{"id":35906,"date":"2024-07-02T08:10:29","date_gmt":"2024-07-02T08:10:29","guid":{"rendered":"https:\/\/skyplanner.ai\/par-mums\/"},"modified":"2026-09-22T11:33:06","modified_gmt":"2026-09-22T11:33:06","slug":"par-mums","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/par-mums\/","title":{"rendered":"Par mums"},"content":{"rendered":"\n<div class=\"wp-block-group sp-about-v2 sp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<!-- ============================================================= 1. HERO -->\n<section class=\"v3-hero v3-lanes\" data-screen-label=\"Hero\">\n  <div class=\"v3-wrap\">\n    <div class=\"v3-hero__top\">\n\n      \n      <p class=\"v3-kick\">Par SkyPlanner<\/p>\n      \n      \n      <h1 class=\"wp-block-heading\">MI ra\u017eo\u0161anas pl\u0101no\u0161ana no <span class=\"u-amber\">Skycode Oy<\/span><\/h1>\n      \n      \n      <p class=\"sub\">SkyPlanner APS pal\u012bdz ra\u017eot\u0101jiem aizst\u0101t manu\u0101lo pl\u0101no\u0161anu un izkl\u0101jlapas ar cilv\u0113ka vad\u012btu MI grafiku pl\u0101no\u0161anu. Pl\u0101not\u0101ji nosaka m\u0113r\u0137us, ierobe\u017eojumus un priorit\u0101tes; SkyPlanner apr\u0113\u0137ina un nep\u0101rtraukti atjaunina pl\u0101nu, izmantojot aktu\u0101los ERP un MES datus. Ra\u017eot\u0101ji vis\u0101 pasaul\u0113 vada savu ra\u017eo\u0161anu ar SkyPlanner, sa\u0146emot atbalstu sav\u0101 valod\u0101 un laika josl\u0101.<\/p>\n      \n\n      <div class=\"v3-hero__cta\">\n\n        \n        <div class=\"wp-block-button\"><a class=\"wp-element-button wp-block-button__link sp-btn sp-btn--green sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n        \n        \n        <div class=\"wp-block-button\"><a class=\"wp-element-button wp-block-button__link sp-btn sp-btn--blue sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Rezerv\u0113t demonstr\u0101ciju<\/a><\/div>\n        \n        \n        <div class=\"wp-block-button\"><a class=\"wp-element-button wp-block-button__link sp-btn sp-btn--text\" href=\"https:\/\/skyplanner.ai\/lv\/funkcijas\/\">Skat\u012bt produkta funkcijas \u2192<\/a><\/div>\n        \n\n      <\/div>\n    <\/div>\n    <div class=\"v3-hero__media\">\n      <div class=\"v3-hero__frame v3-hero__frame--video\">\n        <div class=\"sp-lazy-video\" data-video-720=\"\/wp-content\/themes\/generatepress-child\/assets\/video\/about-us-v2\/skyplanner-team-office-720p.mp4\" data-video-1080=\"\/wp-content\/themes\/generatepress-child\/assets\/video\/about-us-v2\/skyplanner-team-office-1080p.mp4\">\n          <picture>\n            <source srcset=\"\/wp-content\/themes\/generatepress-child\/assets\/video\/about-us-v2\/skyplanner-team-office-poster.webp\" type=\"image\/webp\">\n            <img src=\"\/wp-content\/themes\/generatepress-child\/assets\/video\/about-us-v2\/skyplanner-team-office-poster.jpg\" width=\"1600\" height=\"900\" alt=\"SkyPlanner komanda str\u0101d\u0101 kop\u0101 Skycode biroj\u0101\" decoding=\"async\">\n          <\/picture>\n          <button class=\"sp-lazy-video__play\" type=\"button\" aria-label=\"Atska\u0146ot SkyPlanner komandas un biroja video\">\n            <span class=\"sp-lazy-video__icon\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\"><path d=\"M8 5v14l11-7z\"><\/path><\/svg><\/span>\n            <span class=\"sp-lazy-video__label\">Atska\u0146ot video<\/span>\n          <\/button>\n        <\/div>\n      <\/div>\n    <\/div>\n\n    <dl class=\"v3-entity\" aria-label=\"Uz\u0146\u0113muma juridiskie fakti\">\n\n      <div class=\"v3-entity__cell\">\n        \n        <p class=\"v3-entity__k\">Juridisk\u0101 persona<\/p>\n        \n        \n        <p class=\"v3-entity__v\">Skycode Oy<\/p>\n        \n      <\/div>\n      <div class=\"v3-entity__cell\">\n        \n        <p class=\"v3-entity__k\">Galven\u0101 m\u012btne<\/p>\n        \n        \n        <p class=\"v3-entity__v\">V\u0101sa, Somija<\/p>\n        \n      <\/div>\n      <div class=\"v3-entity__cell\">\n        \n        <p class=\"v3-entity__k\">Dibin\u0101ts<\/p>\n        \n        \n        <p class=\"v3-entity__v\"><span class=\"v3-translation-context\">Dibin\u0101ts: 1997<\/span><span aria-hidden=\"true\">1997<\/span><\/p>\n        \n      <\/div>\n      <div class=\"v3-entity__cell\">\n        \n        <p class=\"v3-entity__k\">SkyPlanner kop\u0161<\/p>\n        \n        \n        <p class=\"v3-entity__v\"><span class=\"v3-translation-context\">SkyPlanner kop\u0161: 2016<\/span><span aria-hidden=\"true\">2016<\/span><\/p>\n        \n      <\/div>\n      <div class=\"v3-entity__cell\">\n        \n        <p class=\"v3-entity__k\">Sasniedzam\u012bba<\/p>\n        \n        \n        <p class=\"v3-entity__v\">Vispasaules t\u012bkls<\/p>\n        \n      <\/div>\n\n    <\/dl>\n  <\/div>\n<\/section>\n\n<!-- ============================================================= 2. IN BRIEF (paper) -->\n<section class=\"v3-sec v3-sec--paper\" data-screen-label=\"SkyPlanner in brief\">\n  <div class=\"v3-wrap\">\n    <div class=\"v3-brief\">\n      <div>\n\n        \n        <p class=\"v3-kick\">SkyPlanner \u012bsum\u0101<\/p>\n        \n        \n        <h2 class=\"wp-block-heading v3-h2\">Fakti \u012bsum\u0101<\/h2>\n        \n        \n        <p class=\"v3-lead\" style=\"margin-top:18px\">\u012asa uzzi\u0146a pirc\u0113jiem, partneriem, iepirkumu speci\u0101listiem un p\u0113tniekiem \u2014 kas ir SkyPlanner, kas to izstr\u0101d\u0101 un k\u0101 tas iek\u013caujas j\u016bsu tehnolo\u0123iju kop\u0101.<\/p>\n        \n\n      <\/div>\n      <dl class=\"v3-facts\">\n\n        <div class=\"v3-facts__row\">\n          \n          <p class=\"v3-facts__k\">Produkts<\/p>\n          \n          \n          <p class=\"v3-facts__v\">SkyPlanner APS<\/p>\n          \n        <\/div>\n        <div class=\"v3-facts__row\">\n          \n          <p class=\"v3-facts__k\">Kategorija<\/p>\n          \n          \n          <p class=\"v3-facts__v\">MI atbalst\u012bta ra\u017eo\u0161anas grafiku pl\u0101no\u0161ana \u00b7 uzlabot\u0101 pl\u0101no\u0161ana &amp; grafiku sast\u0101d\u012b\u0161ana<\/p>\n          \n        <\/div>\n        <div class=\"v3-facts__row\">\n          \n          <p class=\"v3-facts__k\">Juridiskais uz\u0146\u0113mums<\/p>\n          \n          \n          <p class=\"v3-facts__v\">Skycode Oy<\/p>\n          \n        <\/div>\n        <div class=\"v3-facts__row\">\n          \n          <p class=\"v3-facts__k\">Galven\u0101 m\u012btne<\/p>\n          \n          \n          <p class=\"v3-facts__v\">Vaasa, Somija<\/p>\n          \n        <\/div>\n        <div class=\"v3-facts__row\">\n          \n          <p class=\"v3-facts__k\">Dibin\u0101ts<\/p>\n          \n          \n          <p class=\"v3-facts__v\">1997 \u2014 SkyPlanner s\u0101ka darb\u012bbu 2016<\/p>\n          \n        <\/div>\n        <div class=\"v3-facts__row\">\n          \n          <p class=\"v3-facts__k\">Paredz\u0113ts<\/p>\n          \n          \n          <p class=\"v3-facts__v\"><a href=\"\/lv\/razosanas-grafiku-sastadisanas-programmatura-visu-lielumu\/\">Jebkura lieluma<\/a> ra\u017eo\u0161anas uz\u0146\u0113mumiem<\/p>\n          \n        <\/div>\n        <div class=\"v3-facts__row\">\n          \n          <p class=\"v3-facts__k\">Integr\u0113jas ar<\/p>\n          \n          \n          <p class=\"v3-facts__v\">ERP, MES &amp; citu programmat\u016bru, izmantojot REST API<\/p>\n          \n        <\/div>\n        <div class=\"v3-facts__row\">\n          \n          <p class=\"v3-facts__k\">Atbalsts<\/p>\n          \n          \n          <p class=\"v3-facts__v\">Dokument\u0101cija, video, t\u0113rz\u0113\u0161ana \/ e-pasts \/ t\u0101lrunis, ievie\u0161ana, partneri<\/p>\n          \n        <\/div>\n\n      <\/dl>\n    <\/div>\n  <\/div>\n<\/section>\n\n<!-- ============================================================= 3. PROBLEM (dark) -->\n<section class=\"v3-sec v3-sec--dark v3-lanes--dark\" data-screen-label=\"The problem\">\n  <div class=\"v3-wrap\">\n\n    \n    <p class=\"v3-kick\">Probl\u0113ma, ko ap\u0146\u0113m\u0101mies atrisin\u0101t<\/p>\n    \n    \n    <p class=\"v3-problem__quote\">Cilv\u0113ka smadzenes nekad nav biju\u0161as paredz\u0113tas t\u016bksto\u0161iem uzdevumu manu\u0101lai grafika pl\u0101no\u0161anai.<\/p>\n    \n    \n    <p class=\"v3-problem__cite\">Ra\u017eo\u0161anas pl\u0101not\u0101ji joproj\u0101m manu\u0101li koordin\u0113 simtiem vai t\u016bksto\u0161iem darbu, parasti izkl\u0101jlap\u0101s \u2014 un pl\u0101ns noveco br\u012bd\u012b, kad apst\u0101jas iek\u0101rta vai main\u0101s pas\u016bt\u012bjums.<\/p>\n    \n\n    <div class=\"v3-split2\">\n      <div class=\"v3-tile is-human\">\n\n        \n        <h3 class=\"wp-block-heading\">Nosakiet virzienu<\/h3>\n        \n        \n        <p class=\"v3-tile__lab\">Cilv\u0113ki<\/p>\n        \n        \n        <p>Cilv\u0113ki vislab\u0101k sp\u0113j pie\u0146emt pamatotus l\u0113mumus: defin\u0113t m\u0113r\u0137us, ierobe\u017eojumus, priorit\u0101tes un noteikumus, kas r\u016bpn\u012bcai j\u0101iev\u0113ro. Tas stingri paliek j\u016bsu pl\u0101not\u0101ju p\u0101rzi\u0146\u0101.<\/p>\n        \n\n      <\/div>\n      <div class=\"v3-tile is-ai\">\n\n        \n        <h3 class=\"wp-block-heading\">Veic apr\u0113\u0137inu<\/h3>\n        \n        \n        <p class=\"v3-tile__lab\">MI<\/p>\n        \n        \n        <p>SkyPlanner nep\u0101rtraukti apr\u0113\u0137ina \u012bstenojamu, gal\u012bgas kapacit\u0101tes grafiku no re\u0101llaika ra\u017eo\u0161anas datiem \u2014 un p\u0101rr\u0113\u0137ina to da\u017eu sekun\u017eu laik\u0101, kad realit\u0101te main\u0101s.<\/p>\n        \n\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n<!-- ============================================================= 4. PROOF -->\n<section class=\"v3-sec\" data-screen-label=\"Proof\">\n  <div class=\"v3-wrap\">\n    <div class=\"v3-proof v3-dots\">\n      <div class=\"v3-proof__card\" style=\"background:#fff\"><span class=\"v3-translation-context\">5000+ SkyPlanner instal\u0101cijas<\/span><div class=\"v3-proof__num\" aria-hidden=\"true\">5000+<\/div><div class=\"v3-proof__label\" aria-hidden=\"true\">SkyPlanner instal\u0101cijas<\/div><\/div>\n      <div class=\"v3-proof__card\" style=\"background:#fff\"><span class=\"v3-translation-context\">29 gadu pieredze programmat\u016bras un integr\u0101ciju jom\u0101<\/span><div class=\"v3-proof__num\" aria-hidden=\"true\">29<\/div><div class=\"v3-proof__label\" aria-hidden=\"true\">Gadi pieredzes programmat\u016bras un integr\u0101ciju jom\u0101<\/div><\/div>\n      <div class=\"v3-proof__card\" style=\"background:#fff\"><span class=\"v3-translation-context\">30+ valstis ar SkyPlanner t\u0101l\u0101kp\u0101rdev\u0113jiem<\/span><div class=\"v3-proof__num\" aria-hidden=\"true\">30+<\/div><div class=\"v3-proof__label\" aria-hidden=\"true\">valstis ar SkyPlanner t\u0101l\u0101kp\u0101rdev\u0113jiem<\/div><\/div>\n    <\/div>\n\n    \n    <p class=\"v3-updated\"><span class=\"dot\"><\/span> Instal\u0101ciju un t\u0101l\u0101kp\u0101rdev\u0113ju dati p\u0113d\u0113jo reizi atjaunin\u0101ti 2026. gada j\u016bnij\u0101<\/p>\n    \n\n  <\/div>\n<\/section>\n\n<!-- ============================================================= 5. TIMELINE -->\n<section class=\"v3-sec\" style=\"padding-top:0\" data-screen-label=\"Timeline\">\n  <div class=\"v3-wrap\">\n    <div class=\"v3-head is-center\">\n\n      \n      <p class=\"v3-kick\">No Skycode l\u012bdz SkyPlanner<\/p>\n      \n      \n      <h2 class=\"wp-block-heading v3-h2\">Tr\u012bs desmitgades r\u016bpniecisk\u0101s programmat\u016bras jom\u0101<\/h2>\n      \n\n    <\/div>\n    <div class=\"v3-tl-grid\">\n      <div class=\"v3-tl\"><div class=\"v3-tl__line\"><\/div><div class=\"v3-tl__dot\"><\/div>\n\n        \n        <p class=\"v3-tl__year\">1997<\/p>\n        \n        \n        <p class=\"v3-tl__title\">Skycode Oy dibin\u0101\u0161ana<\/p>\n        \n        \n        <p class=\"v3-tl__body\">Somijas programmat\u016bras uz\u0146\u0113mums s\u0101k darb\u012bbu V\u0101s\u0101, izstr\u0101d\u0101jot programmat\u016bru r\u016bpniec\u012bbai.<\/p>\n        \n\n      <\/div>\n      <div class=\"v3-tl\"><div class=\"v3-tl__line\"><\/div><div class=\"v3-tl__dot\"><\/div>\n\n        \n        <p class=\"v3-tl__year\">1997\u20132015<\/p>\n        \n        \n        <p class=\"v3-tl__title\">Piel\u0101gota r\u016bpniecisk\u0101 programmat\u016bra<\/p>\n        \n        \n        <p class=\"v3-tl__body\">Desmitgad\u0113m ilgs piel\u0101gotas ra\u017eo\u0161anas programmat\u016bras un ERP integr\u0101cijas darbs re\u0101l\u0101m r\u016bpn\u012bc\u0101m.<\/p>\n        \n\n      <\/div>\n      <div class=\"v3-tl\"><div class=\"v3-tl__line\"><\/div><div class=\"v3-tl__dot\"><\/div>\n\n        \n        <p class=\"v3-tl__year\">2016<\/p>\n        \n        \n        <p class=\"v3-tl__title\">SkyPlanner s\u0101kums<\/p>\n        \n        \n        <p class=\"v3-tl__body\">SkyPlanner APS izstr\u0101de s\u0101kas cie\u0161\u0101 sadarb\u012bb\u0101 ar ra\u017eo\u0161anas nozares klientiem.<\/p>\n        \n\n      <\/div>\n      <div class=\"v3-tl\"><div class=\"v3-tl__line\"><\/div><div class=\"v3-tl__dot\"><\/div>\n\n        \n        <p class=\"v3-tl__year\">\u0160odien<\/p>\n        \n        \n        <p class=\"v3-tl__title\">M\u0101ko\u0146balst\u012bta APS ar MI<\/p>\n        \n        \n        <p class=\"v3-tl__body\">M\u0101ko\u0146balst\u012bta APS platforma ar MI atbalst\u012btu grafiku sast\u0101d\u012b\u0161anu un glob\u0101lu atbalsta &amp; partneru t\u012bklu.<\/p>\n        \n\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n<!-- ============================================================= 6. DIFFERENTIATORS (paper) -->\n<section class=\"v3-sec v3-sec--paper\" data-screen-label=\"What makes us different\">\n  <div class=\"v3-wrap\">\n    <div class=\"v3-head\">\n\n      \n      <p class=\"v3-kick\">Kas m\u016bs at\u0161\u0137ir<\/p>\n      \n      \n      <h2 class=\"wp-block-heading v3-h2\">In\u017eeniertehnisks v\u0113rt\u0113jums, <span class=\"ink-amber\">nevis meln\u0101s kastes<\/span><\/h2>\n      \n\n    <\/div>\n    <div class=\"v3-diff\">\n\n      <div class=\"v3-diff__card\">\n        \n        <p class=\"v3-diff__idx\">01<\/p>\n        \n        \n        <h3 class=\"wp-block-heading\">Cilv\u0113ka vad\u012bts m\u0101ksl\u012bgais intelekts<\/h3>\n        \n        \n        <p>Pl\u0101not\u0101ji saglab\u0101 kontroli. M\u0101ksl\u012bgais intelekts pied\u0101v\u0101 un atjaunina ra\u017eo\u0161anas grafikus \u2014 j\u016bsu komanda apstiprina, maina un nosaka noteikumus.<\/p>\n        \n      <\/div>\n      <div class=\"v3-diff__card\">\n        \n        <p class=\"v3-diff__idx\">02<\/p>\n        \n        \n        <h3 class=\"wp-block-heading\">Izstr\u0101d\u0101ts re\u0101l\u0101m r\u016bpn\u012bc\u0101m<\/h3>\n        \n        \n        <p>Ierobe\u017eota kapacit\u0101te, p\u0101rstat\u012b\u0161anas, instrumenti, materi\u0101li un mai\u0146u noteikumi. SkyPlanner pl\u0101no, \u0146emot v\u0113r\u0101 ierobe\u017eojumus, kas faktiski past\u0101v j\u016bsu ra\u017eotn\u0113.<\/p>\n        \n      <\/div>\n      <div class=\"v3-diff__card\">\n        \n        <p class=\"v3-diff__idx\">03<\/p>\n        \n        \n        <h3 class=\"wp-block-heading\">Padzi\u013cin\u0101ta ERP\/MES pieredze<\/h3>\n        \n        \n        <p>Gadu desmitiem ilgs integr\u0101ciju darbs aiz moderna REST API. Klienti savieno SkyPlanner ar sist\u0113m\u0101m, kuras vi\u0146i jau izmanto.<\/p>\n        \n      <\/div>\n      <div class=\"v3-diff__card\">\n        \n        <p class=\"v3-diff__idx\">04<\/p>\n        \n        \n        <h3 class=\"wp-block-heading\">\u0100trs ce\u013c\u0161 uz v\u0113rt\u012bbu<\/h3>\n        \n        \n        <p>S\u0101ciet ar bezmaksas izm\u0113\u0123in\u0101jumu, m\u0101cieties no dokument\u0101cijas un video un pievienojiet atbalst\u012btu ievadapm\u0101c\u012bbu, kad v\u0113laties \u0101tr\u0101ku ievie\u0161anu.<\/p>\n        \n      <\/div>\n      <div class=\"v3-diff__card\"><p class=\"v3-diff__idx\">05<\/p><h3>Pakalpojumi, kad tie jums nepiecie\u0161ami<\/h3><p>Integr\u0101cijas, piel\u0101go\u0161ana un darbsemin\u0101ri ir pieejami \u2014 ar m\u016bsu ekspertu un starptautisk\u0101 partneru t\u012bkla starpniec\u012bbu.<\/p><\/div>\n      <div class=\"v3-diff__card\">\n        \n        <p class=\"v3-diff__idx\">06<\/p>\n        \n        \n        <h3 class=\"wp-block-heading\">J\u016bs nekad neesat vieni<\/h3>\n        \n        \n        <p>Augsti motiv\u0113ta komanda ar dzi\u013cu nozares pieredzi sniedz jums atbalstu j\u016bsu valod\u0101 un laika josl\u0101.<\/p>\n        \n      <\/div>\n\n    <\/div>\n  <\/div>\n<\/section>\n\n<!-- ============================================================= 7. TRUST -->\n<section class=\"v3-sec\" data-screen-label=\"Trust layer\">\n  <div class=\"v3-wrap\">\n    <div class=\"v3-head is-center\">\n\n      \n      <p class=\"v3-kick\">Klienti<\/p>\n      \n      \n      <h2 class=\"wp-block-heading v3-h2\">Ra\u017eot\u0101ju izlase, kas pl\u0101no ar SkyPlanner<\/h2>\n      \n      \n      <p class=\"v3-lead\" style=\"margin-top:18px\">Da\u017eas no 5,000+ instal\u0101cij\u0101m vis\u0101 pasaul\u0113 \u2014 no atsevi\u0161\u0137\u0101m ra\u017eotn\u0113m l\u012bdz <a href=\"\/lv\/razosanas-grafiku-programmatura-vairakam-razotnem\/\">vair\u0101ku r\u016bpn\u012bcu<\/a> darb\u012bb\u0101m.<\/p>\n      \n\n    <\/div>\n    <div class=\"v3-logos\">\n      <div class=\"v3-logo-cell\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/about-us-v2\/logo-kjh.png\" width=\"249\" height=\"145\" alt=\"KJH\" loading=\"lazy\" decoding=\"async\"><\/div>\n      <div class=\"v3-logo-cell\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/about-us-v2\/logo-dekotel.png\" width=\"613\" height=\"100\" alt=\"Dekotel\" loading=\"lazy\" decoding=\"async\"><\/div>\n      <div class=\"v3-logo-cell\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/about-us-v2\/logo-amphenol.svg\" width=\"583\" height=\"95\" alt=\"Amphenol\" loading=\"lazy\" decoding=\"async\"><\/div>\n      <div class=\"v3-logo-cell\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/about-us-v2\/logo-pisko.png\" width=\"125\" height=\"76\" alt=\"Pisko\" loading=\"lazy\" decoding=\"async\"><\/div>\n      <div class=\"v3-logo-cell\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/about-us-v2\/logo-mamec.png\" width=\"361\" height=\"71\" alt=\"Mamec\" loading=\"lazy\" decoding=\"async\"><\/div>\n      <div class=\"v3-logo-cell\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/about-us-v2\/logo-saajos.webp\" width=\"250\" height=\"250\" alt=\"Saajos\" loading=\"lazy\" decoding=\"async\"><\/div>\n      <div class=\"v3-logo-cell\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/about-us-v2\/logo-eskomatic.png\" width=\"570\" height=\"60\" alt=\"Eskomatic\" loading=\"lazy\" decoding=\"async\"><\/div>\n      <div class=\"v3-logo-cell\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/about-us-v2\/logo-kaskea.png\" width=\"526\" height=\"134\" alt=\"Kaskea\" loading=\"lazy\" decoding=\"async\"><\/div>\n      <div class=\"v3-logo-cell\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/about-us-v2\/logo-opes.png\" width=\"292\" height=\"197\" alt=\"Opes\" loading=\"lazy\" decoding=\"async\"><\/div>\n    <\/div>\n    <div class=\"v3-trust-links\">\n      <a class=\"v3-trust-link\" href=\"https:\/\/skyplanner.ai\/lv\/klientu-stasti\/\"><h4>Klientu pier\u0101d\u012bjumi <svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M7 17 17 7M9 7h8v8\"><\/path><\/svg><\/h4><p>K\u0101 ra\u017eot\u0101ji izmanto SkyPlanner ceh\u0101.<\/p><\/a>\n      <a class=\"v3-trust-link\" href=\"https:\/\/skyplanner.ai\/lv\/videoklipi\/\"><h4>Produkta resursi <svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M7 17 17 7M9 7h8v8\"><\/path><\/svg><\/h4><p>Izp\u0113tiet video, dokument\u0101ciju un produkta inform\u0101ciju.<\/p><\/a>\n      <a class=\"v3-trust-link\" href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\"><h4>Sazinieties ar m\u016bsu komandu <svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M7 17 17 7M9 7h8v8\"><\/path><\/svg><\/h4><p>P\u0101rskatiet pl\u0101no\u0161anas scen\u0101rijus, darbsemin\u0101rus un ievie\u0161anas iesp\u0113jas.<\/p><\/a>\n    <\/div>\n  <\/div>\n<\/section>\n\n<!-- ============================================================= 7b. RECOGNITION -->\n<section class=\"v3-sec v3-sec--paper\" data-screen-label=\"Recognition\">\n  <div class=\"v3-wrap\">\n    <div class=\"v3-award\">\n      <div>\n\n        \n        <p class=\"v3-kick\">Atzin\u012bba<\/p>\n        \n        \n        <h2 class=\"wp-block-heading v3-h2\">Somijas daudzsolo\u0161\u0101kais automatiz\u0101cijas uz\u0146\u0113mums \u2014 un skat\u012bt\u0101ju favor\u012bts<\/h2>\n        \n        \n        <p class=\"lead\">2021. gad\u0101 no 1,000 uz\u0146\u0113mumiem valsts m\u0113roga Kasvu Open izaugsmes konkurs\u0101 Skycode tika izv\u0113l\u0113ts par Somijas daudzsolo\u0161\u0101ko automatiz\u0101cijas uz\u0146\u0113mumu un ieguva kop\u0113jo skat\u012bt\u0101ju favor\u012bta balvu.<\/p>\n        \n\n        <div class=\"v3-award__tags\">\n\n          \n          <p class=\"v3-award__tag\">Kasvu Open 2021<\/p>\n          \n          \n          <p class=\"v3-award__tag\">Skat\u012bt\u0101ju favor\u012bts<\/p>\n          \n          \n          <p class=\"v3-award__tag\">Top 60 no 1,000 izaugsmes uz\u0146\u0113mumiem<\/p>\n          \n\n        <\/div>\n\n        \n        <div class=\"wp-block-button\"><a class=\"wp-element-button wp-block-button__link v3-award__link\" href=\"https:\/\/kasvuopen.co\/automaation-kasvupolku-lupaavimmat-kasvuyritykset-ovat-robotmation-ja-skycode\/\" target=\"_blank\" rel=\"noopener\">Lasiet ofici\u0101lo pazi\u0146ojumu \u2192<\/a><\/div>\n        \n\n      <\/div>\n      <div>\n        <div class=\"v3-award__media\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/about-us-v2\/kasvu-open-skycode.webp\" width=\"1600\" height=\"1200\" alt=\"Skycode sa\u0146em Kasvu Open 2021 skat\u012bt\u0101ju favor\u012bta balvu\" loading=\"lazy\" decoding=\"async\"><\/div>\n\n        \n        <p class=\"v3-award__cap\">Skycode Kasvu Open 2021 Karnevaali pas\u0101kum\u0101<\/p>\n        \n\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n<!-- ============================================================= 8. TEAM (non-identifying) -->\n<section class=\"v3-sec v3-sec--bluesurf\" data-screen-label=\"Team\">\n  <div class=\"v3-wrap\">\n    <div class=\"v3-team\">\n      <div class=\"v3-team__media\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/about-us-v2\/skyplanner-team-office.webp\" width=\"1800\" height=\"1200\" alt=\"SkyPlanner izstr\u0101d\u0101t\u0101ji darb\u0101 Vaasa biroj\u0101\" loading=\"lazy\" decoding=\"async\"><\/div>\n      <div class=\"v3-team__body\">\n\n        \n        <p class=\"v3-kick\">Komanda, kas ir SkyPlanner pamat\u0101<\/p>\n        \n        \n        <h2 class=\"wp-block-heading v3-h2\">Desmitgad\u0113m ilga pieredze ra\u017eo\u0161anas programmat\u016br\u0101<\/h2>\n        \n        \n        <p class=\"v3-lead\" style=\"margin-top:16px\">SkyPlanner izstr\u0101d\u0101 un atbalsta pieredz\u0113jusi programmat\u016bras komanda un starptautisks partneru t\u012bkls \u2014 t\u0101p\u0113c neatkar\u012bgi no t\u0101, kas jums nepiecie\u0161ams, aiz t\u0101 st\u0101v \u012bsti speci\u0101listi.<\/p>\n        \n\n        <ul class=\"v3-team__pts\">\n\n          <li><span class=\"n\">01<\/span><div>\n            \n            <p class=\"v3-team__pt-title\">Produkta &amp; MI izstr\u0101de<\/p>\n            \n            \n            <p class=\"v3-team__pt-body\">Cilv\u0113ki, kas veido pl\u0101no\u0161anas dzini un MI, kas p\u0101rv\u0113r\u0161 ra\u017eo\u0161anas ierobe\u017eojumus \u012bstenojamos pl\u0101nos.<\/p>\n            \n          <\/div><\/li>\n          <li><span class=\"n\">02<\/span><div>\n            \n            <p class=\"v3-team__pt-title\">Ievie\u0161ana &amp; integr\u0101cijas<\/p>\n            \n            \n            <p class=\"v3-team__pt-body\">Speci\u0101listi, kas savieno SkyPlanner ar j\u016bsu ERP un MES un nodro\u0161ina j\u016bsu datu pl\u016bsmu.<\/p>\n            \n          <\/div><\/li>\n          <li><span class=\"n\">03<\/span><div>\n            \n            <p class=\"v3-team__pt-title\">Atbalsts &amp; klientu pan\u0101kumi<\/p>\n            \n            \n            <p class=\"v3-team__pt-body\">Komanda un partneru t\u012bkls, kas sniedz jums atbalstu j\u016bsu valod\u0101 un laika josl\u0101.<\/p>\n            \n          <\/div><\/li>\n\n        <\/ul>\n\n        \n        <div class=\"wp-block-button\"><a class=\"wp-element-button wp-block-button__link sp-btn sp-btn--blue sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Run\u0101jiet ar m\u016bsu komandu \u2192<\/a><\/div>\n        \n\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n<!-- ============================================================= 9. RESPONSIBLE AI (paper) -->\n<section class=\"v3-sec v3-sec--paper\" data-screen-label=\"Responsible AI\">\n  <div class=\"v3-wrap\">\n    <div class=\"v3-rai\">\n      <div>\n\n        \n        <p class=\"v3-kick\">Atbild\u012bgs m\u0101ksl\u012bgais intelekts &amp; klienta kontrole<\/p>\n        \n        \n        <h2 class=\"wp-block-heading v3-h2\">MI, kas atbalsta pl\u0101not\u0101jus \u2014 tas neaizst\u0101j vi\u0146u spriestsp\u0113ju<\/h2>\n        \n        \n        <p style=\"margin-top:18px\">SkyPlanner MI str\u0101d\u0101 j\u016bsu ra\u017eo\u0161anas pl\u0101not\u0101ju lab\u0101, nevis otr\u0101di. Cilv\u0113ki nosaka priorit\u0101tes, ierobe\u017eojumus un m\u0113r\u0137us; MI apr\u0113\u0137ina grafikus no j\u016bsu ra\u017eo\u0161anas datiem un uztur tos aktu\u0101lus, mainoties apst\u0101k\u013ciem.<\/p>\n        \n        \n        <p>J\u016bs saglab\u0101jat kontroli p\u0101r noteikumiem, datiem un l\u0113mumiem. Kad jums nepiecie\u0161ama pal\u012bdz\u012bba saprast, k\u0101 pl\u0101ns tika izveidots, m\u016bsu komanda un dokument\u0101cija ir pieejama, lai to izskaidrotu.<\/p>\n        \n\n      <\/div>\n      <div class=\"v3-rai__panel\">\n        <ul>\n\n          <li><span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"3\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M5 12l4 4 10-10\"><\/path><\/svg><\/span><div>\n            \n            <p class=\"v3-list-title\">Izstr\u0101d\u0101ts t\u0101, lai cilv\u0113ks saglab\u0101tu kontroli<\/p>\n            \n            \n            <p class=\"v3-list-body\">Pl\u0101not\u0101ji nosaka m\u0113r\u0137us un ierobe\u017eojumus; MI apr\u0113\u0137ina, bet nekad nepie\u0146em l\u0113mumus bez uzraudz\u012bbas.<\/p>\n            \n          <\/div><\/li>\n          <li><span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"3\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M5 12l4 4 10-10\"><\/path><\/svg><\/span><div>\n            \n            <p class=\"v3-list-title\">Glob\u0101ls produkts, kas \u0146em v\u0113r\u0101 GDPR<\/p>\n            \n            \n            <p class=\"v3-list-body\">M\u0101ko\u0146b\u0101z\u0113ts un ra\u017eot\u0101ju izmantots vis\u0101 pasaul\u0113, to izstr\u0101d\u0101jis EU uz\u0146\u0113mums, datu apstr\u0101d\u0113 \u0146emot v\u0113r\u0101 GDPR.<\/p>\n            \n          <\/div><\/li>\n          <li><span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"3\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M5 12l4 4 10-10\"><\/path><\/svg><\/span><div>\n            \n            <p class=\"v3-list-title\">Dokument\u0101cija &amp; video<\/p>\n            \n            \n            <p class=\"v3-list-body\">Atv\u0113rt\u0101 dokument\u0101cija un produkta videomateri\u0101li skaidro, k\u0101 darbojas grafiku pl\u0101no\u0161ana un integr\u0101cijas.<\/p>\n            \n          <\/div><\/li>\n          <li><span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"3\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M5 12l4 4 10-10\"><\/path><\/svg><\/span><div>\n            \n            <p class=\"v3-list-title\">Re\u0101ls atbalsts &amp; pal\u012bdz\u012bba ievie\u0161an\u0101<\/p>\n            \n            \n            <p class=\"v3-list-body\">Atbalsts t\u0113rz\u0113\u0161an\u0101, e-past\u0101 un pa t\u0101lruni, k\u0101 ar\u012b asist\u0113ta ievie\u0161ana, kad to v\u0113laties.<\/p>\n            \n          <\/div><\/li>\n          <li><span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"3\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M5 12l4 4 10-10\"><\/path><\/svg><\/span><div>\n            \n            <p class=\"v3-list-title\">Jaut\u0101jumi par dro\u0161\u012bbu?<\/p>\n            \n            \n            <p class=\"v3-list-body\">Run\u0101jiet ar mums tie\u0161i par datiem, mitin\u0101\u0161anu un dro\u0161\u012bbu j\u016bsu izvietojumam.<\/p>\n            \n          <\/div><\/li>\n\n        <\/ul>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n<!-- ============================================================= 10. FAQ -->\n<section class=\"v3-sec\" data-screen-label=\"FAQ\">\n  <div class=\"v3-wrap\">\n    <div class=\"v3-head is-center\">\n\n      \n      <p class=\"v3-kick\">Jaut\u0101jumi &amp; atbildes<\/p>\n      \n      \n      <h2 class=\"wp-block-heading v3-h2\">Par SkyPlanner<\/h2>\n      \n\n    <\/div>\n    <div class=\"v3-faq\" id=\"faq\">\n      <div class=\"v3-faq__item\"><div class=\"v3-faq__q\">Kam pieder SkyPlanner?<svg class=\"chev\" viewBox=\"0 0 12 8\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M1.5 2 6 6.5 10.5 2\"><\/path><\/svg><\/div><div class=\"v3-faq__a\"><p>SkyPlanner ir Skycode Oy produkts un z\u012bmols. Juridiskais uz\u0146\u0113mums, kas ir SkyPlanner pamat\u0101, ir Skycode Oy; SkyPlanner nav atsevi\u0161\u0137s juridisks uz\u0146\u0113mums.<\/p><\/div><\/div>\n      <div class=\"v3-faq__item\"><div class=\"v3-faq__q\">Kur atrodas SkyPlanner?<svg class=\"chev\" viewBox=\"0 0 12 8\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M1.5 2 6 6.5 10.5 2\"><\/path><\/svg><\/div><div class=\"v3-faq__a\"><p>SkyPlanner izstr\u0101d\u0101 Skycode Oy, kura galvenais birojs atrodas V\u0101s\u0101, Somij\u0101.<\/p><\/div><\/div>\n      <div class=\"v3-faq__item\"><div class=\"v3-faq__q\">K\u0101da ir Skycode Oy pieredze?<svg class=\"chev\" viewBox=\"0 0 12 8\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M1.5 2 6 6.5 10.5 2\"><\/path><\/svg><\/div><div class=\"v3-faq__a\"><p>Skycode Oy ir ilga pieredze programmat\u016bras izstr\u0101d\u0113, integr\u0101cij\u0101s un ar ra\u017eo\u0161anu saist\u012bt\u0101s sist\u0113m\u0101s. SkyPlanner no \u0161\u012bs praktisk\u0101s pieredzes izauga par specializ\u0113tu APS produktu ra\u017eo\u0161anas pl\u0101no\u0161anai un grafiku sast\u0101d\u012b\u0161anai.<\/p><\/div><\/div>\n      <div class=\"v3-faq__item\"><div class=\"v3-faq__q\">Kas ir SkyPlanner APS?<svg class=\"chev\" viewBox=\"0 0 12 8\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M1.5 2 6 6.5 10.5 2\"><\/path><\/svg><\/div><div class=\"v3-faq__a\"><p>SkyPlanner APS ir Advanced Planning and Scheduling programmat\u016bra ra\u017eo\u0161anas pl\u0101no\u0161anai un grafiku sast\u0101d\u012b\u0161anai. T\u0101 pal\u012bdz ra\u017eot\u0101jiem aizst\u0101t manu\u0101lo pl\u0101no\u0161anu un izkl\u0101jlapas ar MI atbalst\u012btu grafiku sast\u0101d\u012b\u0161anu, ko pl\u0101not\u0101ji var virz\u012bt, p\u0101rskat\u012bt un kontrol\u0113t.<\/p><\/div><\/div>\n      <div class=\"v3-faq__item\"><div class=\"v3-faq__q\">K\u0101di ra\u017eot\u0101ji izmanto SkyPlanner?<svg class=\"chev\" viewBox=\"0 0 12 8\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M1.5 2 6 6.5 10.5 2\"><\/path><\/svg><\/div><div class=\"v3-faq__a\"><p>SkyPlanner ir izstr\u0101d\u0101ts ra\u017eot\u0101jiem ar re\u0101lu ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas sare\u017e\u0123\u012bt\u012bbu, \u012bpa\u0161i diskr\u0113t\u0101s, p\u0113c pas\u016bt\u012bjuma izgatavot\u0101s un jaukt\u0101s ra\u017eo\u0161anas vid\u0113s. Tas nav piesaist\u012bts vienai \u0161aurai vertik\u0101lajai nozarei.<\/p><\/div><\/div>\n      <div class=\"v3-faq__item\"><div class=\"v3-faq__q\">Vai j\u016bs atbalst\u0101t klientus starptautiski?<svg class=\"chev\" viewBox=\"0 0 12 8\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M1.5 2 6 6.5 10.5 2\"><\/path><\/svg><\/div><div class=\"v3-faq__a\"><p>J\u0101. SkyPlanner apkalpo ra\u017eot\u0101jus vis\u0101s valst\u012bs un efekt\u012bvi darbojas da\u017e\u0101d\u0101s laika josl\u0101s. M\u0113s atbalst\u0101m att\u0101lin\u0101tu ievie\u0161anu, klientu tik\u0161an\u0101s, dokument\u0101ciju, produktu video, ekspertu atbalstu un t\u012bmek\u013ca darbsemin\u0101rus, un klienti var apspriest viet\u0113jos kl\u0101tienes darbsemin\u0101rus, ja ievie\u0161anai tie b\u016btu noder\u012bgi.<\/p><\/div><\/div>\n      <div class=\"v3-faq__item\"><div class=\"v3-faq__q\">Vai ra\u017eot\u0101ji var izm\u0113\u0123in\u0101t SkyPlanner pirms ieg\u0101des?<svg class=\"chev\" viewBox=\"0 0 12 8\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M1.5 2 6 6.5 10.5 2\"><\/path><\/svg><\/div><div class=\"v3-faq__a\"><p>J\u0101. Ra\u017eot\u0101ji var s\u0101kt 30 dienu bezmaksas izm\u0113\u0123in\u0101jumu bez kred\u012btkartes, izp\u0113t\u012bt SkyPlanner ar dokument\u0101ciju un produktu video, k\u0101 ar\u012b rezerv\u0113t demonstr\u0101ciju vai ievie\u0161anas atbalstu, kad v\u0113las to piem\u0113rot savai ra\u017eo\u0161anas videi.<\/p><\/div><\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n<!-- ============================================================= 10b. COMPANY INFORMATION + MAP -->\n<section class=\"v3-sec v3-sec--paper\" data-screen-label=\"Company information\">\n  <div class=\"v3-wrap\">\n    <div class=\"v3-head\">\n\n      \n      <p class=\"v3-kick\">Uz\u0146\u0113muma inform\u0101cija<\/p>\n      \n      \n      <h2 class=\"wp-block-heading v3-h2\">Skycode Oy \u00b7 V\u0101sa, Somija<\/h2>\n      \n\n    <\/div>\n    <div class=\"v3-company\">\n      <div>\n        <div class=\"v3-coinfo-photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/about-us-v2\/skycode-office-interior.webp\" width=\"1800\" height=\"1200\" alt=\"Skycode biroj\u0101 V\u0101s\u0101, Somij\u0101\" loading=\"lazy\" decoding=\"async\"><\/div>\n        <dl class=\"v3-coinfo\">\n          <div class=\"v3-coinfo__row\"><dt>Uz\u0146\u0113muma nosaukums<\/dt><dd>Skycode Oy<\/dd><\/div>\n          <div class=\"v3-coinfo__row\"><dt>Uz\u0146\u0113muma ID<\/dt><dd><span class=\"v3-translation-context\">Uz\u0146\u0113muma ID: 2204947-0<\/span><span aria-hidden=\"true\">2204947-0<\/span><\/dd><\/div>\n          <div class=\"v3-coinfo__row\"><dt>PVN numurs<\/dt><dd>FI22049470<\/dd><\/div>\n          <div class=\"v3-coinfo__row\"><dt>Galvenais birojs<\/dt><dd>Rantakatu 2 G 11, 65100 Vaasa, Finland<\/dd><\/div>\n          <div class=\"v3-coinfo__row\"><dt>T\u0101lrunis<\/dt><dd><a href=\"tel:+358407000002\">+358 40 700 0002<\/a><\/dd><\/div>\n          <div class=\"v3-coinfo__row\"><dt>Atbalsts<\/dt><dd><a href=\"mailto:support@skyplanner.ai\">support@skyplanner.ai<\/a><\/dd><\/div>\n          <div class=\"v3-coinfo__row\"><dt>P\u0101rdo\u0161ana<\/dt><dd><a href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas noda\u013cu \u2192<\/a><\/dd><\/div>\n          <div class=\"v3-coinfo__row\"><dt>R\u0113\u0137ini un finan\u0161u jaut\u0101jumi<\/dt><dd>Niko Ainali<br><a href=\"tel:+358504713771\">+358 50 471 3771<\/a><br><a href=\"mailto:niko@skycode.fi\">niko@skycode.fi<\/a><\/dd><\/div>\n        <\/dl>\n      <\/div>\n      <div class=\"v3-map\">\n        <iframe title=\"Google karte \u2014 Skycode Oy, Rantakatu 2 G 11, 65100 Vaasa\" src=\"https:\/\/maps.google.com\/maps?q=Skycode%20Rantakatu%202%20G%2011%2C%2065100%20Vaasa&amp;z=12&amp;hl=en&amp;t=m&amp;output=embed&amp;iwloc=near\" loading=\"lazy\" referrerpolicy=\"no-referrer-when-downgrade\"><\/iframe>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n<!-- ============================================================= 11. FINAL CTA (dark) -->\n<section class=\"v3-sec v3-sec--dark v3-lanes--dark\" data-screen-label=\"Final CTA\">\n  <div class=\"v3-wrap\">\n    <div class=\"v3-final\">\n\n      \n      <p class=\"v3-kick\" style=\"justify-content:center\">S\u0101ciet darbu<\/p>\n      \n      \n      <h2 class=\"wp-block-heading\">Vai esat gatavs redz\u0113t ar m\u0101ksl\u012bgo intelektu atbalst\u012btu ra\u017eo\u0161anas grafiku pl\u0101no\u0161anu <span class=\"ink-amber\">sav\u0101 r\u016bpn\u012bc\u0101?<\/span><\/h2>\n      \n      \n      <p>S\u0101ciet bez maksas, rezerv\u0113jiet demonstr\u0101ciju ar m\u016bsu komandu vai izp\u0113tiet, k\u0101 SkyPlanner savienojas ar sist\u0113m\u0101m, kuras jau izmantojat.<\/p>\n      \n\n      <div class=\"v3-final__cta\">\n\n        \n        <div class=\"wp-block-button\"><a class=\"wp-element-button wp-block-button__link sp-btn sp-btn--green sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n        \n        \n        <div class=\"wp-block-button\"><a class=\"wp-element-button wp-block-button__link sp-btn sp-btn--white sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Rezerv\u0113t demonstr\u0101ciju<\/a><\/div>\n        \n        \n        <div class=\"wp-block-button\"><a class=\"wp-element-button wp-block-button__link sp-btn sp-btn--ghost-onblue sp-btn--lg\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/\">Izp\u0113t\u012bt integr\u0101cijas<\/a><\/div>\n        \n\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Par SkyPlanner MI ra\u017eo\u0161anas pl\u0101no\u0161ana no Skycode Oy SkyPlanner APS pal\u012bdz ra\u017eot\u0101jiem aizst\u0101t manu\u0101lo pl\u0101no\u0161anu un izkl\u0101jlapas ar cilv\u0113ka vad\u012btu MI grafiku pl\u0101no\u0161anu. Pl\u0101not\u0101ji nosaka m\u0113r\u0137us, ierobe\u017eojumus un priorit\u0101tes; SkyPlanner apr\u0113\u0137ina un nep\u0101rtraukti atjaunina pl\u0101nu, izmantojot aktu\u0101los ERP un MES datus. Ra\u017eot\u0101ji vis\u0101 pasaul\u0113 vada savu ra\u017eo\u0161anu ar SkyPlanner, sa\u0146emot atbalstu sav\u0101 valod\u0101 un laika &#8230; <a title=\"Par mums\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/par-mums\/\" aria-label=\"Read more about Par mums\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-35906","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Par SkyPlanner APS | MI atbalst\u012btas ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas komanda<\/title>\n<meta name=\"description\" content=\"Par SkyPlanner APS, MI atbalst\u012btas ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas programmat\u016bru, ko izstr\u0101d\u0101 Skycode Oy. Uzziniet par m\u016bsu komandu, glob\u0101lo atbalstu, ievie\u0161anas pieeju un uz\u0146\u0113muma st\u0101stu.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/par-mums\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Par mums\" \/>\n<meta property=\"og:description\" content=\"Par SkyPlanner APS, MI atbalst\u012btas ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas programmat\u016bru, ko izstr\u0101d\u0101 Skycode Oy. Uzziniet par m\u016bsu komandu, glob\u0101lo atbalstu, ievie\u0161anas pieeju un uz\u0146\u0113muma st\u0101stu.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/par-mums\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-22T11:33:06+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/par-mums\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/par-mums\\\/\",\"name\":\"Par SkyPlanner APS | MI atbalst\u012btas ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas komanda\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2024-07-02T08:10:29+00:00\",\"dateModified\":\"2026-09-22T11:33:06+00:00\",\"description\":\"Par SkyPlanner APS, MI atbalst\u012btas ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas programmat\u016bru, ko izstr\u0101d\u0101 Skycode Oy. Uzziniet par m\u016bsu komandu, glob\u0101lo atbalstu, ievie\u0161anas pieeju un uz\u0146\u0113muma st\u0101stu.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/par-mums\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/par-mums\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/par-mums\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Par mums\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Par SkyPlanner APS | MI atbalst\u012btas ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas komanda","description":"Par SkyPlanner APS, MI atbalst\u012btas ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas programmat\u016bru, ko izstr\u0101d\u0101 Skycode Oy. Uzziniet par m\u016bsu komandu, glob\u0101lo atbalstu, ievie\u0161anas pieeju un uz\u0146\u0113muma st\u0101stu.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/par-mums\/","og_locale":"lv_LV","og_type":"article","og_title":"Par mums","og_description":"Par SkyPlanner APS, MI atbalst\u012btas ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas programmat\u016bru, ko izstr\u0101d\u0101 Skycode Oy. Uzziniet par m\u016bsu komandu, glob\u0101lo atbalstu, ievie\u0161anas pieeju un uz\u0146\u0113muma st\u0101stu.","og_url":"https:\/\/skyplanner.ai\/lv\/par-mums\/","og_site_name":"SkyPlanner","article_modified_time":"2026-09-22T11:33:06+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/par-mums\/","url":"https:\/\/skyplanner.ai\/lv\/par-mums\/","name":"Par SkyPlanner APS | MI atbalst\u012btas ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas komanda","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2024-07-02T08:10:29+00:00","dateModified":"2026-09-22T11:33:06+00:00","description":"Par SkyPlanner APS, MI atbalst\u012btas ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas programmat\u016bru, ko izstr\u0101d\u0101 Skycode Oy. Uzziniet par m\u016bsu komandu, glob\u0101lo atbalstu, ievie\u0161anas pieeju un uz\u0146\u0113muma st\u0101stu.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/par-mums\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/par-mums\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/par-mums\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Par mums"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"skyplanner","author_link":"https:\/\/skyplanner.ai\/lv\/author\/skyplanner\/"},"uagb_comment_info":0,"uagb_excerpt":"Par SkyPlanner MI ra\u017eo\u0161anas pl\u0101no\u0161ana no Skycode Oy SkyPlanner APS pal\u012bdz ra\u017eot\u0101jiem aizst\u0101t manu\u0101lo pl\u0101no\u0161anu un izkl\u0101jlapas ar cilv\u0113ka vad\u012btu MI grafiku pl\u0101no\u0161anu. Pl\u0101not\u0101ji nosaka m\u0113r\u0137us, ierobe\u017eojumus un priorit\u0101tes; SkyPlanner apr\u0113\u0137ina un nep\u0101rtraukti atjaunina pl\u0101nu, izmantojot aktu\u0101los ERP un MES datus. Ra\u017eot\u0101ji vis\u0101 pasaul\u0113 vada savu ra\u017eo\u0161anu ar SkyPlanner, sa\u0146emot atbalstu sav\u0101 valod\u0101 un laika&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/35906","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=35906"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/35906\/revisions"}],"predecessor-version":[{"id":95782,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/35906\/revisions\/95782"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=35906"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}