{"id":101672,"date":"2026-10-19T14:00:13","date_gmt":"2026-10-19T14:00:13","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=101672"},"modified":"2026-10-19T14:01:02","modified_gmt":"2026-10-19T14:01:02","slug":"drosibas-krajumi","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/","title":{"rendered":"Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Resursi<\/a> &raquo; Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Komponenta tr\u016bkums var aptur\u0113t mont\u0101\u017eas l\u012bniju pat tad, ja tr\u016bksto\u0161\u0101 deta\u013ca maks\u0101 pavisam maz. \u0160\u0137iet sapr\u0101t\u012bgi tur\u0113t vair\u0101k \u0161\u0101du deta\u013cu kr\u0101jum\u0101. Ta\u010du, palielinot visu komponentu kr\u0101jumus, nauda dr\u012bz vien tiek iesald\u0113ta kr\u0101jumos, kas var izr\u0101d\u012bties nevajadz\u012bgi.<\/p>\n\n\n<p>Dro\u0161\u012bbas kr\u0101jumiem ir konkr\u0113t\u0101ks m\u0113r\u0137is: tur\u0113t papildu kr\u0101jumus nenoteikt\u012bbas seg\u0161anai, nevis vienk\u0101r\u0161i t\u0101p\u0113c, ka kr\u0101jumu papildin\u0101\u0161anu ir gr\u016bti saska\u0146ot. Apr\u0113\u0137iniet rezervi, balstoties uz faktiski sagaid\u0101mo piepras\u012bjumu un papildin\u0101\u0161anas laiku, un tad p\u0101rbaudiet, vai n\u0101kam\u0101 partija b\u016bs pieejama pl\u0101n\u0101 paredz\u0113taj\u0101 br\u012bd\u012b.<\/p>\n\n\n<p>Ja kr\u0101jumus papildin\u0101t ar pa\u0161u ra\u017eot\u0101m deta\u013c\u0101m, tie\u0161i \u0161aj\u0101 otraj\u0101 p\u0101rbaud\u0113 pal\u012bdz SkyPlanner. Arcturus iepl\u0101no partiju l\u012bdz\u0101s citiem ra\u017eo\u0161anas uzdevumiem, un Gantt skat\u0101 ir redzams t\u0101s pl\u0101notais pabeig\u0161anas laiks. J\u016bs velt\u0101t maz\u0101k laika darbu rindu saska\u0146o\u0161anai pie iek\u0101rt\u0101m un varat agr\u0101k rea\u0123\u0113t uz kr\u0101jumu iztr\u016bkuma risku.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas ir dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101?<\/h2>\n\n\n<p>Dro\u0161\u012bbas kr\u0101jumi ir papildu kr\u0101jumi, ko uztur, lai mazin\u0101tu iztr\u016bkuma risku negaid\u012bta piepras\u012bjuma vai kr\u0101jumu papildin\u0101\u0161anas kav\u0113jumu d\u0113\u013c. Ra\u017eot\u0101ji var tos veidot no iepirktiem materi\u0101liem, vair\u0101kiem izstr\u0101d\u0101jumiem kop\u012bgiem komponentiem vai gatav\u0101s produkcijas atkar\u012bb\u0101 no t\u0101, kur nepiecie\u0161ams nodro\u0161in\u0101t pieejam\u012bbu.<\/p>\n\n\n<p>Tie papildina kr\u0101jumus, kas vajadz\u012bgi paredzam\u0101 piepras\u012bjuma seg\u0161anai kr\u0101jumu papildin\u0101\u0161anas laik\u0101. Ja l\u012bdz n\u0101kam\u0101s partijas sa\u0146em\u0161anai pl\u0101nojat izlietot 320 kron\u0161teinus, \u0161ie 320 kron\u0161teini sedz parasto piepras\u012bjumu. Papildu daudzums gad\u012bjumam, ja piepras\u012bjums p\u0101rsniedz paredz\u0113to, ir dro\u0161\u012bbas kr\u0101jumi.<\/p>\n\n\n<p>Zin\u0101ms sezon\u0101ls pieaugums j\u0101iek\u013cauj piepras\u012bjuma pl\u0101n\u0101. Past\u0101v\u012bgi ilg\u0101ks pieg\u0101d\u0101t\u0101ja pas\u016bt\u012bjuma izpildes laiks j\u0101\u0146em v\u0113r\u0101 kr\u0101jumu papildin\u0101\u0161anas apr\u0113\u0137inos. Nevienu no tiem nevajadz\u0113tu pasl\u0113pt nepamatot\u0101 rezerv\u0113.<\/p>\n\n\n<p>Ar\u012b dro\u0161\u012bbas kr\u0101jumi ir paredz\u0113ti izmanto\u0161anai. Tiem nav oblig\u0101ti j\u0101b\u016bt atsevi\u0161\u0137i glab\u0101tai, neaizskaramai rezervei. Da\u013cas \u0161o kr\u0101jumu izlieto\u0161ana pati par sevi neliecina par pl\u0101no\u0161anas k\u013c\u016bmi, ta\u010du, ja tie atk\u0101rtoti izs\u012bkst piln\u012bb\u0101, j\u0101noskaidro iemesls.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nosakiet, kas j\u0101aizsarg\u0101 ar rezervi<\/h2>\n\n\n<p>S\u0101ciet ar poz\u012bciju, kuras tr\u016bkums rada b\u016btiskas sekas. L\u0113ts stiprin\u0101jums, ko izmanto daudzos mont\u0101\u017eas mezglos, var pras\u012bt vair\u0101k uzman\u012bbas nek\u0101 d\u0101rga deta\u013ca, kuru var viegli aizst\u0101t.<\/p>\n\n\n<p>Izv\u0113rt\u0113jiet, kas notiktu, ja \u0161\u012bs poz\u012bcijas pietr\u016bktu: vai apst\u0101tos ra\u017eo\u0161anas \u0161aur\u0101 vieta, aizkav\u0113tos s\u016bt\u012bjums klientam vai ra\u017eo\u0161ana var\u0113tu p\u0101riet uz citu ra\u017eo\u0161anas uzdevumu? Sal\u012bdziniet \u0161\u012bs sekas ar papildu kr\u0101jumos iesaist\u012bto kapit\u0101lu, glab\u0101\u0161anas izmaks\u0101m un izmaks\u0101m, ko rada boj\u0101\u0161an\u0101s un noveco\u0161ana.<\/p>\n\n\n<p>P\u0113c tam izv\u0113lieties, kur\u0101 posm\u0101 uztur\u0113t kr\u0101jumus. Kop\u012bgs komponents var noder\u0113t vair\u0101kiem gatavajiem izstr\u0101d\u0101jumiem, savuk\u0101rt gatav\u0101s produkcijas kr\u0101jumi \u013cauj nekav\u0113joties nos\u016bt\u012bt konkr\u0113tu produktu. Neveidojiet autom\u0101tiski atsevi\u0161\u0137u rezervi katr\u0101 materi\u0101lu specifik\u0101cijas l\u012bmen\u012b viena un t\u0101 pa\u0161a trauc\u0113juma seg\u0161anai. Nosakiet, k\u0101du risku sedz katra rezerve.<\/p>\n\n\n<p>Komponentiem izmantojiet piepras\u012bjumu taj\u0101 posm\u0101, kur tiek uztur\u0113ti attiec\u012bgie kr\u0101jumi. S\u016bt\u012bjumi klientiem ne vienm\u0113r prec\u012bzi atspogu\u013co komponentu vajadz\u012bbas: ra\u017eo\u0161anas partiju d\u0113\u013c komponentu izsnieg\u0161anas ritms var at\u0161\u0137irties. <a href=\"\/lv\/resursi\/mrp-iss-celvedis\/\">Materi\u0101lu pl\u0101nam<\/a> j\u0101balst\u0101s uz zin\u0101maj\u0101m vajadz\u012bb\u0101m, bet rezervei j\u0101sedz atlikus\u012b nenoteikt\u012bba.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0101 apr\u0113\u0137in\u0101t dro\u0161\u012bbas kr\u0101jumus<\/h2>\n\n\n<p>Poz\u012bcijai ar main\u012bgu piepras\u012bjumu un dro\u0161i paredzamu, nemain\u012bgu kr\u0101jumu papildin\u0101\u0161anas laiku bie\u017ei izmanto \u0161\u0101du apr\u0113\u0137inu:<\/p>\n\n\n<p><strong>Dro\u0161\u012bbas kr\u0101jumi = z \u00d7 \u03c3d \u00d7 \u221aL<\/strong><\/p>\n\n\n<p>\u0160aj\u0101 formul\u0101:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>z<\/strong> ir koeficients, kas atbilst izv\u0113l\u0113tajam cikla apkalpo\u0161anas l\u012bmenim.<\/li><li><strong>\u03c3d<\/strong> ir dienas piepras\u012bjuma standartnovirze, kas raksturo, cik liel\u0101 m\u0113r\u0101 dienas daudzumi at\u0161\u0137iras no vid\u0113j\u0101.<\/li><li><strong>L<\/strong> ir laiks, kas vajadz\u012bgs kr\u0101jumu papildin\u0101\u0161anai, izteikts t\u0101d\u0101s pa\u0161\u0101s dien\u0101s k\u0101 dienas piepras\u012bjuma datos.<\/li><\/ul>\n\n\n<p>Model\u012b pie\u0146emts, ka da\u017e\u0101du dienu piepras\u012bjums ir savstarp\u0113ji neatkar\u012bgs un sam\u0113r\u0101 stabils un ka piepras\u012bjumu kr\u0101jumu papildin\u0101\u0161anas period\u0101 var pietiekami labi tuvin\u0101t ar norm\u0101lsadal\u012bjumu. Tas ir noder\u012bgs s\u0101kumpunkts regul\u0101ram pat\u0113ri\u0146am, nevis univers\u0101la formula vis\u0101m ra\u017eo\u0161an\u0101 izmantotaj\u0101m poz\u012bcij\u0101m.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Apr\u0113\u0137ina piem\u0113rs ra\u017eo\u0161an\u0101<\/h3>\n\n\n<p>Iedom\u0101jieties r\u016bpn\u012bcu, kas ra\u017eo stiprin\u0101juma kron\u0161teinus, kurus izmanto t\u0101s mont\u0101\u017eas l\u012bnij\u0101s. Pabeigt\u0101s partijas non\u0101k komponentu noliktav\u0101. T\u0101l\u0101k min\u0113tie skait\u013ci ir ilustrat\u012bvi:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Ievaddati<\/th><th>V\u0113rt\u012bba<\/th><\/tr><\/thead><tbody><tr><td>Vid\u0113jais piepras\u012bjums darbdien\u0101<\/td><td>80 kron\u0161teini<\/td><\/tr><tr><td>Dienas piepras\u012bjuma standartnovirze<\/td><td>20 kron\u0161teini<\/td><\/tr><tr><td>Nemain\u012bgs papildin\u0101\u0161anas laiks l\u012bdz br\u012bdim, kad kr\u0101jumi ir izmantojami<\/td><td>4 darbdienas<\/td><\/tr><tr><td>Cikla apkalpo\u0161anas m\u0113r\u0137a l\u012bmenis<\/td><td>95%<\/td><\/tr><tr><td>Atbilsto\u0161ais z koeficients, noapa\u013cots<\/td><td>1,65<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>R\u016bpn\u012bca nep\u0101rtraukti uzrauga kr\u0101jumu papildin\u0101\u0161anas vajadz\u012bbu, t\u0101p\u0113c nerodas papildu gaid\u012b\u0161anas laiks, k\u0101ds b\u016btu, p\u0101rskatot kr\u0101jumus reizi ned\u0113\u013c\u0101. Katra papildin\u0101\u0161anas partija k\u013c\u016bst pieejama piln\u0101 apjom\u0101 p\u0113c \u010detr\u0101m darbdien\u0101m.<\/p>\n\n\n<p>Apr\u0113\u0137ins ir \u0161\u0101ds:<\/p>\n\n\n<p><strong>Dro\u0161\u012bbas kr\u0101jumi = 1,65 \u00d7 20 \u00d7 \u221a4 = 66 kron\u0161teini<\/strong><\/p>\n\n\n<p>\u0160ie 66 kron\u0161teini ir rezerve nenoteikt\u012bbas seg\u0161anai. Paredzamais piepras\u012bjums kr\u0101jumu papildin\u0101\u0161anas laik\u0101 j\u0101apr\u0113\u0137ina atsevi\u0161\u0137i:<\/p>\n\n\n<p><strong>80 \u00d7 4 = 320 kron\u0161teini<\/strong><\/p>\n\n\n<p>Paredzamais piepras\u012bjums un dro\u0161\u012bbas kr\u0101jumi kop\u0101 veido 386 kron\u0161teinus. \u0160aj\u0101 piem\u0113r\u0101 tas b\u016bs slieksnis kr\u0101jumu papildin\u0101\u0161anas uzs\u0101k\u0161anai, nevis n\u0101kam\u0101s partijas lielums.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Izmantojiet atbilsto\u0161us datus apr\u0113\u0137inam<\/h3>\n\n\n<p>Apr\u0113\u0137iniet dienas piepras\u012bjuma main\u012bgumu, izmantojot reprezentat\u012bvu datu rindu par piepras\u012bjumu katr\u0101 dien\u0101, iek\u013caujot ar\u012b darbdienas, kur\u0101s piepras\u012bjuma patie\u0161\u0101m nebija. Izmantojiet \u0161o dienas nov\u0113rojumu standartnovirzi, nevis m\u0113ne\u0161a standartnovirzi, kas dal\u012bta ar dienu skaitu. P\u0101rbaudiet, vai nav nere\u0123istr\u0113tu dar\u012bjumu un neapmierin\u0101ta piepras\u012bjuma: izsniegtie daudzumi var \u0161\u0137ist m\u0101ksl\u012bgi mazi, ja iztr\u016bkuma d\u0113\u013c ra\u017eo\u0161ana nevar pat\u0113r\u0113t komponentu.<\/p>\n\n\n<p>Paredzam\u0101s izmai\u0146as iek\u013caujiet piepras\u012bjuma pl\u0101n\u0101. Ja pat\u0113ri\u0146\u0161 pieaug vai ir sezon\u0101ls, neapstr\u0101d\u0101tu v\u0113sturisko datu sv\u0101rst\u012bbas var likt sajaukt zin\u0101mu likumsakar\u012bbu ar nenoteikt\u012bbu. Izmantojiet metodi, kas balst\u0101s uz atliku\u0161o prognozes k\u013c\u016bdu, nevis uzskatiet katru novirzi no agr\u0101k\u0101 vid\u0113j\u0101 par nejau\u0161u.<\/p>\n\n\n<p>Kr\u0101jumu papildin\u0101\u0161anas laiku m\u0113riet l\u012bdz br\u012bdim, kad poz\u012bcija ir izmantojama. Iepirktam materi\u0101lam tas var ietvert sa\u0146em\u0161anu un p\u0101rbaudi. Ra\u017eotajam kron\u0161teinam tas ietver gaid\u012b\u0161anu, visu ra\u017eo\u0161anas mar\u0161ruta oper\u0101ciju izpildi un p\u0101rvieto\u0161anu uz komponentu noliktavu. Iek\u0101rtas darb\u012bbas laiks vien nav kr\u0101jumu papildin\u0101\u0161anas laiks.<\/p>\n\n\n<p>J\u0101izmanto ar\u012b viens un tas pats kalend\u0101rs. Ja dienas piepras\u012bjuma main\u012bgums apr\u0113\u0137in\u0101ts par darbdien\u0101m, ar\u012b pas\u016bt\u012bjuma izpildes laiks j\u0101izsaka darbdien\u0101s p\u0113c t\u0101 pa\u0161a kalend\u0101ra. Nedr\u012bkst nep\u0101rdom\u0101ti jaukt kalend\u0101r\u0101s dienas ar ra\u017eo\u0161anas dien\u0101m.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ko dar\u012bt, ja ar\u012b pas\u016bt\u012bjuma izpildes laiks main\u0101s?<\/h3>\n\n\n<p>\u010cetru dienu modelis neder kr\u0101jumu papildin\u0101\u0161anas procesam, kas reiz\u0113m ilgst \u010detras, bet reiz\u0113m asto\u0146as dienas. Ievietojot L viet\u0101 vid\u0113jo laiku, papildu nenoteikt\u012bba netiek \u0146emta v\u0113r\u0101.<\/p>\n\n\n<p>Izmantojiet modeli, kas ietver pas\u016bt\u012bjuma izpildes laika main\u012bgumu, vai analiz\u0113jiet piepras\u012bjumu faktiskajos kr\u0101jumu papildin\u0101\u0161anas periodos, lai nov\u0113rt\u0113tu vajadz\u012bgo rezervi. P\u0101rbaudiet, vai lielas noslodzes periodos vienlaikus pieaug gan pat\u0113ri\u0146\u0161, gan darbu rindas ra\u017eo\u0161an\u0101. \u0160ie faktori var b\u016bt saist\u012bti, t\u0101p\u0113c formula, kur\u0101 piepras\u012bjums un pas\u016bt\u012bjuma izpildes laiks tiek uzskat\u012bti par neatkar\u012bgiem, var nepareizi atspogu\u013cot risku.<\/p>\n\n\n<p>Ja piepras\u012bjums ir neregul\u0101rs, atsevi\u0161\u0137i izsniegumi ir \u013coti lieli vai izmantojamu v\u0113sturisko datu ir maz, izv\u0113lieties citu metodi un p\u0101rbaudiet t\u0101s atbilst\u012bbu poz\u012bcijas faktiskajam pat\u0113ri\u0146a raksturam. Pagaidu rezerve, kas balst\u012bta uz sal\u012bdzin\u0101m\u0101m poz\u012bcij\u0101m un praktisko pieredzi, var b\u016bt noder\u012bga, ja vien dokument\u0113jat t\u0101s pamatojumu un p\u0101rskat\u0101t to, kad uzkr\u0101jas vair\u0101k datu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izv\u0113lieties apkalpo\u0161anas l\u012bmeni, nevis tikai reizin\u0101t\u0101ju<\/h2>\n\n\n<p>\u0160aj\u0101 apr\u0113\u0137in\u0101 95% cikla apkalpo\u0161anas l\u012bmenis noz\u012bm\u0113 aptuveni 95% varb\u016bt\u012bbu pabeigt kr\u0101jumu papildin\u0101\u0161anas ciklu bez iztr\u016bkuma, ja ir sp\u0113k\u0101 mode\u013ca pie\u0146\u0113mumi. Tas nenoz\u012bm\u0113, ka 95% vien\u012bbu tiek nodro\u0161in\u0101tas nekav\u0113joties vai ka 95% klientu pas\u016bt\u012bjumu tiek pieg\u0101d\u0101ti laik\u0101.<\/p>\n\n\n<p>Piepras\u012bto vien\u012bbu da\u013cu, kas tiek nodro\u0161in\u0101ta tie\u0161i no kr\u0101jumiem, raksturo piepras\u012bjuma seguma r\u0101d\u012bt\u0101js. Gan neliels, gan liels iztr\u016bkums katrs var tikt ieskait\u012bts k\u0101 viens cikls ar iztr\u016bkumu, lai gan to ietekme uz piepras\u012bjuma segumu un ra\u017eo\u0161anu var b\u016bt \u013coti at\u0161\u0137ir\u012bga.<\/p>\n\n\n<p>Izv\u0113lieties m\u0113r\u0137i atbilsto\u0161i iztr\u016bkuma sek\u0101m un rezerves uztur\u0113\u0161anas izmaks\u0101m. Nenosakiet zemu m\u0113r\u0137i katrai l\u0113tai poz\u012bcijai tikai t\u0101p\u0113c, ka t\u0101s kr\u0101jumu v\u0113rt\u012bba ir maza.<\/p>\n\n\n<p>Tam pa\u0161am kron\u0161teinam, paaugstinot cikla apkalpo\u0161anas m\u0113r\u0137a l\u012bmeni l\u012bdz 99%, izmanto noapa\u013cotu z koeficientu 2,33:<\/p>\n\n\n<p><strong>2,33 \u00d7 20 \u00d7 \u221a4 = 93,2 kron\u0161teini, noapa\u013cojot uz aug\u0161u \u2014 94<\/strong><\/p>\n\n\n<p>T\u0101 ir izv\u0113le starp 66 un 94 papildu kron\u0161teinu uztur\u0113\u0161anu da\u017e\u0101diem aizsardz\u012bbas l\u012bme\u0146iem, nevis ieteikums katrai poz\u012bcijai nodro\u0161in\u0101t 99% apkalpo\u0161anas l\u012bmeni. Izv\u0113rt\u0113jiet, vai papildu aizsardz\u012bba ir kr\u0101jumos ieguld\u012bto l\u012bdzek\u013cu v\u0113rta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Dro\u0161\u012bbas kr\u0101jumu, pas\u016bt\u012b\u0161anas punkta un partijas lieluma noteik\u0161ana ir atsevi\u0161\u0137i l\u0113mumi<\/h2>\n\n\n<p>Katrs no \u0161iem daudzumiem pal\u012bdz atbild\u0113t uz citu jaut\u0101jumu:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>L\u0113mums<\/th><th>Ko tas nosaka<\/th><th>Kron\u0161teina piem\u0113r\u0101<\/th><\/tr><\/thead><tbody><tr><td>Dro\u0161\u012bbas kr\u0101jumi<\/td><td>Papildu daudzums nenoteikt\u012bbas seg\u0161anai<\/td><td>66 kron\u0161teini<\/td><\/tr><tr><td>Pas\u016bt\u012b\u0161anas punkts<\/td><td>Kad s\u0101kt kr\u0101jumu papildin\u0101\u0161anu<\/td><td>Kr\u0101jumu poz\u012bcija \u2014 386 kron\u0161teini<\/td><\/tr><tr><td>Partijas lielums<\/td><td>Cik daudz papildin\u0101t<\/td><td>Piem\u0113ra partija \u2014 400 kron\u0161teini<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0160eit izmantotajai nep\u0101rtrauktas kr\u0101jumu uzraudz\u012bbas politikai:<\/p>\n\n\n<p><strong>Pas\u016bt\u012b\u0161anas punkts = paredzamais piepras\u012bjums kr\u0101jumu papildin\u0101\u0161anas laik\u0101 + dro\u0161\u012bbas kr\u0101jumi<\/strong><\/p>\n\n\n<p><strong>Pas\u016bt\u012b\u0161anas punkts = 320 + 66 = 386 kron\u0161teini<\/strong><\/p>\n\n\n<p>Lai noteiktu, kad veikt pas\u016bt\u012bjumu, izmantojiet kr\u0101jumu poz\u012bciju: izmantojamajiem kr\u0101jumiem noliktav\u0101 pieskaitiet v\u0113l nesa\u0146emtos papildin\u0101\u0161anas pas\u016bt\u012bjumus un at\u0146emiet jau izpild\u0101mo vai rezerv\u0113to piepras\u012bjumu atbilsto\u0161i saviem kr\u0101jumu uzskaites noteikumiem. Neieskaitiet vienas un t\u0101s pa\u0161as saist\u012bbas divreiz. Ja v\u0113rt\u0113jat tikai atlikumu noliktav\u0101, varat pas\u016bt\u012bt v\u0113l vienu partiju, lai gan pietiekams daudzums jau ir pas\u016bt\u012bts.<\/p>\n\n\n<p>Tom\u0113r v\u0113l nesa\u0146emt\u0101s deta\u013cas mont\u0101\u017e\u0101 izmantot nevar. Pas\u016bt\u012btais daudzums var pasarg\u0101t no atk\u0101rtotas pas\u016bt\u012b\u0161anas, ta\u010du pl\u0101notais sa\u0146em\u0161anas datums var b\u016bt p\u0101r\u0101k v\u0113ls, lai nov\u0113rstu iztr\u016bkumu. T\u0101p\u0113c l\u012bdztekus daudzumam vienm\u0113r p\u0101rbaudiet ar\u012b to, kad kr\u0101jumi b\u016bs pieejami.<\/p>\n\n\n<p>400 kron\u0161teinu partijas lielums ir atsevi\u0161\u0137s ra\u017eo\u0161anas l\u0113mums, ko ietekm\u0113 iek\u0101rtu iestat\u012b\u0161ana, materi\u0101lu p\u0101rvieto\u0161ana un ra\u017eo\u0161anas jauda. Minim\u0101lais ra\u017eo\u0161anas daudzums nosaka partijas lieluma apak\u0161\u0113jo robe\u017eu, nevis dro\u0161\u012bbas kr\u0101jumu m\u0113r\u0137i. Liel\u0101ka partija var palielin\u0101t vid\u0113jos kr\u0101jumus, nenov\u0113r\u0161ot neatbilst\u012bbu daudzum\u0101, kas paredz\u0113ts nenoteikt\u012bbas seg\u0161anai.<\/p>\n\n\n<p>Ja kr\u0101jumu papildin\u0101\u0161anas nepiecie\u0161am\u012bbu p\u0101rskata tikai periodiski, kr\u0101jumiem j\u0101sedz ar\u012b gaid\u012b\u0161anas laiks l\u012bdz n\u0101kamajai p\u0101rskat\u012b\u0161anai. \u010cetru dienu apr\u0113\u0137inu, kas paredz\u0113ts nep\u0101rtrauktai kr\u0101jumu uzraudz\u012bbai, nevar bez izmai\u0146\u0101m piem\u0113rot ikned\u0113\u013cas p\u0101rskat\u012b\u0161anai. J\u0101\u0146em v\u0113r\u0101 ar\u012b lieli kr\u0101jumu izsnieg\u0161anas apjomi, kuru d\u0113\u013c atlikums uzreiz nokr\u012btas zem pas\u016bt\u012b\u0161anas sliek\u0161\u0146a, nevis j\u0101pie\u0146em, ka papildin\u0101\u0161ana s\u0101kas tie\u0161i pie 386.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pirms palielin\u0101t dro\u0161\u012bbas kr\u0101jumus, noskaidrojiet, k\u0101p\u0113c tie izs\u012bka<\/h2>\n\n\n<p>Pie\u0146emsim, ka kron\u0161teinu partiju jau ir pl\u0101nots pabeigt divas darbdienas v\u0113l\u0101k, nek\u0101 paredz kr\u0101jumu papildin\u0101\u0161anas k\u0101rt\u012bba. Pie vid\u0113j\u0101 pat\u0113ri\u0146a \u0161\u012bm div\u0101m dien\u0101m vajag v\u0113l <strong>80 \u00d7 2 = 160 kron\u0161teinus<\/strong>. 66 kron\u0161teinu dro\u0161\u012bbas kr\u0101jumi tika apr\u0113\u0137in\u0101ti piepras\u012bjuma sv\u0101rst\u012bb\u0101m, nevis \u0161\u012bs zin\u0101m\u0101s kav\u0113\u0161an\u0101s seg\u0161anai.<\/p>\n\n\n<p>Lai nov\u0113rstu t\u016bl\u012bt\u0113ju kr\u0101jumu iztr\u016bkumu, joproj\u0101m var b\u016bt vajadz\u012bga steidzama pieg\u0101de vai pagaidu rezerve. Ta\u010du, vienk\u0101r\u0161i palielinot past\u0101v\u012bgos dro\u0161\u012bbas kr\u0101jumus, kav\u0113\u0161an\u0101s c\u0113lonis ra\u017eo\u0161anas grafik\u0101 netiek nov\u0113rsts.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Nov\u0113rot\u0101 situ\u0101cija<\/th><th>Ko p\u0101rbaud\u012bt vai main\u012bt<\/th><\/tr><\/thead><tbody><tr><td>Neparedz\u0113ts piepras\u012bjums atk\u0101rtoti p\u0101rsniedz pl\u0101noto diapazonu<\/td><td>P\u0101rv\u0113rt\u0113jiet sv\u0101rst\u012bbas, pie\u0146\u0113mumus par piepras\u012bjumu un apkalpo\u0161anas l\u012bme\u0146a m\u0113r\u0137i.<\/td><\/tr><tr><td>Ierast\u0101 kr\u0101jumu papildin\u0101\u0161ana tagad aiz\u0146em vair\u0101k laika<\/td><td>Atjauniniet paredzamo piepras\u012bjumu pas\u016bt\u012bjuma izpildes laik\u0101 un p\u0101rr\u0113\u0137iniet dro\u0161\u012bbas kr\u0101jumus jaunajam seguma periodam.<\/td><\/tr><tr><td>Iek\u0101rtas darbu rind\u0101 redzams, ka jau pas\u016bt\u012bta partija kav\u0113jas<\/td><td>Atrisiniet jaudas, materi\u0101lu vai priorit\u0101\u0161u konfliktu un izv\u0113rt\u0113jiet ietekmi uz citiem darbiem.<\/td><\/tr><tr><td>Uzskait\u0113 kr\u0101jumi ir, ta\u010du tos nevar atrast vai izmantot<\/td><td>Pirms main\u0101t m\u0113r\u0137a l\u012bmeni, izlabojiet atlikumus, rezerv\u0101cijas vai kvalit\u0101tes statusu.<\/td><\/tr><tr><td>Ra\u017eo\u0161anas zudumu d\u0113\u013c materi\u0101lu pat\u0113ri\u0146\u0161 p\u0101rsniedz pl\u0101noto<\/td><td>Kori\u0123\u0113jiet pl\u0101noto pat\u0113ri\u0146a normu un izp\u0113tiet procesu; no\u0161\u0137iriet paredzamos zudumus no nenoteikt\u012bbas.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Vienlaikus var past\u0101v\u0113t vair\u0101ki c\u0113lo\u0146i. Lab\u0101ka ra\u017eo\u0161anas grafika pl\u0101no\u0161ana nenov\u0113r\u0161 faktisko nenoteikt\u012bbu pieg\u0101d\u0101t\u0101ju darb\u012bb\u0101, un liel\u0101ki dro\u0161\u012bbas kr\u0101jumi nerada tr\u016bksto\u0161o ra\u017eo\u0161anas jaudu. Svar\u012bgi ir saprast, kura r\u012bc\u012bba nov\u0113rs\u012bs tie\u0161i to iztr\u016bkumu, ar kuru saskaraties.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pl\u0101nojiet re\u0101listisku kr\u0101jumu papildin\u0101\u0161anas datumu ar SkyPlanner<\/h2>\n\n\n<p>Kad kr\u0101jumu papildin\u0101\u0161anas daudzums ir noteikts, SkyPlanner APS pal\u012bdz iepl\u0101not t\u0101 ra\u017eo\u0161anu l\u012bdz\u0101s klientu pas\u016bt\u012bjumiem. Nav j\u0101uztur atsevi\u0161\u0137a kr\u0101jumu papildin\u0101\u0161anas darbu rinda un manu\u0101li j\u0101saska\u0146o t\u0101 ar p\u0101r\u0113jiem darbiem: <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/kas-ir-razosanas-planosana\/\">iepl\u0101nojiet partiju vien\u0101 kop\u012bg\u0101 pl\u0101n\u0101<\/a> ar citiem darbiem, kuriem vajadz\u012bgas t\u0101s pa\u0161as iek\u0101rtas.<\/p>\n\n\n<p>Arcturus apr\u0113\u0137ina grafiku, \u0146emot v\u0113r\u0101 konfigur\u0113tos darba resursus, mai\u0146as, oper\u0101ciju ilgumu, savstarp\u0113j\u0101s atkar\u012bbas un priorit\u0101tes. Gantt skat\u0101 redzams partijas ra\u017eo\u0161anas mar\u0161ruts un pl\u0101notais pabeig\u0161anas laiks. Varat p\u0101rbaud\u012bt, vai kron\u0161teinu papildin\u0101jums b\u016bs gatavs, pirms tas nepiecie\u0161ams mont\u0101\u017e\u0101, nevis uzskat\u012bt v\u0113l nepabeigtu ra\u017eo\u0161anas pas\u016bt\u012bjumu par pieejamiem kr\u0101jumiem.<\/p>\n\n\n<p>Ja steidzama klienta pas\u016bt\u012bjuma d\u0113\u013c partija j\u0101atliek, priorit\u0101tes nosak\u0101t j\u016bs. Arcturus p\u0101rr\u0113\u0137ina darbu sec\u012bbu, un j\u016bs p\u0101rskat\u0101t visu skarto ra\u017eo\u0161anas uzdevumu izpildes laikus. Ja ir iesp\u0113jota materi\u0101lu pieejam\u012bbas iev\u0113ro\u0161ana pl\u0101no\u0161an\u0101, ar\u012b t\u0101 ietekm\u0113 darbu s\u0101kuma laiku. Autopilot var atjaunin\u0101t pl\u0101nu p\u0113c konfigur\u0113tiem notikumiem vai noteiktos laikos, saglab\u0101jot sp\u0113k\u0101 j\u016bsu noteikumus un fiks\u0113tos pl\u0101na elementus.<\/p>\n\n\n<p>Tas ir praktisks iemesls izv\u0113l\u0113ties SkyPlanner: maz\u0101k manu\u0101li j\u0101saska\u0146o darbu rindas, kas konkur\u0113 par tiem pa\u0161iem resursiem, un kr\u0101jumu papildin\u0101\u0161anas kav\u0113\u0161an\u0101s ir redzama agr\u0101k \u2014 kam\u0113r v\u0113l ir laiks main\u012bt pl\u0101nu.<\/p>\n\n\n<p>No\u0161\u0137iriet dro\u0161\u012bbas kr\u0101jumu noteik\u0161anu no ra\u017eo\u0161anas grafika sast\u0101d\u012b\u0161anas. SkyPlanner br\u012bdin\u0101jums par zemu kr\u0101jumu l\u012bmeni var mudin\u0101t j\u016bs izveidot papildin\u0101\u0161anas pas\u016bt\u012bjumu; tas nenoz\u012bm\u0113, ka, sasniedzot noteiktu kr\u0101jumu l\u012bmeni, pas\u016bt\u012bjums tiek izveidots autom\u0101tiski. Iepriek\u0161\u0113jais apr\u0113\u0137ins nosaka vajadz\u012bgo kr\u0101jumu rezervi. Arcturus pl\u0101no izpildes grafiku darbiem, kurus izveidojat vai sa\u0146emat ar integr\u0101cijas starpniec\u012bbu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ko lab\u0101ka darbu saska\u0146o\u0161ana main\u012bja uz\u0146\u0113mum\u0101 Piristeel<\/h3>\n\n\n<p>Jumtu dro\u0161\u012bbas apr\u012bkojuma un lietus\u016bdens novad\u012b\u0161anas sist\u0113mu ra\u017eot\u0101js Piristeel iepriek\u0161 pa\u013c\u0101v\u0101s uz liel\u0101m ra\u017eo\u0161anas partij\u0101m un kr\u0101jumu rezerv\u0113m, bet noda\u013c\u0101m bija ierobe\u017eots p\u0101rskats par citai citas darbu. Sav\u0101 <a href=\"https:\/\/skyplanner.ai\/lv\/klientu-stasti\/piristeel\/\">pieredzes st\u0101st\u0101 par SkyPlanner<\/a> uz\u0146\u0113mums apraksta kop\u012bgu Gantt skatu visai ra\u017eo\u0161anai un lab\u0101ku maz\u0101ku partiju ra\u017eo\u0161anas saska\u0146o\u0161anu. Lielas kr\u0101jumu rezerves vairs nebija priek\u0161noteikums raitam darbam.<\/p>\n\n\n<p>\u0160\u012b pieredze par\u0101da, cik v\u0113rt\u012bgs ir p\u0101rskat\u0101ms, saska\u0146ots pl\u0101ns. Ieguvums nav vienk\u0101r\u0161i visu rezervju samazin\u0101\u0161ana, bet gan iesp\u0113ja netur\u0113t papildu kr\u0101jumus tikai t\u0101p\u0113c, ka ra\u017eo\u0161anas grafiku ir gr\u016bti p\u0101rvald\u012bt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u0101rskatiet dro\u0161\u012bbas kr\u0101jumus kop\u0101 ar papildin\u0101\u0161anas pl\u0101nu<\/h2>\n\n\n<p>Pirmajai izv\u0113l\u0113tajai kr\u0101jumu poz\u012bcijai pierakstiet piepras\u012bjuma apr\u0113\u0137ina pamatu, laiku l\u012bdz izmantojamu kr\u0101jumu sa\u0146em\u0161anai, apkalpo\u0161anas l\u012bme\u0146a m\u0113r\u0137i, apr\u0113\u0137in\u0101tos dro\u0161\u012bbas kr\u0101jumus, atk\u0101rtot\u0101s pas\u016bt\u012b\u0161anas k\u0101rt\u012bbu un partijas lielumu. Sal\u012bdziniet noteikto k\u0101rt\u012bbu ar turpm\u0101kajiem iztr\u016bkumiem un faktiskajiem papildin\u0101\u0161anas rezult\u0101tiem. P\u0101rskatiet to, ja main\u0101s piepras\u012bjums, pieg\u0101\u017eu uzticam\u012bba, pas\u016bt\u012bjuma izpildes laiks vai iztr\u016bkuma sekas. Viens cikls bez sare\u017e\u0123\u012bjumiem v\u0113l nepier\u0101da, ka dro\u0161\u012bbas kr\u0101jumi ir par lielu.<\/p>\n\n\n<p>Saglab\u0101jiet pamatotu rezervi faktisk\u0101s nenoteikt\u012bbas seg\u0161anai. Izmantojiet SkyPlanner, lai pl\u0101notais kr\u0101jumu papildin\u0101\u0161anas datums b\u016btu p\u0101rskat\u0101ms un ra\u017eo\u0161anas darbi, kas konkur\u0113 par resursiem, b\u016btu saska\u0146oti. SkyPlanner var integr\u0113t ar jebkuru ERP vai MES, izmantojot t\u0101 atv\u0113rto REST API, t\u0101p\u0113c varat uzlabot ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu, turpinot izmantot eso\u0161o sist\u0113mu.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Piesakieties SkyPlanner demonstr\u0101cijai<\/a> un izv\u0113lieties tai vienu papildin\u0101mo kr\u0101jumu poz\u012bciju un steidzamu pas\u016bt\u012bjumu, kura d\u0113\u013c nesen n\u0101c\u0101s atlikt \u0161\u012bs poz\u012bcijas partiju. Apskatiet, k\u0101 kop\u012bgais grafiks maina pabeig\u0161anas datumu un j\u016bsu pl\u0101not\u0101ja r\u012bc\u012bbas iesp\u0113jas. Ja vispirms v\u0113laties sist\u0113mu izp\u0113t\u012bt patst\u0101v\u012bgi, <a href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi S\u0101kums &raquo; Resursi &raquo; Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi Komponenta tr\u016bkums var aptur\u0113t mont\u0101\u017eas l\u012bniju pat tad, ja tr\u016bksto\u0161\u0101 deta\u013ca maks\u0101 pavisam maz. \u0160\u0137iet sapr\u0101t\u012bgi tur\u0113t vair\u0101k \u0161\u0101du deta\u013cu kr\u0101jum\u0101. Ta\u010du, palielinot visu komponentu kr\u0101jumus, nauda dr\u012bz vien tiek iesald\u0113ta kr\u0101jumos, kas var izr\u0101d\u012bties nevajadz\u012bgi. Dro\u0161\u012bbas kr\u0101jumiem ir &#8230; <a title=\"Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/\" aria-label=\"Read more about Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":101692,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2531,317],"tags":[],"class_list":["post-101672","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-un-planosana","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137ins un piem\u0113rs<\/title>\n<meta name=\"description\" content=\"Apr\u0113\u0137iniet dro\u0161\u012bbas kr\u0101jumus, nejaucot tos ar pas\u016bt\u012b\u0161anas punktu. Kad pal\u012bdz liel\u0101ki kr\u0101jumi, un kad SkyPlanner var sak\u0101rtot papildin\u0101\u0161anas laiku?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi\" \/>\n<meta property=\"og:description\" content=\"Apr\u0113\u0137iniet dro\u0161\u012bbas kr\u0101jumus, nejaucot tos ar pas\u016bt\u012b\u0161anas punktu. Kad pal\u012bdz liel\u0101ki kr\u0101jumi, un kad SkyPlanner var sak\u0101rtot papildin\u0101\u0161anas laiku?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-19T14:00:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:01:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/drosibas-krajumi\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/drosibas-krajumi\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi\",\"datePublished\":\"2026-10-19T14:00:13+00:00\",\"dateModified\":\"2026-10-19T14:01:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/drosibas-krajumi\\\/\"},\"wordCount\":3300,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/drosibas-krajumi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/safety-stock-in-manufacturing-hero.png\",\"articleSection\":[\"APS un pl\u0101no\u0161ana\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/drosibas-krajumi\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/drosibas-krajumi\\\/\",\"name\":\"Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137ins un piem\u0113rs\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/drosibas-krajumi\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/drosibas-krajumi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/safety-stock-in-manufacturing-hero.png\",\"datePublished\":\"2026-10-19T14:00:13+00:00\",\"dateModified\":\"2026-10-19T14:01:02+00:00\",\"description\":\"Apr\u0113\u0137iniet dro\u0161\u012bbas kr\u0101jumus, nejaucot tos ar pas\u016bt\u012b\u0161anas punktu. Kad pal\u012bdz liel\u0101ki kr\u0101jumi, un kad SkyPlanner var sak\u0101rtot papildin\u0101\u0161anas laiku?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/drosibas-krajumi\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/drosibas-krajumi\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/drosibas-krajumi\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/safety-stock-in-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/safety-stock-in-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Blue mounting brackets in two bins beside a part awaiting assembly, illustrating component safety stock.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/drosibas-krajumi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137ins un piem\u0113rs","description":"Apr\u0113\u0137iniet dro\u0161\u012bbas kr\u0101jumus, nejaucot tos ar pas\u016bt\u012b\u0161anas punktu. Kad pal\u012bdz liel\u0101ki kr\u0101jumi, un kad SkyPlanner var sak\u0101rtot papildin\u0101\u0161anas laiku?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/","og_locale":"lv_LV","og_type":"article","og_title":"Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi","og_description":"Apr\u0113\u0137iniet dro\u0161\u012bbas kr\u0101jumus, nejaucot tos ar pas\u016bt\u012b\u0161anas punktu. Kad pal\u012bdz liel\u0101ki kr\u0101jumi, un kad SkyPlanner var sak\u0101rtot papildin\u0101\u0161anas laiku?","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-19T14:00:13+00:00","article_modified_time":"2026-10-19T14:01:02+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi","datePublished":"2026-10-19T14:00:13+00:00","dateModified":"2026-10-19T14:01:02+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/"},"wordCount":3300,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero.png","articleSection":["APS un pl\u0101no\u0161ana","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/","name":"Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137ins un piem\u0113rs","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero.png","datePublished":"2026-10-19T14:00:13+00:00","dateModified":"2026-10-19T14:01:02+00:00","description":"Apr\u0113\u0137iniet dro\u0161\u012bbas kr\u0101jumus, nejaucot tos ar pas\u016bt\u012b\u0161anas punktu. Kad pal\u012bdz liel\u0101ki kr\u0101jumi, un kad SkyPlanner var sak\u0101rtot papildin\u0101\u0161anas laiku?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero.png","width":1672,"height":941,"caption":"Blue mounting brackets in two bins beside a part awaiting assembly, illustrating component safety stock."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/drosibas-krajumi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/safety-stock-in-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi S\u0101kums &raquo; Resursi &raquo; Dro\u0161\u012bbas kr\u0101jumi ra\u017eo\u0161an\u0101: apr\u0113\u0137iniet nepiecie\u0161amo rezervi Komponenta tr\u016bkums var aptur\u0113t mont\u0101\u017eas l\u012bniju pat tad, ja tr\u016bksto\u0161\u0101 deta\u013ca maks\u0101 pavisam maz. \u0160\u0137iet sapr\u0101t\u012bgi tur\u0113t vair\u0101k \u0161\u0101du deta\u013cu kr\u0101jum\u0101. Ta\u010du, palielinot visu komponentu kr\u0101jumus, nauda dr\u012bz vien tiek iesald\u0113ta kr\u0101jumos, kas var izr\u0101d\u012bties nevajadz\u012bgi. Dro\u0161\u012bbas kr\u0101jumiem ir&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/101672","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101672"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/101672\/revisions"}],"predecessor-version":[{"id":101769,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/101672\/revisions\/101769"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/101692"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101672"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=101672"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=101672"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}