{"id":108751,"date":"2026-10-24T12:48:10","date_gmt":"2026-10-24T12:48:10","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=108751"},"modified":"2026-10-24T12:49:01","modified_gmt":"2026-10-24T12:49:01","slug":"mtbf","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/","title":{"rendered":"Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Resursi<\/a> &raquo; Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Vid\u0113jais laiks starp atteic\u0113m (MTBF) ir remont\u0113jamas iek\u0101rtas vid\u0113jais darb\u012bbas laiks uz vienu atteici.<\/strong> Ra\u017eo\u0161anas iek\u0101rtai to apr\u0113\u0137ina, kop\u0113jo darb\u012bbas stundu skaitu dalot ar taj\u0101 pa\u0161\u0101 nov\u0113ro\u0161anas period\u0101 re\u0123istr\u0113to iek\u0101rtas attei\u010du skaitu:<\/p>\n\n\n<p><strong>MTBF = kop\u0113jais darb\u012bbas laiks \u00f7 attei\u010du skaits<\/strong><\/p>\n\n\n<p>Iek\u0101rtai, kas darbojusies 160 stundas un kurai re\u0123istr\u0113tas \u010detras atteices, nov\u0113rotais MTBF ir 40 darb\u012bbas stundas. Tas nenoz\u012bm\u0113, ka t\u0101 atteiks ik p\u0113c 40 stund\u0101m vai ka apkope \u012bsi pirms 40. stundas nov\u0113rs\u012bs n\u0101kamo atteici.<\/p>\n\n\n<p>Svar\u012bgi ir saprast, ko nov\u0113rot\u0101s likumsakar\u012bbas liek izp\u0113t\u012bt un main\u012bt. Kad apkopes un ra\u017eo\u0161anas speci\u0101listi vienojas par veicamajiem darbiem, laiks, kur\u0101 iek\u0101rta neb\u016bs pieejama, j\u0101atspogu\u013co ar\u012b pas\u016bt\u012bjumu izpildes grafik\u0101. SkyPlanner APS sasaista \u0161\u012bs jaudas izmai\u0146as ar darbiem un pieg\u0101des datumiem, kurus t\u0101s ietekm\u0113, lai jums neb\u016btu pa\u0161iem j\u0101saska\u0146o apkopes darbu saraksts ar atsevi\u0161\u0137\u0101m darbu rind\u0101m pie katras iek\u0101rtas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nosakiet, ko j\u016bsu MTBF apr\u0113\u0137ins paties\u012bb\u0101 m\u0113ra<\/h2>\n\n\n<p>Dal\u012b\u0161ana ir vienk\u0101r\u0161a. R\u016bp\u012bg\u0101k j\u0101izv\u0113rt\u0113, vai stundu uzskaite un attei\u010du skaits atbilst vieniem un tiem pa\u0161iem nosac\u012bjumiem. Pirms p\u0101rskata sagatavo\u0161anas vienojieties ar datu re\u0123istr\u0113t\u0101jiem par \u010detriem jaut\u0101jumiem.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Nosakiet, kuru iek\u0101rtu v\u0113rt\u0113siet<\/h3>\n\n\n<p>S\u0101ciet ar konkr\u0113tu iek\u0101rtu vai sist\u0113mu ar skaidri noteikt\u0101m robe\u017e\u0101m. Apstr\u0101des centrs, t\u0101 darbv\u0101rpsta un viss meh\u0101nisk\u0101s apstr\u0101des iecirknis ir at\u0161\u0137ir\u012bgi m\u0113r\u012bjuma tv\u0113rumi.<\/p>\n\n\n<p>Ja v\u0113rt\u0113jat visu iek\u0101rtu, darbv\u0101rpstas atteice, kas ne\u013cauj iek\u0101rtai veikt nepiecie\u0161amo darbu, ir iek\u0101rtas atteice. Darbv\u0101rpstas komponenta nomai\u0146a un iek\u0101rtas darb\u012bbas atjauno\u0161ana nenoz\u012bm\u0113, ka pati iek\u0101rta ir neremont\u0113jama.<\/p>\n\n\n<p>R\u0101d\u012bt\u0101ju var apr\u0113\u0137in\u0101t ar\u012b visai l\u012bnijai, ta\u010du par l\u012bnijas atteici j\u0101uzskata t\u0101s nesp\u0113ja pild\u012bt nepiecie\u0161amo funkciju. Saskaitot visus komponentu trauksmes ierakstus, vienu l\u012bnijas darb\u012bbas p\u0101rtraukumu var uzskait\u012bt vair\u0101kk\u0101rt.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Defin\u0113jiet atteici, nevis tikai apst\u0101\u0161anos<\/h3>\n\n\n<p>Nor\u0101diet nepiecie\u0161amo funkciju un notikumu, kas uzskat\u0101ms par \u0161\u012bs funkcijas zudumu. Iek\u0101rtas boj\u0101jumu, kura d\u0113\u013c t\u0101 vairs neatbilst nepiecie\u0161amajiem darb\u012bbas nosac\u012bjumiem, var uzskat\u012bt par atteici ar\u012b tad, ja iek\u0101rta nav piln\u012bb\u0101 izsl\u0113gusies.<\/p>\n\n\n<p>Pl\u0101not\u0101 apkope, parasta p\u0101rregul\u0113\u0161ana citam produktam, operatora tr\u016bkums un materi\u0101lu gaid\u012b\u0161ana autom\u0101tiski nav uzskat\u0101mi par iek\u0101rtas atteic\u0113m. Turpiniet uzskait\u012bt \u0161os laika zudumus, bet neiek\u013caujiet tos attei\u010du skait\u0101.<\/p>\n\n\n<p>Vienojieties, k\u0101 uzskait\u012bt \u012bslaic\u012bgus darb\u012bbas trauc\u0113jumus un atk\u0101rtotu k\u013c\u016bdu atiestat\u012b\u0161anu. Vair\u0101ki trauksmes ieraksti vienas nenov\u0113rstas atteices laik\u0101 nav j\u0101uzskaita k\u0101 vair\u0101kas neatkar\u012bgas atteices. Savuk\u0101rt jauna atteice p\u0113c faktiskas darb\u012bbas atjauno\u0161anas ir jauns notikums. Saglab\u0101jiet s\u0101kotn\u0113jos detaliz\u0113tos ierakstus, lai atk\u0101rtotus trauc\u0113jumus var\u0113tu izp\u0113t\u012bt, nevis izsl\u0113gt no p\u0101rskata, nosakot uzskaites slieksni.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Izv\u0113lieties darb\u012bbas laika uzskaites pamatu<\/h3>\n\n\n<p>\u0160aj\u0101 rokasgr\u0101mat\u0101 izmantots <strong>MTBF, kas apr\u0113\u0137in\u0101ts p\u0113c darb\u012bbas laika<\/strong>: stund\u0101m, kur\u0101s v\u0113rt\u0113jam\u0101 iek\u0101rta vai sist\u0113ma faktiski darbojas. Remonta laiku un p\u0101r\u0113jo laiku, kur\u0101 iek\u0101rta nedarbojas, skait\u012bt\u0101j\u0101 neiek\u013cauj. Rezult\u0101ts nav vid\u0113jais kalend\u0101rais laiks no vienas atteices s\u0101kuma l\u012bdz n\u0101kam\u0101s atteices s\u0101kumam.<\/p>\n\n\n<p>Nor\u0101diet, ko ietver darb\u012bbas uzskaites sign\u0101ls. Skait\u012bt\u0101js, kas uzskaita laiku, kam\u0113r iek\u0101rta ir iesl\u0113gta, darba cikla izpildes sign\u0101ls un ar person\u0101lu nodro\u0161in\u0101to mai\u0146u kalend\u0101rs var dot at\u0161\u0137ir\u012bgu stundu kopsummu. Ja j\u016bsu iek\u0101rtas noslodzi b\u016btisk\u0101k raksturo ciklu vai palai\u0161anas rei\u017eu skaits, nevis darb\u012bbas stundas, uzskaitiet \u0161o r\u0101d\u012bt\u0101ju l\u012bdztekus stund\u0101m, nevis pie\u0146emiet, ka tie ir savstarp\u0113ji aizst\u0101jami.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Izmantojiet vien\u0101du nov\u0113ro\u0161anas periodu<\/h3>\n\n\n<p>Darb\u012bbas stund\u0101m un atteic\u0113m izmantojiet vien\u0101du p\u0101rskata perioda s\u0101kumu un beigas. Atteices uzskaitiet p\u0113c to s\u0101kuma \u0161aj\u0101 period\u0101: ja boj\u0101jums radies pag\u0101ju\u0161aj\u0101 m\u0113nes\u012b, \u0161om\u0113nes pabeigts remonts nav jauna atteice.<\/p>\n\n\n<p>Iek\u013caujiet visu faktisko darb\u012bbas laiku p\u0101rskata period\u0101, ar\u012b to, kas l\u012bdz perioda beig\u0101m nav nosl\u0113dzies ar atteici. J\u016bs uzskait\u0101t period\u0101 nov\u0113roto darb\u012bbas laiku, nevis atlas\u0101t tikai tos pabeigtos darb\u012bbas posmus, kuri beigu\u0161ies ar atteici. Perioda kop\u0113j\u0101 d\u012bkst\u0101ves laik\u0101 iek\u013caujiet tikai t\u0101s nepieejam\u012bbas stundas, kas ietilpst \u0161aj\u0101 period\u0101. Ja atteice turpin\u0101s p\u0101ri perioda robe\u017eai, atsevi\u0161\u0137i saglab\u0101jiet pilnu notikuma un darb\u012bbas atjauno\u0161anas ierakstu.<\/p>\n\n\n<p>Par katru atteici saglab\u0101jiet iek\u0101rtas ID, atteices s\u0101kuma un darb\u012bbas atjauno\u0161anas laiku, nov\u0113roto simptomu vai atteices veidu, k\u0101 ar\u012b b\u016btiskos ekspluat\u0101cijas apst\u0101k\u013cus. \u0160\u012b inform\u0101cija \u013cauj izskaidrot ieg\u016bto vid\u0113jo r\u0101d\u012bt\u0101ju.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0101 apr\u0113\u0137in\u0101t MTBF: piem\u0113rs ra\u017eo\u0161an\u0101<\/h2>\n\n\n<p>Iedom\u0101simies vienu remont\u0113jamu apstr\u0101des centru, kuru nov\u0113ro p\u0101rskata period\u0101, kur\u0101 person\u0101ls ir nodro\u0161in\u0101ts kopum\u0101 200 stundas. Laika uzskaites dati veido \u0161\u0101du sadal\u012bjumu. Kategorijas nep\u0101rkl\u0101jas, un \u010detras atteices ir atsevi\u0161\u0137as iek\u0101rtas atteices atbilsto\u0161i iepriek\u0161 saska\u0146otajai defin\u012bcijai.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Laika kategorija<\/th><th>Stundas p\u0101rskata period\u0101<\/th><th>K\u0101 \u0146em v\u0113r\u0101 \u0161aj\u0101 apr\u0113\u0137in\u0101<\/th><\/tr><\/thead><tbody><tr><td>Pl\u0101not\u0101 tehnisk\u0101 apkope<\/td><td>12<\/td><td>Nav darb\u012bbas laiks; nav atteice<\/td><\/tr><tr><td>Parasta iestat\u012b\u0161ana un p\u0101rregul\u0113\u0161ana<\/td><td>8<\/td><td>Nav darb\u012bbas laiks; nav atteice<\/td><\/tr><tr><td>Materi\u0101lu gaid\u012b\u0161ana, kam\u0113r iek\u0101rta nedarbojas<\/td><td>10<\/td><td>Nav darb\u012bbas laiks; nav iek\u0101rtas atteice<\/td><\/tr><tr><td>Iek\u0101rta nav pieejama \u010detru attei\u010du d\u0113\u013c<\/td><td>10<\/td><td>Nav darb\u012bbas laiks; saglab\u0101 d\u012bkst\u0101ves anal\u012bzei<\/td><\/tr><tr><td>Faktiskais darb\u012bbas laiks<\/td><td>160<\/td><td>MTBF formulas skait\u012bt\u0101js<\/td><\/tr><tr><td>Kop\u0113jais laiks, kur\u0101 nodro\u0161in\u0101ts person\u0101ls<\/td><td>200<\/td><td>Kopsumma uzskaites p\u0101rbaudei, nevis formulas skait\u012bt\u0101js<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Apr\u0113\u0137ins:<\/p>\n\n\n<p><strong>160 darb\u012bbas stundas \u00f7 4 atteices = 40 darb\u012bbas stundas uz vienu atteici<\/strong><\/p>\n\n\n<p>Ja s\u0101kat ar kop\u0113jo laiku, kur\u0101 nodro\u0161in\u0101ts person\u0101ls, vispirms at\u0146emiet visas kategorijas, kur\u0101s iek\u0101rta nedarboj\u0101s: 200 \u2212 12 \u2212 8 \u2212 10 \u2212 10 = 160 stundas. Ja datu avot\u0101 jau nor\u0101d\u012btas 160 faktisk\u0101s darb\u012bbas stundas, izmantojiet t\u0101s tie\u0161i. Atk\u0101rtoti at\u0146emot d\u012bkst\u0101vi, ieg\u016btais MTBF b\u016btu nepamatoti zems.<\/p>\n\n\n<p>Piem\u0113rs ar\u012b par\u0101da, k\u0101p\u0113c ar mai\u0146u kalend\u0101ru vien nepietiek. Dalot 200 stundas, kur\u0101s nodro\u0161in\u0101ts person\u0101ls, ar \u010detr\u0101m atteic\u0113m, ieg\u016btu 50 stundas uz vienu atteici, ta\u010du \u0161aj\u0101 rezult\u0101t\u0101 b\u016btu iek\u013cauts ar\u012b laiks, kur\u0101 iek\u0101rta nedarboj\u0101s.<\/p>\n\n\n<p>Nor\u0101diet rezult\u0101tu kop\u0101 ar t\u0101 kontekstu: \u201cIek\u0101rta MC-01, p\u0101rskata periods, 160 darb\u012bbas stundas, \u010detras atteices, nov\u0113rotais MTBF \u2014 40 stundas.\u201d Sal\u012bdzinot rezult\u0101tu ar citu periodu, darb\u012bbas laiks un attei\u010du skaits ir tikpat svar\u012bgi k\u0101 pati MTBF v\u0113rt\u012bba.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0101 neizkrop\u013cot rezult\u0101tu, ja attei\u010du nav vai v\u0113rt\u0113 vair\u0101kas iek\u0101rtas<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Ko dar\u012bt, ja attei\u010du nav bijis?<\/h3>\n\n\n<p>Nedaliet ar nulli un nenor\u0101diet bezgal\u012bgu MTBF k\u0101 nevainojamas uzticam\u012bbas pier\u0101d\u012bjumu. Rakstiet \u201c160 darb\u012bbas stund\u0101s atteices nav nov\u0113rotas\u201d, p\u0101rskat\u0101 izmantojot faktisko darb\u012bbas laiku.<\/p>\n\n\n<p>T\u0101 ir noder\u012bga inform\u0101cija, ta\u010du t\u0101 nav l\u012bdzv\u0113rt\u012bga vair\u0101kiem darb\u012bbas gadiem bez atteic\u0113m. Lai apr\u0113\u0137in\u0101tu statistiski pamatotu apak\u0161\u0113jo ticam\u012bbas robe\u017eu, nepiecie\u0161ams statistiskais modelis un izv\u0113l\u0113ts ticam\u012bbas l\u012bmenis. Parast\u0101 ra\u017eo\u0161anas p\u0101rskat\u0101 god\u012bg\u0101k ir saglab\u0101t nulles attei\u010du skaitu un nov\u0113roto darb\u012bbas laiku, nevis izdom\u0101t punktveida nov\u0113rt\u0113jumu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ko dar\u012bt, ja izmanto vair\u0101ku iek\u0101rtu datus?<\/h3>\n\n\n<p>Ja sal\u012bdzin\u0101mas iek\u0101rtas ir pamatoti apvienotas grup\u0101, izmantojiet formulu <strong>iek\u0101rtu kop\u0113jais darb\u012bbas stundu skaits \u00f7 kop\u0113jais attei\u010du skaits<\/strong>. Nedaliet vienu kop\u012bgu kalend\u0101ro periodu ar visu iek\u0101rtu attei\u010du skaitu un neapr\u0113\u0137iniet atsevi\u0161\u0137o MTBF v\u0113rt\u012bbu nesv\u0113rto vid\u0113jo.<\/p>\n\n\n<p>Piem\u0113ram, iedom\u0101simies divas sal\u012bdzin\u0101mas iek\u0101rtas, kuru datus re\u0123istr\u0113 p\u0113c vien\u0101diem noteikumiem. Vienai uzskait\u012btas 160 stundas un \u010detras atteices, otrai \u2014 240 stundas un divas atteices. Apvienotais rezult\u0101ts ir 400 \u00f7 6 jeb aptuveni 66,7 darb\u012bbas stundas uz vienu atteici, nevis vienk\u0101r\u0161ais vid\u0113jais no 40 un 120, kas b\u016btu 80.<\/p>\n\n\n<p>Saglab\u0101jiet ar\u012b katras iek\u0101rtas atsevi\u0161\u0137os rezult\u0101tus. Kop\u0113jais r\u0101d\u012bt\u0101js var nepar\u0101d\u012bt, kura iek\u0101rta rada visvair\u0101k probl\u0113mu ra\u017eo\u0161an\u0101. At\u0161\u0137ir\u012bgas konstrukcijas, vecuma vai darba re\u017e\u012bma d\u0113\u013c var b\u016bt lietder\u012bgi veidot atsevi\u0161\u0137as grupas, nevis apr\u0113\u0137in\u0101t vienu uzticam\u012bbas r\u0101d\u012bt\u0101ju visai r\u016bpn\u012bcai.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pirms izv\u0113laties r\u012bc\u012bbu, izv\u0113rt\u0113jiet MTBF noz\u012bmi<\/h2>\n\n\n<p>Liel\u0101ks nov\u0113rotais MTBF noz\u012bm\u0113 maz\u0101k uzskait\u012bto attei\u010du uz vienu darb\u012bbas stundu noteiktaj\u0101 m\u0113r\u012bjuma tv\u0113rum\u0101. Tas, vai \u0161is rezult\u0101ts liecina par uzlabojumu, ir atkar\u012bgs ar\u012b no cit\u0101m izmai\u0146\u0101m.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sal\u012bdziniet sal\u012bdzin\u0101mus datus<\/h3>\n\n\n<p>Sal\u012bdziniet periodus, kuros izmantotas vien\u0101das atteices defin\u012bcijas, darb\u012bbas laika uzskaites principi un v\u0113rt\u0113jam\u0101s iek\u0101rtas robe\u017eas. P\u0113c tam p\u0101rbaudiet, k\u0101di darbi veikti. Ja iek\u0101rta ra\u017eo maz\u0101k pras\u012bgu produktu kl\u0101stu ar cit\u0101du slodzi, tas v\u0113l nepier\u0101da, ka apkopes izmai\u0146as ir devu\u0161as rezult\u0101tu.<\/p>\n\n\n<p>L\u012bdz\u0101s tendencei nor\u0101diet faktisko darb\u012bbas laiku un attei\u010du skaitu. Viens \u012bss periods ar vienu atteici var krasi main\u012bt vid\u0113jo v\u0113rt\u012bbu. Ilg\u0101ki nov\u0113rojumi pal\u012bdz, ta\u010du, apvienojot datus par gadiem ar at\u0161\u0137ir\u012bgiem ekspluat\u0101cijas apst\u0101k\u013ciem, var nepaman\u012bt nesenu pasliktin\u0101\u0161anos. Izv\u0113rt\u0113jiet p\u0113d\u0113j\u0101 laika tendenci un apst\u0101k\u013cus, kas to veidoju\u0161i, nevis tikai kop\u0113jo vid\u0113jo r\u0101d\u012bt\u0101ju.<\/p>\n\n\n<p>Nav viena univers\u0101la \u201claba MTBF\u201d, kas der\u0113tu vis\u0101m ra\u017eo\u0161anas iek\u0101rt\u0101m. Lietder\u012bgs m\u0113r\u0137is balst\u0101s sal\u012bdzin\u0101mos v\u0113sturiskajos datos, pras\u012btaj\u0101 darba re\u017e\u012bm\u0101 un atteices sek\u0101s. Augsts r\u0101d\u012bt\u0101js iek\u0101rtai, kuras darbu var viegli novirz\u012bt citur, pieg\u0101des termi\u0146iem var b\u016bt maz\u0101k noz\u012bm\u012bgs nek\u0101 bie\u017ei p\u0101rtraukumi vien\u012bgaj\u0101 iek\u0101rt\u0101, kas sp\u0113j veikt kritiski svar\u012bgu oper\u0101ciju.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Neuztveriet vid\u0113jo r\u0101d\u012bt\u0101ju k\u0101 laika atskaiti l\u012bdz atteicei<\/h3>\n\n\n<p>MTBF 40 stundas nenor\u0101da ne n\u0101kam\u0101s atteices br\u012bdi, ne iek\u0101rtas atliku\u0161o darbm\u016b\u017eu. Atteices var notikt vair\u0101kas p\u0113c k\u0101rtas, savuk\u0101rt atsevi\u0161\u0137i nep\u0101rtrauktas darb\u012bbas posmi var b\u016bt daudz ilg\u0101ki par vid\u0113jo.<\/p>\n\n\n<p>Ar MTBF vien nepietiek ar\u012b profilaktisk\u0101s apkopes interv\u0101la pamato\u0161anai. Pareiz\u0101 r\u012bc\u012bba ir atkar\u012bga no atteices meh\u0101nisma, datiem par iek\u0101rtas st\u0101vokli, iek\u0101rtas ekspluat\u0101cijas nor\u0101d\u012bjumiem un atteices sek\u0101m. Piem\u0113ram, ar laiku radies nodilums un periodisks pies\u0101r\u0146ojums j\u0101izmekl\u0113 at\u0161\u0137ir\u012bgi; kop\u0113jais vid\u0113jais r\u0101d\u012bt\u0101js nevar pateikt, kur\u0161 no tiem ir probl\u0113mas c\u0113lonis.<\/p>\n\n\n<p>Ja r\u0101d\u012bt\u0101js pasliktin\u0101s, atrodiet attiec\u012bgos attei\u010du gad\u012bjumus un uzdodiet konkr\u0113t\u0101ku jaut\u0101jumu: k\u0101ds atteices veids atk\u0101rtojas, k\u0101dos apst\u0101k\u013cos un k\u0101das izmai\u0146as to nov\u0113rstu? P\u0113c darbu veik\u0161anas p\u0101rbaudiet, vai sal\u012bdzin\u0101mos ekspluat\u0101cijas apst\u0101k\u013cos probl\u0113ma atk\u0101rtojas.<\/p>\n\n\n<h3 class=\"wp-block-heading\">V\u0113rt\u0113jiet attei\u010du bie\u017eumu kop\u0101 ar zaud\u0113to laiku<\/h3>\n\n\n<p>MTBF nepar\u0101da, cik ilgi p\u0113c atteices ra\u017eo\u0161ana nav iesp\u0113jama. Divas iek\u0101rtas ar vien\u0101du MTBF var \u013coti at\u0161\u0137ir\u012bgi ietekm\u0113t pas\u016bt\u012bjumu izpildi, ja viena \u0101tri ats\u0101k darbu, bet otrai j\u0101gaida speci\u0101lists vai rezerves da\u013ca.<\/p>\n\n\n<p>L\u012bdz\u0101s vid\u0113jam r\u0101d\u012bt\u0101jam izv\u0113rt\u0113jiet kop\u0113jo attei\u010du izrais\u012bto d\u012bkst\u0101ves laiku un ilg\u0101kos atsevi\u0161\u0137os p\u0101rtraukumus. Sekojiet ar\u012b tam, k\u0101 tie ietekm\u0113 turpm\u0101kos darbus. \u012ass p\u0101rtraukums tie\u0161i pirms vien\u012bg\u0101 pieejam\u0101 laika loga kritiski svar\u012bgai oper\u0101cijai var vair\u0101k apdraud\u0113t pieg\u0101di nek\u0101 ilg\u0101ka apst\u0101\u0161an\u0101s, p\u0113c kuras ir pietiekami daudz laika iekav\u0113juma atg\u016b\u0161anai.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTBF, MTTR un MTTF sal\u012bdzin\u0101jums<\/h2>\n\n\n<p>\u0160ie r\u0101d\u012bt\u0101ji atbild uz at\u0161\u0137ir\u012bgiem jaut\u0101jumiem. Vienm\u0113r skaidri nor\u0101diet, uz kuru objektu r\u0101d\u012bt\u0101js attiecas un k\u0101 defin\u0113ts m\u0113r\u0101mais laiks, nevis uztveriet \u0161os sa\u012bsin\u0101jumus k\u0101 savstarp\u0113ji aizst\u0101jamus v\u0113rt\u0113jumus.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>R\u0101d\u012bt\u0101js<\/th><th>Uz k\u0101du jaut\u0101jumu tas atbild<\/th><th>Praktisk\u0101 at\u0161\u0137ir\u012bba<\/th><\/tr><\/thead><tbody><tr><td>MTBF: vid\u0113jais laiks starp atteic\u0113m<\/td><td>K\u0101ds bija remont\u0113jamas iek\u0101rtas vid\u0113jais darb\u012bbas laiks uz vienu atteici?<\/td><td>P\u0113c remonta iek\u0101rta ats\u0101k darbu.<\/td><\/tr><tr><td>MTTR: vid\u0113jais remonta vai darbsp\u0113jas atjauno\u0161anas laiks<\/td><td>Cik ilgi vid\u0113ji ilgst remonts vai darbsp\u0113jas atjauno\u0161ana atbilsto\u0161i noteiktajai defin\u012bcijai?<\/td><td>Nor\u0101diet, vai laika uzskait\u0113 ietilpst gaid\u012b\u0161ana, diagnostika, p\u0101rbaudes un atk\u0101rtota palai\u0161ana; da\u017e\u0101dos p\u0101rskatos uzskaites robe\u017eas at\u0161\u0137iras.<\/td><\/tr><tr><td>MTTF: vid\u0113jais laiks l\u012bdz atteicei<\/td><td>Cik ilgi neremont\u0113jams izstr\u0101d\u0101jums darbojas l\u012bdz atteicei?<\/td><td>Attiecas uz izstr\u0101d\u0101jumu, ko nomaina, nevis remont\u0113, bet ne autom\u0101tiski uz visu iek\u0101rtu, kur\u0101 tas atrodas.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 ir svar\u012bgs viss periods, kur\u0101 iek\u0101rta nav pieejama, pat ja remonta p\u0101rskat\u0101 uzskait\u012bts tikai tie\u0161ais remonta darbs. Deta\u013cas nomai\u0146a var aiz\u0146emt maz laika, ta\u010du iek\u0101rta var palikt nepieejama daudz ilg\u0101k, kam\u0113r komanda sag\u0101d\u0101 deta\u013cu un veic ra\u017eo\u0161anas ats\u0101k\u0161anai nepiecie\u0161am\u0101s p\u0101rbaudes.<\/p>\n\n\n<p>\u0160\u012b at\u0161\u0137ir\u012bba pal\u012bdz izvair\u012bties no izplat\u012btas pl\u0101no\u0161anas k\u013c\u016bdas: pie\u0146\u0113muma, ka vid\u0113jais remonta ilgums garant\u0113 katra turpm\u0101k\u0101 boj\u0101juma nov\u0113r\u0161anu \u0161aj\u0101 laik\u0101.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izmantojiet uzticam\u012bbas anal\u012bzes secin\u0101jumus ra\u017eo\u0161anas l\u0113mumu pie\u0146em\u0161an\u0101 ar SkyPlanner<\/h2>\n\n\n<p>Pie\u0146emsim, ka p\u0113c izmekl\u0113\u0161anas apkopes komanda vienojas par tr\u012bs stundu darbiem apstr\u0101des centr\u0101 n\u0101kamaj\u0101 tre\u0161dien\u0101. Tas ir apkopes laika logs, kas izv\u0113l\u0113ts, pamatojoties uz tehnisku l\u0113mumu, nevis atteices datums, kas prognoz\u0113ts p\u0113c 40 stundu MTBF.<\/p>\n\n\n<p>\u0160\u012b vieno\u0161an\u0101s maina klientu pas\u016bt\u012bjumiem pieejamo jaudu. Ja t\u0101 paliek tikai apkopes kalend\u0101r\u0101, ra\u017eo\u0161anas pl\u0101n\u0101 joproj\u0101m var tikt paredz\u0113ti darbi iek\u0101rtai, kas neb\u016bs pieejama. Pl\u0101not\u0101js \u0161o pretrunu atkl\u0101j tikai tad, kad cen\u0161as nodro\u0161in\u0101t attiec\u012bg\u0101s ned\u0113\u013cas pieg\u0101des.<\/p>\n\n\n<p>SkyPlanner sist\u0113m\u0101 <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-planosana-iekartu-apkopes-laika\/\">re\u0123istr\u0113jiet saska\u0146oto laika interv\u0101lu<\/a> k\u0101 <strong>darba centra iz\u0146\u0113mumu<\/strong>. Iz\u0146\u0113mums nosaka, ka \u0161aj\u0101 period\u0101 resurss nav pieejams. P\u0113c tam SkyPlanner pl\u0101no\u0161anas m\u0101ksl\u012bgais intelekts Arcturus var p\u0101rr\u0113\u0137in\u0101t iepl\u0101nojam\u0101s oper\u0101cijas atbilsto\u0161i main\u012btajai jaudai, \u0146emot v\u0113r\u0101 konfigur\u0113tos darba centrus, mai\u0146as, oper\u0101ciju ilgumu, atkar\u012bbas, priorit\u0101tes un fiks\u0113jumus. Ieg\u016bt\u0101 sec\u012bba ir redzama Ganta diagramm\u0101.<\/p>\n\n\n<p>Pl\u0101nojot tre\u0161dienas apkopes darbus, p\u0101rbaudiet, vai p\u0113c gaido\u0161aj\u0101m apstr\u0101des oper\u0101cij\u0101m joproj\u0101m pietiek laika turpm\u0101kaj\u0101m p\u0101rbaud\u0113m un mont\u0101\u017eai. Ja ra\u017eo\u0161anas uzdevumu p\u0101rce\u013c uz piem\u0113rotu alternat\u012bvu resursu, p\u0101rbaudiet ar\u012b \u0161im resursam jau iepl\u0101notos darbus un to termi\u0146us. Br\u012bvs laika logs ir v\u0113rt\u012bgs tikai tad, ja oper\u0101ciju tur patie\u0161\u0101m var veikt un ar\u012b atliku\u0161ie mar\u0161ruta posmi iek\u013caujas termi\u0146\u0101.<\/p>\n\n\n<p>T\u0101p\u0113c SkyPlanner ir noder\u012bgs n\u0101kamais solis, ja uzticam\u012bbas uzlabo\u0161anas darbi maina iek\u0101rtu pieejam\u012bbu. Tehniskos un komerci\u0101los l\u0113mumus joproj\u0101m pie\u0146emat j\u016bs, bet Arcturus veic <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/kas-ir-razosanas-planosana\/\">savstarp\u0113ji saist\u012bto darbu grafika apr\u0113\u0137inu<\/a>. Maz\u0101k laika j\u0101velta darbu rindu p\u0101rk\u0101rto\u0161anai, un ra\u017eo\u0161anas un p\u0101rdo\u0161anas komand\u0101m ir kop\u012bgs pamats atliku\u0161ajiem l\u0113mumiem par pieg\u0101d\u0113m.<\/p>\n\n\n<p>Ja saska\u0146otais apkopes laiks main\u0101s, atjauniniet apkopes laika logu. P\u0101rr\u0113\u0137iniet grafiku un p\u0101rskatiet skart\u0101s pieg\u0101des saist\u012bbas, lai n\u0101kam\u0101s mai\u0146as pl\u0101ns nebalst\u012btos uz novecoju\u0161u pie\u0146\u0113mumu par iek\u0101rtas pieejam\u012bbu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Noskaidrojiet, k\u0101 vienas iek\u0101rtas pieejam\u012bba ietekm\u0113 j\u016bsu pieg\u0101des<\/h2>\n\n\n<p>Lietder\u012bgas MTBF anal\u012bzes rezult\u0101ts ir skaidr\u0101ka r\u012bc\u012bba, nevis tikai skaitlis. Nosakiet, uz k\u0101diem datiem balst\u0101ties, izmekl\u0113jiet noz\u012bm\u012bg\u0101s atteices un iek\u013caujiet saska\u0146ot\u0101s jaudas izmai\u0146as pl\u0101n\u0101, p\u0113c kura ra\u017eo\u0161ana patie\u0161\u0101m str\u0101d\u0101.<\/p>\n\n\n<p>Izv\u0113lieties SkyPlanner, ja \u0161\u012bs izmai\u0146as j\u0101saska\u0146o visos skartajos klientu pas\u016bt\u012bjumos, nep\u0101rk\u0101rtojot katras saist\u012bt\u0101s iek\u0101rtas darbu rindu manu\u0101li. SkyPlanner integr\u0113jas ar jebkuru ERP vai MES sist\u0113mu, izmantojot atv\u0113rto REST API, t\u0101p\u0113c grafika uzlabo\u0161an\u0101 varat balst\u012bties uz jau eso\u0161o pas\u016bt\u012bjumu un ra\u017eo\u0161anas inform\u0101ciju.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Piesakiet SkyPlanner demonstr\u0101ciju<\/a>, sagatavojot piem\u0113ru ar vienu iek\u0101rtu, saska\u0146oto t\u0101s nepieejam\u012bbas periodu un pas\u016bt\u012bjumiem, kas taj\u0101 j\u0101apstr\u0101d\u0101. L\u016bdziet par\u0101d\u012bt, kuras oper\u0101cijas tiek p\u0101rceltas, kas notiek turpm\u0101kajos posmos un par kuriem sol\u012btajiem pieg\u0101des termi\u0146iem j\u0101pie\u0146em l\u0113mums. Ja vispirms v\u0113laties izp\u0113t\u012bt pa\u0161i, <a href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a> un apskatiet, k\u0101 jaudas izmai\u0146as p\u0101rveido grafiku.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana S\u0101kums &raquo; Resursi &raquo; Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana Vid\u0113jais laiks starp atteic\u0113m (MTBF) ir remont\u0113jamas iek\u0101rtas vid\u0113jais darb\u012bbas laiks uz vienu atteici. Ra\u017eo\u0161anas iek\u0101rtai to apr\u0113\u0137ina, kop\u0113jo darb\u012bbas stundu skaitu dalot ar taj\u0101 pa\u0161\u0101 nov\u0113ro\u0161anas period\u0101 re\u0123istr\u0113to iek\u0101rtas attei\u010du skaitu: MTBF = kop\u0113jais &#8230; <a title=\"Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/\" aria-label=\"Read more about Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":108771,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-108751","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana<\/title>\n<meta name=\"description\" content=\"Apr\u0113\u0137iniet iek\u0101rtas MTBF no prec\u012bziem darb\u012bbas laika un attei\u010du datiem. Izmantojiet to uzticam\u012bbas uzlabo\u0161anai un ra\u017eo\u0161anas saist\u012bbu izpildes pl\u0101no\u0161anai.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana\" \/>\n<meta property=\"og:description\" content=\"Apr\u0113\u0137iniet iek\u0101rtas MTBF no prec\u012bziem darb\u012bbas laika un attei\u010du datiem. Izmantojiet to uzticam\u012bbas uzlabo\u0161anai un ra\u017eo\u0161anas saist\u012bbu izpildes pl\u0101no\u0161anai.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-24T12:48:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-24T12:49:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtbf\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtbf\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana\",\"datePublished\":\"2026-10-24T12:48:10+00:00\",\"dateModified\":\"2026-10-24T12:49:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtbf\\\/\"},\"wordCount\":3087,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtbf\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-between-failures-hero.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtbf\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtbf\\\/\",\"name\":\"Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtbf\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtbf\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-between-failures-hero.png\",\"datePublished\":\"2026-10-24T12:48:10+00:00\",\"dateModified\":\"2026-10-24T12:49:01+00:00\",\"description\":\"Apr\u0113\u0137iniet iek\u0101rtas MTBF no prec\u012bziem darb\u012bbas laika un attei\u010du datiem. Izmantojiet to uzticam\u012bbas uzlabo\u0161anai un ra\u017eo\u0161anas saist\u012bbu izpildes pl\u0101no\u0161anai.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtbf\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtbf\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtbf\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-between-failures-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-between-failures-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A machining centre produces unequal runs of parts, interrupted by fault and repair symbols.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mtbf\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana","description":"Apr\u0113\u0137iniet iek\u0101rtas MTBF no prec\u012bziem darb\u012bbas laika un attei\u010du datiem. Izmantojiet to uzticam\u012bbas uzlabo\u0161anai un ra\u017eo\u0161anas saist\u012bbu izpildes pl\u0101no\u0161anai.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/","og_locale":"lv_LV","og_type":"article","og_title":"Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana","og_description":"Apr\u0113\u0137iniet iek\u0101rtas MTBF no prec\u012bziem darb\u012bbas laika un attei\u010du datiem. Izmantojiet to uzticam\u012bbas uzlabo\u0161anai un ra\u017eo\u0161anas saist\u012bbu izpildes pl\u0101no\u0161anai.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-24T12:48:10+00:00","article_modified_time":"2026-10-24T12:49:01+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana","datePublished":"2026-10-24T12:48:10+00:00","dateModified":"2026-10-24T12:49:01+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/"},"wordCount":3087,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/","name":"Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png","datePublished":"2026-10-24T12:48:10+00:00","dateModified":"2026-10-24T12:49:01+00:00","description":"Apr\u0113\u0137iniet iek\u0101rtas MTBF no prec\u012bziem darb\u012bbas laika un attei\u010du datiem. Izmantojiet to uzticam\u012bbas uzlabo\u0161anai un ra\u017eo\u0161anas saist\u012bbu izpildes pl\u0101no\u0161anai.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png","width":1672,"height":941,"caption":"A machining centre produces unequal runs of parts, interrupted by fault and repair symbols."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mtbf\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana S\u0101kums &raquo; Resursi &raquo; Vid\u0113jais laiks starp atteic\u0113m: MTBF apr\u0113\u0137ins un izmanto\u0161ana Vid\u0113jais laiks starp atteic\u0113m (MTBF) ir remont\u0113jamas iek\u0101rtas vid\u0113jais darb\u012bbas laiks uz vienu atteici. Ra\u017eo\u0161anas iek\u0101rtai to apr\u0113\u0137ina, kop\u0113jo darb\u012bbas stundu skaitu dalot ar taj\u0101 pa\u0161\u0101 nov\u0113ro\u0161anas period\u0101 re\u0123istr\u0113to iek\u0101rtas attei\u010du skaitu: MTBF = kop\u0113jais&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/108751","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=108751"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/108751\/revisions"}],"predecessor-version":[{"id":108812,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/108751\/revisions\/108812"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/108771"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=108751"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=108751"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=108751"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}