u0101kais uzlabojums ne vienm\u0113r ir \u0101tr\u0101ka pa\u0161a remonta veik\u0161ana \u2014 tas var b\u016bt gaid\u012b\u0161anas nov\u0113r\u0161ana pirms remonta s\u0101kuma.<\/p>\n\n\n<p>Ja rea\u0123\u0113\u0161ana ir l\u0113na, p\u0101rskatiet, k\u0101 zi\u0146a par boj\u0101jumu non\u0101k pie atbild\u012bg\u0101s personas un k\u0101 atbild\u012bba tiek nodota starp mai\u0146\u0101m. Iek\u0101rtas identifikators, nov\u0113rot\u0101s paz\u012bmes un skaidra k\u0101rt\u012bba, k\u0101 probl\u0113mu nodot t\u0101l\u0101k, tehnisk\u0101s apkopes komandai dod daudz noder\u012bg\u0101ku s\u0101kumpunktu nek\u0101 neskaidra zi\u0146a, ka ra\u017eo\u0161ana ir apst\u0101jusies.<\/p>\n\n\n<p>Ja visvair\u0101k laika aiz\u0146em diagnostika, uzlabojiet piek\u013cuvi attiec\u012bg\u0101s iek\u0101rtas inform\u0101cijai, boj\u0101jumu v\u0113sturei un speci\u0101listu zin\u0101\u0161an\u0101m. Atk\u0101rtotus boj\u0101jumus izv\u0113rt\u0113jiet kop\u0101 ar tehnisk\u0101s apkopes komandu un in\u017eenieriem. Atk\u0101rtota iek\u0101rtas atiestat\u012b\u0161ana var sa\u012bsin\u0101t atsevi\u0161\u0137as re\u0123istr\u0113t\u0101s apst\u0101\u0161an\u0101s, ta\u010du nenov\u0113rst to c\u0113loni.<\/p>\n\n\n<p>Ja liel\u0101ko da\u013cu laika aiz\u0146em deta\u013cu gaid\u012b\u0161ana, noskaidrojiet, kura deta\u013ca bija vajadz\u012bga, k\u0101 t\u0101 tika identific\u0113ta un k\u0101p\u0113c nebija pieejama. M\u0113r\u0137\u0113ts uzlabojums kritiski svar\u012bgu rezerves da\u013cu pieejam\u012bb\u0101 vai identific\u0113\u0161an\u0101 var b\u016bt lietder\u012bg\u0101ks nek\u0101 visu deta\u013cu glab\u0101\u0161ana noliktav\u0101. Tr\u012bs stundu piem\u0113r\u0101 60 min\u016b\u0161u ilg\u0101 deta\u013cas gaid\u012b\u0161ana ir ac\u012bmredzams izp\u0113tes jaut\u0101jums, nevis pier\u0101d\u012bjums tam, ka k\u0101da konkr\u0113ta kr\u0101jumu politika jau ir pamatota.<\/p>\n\n\n<p>Ja visilg\u0101k aiz\u0146em pats remonts, izv\u0113rt\u0113jiet sagatavo\u0161anos, piek\u013cuvi iek\u0101rtai, instrumentus, instrukcijas un darbam vajadz\u012bg\u0101s prasmes. Ja \u0161aur\u0101 vieta ir p\u0101rbaude vai at\u013caujas do\u0161ana ekspluat\u0101cijas ats\u0101k\u0161anai, vienojieties, k\u0101 laikus nodro\u0161in\u0101t vajadz\u012bgo cilv\u0113ku pieejam\u012bbu un p\u0101rbau\u017eu veik\u0161anu. Uzlabojums ir lab\u0101k sagatavota ekspluat\u0101cijas ats\u0101k\u0161ana, nevis p\u0101rbau\u017eu izlai\u0161ana, lai \u0101tr\u0101k aptur\u0113tu laika uzskaiti.<\/p>\n\n\n<p>Nosakiet atbild\u012bgo par izv\u0113l\u0113to pas\u0101kumu un izv\u0113rt\u0113jiet turpm\u0101kos sal\u012bdzin\u0101mos gad\u012bjumus. Sekojiet gan attiec\u012bg\u0101 posma ilgumam, gan pilnajam atjauno\u0161anas laikam. \u012as\u0101ks remonta posms ra\u017eo\u0161anai dod ierobe\u017eotu ieguvumu, ja ietaup\u012btais laiks vienk\u0101r\u0161i p\u0101rv\u0113r\u0161as cit\u0101 gaid\u012b\u0161an\u0101 vai nepabeigts darbs dr\u012bz izraisa v\u0113l vienu p\u0101rtraukumu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Atjauniniet ra\u017eo\u0161anas pl\u0101nu, mainoties remonta gaitai<\/h2>\n\n\n<p>Uzlabot atjauno\u0161anu n\u0101kotn\u0113 ir viens uzdevums. <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-grafika-parplanosana-pec-iekartas-bojajuma\/\">Izpild\u012bt \u0161odienas saist\u012bbas pret klientiem<\/a> \u2014 cits. Lai izlemtu, ko ra\u017eot t\u0101l\u0101k, nevar gaid\u012bt m\u0113ne\u0161a beigu vid\u0113jo r\u0101d\u012bt\u0101ju.<\/p>\n\n\n<p>Iedom\u0101jieties, ka tehnisk\u0101s apkopes komanda s\u0101kotn\u0113ji paredz apstr\u0101des centra darba ats\u0101k\u0161anu plkst. 11:00. P\u0113c atk\u0101rtota izv\u0113rt\u0113juma paredzamais laiks tiek p\u0101rcelts uz 14:00. V\u0113sturiskais MTTR nav main\u012bjies, ta\u010du gaido\u0161ajiem pas\u016bt\u012bjumiem pieejam\u0101 jauda gan ir main\u012bjusies. Vienam pas\u016bt\u012bjumam p\u0113c meh\u0101nisk\u0101s apstr\u0101des v\u0113l j\u0101veic p\u0101rbaude, bet alternat\u012bvaj\u0101 centr\u0101 jau iepl\u0101nots darbs citam klientam.<\/p>\n\n\n<p><strong>SkyPlanner APS iek\u013cauj \u0161o jaudas izmai\u0146u <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/kas-ir-razosanas-planosana\/\">vienotaj\u0101 ra\u017eo\u0161anas grafik\u0101<\/a>.<\/strong> Re\u0123istr\u0113jiet tehnisk\u0101s apkopes komandas izv\u0113rt\u0113to periodu, kur\u0101 darba centrs nav pieejams, k\u0101 darba centra iz\u0146\u0113mumu. Kad paredzamais darba ats\u0101k\u0161anas laiks main\u0101s, atjauniniet laika interv\u0101lu un p\u0101rr\u0113\u0137iniet grafiku. SkyPlanner pl\u0101no\u0161anas m\u0101ksl\u012bgais intelekts Arcturus p\u0101rpl\u0101no t\u0101s izmai\u0146u skart\u0101s oper\u0101cijas, kuras var iek\u013caut grafik\u0101, atbilsto\u0161i re\u0123istr\u0113tajai jaudai, \u0146emot v\u0113r\u0101 konfigur\u0113tos resursus, oper\u0101ciju savstarp\u0113j\u0101s atkar\u012bbas, priorit\u0101tes un fiks\u0113jumus. Ieg\u016bt\u0101 sec\u012bba ir redzama Ganta diagramm\u0101.<\/p>\n\n\n<p>Ja darbs ats\u0101ksies plkst. 14:00, p\u0101rbaudiet, vai p\u0113c gaido\u0161ajiem meh\u0101nisk\u0101s apstr\u0101des darbiem v\u0113l pietiks laika p\u0101rbaudei un pieg\u0101dei. Ja oper\u0101ciju var veikt piem\u0113rot\u0101 alternat\u012bv\u0101 iek\u0101rt\u0101, izv\u0113rt\u0113jiet ar\u012b \u0161im resursam jau iepl\u0101not\u0101s saist\u012bbas. Par jau ies\u0101kta darba ats\u0101k\u0161anu j\u0101pie\u0146em atsevi\u0161\u0137s l\u0113mums \u2014 gaido\u0161o darbu rindas p\u0101rr\u0113\u0137ins neaizst\u0101j p\u0101rtraukt\u0101 ra\u017eo\u0161anas uzdevuma st\u0101vok\u013ca p\u0101rbaudi.<\/p>\n\n\n<p>Ieguvums ir maz\u0101ks manu\u0101lais darbs, p\u0101rk\u0101rtojot savstarp\u0113ji atkar\u012bgu darbu rindas, un skaidr\u0101ks pamats l\u0113mumiem par pieg\u0101d\u0113m. Par pa\u0161reiz\u0113jo atjauno\u0161anas laika nov\u0113rt\u0113jumu atbild tehnisk\u0101s apkopes komanda. J\u016bs nosak\u0101t ra\u017eo\u0161anas priorit\u0101tes. Arcturus p\u0101rr\u0113\u0137ina savstarp\u0113ji saist\u012bto darbu grafiku, lai jums neb\u016btu atsevi\u0161\u0137i j\u0101p\u0101rk\u0101rto katras iek\u0101rtas darbu saraksts.<\/p>\n\n\n<p>Tie\u0161i t\u0101p\u0113c l\u012bdztekus remonta procesa uzlabo\u0161anai ir v\u0113rts izv\u0113l\u0113ties SkyPlanner: <strong>p\u0101rskat\u012btais pie\u0146\u0113mums par iek\u0101rtas pieejam\u012bbu tiek \u0146emts v\u0113r\u0101 attiec\u012bgajos pas\u016bt\u012bjumos un turpm\u0101kaj\u0101s oper\u0101cij\u0101s<\/strong>. Ja nenoteikt\u012bba saglab\u0101jas, vienojieties, kad pie\u0146\u0113mumu izv\u0113rt\u0113t v\u0113lreiz, un atjauniniet grafiku, tikl\u012bdz sa\u0146emta prec\u012bz\u0101ka inform\u0101cija.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Apskatiet, k\u0101 viena ieilgusi atteice ietekm\u0113 pieg\u0101des<\/h2>\n\n\n<p>Noder\u012bgs MTTR p\u0101rskats par\u0101da, kas ir m\u0113r\u012bts, kuri gad\u012bjumi veido vid\u0113jo r\u0101d\u012bt\u0101ju un ar ko s\u0101kt uzlabojumus. Noder\u012bgs ra\u017eo\u0161anas pl\u0101ns par\u0101da, k\u0101 r\u012bkoties, kam\u0113r pa\u0161reiz\u0113jais remonts rit savu gaitu. Sasaistot \u0161os l\u0113mumus, pamatota tehnisk\u0101s apkopes anal\u012bze nek\u013c\u016bst tikai par atrautu m\u0113ne\u0161a r\u0101d\u012bt\u0101ju.<\/p>\n\n\n<p>SkyPlanner var integr\u0113t ar jebkuru ERP vai MES sist\u0113mu, izmantojot t\u0101 atv\u0113rto REST API, t\u0101p\u0113c vienota ra\u017eo\u0161anas grafika veido\u0161an\u0101 var izmantot j\u016bsu eso\u0161os pas\u016bt\u012bjumu un ra\u017eo\u0161anas datus.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Piesakieties SkyPlanner demonstr\u0101cijai<\/a> un sagatavojiet piem\u0113ru par vienu nesenu atteici, p\u0101rskat\u012bto pie\u0146\u0113mumu par iek\u0101rtas darba ats\u0101k\u0161anu un klientu pas\u016bt\u012bjumiem, kuru izpild\u0113 \u0161is resurss tiek izmantots. L\u016bdziet par\u0101d\u012bt, kuras gaido\u0161\u0101s oper\u0101cijas tiek p\u0101rceltas, k\u0101 tas ietekm\u0113 turpm\u0101kos posmus un kuriem sol\u012btajiem pieg\u0101des termi\u0146iem j\u0101piev\u0113r\u0161 uzman\u012bba. Ja vispirms v\u0113laties izp\u0113t\u012bt pa\u0161i, <a href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a> un apskatiet, k\u0101 jaudas izmai\u0146as p\u0101rveido grafiku.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus S\u0101kums &raquo; Resursi &raquo; Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus Vid\u0113jais remonta laiks (MTTR) ir noteikta remonta vai darbsp\u0113jas atjauno\u0161anas procesa vid\u0113jais ilgums p\u0113c iek\u0101rtas atteices. Lai to apr\u0113\u0137in\u0101tu, saskaitiet savstarp\u0113ji sal\u012bdzin\u0101mu, pabeigtu gad\u012bjumu ilgumus un izdaliet summu ar \u0161o gad\u012bjumu skaitu: MTTR &#8230; <a title=\"Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/\" aria-label=\"Read more about Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":108953,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-108933","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un maziniet laika zudumus<\/title>\n<meta name=\"description\" content=\"Apr\u0113\u0137iniet j\u0113gpilnu MTTR, noskaidrojiet, kas kav\u0113 iek\u0101rtas atjauno\u0161anu un k\u0101 turpin\u0101t klientu pas\u016bt\u012bjumu izpildi, ja remonts ieilgst.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus\" \/>\n<meta property=\"og:description\" content=\"Apr\u0113\u0137iniet j\u0113gpilnu MTTR, noskaidrojiet, kas kav\u0113 iek\u0101rtas atjauno\u0161anu un k\u0101 turpin\u0101t klientu pas\u016bt\u012bjumu izpildi, ja remonts ieilgst.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-24T16:49:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-24T16:50:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mttr\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mttr\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus\",\"datePublished\":\"2026-10-24T16:49:56+00:00\",\"dateModified\":\"2026-10-24T16:50:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mttr\\\/\"},\"wordCount\":3190,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mttr\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-to-repair-hero.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mttr\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mttr\\\/\",\"name\":\"Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un maziniet laika zudumus\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mttr\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mttr\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-to-repair-hero.png\",\"datePublished\":\"2026-10-24T16:49:56+00:00\",\"dateModified\":\"2026-10-24T16:50:47+00:00\",\"description\":\"Apr\u0113\u0137iniet j\u0113gpilnu MTTR, noskaidrojiet, kas kav\u0113 iek\u0101rtas atjauno\u0161anu un k\u0101 turpin\u0101t klientu pas\u016bt\u012bjumu izpildi, ja remonts ieilgst.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mttr\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mttr\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mttr\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-to-repair-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-to-repair-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Restoration stages from maintenance response and parts waiting through repair, testing and production release.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mttr\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un maziniet laika zudumus","description":"Apr\u0113\u0137iniet j\u0113gpilnu MTTR, noskaidrojiet, kas kav\u0113 iek\u0101rtas atjauno\u0161anu un k\u0101 turpin\u0101t klientu pas\u016bt\u012bjumu izpildi, ja remonts ieilgst.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/","og_locale":"lv_LV","og_type":"article","og_title":"Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus","og_description":"Apr\u0113\u0137iniet j\u0113gpilnu MTTR, noskaidrojiet, kas kav\u0113 iek\u0101rtas atjauno\u0161anu un k\u0101 turpin\u0101t klientu pas\u016bt\u012bjumu izpildi, ja remonts ieilgst.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-24T16:49:56+00:00","article_modified_time":"2026-10-24T16:50:47+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus","datePublished":"2026-10-24T16:49:56+00:00","dateModified":"2026-10-24T16:50:47+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/"},"wordCount":3190,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/","name":"Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un maziniet laika zudumus","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png","datePublished":"2026-10-24T16:49:56+00:00","dateModified":"2026-10-24T16:50:47+00:00","description":"Apr\u0113\u0137iniet j\u0113gpilnu MTTR, noskaidrojiet, kas kav\u0113 iek\u0101rtas atjauno\u0161anu un k\u0101 turpin\u0101t klientu pas\u016bt\u012bjumu izpildi, ja remonts ieilgst.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png","width":1672,"height":941,"caption":"Restoration stages from maintenance response and parts waiting through repair, testing and production release."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mttr\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus S\u0101kums &raquo; Resursi &raquo; Vid\u0113jais remonta laiks: apr\u0113\u0137iniet MTTR un samaziniet laika zudumus Vid\u0113jais remonta laiks (MTTR) ir noteikta remonta vai darbsp\u0113jas atjauno\u0161anas procesa vid\u0113jais ilgums p\u0113c iek\u0101rtas atteices. Lai to apr\u0113\u0137in\u0101tu, saskaitiet savstarp\u0113ji sal\u012bdzin\u0101mu, pabeigtu gad\u012bjumu ilgumus un izdaliet summu ar \u0161o gad\u012bjumu skaitu: MTTR&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/108933","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=108933"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/108933\/revisions"}],"predecessor-version":[{"id":108995,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/108933\/revisions\/108995"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/108953"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=108933"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=108933"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=108933"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}