{"id":101431,"date":"2026-10-17T17:00:34","date_gmt":"2026-10-17T17:00:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=101431"},"modified":"2026-10-17T17:01:20","modified_gmt":"2026-10-17T17:01:20","slug":"darba-laika-normesana","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/","title":{"rendered":"Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lv\/\">S\u0101kums<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/\">Resursi<\/a> &raquo; Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Aptuvenais las\u012b\u0161anas laiks: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> min\u016btes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Veicot darba laika norm\u0113\u0161anu ra\u017eo\u0161an\u0101, m\u0113ra konkr\u0113ti defin\u0113tu darbu, lai noteiktu, cik daudz laika t\u0101 izpildei vajadz\u0113tu aiz\u0146emt nor\u0101d\u012btajos apst\u0101k\u013cos. Veicot tie\u0161u hronometr\u0101\u017eu, darbu sadala elementos, nov\u0113ro to ilgumu, attiec\u012bgajos gad\u012bjumos \u0146em v\u0113r\u0101 norm\u0101lo darba tempu un iek\u013cauj pamatotas laika pielaides, lai ieg\u016btu laika normu.<\/p>\n\n\n<p>Svar\u012bg\u0101kais v\u0101rds ir <strong>defin\u0113ts<\/strong>. Pag\u0101ju\u0161\u0101 m\u0113ne\u0161a ra\u017eo\u0161anas uzdevumu laika uzskaites vid\u0113j\u0101 v\u0113rt\u012bba var ietvert da\u017e\u0101das darba metodes, materi\u0101lu tr\u016bkuma izrais\u012btu gaid\u012b\u0161anu un apm\u0101c\u012bbas laiku. Hronometr\u0113jot \u0101tr\u0101ko operatoru, ieg\u016bsiet citu skaitli, ta\u010du ne vienm\u0113r lab\u0101ku normu.<\/p>\n\n\n<p>Lietder\u012bgas izp\u0113tes rezult\u0101ts ir laiks, kuru varat izskaidrot, p\u0101rbaud\u012bt un atjaunin\u0101t, kad darbs main\u0101s. P\u0113c tam SkyPlanner pal\u012bdz izmantot re\u0101listiskus oper\u0101ciju ilgumus visu neizpild\u012bto pas\u016bt\u012bjumu pl\u0101no\u0161an\u0101, nevis tikai izlabot skaitli ERP sist\u0113m\u0101 un manu\u0101li p\u0101rk\u0101rtot darbu rindas pie katras skart\u0101s iek\u0101rtas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nov\u0113rotais laiks, norm\u0101lais laiks un laika norma<\/h2>\n\n\n<p>\u0160ie tr\u012bs lielumi atbild uz at\u0161\u0137ir\u012bgiem jaut\u0101jumiem:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Laiks<\/th><th>Ko tas noz\u012bm\u0113<\/th><th>Kas j\u0101zina<\/th><\/tr><\/thead><tbody><tr><td>Nov\u0113rotais laiks<\/td><td>Cik ilgi faktiski norit\u0113ja re\u0123istr\u0113tais darbs<\/td><td>Darba metode, m\u0113r\u012bjuma s\u0101kuma un beigu punkti un nov\u0113ro\u0161anas apst\u0101k\u013ci<\/td><\/tr><tr><td>Norm\u0101lais laiks<\/td><td>Laiks, kas vajadz\u012bgs defin\u0113tajam darbam atskaites darba temp\u0101<\/td><td>Pamatots darba tempa nov\u0113rt\u0113jums roku darbam, kura ilgums ir atkar\u012bgs no tempa<\/td><\/tr><tr><td>Laika norma<\/td><td>Norm\u0101lais laiks ar iek\u013caut\u0101m attiec\u012bgaj\u0101m laika pielaid\u0113m<\/td><td>K\u0101das laika pielaides piem\u0113ro un k\u0101 t\u0101s apr\u0113\u0137ina<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Laika norma nav \u0101truma rekords. T\u0101 raksturo laiku, kas nepiecie\u0161ams, lai apm\u0101c\u012bts, prasm\u012bgs darbinieks veiktu darbu p\u0113c defin\u0113tas metodes atskaites temp\u0101, ieskaitot vajadz\u012bg\u0101s laika pielaides.<\/p>\n\n\n<p>Ar\u012b roku darba laika norma autom\u0101tiski nenoz\u012bm\u0113 laiku, uz kuru j\u0101rezerv\u0113 iek\u0101rta. Iek\u0101rta var darboties, kam\u0113r operators p\u0101rbauda iepriek\u0161\u0113jo deta\u013cu. Neaizmirstiet \u0161o at\u0161\u0137ir\u012bbu vis\u0101 izp\u0113tes gait\u0101: vispirms nosak\u0101t veicam\u0101 darba apjomu un tikai tad lemjat, k\u0101 tas noslogo katru resursu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izv\u0113lieties darbam piem\u0113rotu m\u0113r\u012b\u0161anas metodi<\/h2>\n\n\n<p>Tie\u0161a hronometr\u0101\u017ea ir piem\u0113rota stabilam, atk\u0101rtotam darbam, kura elementus var nov\u0113rot. T\u0101 ir laba izv\u0113le, ja j\u0101izprot, k\u0101p\u0113c eso\u0161\u0101 norma ir nepareiza, nevis vienk\u0101r\u0161i j\u0101aizst\u0101j t\u0101 ar citu apl\u0113si.<\/p>\n\n\n<p>Cit\u0101s situ\u0101cij\u0101s vajadz\u012bga cita pieeja:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>L\u012bdz\u012bgos darbos atk\u0101rtojas jau zin\u0101mi elementi.<\/strong> P\u0101rbaud\u012bta laika normat\u012bvu sist\u0113ma \u013cauj apvienot iepriek\u0161 noteiktus elementu laikus, ja darba metode un ietekm\u0113jo\u0161ie faktori sakr\u012bt. Neapr\u0113\u0137iniet vienu kop\u012bgu vid\u0113jo v\u0113rt\u012bbu at\u0161\u0137ir\u012bgiem produktiem.<\/li><li><strong>Roku darba metodi izstr\u0101d\u0101 pirms ra\u017eo\u0161anas s\u0101kuma.<\/strong> Ar iepriek\u0161 noteiktu kust\u012bbu laiku sist\u0113mu var apr\u0113\u0137in\u0101t darba laiku no defin\u0113t\u0101m kust\u012bb\u0101m. Tam nepiecie\u0161ama prasme lietot izv\u0113l\u0113to sist\u0113mu, nevis min\u0113jums par darba tempa nov\u0113rt\u0113jumu hronometr\u0101\u017e\u0101.<\/li><li><strong>J\u0101izprot, kam tiek pat\u0113r\u0113ts mai\u0146as laiks.<\/strong> Momentnov\u0113rojumu metode \u013cauj nov\u0113rt\u0113t, k\u0101da laika da\u013ca tiek pat\u0113r\u0113ta darb\u012bb\u0101m vai aizkav\u0113jumiem. T\u0101 var pal\u012bdz\u0113t izv\u0113rt\u0113t laika pielaides, ta\u010du pati par sevi nenosaka katra \u012bsa darba elementa prec\u012bzu ilgumu.<\/li><li><strong>Ilgumu nosaka tehnolo\u0123iskais process.<\/strong> Apr\u0113\u0137iniet vai p\u0101rbaudiet ma\u0161\u012bnlaiku p\u0113c programmas vai procesa parametriem un operatora darbu p\u0113tiet atsevi\u0161\u0137i.<\/li><\/ul>\n\n\n<p>Iepriek\u0161\u0113jo ra\u017eo\u0161anas uzdevumu uzskaites dati joproj\u0101m ir noder\u012bgi. Pirms izmantojat tos k\u0101 normu, p\u0101rbaudiet, ko tie ietver: re\u0123istr\u0113tais kop\u0113jais ilgums, kur\u0101 iek\u013cauta materi\u0101lu gaid\u012b\u0161ana, pats par sevi nevar par\u0101d\u012bt roku darba norm\u0101lo laiku.<\/p>\n\n\n<p>Turpm\u0101k aprakst\u012bt\u0101 metode ir paredz\u0113ta atk\u0101rtota darba tie\u0161ai izp\u0113tei.<\/p>\n\n\n<h2 class=\"wp-block-heading\">1. Defin\u0113jiet metodi, pirms iesl\u0113dzat hronometru<\/h2>\n\n\n<p>Izv\u0113lieties oper\u0101ciju, kur\u0101 ticam\u0101ka norma ietekm\u0113s re\u0101lu l\u0113mumu, piem\u0113ram, \u013coti noslogotu mont\u0101\u017eas darba vietu vai atk\u0101rtotu ra\u017eo\u0161anas uzdevumu, kura ilgums regul\u0101ri p\u0101rsteidz pl\u0101not\u0101jus.<\/p>\n\n\n<p>Aprakstiet produktu un t\u0101 versiju, iek\u0101rtas, instrumentus un pal\u012bgier\u012bces, materi\u0101lu izvietojumu un padevi, darba sec\u012bbu un nepiecie\u0161am\u0101s kvalit\u0101tes p\u0101rbaudes. Nor\u0101diet notikumus, kas iez\u012bm\u0113 darba s\u0101kumu un beigas. Skaidri nosakiet, vai rezult\u0101ts attiecas uz vienu vien\u012bbu, ciklu vai partiju, un atsevi\u0161\u0137i izdaliet vienreiz\u0113jo iestat\u012b\u0161anu.<\/p>\n\n\n<p>P\u0101rrun\u0101jiet \u0161o aprakstu ar cilv\u0113kiem, kuri veic oper\u0101ciju. Izskaidrojiet, k\u0101p\u0113c izp\u0113te tiek veikta un k\u0101 tiks izmantoti rezult\u0101ti. Vi\u0146u zin\u0101\u0161anas bie\u017ei atkl\u0101j nepiecie\u0161amus darbus, kas eso\u0161aj\u0101 apl\u0113s\u0113 nav iek\u013cauti, piem\u0113ram, pal\u012bgier\u012bces papildin\u0101\u0161anu vai periodisku p\u0101rbaudi.<\/p>\n\n\n<p>Nov\u0113rojiet apm\u0101c\u012btu operatoru, kur\u0161 str\u0101d\u0101 p\u0113c noteikt\u0101s, dro\u0161\u0101s metodes. Ja pal\u012bgier\u012bci v\u0113l p\u0101rveido vai operators v\u0113l apg\u016bst darba sec\u012bbu, vispirms stabiliz\u0113jiet metodi. Papildu hronometr\u0101\u017eas m\u0113r\u012bjumi nedos uzticamu laika normu, kam\u0113r process nav nostabiliz\u0113ts.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2. Re\u0123istr\u0113jiet elementus, to bie\u017eumu un iz\u0146\u0113mumus<\/h2>\n\n\n<p>Sadaliet oper\u0101ciju elementos ar skaidri nov\u0113rojam\u0101m robe\u017e\u0101m: korpuss ievietots pal\u012bgier\u012bc\u0113, stiprin\u0101jumi pievilkti, p\u0101rbaude pabeigta. No\u0161\u0137iriet no tempa atkar\u012bgo roku darbu no iek\u0101rtas noteikt\u0101 laika. Darbiem, kas notiek tikai periodiski, piem\u0113ram, tvertnes nomai\u0146ai, nor\u0101diet to bie\u017eumu, nevis pie\u0146emiet, ka tie notiek ar katru vien\u012bbu.<\/p>\n\n\n<p>Katram nov\u0113rojumam saglab\u0101jiet elementa laiku, attiec\u012bgos apst\u0101k\u013cus un izmantoto darba tempa nov\u0113rt\u0113jumu, ja t\u0101ds ir. Atz\u012bm\u0113jiet p\u0101rtraukumus, tikl\u012bdz tie rodas. Ja tr\u016bkst komponenta vai sal\u016bst instruments, re\u0123istr\u0113jiet notikumu un t\u0101 ilgumu atsevi\u0161\u0137i; neizdz\u0113siet ilgo m\u0113r\u012bjumu bez paskaidrojuma un nepasl\u0113piet to norm\u0101l\u0101 darba vid\u0113j\u0101 laik\u0101.<\/p>\n\n\n<p>Veiciet nov\u0113rojumus reprezentat\u012bvos ra\u017eo\u0161anas apst\u0101k\u013cos, nevis tikai vien\u0101 \u0113rti pieejam\u0101 darba posm\u0101 bez p\u0101rtraukumiem. P\u0101rbaudiet, vai ar vienu un to pa\u0161u metodi vien\u0101dos apst\u0101k\u013cos elementu laiki ir pietiekami vienm\u0113r\u012bgi. Ja t\u0101 nav, noskaidrojiet c\u0113loni: at\u0161\u0137ir\u012bgam materi\u0101lu izvietojumam un padevei var b\u016bt vajadz\u012bga atsevi\u0161\u0137a metode, savuk\u0101rt nejau\u0161a m\u0113r\u012bjuma k\u013c\u016bda ir dokument\u0113ti j\u0101izlabo.<\/p>\n\n\n<p><strong>Nav univers\u0101la ciklu skaita, kas garant\u0113tu izp\u0113tes pietiekam\u012bbu.<\/strong> Nov\u0113rojumu skaits ir atkar\u012bgs no main\u012bguma, nepiecie\u0161am\u0101s precizit\u0101tes un l\u0113muma, kura pie\u0146em\u0161anai normu izmantos. Ar s\u0101kotn\u0113jo nov\u0113rojumu kopu nov\u0113rt\u0113jiet izkliedi un p\u0113c tam nosakiet vajadz\u012bgo izlases apjomu atbilsto\u0161i izv\u0113l\u0113tajiem ticam\u012bbas un precizit\u0101tes krit\u0113rijiem. \u0160\u0101du nov\u0113rt\u0113jumu var veikt apm\u0101c\u012bts darba laika m\u0113r\u012b\u0161anas speci\u0101lists. Desmit gandr\u012bz vien\u0101di m\u0113r\u012bjumi vien\u0101 netipisk\u0101 darba posm\u0101 neaizst\u0101j reprezentat\u012bvus datus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">3. P\u0101rr\u0113\u0137iniet nov\u0113roto roku darba laiku norm\u0101laj\u0101 laik\u0101<\/h2>\n\n\n<p>Katram elementam no sal\u012bdzin\u0101miem m\u0113r\u012bjumiem apr\u0113\u0137iniet reprezentat\u012bvu nov\u0113roto ilgumu, parasti to aritm\u0113tisko vid\u0113jo. Saglab\u0101jiet pamatojumu katra m\u0113r\u012bjuma izsl\u0113g\u0161anai. Ja nov\u0113rojumos darba temps at\u0161\u0137iras, pirms rezult\u0101tu apvieno\u0161anas p\u0101rr\u0113\u0137iniet attiec\u012bgos m\u0113r\u012bjumus norm\u0101laj\u0101 laik\u0101, nevis piem\u0113rojiet ar tiem nesaist\u012btu vid\u0113jo tempa nov\u0113rt\u0113jumu.<\/p>\n\n\n<p>Darba tempa nov\u0113rt\u0113jum\u0101 nov\u0113roto roku darba tempu sal\u012bdzina ar defin\u0113tu atskaites tempu. Ja izmanto skalu, kur\u0101 norm\u0101lais temps ir 100%, apr\u0113\u0137ins ir \u0161\u0101ds:<\/p>\n\n\n<p><strong>Norm\u0101lais roku darba laiks = nov\u0113rotais roku darba laiks \u00d7 darba tempa koeficients<\/strong><\/p>\n\n\n<p>Darba tempa nov\u0113rt\u0113jumam 110% atbilst koeficients 1,10. Tas noz\u012bm\u0113, ka nov\u0113rotais darbs veikts \u0101tr\u0101k par atskaites tempu, t\u0101p\u0113c norm\u0101lais laiks ir ilg\u0101ks par nov\u0113roto laiku. Nov\u0113rt\u0113jums zem 100% rada pret\u0113ju korekciju.<\/p>\n\n\n<p>Darba tempa nov\u0113rt\u0113jums nav procents, ko izv\u0113las, lai rezult\u0101ts sakristu ar veco normu ERP sist\u0113m\u0101. Tam vajadz\u012bgs apm\u0101c\u012bts v\u0113rt\u0113t\u0101js, konsekvents atskaites temps un v\u0113rt\u0113jums, kas veikts darba nov\u0113ro\u0161anas laik\u0101. Ja tempa nov\u0113rt\u0113jumu nevarat pamatot, saglab\u0101jiet rezult\u0101tu k\u0101 nov\u0113rojumu, nevis pasniedziet to k\u0101 norm\u0101lam tempam noteiktu normu.<\/p>\n\n\n<p>Piem\u0113rojiet tempa nov\u0113rt\u0113jumu attiec\u012bgajiem roku darba elementiem, nevis bez iz\u0161\u0137ir\u012bbas visam oper\u0101cijas ilgumam. Autom\u0101tisks tr\u012bs min\u016b\u0161u sild\u012b\u0161anas cikls nek\u013c\u016bst ilg\u0101ks t\u0101p\u0113c, ka darbinieks iekrau\u0161anu veicis ar 110% tempu. Ja temps da\u017e\u0101dos nov\u0113rojumos main\u0101s, saglab\u0101jiet katru laiku kop\u0101 ar attiec\u012bgo tempa nov\u0113rt\u0113jumu, lai apr\u0113\u0137ins atspogu\u013cotu faktiski nov\u0113roto.<\/p>\n\n\n<h2 class=\"wp-block-heading\">4. Pievienojiet laika pielaides ar skaidri noteiktu apr\u0113\u0137ina b\u0101zi<\/h2>\n\n\n<p>Norm\u0101lais darba laiks vien neaptver visas pamatot\u0101s laika vajadz\u012bbas darba dien\u0101. Atbilsto\u0161i j\u0101\u0146em v\u0113r\u0101 personisk\u0101s vajadz\u012bbas, atp\u016bta p\u0113c darba slodzes un attiec\u012bgie nenov\u0113r\u0161amie aizkav\u0113jumi.<\/p>\n\n\n<p>Nosakiet \u0161\u012bs laika pielaides, \u0146emot v\u0113r\u0101 darba apst\u0101k\u013cus, izmantoto darba laika m\u0113r\u012b\u0161anas metodi un datus par attiec\u012bgaj\u0101m darb\u012bb\u0101m vai p\u0101rtraukumiem. Pla\u0161\u0101ki nov\u0113rojumi vai momentnov\u0113rojumu metode var pal\u012bdz\u0113t noteikt atk\u0101rtotu pal\u012bgdarbu un aizkav\u0113jumu laiku; atp\u016btas vajadz\u012bbas j\u0101izv\u0113rt\u0113 p\u0113c darba un t\u0101 apst\u0101k\u013ciem. No citas r\u016bpn\u012bcas p\u0101r\u0146emts procents \u0161\u0101du izv\u0113rt\u0113jumu neaizst\u0101j.<\/p>\n\n\n<p>Neaizmirstiet nepiecie\u0161amos periodiskos darbus. Ja regul\u0101ra tvertnes nomai\u0146a jau ir iek\u013cauta k\u0101 darba elements, neieskaitiet to v\u0113lreiz visp\u0101r\u0113j\u0101 aizkav\u0113jumu pielaid\u0113. T\u0101pat nep\u0101rv\u0113rtiet katru nov\u0113r\u0161amu boj\u0101jumu vai materi\u0101lu gaid\u012b\u0161anu par past\u0101v\u012bgu veicam\u0101 darba da\u013cu. Re\u0123istr\u0113jiet \u0161os laika zudumus, lai var\u0113tu nov\u0113rst to c\u0113lo\u0146us, un skaidri nosakiet, k\u0101 tos \u0146em v\u0113r\u0101 pl\u0101no\u0161an\u0101.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Apr\u0113\u0137ina piem\u0113rs: no nov\u0113rojumiem l\u012bdz laika normai<\/h3>\n\n\n<p>Iedom\u0101simies stabilu manu\u0101l\u0101s mont\u0101\u017eas oper\u0101ciju. T\u0101l\u0101k nor\u0101d\u012btie skait\u013ci ilustr\u0113 apr\u0113\u0137inu; tempa nov\u0113rt\u0113jums un laika pielaide nav ieteikumi j\u016bsu r\u016bpn\u012bcai. Pie\u0146emsim, ka uzskait\u012btie elementi tiek veikti sec\u012bgi, katrs vienu reizi katram mont\u0113jamajam izstr\u0101d\u0101jumam, un speci\u0101lists ir pamatojis nov\u0113rot\u0101 roku darba tempa nov\u0113rt\u0113jumu 110%.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Roku darba elements<\/th><th>Izv\u0113l\u0113tais nov\u0113rotais laiks<\/th><th>Darba tempa koeficients<\/th><th>Norm\u0101lais laiks<\/th><\/tr><\/thead><tbody><tr><td>Korpusa ievieto\u0161ana<\/td><td>30 sekundes<\/td><td>1,10<\/td><td>33 sekundes<\/td><\/tr><tr><td>Mezgla sastiprin\u0101\u0161ana<\/td><td>40 sekundes<\/td><td>1,10<\/td><td>44 sekundes<\/td><\/tr><tr><td>P\u0101rbaude un ievieto\u0161ana papl\u0101t\u0113<\/td><td>20 sekundes<\/td><td>1,10<\/td><td>22 sekundes<\/td><\/tr><tr><td>Katr\u0101 cikl\u0101 atk\u0101rtotais darbs kop\u0101<\/td><td>90 sekundes<\/td><td><\/td><td>99 sekundes<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Turkl\u0101t p\u0113c katriem 20 samont\u0113tiem izstr\u0101d\u0101jumiem j\u0101nomaina konteiners. \u0160im darbam atsevi\u0161\u0137i noteiktais norm\u0101lais laiks ir 60 sekundes, t\u0101tad uz vienu izstr\u0101d\u0101jumu attiecin\u0101mas 60 \u00f7 20 = 3 sekundes. Kop\u0113jais norm\u0101lais laiks t\u0101d\u0113j\u0101di ir <strong>102 sekundes uz vienu izstr\u0101d\u0101jumu<\/strong>.<\/p>\n\n\n<p>Tagad pie\u0146emsim, ka izp\u0113t\u0113 noteikta laika pielaide 15% apm\u0113r\u0101 no norm\u0101l\u0101 laika:<\/p>\n\n\n<p><strong>Laika norma = norm\u0101lais laiks \u00d7 (1 + laika pielaide)<\/strong><\/p>\n\n\n<p>102 \u00d7 1,15 = <strong>117,3 sekundes uz vienu izstr\u0101d\u0101jumu<\/strong>.<\/p>\n\n\n<p>Svar\u012bgi, kas ir sauc\u0113j\u0101. Ja laika pielaide izteikta k\u0101 15% no kop\u0113j\u0101s laika normas, izmantojiet \u0161\u0101du formulu:<\/p>\n\n\n<p><strong>Laika norma = norm\u0101lais laiks \u00f7 (1 \u2212 laika pielaide)<\/strong><\/p>\n\n\n<p>102 \u00f7 0,85 = <strong>120 sekundes uz vienu izstr\u0101d\u0101jumu<\/strong>.<\/p>\n\n\n<p>Rezult\u0101ti at\u0161\u0137iras, jo \u201c15%\u201d \u0161eit apz\u012bm\u0113 divas da\u017e\u0101das attiec\u012bbas. Dokument\u0113jiet, uz k\u0101das b\u0101zes apr\u0113\u0137in\u0101ta j\u016bsu laika norma. Pl\u0101not\u0101jam, kur\u0161 to izmantos v\u0113l\u0101k, nevajadz\u0113tu \u0161o b\u0101zi izsecin\u0101t no galarezult\u0101ta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">5. P\u0101rbaudiet un ieviesiet laika normu, ko var\u0113siet uztur\u0113t aktu\u0101lu<\/h2>\n\n\n<p>Pirms aizst\u0101jat pa\u0161reiz\u0113jo laika normu, p\u0101rbaudiet rezult\u0101tu turpm\u0101k\u0101 ra\u017eo\u0161an\u0101, izmantojot to pa\u0161u metodi t\u0101dos pa\u0161os apst\u0101k\u013cos. Sal\u012bdziniet l\u012bdzv\u0113rt\u012bgus daudzumus un vien\u0101di norobe\u017eotus laika interv\u0101lus, ietverot norm\u0101 paredz\u0113tos periodiskos darbus un laika pielaides. Tas, ka viens cikls pabeigts \u0101tr\u0101k par normu, kur\u0101 iek\u013cautas pielaides, nav pier\u0101d\u012bjums, ka pielaides j\u0101atce\u013c.<\/p>\n\n\n<p>Neizskaidrot\u0101s at\u0161\u0137ir\u012bbas p\u0101rrun\u0101jiet ar operatoru un par metodi atbild\u012bgo personu. Ja rezult\u0101ts nav der\u012bgs, jo izlaists b\u016btisks darba elements, labojiet izp\u0113ti. Ja metode at\u0161\u0137iras, defin\u0113jiet t\u0101s variantus. Nevajag vienk\u0101r\u0161i palielin\u0101t laika normu, l\u012bdz taj\u0101 iek\u013caujas visi agr\u0101k re\u0123istr\u0113tie laiki.<\/p>\n\n\n<p>Saglab\u0101jiet izsekojamu dokument\u0101ciju, kur\u0101 nor\u0101d\u012bts:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Produkts, oper\u0101cija, metodes redakcija un resursu izmanto\u0161anas apst\u0101k\u013ci, uz kuriem norma attiecas.<\/li><li>S\u0101kotn\u0113jie nov\u0113rojumi, darba elementu izpildes bie\u017eums un iz\u0146\u0113mumu uzskaites k\u0101rt\u012bba.<\/li><li>Darba tempa nov\u0113rt\u0113\u0161anas pieeja, nov\u0113rt\u0113jums un norm\u0101l\u0101 laika apr\u0113\u0137ins.<\/li><li>Laika pielai\u017eu kategorijas, pamatojums, apr\u0113\u0137ina sauc\u0113js un ieg\u016bt\u0101 laika norma.<\/li><li>P\u0101rbaudes rezult\u0101ts, atbild\u012bgais p\u0101rbaud\u012bt\u0101js, sp\u0113k\u0101 st\u0101\u0161an\u0101s datums un p\u0101rskat\u012b\u0161anas nosac\u012bjumi.<\/li><\/ul>\n\n\n<p>Ieviesiet laika normu atbilsto\u0161i k\u0101rt\u012bbai, k\u0101d\u0101 j\u016bsu uz\u0146\u0113mum\u0101 ra\u017eo\u0161anas in\u017eenieri apstiprina normas. Apstiprin\u0101jums apliecina, ka normas pamatojums un piem\u0113ro\u0161anas joma ir atbilsto\u0161i t\u0101s izmanto\u0161anai; tas neaizst\u0101j m\u0113r\u012bjumus ar vieno\u0161an\u0101s ce\u013c\u0101 ieg\u016btu skaitli.<\/p>\n\n\n<p>P\u0101rskatiet laika normu, ja main\u0101s instrumenti un pal\u012bgier\u012bces, materi\u0101ls, konstrukcija, p\u0101rbaudes pras\u012bbas vai darba metode, k\u0101 ar\u012b tad, ja sal\u012bdzin\u0101mi faktiskie dati uzr\u0101da past\u0101v\u012bgu, neizskaidrotu at\u0161\u0137ir\u012bbu. Saglab\u0101jiet iepriek\u0161\u0113jo versiju, lai var\u0113tu at\u0161\u0137irt patiesu metodes uzlabojumu no izmai\u0146\u0101m laika uzskait\u0113.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izmantojiet laika normu, lai pareizi noteiktu resursu noslodzi<\/h2>\n\n\n<p>Pirms ievad\u0101t rezult\u0101tu pl\u0101no\u0161anas model\u012b, pajaut\u0101jiet: <strong>kura resursa aiz\u0146emt\u012bbu raksturo \u0161is laiks?<\/strong><\/p>\n\n\n<p>Piem\u0113r\u0101, kur viss darbs tiek veikts manu\u0101li, laika norma raksturo mont\u0101\u017eas darbu vien\u0101 darba viet\u0101. Meh\u0101nisk\u0101s apstr\u0101des oper\u0101cij\u0101 operatora darbs, iek\u0101rtas autom\u0101tisk\u0101 darb\u012bba un p\u0101rbaude var norit\u0113t vienlaikus. Saskaitot visus \u0161os laikus, iek\u0101rtas aiz\u0146emt\u012bbas ilgums tiktu p\u0101rv\u0113rt\u0113ts. Savuk\u0101rt, \u0146emot v\u0113r\u0101 tikai grie\u0161anas laiku, var\u0113tu palikt neieskait\u012bta sagataves ievieto\u0161ana, kuras laik\u0101 n\u0101kamo ciklu v\u0113l nevar s\u0101kt.<\/p>\n\n\n<p>Ja darb\u012bbu p\u0101rkl\u0101\u0161an\u0101s ir b\u016btiska, att\u0113lojiet operatora un iek\u0101rtas darb\u012bbas paral\u0113l\u0101s laika josl\u0101s. Nosakiet, kad katrs resurss ir aiz\u0146emts un vai autom\u0101tisk\u0101s darb\u012bbas laik\u0101 operators tie\u0161\u0101m var veikt citu ra\u017eo\u0161anas uzdevumu. Nepie\u0146emiet, ka iek\u0101rtas darb\u012bba bez uzraudz\u012bbas noz\u012bm\u0113 neierobe\u017eotu operatora pieejam\u012bbu.<\/p>\n\n\n<p>Saska\u0146ojiet ar\u012b laika pielaides ar resursa kalend\u0101ru. P\u0101rtraukumam, kas jau atskait\u012bts no pieejam\u0101 darba laika, nevajadz\u0113tu otrreiz samazin\u0101t jaudu, palielinot ilgumu ar pielaidi par to pa\u0161u p\u0101rtraukumu. Saglab\u0101jiet izp\u0113t\u0113 noteikto laika normu, bet dokument\u0113jiet, k\u0101 t\u0101s sast\u0101vda\u013cas tiek izmantotas pl\u0101not\u0101 ilguma un pieejam\u0101s jaudas apr\u0113\u0137in\u0101.<\/p>\n\n\n<p>Lai apr\u0113\u0137in\u0101tu laiku uz vienu deta\u013cu un da\u017e\u0101diem pas\u016bt\u012bjumu apjomiem atsevi\u0161\u0137i \u0146emtu v\u0113r\u0101 iestat\u012b\u0161anas laiku, izmantojiet m\u016bsu <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/razosanas-cikla-laiks\/\">ra\u017eo\u0161anas cikla laika ce\u013cvedi<\/a>. \u0160eit vispirms j\u0101atbild uz citu jaut\u0101jumu: vai apr\u0113\u0137ina pamat\u0101 eso\u0161\u0101 laika norma visp\u0101r atbilst defin\u0113tajam darbam.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izmantojiet prec\u012bz\u0101kus ilgumus pl\u0101no\u0161an\u0101 ar SkyPlanner<\/h2>\n\n\n<p>Kori\u0123\u0113ts ilgums ietekm\u0113 ne tikai izp\u0113t\u012bto oper\u0101ciju. Tas maina to, cik daudz laika tai j\u0101atv\u0113l iek\u0101rtas darbu rind\u0101, kad var s\u0101kt n\u0101kamos darbus un k\u0101 citi pas\u016bt\u012bjumi konkur\u0113 par to pa\u0161u jaudu. Vienas pamatdatu v\u0113rt\u012bbas atjaunin\u0101\u0161ana ir tikai \u0161\u0101 pl\u0101no\u0161anas darba s\u0101kums.<\/p>\n\n\n<p>SkyPlanner \u013cauj defin\u0113t procesa posmu ilgumu, iestat\u012b\u0161anas un demont\u0101\u017eas laiku, piem\u0113rot\u0101s darba vietas un savstarp\u0113j\u0101s atkar\u012bbas. T\u0101 pl\u0101no\u0161anas m\u0101ksl\u012bgais intelekts Arcturus <a href=\"https:\/\/skyplanner.ai\/lv\/resursi\/kas-ir-razosanas-planosana\/\">apr\u0113\u0137ina ra\u017eo\u0161anas grafiku<\/a> atbilsto\u0161i j\u016bsu konfigur\u0113tajiem resursiem un priorit\u0101t\u0113m, un rezult\u0101ts ir redzams Gantt skat\u0101. Varat izv\u0113rt\u0113t re\u0101listisk\u0101ku ilgumu ietekmi uz visiem neizpild\u012btajiem pas\u016bt\u012bjumiem, nevis manu\u0101li p\u0101rk\u0101rtot katru skarto darbu rindu. J\u016bs nosak\u0101t priorit\u0101tes un nostiprin\u0101t l\u0113mumus ar noteikumiem un blo\u0137\u0113jumiem.<\/p>\n\n\n<p>SkyPlanner r\u012bki Timer un ShopFloor \u013cauj re\u0123istr\u0113t laiku un daudzumus, nodro\u0161inot faktiskos ra\u017eo\u0161anas datus turpm\u0101k\u0101m p\u0101rbaud\u0113m. SkyPlanner pied\u0101v\u0101 ar\u012b procesa posmu ilguma prognoz\u0113\u0161anu, balstoties uz v\u0113sturiskajiem laika uzskaites datiem. Tas pal\u012bdz pl\u0101no\u0161anas apl\u0113ses sasaist\u012bt ar praktisko pieredzi. Darba laika izp\u0113te nosaka, cik laika defin\u0113tajam darbam vajadz\u0113tu pras\u012bt norm\u0101l\u0101 temp\u0101, savuk\u0101rt prognoze p\u0113c v\u0113sturiskajiem datiem pal\u012bdz apl\u0113st ilgumu, pamatojoties uz re\u0123istr\u0113to ra\u017eo\u0161anas norisi. Izv\u0113loties ievaddatus, \u0161os m\u0113r\u0137us no\u0161\u0137iriet.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/klientu-stasti\/mamec\/\">Mamec pieredze<\/a> par\u0101da, k\u0101p\u0113c ir svar\u012bga saska\u0146ota grafiku sast\u0101d\u012b\u0161ana. \u0160im Somijas ra\u017eot\u0101jam bija t\u016bksto\u0161iem savstarp\u0113ji atkar\u012bgu darba uzdevumu, kuru priorit\u0101tes noteica p\u0113c pieg\u0101des datumiem pap\u012bra pas\u016bt\u012bjumos. SkyPlanner tika integr\u0113ts ar uz\u0146\u0113muma Oscar ERP un k\u013cuva par galveno ra\u017eo\u0161anas pl\u0101no\u0161anas platformu. Mamec zi\u0146o par kop\u012bgu ra\u017eo\u0161anas p\u0101rskatu re\u0101llaik\u0101 un iev\u0113rojami maz\u0101ku pl\u0101no\u0161anas darba slodzi. \u0160\u012b pieredze par\u0101da, k\u0101du v\u0113rt\u012bbu sniedz visa pl\u0101na p\u0101rvald\u012bba, nevis katras darbu rindas atst\u0101\u0161ana atsevi\u0161\u0137u manu\u0101lu l\u0113mumu zi\u0146\u0101.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, kad prec\u012bz\u0101ki oper\u0101ciju laiki j\u0101p\u0101rv\u0113r\u0161 lab\u0101k\u0101 ra\u017eo\u0161anas grafik\u0101.<\/strong> Izmantojot atv\u0113rto REST API, tas integr\u0113jas ar jebkuru ERP vai MES, t\u0101p\u0113c varat saglab\u0101t eso\u0161\u0101s sist\u0113mas un izmantot re\u0101listiskus ilgumus ierobe\u017eotas jaudas pl\u0101no\u0161an\u0101.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Piesakiet SkyPlanner demonstr\u0101ciju<\/a> un sagatavojiet vienas oper\u0101cijas pa\u0161reiz\u0113jo laika normu, t\u0101s izp\u0113tes dokument\u0101ciju, jaun\u0101kos faktiskos datus un tipisku pas\u016bt\u012bjuma ra\u017eo\u0161anas mar\u0161rutu. Tas dos konkr\u0113tu s\u0101kumpunktu, lai apskat\u012btu, k\u0101 pamatots laiks var uzlabot pl\u0101nu, p\u0113c kura str\u0101d\u0101 j\u016bsu cehs. Ja vispirms v\u0113laties sist\u0113mu izp\u0113t\u012bt pa\u0161i, <a href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">izm\u0113\u0123iniet SkyPlanner ar demonstr\u0101cijas datiem<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu S\u0101kums &raquo; Resursi &raquo; Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu Veicot darba laika norm\u0113\u0161anu ra\u017eo\u0161an\u0101, m\u0113ra konkr\u0113ti defin\u0113tu darbu, lai noteiktu, cik daudz laika t\u0101 izpildei vajadz\u0113tu aiz\u0146emt nor\u0101d\u012btajos apst\u0101k\u013cos. Veicot tie\u0161u hronometr\u0101\u017eu, darbu sadala elementos, nov\u0113ro to ilgumu, attiec\u012bgajos gad\u012bjumos \u0146em v\u0113r\u0101 norm\u0101lo darba &#8230; <a title=\"Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/\" aria-label=\"Read more about Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":101453,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2559,317],"tags":[],"class_list":["post-101431","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-razosanas-efektivitate","category-resursi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: izmantojama laika norma<\/title>\n<meta name=\"description\" content=\"Aizst\u0101jiet p\u0101rmantot\u0101s apl\u0113ses ar pamatotu laika normu. Apg\u016bstiet darba izp\u0113ti, tempa nov\u0113rt\u0113\u0161anu un laika pielaides, pl\u0101nojiet ar SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu\" \/>\n<meta property=\"og:description\" content=\"Aizst\u0101jiet p\u0101rmantot\u0101s apl\u0113ses ar pamatotu laika normu. Apg\u016bstiet darba izp\u0113ti, tempa nov\u0113rt\u0113\u0161anu un laika pielaides, pl\u0101nojiet ar SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-17T17:00:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-17T17:01:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/darba-laika-normesana\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/darba-laika-normesana\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu\",\"datePublished\":\"2026-10-17T17:00:34+00:00\",\"dateModified\":\"2026-10-17T17:01:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/darba-laika-normesana\\\/\"},\"wordCount\":3209,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/darba-laika-normesana\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"articleSection\":[\"Ra\u017eo\u0161anas efektivit\u0101te\",\"resursi\"],\"inLanguage\":\"lv-LV\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/darba-laika-normesana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/darba-laika-normesana\\\/\",\"name\":\"Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: izmantojama laika norma\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/darba-laika-normesana\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/darba-laika-normesana\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"datePublished\":\"2026-10-17T17:00:34+00:00\",\"dateModified\":\"2026-10-17T17:01:20+00:00\",\"description\":\"Aizst\u0101jiet p\u0101rmantot\u0101s apl\u0113ses ar pamatotu laika normu. Apg\u016bstiet darba izp\u0113ti, tempa nov\u0113rt\u0113\u0161anu un laika pielaides, pl\u0101nojiet ar SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/darba-laika-normesana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/darba-laika-normesana\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/darba-laika-normesana\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Manual assembly in a fixture beside a stopwatch and observation records for a manufacturing time study.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/resursi\\\/darba-laika-normesana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: izmantojama laika norma","description":"Aizst\u0101jiet p\u0101rmantot\u0101s apl\u0113ses ar pamatotu laika normu. Apg\u016bstiet darba izp\u0113ti, tempa nov\u0113rt\u0113\u0161anu un laika pielaides, pl\u0101nojiet ar SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/","og_locale":"lv_LV","og_type":"article","og_title":"Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu","og_description":"Aizst\u0101jiet p\u0101rmantot\u0101s apl\u0113ses ar pamatotu laika normu. Apg\u016bstiet darba izp\u0113ti, tempa nov\u0113rt\u0113\u0161anu un laika pielaides, pl\u0101nojiet ar SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-17T17:00:34+00:00","article_modified_time":"2026-10-17T17:01:20+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu","datePublished":"2026-10-17T17:00:34+00:00","dateModified":"2026-10-17T17:01:20+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/"},"wordCount":3209,"publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","articleSection":["Ra\u017eo\u0161anas efektivit\u0101te","resursi"],"inLanguage":"lv-LV"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/","url":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/","name":"Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: izmantojama laika norma","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","datePublished":"2026-10-17T17:00:34+00:00","dateModified":"2026-10-17T17:01:20+00:00","description":"Aizst\u0101jiet p\u0101rmantot\u0101s apl\u0113ses ar pamatotu laika normu. Apg\u016bstiet darba izp\u0113ti, tempa nov\u0113rt\u0113\u0161anu un laika pielaides, pl\u0101nojiet ar SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","width":1672,"height":941,"caption":"Manual assembly in a fixture beside a stopwatch and observation records for a manufacturing time study."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/resursi\/darba-laika-normesana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu S\u0101kums &raquo; Resursi &raquo; Darba laika norm\u0113\u0161ana ra\u017eo\u0161an\u0101: nosakiet izmantojamu laika normu Veicot darba laika norm\u0113\u0161anu ra\u017eo\u0161an\u0101, m\u0113ra konkr\u0113ti defin\u0113tu darbu, lai noteiktu, cik daudz laika t\u0101 izpildei vajadz\u0113tu aiz\u0146emt nor\u0101d\u012btajos apst\u0101k\u013cos. Veicot tie\u0161u hronometr\u0101\u017eu, darbu sadala elementos, nov\u0113ro to ilgumu, attiec\u012bgajos gad\u012bjumos \u0146em v\u0113r\u0101 norm\u0101lo darba&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/101431","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101431"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/101431\/revisions"}],"predecessor-version":[{"id":101494,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts\/101431\/revisions\/101494"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/101453"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101431"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories?post=101431"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags?post=101431"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}