{"id":108841,"date":"2026-10-24T14:53:53","date_gmt":"2026-10-24T14:53:53","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=108841"},"modified":"2026-10-24T14:54:47","modified_gmt":"2026-10-24T14:54:47","slug":"pieprasijuma-prognozesana","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/","title":{"rendered":"Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Resursi<\/a> &raquo; Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">14<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101 \u013cauj apl\u0113st, kuri produkti klientiem b\u016bs vajadz\u012bgi, k\u0101d\u0101 daudzum\u0101 un kad.<\/strong> Taj\u0101 apvieno v\u0113sturiskos piepras\u012bjuma datus ar inform\u0101ciju par gaid\u0101maj\u0101m p\u0101rmai\u0146\u0101m, lai iepirkumu un ra\u017eo\u0161anas l\u0113mumiem b\u016btu kop\u012bgs pamats.<\/p>\n\n\n<p>Noder\u012bga prognoze pal\u012bdz sagatavoties, neveidojot kr\u0101jumus katram iesp\u0113jamajam p\u0101rdo\u0161anas dar\u012bjumam. Izv\u0113rt\u0113jot prognozes k\u013c\u016bdas un pie\u0146\u0113mumus, var izlemt, k\u0101das saist\u012bbas uz\u0146emties tagad un kas var pagaid\u012bt. Prognoz\u0113\u0161ana ir da\u013ca no piepras\u012bjuma pl\u0101no\u0161anas \u2014 pla\u0161\u0101ka procesa, kur\u0101 izv\u0113rt\u0113 tirgus inform\u0101ciju un vienojas par piepras\u012bjuma pl\u0101nu.<\/p>\n\n\n<p>Praks\u0113 j\u0101atrisina divi uzdevumi: vispirms pietiekami prec\u012bzi j\u0101apl\u0113\u0161 piepras\u012bjums konkr\u0113t\u0101 l\u0113muma pie\u0146em\u0161anai, p\u0113c tam j\u0101izveido ra\u017eo\u0161anas pl\u0101ns, kas \u013cauj \u012bstenot izv\u0113l\u0113to r\u012bc\u012bbu. SkyPlanner APS nodro\u0161ina detaliz\u0113tu ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu atbilsto\u0161i j\u016bsu l\u0113mumiem, t\u0101p\u0113c, tiem mainoties, nav no jauna j\u0101veido atsevi\u0161\u0137as darbu rindas katrai iek\u0101rtai.<\/p>\n\n\n<p>T\u0101l\u0101k apl\u016bkosim, k\u0101 izveidot prognozi, nov\u0113rt\u0113t t\u0101s k\u013c\u016bdas un izmantot to praks\u0113.<\/p>\n\n\n<h2 class=\"wp-block-heading\">1. Nosakiet, k\u0101du l\u0113mumu pie\u0146em\u0161an\u0101 prognozei j\u0101pal\u012bdz<\/h2>\n\n\n<p>S\u0101ciet ar pie\u0146emamo l\u0113mumu, nevis prognoz\u0113\u0161anas modeli. Materi\u0101lu rezerv\u0113\u0161anai produktam ar ilgu pas\u016bt\u012bjuma izpildes laiku, n\u0101kam\u0101 m\u0113ne\u0161a kr\u0101jumu papildin\u0101\u0161anas pl\u0101no\u0161anai un papildu ra\u017eo\u0161anas mai\u0146as izv\u0113rt\u0113\u0161anai ir vajadz\u012bga at\u0161\u0137ir\u012bga detaliz\u0101cijas pak\u0101pe.<\/p>\n\n\n<p>Pirms datu v\u0101k\u0161anas pierakstiet \u010detras lietas:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Ko prognoz\u0113siet:<\/strong> gatavu produktu, produktu saimi vai citu skaidri defin\u0113tu pl\u0101no\u0161anas vien\u012bbu.<\/li><li><strong>M\u0113rvien\u012bba:<\/strong> gabali, iepakojumi, kilogrami vai cita konsekventi lietota fizisk\u0101 m\u0113rvien\u012bba. Ie\u0146\u0113mumi vien var neatkl\u0101t cenu un produktu sortimenta strukt\u016bras izmai\u0146as.<\/li><li><strong>Periods:<\/strong> kad klientiem produkts ir vajadz\u012bgs. Ja dati to \u013cauj, periodu konsekventi nosakiet p\u0113c klienta piepras\u012bt\u0101 datuma.<\/li><li><strong>Pl\u0101no\u0161anas horizonts:<\/strong> cik ilgu laiku iepriek\u0161 j\u0101pie\u0146em l\u0113mums, \u0146emot v\u0113r\u0101 iepirkumu un ra\u017eo\u0161anas pas\u016bt\u012bjumu izpildes laiku.<\/li><\/ul>\n\n\n<p>Ja l\u0113mums par materi\u0101lu ieg\u0101di j\u0101pie\u0146em \u010detras ned\u0113\u013cas pirms to izmanto\u0161anas, nepietiek ar prognozi, kas ir prec\u012bza tikai vienu ned\u0113\u013cu uz priek\u0161u. V\u0113rt\u0113jiet tie\u0161i to \u010detras ned\u0113\u013cas iepriek\u0161 sagatavoto apl\u0113si, kas iepirkumu veic\u0113jiem patie\u0161\u0101m j\u0101izmanto.<\/p>\n\n\n<p>Pl\u0101no\u0161anas detaliz\u0101ciju izv\u0113lieties atbilsto\u0161i pie\u0146emamajam l\u0113mumam. Produktu saimes prognoze var pal\u012bdz\u0113t izv\u0113rt\u0113t papildu mai\u0146as nepiecie\u0161am\u012bbu n\u0101kotn\u0113, ta\u010du t\u0101 nepasaka, kuru konkr\u0113tam variantam vajadz\u012bgo komponentu ieg\u0101d\u0101ties. Savuk\u0101rt, atsevi\u0161\u0137i prognoz\u0113jot katru reti pas\u016bt\u012btu variantu, var ieg\u016bt vair\u0101k nejau\u0161u sv\u0101rst\u012bbu nek\u0101 noder\u012bgas inform\u0101cijas. Nodro\u0161iniet, lai saimes kop\u0113jais apjoms sakristu ar t\u0101 sadal\u012bjumu pa produktiem, un izv\u0113rt\u0113jiet, vai \u0161\u0101 sadal\u012bjuma izmai\u0146as ietekm\u0113 materi\u0101lu vai jaudas vajadz\u012bbas.<\/p>\n\n\n<p>Ra\u017eo\u0161an\u0101 noliktavai prognozes pal\u012bdz pie\u0146emt l\u0113mumus par kr\u0101jumu papildin\u0101\u0161anu. Ra\u017eo\u0161an\u0101 p\u0113c pas\u016bt\u012bjuma pamats ra\u017eo\u0161anas uzs\u0101k\u0161anai var b\u016bt apstiprin\u0101ti pas\u016bt\u012bjumi, savuk\u0101rt prognozes pal\u012bdz laikus sagatavot kop\u012bgi izmantojamo jaudu vai sag\u0101d\u0101t izejmateri\u0101lus ar ilgu pas\u016bt\u012bjuma izpildes laiku. Prognozes esam\u012bba pati par sevi nenoz\u012bm\u0113, ka j\u0101ra\u017eo gatav\u0101s produkcijas kr\u0101jumi v\u0113l neapstiprin\u0101tam piepras\u012bjumam.<\/p>\n\n\n<p>P\u0101rdo\u0161anas m\u0113r\u0137i turiet atsevi\u0161\u0137i no prognozes. M\u0113r\u0137is nosaka, cik uz\u0146\u0113mums v\u0113las p\u0101rdot, bet prognoze r\u0101da pa\u0161reiz\u0113jo apl\u0113si par to, cik klientiem b\u016bs vajadz\u012bgs. Samazinot prognozi, lai t\u0101 atbilstu pa\u0161reiz\u0113jai r\u016bpn\u012bcas jaudai, iesp\u0113jamais neapmierin\u0101tais piepras\u012bjums tiek nosl\u0113pts, nevis atrisin\u0101ts.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2. Sagatavojiet v\u0113sturiskos piepras\u012bjuma datus, kas atspogu\u013co klientu vajadz\u012bbas<\/h2>\n\n\n<p>Izmantojiet konsekventi veidotu piepras\u012bjuma apjomu datu rindu pa produktiem un periodiem. Par s\u0101kumpunktu var kalpot ERP sist\u0113mas nos\u016bt\u012bjumu p\u0101rskats, ta\u010du p\u0101rbaudiet, ko taj\u0101 nor\u0101d\u012btie datumi un daudzumi paties\u012bb\u0101 atspogu\u013co.<\/p>\n\n\n<p>Bie\u017es maldu avots ir nov\u0113lotas pieg\u0101des. Ja vien\u0101 ned\u0113\u013c\u0101 piepras\u012bto produkciju nos\u016bta n\u0101kamaj\u0101, var rasties iespaids, ka pirmaj\u0101 ned\u0113\u013c\u0101 piepras\u012bjums bijis v\u0101j\u0161, bet otraj\u0101 \u2014 neparasti liels. Ja m\u0113r\u0137is ir prognoz\u0113t, kad produktam j\u0101b\u016bt pieejamam, iesp\u0113ju robe\u017e\u0101s izmantojiet klienta piepras\u012bto periodu. Pret\u0113j\u0101 gad\u012bjum\u0101 modelis j\u016bsu pa\u0161u pieg\u0101des kav\u0113jumus var uztvert k\u0101 piepras\u012bjuma likumsakar\u012bbu.<\/p>\n\n\n<p>P\u0101rbaudiet v\u0113sturiskos datus kop\u0101 ar p\u0101rdo\u0161anas un ra\u017eo\u0161anas kol\u0113\u0123iem:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Nov\u0113rsiet ierakstu dubl\u0113\u0161anos, sak\u0101rtojiet m\u0113rvien\u012bbu p\u0101rr\u0113\u0137inus un produktu kodu mai\u0146as. Atgriezto pre\u010du un atcelto pas\u016bt\u012bjumu uzskait\u0113 \u0146emiet v\u0113r\u0101 to iemeslus, nevis uzskatiet katru korekciju par jaunu negat\u012bvu piepras\u012bjumu.<\/li><li>Saglab\u0101jiet periodus, kuros piepras\u012bjums patie\u0161\u0101m bijis nulle. Tr\u016bksto\u0161s ieraksts autom\u0101tiski nenoz\u012bm\u0113 nulli, savuk\u0101rt ned\u0113\u013cu bez piepras\u012bjuma izsl\u0113g\u0161ana var nepamatoti palielin\u0101t apl\u0113si.<\/li><li>Atz\u012bm\u0113jiet kr\u0101jumu iztr\u016bkumus, pieejamo daudzumu sadales ierobe\u017eojumus un jaudas ierobe\u017eojumus. Ja nos\u016bt\u012btas 60 vien\u012bbas, lai gan klientiem vajadz\u0113ja 100, tas nepier\u0101da, ka piepras\u012bjums bija tikai 60 vien\u012bbas. Ja ir re\u0123istr\u0113ti neizpild\u012bti piepras\u012bjumi, izmantojiet tos; jebkuru apl\u0113si par zaud\u0113to piepras\u012bjumu skaidri atz\u012bm\u0113jiet k\u0101 apl\u0113si.<\/li><li>Atz\u012bm\u0113jiet p\u0101rdo\u0161anas veicin\u0101\u0161anas akcijas, vienreiz\u0113jus l\u012bgumus, jaunu produktu ievie\u0161anu un produktus, kuru ra\u017eo\u0161ana ir p\u0101rtraukta. Saglab\u0101jiet s\u0101kotn\u0113jos v\u0113sturiskos datus un dokument\u0113jiet, k\u0101p\u0113c kori\u0123\u0113jat model\u0113\u0161anai izmantoto datu rindu.<\/li><\/ul>\n\n\n<p>Att\u0113lojiet ieg\u016btos apjomus laika grafik\u0101. Mekl\u0113jiet stabilu l\u012bmeni, notur\u012bgu pieaugumu vai kritumu, atk\u0101rtotus sezon\u0101lus maksimumus un ilgus p\u0101rtraukumus starp pas\u016bt\u012bjumiem. \u0160\u012bs likumsakar\u012bbas pal\u012bdz izv\u0113l\u0113ties metodes, kuras b\u016btu v\u0113rts p\u0101rbaud\u012bt.<\/p>\n\n\n<p>Neprognoz\u0113jiet katra komponenta piepras\u012bjumu atsevi\u0161\u0137i, ja t\u0101 vajadz\u012bbu nosaka pl\u0101notie produkti, kuros tas ietilpst. \u0160\u0101ds atkar\u012bgais piepras\u012bjums j\u0101nosaka, izmantojot materi\u0101lu specifik\u0101ciju un materi\u0101lu vajadz\u012bbu apr\u0113\u0137inu. Pret\u0113j\u0101 gad\u012bjum\u0101 uz vienu un to pa\u0161u iepirkumu jaut\u0101jumu varat ieg\u016bt savstarp\u0113ji pretrun\u012bgas atbildes.<\/p>\n\n\n<h2 class=\"wp-block-heading\">3. Izv\u0113lieties piepras\u012bjuma raksturam atbilsto\u0161u prognoz\u0113\u0161anas metodi<\/h2>\n\n\n<p>Nav vienas metodes, kas b\u016btu vislab\u0101k\u0101 visiem ra\u017eotajiem produktiem. S\u0101ciet ar vienk\u0101r\u0161u b\u0101zes prognozi un p\u0113c tam izv\u0113rt\u0113jiet, vai cita metode pal\u012bdz pie\u0146emt lab\u0101kus l\u0113mumus.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Piepras\u012bjuma raksturs<\/th><th>Ar ko s\u0101kt<\/th><th>Kas j\u0101p\u0101rbauda<\/th><\/tr><\/thead><tbody><tr><td>Sam\u0113r\u0101 stabils piepras\u012bjums<\/td><td>P\u0113d\u0113jo periodu sl\u012bdo\u0161ais vid\u0113jais vai vienk\u0101r\u0161\u0101 eksponenci\u0101l\u0101 izl\u012bdzin\u0101\u0161ana<\/td><td>Vai izv\u0113l\u0113tais vid\u0113j\u0101 apr\u0113\u0137ina periods izl\u012bdzina nejau\u0161\u0101s sv\u0101rst\u012bbas, nenosl\u0113pjot re\u0101las p\u0101rmai\u0146as<\/td><\/tr><tr><td>Atk\u0101rtots sezon\u0101ls piepras\u012bjums<\/td><td>P\u0113d\u0113j\u0101s sal\u012bdzin\u0101m\u0101s sezonas dati k\u0101 atskaites punkts; sezon\u0101ls prognoz\u0113\u0161anas modelis<\/td><td>Vai nav main\u012bju\u0161ies sv\u0113tku datumi, darba dienu skaits vai produktu kl\u0101sts<\/td><\/tr><tr><td>Notur\u012bga tendence<\/td><td>Modelis, kas \u0146em v\u0113r\u0101 tendenci, piem\u0113ram, eksponenci\u0101l\u0101 izl\u012bdzin\u0101\u0161ana ar tendenci<\/td><td>Vai pieaugums turpin\u0101s vai produkts tuvojas brieduma posmam<\/td><\/tr><tr><td>Piepras\u012bjums, kas saist\u012bts ar izm\u0113r\u0101miem ietekmes faktoriem<\/td><td>Regresija vai piem\u0113rots ma\u0161\u012bnm\u0101c\u012b\u0161an\u0101s modelis<\/td><td>Vai inform\u0101cija par ietekmes faktoriem tie\u0161\u0101m b\u016bs pieejama prognozes sagatavo\u0161anas br\u012bd\u012b<\/td><\/tr><tr><td>Daudzi periodi bez piepras\u012bjuma un atsevi\u0161\u0137i pas\u016bt\u012bjumi<\/td><td>Neregul\u0101ra piepras\u012bjuma prognoz\u0113\u0161anas pieeja, piem\u0113ram, Krostona tipa metode<\/td><td>Rezult\u0101ti vis\u0101 kr\u0101jumu papildin\u0101\u0161anas horizont\u0101, nevis tikai sp\u0113ja paredz\u0113t katru ned\u0113\u013cu bez piepras\u012bjuma<\/td><\/tr><tr><td>Jauns produkts ar nelielu v\u0113sturisko datu apjomu<\/td><td>Dati par sal\u012bdzin\u0101miem produktiem un sistem\u0101tiski apkopoti p\u0101rdo\u0161anas speci\u0101listu un klientu v\u0113rt\u0113jumi<\/td><td>Pie\u0146\u0113mumi par produkta ievie\u0161anu, eso\u0161o produktu aizst\u0101\u0161ana un tas, cik \u0101tri prognozi preciz\u0113 p\u0113c faktisk\u0101 piepras\u012bjuma datiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Vienk\u0101r\u0161\u0101 eksponenci\u0101l\u0101 izl\u012bdzin\u0101\u0161ana pie\u0161\u0137ir liel\u0101ku svaru jaun\u0101kajiem nov\u0113rojumiem, ta\u010du t\u0101s pamatforma nemodel\u0113 ne tendenci, ne sezonalit\u0101ti. Krostona tipa metodes ir paredz\u0113tas neregul\u0101ram piepras\u012bjumam: t\u0101s \u0146em v\u0113r\u0101 piepras\u012bjuma apjomus, kas nav nulle, un interv\u0101lus starp tiem. Tom\u0113r t\u0101s nenov\u0113r\u0161 nenoteikt\u012bbu par n\u0101kamo pas\u016bt\u012bjumu.<\/p>\n\n\n<p>Vienk\u0101r\u0161am sl\u012bdo\u0161\u0101 vid\u0113j\u0101 piem\u0113ram pie\u0146emsim, ka p\u0113d\u0113jo tr\u012bs ned\u0113\u013cu piepras\u012bjums bija 80, 100 un 120 vien\u012bbas. Izmantojot tr\u012bs ned\u0113\u013cu sl\u012bdo\u0161o vid\u0113jo, n\u0101kam\u0101s ned\u0113\u013cas prognoze ir \u0161\u0101da:<\/p>\n\n\n<p><strong>Prognoze = (80 + 100 + 120) \u00f7 3 = 100 vien\u012bbas.<\/strong><\/p>\n\n\n<p>\u0160o apr\u0113\u0137inu ir viegli izskaidrot. Tom\u0113r tas var atpalikt no re\u0101las pieauguma tendences. Tr\u012bs nov\u0113rojumi par\u0101da apr\u0113\u0137ina principu, nevis pier\u0101da, ka metode ir piem\u0113rota konkr\u0113tajam produktam.<\/p>\n\n\n<p>Sal\u012bdziniet izv\u0113l\u0113t\u0101s metodes ar vienk\u0101r\u0161iem atskaites punktiem: p\u0113d\u0113jo nov\u0113roto piepras\u012bjumu un sezon\u0101liem produktiem \u2014 p\u0113d\u0113jo sal\u012bdzin\u0101mo sezonas periodu. Sare\u017e\u0123\u012bt\u0101ka mode\u013ca izmanto\u0161anai j\u0101b\u016bt pamatotai ar lab\u0101kiem rezult\u0101tiem datos, kas nav izmantoti t\u0101 izveid\u0113, vai ar lab\u0101kiem operat\u012bvajiem l\u0113mumiem, nevis ar iespaid\u012bgu nosaukumu.<\/p>\n\n\n<p>Ar\u012b modelim, kur\u0101 izmanto p\u0101rdo\u0161anas veicin\u0101\u0161anas akciju datus vai ekonomiskos r\u0101d\u012bt\u0101jus, ir vajadz\u012bgi re\u0101listiski n\u0101kotnes ievaddati. P\u0101rbaudot to ar inform\u0101ciju, kas prognozes sagatavo\u0161anas datum\u0101 nebija pieejama, rezult\u0101ts izskat\u012bsies lab\u0101ks, nek\u0101 tas b\u016btu var\u0113jis b\u016bt praks\u0113. Prognoz\u0113\u0161anai noder\u012bga sakar\u012bba pati par sevi nepier\u0101da, ka, mainot attiec\u012bgo faktoru, tiks pan\u0101kts konkr\u0113ts p\u0101rdo\u0161anas pieaugums.<\/p>\n\n\n<h2 class=\"wp-block-heading\">4. Papildiniet prognozi ar uz\u0146\u0113muma r\u012bc\u012bb\u0101 eso\u0161o inform\u0101ciju, saglab\u0101jot b\u0101zes prognozi<\/h2>\n\n\n<p>V\u0113sturiskie dati nepasaka visu. Klients, iesp\u0113jams, ir pazi\u0146ojis par darb\u012bbas p\u0101rtrauk\u0161anu, izplat\u012bt\u0101js atver jaunu tirdzniec\u012bbas vietu vai k\u0101ds produkts aizst\u0101j vec\u0101ku modeli.<\/p>\n\n\n<p>Saglab\u0101jiet statistisko b\u0101zes prognozi redzamu un katru korekciju, kas balst\u012bta uz uz\u0146\u0113m\u0113jdarb\u012bbas inform\u0101ciju, re\u0123istr\u0113jiet atsevi\u0161\u0137i. Nor\u0101diet daudzumu, periodu, pamatojumu, atbild\u012bgo personu un p\u0101rskat\u012b\u0161anas datumu. Pirms pievienojat korekciju, p\u0101rbaudiet, vai t\u0101s ietekme jau nav ietverta model\u012b vai cit\u0101 korekcij\u0101.<\/p>\n\n\n<p>Pie\u0146emsim, ka b\u0101zes prognoze k\u0101dai no n\u0101kamaj\u0101m ned\u0113\u013c\u0101m ir 100 vien\u012bbas. P\u0101rdo\u0161anas noda\u013ca sniedz pamatojumu v\u0113l 20 vien\u012bbu piepras\u012bjumam no jauna klienta papildus visam, kas jau ietverts prognoz\u0113. P\u0101rskat\u012bt\u0101 prognoze ir 120 vien\u012bbas. Ja klients p\u0101riet no cita produkta uz \u0161o, kori\u0123\u0113jiet ar\u012b otra produkta prognozi, nevis uzskaitiet \u0161o p\u0101reju k\u0101 t\u012bru pieaugumu.<\/p>\n\n\n<p>T\u0101d\u0113j\u0101di p\u0101rskat\u012b\u0161an\u0101 var atbild\u0113t uz konkr\u0113tiem jaut\u0101jumiem: vai papildu piepras\u012bjums \u012bstenoj\u0101s, kur\u0101 period\u0101 tas notika un vai manu\u0101l\u0101 korekcija uzlaboja prognozi? Laika gait\u0101 sal\u012bdziniet b\u0101zes prognozes k\u013c\u016bdu ar kori\u0123\u0113t\u0101s prognozes k\u013c\u016bdu. Saglab\u0101jiet korekcijas, kas papildina prognozi ar jaunu inform\u0101ciju; izp\u0113tiet t\u0101s, kas atk\u0101rtoti pievieno tikai optimismu.<\/p>\n\n\n<p>Ja jauna produkta ievie\u0161ana vai liels l\u012bgums ir saist\u012bts ar nenoteikt\u012bbu, saglab\u0101jiet b\u0101zes scen\u0101riju un ticamus liel\u0101ka un maz\u0101ka piepras\u012bjuma scen\u0101rijus kop\u0101 ar to pie\u0146\u0113mumiem. Tie ir pl\u0101no\u0161anas scen\u0101riji, nevis statistiski kalibr\u0113ti prognoz\u0113\u0161anas interv\u0101li. Izmantojiet tos, lai noteiktu, kuri l\u0113mumi main\u012btos: materi\u0101lu rezerv\u0113\u0161ana, papildu mai\u0146a vai v\u0113l\u0101ks l\u0113mums par gatav\u0101s produkcijas kr\u0101jumu veido\u0161anu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">5. M\u0113riet prognozes k\u013c\u016bdu l\u0113mumiem svar\u012bgaj\u0101 prognoz\u0113\u0161anas horizont\u0101<\/h2>\n\n\n<p>Saglab\u0101jiet katru izlaisto prognozi, nor\u0101dot t\u0101s datumu, prognoz\u0113jamo periodu, artikulu un versiju. Kad faktiskais piepras\u012bjums ir zin\u0101ms, sal\u012bdziniet to ar versiju, kas bija pieejama br\u012bd\u012b, kad uz\u0146\u0113mumam bija j\u0101r\u012bkojas, nevis ar p\u0113d\u0113jo preciz\u0113jumu \u012bsi pirms pieg\u0101des.<\/p>\n\n\n<p>Metodes izv\u0113lei izmantojiet prognoz\u0113\u0161anas simul\u0101ciju ar v\u0113sturiskajiem datiem. Piel\u0101gojiet metodi, izmantojot tikai inform\u0101ciju, kas bija pieejama k\u0101d\u0101 agr\u0101k\u0101 datum\u0101, un sagatavojiet prognozi vajadz\u012bgajam horizontam. P\u0113c tam p\u0101rceliet datu atskaites datumu uz priek\u0161u un atk\u0101rtojiet p\u0101rbaudi. \u0160\u0101di, pak\u0101peniski p\u0101rb\u012bdot prognozes s\u0101kumpunktu, var p\u0101rbaud\u012bt re\u0101lo prognoz\u0113\u0161anas uzdevumu, nepie\u013caujot n\u0101kotnes nov\u0113rojumu izmanto\u0161anu pag\u0101tnes prognoz\u0113s.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Prognozes k\u013c\u016bdas piem\u0113rs<\/h3>\n\n\n<p>Pie\u0146emsim, ka v\u0113rt\u0113jat viena produkta prognozi \u010detr\u0101m ned\u0113\u013c\u0101m. Katr\u0101 t\u0101l\u0101k redzamaj\u0101 rind\u0101 saglab\u0101t\u0101 prognoze ir izlaista <strong>\u010detras ned\u0113\u013cas pirms attiec\u012bg\u0101s prognoz\u0113jam\u0101s ned\u0113\u013cas<\/strong>. \u0160eit k\u013c\u016bda ar z\u012bmi ir prognoze m\u012bnus faktiskais piepras\u012bjums, t\u0101p\u0113c pozit\u012bvs skaitlis nor\u0101da uz p\u0101rv\u0113rt\u0113tu piepras\u012bjumu.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Prognoz\u0113jam\u0101 ned\u0113\u013ca<\/th><th>Saglab\u0101t\u0101 prognoze<\/th><th>Faktiskais piepras\u012bjums<\/th><th>K\u013c\u016bda ar z\u012bmi<\/th><th>Absol\u016bt\u0101 k\u013c\u016bda<\/th><\/tr><\/thead><tbody><tr><td>1. ned\u0113\u013ca<\/td><td>110<\/td><td>100<\/td><td>+10<\/td><td>10<\/td><\/tr><tr><td>2. ned\u0113\u013ca<\/td><td>110<\/td><td>120<\/td><td>\u221210<\/td><td>10<\/td><\/tr><tr><td>3. ned\u0113\u013ca<\/td><td>110<\/td><td>80<\/td><td>+30<\/td><td>30<\/td><\/tr><tr><td>4. ned\u0113\u013ca<\/td><td>110<\/td><td>100<\/td><td>+10<\/td><td>10<\/td><\/tr><tr><td>Kop\u0101<\/td><td>440<\/td><td>400<\/td><td>+40<\/td><td>60<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Tr\u012bs r\u0101d\u012bt\u0101ji raksturo da\u017e\u0101dus \u0161\u012b rezult\u0101ta aspektus:<\/p>\n\n\n<p><strong>Vid\u0113j\u0101 absol\u016bt\u0101 k\u013c\u016bda (MAE) = absol\u016bto k\u013c\u016bdu summa \u00f7 periodu skaits = 60 \u00f7 4 = 15 vien\u012bbas ned\u0113\u013c\u0101.<\/strong><\/p>\n\n\n<p>MAE saprotami par\u0101da tipisko k\u013c\u016bdas lielumu produkta vien\u012bb\u0101s. T\u0101 nepar\u0101da, vai prognoze m\u0113dz b\u016bt par lielu vai par mazu.<\/p>\n\n\n<p><strong>Sv\u0113rt\u0101 absol\u016bt\u0101 procentu\u0101l\u0101 k\u013c\u016bda (WAPE) = absol\u016bto k\u013c\u016bdu summa \u00f7 faktisk\u0101 piepras\u012bjuma summa \u00d7 100 = 60 \u00f7 400 \u00d7 100 = 15 %.<\/strong><\/p>\n\n\n<p>\u0160iem nenegat\u012bvajiem piepras\u012bjuma daudzumiem WAPE izsaka absol\u016bto k\u013c\u016bdu attiec\u012bb\u0101 pret kop\u0113jo piepras\u012bjumu. Tas nenoz\u012bm\u0113, ka katras ned\u0113\u013cas prognozes k\u013c\u016bda bija 15 % robe\u017e\u0101s vai ka piepras\u012bjumu var\u0113s apmierin\u0101t ar 85 % varb\u016bt\u012bbu.<\/p>\n\n\n<p><strong>Vid\u0113j\u0101 k\u013c\u016bda ar z\u012bmi jeb sistem\u0101tisk\u0101 novirze = k\u013c\u016bdu ar z\u012bmi summa \u00f7 periodu skaits = 40 \u00f7 4 = +10 vien\u012bbas ned\u0113\u013c\u0101.<\/strong><\/p>\n\n\n<p>Ja k\u013c\u016bdas z\u012bmi nosaka p\u0113c iepriek\u0161 nor\u0101d\u012bt\u0101 principa, prognoze vid\u0113ji bija par lielu. \u010cetr\u0101s ned\u0113\u013c\u0101s t\u0101 p\u0101rsniedza faktisko piepras\u012bjumu par 40 vien\u012bb\u0101m jeb 10 % no kop\u0113j\u0101 faktisk\u0101 piepras\u012bjuma. P\u0101rv\u0113rt\u0113jumi un nepietiekami nov\u0113rt\u0113jumi kopsumm\u0101 var savstarp\u0113ji kompens\u0113ties, t\u0101p\u0113c sistem\u0101tisk\u0101 novirze viena pati neraksturo k\u013c\u016bdas lielumu.<\/p>\n\n\n<p>\u0160\u012bs \u010detras rindas ilustr\u0113 r\u0101d\u012bt\u0101jus, ta\u010du ar t\u0101m nepietiek prognozes p\u0101rbaudei. Veiciet pietiekami daudz p\u0101rbau\u017eu ar pak\u0101peniski p\u0101rb\u012bd\u012btu prognozes s\u0101kumpunktu, lai aptvertu produktam rakstur\u012bgo sezonalit\u0101ti, pas\u016bt\u012bjumu dinamiku un p\u0101rmai\u0146as.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Izvairieties no maldino\u0161a precizit\u0101tes v\u0113rt\u0113juma<\/h3>\n\n\n<p>Apr\u0113\u0137inot vid\u0113jo absol\u016bto procentu\u0101lo k\u013c\u016bdu (MAPE), katra perioda absol\u016bto k\u013c\u016bdu dala ar attiec\u012bg\u0101 perioda faktisko piepras\u012bjumu. Ja faktiskais piepras\u012bjums ir nulle, r\u0101d\u012bt\u0101js nav defin\u0113ts, bet nulles tuvum\u0101 tas ir nestabils. T\u0101p\u0113c tas nav piem\u0113rots k\u0101 noklus\u0113juma r\u0101d\u012bt\u0101js produktiem ar retu piepras\u012bjumu.<\/p>\n\n\n<p>WAPE apr\u0113\u0137in\u0101 var iek\u013caut atsevi\u0161\u0137us periodus bez piepras\u012bjuma, ta\u010du r\u0101d\u012bt\u0101js nav defin\u0113ts, ja kop\u0113jais faktiskais piepras\u012bjums ir nulle. Ar\u012b t\u0101 sauc\u0113js main\u0101s atkar\u012bb\u0101 no apjoma: pieaugot piepras\u012bjumam, procentu\u0101lais r\u0101d\u012bt\u0101js var uzlaboties pat tad, ja k\u013c\u016bda vien\u012bb\u0101s nav main\u012bjusies. V\u0113rt\u0113jiet to kop\u0101 ar MAE, sistem\u0101tisko novirzi un vienk\u0101r\u0161o b\u0101zes prognozi tajos pa\u0161os p\u0101rbaudes periodos.<\/p>\n\n\n<p>Produktu saimes kop\u0113jais r\u0101d\u012bt\u0101js var sl\u0113pt to, ka viena varianta piepras\u012bjums tiek past\u0101v\u012bgi p\u0101rv\u0113rt\u0113ts, bet cita \u2014 nov\u0113rt\u0113ts par zemu. V\u0113rt\u0113jiet ne tikai kop\u0113jo vid\u0113jo r\u0101d\u012bt\u0101ju, bet ar\u012b produktus, kas rada pieg\u0101\u017eu izpildes risku, d\u0101rgus kr\u0101jumus vai kritisko resursu noslodzi.<\/p>\n\n\n<p>Nav univers\u0101la pie\u0146emama prognozes k\u013c\u016bdas procenta. K\u013c\u016bdai 15 vien\u012bbu apm\u0113r\u0101 ir at\u0161\u0137ir\u012bgas sekas, ja runa ir par l\u0113tu, pla\u0161i izmantotu deta\u013cu vai par reti piepras\u012btu gatavu mezglu. V\u0113rt\u0113jiet prognozi, \u0146emot v\u0113r\u0101 iztr\u016bkuma un p\u0101rpalikuma izmaksas, kr\u0101jumu papildin\u0101\u0161anas laiku un pieejam\u0101s r\u012bc\u012bbas iesp\u0113jas. Nosakot rezerves, \u0146emiet v\u0113r\u0101 nenoteikt\u012bbu un klientu apkalpo\u0161anas politiku; nepieskaitiet MAE vienk\u0101r\u0161i katram ra\u017eo\u0161anas daudzumam.<\/p>\n\n\n<h2 class=\"wp-block-heading\">6. Pie\u0146emiet l\u0113mumu par ra\u017eo\u0161anu, balstoties uz prognozi<\/h2>\n\n\n<p>P\u0101rskat\u012bt\u0101 prognoze ir klientu piepras\u012bjuma apl\u0113se. Par ra\u017eo\u0161anas daudzumu j\u0101lemj atsevi\u0161\u0137i, \u0146emot v\u0113r\u0101 apstiprin\u0101tos pas\u016bt\u012bjumus, izmantojamos kr\u0101jumus, sagaid\u0101mo produkciju no jau pl\u0101not\u0101s ra\u017eo\u0161anas un kr\u0101jumu l\u012bmeni, ko v\u0113laties saglab\u0101t.<\/p>\n\n\n<p>Neuzskaitiet vienu un to pa\u0161u piepras\u012bjumu divreiz. Ja prognoze ir 120 vien\u012bbas un apstiprin\u0101tie pas\u016bt\u012bjumi aptver 70 no \u0161\u012bm vien\u012bb\u0101m, tad, piem\u0113rojot vienk\u0101r\u0161u principu, kur\u0101 pas\u016bt\u012bjumi aizst\u0101j attiec\u012bg\u0101 perioda prognoz\u0113to piepras\u012bjumu, v\u0113l paliek 50 ar pas\u016bt\u012bjumiem neaptvertas prognozes vien\u012bbas. Kop\u0113jais piepras\u012bjums joproj\u0101m ir 120, nevis 190. J\u016bsu faktisk\u0101 k\u0101rt\u012bba var paredz\u0113t prognozes aizst\u0101\u0161anu ar pas\u016bt\u012bjumiem ar\u012b starp da\u017e\u0101diem datumiem vai piepras\u012bjuma kategorij\u0101m.<\/p>\n\n\n<p>Tagad pie\u0146emsim, ka jums ir 30 izmantojamas gatav\u0101s produkcijas vien\u012bbas, perioda beig\u0101s v\u0113laties atst\u0101t 10 un nav gaid\u0101ma produkcijas sa\u0146em\u0161ana no jau pl\u0101not\u0101s ra\u017eo\u0161anas. Lai apmierin\u0101tu 120 vien\u012bbu piepras\u012bjumu, b\u016btu j\u0101pl\u0101no sara\u017eot <strong>100 vien\u012bbas: 120 + 10 \u2212 30<\/strong>. \u0160aj\u0101 apr\u0113\u0137in\u0101 pie\u0146emts, ka kr\u0101jumi un pabeigt\u0101 produkcija ir pieejami pirms attiec\u012bg\u0101 piepras\u012bjuma izpildes termi\u0146a.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/master-production-schedule\/\">Ra\u017eo\u0161anas pamatpl\u0101n\u0101<\/a> nosaka \u0161os daudzumus un pieejam\u012bbas datumus katram artikulam. <a href=\"\/lv\/resursi\/mrp-iss-celvedis\/\">MRP<\/a> apr\u0113\u0137ina apstiprin\u0101to ra\u017eo\u0161anas apjomu izpildei vajadz\u012bgos materi\u0101lus un komponentus. Ne prognoze, ne kr\u0101jumu atlikums nepier\u0101da, ka r\u016bpn\u012bcai ir pietiekama jauda, lai tos sara\u017eotu laikus.<\/p>\n\n\n<p>Piem\u0113ram, pie\u0146emsim, ka \u0161o 100 vien\u012bbu ra\u017eo\u0161anai vajag 0,2 ma\u0161\u012bnstundas uz vien\u012bbu un divas stundas iek\u0101rtas iestat\u012b\u0161anai \u2014 t\u0101tad <strong>22 stundas<\/strong> uz kritisk\u0101s iek\u0101rtas. Citiem jau uz\u0146emtiem pas\u016bt\u012bjumiem uz t\u0101s vajag v\u0113l 20 stundas, bet l\u012bdz vajadz\u012bgajam pabeig\u0161anas datumam ir pieejamas tikai 40 stundas. Ierosin\u0101t\u0101 noslodze ir 42 stundas. Jums j\u0101nov\u0113r\u0161 divu stundu iztr\u016bkums, j\u0101izmanto piem\u0113rota alternat\u012bva vai j\u0101p\u0101rskata uz\u0146emt\u0101s saist\u012bbas.<\/p>\n\n\n<p>Nesamaziniet klientu piepras\u012bjuma prognozi l\u012bdz 110 tikai t\u0101d\u0113\u013c, lai iek\u0101rtas noslodze iek\u013cautos pieejamaj\u0101 laik\u0101. Ar\u012b turpm\u0101k pl\u0101n\u0101 uzr\u0101diet piepras\u012bjuma apl\u0113si un izlemiet, k\u0101 nov\u0113rst pieg\u0101des iesp\u0113ju neatbilst\u012bbu piepras\u012bjumam.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izmantojiet SkyPlanner, lai iepl\u0101notu izv\u0113l\u0113tajai r\u012bc\u012bbai vajadz\u012bgos darbus<\/h2>\n\n\n<p>Ja prognozes izmai\u0146u d\u0113\u013c main\u0101t ra\u017eo\u0161anas saist\u012bbas, grafika p\u0101rpl\u0101no\u0161ana var skart vair\u0101kas iek\u0101rtas un pas\u016bt\u012bjumus. Vienas partijas pievieno\u0161ana ietekm\u0113 turpm\u0101k\u0101s oper\u0101cijas, darbus, kas jau gaida \u0161o iek\u0101rtu rind\u0101s, un no tiem atkar\u012bgos pieg\u0101des datumus.<\/p>\n\n\n<p><strong>SkyPlanner APS apvieno \u0161os darbus <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/kas-ir-razosanas-planosana\/\">vienot\u0101 resursu noslodzes grafik\u0101<\/a>.<\/strong> Defin\u0113jiet darba stacijas, mai\u0146as, operatorus, procesa so\u013cus un to ilgumu, p\u0113c tam vadiet pl\u0101no\u0161anu ar priorit\u0101t\u0113m un blo\u0137\u0113jumiem. Arcturus, SkyPlanner m\u0101ksl\u012bgais intelekts ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai, apr\u0113\u0137ina ra\u017eo\u0161anas uzdevumu izvietojumu, \u0146emot v\u0113r\u0101 iestat\u012bto jaudu, piem\u0113rotos resursus un oper\u0101ciju savstarp\u0113j\u0101s atkar\u012bbas. Ganta diagrammas skat\u0101 ir redzama ieg\u016bt\u0101 darbu sec\u012bba un pabeig\u0161anas datumi.<\/p>\n\n\n<p>Ierosin\u0101tajai 100 vien\u012bbu partijai tas sasaista vajadz\u012bgo meh\u0101nisko apstr\u0101di ar p\u0101r\u0113j\u0101m ra\u017eo\u0161anas mar\u0161ruta oper\u0101cij\u0101m un citiem darbiem, kas izmanto tos pa\u0161us resursus. Varat izv\u0113rt\u0113t, vai apstiprin\u0101tas izmai\u0146as mai\u0146u grafik\u0101 vai cita priorit\u0101te \u013cauj pabeigt darbus vajadz\u012bgaj\u0101 laik\u0101, manu\u0101li nesaska\u0146ojot katras skart\u0101s iek\u0101rtas darbu rindu.<\/p>\n\n\n<p>Ja ir iesl\u0113gta pl\u0101no\u0161ana, kur\u0101 \u0146em v\u0113r\u0101 materi\u0101lu pieejam\u012bbu, Arcturus, apr\u0113\u0137inot s\u0101kuma laikus, iev\u0113ro gan eso\u0161os kr\u0101jumus, gan ien\u0101ko\u0161o materi\u0101lu pieejam\u012bbu. Paredzamie iepirkumu pieg\u0101des datumi nor\u0101da uz sagaid\u0101mo pieejam\u012bbu; kr\u0101jumi tiek atjaunin\u0101ti, kad sa\u0146em\u0161ana ir apstiprin\u0101ta. Ar to vien, ka iek\u0101rta grafik\u0101 ir br\u012bva, nepietiek, ja materi\u0101ls nav pieejams vai iepriek\u0161\u0113j\u0101 oper\u0101cija nav pabeigta.<\/p>\n\n\n<p>L\u0113mumus par prognoz\u0113m un kr\u0101jumu papildin\u0101\u0161anu ar\u012b turpm\u0101k pie\u0146emiet piepras\u012bjuma pl\u0101no\u0161anas proces\u0101 vai ERP sist\u0113m\u0101. SkyPlanner autom\u0101tiski neveido ra\u017eo\u0161anas uzdevumus no prognoz\u0113m; tas sast\u0101da grafiku tiem ra\u017eo\u0161anas uzdevumiem, kurus izveidojat pa\u0161i vai nododat ar integr\u0101cijas starpniec\u012bbu. <strong>SkyPlanner var integr\u0113t ar jebkuru ERP vai MES sist\u0113mu, izmantojot t\u0101 atv\u0113rto REST API<\/strong>, t\u0101p\u0113c varat saglab\u0101t sist\u0113mu, kur\u0101 p\u0101rvald\u0101t \u0161os l\u0113mumus, un uzlabot to izpildes detaliz\u0113to pl\u0101no\u0161anu.<\/p>\n\n\n<p>Tas ir iemesls izv\u0113l\u0113ties SkyPlanner, ja piepras\u012bjuma izmai\u0146u d\u0113\u013c atkal un atkal n\u0101kas manu\u0101li p\u0101rpl\u0101not ra\u017eo\u0161anu: pl\u0101not\u0101ji nosaka priorit\u0101tes, bet Arcturus apr\u0113\u0137ina darbu izpildes sec\u012bbu katram resursam, lai \u0161os l\u0113mumus \u012bstenotu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ko \u0101tr\u0101ka p\u0101rpl\u0101no\u0161ana main\u012bja uz\u0146\u0113mum\u0101 Fredman Operations<\/h3>\n\n\n<p>Somijas uz\u0146\u0113mums <a href=\"https:\/\/skyplanner.ai\/lv\/klientu-stasti\/fredman-operations\/\">Fredman Operations<\/a>, kas ra\u017eo saskarei ar p\u0101rtiku dro\u0161us virtuves un iepakojuma izstr\u0101d\u0101jumus, iepriek\u0161 ra\u017eo\u0161anas uzdevumu priorit\u0101tes noteica manu\u0101li. Tam nebija prec\u012bza p\u0101rskata par to, kad atbr\u012bvosies iek\u0101rtas un k\u0101da jauda pieejama katr\u0101 mai\u0146\u0101. Steidzama p\u0101rpl\u0101no\u0161ana var\u0113ja aiz\u0146emt stundu vai ilg\u0101k.<\/p>\n\n\n<p>Ievie\u0161ot SkyPlanner, uz\u0146\u0113mums savienoja savas L7 un LTR sist\u0113mas un ieguva kop\u012bgu p\u0101rskatu par jaudu un darbiem Ganta diagramm\u0101. K\u0101 uz\u0146\u0113mums st\u0101sta sav\u0101 pieredzes aprakst\u0101, lai p\u0101rbaud\u012btu, vai visus neizpild\u012btos pas\u016bt\u012bjumus var pabeigt agr\u0101k, tagad vajadz\u012bgas sekundes, nevis stund\u0101m ilgi manu\u0101li apr\u0113\u0137ini. Komanda zi\u0146o ar\u012b par maz\u0101ku virsstundu apjomu un \u0101tr\u0101ku reakciju uz grafika izmai\u0146\u0101m.<\/p>\n\n\n<p>B\u016btiskais ieguvums ir sp\u0113ja rea\u0123\u0113t ra\u017eo\u0161an\u0101: saprast, k\u0101 main\u012bt\u0101s pras\u012bbas ietekm\u0113 darbus un pieg\u0101des datumus, kam\u0113r v\u0113l ir laiks r\u012bkoties.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Saglab\u0101jiet saikni starp prognozi un ra\u017eo\u0161anas reakciju<\/h2>\n\n\n<p>Nosakiet p\u0101rskat\u012b\u0161anas bie\u017eumu atbilsto\u0161i l\u0113mumiem, kas jums j\u0101pie\u0146em. Sa\u0146emot jaunus piepras\u012bjuma datus, atjauniniet b\u0101zes prognozi, kop\u0101 ar p\u0101rdo\u0161anas komandu izv\u0113rt\u0113jiet b\u016btisk\u0101s novirzes un sekojiet arhiv\u0113t\u0101s prognozes k\u013c\u016bdai, izmantojot katram l\u0113mumam nepiecie\u0161amo prognoz\u0113\u0161anas apsteidzi. Nepie\u013caujiet, ka regul\u0101ri prognozes labojumi bez saska\u0146o\u0161anas maina saist\u012bbas, kuru izpildei ra\u017eo\u0161ana jau gatavojas.<\/p>\n\n\n<p>Ja saska\u0146otas izmai\u0146as maina sara\u017eojamo daudzumu vai pieejam\u012bbas datumu, atjauniniet ra\u017eo\u0161anas uzdevumus un p\u0101rskatiet attiec\u012bgo resursu noslodzes grafiku. Tas iepirkumu, ra\u017eo\u0161anas un p\u0101rdo\u0161anas komand\u0101m sniedz vienotu priek\u0161statu par to, kas ir main\u012bjies un ko tagad iesp\u0113jams pieg\u0101d\u0101t.<\/p>\n\n\n<p>Lai redz\u0113tu, k\u0101 rea\u0123\u0113t uz \u0161\u0101d\u0101m izmai\u0146\u0101m, samazinot manu\u0101lo pl\u0101no\u0161anu, <a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">piesakieties SkyPlanner demonstr\u0101cijai<\/a>. Sagatavojiet piem\u0113ru ar ra\u017eo\u0161anas apjomu, ko esat izv\u0113l\u0113ju\u0161ies p\u0113c prognozes izmai\u0146\u0101m, t\u0101 ra\u017eo\u0161anas mar\u0161rutu un datumiem, kuros produktiem j\u0101b\u016bt pieejamiem. \u0160ie dati b\u016bs praktisks s\u0101kumpunkts, lai izv\u0113rt\u0113tu ietekmi uz kop\u012bgi izmantoto jaudu un cit\u0101m izpildes saist\u012bb\u0101m. Ja vispirms v\u0113laties izp\u0113t\u012bt pa\u0161i, <a href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis S\u0101kums &raquo; Resursi &raquo; Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101 \u013cauj apl\u0113st, kuri produkti klientiem b\u016bs vajadz\u012bgi, k\u0101d\u0101 daudzum\u0101 un kad. Taj\u0101 apvieno v\u0113sturiskos piepras\u012bjuma datus ar inform\u0101ciju par gaid\u0101maj\u0101m p\u0101rmai\u0146\u0101m, lai iepirkumu un ra\u017eo\u0161anas l\u0113mumiem b\u016btu kop\u012bgs pamats. Noder\u012bga prognoze pal\u012bdz sagatavoties, neveidojot kr\u0101jumus katram iesp\u0113jamajam p\u0101rdo\u0161anas &#8230; <a title=\"Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/\" aria-label=\"Read more about Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":108861,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-108841","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis<\/title>\n<meta name=\"description\" content=\"Veidojiet ra\u017eo\u0161an\u0101 izmantojamu piepras\u012bjuma prognozi. Izv\u0113lieties metodi, m\u0113riet k\u013c\u016bdu un main\u012bgo piepras\u012bjumu p\u0101rv\u0113rtiet izpild\u0101m\u0101 ra\u017eo\u0161anas pl\u0101n\u0101.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis\" \/>\n<meta property=\"og:description\" content=\"Veidojiet ra\u017eo\u0161an\u0101 izmantojamu piepras\u012bjuma prognozi. Izv\u0113lieties metodi, m\u0113riet k\u013c\u016bdu un main\u012bgo piepras\u012bjumu p\u0101rv\u0113rtiet izpild\u0101m\u0101 ra\u017eo\u0161anas pl\u0101n\u0101.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-24T14:53:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-24T14:54:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"21 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/pieprasijuma-prognozesana\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/pieprasijuma-prognozesana\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis\",\"datePublished\":\"2026-10-24T14:53:53+00:00\",\"dateModified\":\"2026-10-24T14:54:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/pieprasijuma-prognozesana\\\/\"},\"wordCount\":4152,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/pieprasijuma-prognozesana\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/demand-forecasting-manufacturing-hero.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/pieprasijuma-prognozesana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/pieprasijuma-prognozesana\\\/\",\"name\":\"Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/pieprasijuma-prognozesana\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/pieprasijuma-prognozesana\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/demand-forecasting-manufacturing-hero.png\",\"datePublished\":\"2026-10-24T14:53:53+00:00\",\"dateModified\":\"2026-10-24T14:54:47+00:00\",\"description\":\"Veidojiet ra\u017eo\u0161an\u0101 izmantojamu piepras\u012bjuma prognozi. Izv\u0113lieties metodi, m\u0113riet k\u013c\u016bdu un main\u012bgo piepras\u012bjumu p\u0101rv\u0113rtiet izpild\u0101m\u0101 ra\u017eo\u0161anas pl\u0101n\u0101.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/pieprasijuma-prognozesana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/pieprasijuma-prognozesana\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/pieprasijuma-prognozesana\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/demand-forecasting-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/demand-forecasting-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A magnifying glass examines groups of machined rings beside pale outlines representing future demand.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/pieprasijuma-prognozesana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis","description":"Veidojiet ra\u017eo\u0161an\u0101 izmantojamu piepras\u012bjuma prognozi. Izv\u0113lieties metodi, m\u0113riet k\u013c\u016bdu un main\u012bgo piepras\u012bjumu p\u0101rv\u0113rtiet izpild\u0101m\u0101 ra\u017eo\u0161anas pl\u0101n\u0101.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/","og_locale":"lv_LV","og_type":"article","og_title":"Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis","og_description":"Veidojiet ra\u017eo\u0161an\u0101 izmantojamu piepras\u012bjuma prognozi. Izv\u0113lieties metodi, m\u0113riet k\u013c\u016bdu un main\u012bgo piepras\u012bjumu p\u0101rv\u0113rtiet izpild\u0101m\u0101 ra\u017eo\u0161anas pl\u0101n\u0101.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-24T14:53:53+00:00","article_modified_time":"2026-10-24T14:54:47+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"21 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis","datePublished":"2026-10-24T14:53:53+00:00","dateModified":"2026-10-24T14:54:47+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/"},"wordCount":4152,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/","name":"Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","datePublished":"2026-10-24T14:53:53+00:00","dateModified":"2026-10-24T14:54:47+00:00","description":"Veidojiet ra\u017eo\u0161an\u0101 izmantojamu piepras\u012bjuma prognozi. Izv\u0113lieties metodi, m\u0113riet k\u013c\u016bdu un main\u012bgo piepras\u012bjumu p\u0101rv\u0113rtiet izpild\u0101m\u0101 ra\u017eo\u0161anas pl\u0101n\u0101.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","width":1672,"height":941,"caption":"A magnifying glass examines groups of machined rings beside pale outlines representing future demand."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/pieprasijuma-prognozesana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis S\u0101kums &raquo; Resursi &raquo; Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101: praktisks ce\u013cvedis Piepras\u012bjuma prognoz\u0113\u0161ana ra\u017eo\u0161an\u0101 \u013cauj apl\u0113st, kuri produkti klientiem b\u016bs vajadz\u012bgi, k\u0101d\u0101 daudzum\u0101 un kad. Taj\u0101 apvieno v\u0113sturiskos piepras\u012bjuma datus ar inform\u0101ciju par gaid\u0101maj\u0101m p\u0101rmai\u0146\u0101m, lai iepirkumu un ra\u017eo\u0161anas l\u0113mumiem b\u016btu kop\u012bgs pamats. Noder\u012bga prognoze pal\u012bdz sagatavoties, neveidojot kr\u0101jumus katram iesp\u0113jamajam p\u0101rdo\u0161anas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/108841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=108841"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/108841\/revisions"}],"predecessor-version":[{"id":108904,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/108841\/revisions\/108904"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/108861"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=108841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=108841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=108841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}