{"id":107864,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/karat\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/integracijas-celvedis\/","title":{"rendered":"KARAT integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ KARAT<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">KARAT integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 KARAT integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot IS KARAT ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar KARAT, izmantojot pa\u0161as KARAT saskarnes:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus (v\u00fdrobn\u00ed p\u0159\u00edkazy) un ra\u017eo\u0161anas uzdevumus (v\u00fdrobn\u00ed zak\u00e1zky) ar to oper\u0101cij\u0101m, nomenklat\u016bras kart\u012btes, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, iek\u0101rtas, darbavietas, person\u0101la resursus, kr\u0101jumus un izsniegtos iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Pl\u0101notie s\u0101kuma un beigu datumi tiek ierakst\u012bti atpaka\u013c KARAT ra\u017eo\u0161anas datos.<\/li>\n\n\n<li>Ja izv\u0113laties, operatoru darba laika ierakstus var nos\u016bt\u012bt atpaka\u013c uz KARAT, izmantojot atskai\u0161u re\u0123istr\u0113\u0161anu termin\u0101\u013cos.<\/li>\n\n\n<li>SkyPlanner webhook pazi\u0146ojumi nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu KARAT konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darba s\u0101k\u0161anas. \u0160is ce\u013cvedis ir paredz\u0113ts KARAT partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties vai pa\u0161i veidot risin\u0101jumu, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"karat-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">KARAT integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Saska\u0146ota datu saskarne.<\/p>\n\n\n<p class=\"fx-pain__b\">KARAT Software nor\u0101da, ka ERP KARAT atv\u0113rt\u012bba \u013cauj to savienot ar cit\u0101m \u0101r\u0113j\u0101m inform\u0101cijas sist\u0113m\u0101m un ka sist\u0113ma atbalsta elektronisku datu apmai\u0146u XML, EDI, ISDOC un ISDS form\u0101tos (<a href=\"https:\/\/www.karatsoftware.cz\/podpora-a-sluzby\/vyvoj-software-a-aplikaci\/\">KARAT programmat\u016bras izstr\u0101de<\/a>). Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai tas noz\u012bm\u0113 j\u016bsu instal\u0101cijai saska\u0146otu saskarni, kas eksport\u0113 atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos mar\u0161rutus, resursus, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus un import\u0113 pl\u0101notos datumus.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Saskarne atskai\u0161u re\u0123istr\u0113\u0161anai termin\u0101\u013cos.<\/p>\n\n\n<p class=\"fx-pain__b\">KARAT modulis atskai\u0161u re\u0123istr\u0113\u0161anai termin\u0101\u013cos (termin\u00e1lov\u00e9 odv\u00e1d\u011bn\u00ed) sagatavo datus eksportam uz \u0101r\u0113ju sist\u0113mu un pie\u0146em import\u0113tos datus atbilsto\u0161i saska\u0146otai saskarnei (<a href=\"https:\/\/www.karatsoftware.cz\/erp-karat\/terminalove-odvadeni\/\">atskai\u0161u re\u0123istr\u0113\u0161ana termin\u0101\u013cos<\/a>). Tas apstr\u0101d\u0101 darba s\u0101k\u0161anu, p\u0101rtrauk\u0161anu un pabeig\u0161anu, oper\u0101ciju nodo\u0161anu, materi\u0101lu izsnieg\u0161anu ra\u017eo\u0161anai un gatav\u0101s produkcijas sa\u0146em\u0161anu. \u0160\u012b ir piem\u0113rota saskarne SkyPlanner re\u0123istr\u0113to darbu datu nos\u016bt\u012b\u0161anai.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Sist\u0113mu integr\u0101cijas pakalpojums.<\/p>\n\n\n<p class=\"fx-pain__b\">KARAT Software pied\u0101v\u0101 pakalpojumu, kas savieno IS KARAT ar ra\u017eotnes datu v\u0101k\u0161anas sist\u0113m\u0101m, automatiz\u0113t\u0101m noliktav\u0101m, CAD\/CAM un cit\u0101m specializ\u0113t\u0101m lietotn\u0113m (<a href=\"https:\/\/www.karatsoftware.cz\/podpora-a-sluzby\/systemova-integrace\/\">sist\u0113mu integr\u0101cija<\/a>). Nosakot projekta tv\u0113rumu, SkyPlanner komanda saska\u0146o saskarni ar KARAT Software vai j\u016bsu KARAT partneri.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Excel un CSV.<\/p>\n\n\n<p class=\"fx-pain__b\">Izm\u0113\u0123in\u0101juma datu iel\u0101dei pietiek ar atv\u0113rtajiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem, kas eksport\u0113ti Excel vai CSV form\u0101t\u0101.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un licenc\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Integr\u0101cijas lietot\u0101js.<\/strong> Saskarne darbojas ar KARAT lietot\u0101ja kontu, kuram ir ties\u012bbas las\u012bt un rakst\u012bt attiec\u012bgos ra\u017eo\u0161anas, noliktavas un iepirkumu datus. KARAT piek\u013cuves ties\u012bbas var noteikt l\u012bdz pat atsevi\u0161\u0137\u0101m tabulu atsl\u0113g\u0101m, t\u0101p\u0113c pie\u0161\u0137iriet tikai nepiecie\u0161am\u0101s ties\u012bbas.<\/li>\n\n\n<li><strong>Izvietojums.<\/strong> IS KARAT darbojas lok\u0101li, \u0101rpakalpojuma vai SaaS veid\u0101. Nosakot tv\u0113rumu, saska\u0146otajai saskarnei tiek konfigur\u0113ts j\u016bsu izvietojumam atbilsto\u0161s datu p\u0101rs\u016bt\u012b\u0161anas veids \u2014 failu apmai\u0146a vai pakalpojuma galapunkts.<\/li>\n\n\n<li><strong>Licenc\u0113\u0161ana.<\/strong> Par saska\u0146oto saskarni un visiem KARAT Software veicamajiem darbiem vienojas ar KARAT Software vai j\u016bsu partneri.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru Authorization-Token galven\u0113 (SkyPlanner Settings &gt; API), un API ir dokument\u0113ta Swagger\/OpenAPI. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim izskaidroti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska datu nolas\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner nolasa KARAT datus p\u0113c grafika. Jaunie darbi tiek sa\u0146emti ar pl\u0101notu eksportu vai nolas\u012b\u0161anu caur saska\u0146oto saskarni, atlasot atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un jaun\u0101k\u0101s izmai\u0146as. Bie\u017eumu nosaka katrai ra\u017eotnei atsevi\u0161\u0137i: ra\u017eo\u0161anas pas\u016bt\u012bjumiem \u2014 ik p\u0113c da\u017e\u0101m min\u016bt\u0113m, kr\u0101jumiem \u2014 reizi stund\u0101.<\/p>\n\n\n<p>Kad main\u0101s st\u0101voklis vai grafiks, SkyPlanner nos\u016bta webhook pazi\u0146ojumus, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c ierosina notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu atbilst\u012bbas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>KARAT objekts<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Nomenklat\u016bras kart\u012btes (karty), m\u0113rvien\u012bbas<\/td><td>Produkti un materi\u0101li<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam periodiska nolas\u012b\u0161ana<\/td><\/tr><tr><td>Materi\u0101lu specifik\u0101cijas (kusovn\u00edky)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katra produkta materi\u0101li<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Tehnolo\u0123iskie mar\u0161ruti (technologick\u00e9 postupy), oper\u0101cijas un laiki<\/td><td>Procesa so\u013ci ar ilgumu, sagatavo\u0161anas un nosl\u0113guma darbu laikiem<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Resursi (zdroje): iek\u0101rtas, darbavietas<\/td><td>Darba centri, darba centru grupas, alternat\u012bvie darba centri<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam reti<\/td><\/tr><tr><td>Person\u0101la resursi<\/td><td>Person\u0101ls un operatoru skaits katram ra\u017eo\u0161anas uzdevumam<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumi (v\u00fdrobn\u00ed p\u0159\u00edkazy), ra\u017eo\u0161anas uzdevumi (v\u00fdrobn\u00ed zak\u00e1zky), oper\u0101cijas, materi\u0101li<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>Nolas\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Noliktavas kr\u0101jumi (sklady)<\/td><td>Kr\u0101jumu atlikumi<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>Nolas\u012b\u0161ana reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>Izsniegtie iepirkuma pas\u016bt\u012bjumi (objedn\u00e1vky vydan\u00e9) ar pieg\u0101des datumiem<\/td><td>Iepirkuma pas\u016bt\u012bjumi, ien\u0101ko\u0161ie materi\u0101li p\u0113c pieg\u0101des datuma<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>Nolas\u012b\u0161ana reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>Pl\u0101notais s\u0101kums un beigas katrai pas\u016bt\u012bjuma oper\u0101cijai (saska\u0146ots imports)<\/td><td>Pl\u0101notais s\u0101kums un beigas katram ra\u017eo\u0161anas uzdevumam<\/td><td>SkyPlanner \u2192 KARAT<\/td><td>Mainoties grafikam, ar SkyPlanner webhook pazi\u0146ojumu<\/td><\/tr><tr><td>Atskaites termin\u0101\u013cos: s\u0101k\u0161ana, aptur\u0113\u0161ana, nodo\u0161ana, daudzumi<\/td><td>Darba laika ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 KARAT<\/td><td>P\u0113c katra apstiprin\u0101juma vai katr\u0101 mai\u0146\u0101, ja \u0161\u0101da iesp\u0113ja izv\u0113l\u0113ta<\/td><\/tr><tr><td>Nav KARAT sist\u0113m\u0101<\/td><td>Sagatavo\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, ra\u017eo\u0161anas uzdevumi ar vair\u0101kiem operatoriem<\/td><td>Uztur SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas sh\u0113mas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet nomenklat\u016bras kart\u012btes, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos mar\u0161rutus un resursus. R\u016bp\u012bgi nosakiet resursu atbilst\u012bbu SkyPlanner sist\u0113m\u0101: darbavieta ar \u010detr\u0101m iek\u0101rt\u0101m k\u013c\u016bst par vienu darba centru grupu vai \u010detriem darba centriem. Person\u0101la resursi, piem\u0113ram, tehnologi un projekt\u0113t\u0101ji, kuru darbu ra\u017eo\u0161anas sagatavo\u0161an\u0101 pl\u0101no, izmantojot sv\u0113rto pl\u0101no\u0161anu, netiek iek\u013cauti ra\u017eotnes darba grafik\u0101, ja vien neizlemjat cit\u0101di.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet izpildei nodotos ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m un materi\u0101liem, k\u0101 ar\u012b izsniegtos iepirkuma pas\u016bt\u012bjumus. SkyPlanner uzskata pas\u016bt\u012btos materi\u0101lus par pieejamiem iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad pas\u016bt\u012bjumam tiek pie\u0161\u0137irts statuss Delivered.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Kad pl\u0101no\u0161anas dzinis ievieto vai p\u0101rvieto ra\u017eo\u0161anas uzdevumu, SkyPlanner webhook pazi\u0146ojums ierosina pl\u0101noto s\u0101kuma un beigu datumu importu KARAT sist\u0113m\u0101 caur saska\u0146oto saskarni. Nosakot ievie\u0161anas tv\u0113rumu, tiek fiks\u0113ts importa m\u0113r\u0137is KARAT sist\u0113m\u0101 \u2014 resursu rezerv\u0101cijas vai ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101ciju datumi.<\/p>\n\n\n<p><strong>4. Apstiprin\u0101jumi ra\u017eotn\u0113.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un darba laika ieraksti uztur grafiku aktu\u0101lu. J\u016bs izv\u0113laties, vai faktiskos laikus nos\u016bt\u012bt atpaka\u013c uz KARAT. Ja izv\u0113laties tos nos\u016bt\u012bt, dati tiek import\u0113ti caur termin\u0101\u013cu atskai\u0161u saskarni k\u0101 katras oper\u0101cijas s\u0101k\u0161anas, aptur\u0113\u0161anas un daudzuma notikumi. Ja ne, operatori turpina re\u0123istr\u0113t atskaites KARAT termin\u0101\u013cos, un SkyPlanner nolasa \u0161\u012bs atskaites.<\/p>\n\n\n<p><strong>5. Datu p\u0101rvald\u012bbas un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms darba s\u0101k\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Nomenklat\u016bras kart\u012btes, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, daudzumi, pas\u016bt\u012bjuma statuss<\/td><td>KARAT<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiki, iek\u0101rtu pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sagatavo\u0161anas laiku matrica, pras\u012bbas instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Viena sist\u0113ma, ko izv\u0113las, nosakot tv\u0113rumu<\/td><\/tr><tr><td>Oper\u0101ciju atskaites, materi\u0101lu izsnieg\u0161ana un sa\u0146em\u0161ana<\/td><td>KARAT \u2014 datus ievada tur vai nos\u016bta no SkyPlanner darba laika ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas ieraksta pas\u016bt\u012bjumu datumus. Ja APS KARAT joproj\u0101m saglab\u0101 pl\u0101nus ra\u017eo\u0161anas datos, atsp\u0113jojiet \u0161o funkciju pas\u016bt\u012bjumiem, kuru grafikus sast\u0101da SkyPlanner, lai abas sist\u0113mas nekad nep\u0101rrakst\u012btu viena otras datus.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas darbu s\u0101kuma. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot no KARAT CSV vai Excel form\u0101t\u0101 eksport\u0113tus datus par iek\u0101rt\u0101m, tehnolo\u0123iskajiem mar\u0161rutiem un atv\u0113rtajiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Atbilst\u012bbu noteik\u0161ana.<\/strong> Fiks\u0113jiet datu atbilst\u012bbu tabulu, datu p\u0101rvald\u012bbas noteikumus, sinhroniz\u0101cijas bie\u017eumu un to, vai oper\u0101ciju atskaites nos\u016bt\u012bs atpaka\u013c.<\/li>\n\n\n<li><strong>KARAT saskarne.<\/strong> Saska\u0146ojiet eksporta un importa form\u0101tu un datu p\u0101rs\u016bt\u012b\u0161anas veidu ar KARAT Software vai savu partneri un izveidojiet integr\u0101cijas lietot\u0101ja kontu. Vispirms veiciet p\u0101rbaudi datub\u0101zes kopij\u0101.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Nomenklat\u016bras kart\u012btes, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, resursi.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Pl\u0101nota nolas\u012b\u0161ana ar filtriem un atk\u0101rtotiem m\u0113\u0123in\u0101jumiem.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> Sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits katram ra\u017eo\u0161anas uzdevumam un alternat\u012bvas iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> P\u0101rbaudiet pl\u0101noto datumu importu un, ja esat to izv\u0113l\u0113ju\u0161ies, ar\u012b termin\u0101\u013cu uzskaites datu importu.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Izmantojiet SkyPlanner paral\u0113li pa\u0161reiz\u0113jam pl\u0101nam, sal\u012bdziniet datumus un labojiet pamatdatus.<\/li>\n\n\n<li><strong>Ekspluat\u0101cijas s\u0101k\u0161ana.<\/strong> Kad dati sakr\u012bt, iesl\u0113dziet ierakst\u012b\u0161anu atpaka\u013c.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-karat-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot KARAT integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Par saskarni vienojas katrai instal\u0101cijai atsevi\u0161\u0137i.<\/strong> Atv\u0113liet laiku tv\u0113ruma noteik\u0161anai kop\u0101 ar KARAT Software vai savu partneri un, dokument\u0113jot datu atbilst\u012bbu, fiks\u0113jiet ar\u012b eksporta un importa form\u0101tu.<\/li>\n\n\n<li><strong>Atbild\u012bba par pl\u0101nu.<\/strong> Aizverot APS KARAT, pl\u0101ni tiek saglab\u0101ti ra\u017eo\u0161anas datos. Izlemiet, vai un kurus pas\u016bt\u012bjumus tas turpin\u0101s pl\u0101not.<\/li>\n\n\n<li><strong>Kop\u0113jais pl\u0101ns vair\u0101k\u0101m ra\u017eotn\u0113m.<\/strong> Katr\u0101 ra\u017eotn\u0113 nosakiet, kuriem pas\u016bt\u012bjumiem SkyPlanner sast\u0101d\u012bs grafiku.<\/li>\n\n\n<li><strong>Eso\u0161\u0101s termin\u0101\u013cu integr\u0101cijas.<\/strong> Ja termin\u0101\u013cu uzskaites dati jau tiek eksport\u0113ti uz citu sist\u0113mu, izmantojiet eso\u0161o saska\u0146oto saskarni ar\u012b SkyPlanner darba laika ierakstiem, nevis pievienojiet otru.<\/li>\n\n\n<li><strong>Laika m\u0113rvien\u012bbas.<\/strong> Pirmaj\u0101 iel\u0101d\u0113 p\u0101rbaudiet oper\u0101ciju laika m\u0113rvien\u012bbas tehnolo\u0123iskajos mar\u0161rutos. No t\u0101m ir atkar\u012bgs visu ilgumu apr\u0113\u0137ins.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-karat-integratio\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 un uztur KARAT integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c ekspluat\u0101cijas s\u0101k\u0161anas,<\/strong> aptverot saska\u0146ot\u0101s eksporta, importa un termin\u0101\u013cu uzskaites datu pl\u016bsmas. Katr\u0101 ra\u017eotn\u0113 KARAT izmanto at\u0161\u0137ir\u012bgi, un \u0161aj\u0101 darb\u0101 lieti noder zin\u0101\u0161anas par \u0161\u012bm \u012bpatn\u012bb\u0101m.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b KARAT Software vai j\u016bsu KARAT partneris.<\/strong> Vi\u0146i p\u0101rzina j\u016bsu instal\u0101ciju un datu strukt\u016bras un kop\u0101 ar SkyPlanner komandu var iestat\u012bt saska\u0146oto saskarni un integr\u0101cijas lietot\u0101ju.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var papildin\u0101t integr\u0101ciju,<\/strong> izmantojot SkyPlanner REST API un API pilnvaru. Lai s\u0101ktu darbu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz\u0113s. Integr\u0101cijas dokument\u0101cija pieejama sada\u013c\u0101 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner maks\u0101 no 199 \u20ac m\u0113nes\u012b. Cen\u0101 iek\u013cauti 5 darba centri, un nor\u0113\u0137ini notiek katru m\u0113nesi. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101na pied\u0101v\u0101jumu, \u0146emot v\u0113r\u0101 j\u016bsu procesu un vajadz\u012bbas. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/integracija\/erp\/karat\/razosanas-planosana\/\">KARAT ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai<\/a>, <a href=\"\/lv\/integracija\/erp\/karat\/\">KARAT lapu<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju p\u0101rskatu<\/a>. Ar grafiku sast\u0101d\u012b\u0161anas pamatiem iepaz\u012bstieties sada\u013c\u0101 <a href=\"\/lv\/resursi\/kas-ir-razosanas-planosana\/\">Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana \u013cauj ietaup\u012bt 2 darba stundas katru ned\u0113\u013cu, un jaun\u0101 darba rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu kombinezonos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumta dro\u0161\u012bbas elementu r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir \u013c\u0101vis skaidri saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span> d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner mums ir v\u0113rt\u012bgs k\u0101 ikdien\u0101 noder\u012bgs r\u012bks, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska slodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir krasi samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 SkyPlanner savienojas ar KARAT?<\/summary>\n<p class=\"sp-faq__a\">Pas\u016bt\u012bjumi, pamatdati un pl\u0101notie datumi tiek p\u0101rs\u016bt\u012bti XML form\u0101t\u0101, izmantojot saska\u0146otu KARAT datu saskarni, savuk\u0101rt re\u0123istr\u0113tie darba dati \u2014 izmantojot KARAT termin\u0101\u013cu uzskaiti. SkyPlanner komanda to iestata ievie\u0161anas laik\u0101 kop\u0101 ar KARAT Software vai j\u016bsu KARAT partneri.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 SkyPlanner sa\u0146em KARAT sist\u0113m\u0101 veikt\u0101s izmai\u0146as?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner nolasa KARAT datus p\u0113c katrai ra\u017eotnei noteikta grafika, atlasot tikai atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un jaun\u0101k\u0101s izmai\u0146as. SkyPlanner izmanto savus webhooks, lai nos\u016bt\u012btu grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c KARAT?<\/summary>\n<p class=\"sp-faq__a\">Katras pas\u016bt\u012bjuma oper\u0101cijas pl\u0101notie s\u0101kuma un beigu datumi tiek import\u0113ti caur saska\u0146oto saskarni. Ievie\u0161anas tv\u0113ruma noteik\u0161anas laik\u0101 SkyPlanner komanda nosaka importa m\u0113r\u0137i: resursu rezerv\u0101cijas vai oper\u0101ciju datumus ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai operatoru darba laika ierakstus var nos\u016bt\u012bt atpaka\u013c uz KARAT?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, ja izv\u0113laties \u0161o iesp\u0113ju. KARAT termin\u0101\u013cu uzskaite pie\u0146em import\u0113tus datus caur saska\u0146otu saskarni, t\u0101p\u0113c SkyPlanner darba laika ieraksti tiek nos\u016bt\u012bti k\u0101 katras oper\u0101cijas s\u0101k\u0161anas, aptur\u0113\u0161anas un daudzuma notikumi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai KARAT partnerim ieteikt APS KARAT vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja klienta pl\u0101ns bie\u017ei main\u0101s un t\u0101 pamat\u0101 j\u0101b\u016bt aktu\u0101lajiem datiem. APS KARAT pl\u0101no\u0161anai izmanto no ra\u017eo\u0161anas eksport\u0113tus datus, un pl\u0101not\u0101ji izveido vair\u0101kus variantus, pirms vienu no tiem saglab\u0101 atpaka\u013c sist\u0113m\u0101 (<a href=\"https:\/\/www.karatsoftware.cz\/propojeni-pokrocileho-planovani-vyroby-aps-a-rizeni-dodavatelskeho-retezce-scm-v-is-karat\/\">KARAT<\/a>). SkyPlanner autom\u0101tiski p\u0101rpl\u0101no, pl\u0101no p\u0101rregul\u0113\u0161anu, instrumentus, brig\u0101des un materi\u0101lus un \u013cauj str\u0101d\u0101t neierobe\u017eotam lietot\u0101ju skaitam \u2014 no 199 \u20ac m\u0113nes\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t datus no KARAT ar CSV vai Excel failiem. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ KARAT KARAT integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 KARAT integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot IS KARAT ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar KARAT, izmantojot pa\u0161as KARAT saskarnes: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu KARAT konfigur\u0101cijai &#8230; <a title=\"KARAT integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/integracijas-celvedis\/\" aria-label=\"Read more about KARAT integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106644,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107864","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>KARAT APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Savienojiet KARAT ar SkyPlanner APS: saska\u0146ota XML saskarne, termin\u0101\u013cu atskai\u0161u imports, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113jums, atpaka\u013cieraksta k\u0101rt\u012bba, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"KARAT integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienojiet KARAT ar SkyPlanner APS: saska\u0146ota XML saskarne, termin\u0101\u013cu atskai\u0161u imports, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113jums, atpaka\u013cieraksta k\u0101rt\u012bba, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/karat\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/karat\\\/integracijas-celvedis\\\/\",\"name\":\"KARAT APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Savienojiet KARAT ar SkyPlanner APS: saska\u0146ota XML saskarne, termin\u0101\u013cu atskai\u0161u imports, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113jums, atpaka\u013cieraksta k\u0101rt\u012bba, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/karat\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/karat\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/karat\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai KARAT: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/karat\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"KARAT integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"KARAT APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Savienojiet KARAT ar SkyPlanner APS: saska\u0146ota XML saskarne, termin\u0101\u013cu atskai\u0161u imports, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113jums, atpaka\u013cieraksta k\u0101rt\u012bba, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"KARAT integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienojiet KARAT ar SkyPlanner APS: saska\u0146ota XML saskarne, termin\u0101\u013cu atskai\u0161u imports, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113jums, atpaka\u013cieraksta k\u0101rt\u012bba, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/integracijas-celvedis\/","name":"KARAT APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Savienojiet KARAT ar SkyPlanner APS: saska\u0146ota XML saskarne, termin\u0101\u013cu atskai\u0161u imports, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113jums, atpaka\u013cieraksta k\u0101rt\u012bba, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai KARAT: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/"},{"@type":"ListItem","position":5,"name":"KARAT integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ KARAT KARAT integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 KARAT integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot IS KARAT ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar KARAT, izmantojot pa\u0161as KARAT saskarnes: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu KARAT konfigur\u0101cijai&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=107864"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107864\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106644"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=107864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}