{"id":105795,"date":"2026-10-22T08:34:46","date_gmt":"2026-10-22T08:34:46","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105795"},"modified":"2026-10-22T08:35:48","modified_gmt":"2026-10-22T08:35:48","slug":"razosanas-pieskaitamas-izmaksas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/","title":{"rendered":"Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Resursi<\/a> &raquo; Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Ra\u017eo\u0161anas uzdevumam var b\u016bt vajadz\u012bgs maz materi\u0101lu, ta\u010du tas joproj\u0101m var rad\u012bt iev\u0113rojamas ra\u017eo\u0161anas izmaksas. Iek\u0101rtai vajag vietu, apkopi un elektroener\u0123iju. Ra\u017eo\u0161anas vad\u012bt\u0101ji un atbalsta person\u0101ls nodro\u0161ina nep\u0101rtrauktu darba norisi. Neiek\u013caujot \u0161\u012bs izmaksas apr\u0113\u0137in\u0101, produkts \u0161\u0137iet ienes\u012bg\u0101ks, nek\u0101 tas paties\u012bb\u0101 ir. Savuk\u0101rt nep\u0101rdom\u0101ta izmaksu sadale var rad\u012bt mald\u012bgu priek\u0161statu par to, kur\u0161 produkts izmaks\u0101 d\u0101rgi.<\/p>\n\n\n<p><strong>Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas ir netie\u0161\u0101s ra\u017eo\u0161anas nodro\u0161in\u0101\u0161anas izmaksas, neietverot tie\u0161\u0101s materi\u0101lu un tie\u0161\u0101s darbasp\u0113ka izmaksas.<\/strong> Tipiski piem\u0113ri ir ra\u017eo\u0161anas telpu noma, ra\u017eo\u0161anas iek\u0101rtu nolietojums, apkope un ra\u017eo\u0161anas uzraudz\u012bba. \u0160\u012bs izmaksas nodro\u0161ina darbu, ta\u010du to atsevi\u0161\u0137a attiecin\u0101\u0161ana uz katru produktu nav ekonomiski lietder\u012bga. T\u0101p\u0113c t\u0101s sadala, konsekventi izmantojot vienotu b\u0101zi.<\/p>\n\n\n<p>Noder\u012bgs pieskait\u0101mo izmaksu apr\u0113\u0137ins atbild uz diviem jaut\u0101jumiem: k\u0101da da\u013ca ra\u017eotnes izmaksu j\u0101attiecina uz \u0161o darbu, un ko paties\u012bb\u0101 var main\u012bt? SkyPlanner APS pal\u012bdz ra\u017eo\u0161anas organiz\u0113\u0161an\u0101, sasaistot pieejamo jaudu, ra\u017eo\u0161anas uzskaites datus un pl\u0101no\u0161anu ar m\u0101ksl\u012bgo intelektu. T\u0101d\u0113j\u0101di resursi, par kuriem jau ir samaks\u0101ts, maz\u0101k laika pavada, gaidot \u012bstenojamu darbu sec\u012bbu, un vair\u0101k laika \u2014 izpildot vajadz\u012bgos pas\u016bt\u012bjumus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ko iek\u013cauj ra\u017eo\u0161anas pieskait\u0101maj\u0101s izmaks\u0101s?<\/h2>\n\n\n<p>Vispirms nosakiet, kuras izmaksas attiecas uz ra\u017eotni, nevis uzskaitiet visus izdevumus, kurus ir gr\u016bti attiecin\u0101t uz konkr\u0113tu produktu. Netie\u0161\u0101s ra\u017eo\u0161anas izmaksas ir j\u0101iek\u013cauj ra\u017eo\u0161anas izmaksu apr\u0113\u0137in\u0101. Ta\u010du rekl\u0101mas kampa\u0146a vai galven\u0101 biroja r\u0113\u0137ins par juridiskiem pakalpojumiem nek\u013c\u016bst par ra\u017eo\u0161anas pieskait\u0101maj\u0101m izmaks\u0101m tikai t\u0101p\u0113c, ka no t\u0101 labumu g\u016bst vair\u0101ki produkti.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Izmaksas<\/th><th>Parast\u0101 klasifik\u0101cija<\/th><th>Pamatojums<\/th><\/tr><\/thead><tbody><tr><td>Met\u0101ls vai komponenti, kas attiecin\u0101mi uz konkr\u0113tu produktu<\/td><td>Tie\u0161\u0101s materi\u0101lu izmaksas<\/td><td>Produkta izgatavo\u0161an\u0101 pat\u0113r\u0113 nosak\u0101mu daudzumu<\/td><\/tr><tr><td>Operatora darba laiks, kas attiecin\u0101ms uz ra\u017eo\u0161anas uzdevumu<\/td><td>Tie\u0161\u0101s darbasp\u0113ka izmaksas<\/td><td>Darbu var attiecin\u0101t uz konkr\u0113to ra\u017eo\u0161anas uzdevumu<\/td><\/tr><tr><td>Ra\u017eo\u0161anas uzraugi un apkopes person\u0101ls, kas apkalpo vair\u0101kus ra\u017eo\u0161anas uzdevumus vai iecirk\u0146us<\/td><td>Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas<\/td><td>Vi\u0146i nodro\u0161ina vair\u0101ku ra\u017eo\u0161anas uzdevumu vai iecirk\u0146u darbu<\/td><\/tr><tr><td>Ra\u017eo\u0161anas telpu noma, apdro\u0161in\u0101\u0161ana un ra\u017eo\u0161anas iek\u0101rtu nolietojums<\/td><td>Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas<\/td><td>T\u0101s nodro\u0161ina ra\u017eo\u0161anai nepiecie\u0161amo vidi un pamatl\u012bdzek\u013cus<\/td><\/tr><tr><td>Ra\u017eotnes kop\u0113jie komun\u0101lie pakalpojumi, sm\u0113rvielas un s\u012bkie pal\u012bgmateri\u0101li<\/td><td>Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas<\/td><td>Atsevi\u0161\u0137a pat\u0113ri\u0146a uzskaite katram produktam nav ekonomiski lietder\u012bga<\/td><\/tr><tr><td>P\u0101rdo\u0161anas komisijas, rekl\u0101ma un uz\u0146\u0113muma visp\u0101r\u0113j\u0101 administr\u0101cija<\/td><td>Ar ra\u017eo\u0161anu nesaist\u012btas izmaksas<\/td><td>T\u0101s nodro\u0161ina p\u0101rdo\u0161anu vai uz\u0146\u0113muma darb\u012bbu kopum\u0101, nevis ra\u017eo\u0161anas procesu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izmaksu klasifik\u0101cija ir atkar\u012bga no t\u0101, k\u0101dam nol\u016bkam resursi izmantoti un k\u0101 izmaksas uzskait\u012btas. Konkr\u0113tam procesam atsevi\u0161\u0137i uzskait\u012btu elektroener\u0123iju var attiecin\u0101t tie\u0161\u0101k nek\u0101 kop\u0113jo \u0113kas r\u0113\u0137inu. Poz\u012bcija, kas paredz\u0113ta tikai konkr\u0113tam ra\u017eo\u0161anas uzdevumam, var b\u016bt tie\u0161\u0101s izmaksas, pat ja l\u012bdz\u012bgas poz\u012bcijas parasti apvieno kop\u0113j\u0101 izmaksu grup\u0101. Iev\u0113rojiet saska\u0146otu pa\u0161izmaksas apr\u0113\u0137ina politiku, nevis mainiet izmaksu uzskaites pieeju, lai konkr\u0113ts cenu pied\u0101v\u0101jums izskat\u012btos pievilc\u012bg\u0101ks.<\/p>\n\n\n<p>Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas ir tikai viena ra\u017eo\u0161anas izmaksu da\u013ca:<\/p>\n\n\n<p><strong>Ra\u017eo\u0161anas izmaksas = Tie\u0161\u0101s materi\u0101lu izmaksas + Tie\u0161\u0101s darbasp\u0113ka izmaksas + Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas<\/strong><\/p>\n\n\n<p>Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas nav tas pats, kas visas uz\u0146\u0113muma pieskait\u0101m\u0101s izmaksas, un ra\u017eo\u0161anas izmaksu apr\u0113\u0137ins v\u0113l nenosaka pilnu p\u0101rdo\u0161anas cenu. Nosakot cenu, joproj\u0101m j\u0101\u0146em v\u0113r\u0101 p\u0101rdo\u0161anas izmaksas, p\u0101r\u0113j\u0101s uz\u0146\u0113muma darb\u012bbas izmaksas un nepiecie\u0161am\u0101 pe\u013c\u0146as da\u013ca.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Netie\u0161\u0101s izmaksas nenoz\u012bm\u0113 nemain\u012bg\u0101s izmaksas<\/h3>\n\n\n<p>Tie ir at\u0161\u0137ir\u012bgi klasifik\u0101cijas veidi. Apz\u012bm\u0113jums \u201cnetie\u0161\u0101s\u201d raksturo to, k\u0101 izmaksas attiecina uz produktu. Savuk\u0101rt \u201cnemain\u012bg\u0101s\u201d raksturo to, k\u0101 izmaksu kopsumma main\u0101s l\u012bdz ar darb\u012bbas apjomu noteikt\u0101 period\u0101 un darb\u012bbas diapazon\u0101.<\/p>\n\n\n<p>Ra\u017eo\u0161anas telpu nomas maksa m\u0113ne\u0161a laik\u0101 var palikt nemain\u012bga. Da\u013ca ener\u0123ijas un pal\u012bgmateri\u0101lu izmaksu ra\u017eo\u0161an\u0101 main\u0101s atkar\u012bb\u0101 no iek\u0101rtu noslodzes. Apkopes l\u012bgum\u0101 var b\u016bt noteikta fiks\u0113ta maksa un papildu izdevumi, kas atkar\u012bgi no lieto\u0161anas apjoma. Uzskaitiet \u0161\u012bs da\u013cas atsevi\u0161\u0137i: liel\u0101ks izlaides apjoms \u013cauj sadal\u012bt nemain\u012bg\u0101s izmaksas uz vair\u0101k vien\u012bb\u0101m, ta\u010du var palielin\u0101t ar\u012b main\u012bg\u0101s pieskait\u0101m\u0101s izmaksas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0101 apr\u0113\u0137in\u0101t un sadal\u012bt ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas<\/h2>\n\n\n<p>Lai noteiktu perioda kop\u0113j\u0101s ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas, saskaitiet netie\u0161\u0101s ra\u017eotnes izmaksas atbilsto\u0161i saska\u0146otajam tv\u0113rumam. Lai \u0161o summu attiecin\u0101tu uz produktiem vai ra\u017eo\u0161anas uzdevumiem, daliet attiec\u012bg\u0101s izmaksu grupas kopsummu ar sadales b\u0101zes apjomu un piem\u0113rojiet ieg\u016bto likmi attiec\u012bgajam darbam.<\/p>\n\n\n<p>Pl\u0101no\u0161anai un ra\u017eo\u0161anas uzdevumu pa\u0161izmaksas apr\u0113\u0137inam izmanto iepriek\u0161 noteiktu likmi, ko apr\u0113\u0137ina no bud\u017eeta datiem:<\/p>\n\n\n<p><strong>Iepriek\u0161 noteikt\u0101 pieskait\u0101mo izmaksu likme = Bud\u017eet\u0101 paredz\u0113t\u0101s ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas \u00f7 Bud\u017eet\u0101 paredz\u0113tais sadales b\u0101zes apjoms<\/strong><\/p>\n\n\n<p><strong>Uz ra\u017eo\u0161anas uzdevumu attiecin\u0101t\u0101s pieskait\u0101m\u0101s izmaksas = Iepriek\u0161 noteikt\u0101 pieskait\u0101mo izmaksu likme \u00d7 Ra\u017eo\u0161anas uzdevuma faktiskais pat\u0113ri\u0146\u0161 sadales b\u0101zes vien\u012bb\u0101s<\/strong><\/p>\n\n\n<p>Sadales b\u0101ze nosaka likmes m\u0113rvien\u012bbu. Dalot dol\u0101rus ar ma\u0161\u012bnstund\u0101m, ieg\u016bst dol\u0101rus par ma\u0161\u012bnstundu, nevis procentus. Savuk\u0101rt, dalot ar tie\u0161aj\u0101m darbasp\u0113ka izmaks\u0101m un reizinot ar 100, ieg\u016bst procentu\u0101lu likmi no tie\u0161aj\u0101m darbasp\u0113ka izmaks\u0101m.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Apkopojiet izmaksas par vienu un to pa\u0161u periodu, iev\u0113rojot vienotu tv\u0113rumu<\/h3>\n\n\n<p>Apkopojiet attiec\u012bg\u0101s ra\u017eotnes izmaksas no finan\u0161u uzskaites datiem. Izmaksu un darb\u012bbas apjoma bud\u017eetam izmantojiet vienu un to pa\u0161u m\u0113nesi, ceturksni vai gadu. Ja \u0113k\u0101 atrodas gan biroji, gan ra\u017eotne, vispirms sadaliet t\u0101s kop\u0113j\u0101s izmaksas starp attiec\u012bgaj\u0101m zon\u0101m un tikai tad ra\u017eo\u0161anas da\u013cu attieciniet uz ra\u017eo\u0161anas uzdevumiem.<\/p>\n\n\n<p>Neiek\u013caujiet pieskait\u0101mo izmaksu grup\u0101 izmaksas, kas jau attiecin\u0101tas tie\u0161i. Pret\u0113j\u0101 gad\u012bjum\u0101 to pa\u0161u apkopes pakalpojumu vai konkr\u0113tam ra\u017eo\u0161anas uzdevumam paredz\u0113to materi\u0101lu var ieskait\u012bt divreiz: tie\u0161i un v\u0113lreiz ar pieskait\u0101mo izmaksu likmi. Skaidri noteikta kontu piesaiste izmaksu grup\u0101m \u013cauj apr\u0113\u0137inu atk\u0101rtot p\u0113c vieniem un tiem pa\u0161iem principiem.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Izv\u0113lieties sadales b\u0101zi, kas atbilst darba raksturam<\/h3>\n\n\n<p>Visviegl\u0101k pieejamais r\u0101d\u012bt\u0101js ne vienm\u0113r sniedz visnoder\u012bg\u0101ko inform\u0101ciju. Izv\u0113rt\u0113jiet, k\u0101p\u0113c vienam ra\u017eo\u0161anas uzdevumam vajag vair\u0101k to atbalsta resursu, kuru izmaksas apkopotas attiec\u012bgaj\u0101 grup\u0101.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Sadales b\u0101ze<\/th><th>Kad t\u0101 var b\u016bt noder\u012bga<\/th><th>Kam piev\u0113rst uzman\u012bbu<\/th><\/tr><\/thead><tbody><tr><td>Ma\u0161\u012bnstundas<\/td><td>Oper\u0101cij\u0101s, kur\u0101s intens\u012bvi izmanto iek\u0101rtas<\/td><td>Da\u017e\u0101du iek\u0101rtu grupu izmaksas var b\u016bt \u013coti at\u0161\u0137ir\u012bgas<\/td><\/tr><tr><td>Tie\u0161\u0101 darba stundas<\/td><td>Darbietilp\u012bg\u0101 ra\u017eo\u0161an\u0101 ar kopum\u0101 l\u012bdz\u012bg\u0101m atbalsta vajadz\u012bb\u0101m<\/td><td>Automatiz\u0101cija var v\u0101jin\u0101t saikni starp darba laiku un pieskait\u0101maj\u0101m izmaks\u0101m<\/td><\/tr><tr><td>Tie\u0161\u0101s darbasp\u0113ka izmaksas<\/td><td>Pieskait\u0101mo izmaksu procentu\u0101lai likmei, kuras b\u0101ze ir darbasp\u0113ka izmaksas<\/td><td>Atalgojuma at\u0161\u0137ir\u012bbas var main\u012bt attiecin\u0101to summu, nemainoties resursu pat\u0113ri\u0146am<\/td><\/tr><tr><td>Sara\u017eoto vien\u012bbu skaits<\/td><td>Sal\u012bdzin\u0101miem produktiem ar l\u012bdz\u012bg\u0101m apstr\u0101des pras\u012bb\u0101m<\/td><td>Vienk\u0101r\u0161a deta\u013ca un sare\u017e\u0123\u012bts mezgls nav l\u012bdzv\u0113rt\u012bgas vien\u012bbas<\/td><\/tr><tr><td>Iestat\u012b\u0161anu skaits, p\u0101rbau\u017eu skaits vai cits darb\u012bbas r\u0101d\u012bt\u0101js<\/td><td>Atsevi\u0161\u0137ai izmaksu grupai, kuras apjomu nosaka attiec\u012bg\u0101 darb\u012bba<\/td><td>Darb\u012bbai j\u0101b\u016bt skaidri defin\u0113tai un konsekventi uzskait\u012btai<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>L\u012bdz\u012bgiem darbiem vienota likme visai ra\u017eotnei var b\u016bt pamatots s\u0101kumpunkts. Ja meh\u0101niskaj\u0101 apstr\u0101d\u0113 un manu\u0101laj\u0101 mont\u0101\u017e\u0101 izmanto \u013coti at\u0161\u0137ir\u012bgus resursus, atsevi\u0161\u0137as likmes pa iecirk\u0146iem var prec\u012bz\u0101k atspogu\u013cot produkta izmaksas. V\u0113l detaliz\u0113t\u0101ka ir uz darb\u012bb\u0101m balst\u012bta pa\u0161izmaksas apr\u0113\u0137in\u0101\u0161ana: taj\u0101 atsevi\u0161\u0137as izmaksu grupas sadala atbilsto\u0161i ar t\u0101m saist\u012btaj\u0101m darb\u012bb\u0101m.<\/p>\n\n\n<p>Izmantojiet detaliz\u0113t\u0101ku apr\u0113\u0137inu tur, kur tas var ietekm\u0113t l\u0113mumus par cenu, produktu sortimentu vai uzlabojumiem. Sare\u017e\u0123\u012bts modelis, kura pamat\u0101 ir neuzticami darb\u012bbu uzskaites dati, pats par sevi nav noder\u012bg\u0101ks.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Apr\u0113\u0137iniet likmi un piem\u0113rojiet to ra\u017eo\u0161anas uzdevumam<\/h3>\n\n\n<p>Pie\u0146emsim, ka meh\u0101nisk\u0101s apstr\u0101des iecirk\u0146a bud\u017eet\u0101 <strong>vienam m\u0113nesim paredz\u0113ti 60 000 $ ra\u017eo\u0161anas pieskait\u0101maj\u0101m izmaks\u0101m un 2 000 ma\u0161\u012bnstundu<\/strong>. \u0160aj\u0101 izmaksu grup\u0101 ietilpst iecirk\u0146a da\u013ca no ra\u017eo\u0161anas telpu izmaks\u0101m, iek\u0101rtu nolietojums, apkope, uzraudz\u012bba un ra\u017eo\u0161anas pal\u012bgmateri\u0101li, kuru izmaksas uzskaita k\u0101 netie\u0161\u0101s izmaksas.<\/p>\n\n\n<p><strong>60 000 $ \u00f7 2 000 ma\u0161\u012bnstundu = 30 $ par ma\u0161\u012bnstundu<\/strong><\/p>\n\n\n<p>Izpildot ra\u017eo\u0161anas uzdevumu, ir ieg\u016btas 100 identiskas, kvalit\u0101tes pras\u012bb\u0101m atbilsto\u0161as deta\u013cas un pat\u0113r\u0113tas 50 ma\u0161\u012bnstundas. Uz uzdevumu attiecin\u0101t\u0101s pieskait\u0101m\u0101s izmaksas ir:<\/p>\n\n\n<p><strong>50 stundas \u00d7 30 $ = 1 500 $ ra\u017eo\u0161anas uzdevumam<\/strong><\/p>\n\n\n<p><strong>1 500 $ \u00f7 100 kvalit\u0101tes pras\u012bb\u0101m atbilsto\u0161as deta\u013cas = 15 $ attiecin\u0101to pieskait\u0101mo izmaksu uz deta\u013cu<\/strong><\/p>\n\n\n<p>Pie\u0146emsim, ka tie\u0161\u0101s materi\u0101lu izmaksas ir 12 $ un tie\u0161\u0101s darbasp\u0113ka izmaksas \u2014 8 $ par deta\u013cu. Tad ra\u017eo\u0161anas izmaksas ir <strong>35 $ par deta\u013cu: 12 $ + 8 $ + 15 $<\/strong>. Tas ir ra\u017eo\u0161anas pa\u0161izmaksas apr\u0113\u0137ins, nevis ieteikums noteikt p\u0101rdo\u0161anas cenu 35 $ apm\u0113r\u0101.<\/p>\n\n\n<p>Piem\u0113r\u0101 pie\u0146emts, ka ra\u017eo\u0161anas uzdevums ir pabeigts un t\u0101 izmaksas attiecas uz \u0161\u012bm 100 deta\u013c\u0101m. Ja darbs v\u0113l nav pabeigts, t\u0101 izmaksas un uzskait\u012btais darb\u012bbas apjoms j\u0101atst\u0101j pie attiec\u012bg\u0101s nepabeigt\u0101s ra\u017eo\u0161anas, nevis viss j\u0101attiecina uz period\u0101 pabeigto izstr\u0101d\u0101jumu daudzumu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Sal\u012bdziniet attiecin\u0101t\u0101s pieskait\u0101m\u0101s izmaksas ar faktiskaj\u0101m<\/h3>\n\n\n<p>Bud\u017eet\u0101 noteikt\u0101 likme nenoz\u012bm\u0113, ka faktisk\u0101s pieskait\u0101m\u0101s izmaksas b\u016bs vien\u0101das ar bud\u017eet\u0101 paredz\u0113taj\u0101m. Pie\u0146emsim, ka noda\u013ca m\u0113nesi nosl\u0113dz ar 1 800 faktiskaj\u0101m ma\u0161\u012bnstund\u0101m un 62 000 $ faktiskaj\u0101m pieskait\u0101maj\u0101m izmaks\u0101m.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Sal\u012bdzin\u0101jums m\u0113ne\u0161a beig\u0101s<\/th><th>Summa<\/th><\/tr><\/thead><tbody><tr><td>Attiecin\u0101t\u0101s pieskait\u0101m\u0101s izmaksas: 1 800 stundas \u00d7 30 $<\/td><td>54 000 $<\/td><\/tr><tr><td>Faktisk\u0101s ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas<\/td><td>62 000 $<\/td><\/tr><tr><td>Nepietiekami attiecin\u0101t\u0101s pieskait\u0101m\u0101s izmaksas: faktisk\u0101s m\u012bnus attiecin\u0101t\u0101s<\/td><td>8 000 $<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Noda\u013cas pieskait\u0101m\u0101s izmaksas bija par 8 000 $ liel\u0101kas nek\u0101 summa, kas attiecin\u0101ta, izmantojot likmi. \u0160o starp\u012bbu sauc par <strong>nepietiekami attiecin\u0101taj\u0101m pieskait\u0101maj\u0101m izmaks\u0101m<\/strong>. Ja attiecin\u0101t\u0101 summa p\u0101rsniegtu faktisk\u0101s pieskait\u0101m\u0101s izmaksas, t\u0101s b\u016btu p\u0101rm\u0113r\u012bgi attiecin\u0101tas.<\/p>\n\n\n<p>Izv\u0113rt\u0113jiet abas puses. \u0160aj\u0101 piem\u0113r\u0101 faktisk\u0101s pieskait\u0101m\u0101s izmaksas p\u0101rsniedz bud\u017eetu, bet darb\u012bbas apjoms ir maz\u0101ks par bud\u017eet\u0101 paredz\u0113to. Starp\u012bba pati par sevi nepier\u0101da, ka operatori str\u0101d\u0101ju\u0161i neefekt\u012bvi: to var ietekm\u0113t ra\u017eo\u0161anas apjoms, produktu sortiments, uztur\u0113\u0161anas izdevumi, cenas un s\u0101kotn\u0113j\u0101s apl\u0113ses. Finan\u0161u noda\u013ca veic uzskaites korekciju, savuk\u0101rt ra\u017eo\u0161anas speci\u0101listi pal\u012bdz izskaidrot, k\u0101da darb\u012bba \u0161o starp\u012bbu rad\u012bjusi.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. P\u0101rskatiet pie\u0146\u0113mumus, nesl\u0113pjot izmai\u0146as<\/h3>\n\n\n<p>Saglab\u0101jiet s\u0101kotn\u0113j\u0101 sal\u012bdzin\u0101jum\u0101 izmantoto likmi un bud\u017eetu. N\u0101kamajiem periodiem paredz\u0113t\u0101s likmes p\u0101rskatiet tad, kad patie\u0161\u0101m main\u0101s izmaksu strukt\u016bra vai pl\u0101notais darb\u012bbas apjoms, nevis neman\u0101mi aizst\u0101jiet pie\u0146\u0113mumus, kas izskaidro pa\u0161reiz\u0113jo rezult\u0101tu.<\/p>\n\n\n<p>Vad\u012bbas vajadz\u012bb\u0101m apr\u0113\u0137in\u0101ta m\u0113ne\u0161a vid\u0113j\u0101 likme nav autom\u0101tiski izmantojama kr\u0101jumu nov\u0113rt\u0113\u0161anai. Vienojieties ar finan\u0161u noda\u013cu par nov\u0113rt\u0113\u0161anas pamatu, tostarp par to, k\u0101 atbilsto\u0161i j\u016bsu gr\u0101matved\u012bbas noteikumiem j\u0101uzskaita neizmantot\u0101 jauda un neparast\u0101s izmaksas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Maz\u0101kas pieskait\u0101m\u0101s izmaksas uz vien\u012bbu ne vienm\u0113r noz\u012bm\u0113 ietaup\u012bjumu<\/h2>\n\n\n<p>\u0160\u0137ietami lab\u0101ku rezult\u0101tu var rad\u012bt tr\u012bs at\u0161\u0137ir\u012bgi faktori. Katram vajadz\u012bgi at\u0161\u0137ir\u012bgi pier\u0101d\u012bjumi.<\/p>\n\n\n<p><strong>Cit\u0101ds izmaksu sadal\u012bjums<\/strong> maina to, uz kuriem ra\u017eo\u0161anas uzdevumiem izmaksas tiek attiecin\u0101tas. P\u0101reja no darba stund\u0101m uz ma\u0161\u012bnstund\u0101m var nodro\u0161in\u0101t ticam\u0101ku produktu sal\u012bdzin\u0101jumu, ta\u010du t\u0101 nesamazina nomas maksu, nolietojumu vai darba samaksu. Ieguvums ir lab\u0101ka inform\u0101cija l\u0113mumu pie\u0146em\u0161anai.<\/p>\n\n\n<p><strong>Lab\u0101ka eso\u0161\u0101s jaudas izmanto\u0161ana<\/strong> \u013cauj sara\u017eot vair\u0101k noder\u012bgas produkcijas ar resursiem, kuru uztur\u0113\u0161anu jau apmaks\u0101jat. Apl\u016bkosim atsevi\u0161\u0137u, vienk\u0101r\u0161otu sal\u012bdzin\u0101jumu, kur\u0101 r\u016bpn\u012bcas fiks\u0113t\u0101s pieskait\u0101m\u0101s izmaksas paliek 40 000 $. Sara\u017eojot 2 000 sal\u012bdzin\u0101mu gatav\u0101s produkcijas vien\u012bbu, \u0161\u012b fiks\u0113t\u0101 da\u013ca vid\u0113ji ir 20 $ uz vien\u012bbu. Pie 2 500 vien\u012bb\u0101m t\u0101 ir vid\u0113ji 16 $. Kop\u0113j\u0101s fiks\u0113t\u0101s izmaksas nemain\u0101s.<\/p>\n\n\n<p>\u0160\u0101ds uzlabojums ir v\u0113rt\u012bgs, ja papildu vien\u012bbas ir vajadz\u012bgas un t\u0101s var p\u0101rdot ar pe\u013c\u0146u. Tas nav pamatojums nevajadz\u012bgu kr\u0101jumu veido\u0161anai. Ekonomiskaj\u0101 pamatojum\u0101 joproj\u0101m j\u0101iek\u013cauj papildu materi\u0101li, main\u012bg\u0101s izmaksas un visi papildu izdevumi jaudas nodro\u0161in\u0101\u0161anai.<\/p>\n\n\n<p><strong>Re\u0101ls izdevumu samazin\u0101jums<\/strong> maina faktisko t\u0113ri\u0146u apjomu. Ja izdodas izvair\u012bties no virsstundu apmaksas, samazin\u0101t ener\u0123ijas iepirkumu vai atteikties no pakalpojuma izmaks\u0101m, finansi\u0101l\u0101 ietekme at\u0161\u0137iras no vienas stundas atbr\u012bvo\u0161anas jau apmaks\u0101t\u0101 mai\u0146\u0101. Nolietojums ir izmaksas, ta\u010du t\u0101 attiecin\u0101\u0161ana pati par sevi nav k\u0101rt\u0113jais naudas maks\u0101jums.<\/p>\n\n\n<p>Pirms s\u0101kat uzlabojumus, nosauciet sagaid\u0101mo ieguvumu. P\u0113c tam l\u012bdztekus r\u0101d\u012bt\u0101jam uz vien\u012bbu p\u0101rbaudiet kop\u0113j\u0101s izmaksas, izmantojamo jaudu un nepiecie\u0161am\u0101s gatav\u0101s produkcijas apjomu. Tas ne\u013cauj uzskaites r\u0101d\u012bt\u0101ju uzlabojumu pasniegt k\u0101 jau ietaup\u012btu naudu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izmantojiet SkyPlanner, lai liktu liet\u0101 jau apmaks\u0101to jaudu<\/h2>\n\n\n<p>Pieskait\u0101mo izmaksu apr\u0113\u0137ins var par\u0101d\u012bt, ka uz produktu grupu tiek attiecin\u0101tas lielas ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas. N\u0101kamais jaut\u0101jums ir par to, kas notiek \u0161\u012bs grupas ra\u017eo\u0161anas mar\u0161rut\u0101. Vai iek\u0101rtas tie\u0161\u0101m ir p\u0101rslogotas, vai ar\u012b apmaks\u0101t\u0101s stundas tiek zaud\u0113tas, kam\u0113r ra\u017eo\u0161anas uzdevumi gaida iepriek\u0161\u0113jo oper\u0101ciju pabeig\u0161anu, pieejamus operatorus vai materi\u0101lus?<\/p>\n\n\n<p>Ja probl\u0113ma ir savstarp\u0113ji nesaska\u0146otas darbu rindas un nep\u0101rtraukta manu\u0101la p\u0101rpl\u0101no\u0161ana, SkyPlanner ir praktisks veids, k\u0101 palielin\u0101t \u0161\u012bs jaudas atdevi. T\u0101 v\u0113rt\u012bba nav izmaksu p\u0101rcel\u0161ana no viena produkta uz citu. T\u0101 ir iesp\u0113ja viegl\u0101k iepl\u0101not un pabeigt nepiecie\u0161amos darbus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Noskaidrojiet, k\u0101da jauda faktiski ir pieejama likmes pamat\u0101<\/h3>\n\n\n<p>SkyPlanner apvieno darba centrus, mai\u0146as, operatorus un oper\u0101ciju ilgumus vienot\u0101 pl\u0101no\u0161anas vid\u0113. Jaudas skatos slodze ir sal\u012bdzin\u0101ta ar pieejamo jaudu, savuk\u0101rt darba centru iz\u0146\u0113mumi atspogu\u013co t\u0101dus periodus k\u0101 pl\u0101not\u0101 apkope. Varat izp\u0113t\u012bt resursus d\u0101rg\u0101 ra\u017eo\u0161anas mar\u0161rut\u0101, nevis saskait\u012bt visas r\u016bpn\u012bcas stundas kop\u0101 un uzskat\u012bt t\u0101s par savstarp\u0113ji aizst\u0101jam\u0101m.<\/p>\n\n\n<p>SkyPlanner r\u012bks Timer un <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-parskats\/\">ra\u017eo\u0161anas p\u0101rskati<\/a> sasaista re\u0123istr\u0113to darba laiku un sara\u017eoto apjomu ar ra\u017eo\u0161anas uzdevumiem. \u0160ie ieraksti pal\u012bdz ra\u017eo\u0161anas un finan\u0161u speci\u0101listiem p\u0101rrun\u0101t faktiski notiku\u0161o. Izv\u0113loties izmaksu apr\u0113\u0137ina ievaddatus, no\u0161\u0137iriet ma\u0161\u012bnstundas, operatoru darba stundas un kop\u0113jo pag\u0101ju\u0161o laiku: re\u0123istr\u0113tajai stundai j\u0101noz\u012bm\u0113 tas pats, kas stundai j\u016bsu izmaksu sadales b\u0101z\u0113.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Saska\u0146ojiet darbus, kuros \u0161\u012b jauda tiek izmantota<\/h3>\n\n\n<p>Arcturus \u2014 SkyPlanner m\u0101ksl\u012bgais intelekts ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai \u2014 apr\u0113\u0137ina darbu sec\u012bbu atbilsto\u0161i j\u016bsu noteiktajai jaudai, oper\u0101ciju savstarp\u0113j\u0101m atkar\u012bb\u0101m un priorit\u0101t\u0113m. Ja ir iesp\u0113jota pl\u0101no\u0161ana, kas \u0146em v\u0113r\u0101 materi\u0101lus, apr\u0113\u0137inu ietekm\u0113 ar\u012b materi\u0101lu pieejam\u012bba. Gantt laika skala par\u0101da savstarp\u0113ji saska\u0146otu pl\u0101nu, nevis atsevi\u0161\u0137as iek\u0101rtu darbu rindas, kuras k\u0101dam nep\u0101rtraukti j\u0101saska\u0146o.<\/p>\n\n\n<p>Iedom\u0101jieties, ka meh\u0101niskajai apstr\u0101dei ir br\u012bva jauda vienai partijai, ta\u010du t\u0101s iepriek\u0161\u0113j\u0101 oper\u0101cija v\u0113l nav pabeigta, savuk\u0101rt cita klienta pas\u016bt\u012bjums jau ir gatavs darbam. Gar\u0101ka meh\u0101nisk\u0101s apstr\u0101des darbu rinda vien probl\u0113mu neatrisina. Saska\u0146ojot gatav\u012bbu darbam ar nepiecie\u0161amajiem pabeig\u0161anas termi\u0146iem, pieejamo laiku var izmantot lietder\u012bgi.<\/p>\n\n\n<p>Mainoties apst\u0101k\u013ciem, konfigur\u0113t\u0101 autom\u0101tisk\u0101 p\u0101rpl\u0101no\u0161ana uztur pl\u0101nu aktu\u0101lu, saglab\u0101jot sp\u0113k\u0101 j\u016bsu noteikumus un fiks\u0113jumus. J\u016bs nosak\u0101t priorit\u0101tes, bet Arcturus veic <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/kas-ir-razosanas-planosana\/\">ra\u017eo\u0161anas grafika apr\u0113\u0137inu<\/a>. Tas samazina ikdien\u0101 nepiecie\u0161amo darbu rindu kori\u0123\u0113\u0161anu un pal\u012bdz komandai izmantot pieejam\u0101s stundas pas\u016bt\u012bjumiem, kuru izpilde j\u0101virza uz priek\u0161u.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ko tas main\u012bja uz\u0146\u0113mum\u0101 UTU<\/h3>\n\n\n<p>Elektrosadales pane\u013cu un sadales iek\u0101rtu ra\u017eot\u0101js UTU iepriek\u0161 pl\u0101noja darbus katras noda\u013cas atsevi\u0161\u0137aj\u0101s izkl\u0101jlap\u0101s. Izmai\u0146as ERP sist\u0113m\u0101 ne vienm\u0113r non\u0101ca l\u012bdz ra\u017eo\u0161anai, un faktiski pieejamo jaudu bija gr\u016bti p\u0101rskat\u012bt.<\/p>\n\n\n<p>Savienojot SkyPlanner ar Oracle NetSuite, UTU apvienoja r\u016bpn\u012bcas l\u012bnijas un noda\u013cas vien\u0101 sist\u0113m\u0101. <a href=\"https:\/\/skyplanner.ai\/lv\/klientu-stasti\/utu\/\">UTU pieredzes st\u0101st\u0101<\/a> aprakst\u012bts, k\u0101, uzlabojot darbu sec\u012bbu, samazin\u0101j\u0101s d\u012bkst\u0101ve un ar eso\u0161o jaudu tika paveikts vair\u0101k darba. Tie\u0161i \u0161\u0101ds ieguvums ra\u017eo\u0161an\u0101 j\u0101mekl\u0113, analiz\u0113jot lielas pieskait\u0101m\u0101s izmaksas: lab\u0101k izmantot resursus, kuru uztur\u0113\u0161anu r\u016bpn\u012bca jau apmaks\u0101.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izmantojiet pieskait\u0101mo izmaksu anal\u012bzi lab\u0101kiem l\u0113mumiem ra\u017eo\u0161an\u0101<\/h2>\n\n\n<p>Izv\u0113lieties vienu produktu grupu, kuras izmaks\u0101m vai pe\u013c\u0146as mar\u017eai j\u0101piev\u0113r\u0161 uzman\u012bba. Saska\u0146ojiet ar finan\u0161u noda\u013cu \u0161\u012bs grupas netie\u0161o ra\u017eo\u0161anas izmaksu kopumu, sadales b\u0101zi un likmi. P\u0113c tam izsekojiet t\u0101s ra\u017eo\u0161anas mar\u0161rutam: nepiecie\u0161amaj\u0101m un re\u0123istr\u0113taj\u0101m stund\u0101m, gaid\u012b\u0161anai starp oper\u0101cij\u0101m un citiem pas\u016bt\u012bjumiem, kas konkur\u0113 par tiem pa\u0161iem resursiem.<\/p>\n\n\n<p>Ja likme rada mald\u012bgu priek\u0161statu, uzlabojiet izmaksu apr\u0113\u0137ina modeli. Ja grafika d\u0113\u013c izmantojam\u0101 jauda tiek izniekota, izv\u0113lieties SkyPlanner, lai sasaist\u012btu darbus un samazin\u0101tu to manu\u0101lo saska\u0146o\u0161anu. SkyPlanner var integr\u0113t ar jebkuru ERP vai MES sist\u0113mu, izmantojot t\u0101 atv\u0113rto REST API, t\u0101p\u0113c uzlabota ra\u017eo\u0161anas pl\u0101no\u0161ana var darboties l\u012bdz\u0101s j\u016bsu eso\u0161aj\u0101m uz\u0146\u0113muma sist\u0113m\u0101m.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Piesakiet SkyPlanner demonstr\u0101ciju<\/a> un sagatavojiet inform\u0101ciju par izv\u0113l\u0113to produktu grupu, t\u0101s ra\u017eo\u0161anas mar\u0161rutu un nesena perioda ra\u017eo\u0161anas uzskaites datiem. Sarun\u0101 noskaidrojiet, kur apmaks\u0101to jaudu var\u0113tu izmantot nepiecie\u0161am\u0101s produkcijas izgatavo\u0161anai un k\u0101 tas main\u012btu izmaksas vai pieg\u0101des rezult\u0101tus. Ja vispirms v\u0113laties iepaz\u012bt pl\u0101no\u0161anas vidi, <a href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana S\u0101kums &raquo; Resursi &raquo; Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana Ra\u017eo\u0161anas uzdevumam var b\u016bt vajadz\u012bgs maz materi\u0101lu, ta\u010du tas joproj\u0101m var rad\u012bt iev\u0113rojamas ra\u017eo\u0161anas izmaksas. Iek\u0101rtai vajag vietu, apkopi un elektroener\u0123iju. Ra\u017eo\u0161anas vad\u012bt\u0101ji un atbalsta person\u0101ls nodro\u0161ina nep\u0101rtrauktu darba norisi. Neiek\u013caujot \u0161\u012bs izmaksas apr\u0113\u0137in\u0101, produkts \u0161\u0137iet ienes\u012bg\u0101ks, &#8230; <a title=\"Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/\" aria-label=\"Read more about Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105816,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2559,317],"tags":[],"class_list":["post-105795","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-razosanas-efektivitate","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana<\/title>\n<meta name=\"description\" content=\"Apr\u0113\u0137iniet ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas, izv\u0113lieties piem\u0113rotu sadales b\u0101zi. Vai zem\u0101kas vien\u012bbas izmaksas noz\u012bm\u0113 naudas ietaup\u012bjumu vai lab\u0101ku jaudas izmanto\u0161anu?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana\" \/>\n<meta property=\"og:description\" content=\"Apr\u0113\u0137iniet ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas, izv\u0113lieties piem\u0113rotu sadales b\u0101zi. Vai zem\u0101kas vien\u012bbas izmaksas noz\u012bm\u0113 naudas ietaup\u012bjumu vai lab\u0101ku jaudas izmanto\u0161anu?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-22T08:34:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T08:35:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"940\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-pieskaitamas-izmaksas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-pieskaitamas-izmaksas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana\",\"datePublished\":\"2026-10-22T08:34:46+00:00\",\"dateModified\":\"2026-10-22T08:35:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-pieskaitamas-izmaksas\\\/\"},\"wordCount\":3462,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-pieskaitamas-izmaksas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-overhead-hero.png\",\"articleSection\":[\"Ra\u017eo\u0161anas efektivit\u0101te\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-pieskaitamas-izmaksas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-pieskaitamas-izmaksas\\\/\",\"name\":\"Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-pieskaitamas-izmaksas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-pieskaitamas-izmaksas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-overhead-hero.png\",\"datePublished\":\"2026-10-22T08:34:46+00:00\",\"dateModified\":\"2026-10-22T08:35:48+00:00\",\"description\":\"Apr\u0113\u0137iniet ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas, izv\u0113lieties piem\u0113rotu sadales b\u0101zi. Vai zem\u0101kas vien\u012bbas izmaksas noz\u012bm\u0113 naudas ietaup\u012bjumu vai lab\u0101ku jaudas izmanto\u0161anu?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-pieskaitamas-izmaksas\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-pieskaitamas-izmaksas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-pieskaitamas-izmaksas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-overhead-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-overhead-hero.png\",\"width\":1672,\"height\":940,\"caption\":\"Blue machines and metal parts beneath shared factory lighting and a structural frame.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/razosanas-pieskaitamas-izmaksas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana","description":"Apr\u0113\u0137iniet ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas, izv\u0113lieties piem\u0113rotu sadales b\u0101zi. Vai zem\u0101kas vien\u012bbas izmaksas noz\u012bm\u0113 naudas ietaup\u012bjumu vai lab\u0101ku jaudas izmanto\u0161anu?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/","og_locale":"lv_LV","og_type":"article","og_title":"Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana","og_description":"Apr\u0113\u0137iniet ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas, izv\u0113lieties piem\u0113rotu sadales b\u0101zi. Vai zem\u0101kas vien\u012bbas izmaksas noz\u012bm\u0113 naudas ietaup\u012bjumu vai lab\u0101ku jaudas izmanto\u0161anu?","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-22T08:34:46+00:00","article_modified_time":"2026-10-22T08:35:48+00:00","og_image":[{"width":1672,"height":940,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana","datePublished":"2026-10-22T08:34:46+00:00","dateModified":"2026-10-22T08:35:48+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/"},"wordCount":3462,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero.png","articleSection":["Ra\u017eo\u0161anas efektivit\u0101te","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/","name":"Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero.png","datePublished":"2026-10-22T08:34:46+00:00","dateModified":"2026-10-22T08:35:48+00:00","description":"Apr\u0113\u0137iniet ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas, izv\u0113lieties piem\u0113rotu sadales b\u0101zi. Vai zem\u0101kas vien\u012bbas izmaksas noz\u012bm\u0113 naudas ietaup\u012bjumu vai lab\u0101ku jaudas izmanto\u0161anu?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero.png","width":1672,"height":940,"caption":"Blue machines and metal parts beneath shared factory lighting and a structural frame."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-pieskaitamas-izmaksas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero.png",1672,940,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero.png",1672,940,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-overhead-hero-360x202.png",360,202,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana S\u0101kums &raquo; Resursi &raquo; Ra\u017eo\u0161anas pieskait\u0101m\u0101s izmaksas: likmes apr\u0113\u0137ins un lieto\u0161ana Ra\u017eo\u0161anas uzdevumam var b\u016bt vajadz\u012bgs maz materi\u0101lu, ta\u010du tas joproj\u0101m var rad\u012bt iev\u0113rojamas ra\u017eo\u0161anas izmaksas. Iek\u0101rtai vajag vietu, apkopi un elektroener\u0123iju. Ra\u017eo\u0161anas vad\u012bt\u0101ji un atbalsta person\u0101ls nodro\u0161ina nep\u0101rtrauktu darba norisi. Neiek\u013caujot \u0161\u012bs izmaksas apr\u0113\u0137in\u0101, produkts \u0161\u0137iet ienes\u012bg\u0101ks,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/105795","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=105795"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/105795\/revisions"}],"predecessor-version":[{"id":105858,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/105795\/revisions\/105858"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/105816"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=105795"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=105795"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=105795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}