{"id":10197,"date":"2023-04-21T10:40:41","date_gmt":"2023-04-21T10:40:41","guid":{"rendered":"https:\/\/skyplanner.ai\/resursi\/mrp-iss-celvedis\/"},"modified":"2026-10-15T17:52:04","modified_gmt":"2026-10-15T17:52:04","slug":"mrp-iss-celvedis","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/","title":{"rendered":"MRP: \u012bss ce\u013cvedis"},"content":{"rendered":"<div class=\"gb-container gb-container-3df1db73 no-overflow\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-d55bc3f3\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-8557534f\">\n<div class=\"gb-grid-column gb-grid-column-8526f60b\"><div class=\"gb-container gb-container-8526f60b front-head\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-93641464\"><div class=\"gb-inside-container\">\n<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/skyplanner.ai\/lv\/\">Home<\/a><\/span> \u00bb <span><a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Raksti<\/a><\/span> \u00bb <span class=\"breadcrumb_last\" aria-current=\"page\">MRP: \u012bss ce\u013cvedis<\/span><\/span><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-26760224\"><div class=\"gb-inside-container\">\n\n<h1 class=\"wp-block-heading has-text-align-left has-text-color\" id=\"h-mrp-a-brief-guide\" style=\"color:#1f1f33\">MRP: \u012bss ce\u013cvedis<\/h1>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-3112db8f\"><div class=\"gb-inside-container\">\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-6986ace5\"><div class=\"gb-inside-container\">\n\n<p>Pl\u0101no\u0161ana ir \u013coti svar\u012bga, lai sasniegtu m\u0113r\u0137i. Piem\u0113ram, pie\u0146emsim, ka j\u016bs iepriek\u0161 pl\u0101nojat k\u0101du pas\u0101kumu vai<br\/>ce\u013cojumu, pat t\u0101das ikdienas darb\u012bbas k\u0101 \u0113diena gatavo\u0161ana. T\u0101d\u0101 gad\u012bjum\u0101 jums ir nepiecie\u0161ams, lai<br\/>organiz\u0101cij\u0101 b\u016btu vajadz\u012bgais sast\u0101vda\u013cu daudzums un visi nepiecie\u0161amie r\u012bki, lai izvair\u012btos no<br\/>papildu naudas t\u0113r\u0113\u0161anas un var\u0113tu veikt, k\u0101 pl\u0101nots. \u0160obr\u012bd \u0161\u012bs darb\u012bbas ir daudz<br\/>vienk\u0101r\u0161\u0101k organiz\u0113jamas nek\u0101 ra\u017eo\u0161anas un pakalpojumu nozares procesi.<\/p>\n\n\n\n<p>M\u016bsdienu uz\u0146\u0113m\u0113jdarb\u012bbas pasaul\u0113 ir svar\u012bgi zin\u0101t, cik daudz ir nepiecie\u0161am\u0101 invent\u0101ra un apr\u012bkojuma<br\/>. No otras puses, kr\u0101jumu iztr\u016bkums var izrais\u012bt sastr\u0113gumus un nov\u0113lotas pieg\u0101des,<br\/>padarot uz\u0146\u0113mumu neefekt\u012bvu un konkur\u0113tsp\u0113j\u012bgu. M\u016bsdien\u0101s ir materi\u0101lu pras\u012bbu<br\/>pl\u0101no\u0161ana, kas pal\u012bdz\u0113s \u0161aj\u0101 sare\u017e\u0123\u012btaj\u0101 situ\u0101cij\u0101, un citas funkcijas, turkl\u0101t \u0161\u012b sist\u0113ma<br\/>padar\u012bs \u0161os procesus par vienk\u0101r\u0161u darbu.<\/p>\n\n\n\n<p>Uzzin\u0101sim, k\u0101 darbojas materi\u0101lu pras\u012bbu pl\u0101no\u0161ana un k\u0101 \u0161\u012b sist\u0113ma var pacelt uz\u0146\u0113mumu<br\/>n\u0101kamaj\u0101 l\u012bmen\u012b.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-b0f6164d\"><div class=\"gb-inside-container\">\n\n<h3 class=\"wp-block-heading\" id=\"h-what-is-material-requirements-planning\">Kas ir materi\u0101lu pras\u012bbu pl\u0101no\u0161ana?<\/h3>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>Materi\u0101lu vajadz\u012bbu pl\u0101no\u0161ana (MRP) apr\u0113\u0137ina, k\u0101di materi\u0101li un komponenti ir vajadz\u012bgi, k\u0101d\u0101 daudzum\u0101 un kad, izmantojot datus par piepras\u012bjumu, materi\u0101lu specifik\u0101cij\u0101m, kr\u0101jumiem un izpildes laikiem.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>MRP saska\u0146o materi\u0101lu pieg\u0101di ar ra\u017eo\u0161anas vajadz\u012bb\u0101m. T\u0101s pl\u0101notie pas\u016bt\u012bjumu datumi pal\u012bdz veidot <a href=\"\/lv\/resursi\/kas-ir-razosanas-planosana\/\">ra\u017eo\u0161anas grafiku<\/a>, ta\u010du pa\u0161i par sevi neapliecina, ka iek\u0101rtas un darbinieki sp\u0113s paveikt darbu laikus. Tas j\u0101p\u0101rbauda atsevi\u0161\u0137i, detaliz\u0113ti pl\u0101nojot jaudas noslodzi.<\/p>\n\n\n\n<p>Materi\u0101lu pras\u012bbu pl\u0101no\u0161ana ir lielisks r\u012bks, kas pal\u012bdz uz\u0146\u0113mumiem efekt\u012bv\u0101k rea\u0123\u0113t uz piepras\u012bjuma pieaugumu, nov\u0113r\u0161ot kav\u0113jumus vai pieejam\u012bbas tr\u016bkumu. \u0160o r\u012bku galvenok\u0101rt izmanto uz produktiem balst\u012btos uz\u0146\u0113mumos.<\/p>\n\n\n<div class=\"gb-container gb-container-51461b32\"><div class=\"gb-inside-container\">\n\n<p><strong>MRP p\u0101rv\u0113r\u0161 ra\u017eo\u0161anas piepras\u012bjumu pa periodiem sadal\u012bt\u0101s materi\u0101lu vajadz\u012bb\u0101s un pl\u0101notos pieg\u0101des pas\u016bt\u012bjumos. Piepras\u012bjuma prognozes ir pl\u0101no\u0161anas ievaddati, nevis autom\u0101tisks MRP apr\u0113\u0137ina rezult\u0101ts.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>MRP apr\u0113\u0137ina materi\u0101lu neto vajadz\u012bbas, izmantojot datus par piepras\u012bjumu, materi\u0101lu specifik\u0101cij\u0101m, pieejamajiem kr\u0101jumiem, pl\u0101notaj\u0101m pieg\u0101d\u0113m un izpildes laikiem. Pirms pie\u0146emat, ka pl\u0101notie ra\u017eo\u0161anas datumi ir sasniedzami, veiciet <a href=\"\/lv\/resursi\/razosanas-jaudas-planosana\/\">ra\u017eo\u0161anas jaudas pl\u0101no\u0161anu<\/a>, lai p\u0101rbaud\u012btu iek\u0101rtu un operatoru pieejamo darba laiku.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-mrp-types\">MRP veidi<\/h3>\n\n\n\n<p>J\u0101no\u0161\u0137ir materi\u0101lu vajadz\u012bbu pamatpl\u0101no\u0161ana (MRP I) no pla\u0161\u0101kas ra\u017eo\u0161anas resursu pl\u0101no\u0161anas koncepcijas (MRP II):<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>MRP I<\/strong><\/h4>\n\n\n\n<p>MRP I apr\u0113\u0137ina izejvielu un komponentu vajadz\u012bbu, izv\u0113r\u0161ot materi\u0101lu specifik\u0101cijas un at\u0146emot pieejamos kr\u0101jumus un pl\u0101not\u0101s pieg\u0101des. Izmantojot izpildes laikus, t\u0101 pied\u0101v\u0101 pas\u016bt\u012bjumu datumus. \u0160ie datumi veido materi\u0101lu pl\u0101nu, nevis iek\u0101rtu grafiku, kur\u0101 iev\u0113rota ierobe\u017eota jauda.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a8fa4314 gb-headline-text\"><strong>MRP II<\/strong><\/h4>\n\n\n\n<p>Ra\u017eo\u0161anas resursu pl\u0101no\u0161ana (MRP II) papla\u0161ina materi\u0101lu pl\u0101no\u0161anu, veidojot visaptvero\u0161\u0101ku ra\u017eo\u0161anas pl\u0101nu, kas ietver ar\u012b jaudas un finan\u0161u pl\u0101no\u0161anu. \u0160is pla\u0161\u0101kais tv\u0113rums nenoz\u012bm\u0113, ka MRP I pamatfunkcijas sp\u0113j sast\u0101d\u012bt grafiku, iev\u0113rojot ierobe\u017eotu jaudu. P\u0101rbaudiet, k\u0101das pl\u0101no\u0161anas funkcijas j\u016bsu programmat\u016bra patie\u0161\u0101m nodro\u0161ina.<\/p>\n\n\n\n<p>MRP I un MRP II uzskata par tie\u0161iem <a href=\"\/lv\/resursi\/kas-ir-erp\/\">uz\u0146\u0113muma resursu pl\u0101no\u0161anas<\/a> (<a href=\"\/lv\/resursi\/razosanas-erp-visaptveross-celvedis\/\">ERP<\/a>) sist\u0113mu priek\u0161te\u010diem. ERP atbalsta ar\u012b citus uz\u0146\u0113muma svar\u012bgos funkcion\u0101los procesus, piem\u0113ram, <a href=\"\/lv\/resursi\/kas-ir-piegades-kedes-vadiba-scm\/\">pieg\u0101des \u0137\u0113des p\u0101rvald\u012bbu<\/a>, m\u0101rketingu, cilv\u0113kresursus un gr\u0101matved\u012bbu. Uz\u0146\u0113mums var integr\u0113t MRP sist\u0113mas ar ERP, lai lab\u0101k p\u0101rredz\u0113tu inform\u0101cijas pl\u016bsmu un lab\u0101k kontrol\u0113tu ra\u017eo\u0161anas procesu, apzinot iesp\u0113jam\u0101s \u0161aur\u0101s vietas un pieskatot kr\u0101jumu l\u012bmeni.<\/p>\n\n\n\n<p>ERP ir b\u016btiska lielajiem uz\u0146\u0113mumiem, jo \u0161\u012b programmat\u016bra var centraliz\u0113t da\u017e\u0101dus ra\u017eo\u0161anas procesus un nodro\u0161in\u0101t to racionaliz\u0101ciju, k\u0101 ar\u012b dal\u012bties ar p\u0101rredzam\u0101ku inform\u0101ciju par da\u017e\u0101diem departamentiem.<\/p>\n\n\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Ra\u017eo\u0161anas pl\u0101no\u0161ana un grafiko\u0161ana Produkta att\u0113la tie\u0161ais skats\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Uzlabota ra\u017eo\u0161anas pl\u0101no\u0161ana ar m\u0101ksl\u012bgo intelektu &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Uzziniet vair\u0101k par m\u016bsu pieeju ra\u017eo\u0161anas pl\u0101no\u0161anai un optimiz\u0101cijai, izmantojot m\u0101ksl\u012bg\u0101 intelekta iesp\u0113jas.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"\/lv\/\" aria-label=\"Rezerv\u0113t demonstr\u0101ciju\">Ra\u017eo\u0161anas pl\u0101no\u0161ana ar m\u0101ksl\u012bgo intelektu<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-1794ec07\"><div class=\"gb-inside-container\">\n\n<h3 class=\"wp-block-heading\" id=\"h-processes-of-mrp\">MRP procesi<\/h3>\n\n\n\n<p>MRP p\u0101rv\u0113r\u0161 ra\u017eo\u0161anas piepras\u012bjumu materi\u0101lu pl\u0101n\u0101. T\u0101 izmanto ievad\u012btos piepras\u012bjuma datus, nevis patst\u0101v\u012bgi prognoz\u0113 tirgus tendences. Galvenie so\u013ci ir \u0161\u0101di:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Apr\u0113\u0137ina materi\u0101lu vajadz\u012bbu atbilsto\u0161i piepras\u012bjumam<\/strong>: MRP izmanto pl\u0101notos produktu daudzumus un materi\u0101lu specifik\u0101cijas, lai apr\u0113\u0137in\u0101tu izejvielu un komponentu bruto vajadz\u012bbu.<br><\/li>\n\n\n\n<li><strong>P\u0101rbauda kr\u0101jumus un pl\u0101not\u0101s pieg\u0101des<\/strong>: MRP sal\u012bdzina bruto vajadz\u012bbu ar izmantojamajiem kr\u0101jumiem un gaid\u0101maj\u0101m pieg\u0101d\u0113m, lai apr\u0113\u0137in\u0101tu neto vajadz\u012bbu. Prec\u012bza kr\u0101jumu uzskaite ir b\u016btiska; MRP pati nenosaka, kur materi\u0101li fiziski j\u0101uzglab\u0101.<br><\/li>\n\n\n\n<li><strong>Pl\u0101no pieg\u0101\u017eu daudzumus un datumus<\/strong>: MRP izmanto neto vajadz\u012bbu, partiju lieluma noteik\u0161anas principus un izpildes laikus, lai pied\u0101v\u0101tu iepirkuma vai ra\u017eo\u0161anas pas\u016bt\u012bjumus un to palai\u0161anas datumus.<br><br>Lai pl\u0101notu oper\u0101ciju izpildi iek\u0101rt\u0101s un darba centros, vajadz\u012bgs detaliz\u0113ts ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas modelis, kur\u0101 ietverti tehnolo\u0123iskie procesi, oper\u0101ciju ilgums, iestat\u012b\u0161anas laiks un pieejam\u0101 jauda. MRP pamatfunkcijas nenosaka, k\u0101d\u0101 sec\u012bb\u0101 katrs resurss var\u0113s izpild\u012bt darbus.<br><\/li>\n\n\n\n<li><strong>Nor\u0101da uz izmai\u0146\u0101m materi\u0101lu pl\u0101n\u0101<\/strong>: Mainoties pieg\u0101d\u0113m vai piepras\u012bjumam, MRP var konstat\u0113t iztr\u016bkumus vai pas\u016bt\u012bjumus, kuru termi\u0146i j\u0101p\u0101rpl\u0101no. Lai nov\u0113rstu jaudas konfliktu vai p\u0101rveidotu iek\u0101rtu grafiku, atsevi\u0161\u0137i j\u0101veic ra\u017eo\u0161anas jaudas pl\u0101no\u0161ana un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana.<\/li>\n<\/ol>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-68ae52c7\"><div class=\"gb-inside-container\">\n\n<h3 class=\"wp-block-heading\" id=\"h-mrp-inputs\">MRP ievades dati<\/h3>\n\n\n\n<p>Lai ieg\u016btu lab\u0101kus rezult\u0101tus un efekt\u012bv\u0101ku ra\u017eo\u0161anu, ir nepiecie\u0161ama atjaunin\u0101ta inform\u0101cija. Turkl\u0101t vad\u012bt\u0101ji var pievienot v\u0113l citus datus, ko d\u0113v\u0113 par MRP ievades datiem; starp svar\u012bg\u0101kajiem ir \u0161\u0101di:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Materi\u0101lu specifik\u0101cijas (BOM)<\/strong>: Produkta strukt\u016bra, kur\u0101 uzskait\u012bti nepiecie\u0161amie materi\u0101li un komponenti un nor\u0101d\u012bti to daudzumi. Oper\u0101ciju sec\u012bba, darba centri un iestat\u012b\u0161anas pras\u012bbas tiek noteiktas ra\u017eo\u0161anas tehnolo\u0123iskaj\u0101 proces\u0101, nevis tikai materi\u0101lu sarakst\u0101.<br><\/li>\n\n\n\n<li><strong><a href=\"\/lv\/resursi\/master-production-schedule\/\">Ra\u017eo\u0161anas pamatpl\u0101ns (MPS)<\/a><\/strong>: <a href=\"\/lv\/\">Ra\u017eo\u0161anas pl\u0101ns<\/a> produktu l\u012bmen\u012b, kur\u0101 nor\u0101d\u012bts, k\u0101di produkti j\u0101ra\u017eo, k\u0101d\u0101 daudzum\u0101 un kuros periodos. MRP apr\u0113\u0137ina \u0161ai pl\u0101notajai ra\u017eo\u0161anai nepiecie\u0161amo komponentu daudzumu; sast\u0101dot detaliz\u0113tu ra\u017eo\u0161anas grafiku, p\u0101rbauda darbu sec\u012bbu katram resursam.<br><\/li>\n\n\n\n<li><strong>Invent\u0101ra statusa datne (ISF<\/strong>): Inform\u0101ciju par pieejamo kr\u0101jumu statusu un to, cik daudz kr\u0101jumu ir nepiecie\u0161ams, lai izpild\u012btu iepirkuma pas\u016bt\u012bjumu.<br\/><\/li>\n\n\n\n<li><strong>Piepras\u012bjuma prognoze<\/strong>: Prognozes un apstiprin\u0101tie klientu pas\u016bt\u012bjumi sniedz pl\u0101no\u0161anai vajadz\u012bgo inform\u0101ciju par piepras\u012bjumu. MRP izmanto \u0161o inform\u0101ciju, lai apr\u0113\u0137in\u0101tu materi\u0101lu vajadz\u012bbu; pati t\u0101 piepras\u012bjuma prognozi neveido.<\/li>\n<\/ul>\n\n\n<div class=\"gb-container gb-container-7f408084\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-87005d77\"><div class=\"gb-inside-container\">\n\n<h3 class=\"wp-block-heading\" id=\"h-mrp-outputs\">MRP rezult\u0101ti<\/h3>\n\n\n\n<p>Ir da\u017ei MRP programmas \u0123ener\u0113ti rezult\u0101ti, kurus j\u016bsu ra\u017eo\u0161anas process var izmantot<br\/>, piem\u0113ram:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Iepirkuma pas\u016bt\u012bjumu priek\u0161likumi<\/strong>: MRP nosaka materi\u0101lu daudzumus un datumus, kas j\u0101izv\u0113rt\u0113 iepirkumu speci\u0101listiem. Atkar\u012bb\u0101 no sist\u0113mas rezult\u0101ts var b\u016bt pl\u0101nots pas\u016bt\u012bjums vai iepirkuma piepras\u012bjums, nevis pieg\u0101d\u0101t\u0101jam autom\u0101tiski nos\u016bt\u012bts pas\u016bt\u012bjums.<br><\/li>\n\n\n\n<li><strong>Materi\u0101lu pl\u0101ns<\/strong>: \u0160aj\u0101 pl\u0101n\u0101 ir iek\u013cauta t\u0101da inform\u0101cija k\u0101 izejmateri\u0101lu specifik\u0101cijas, mont\u0101\u017eas deta\u013cas un sast\u0101vda\u013cas, kas nepiecie\u0161amas galaprodukta pabeig\u0161anai. Materi\u0101lu pl\u0101n\u0101 ir nor\u0101d\u012bts ar\u012b katra materi\u0101la daudzums un grafiks, kad \u0161ie resursi b\u016bs nepiecie\u0161ami.<br\/><\/li>\n\n\n\n<li><strong>Darba pas\u016bt\u012bjumi<\/strong>: Tas ietver darbus, kas saist\u012bti ar galaprodukta ra\u017eo\u0161anu. Darba uzdevum\u0101 ir detaliz\u0113ti nor\u0101d\u012btas nepiecie\u0161am\u0101s izejvielas un komponenti, gala produkta s\u0101kuma un beigu datumi, k\u0101 ar\u012b visu noda\u013cu pien\u0101kumi, lai darbs b\u016btu saska\u0146ots.<br\/><\/li>\n\n\n\n<li><strong>Pamata un papildu p\u0101rskati<\/strong>: Atkar\u012bb\u0101 no sist\u0113mas p\u0101rskatos redzami pl\u0101notie pieg\u0101des pas\u016bt\u012bjumi, izmai\u0146as eso\u0161ajos pas\u016bt\u012bjumos, novirzes un pl\u0101no\u0161anas rezult\u0101ti. Piepras\u012bjuma prognoz\u0113\u0161ana un detaliz\u0113ta jaudas noslodzes pl\u0101no\u0161ana ir atsevi\u0161\u0137as funkcijas, pat ja t\u0101s ietilpst vien\u0101 programmat\u016bras komplekt\u0101.<\/li>\n<\/ul>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-c6c85bb5\"><div class=\"gb-inside-container\">\n\n<h3 class=\"wp-block-heading\" id=\"h-benefits-of-material-requirements-planning\">Materi\u0101lu pras\u012bbu pl\u0101no\u0161anas priek\u0161roc\u012bbas<\/h3>\n\n\n\n<p>Daudzu veidu uz\u0146\u0113mumiem, piem\u0113ram, tehnolo\u0123iju ra\u017eo\u0161anas, m\u0113be\u013cu ra\u017eo\u0161anas, p\u0101rtikas r\u016bpniec\u012bbas vai pat pakalpojumu nozares uz\u0146\u0113mumiem, ir vair\u0101ki iemesli, k\u0101d\u0113\u013c uz\u0146\u0113mums var g\u016bt labumu no MRP sist\u0113mas izmanto\u0161anas ra\u017eo\u0161anas procesos, piem\u0113ram:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Lab\u0101ka kr\u0101jumu p\u0101rvald\u012bba<\/strong>: Sal\u012bdzinot materi\u0101lu vajadz\u012bbu ar kr\u0101jumiem un gaid\u0101maj\u0101m pieg\u0101d\u0113m, pl\u0101not\u0101ji var konstat\u0113t iztr\u016bkumus un izvair\u012bties no nevajadz\u012bgas kr\u0101jumu papildin\u0101\u0161anas. Rezult\u0101ts ir atkar\u012bgs no piepras\u012bjuma, kr\u0101jumu un produktu datu precizit\u0101tes.<br><\/li>\n\n\n\n<li><strong>Iepirkumu pl\u0101no\u0161ana<\/strong>: MRP pied\u0101v\u0101, k\u0101di daudzumi j\u0101iep\u0113rk un kad tie b\u016bs vajadz\u012bgi. Iepirkumu speci\u0101listi var izmantot \u0161os priek\u0161likumus, lai sagatavotu iepirkuma pas\u016bt\u012bjumus; autom\u0101tiska sazi\u0146a ar pieg\u0101d\u0101t\u0101jiem ir atkar\u012bga no iepirkumu programmat\u016bras un t\u0101s konfigur\u0101cijas.<br><\/li>\n\n\n\n<li><strong>Agr\u012bn\u0101ki br\u012bdin\u0101jumi par iztr\u016bkumiem<\/strong>: Mainoties piepras\u012bjumam vai pieg\u0101d\u0113m, materi\u0101lu vajadz\u012bbu p\u0101rr\u0113\u0137ins pal\u012bdz pl\u0101not\u0101jiem konstat\u0113t tr\u016bksto\u0161os komponentus un p\u0101rskat\u012bt pieg\u0101des datumus. Br\u012bdin\u0101jums par novirzi materi\u0101lu pl\u0101n\u0101 nav iek\u0101rtu rezerves grafiks neparedz\u0113tiem gad\u012bjumiem.<br><\/li>\n\n\n\n<li><strong>Pal\u012bdz uzlabot produktivit\u0101ti<\/strong>: Materi\u0101lu pl\u0101ns pal\u012bdz ra\u017eo\u0161anas komand\u0101m sagatavot darbam vajadz\u012bgos komponentus. Iek\u0101rtu un darbasp\u0113ka noslodze joproj\u0101m ir atkar\u012bga no tehnolo\u0123iskajiem procesiem, jaudas un detaliz\u0113t\u0101 ra\u017eo\u0161anas grafika.<br><\/li>\n\n\n\n<li><strong>Atbalsta resursu pl\u0101no\u0161anu<\/strong>: MRP sniedz inform\u0101ciju par materi\u0101lu daudzumiem un datumiem iepirkumu un ra\u017eo\u0161anas pl\u0101no\u0161anai. Iek\u0101rtu un darbasp\u0113ka jauda j\u0101p\u0101rbauda atsevi\u0161\u0137i; materi\u0101lu pieejam\u012bba vien negarant\u0113, ka pas\u016bt\u012bjumu var\u0113s izpild\u012bt laikus.<br><\/li>\n\n\n\n<li><strong>Nodro\u0161ina datu organiz\u0113\u0161anu<\/strong>: Ra\u017eo\u0161anas procesi rada lielu inform\u0101cijas apjomu, piem\u0113ram, pieejamos kr\u0101jumu datus, pieg\u0101des, r\u0113\u0137inus, pirkumus un citus p\u0101rskatus, kas j\u0101analiz\u0113 un j\u0101dokument\u0113 organiz\u0113t\u0101 veid\u0101. MRP pal\u012bdz\u0113s apstr\u0101d\u0101t \u0161o garlaic\u012bgo uzdevumu, lab\u0101k p\u0101rvaldot uz\u0146\u0113mum\u0101 apkopoto inform\u0101ciju.<br\/><\/li>\n\n\n\n<li><strong>Pal\u012bdz izvair\u012bties no p\u0101rm\u0113r\u012bgiem iepirkumiem<\/strong>: At\u0146emot no materi\u0101lu vajadz\u012bbas izmantojamos kr\u0101jumus un pl\u0101not\u0101s pieg\u0101des, var samazin\u0101t nevajadz\u012bgus iepirkumus. MRP negarant\u0113 zem\u0101k\u0101s kop\u0113j\u0101s iepirkuma, uzglab\u0101\u0161anas vai transport\u0113\u0161anas izmaksas.<br><\/li>\n\n\n\n<li><strong>Efekt\u012bv\u0101ka pl\u0101no\u0161anai atv\u0113l\u0113t\u0101 laika izmanto\u0161ana<\/strong>: Programmat\u016bra var automatiz\u0113t atk\u0101rtotus materi\u0101lu apr\u0113\u0137inus un pas\u016bt\u012bjumu priek\u0161likumu sagatavo\u0161anu. Pl\u0101not\u0101jiem joproj\u0101m j\u0101uztur prec\u012bzi ievaddati, j\u0101izv\u0113rt\u0113 novirzes un j\u0101saska\u0146o iepirkumu un ra\u017eo\u0161anas l\u0113mumi.<br><\/li>\n\n\n\n<li><strong>Palielina klientu apmierin\u0101t\u012bbu<\/strong>: MRP, izmantojot labu ra\u017eo\u0161anas pl\u0101no\u0161anu un izvairoties no izejvielu un sast\u0101vda\u013cu tr\u016bkuma riska, pal\u012bdz samazin\u0101t pieg\u0101des termi\u0146us, radot klientu lojalit\u0101ti un veidojot labu uz\u0146\u0113muma reput\u0101ciju, padarot uz\u0146\u0113mumu uzticam\u0101ku n\u0101kotnes klientiem.<\/li>\n<\/ol>\n\n\n\n<p>MRP darb\u012bbai ir vajadz\u012bgas prec\u012bzas materi\u0101lu specifik\u0101cijas, kr\u0101jumu uzskaites dati, piepras\u012bjuma dati un izpildes laiki. MRP pamatfunkcionalit\u0101te parasti izmanto pl\u0101notos izpildes laikus, neatrisinot konfliktus, ko rada ierobe\u017eota ra\u017eo\u0161anas jauda, t\u0101p\u0113c pied\u0101v\u0101tajiem termi\u0146iem ir vajadz\u012bga <a href=\"\/lv\/resursi\/razosanas-jaudas-vajadzibu-planosana\/\">atsevi\u0161\u0137a ra\u017eo\u0161anas jaudas p\u0101rbaude<\/a>. Ja main\u0101s ievaddati vai pieg\u0101des datumi, p\u0101rr\u0113\u0137iniet materi\u0101lu pl\u0101nu un p\u0101rskatiet detaliz\u0113to ra\u017eo\u0161anas grafiku.<\/p>\n\n\n\n<p>Tom\u0113r MRP sist\u0113ma uz\u0146emas gr\u016bto uzdevumu apr\u0113\u0137in\u0101t nepiecie\u0161am\u0101s izejvielas un sast\u0101vda\u013cas un p\u0101rvald\u012bt ra\u017eo\u0161anas pl\u0101nus daudz prasm\u012bg\u0101k un efekt\u012bv\u0101k nek\u0101 ar rok\u0101m un izmantojot garlaic\u012bgas izkl\u0101jlapas.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Padariet savu uz\u0146\u0113mumu efekt\u012bv\u0101ku \u012bs\u0101 laik\u0101!<\/h3>\n\n\n\n<p>MRP atbild uz jaut\u0101jumiem par materi\u0101liem: kas ir vajadz\u012bgs, cik daudz un kad. SkyPlanner APS risina detaliz\u0113tas ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas jaut\u0101jumus: kur\u0161 ra\u017eo\u0161anas uzdevums j\u0101izpilda kur\u0101 darba centr\u0101, kad un k\u0101d\u0101 sec\u012bb\u0101, \u0146emot v\u0113r\u0101 materi\u0101lu pieejam\u012bbu, mai\u0146as, priorit\u0101tes un pieg\u0101des datumus. SkyPlanner neaizst\u0101j ERP; tas integr\u0113jas ar jebkuru ERP vai MES, izmantojot savu atv\u0113rto REST API. Pl\u0101not\u0101ji nosaka priorit\u0101tes un noteikumus, bet Arcturus apr\u0113\u0137ina ra\u017eo\u0161anas grafiku.<\/p>\n\n\n\n<p>Uzziniet, k\u0101 m\u0113s varam pal\u012bdz\u0113t jums atjaunin\u0101t un padar\u012bt j\u016bsu uz\u0146\u0113mumu konkur\u0113tsp\u0113j\u012bg\u0101ku.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-fb4bc7a3 sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-f791a09c\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-ff11cdab\">\n<div class=\"gb-grid-column gb-grid-column-525e141f\"><div class=\"gb-container gb-container-525e141f\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"588\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png\" alt=\"SkyPlanner APS - Ra\u017eo\u0161anas pl\u0101no\u0161anas un grafiku skats\" class=\"wp-image-4273\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-300x172.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-768x441.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1536x882.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-2048x1175.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-279cad58\"><div class=\"gb-container gb-container-279cad58\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-skyrocket-your-production-with-skyplanner-aps\" style=\"font-size:24px\">Palieliniet savu ra\u017eo\u0161anas apjomu ar SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Pierakstieties uz demonstr\u0101ciju ar m\u016bsu speci\u0101listu komandu, lai redz\u0113tu, k\u0101 SkyPlanner APS darbojas re\u0101laj\u0101 dz\u012bv\u0113.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-4efb82ec\">\n\n<a class=\"gb-button gb-button-89b98570 gb-button-text\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\" aria-label=\"Rezerv\u0113t demonstr\u0101ciju\">Rezerv\u0113t demonstr\u0101ciju<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n<hr class=\"wp-block-separator has-text-color has-base-color has-css-opacity has-base-background-color has-background\"\/>\n\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":5,"featured_media":9057,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2686,317],"tags":[],"class_list":["post-10197","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-erp-lv","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MRP: ko un kad pas\u016bt\u012bt? &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"K\u0101dus materi\u0101lus pirkt un kad tos pas\u016bt\u012bt? MRP sist\u0113ma izmanto piepras\u012bjumu, kr\u0101jumus un pieg\u0101des laikus, lai noteiktu ra\u017eo\u0161anai vajadz\u012bgos materi\u0101lus.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MRP: \u012bss ce\u013cvedis\" \/>\n<meta property=\"og:description\" content=\"K\u0101dus materi\u0101lus pirkt un kad tos pas\u016bt\u012bt? MRP sist\u0113ma izmanto piepras\u012bjumu, kr\u0101jumus un pieg\u0101des laikus, lai noteiktu ra\u017eo\u0161anai vajadz\u012bgos materi\u0101lus.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-04-21T10:40:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T17:52:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Teemu Hakala\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Teemu Hakala\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mrp-iss-celvedis\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mrp-iss-celvedis\\\/\"},\"author\":{\"name\":\"Teemu Hakala\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/c6a20b9cdaae7e4429ef319efc97d730\"},\"headline\":\"MRP: \u012bss ce\u013cvedis\",\"datePublished\":\"2023-04-21T10:40:41+00:00\",\"dateModified\":\"2026-10-15T17:52:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mrp-iss-celvedis\\\/\"},\"wordCount\":2368,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mrp-iss-celvedis\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/mrp-article_photo-scaled-e1682073588927.jpg\",\"articleSection\":[\"ERP\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mrp-iss-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mrp-iss-celvedis\\\/\",\"name\":\"MRP: ko un kad pas\u016bt\u012bt? &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mrp-iss-celvedis\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mrp-iss-celvedis\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/mrp-article_photo-scaled-e1682073588927.jpg\",\"datePublished\":\"2023-04-21T10:40:41+00:00\",\"dateModified\":\"2026-10-15T17:52:04+00:00\",\"description\":\"K\u0101dus materi\u0101lus pirkt un kad tos pas\u016bt\u012bt? MRP sist\u0113ma izmanto piepras\u012bjumu, kr\u0101jumus un pieg\u0101des laikus, lai noteiktu ra\u017eo\u0161anai vajadz\u012bgos materi\u0101lus.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mrp-iss-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mrp-iss-celvedis\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mrp-iss-celvedis\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/mrp-article_photo-scaled-e1682073588927.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/mrp-article_photo-scaled-e1682073588927.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"MRP: A Brief Guide\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/mrp-iss-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Raksti\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"MRP: \u012bss ce\u013cvedis\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/c6a20b9cdaae7e4429ef319efc97d730\",\"name\":\"Teemu Hakala\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/38f2b3486c8da9b8cbe872afbb2820740b42578e1976ad3ece592c9a5e9bcaee?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/38f2b3486c8da9b8cbe872afbb2820740b42578e1976ad3ece592c9a5e9bcaee?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/38f2b3486c8da9b8cbe872afbb2820740b42578e1976ad3ece592c9a5e9bcaee?s=96&d=mm&r=g\",\"caption\":\"Teemu Hakala\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MRP: ko un kad pas\u016bt\u012bt? &#8211; SkyPlanner","description":"K\u0101dus materi\u0101lus pirkt un kad tos pas\u016bt\u012bt? MRP sist\u0113ma izmanto piepras\u012bjumu, kr\u0101jumus un pieg\u0101des laikus, lai noteiktu ra\u017eo\u0161anai vajadz\u012bgos materi\u0101lus.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"MRP: \u012bss ce\u013cvedis","og_description":"K\u0101dus materi\u0101lus pirkt un kad tos pas\u016bt\u012bt? MRP sist\u0113ma izmanto piepras\u012bjumu, kr\u0101jumus un pieg\u0101des laikus, lai noteiktu ra\u017eo\u0161anai vajadz\u012bgos materi\u0101lus.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/","og_site_name":"SkyPlanner","article_published_time":"2023-04-21T10:40:41+00:00","article_modified_time":"2026-10-15T17:52:04+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg","type":"image\/jpeg"}],"author":"Teemu Hakala","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Teemu Hakala","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/"},"author":{"name":"Teemu Hakala","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/c6a20b9cdaae7e4429ef319efc97d730"},"headline":"MRP: \u012bss ce\u013cvedis","datePublished":"2023-04-21T10:40:41+00:00","dateModified":"2026-10-15T17:52:04+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/"},"wordCount":2368,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg","articleSection":["ERP","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/","name":"MRP: ko un kad pas\u016bt\u012bt? &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg","datePublished":"2023-04-21T10:40:41+00:00","dateModified":"2026-10-15T17:52:04+00:00","description":"K\u0101dus materi\u0101lus pirkt un kad tos pas\u016bt\u012bt? MRP sist\u0113ma izmanto piepras\u012bjumu, kr\u0101jumus un pieg\u0101des laikus, lai noteiktu ra\u017eo\u0161anai vajadz\u012bgos materi\u0101lus.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg","width":2560,"height":1707,"caption":"MRP: A Brief Guide"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/mrp-iss-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Raksti","item":"https:\/\/skyplanner.ai\/lv\/resursi\/"},{"@type":"ListItem","position":3,"name":"MRP: \u012bss ce\u013cvedis"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/c6a20b9cdaae7e4429ef319efc97d730","name":"Teemu Hakala","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/38f2b3486c8da9b8cbe872afbb2820740b42578e1976ad3ece592c9a5e9bcaee?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/38f2b3486c8da9b8cbe872afbb2820740b42578e1976ad3ece592c9a5e9bcaee?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/38f2b3486c8da9b8cbe872afbb2820740b42578e1976ad3ece592c9a5e9bcaee?s=96&d=mm&r=g","caption":"Teemu Hakala"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg",2560,1707,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-2048x1365.jpg",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/04\/mrp-article_photo-scaled-e1682073588927.jpg",360,240,false]},"uagb_author_info":{"display_name":"Teemu Hakala","author_link":"https:\/\/skyplanner.ai\/lv\/author\/teemu\/"},"uagb_comment_info":0,"uagb_excerpt":null,"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/10197","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=10197"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/10197\/revisions"}],"predecessor-version":[{"id":93226,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/10197\/revisions\/93226"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/9057"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=10197"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=10197"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=10197"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}