{"id":24160,"date":"2023-06-21T17:24:55","date_gmt":"2023-06-21T17:24:55","guid":{"rendered":"https:\/\/skyplanner.ai\/izmeginajums\/"},"modified":"2026-11-12T12:47:25","modified_gmt":"2026-11-12T12:47:25","slug":"izmeginajums","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/izmeginajums\/","title":{"rendered":"S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu"},"content":{"rendered":"\n<div class=\"wp-block-group sp-trial-v2 sp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n  \n  <section class=\"wp-block-group tr2-hero\" id=\"signup\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n    \n    <div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n      \n      <div class=\"wp-block-group tr2-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n        \n        <div class=\"wp-block-group tr2-hero__lead\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n          \n          <p class=\"tr2-eyebrow\">Bezmaksas izm\u0113\u0123in\u0101jums &middot; 30 dienas<\/p>\n          \n\n          \n          <h1 class=\"wp-block-heading tr2-hero__title\">S\u0101ciet 30 dienu SkyPlanner izm\u0113\u0123in\u0101jumu<\/h1>\n          \n\n          \n          <p class=\"tr2-hero__sub\">Izveidojiet savu pirmo re\u0101listisko ra\u017eo\u0161anas grafiku, izmantojot ar m\u0101ksl\u012bgo intelektu atbalst\u012btu ra\u017eo\u0161anas pl\u0101no\u0161anu (APS) un interakt\u012bvu Ganta laika skalu &mdash; kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n          \n\n          \n          <ul class=\"wp-block-list tr2-bullets\"><li>Vad\u012bts iestat\u012b\u0161anas vednis &mdash; pirmais iepl\u0101notais produkts aptuveni 5 min\u016bt\u0113s<\/li><li>Vai ar\u012b uzticiet iestat\u012b\u0161anu savam MI asistentam (Claude, ChatGPT vai Copilot), izmantojot MCP<\/li><li>Interakt\u012bva Ganta laika skala, kur\u0101 kontrole paliek cilv\u0113ka rok\u0101s<\/li><li>S\u0101ciet ar demonstr\u0101cijas datiem vai ar l\u012bdz 20 sav\u0101m darba viet\u0101m<\/li><\/ul>\n          \n\n          \n          <p class=\"tr2-hero__sales\"><a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Liel\u0101ka vai sare\u017e\u0123\u012bt\u0101ka iestat\u012b\u0161ana? Sazinieties ar p\u0101rdo\u0161anas komandu<\/a><\/p>\n          \n        <\/div><\/div>\n        \n\n        \n        <div class=\"wp-block-group tr2-signup\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n          \n          <div class=\"wp-block-group tr2-signup__head\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n            \n            <h2 class=\"wp-block-heading\">Izveidojiet savu bezmaksas izm\u0113\u0123in\u0101jumu<\/h2>\n            \n\n            \n            <p>30 dienas ar SkyPlanner Basic. Bez kred\u012btkartes.<\/p>\n            \n          <\/div><\/div>\n          \n\n          \n          <div class=\"wp-block-group tr2-signup__body\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n            \n            <p class=\"tr2-oauth-lead\">\u0100tr\u0101kais veids, k\u0101 s\u0101kt &mdash; viens klik\u0161\u0137is, parole nav nepiecie\u0161ama<\/p>\n            \n\n            \n            <div class=\"wp-block-buttons tr2-oauth is-vertical is-layout-flex wp-container-core-buttons-is-layout-8cf370e7 wp-block-buttons-is-layout-flex\">\n              \n              <div class=\"wp-block-button tr2-btn tr2-btn--oauth tr2-btn--google\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/accounts.google.com\/o\/oauth2\/v2\/auth?response_type=code&amp;access_type=online&amp;client_id=290427695915-chpp0q9ad9d5e7sad7lcpqqejai77pab.apps.googleusercontent.com&amp;redirect_uri=https:\/\/skyplanner.app\/new-customer-google&amp;state&amp;scope=email%20profile&amp;approval_prompt=auto\">Turpin\u0101t ar Google<\/a><\/div>\n              \n\n              \n              <div class=\"wp-block-button tr2-btn tr2-btn--oauth tr2-btn--microsoft\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/login.microsoftonline.com\/common\/oauth2\/v2.0\/authorize?state=microsoft&amp;client_id=129e325f-c8b2-44da-b8c6-543aeaa04b34&amp;response_type=code&amp;scope=https:\/\/graph.microsoft.com\/user.read&amp;redirect_uri=https:\/\/skyplanner.app\/new-customer-outlook\">Turpin\u0101t ar Microsoft<\/a><\/div>\n              \n            <\/div>\n            \n\n            \n            <p class=\"tr2-or\"><span>vai<\/span><\/p>\n            \n\n            \n            <details class=\"wp-block-details tr2-email-panel is-layout-flow wp-block-details-is-layout-flow\"><summary>Re\u0123istr\u0113jieties ar darba e-pastu<\/summary>\n              <style id=\"wpforms-css-vars-11508\">\n\t\t\t\t#wpforms-11508 {\n\t\t\t\t\n\t\t\t}\n\t\t\t<\/style><div class=\"wpforms-container wpforms-container-full demo-form wpforms-render-modern\" id=\"wpforms-11508\"><form id=\"wpforms-form-11508\" class=\"wpforms-validate wpforms-form wpforms-ajax-form\" data-formid=\"11508\" method=\"post\" enctype=\"multipart\/form-data\" action=\"\/lv\/wp-json\/wp\/v2\/pages\/24160\" data-token=\"42eb09e9dad892ed2b4d1ab68e6872e1\" data-token-time=\"1795587739\"><noscript class=\"wpforms-error-noscript\">Please enable JavaScript in your browser to complete this form.<\/noscript><div id=\"wpforms-error-noscript\" style=\"display: none;\">Please enable JavaScript in your browser to complete this form.<\/div><div class=\"wpforms-field-container\"><div id=\"wpforms-11508-field_3-container\" class=\"wpforms-field wpforms-field-text demo-form-half form-inpu\" data-field-type=\"text\" data-field-id=\"3\"><label class=\"wpforms-field-label\" for=\"wpforms-11508-field_3\">V\u0101rds <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"text\" id=\"wpforms-11508-field_3\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][3]\" aria-errormessage=\"wpforms-11508-field_3-error\" required><\/div><div id=\"wpforms-11508-field_4-container\" class=\"wpforms-field wpforms-field-text demo-form-half form-inpu\" data-field-type=\"text\" data-field-id=\"4\"><label class=\"wpforms-field-label\" for=\"wpforms-11508-field_4\">Uzv\u0101rds <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"text\" id=\"wpforms-11508-field_4\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][4]\" aria-errormessage=\"wpforms-11508-field_4-error\" required><\/div><div id=\"wpforms-11508-field_1-container\" class=\"wpforms-field wpforms-field-text demo-form-half form-inpu\" data-field-type=\"text\" data-field-id=\"1\"><label class=\"wpforms-field-label\" for=\"wpforms-11508-field_1\">Uz\u0146\u0113muma nosaukums <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"text\" id=\"wpforms-11508-field_1\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][1]\" aria-errormessage=\"wpforms-11508-field_1-error\" required><\/div><div id=\"wpforms-11508-field_22-container\" class=\"wpforms-field wpforms-field-email demo-form-half form-inpu\" data-field-type=\"email\" data-field-id=\"22\"><label class=\"wpforms-field-label\" for=\"wpforms-11508-field_22\">Email <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"email\" id=\"wpforms-11508-field_22\" class=\"wpforms-field-medium wpforms-field-required\" name=\"wpforms[fields][22]\" spellcheck=\"false\" aria-errormessage=\"wpforms-11508-field_22-error\" required><\/div><div id=\"wpforms-11508-field_10-container\" class=\"wpforms-field wpforms-field-select demo-form-full form-inpu hidden-countrycode wpforms-field-select-style-classic\" data-field-type=\"select\" data-field-id=\"10\"><label class=\"wpforms-field-label\" for=\"wpforms-11508-field_10\">Re\u0123ions<\/label><select id=\"wpforms-11508-field_10\" class=\"wpforms-field-large\" name=\"wpforms[fields][10]\"><option value=\"Eiropa\"  class=\"choice-1 depth-1\"  >Eiropa<\/option><\/select><\/div><div id=\"wpforms-11508-field_21-container\" class=\"wpforms-field wpforms-field-text hidden-image hidden-region hidden-countrycode\" data-field-type=\"text\" data-field-id=\"21\"><label class=\"wpforms-field-label\" for=\"wpforms-11508-field_21\">Region_on_change<\/label><input type=\"text\" id=\"wpforms-11508-field_21\" class=\"wpforms-field-medium\" name=\"wpforms[fields][21]\" value=\"EU\" aria-errormessage=\"wpforms-11508-field_21-error\" ><\/div><div id=\"wpforms-11508-field_19-container\" class=\"wpforms-field wpforms-field-text hidden-countrycode hidden-image\" data-field-type=\"text\" data-field-id=\"19\"><label class=\"wpforms-field-label\" for=\"wpforms-11508-field_19\">Country<\/label><input type=\"text\" id=\"wpforms-11508-field_19\" class=\"wpforms-field-medium\" name=\"wpforms[fields][19]\" aria-errormessage=\"wpforms-11508-field_19-error\" ><\/div><div id=\"wpforms-11508-field_20-container\" class=\"wpforms-field wpforms-field-address hidden-image\" data-field-type=\"address\" data-field-id=\"20\"><fieldset><legend class=\"wpforms-field-label\">Address<\/legend><div class=\"wpforms-field-row wpforms-field-medium\"><div ><input type=\"text\" id=\"wpforms-11508-field_20\" class=\"wpforms-field-address-address1\" name=\"wpforms[fields][20][address1]\" aria-errormessage=\"wpforms-11508-field_20-error\" ><label for=\"wpforms-11508-field_20\" class=\"wpforms-field-sublabel after\">Address Line 1<\/label><\/div><\/div><div class=\"wpforms-field-row wpforms-field-medium\"><div ><input type=\"text\" id=\"wpforms-11508-field_20-address2\" class=\"wpforms-field-address-address2\" name=\"wpforms[fields][20][address2]\" aria-errormessage=\"wpforms-11508-field_20-address2-error\" ><label for=\"wpforms-11508-field_20-address2\" class=\"wpforms-field-sublabel after\">Address Line 2<\/label><\/div><\/div><div class=\"wpforms-field-row wpforms-field-medium\"><div class=\"wpforms-field-row-block wpforms-one-half wpforms-first\"><input type=\"text\" id=\"wpforms-11508-field_20-city\" class=\"wpforms-field-address-city\" name=\"wpforms[fields][20][city]\" aria-errormessage=\"wpforms-11508-field_20-city-error\" ><label for=\"wpforms-11508-field_20-city\" class=\"wpforms-field-sublabel after\">City<\/label><\/div><div class=\"wpforms-field-row-block wpforms-one-half\"><input type=\"text\" id=\"wpforms-11508-field_20-state\" class=\"wpforms-field-address-state\" name=\"wpforms[fields][20][state]\" aria-errormessage=\"wpforms-11508-field_20-state-error\" ><label for=\"wpforms-11508-field_20-state\" class=\"wpforms-field-sublabel after\">State \/ Province \/ Region<\/label><\/div><\/div><div class=\"wpforms-field-row wpforms-field-medium\"><div class=\"wpforms-field-row-block wpforms-one-half wpforms-first\"><input type=\"text\" id=\"wpforms-11508-field_20-postal\" class=\"wpforms-field-address-postal\" name=\"wpforms[fields][20][postal]\" aria-errormessage=\"wpforms-11508-field_20-postal-error\" ><label for=\"wpforms-11508-field_20-postal\" class=\"wpforms-field-sublabel after\">Postal Code<\/label><\/div><div class=\"wpforms-field-row-block wpforms-one-half\"><select id=\"wpforms-11508-field_20-country\" class=\"wpforms-field-address-country\" name=\"wpforms[fields][20][country]\" aria-errormessage=\"wpforms-11508-field_20-country-error\" ><option class=\"placeholder\" value=\"\" selected disabled>--- Select country ---<\/option><option value=\"AF\" >Afghanistan<\/option><option value=\"AL\" >Albania<\/option><option value=\"DZ\" >Algeria<\/option><option value=\"AS\" >American Samoa<\/option><option value=\"AD\" >Andorra<\/option><option value=\"AO\" >Angola<\/option><option value=\"AI\" >Anguilla<\/option><option value=\"AQ\" >Antarctica<\/option><option value=\"AG\" >Antigua and Barbuda<\/option><option value=\"AR\" >Argentina<\/option><option value=\"AM\" >Armenia<\/option><option value=\"AW\" >Aruba<\/option><option value=\"AU\" >Australia<\/option><option value=\"AT\" >Austria<\/option><option value=\"AZ\" >Azerbaijan<\/option><option value=\"BS\" >Bahamas<\/option><option value=\"BH\" >Bahrain<\/option><option value=\"BD\" >Bangladesh<\/option><option value=\"BB\" >Barbados<\/option><option value=\"BY\" >Belarus<\/option><option value=\"BE\" >Belgium<\/option><option value=\"BZ\" >Belize<\/option><option value=\"BJ\" >Benin<\/option><option value=\"BM\" >Bermuda<\/option><option value=\"BT\" >Bhutan<\/option><option value=\"BO\" >Bolivia (Plurinational State of)<\/option><option value=\"BQ\" >Bonaire, Saint Eustatius and Saba<\/option><option value=\"BA\" >Bosnia and Herzegovina<\/option><option value=\"BW\" >Botswana<\/option><option value=\"BV\" >Bouvet Island<\/option><option value=\"BR\" >Brazil<\/option><option value=\"IO\" >British Indian Ocean Territory<\/option><option value=\"BN\" >Brunei Darussalam<\/option><option value=\"BG\" >Bulgaria<\/option><option value=\"BF\" >Burkina Faso<\/option><option value=\"BI\" >Burundi<\/option><option value=\"CV\" >Cabo Verde<\/option><option value=\"KH\" >Cambodia<\/option><option value=\"CM\" >Cameroon<\/option><option value=\"CA\" >Canada<\/option><option value=\"KY\" >Cayman Islands<\/option><option value=\"CF\" >Central African Republic<\/option><option value=\"TD\" >Chad<\/option><option value=\"CL\" >Chile<\/option><option value=\"CN\" >China<\/option><option value=\"CX\" >Christmas Island<\/option><option value=\"CC\" >Cocos (Keeling) Islands<\/option><option value=\"CO\" >Colombia<\/option><option value=\"KM\" >Comoros<\/option><option value=\"CG\" >Congo<\/option><option value=\"CD\" >Congo (Democratic Republic of the)<\/option><option value=\"CK\" >Cook Islands<\/option><option value=\"CR\" >Costa Rica<\/option><option value=\"HR\" >Croatia<\/option><option value=\"CU\" >Cuba<\/option><option value=\"CW\" >Cura\u00e7ao<\/option><option value=\"CY\" >Cyprus<\/option><option value=\"CZ\" >Czech Republic<\/option><option value=\"CI\" >C\u00f4te d&#039;Ivoire<\/option><option value=\"DK\" >Denmark<\/option><option value=\"DJ\" >Djibouti<\/option><option value=\"DM\" >Dominica<\/option><option value=\"DO\" >Dominican Republic<\/option><option value=\"EC\" >Ecuador<\/option><option value=\"EG\" >Egypt<\/option><option value=\"SV\" >El Salvador<\/option><option value=\"GQ\" >Equatorial Guinea<\/option><option value=\"ER\" >Eritrea<\/option><option value=\"EE\" >Estonia<\/option><option value=\"SZ\" >Eswatini (Kingdom of)<\/option><option value=\"ET\" >Ethiopia<\/option><option value=\"FK\" >Falkland Islands (Malvinas)<\/option><option value=\"FO\" >Faroe Islands<\/option><option value=\"FJ\" >Fiji<\/option><option value=\"FI\" >Finland<\/option><option value=\"FR\" >France<\/option><option value=\"GF\" >French Guiana<\/option><option value=\"PF\" >French Polynesia<\/option><option value=\"TF\" >French Southern Territories<\/option><option value=\"GA\" >Gabon<\/option><option value=\"GM\" >Gambia<\/option><option value=\"GE\" >Georgia<\/option><option value=\"DE\" >Germany<\/option><option value=\"GH\" >Ghana<\/option><option value=\"GI\" >Gibraltar<\/option><option value=\"GR\" >Greece<\/option><option value=\"GL\" >Greenland<\/option><option value=\"GD\" >Grenada<\/option><option value=\"GP\" >Guadeloupe<\/option><option value=\"GU\" >Guam<\/option><option value=\"GT\" >Guatemala<\/option><option value=\"GG\" >Guernsey<\/option><option value=\"GN\" >Guinea<\/option><option value=\"GW\" >Guinea-Bissau<\/option><option value=\"GY\" >Guyana<\/option><option value=\"HT\" >Haiti<\/option><option value=\"HM\" >Heard Island and McDonald Islands<\/option><option value=\"HN\" >Honduras<\/option><option value=\"HK\" >Hong Kong<\/option><option value=\"HU\" >Hungary<\/option><option value=\"IS\" >Iceland<\/option><option value=\"IN\" >India<\/option><option value=\"ID\" >Indonesia<\/option><option value=\"IR\" >Iran (Islamic Republic of)<\/option><option value=\"IQ\" >Iraq<\/option><option value=\"IE\" >Ireland (Republic of)<\/option><option value=\"IM\" >Isle of Man<\/option><option value=\"IL\" >Israel<\/option><option value=\"IT\" >Italy<\/option><option value=\"JM\" >Jamaica<\/option><option value=\"JP\" >Japan<\/option><option value=\"JE\" >Jersey<\/option><option value=\"JO\" >Jordan<\/option><option value=\"KZ\" >Kazakhstan<\/option><option value=\"KE\" >Kenya<\/option><option value=\"KI\" >Kiribati<\/option><option value=\"KP\" >Korea (Democratic People&#039;s Republic of)<\/option><option value=\"KR\" >Korea (Republic of)<\/option><option value=\"XK\" >Kosovo<\/option><option value=\"KW\" >Kuwait<\/option><option value=\"KG\" >Kyrgyzstan<\/option><option value=\"LA\" >Lao People&#039;s Democratic Republic<\/option><option value=\"LV\" >Latvia<\/option><option value=\"LB\" >Lebanon<\/option><option value=\"LS\" >Lesotho<\/option><option value=\"LR\" >Liberia<\/option><option value=\"LY\" >Libya<\/option><option value=\"LI\" >Liechtenstein<\/option><option value=\"LT\" >Lithuania<\/option><option value=\"LU\" >Luxembourg<\/option><option value=\"MO\" >Macao<\/option><option value=\"MG\" >Madagascar<\/option><option value=\"MW\" >Malawi<\/option><option value=\"MY\" >Malaysia<\/option><option value=\"MV\" >Maldives<\/option><option value=\"ML\" >Mali<\/option><option value=\"MT\" >Malta<\/option><option value=\"MH\" >Marshall Islands<\/option><option value=\"MQ\" >Martinique<\/option><option value=\"MR\" >Mauritania<\/option><option value=\"MU\" >Mauritius<\/option><option value=\"YT\" >Mayotte<\/option><option value=\"MX\" >Mexico<\/option><option value=\"FM\" >Micronesia (Federated States of)<\/option><option value=\"MD\" >Moldova (Republic of)<\/option><option value=\"MC\" >Monaco<\/option><option value=\"MN\" >Mongolia<\/option><option value=\"ME\" >Montenegro<\/option><option value=\"MS\" >Montserrat<\/option><option value=\"MA\" >Morocco<\/option><option value=\"MZ\" >Mozambique<\/option><option value=\"MM\" >Myanmar<\/option><option value=\"NA\" >Namibia<\/option><option value=\"NR\" >Nauru<\/option><option value=\"NP\" >Nepal<\/option><option value=\"NL\" >Netherlands<\/option><option value=\"NC\" >New Caledonia<\/option><option value=\"NZ\" >New Zealand<\/option><option value=\"NI\" >Nicaragua<\/option><option value=\"NE\" >Niger<\/option><option value=\"NG\" >Nigeria<\/option><option value=\"NU\" >Niue<\/option><option value=\"NF\" >Norfolk Island<\/option><option value=\"MK\" >North Macedonia (Republic of)<\/option><option value=\"MP\" >Northern Mariana Islands<\/option><option value=\"NO\" >Norway<\/option><option value=\"OM\" >Oman<\/option><option value=\"PK\" >Pakistan<\/option><option value=\"PW\" >Palau<\/option><option value=\"PS\" >Palestine (State of)<\/option><option value=\"PA\" >Panama<\/option><option value=\"PG\" >Papua New Guinea<\/option><option value=\"PY\" >Paraguay<\/option><option value=\"PE\" >Peru<\/option><option value=\"PH\" >Philippines<\/option><option value=\"PN\" >Pitcairn<\/option><option value=\"PL\" >Poland<\/option><option value=\"PT\" >Portugal<\/option><option value=\"PR\" >Puerto Rico<\/option><option value=\"QA\" >Qatar<\/option><option value=\"RO\" >Romania<\/option><option value=\"RU\" >Russian Federation<\/option><option value=\"RW\" >Rwanda<\/option><option value=\"RE\" >R\u00e9union<\/option><option value=\"BL\" >Saint Barth\u00e9lemy<\/option><option value=\"SH\" >Saint Helena, Ascension and Tristan da Cunha<\/option><option value=\"KN\" >Saint Kitts and Nevis<\/option><option value=\"LC\" >Saint Lucia<\/option><option value=\"MF\" >Saint Martin (French part)<\/option><option value=\"PM\" >Saint Pierre and Miquelon<\/option><option value=\"VC\" >Saint Vincent and the Grenadines<\/option><option value=\"WS\" >Samoa<\/option><option value=\"SM\" >San Marino<\/option><option value=\"ST\" >Sao Tome and Principe<\/option><option value=\"SA\" >Saudi Arabia<\/option><option value=\"SN\" >Senegal<\/option><option value=\"RS\" >Serbia<\/option><option value=\"SC\" >Seychelles<\/option><option value=\"SL\" >Sierra Leone<\/option><option value=\"SG\" >Singapore<\/option><option value=\"SX\" >Sint Maarten (Dutch part)<\/option><option value=\"SK\" >Slovakia<\/option><option value=\"SI\" >Slovenia<\/option><option value=\"SB\" >Solomon Islands<\/option><option value=\"SO\" >Somalia<\/option><option value=\"ZA\" >South Africa<\/option><option value=\"GS\" >South Georgia and the South Sandwich Islands<\/option><option value=\"SS\" >South Sudan<\/option><option value=\"ES\" >Spain<\/option><option value=\"LK\" >Sri Lanka<\/option><option value=\"SD\" >Sudan<\/option><option value=\"SR\" >Suriname<\/option><option value=\"SJ\" >Svalbard and Jan Mayen<\/option><option value=\"SE\" >Sweden<\/option><option value=\"CH\" >Switzerland<\/option><option value=\"SY\" >Syrian Arab Republic<\/option><option value=\"TW\" >Taiwan, Republic of China<\/option><option value=\"TJ\" >Tajikistan<\/option><option value=\"TZ\" >Tanzania (United Republic of)<\/option><option value=\"TH\" >Thailand<\/option><option value=\"TL\" >Timor-Leste<\/option><option value=\"TG\" >Togo<\/option><option value=\"TK\" >Tokelau<\/option><option value=\"TO\" >Tonga<\/option><option value=\"TT\" >Trinidad and Tobago<\/option><option value=\"TN\" >Tunisia<\/option><option value=\"TM\" >Turkmenistan<\/option><option value=\"TC\" >Turks and Caicos Islands<\/option><option value=\"TV\" >Tuvalu<\/option><option value=\"TR\" >T\u00fcrkiye<\/option><option value=\"UG\" >Uganda<\/option><option value=\"UA\" >Ukraine<\/option><option value=\"AE\" >United Arab Emirates<\/option><option value=\"GB\" >United Kingdom of Great Britain and Northern Ireland<\/option><option value=\"UM\" >United States Minor Outlying Islands<\/option><option value=\"US\" >United States of America<\/option><option value=\"UY\" >Uruguay<\/option><option value=\"UZ\" >Uzbekistan<\/option><option value=\"VU\" >Vanuatu<\/option><option value=\"VA\" >Vatican City State<\/option><option value=\"VE\" >Venezuela (Bolivarian Republic of)<\/option><option value=\"VN\" >Vietnam<\/option><option value=\"VG\" >Virgin Islands (British)<\/option><option value=\"VI\" >Virgin Islands (U.S.)<\/option><option value=\"WF\" >Wallis and Futuna<\/option><option value=\"EH\" >Western Sahara<\/option><option value=\"YE\" >Yemen<\/option><option value=\"ZM\" >Zambia<\/option><option value=\"ZW\" >Zimbabwe<\/option><option value=\"AX\" >\u00c5land Islands<\/option><\/select><label for=\"wpforms-11508-field_20-country\" class=\"wpforms-field-sublabel after\">Country<\/label><\/div><\/div><\/fieldset><\/div><div id=\"wpforms-11508-field_18-container\" class=\"wpforms-field wpforms-field-checkbox\" data-field-type=\"checkbox\" data-field-id=\"18\"><fieldset><legend class=\"wpforms-field-label wpforms-label-hide\" aria-hidden=\"false\">Checkboxes<\/legend><ul id=\"wpforms-11508-field_18\"><li class=\"choice-1 depth-1\"><input type=\"checkbox\" id=\"wpforms-11508-field_18_1\" name=\"wpforms[fields][18][]\" value=\"I don&#039;t want to receive emails about Skyplanner feature updates, marketing best practices, and promotions\" aria-errormessage=\"wpforms-11508-field_18_1-error\"  ><label class=\"wpforms-field-label-inline\" for=\"wpforms-11508-field_18_1\">I don't want to receive emails about Skyplanner feature updates, marketing best practices, and promotions<\/label><\/li><\/ul><\/fieldset><\/div><\/div><!-- .wpforms-field-container --><div class=\"wpforms-submit-container\" ><input type=\"hidden\" name=\"wpforms[id]\" value=\"11508\"><input type=\"hidden\" name=\"wpforms[time_token]\" value=\"1795587739.cb784382eaa54b5710ce748843247cbf63c517aa22e381c590b983aa12e24f60\"><input type=\"hidden\" name=\"page_title\" value=\"\"><input type=\"hidden\" name=\"page_url\" value=\"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/24160\"><input type=\"hidden\" name=\"url_referer\" value=\"\"><button type=\"submit\" name=\"wpforms[submit]\" id=\"wpforms-submit-11508\" class=\"wpforms-submit demo-submit\" data-alt-text=\"Nos\u016btot...\" data-submit-text=\"Turpin\u0101t\" aria-live=\"assertive\" value=\"wpforms-submit\">Turpin\u0101t<\/button><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/plugins\/wpforms\/assets\/images\/submit-spin.svg\" class=\"wpforms-submit-spinner\" style=\"display: none;\" width=\"26\" height=\"26\" alt=\"Loading\"><\/div><\/form><\/div>  <!-- .wpforms-container -->\n\n            <\/details>\n            \n\n            \n            <p class=\"tr2-fine\">Kred\u012btkarte nav nepiecie\u0161ama. J\u016bs izveidosiet izm\u0113\u0123in\u0101juma darba vidi un var\u0113siet s\u0101kt ar demonstr\u0101cijas datiem vai savu konfigur\u0101ciju. Turpinot, j\u016bs piekr\u012btat m\u016bsu <a href=\"\/skyplanner-terms-of-service\/\">Noteikumiem<\/a> un <a href=\"\/privacy-policy\/\">Priv\u0101tuma politikai<\/a>.<\/p>\n            \n          <\/div><\/div>\n          \n\n          \n          <ul class=\"wp-block-list tr2-risk\"><li>30 dienas bez maksas<\/li><li>Bez kred\u012btkartes<\/li><li>L\u012bdz 20 darba viet\u0101m<\/li><li>Atbalsts iek\u013cauts<\/li><\/ul>\n          \n        <\/div><\/div>\n        \n      <\/div><\/div>\n      \n    <\/div><\/div>\n    \n  <\/div><\/section>\n  \n\n  \n  <section class=\"wp-block-group sp-section tr2-activation\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n    \n    <div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n      \n      <div class=\"wp-block-group tr2-sec-head\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n        \n        <p class=\"tr2-eyebrow\">Kas notiek p\u0113c tam, kad s\u0101kat<\/p>\n        \n\n        \n        <h2 class=\"wp-block-heading tr2-h2\">J\u016bsu pirmais ar MI iepl\u0101notais produkts <span class=\"hl\">aptuveni 5 min\u016bt\u0113s<\/span><\/h2>\n        \n\n        \n        <p>J\u016bs nesastapsieties ar tuk\u0161u ekr\u0101nu un jums neb\u016bs j\u0101min, ko dar\u012bt. Vad\u012bts iestat\u012b\u0161anas asistents pal\u012bdz aprakst\u012bt j\u016bsu ra\u017eo\u0161anu, p\u0113c tam Arcturus AI p\u0101rv\u0113r\u0161 to re\u0101listisk\u0101 pl\u0101n\u0101, kuru varat skat\u012bt un piel\u0101got.<\/p>\n        \n      <\/div><\/div>\n      \n\n      \n      <div class=\"wp-block-group tr2-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n        \n        <div class=\"wp-block-group tr2-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\"><p class=\"tr2-step__num\">1<\/p><h3 class=\"wp-block-heading\">Izveidojiet savu izm\u0113\u0123in\u0101juma darba vidi<\/h3><p>Re\u0123istr\u0113jieties ar Google, Microsoft vai darba e-pastu \u2014 j\u016bsu darba vide b\u016bs gatava da\u017eos mirk\u013cos.<\/p><\/div><\/div>\n        \n\n        \n        <div class=\"wp-block-group tr2-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\"><p class=\"tr2-step__num\">2<\/p><h3 class=\"wp-block-heading\">Demo dati vai s\u0101kums no nulles<\/h3><p>Izp\u0113tiet SkyPlanner ar gataviem piem\u0113ra datiem vai uzreiz s\u0101ciet ar savu ra\u017eo\u0161anu.<\/p><\/div><\/div>\n        \n\n        \n        <div class=\"wp-block-group tr2-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\"><p class=\"tr2-step__num\">3<\/p><h3 class=\"wp-block-heading\">Aprakstiet savu ra\u017eo\u0161anu<\/h3><p>Past\u0101stiet iestat\u012b\u0161anas asistentam saviem v\u0101rdiem, ko j\u016bs ra\u017eojat. Tas sagatavos j\u016bsu darba vietu un produktu melnrakstu, ko var\u0113siet p\u0101rskat\u012bt un piel\u0101got.<\/p><\/div><\/div>\n        \n\n        \n        <div class=\"wp-block-group tr2-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\"><p class=\"tr2-step__num\">4<\/p><h3 class=\"wp-block-heading\">Palaidiet Arcturus<\/h3><p>Arcturus da\u017e\u0101s sekund\u0113s izveido grafiku, kas \u0146em v\u0113r\u0101 j\u016bsu re\u0101lo jaudu.<\/p><\/div><\/div>\n        \n\n        \n        <div class=\"wp-block-group tr2-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\"><p class=\"tr2-step__num\">5<\/p><h3 class=\"wp-block-heading\">Skatiet un piel\u0101gojiet savu Ganta diagrammu<\/h3><p>Skatiet savu pirmo re\u0101listisko laika grafiku, p\u0113c tam p\u0101rpl\u0101nojiet, fiks\u0113jiet un piel\u0101gojiet to pa\u0161i.<\/p><\/div><\/div>\n        \n      <\/div><\/div>\n      \n\n      \n      <div class=\"wp-block-group tr2-shot\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n        \n        <div class=\"tr2-shot__bar\"><span><\/span><span><\/span><span><\/span><b>SkyPlanner APS &middot; Ra\u017eo\u0161anas pl\u0101no\u0161ana<\/b><\/div>\n        \n\n        \n        <figure class=\"wp-block-image size-full tr2-shot__image\"><img decoding=\"async\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/trial-v2\/trial-v2-gantt.png\" alt=\"SkyPlanner APS Gantt ra\u017eo\u0161anas pl\u0101no\u0161anas laika skala, kur\u0101 redzami ar MI sapl\u0101noti darbi darbstaciju rind\u0101s\"\/><\/figure>\n        \n\n        \n        <p class=\"tr2-shot__cap\"><strong>Tas ir j\u016bsu m\u0113r\u0137is.<\/strong> Ar MI sapl\u0101noti darbi vis\u0101s j\u016bsu darba viet\u0101s \u2014 par\u0101d\u012bti k\u0101 nesapl\u0101noti, sapl\u0101noti vai kav\u0113ti, ar p\u0101rpl\u0101no\u0161anu vien\u0101 klik\u0161\u0137\u012b, tikl\u012bdz main\u0101s priorit\u0101tes.<\/p>\n        \n      <\/div><\/div>\n      \n    <\/div><\/div>\n    \n  <\/div><\/section>\n  \n\n  \n  <section class=\"wp-block-group sp-section tr2-band-light\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n    \n    <div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n      \n      <div class=\"wp-block-group tr2-sec-head tr2-sec-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n        \n        <p class=\"tr2-eyebrow\">Vai \u0161is izm\u0113\u0123in\u0101jums jums ir piem\u0113rots?<\/p>\n        \n\n        \n        <h2 class=\"wp-block-heading tr2-h2\">Izv\u0113lieties patst\u0101v\u012bgu ievie\u0161anu vai <span class=\"hl\">ievie\u0161anu ar atbalstu<\/span><\/h2>\n        \n\n        \n        <p>S\u0101ciet patst\u0101v\u012bgi ar bezmaksas 30 dienu izm\u0113\u0123in\u0101jumu vai izv\u0113lieties ievie\u0161anu ar atbalstu, ja v\u0113laties, lai SkyPlanner eksperts pal\u012bdz\u0113tu jums veikt iestat\u012b\u0161anu, apm\u0101c\u012bt komandu un \u0101tr\u0101k sasniegt pirmo re\u0101listisko ra\u017eo\u0161anas grafiku.<\/p>\n        \n      <\/div><\/div>\n      \n\n      \n      <div class=\"wp-block-group tr2-fit\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n        \n        <div class=\"wp-block-group tr2-fit__col\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n          \n          <p class=\"tr2-fit__lbl\">1. variants \u00b7 Patst\u0101v\u012bga ievie\u0161ana<\/p>\n          \n\n          \n          <h3 class=\"wp-block-heading\">S\u0101ciet savu bezmaksas izm\u0113\u0123in\u0101jumu jau \u0161odien<\/h3>\n          \n\n          \n          <ul class=\"wp-block-list tr2-checklist\"><li>Komandas, kas v\u0113las patst\u0101v\u012bgi iepaz\u012bt SkyPlanner<\/li><li>Fokus\u0113ta koncepcijas p\u0101rbaude ar l\u012bdz 20 darba viet\u0101m<\/li><li>Ra\u017eo\u0161anas pl\u0101not\u0101ji, kuri savu procesu var model\u0113t ar demo datiem vai savu konfigur\u0101ciju<\/li><li>Uz\u0146\u0113mumi, kas aizst\u0101j izkl\u0101jlapas, manu\u0101lu pl\u0101no\u0161anu vai ERP pl\u0101no\u0161anas nepiln\u012bbas<\/li><\/ul>\n          \n\n          \n          <div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button tr2-btn tr2-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"#signup\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div><\/div>\n          \n        <\/div><\/div>\n        \n\n        \n        <div class=\"wp-block-group tr2-fit__col tr2-fit__col--assisted\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n          \n          <p class=\"tr2-fit__lbl\">2. variants \u00b7 Ievie\u0161ana ar atbalstu<\/p>\n          \n\n          \n          <h3 class=\"wp-block-heading\">Sa\u0146emiet ekspertu vad\u012bbu jau no s\u0101kuma<\/h3>\n          \n\n          \n          <ul class=\"wp-block-list tr2-checklist\"><li>Komandas, kas v\u0113las vad\u012btu ce\u013cu l\u012bdz savam pirmajam re\u0101listiskajam ra\u017eo\u0161anas grafikam<\/li><li>Sare\u017e\u0123\u012bt\u0101ka tehnolo\u0123isko mar\u0161rutu, darba vietu, jaudas vai datu iestat\u012b\u0161ana<\/li><li>ERP, MES, datu import\u0113\u0161anas vai integr\u0101cijas pl\u0101no\u0161ana<\/li><li>Uz\u0146\u0113mumi, kas v\u0113las ievie\u0161anas, apm\u0101c\u012bbu un izvieto\u0161anas atbalstu<\/li><\/ul>\n          \n\n          \n          <div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button tr2-btn tr2-btn--blue\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/atbalstitas-ieviesanas-pakalpojumi\/\">Izp\u0113tiet ievie\u0161anu ar atbalstu<\/a><\/div><\/div>\n          \n        <\/div><\/div>\n        \n      <\/div><\/div>\n      \n    <\/div><\/div>\n    \n  <\/div><\/section>\n  \n\n  \n  <section class=\"wp-block-group sp-section tr2-band-light tr2-trustsec\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n    \n    <div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n      \n      <ul class=\"wp-block-list tr2-trustrow\"><li>M\u0101ko\u0146a APS &mdash; nekas nav j\u0101mitina<\/li><li>Sp\u0113c\u012bga datu aizsardz\u012bba<\/li><li>Atbalsts nov\u0113rt\u0113\u0161anas laik\u0101<\/li><\/ul>\n      \n    <\/div><\/div>\n    \n  <\/div><\/section>\n  \n\n  \n  <section class=\"wp-block-group sp-section tr2-faq-section\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n    \n    <div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n      \n      <div class=\"wp-block-group tr2-sec-head tr2-sec-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n        \n        <p class=\"tr2-eyebrow\">Atbildes uz jaut\u0101jumiem<\/p>\n        \n\n        \n        <h2 class=\"wp-block-heading tr2-h2\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n        \n      <\/div><\/div>\n      \n\n      \n      <div class=\"wp-block-group sp-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n        \n        <details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\" open><summary>Vai ir nepiecie\u0161ama kred\u012btkarte?<\/summary><p>N\u0113. 30 dienu bezmaksas izm\u0113\u0123in\u0101jumam nav nepiecie\u0161ama kred\u012btkarte un maks\u0101jumu inform\u0101cija. Varat re\u0123istr\u0113ties ar Google, Microsoft vai darba e-pasta adresi un s\u0101kt uzreiz.<\/p><\/details>\n        \n\n        \n        <details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas notiek p\u0113c 30 dien\u0101m?<\/summary><p>Varat izlemt, vai turpin\u0101t lietot SkyPlanner. Ja izm\u0113\u0123in\u0101jums ir pal\u012bdz\u0113jis jums izveidot noder\u012bgu ra\u017eo\u0161anas grafiku, varat turpin\u0101t ar abonementu vai p\u0101rrun\u0101t ar mums ievie\u0161anu, integr\u0101cijas vai pla\u0161\u0101ku izv\u0113r\u0161anu.<\/p><\/details>\n        \n\n        \n        <details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ko varu izm\u0113\u0123in\u0101t izm\u0113\u0123in\u0101juma laik\u0101?<\/summary><p>Varat nov\u0113rt\u0113t SkyPlanner galveno pl\u0101no\u0161anas darbpl\u016bsmu: darba vietas, procesa so\u013cus, produktus, pas\u016bt\u012bjumus, Ganta laika skalu un MI vad\u012btu pl\u0101no\u0161anu ar Arcturus. M\u0113r\u0137is ir noskaidrot, vai SkyPlanner var izveidot re\u0101listisku ra\u017eo\u0161anas grafiku j\u016bsu konfigur\u0101cijai.<\/p><\/details>\n        \n\n        \n        <details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izmantot demo datus vai savus datus?<\/summary><p>J\u0101. Varat s\u0101kt ar demonstr\u0101cijas datiem, lai \u0101tri iepaz\u012btu SkyPlanner, vai izveidot savu konfigur\u0101ciju ar sav\u0101m darba viet\u0101m, procesa so\u013ciem, produktiem un pas\u016bt\u012bjumiem.<\/p><\/details>\n        \n\n        \n        <details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai mans MI asistents var man\u0101 viet\u0101 iestat\u012bt izm\u0113\u0123in\u0101juma vidi?<\/summary><p>J\u0101. Izm\u0113\u0123in\u0101jum\u0101 ir iek\u013cauts MCP serveris. SkyPlanner MCP lap\u0101 pievienojiet Claude, ChatGPT, Copilot vai citu asistentu, kas atbalsta MCP, un nododiet tam savu ra\u017eo\u0161anas datu izkl\u0101jlapu vai no ERP eksport\u0113tus datus. Asistents izveidos j\u016bsu darba vietas, produktus un pas\u016bt\u012bjumus un l\u016bgs Arcturus AI sast\u0101d\u012bt grafiku. Uzziniet, k\u0101 tas darbojas, <a href=\"\/lv\/mcp-serveris\/\">MCP servera lap\u0101<\/a>.<\/p><\/details>\n        \n\n        \n        <details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ko noz\u012bm\u0113 20 darba vietu ierobe\u017eojums?<\/summary><p>Bezmaksas izm\u0113\u0123in\u0101jums ir paredz\u0113ts fokus\u0113tai koncepcijas p\u0101rbaudei ar l\u012bdz 20 darba viet\u0101m. Ja j\u016bsu ra\u017eo\u0161anas konfigur\u0101cija ir liel\u0101ka, j\u016bs joproj\u0101m varat nov\u0113rt\u0113t SkyPlanner, ta\u010du ievie\u0161ana ar atbalstu var b\u016bt piem\u0113rot\u0101ks ce\u013c\u0161.<\/p><\/details>\n        \n\n        \n        <details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu sa\u0146emt pal\u012bdz\u012bbu ar ievie\u0161anu vai integr\u0101cij\u0101m?<\/summary><p>J\u0101. Ja v\u0113laties pal\u012bdz\u012bbu ra\u017eo\u0161anas mode\u013ca iestat\u012b\u0161an\u0101, komandas apm\u0101c\u012bb\u0101, import\u0113\u0161anas pl\u0101no\u0161an\u0101 vai ERP\/MES integr\u0101cijas apsprie\u0161an\u0101, varat izv\u0113l\u0113ties ievie\u0161anu ar atbalstu vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazin\u0101ties ar mums<\/a> pirms s\u0101k\u0161anas.<\/p><\/details>\n        \n      <\/div><\/div>\n      \n    <\/div><\/div>\n    \n  <\/div><\/section>\n  \n\n  \n  <section class=\"wp-block-group sp-section tr2-final-section\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n    \n    <div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n      \n      <div class=\"wp-block-group tr2-final\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n        \n        <h2 class=\"wp-block-heading tr2-h2\">S\u0101ciet ar izm\u0113\u0123in\u0101jumu<\/h2>\n        \n\n        \n        <p>Izveidojiet savu pirmo re\u0101listisko ra\u017eo\u0161anas grafiku 30 dien\u0101s &mdash; un sazinieties ar mums, ja j\u016bsu ra\u017eo\u0161anas konfigur\u0101cija ir sare\u017e\u0123\u012bt\u0101ka.<\/p>\n        \n\n        \n        <div class=\"wp-block-buttons tr2-final__actions is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n          \n          <div class=\"wp-block-button tr2-btn tr2-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"#signup\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n          \n\n          \n          <div class=\"wp-block-button tr2-btn tr2-btn--ghost-onblue\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n          \n        <\/div>\n        \n\n        \n        <p class=\"tr2-final__note\">30 dienas bez maksas &middot; Bez kred\u012btkartes &middot; SkyPlanner Basic &middot; Atbalsts iek\u013cauts<\/p>\n        \n      <\/div><\/div>\n      \n    <\/div><\/div>\n    \n  <\/div><\/section>\n  \n<\/div><\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Bezmaksas izm\u0113\u0123in\u0101jums &middot; 30 dienas S\u0101ciet 30 dienu SkyPlanner izm\u0113\u0123in\u0101jumu Izveidojiet savu pirmo re\u0101listisko ra\u017eo\u0161anas grafiku, izmantojot ar m\u0101ksl\u012bgo intelektu atbalst\u012btu ra\u017eo\u0161anas pl\u0101no\u0161anu (APS) un interakt\u012bvu Ganta laika skalu &mdash; kred\u012btkarte nav nepiecie\u0161ama. Vad\u012bts iestat\u012b\u0161anas vednis &mdash; pirmais iepl\u0101notais produkts aptuveni 5 min\u016bt\u0113s Vai ar\u012b uzticiet iestat\u012b\u0161anu savam MI asistentam (Claude, ChatGPT vai Copilot), izmantojot &#8230; <a title=\"S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\" aria-label=\"Read more about S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-24160","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Bezmaksas SkyPlanner izm\u0113\u0123in\u0101jums | MI ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas programmat\u016bra<\/title>\n<meta name=\"description\" content=\"S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu un izveidojiet re\u0101listisku ra\u017eo\u0161anas grafiku ar MI darbin\u0101tu APS un interakt\u012bvu Ganta diagrammu. Kred\u012btkarte nav nepiecie\u0161ama.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu\" \/>\n<meta property=\"og:description\" content=\"S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu un izveidojiet re\u0101listisku ra\u017eo\u0161anas grafiku ar MI darbin\u0101tu APS un interakt\u012bvu Ganta diagrammu. Kred\u012btkarte nav nepiecie\u0161ama.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/izmeginajums\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-12T12:47:25+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/izmeginajums\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/izmeginajums\\\/\",\"name\":\"Bezmaksas SkyPlanner izm\u0113\u0123in\u0101jums | MI ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas programmat\u016bra\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2023-06-21T17:24:55+00:00\",\"dateModified\":\"2026-11-12T12:47:25+00:00\",\"description\":\"S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu un izveidojiet re\u0101listisku ra\u017eo\u0161anas grafiku ar MI darbin\u0101tu APS un interakt\u012bvu Ganta diagrammu. Kred\u012btkarte nav nepiecie\u0161ama.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/izmeginajums\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/izmeginajums\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/izmeginajums\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Bezmaksas SkyPlanner izm\u0113\u0123in\u0101jums | MI ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas programmat\u016bra","description":"S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu un izveidojiet re\u0101listisku ra\u017eo\u0161anas grafiku ar MI darbin\u0101tu APS un interakt\u012bvu Ganta diagrammu. Kred\u012btkarte nav nepiecie\u0161ama.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/izmeginajums\/","og_locale":"lv_LV","og_type":"article","og_title":"S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu","og_description":"S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu un izveidojiet re\u0101listisku ra\u017eo\u0161anas grafiku ar MI darbin\u0101tu APS un interakt\u012bvu Ganta diagrammu. Kred\u012btkarte nav nepiecie\u0161ama.","og_url":"https:\/\/skyplanner.ai\/lv\/izmeginajums\/","og_site_name":"SkyPlanner","article_modified_time":"2026-11-12T12:47:25+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/izmeginajums\/","url":"https:\/\/skyplanner.ai\/lv\/izmeginajums\/","name":"Bezmaksas SkyPlanner izm\u0113\u0123in\u0101jums | MI ra\u017eo\u0161anas grafiku pl\u0101no\u0161anas programmat\u016bra","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2023-06-21T17:24:55+00:00","dateModified":"2026-11-12T12:47:25+00:00","description":"S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu un izveidojiet re\u0101listisku ra\u017eo\u0161anas grafiku ar MI darbin\u0101tu APS un interakt\u012bvu Ganta diagrammu. Kred\u012btkarte nav nepiecie\u0161ama.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/izmeginajums\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/izmeginajums\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/izmeginajums\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"S\u0101ciet savu 30 dienu SkyPlanner izm\u0113\u0123in\u0101juma periodu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"skyplanner","author_link":"https:\/\/skyplanner.ai\/lv\/author\/skyplanner\/"},"uagb_comment_info":0,"uagb_excerpt":"Bezmaksas izm\u0113\u0123in\u0101jums &middot; 30 dienas S\u0101ciet 30 dienu SkyPlanner izm\u0113\u0123in\u0101jumu Izveidojiet savu pirmo re\u0101listisko ra\u017eo\u0161anas grafiku, izmantojot ar m\u0101ksl\u012bgo intelektu atbalst\u012btu ra\u017eo\u0161anas pl\u0101no\u0161anu (APS) un interakt\u012bvu Ganta laika skalu &mdash; kred\u012btkarte nav nepiecie\u0161ama. Vad\u012bts iestat\u012b\u0161anas vednis &mdash; pirmais iepl\u0101notais produkts aptuveni 5 min\u016bt\u0113s Vai ar\u012b uzticiet iestat\u012b\u0161anu savam MI asistentam (Claude, ChatGPT vai Copilot), izmantojot&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/24160","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=24160"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/24160\/revisions"}],"predecessor-version":[{"id":90023,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/24160\/revisions\/90023"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=24160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}