{"id":107777,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/sylob\/razosanas-planosana\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/razosanas-planosana\/","title":{"rendered":"Vai Sylob ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Sylob pl\u0101no\u0161anas un CADPLAN sal\u012bdzin\u0101jums ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Sylob<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Sylob ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? <span class=\"hl\">Sylob pl\u0101no\u0161anas un CADPLAN sal\u012bdzin\u0101jums ar SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">J\u0101, katram darba centram atsevi\u0161\u0137i. Sylob 9 katru darba centru (centre de charge) var pl\u0101not ar neierobe\u017eotu vai ierobe\u017eotu jaudu. Ja jauda ir ierobe\u017eota, darba centr\u0101 vienlaikus veic tikai vienu oper\u0101ciju. Sylob m\u0101c\u012bbu materi\u0101los ieteikts s\u0101kt ar neierobe\u017eotu jaudu. Grafiku optimiz\u0101ciju, iev\u0113rojot ierobe\u017eojumus, nodro\u0161ina CADPLAN \u2014 APS risin\u0101jums, ko Sylob savieno ar ERP. SkyPlanner APS ir m\u0101ko\u0146risin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai, kas darbojas l\u012bdz\u0101s Sylob ERP. To varat izm\u0113\u0123in\u0101t ar saviem ra\u017eo\u0161anas pas\u016bt\u012bjumiem 30 dienu izm\u0113\u0123in\u0101juma laik\u0101.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-sylob-erp-plans-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 Sylob ERP pl\u0101no ra\u017eo\u0161anu \u2014 soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sylob nodro\u0161ina pl\u0101no\u0161anu vair\u0101kos l\u012bme\u0146os: &#8220;Plan Industriel et Commercial (PIC), Plan Directeur de Production (PDP), plan de charge, ordonnancement court terme,&#8221; (ra\u017eo\u0161anas un p\u0101rdo\u0161anas pl\u0101ns, ra\u017eo\u0161anas pamatpl\u0101ns, noslodzes pl\u0101ns un \u012bstermi\u0146a ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana). To papildina digit\u0101ls ceha pl\u0101ns un darbinieku darba pl\u0101no\u0161ana. (<a href=\"https:\/\/www.sylob.com\/fr\/fonctionnalites\/planification-ordonnancement\">Sylob<\/a>) Ra\u017eo\u0161anas pl\u0101no\u0161anas \u0137\u0113di veido se\u0161i posmi.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Artikuli, materi\u0101lu specifik\u0101cijas un tehnolo\u0123iskie procesi<\/h3>\n\n\n<p>Artikuli (articles) ir iep\u0113rkam\u0101s vai ra\u017eojam\u0101s vien\u012bbas. Ra\u017eojamam artikulam ir daudzl\u012bme\u0146u materi\u0101lu specifik\u0101cija (nomenclature) un tehnolo\u0123iskais process (gamme), kur\u0101 nor\u0101d\u012btas oper\u0101cijas, to ilgums un atskaites punkti. Sylob sagatavo ra\u017eo\u0161anas pas\u016bt\u012bjumus &#8220;\u00e0 partir des op\u00e9rations, temps et jalonnements d\u00e9finis dans vos gammes&#8221; (pamatojoties uz j\u016bsu tehnolo\u0123iskajos procesos noteiktaj\u0101m oper\u0101cij\u0101m, ilgumu un atskaites punktiem) un atbalsta ar\u012b alternat\u012bvus tehnolo\u0123iskos procesus. (<a href=\"https:\/\/www.sylob.com\/fr\/fonctionnalites\/gestion-de-production\">Sylob<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Darba centri un to kalend\u0101ri<\/h3>\n\n\n<p>Katru oper\u0101ciju veic darba centr\u0101. Sylob to defin\u0113 k\u0101 &#8220;un groupe de ressources capable de r\u00e9aliser la m\u00eame t\u00e2che dans les m\u00eames conditions&#8221; (resursu grupu, kas sp\u0113j veikt vienu un to pa\u0161u uzdevumu vien\u0101dos apst\u0101k\u013cos). Darba centra tips ir Machine (iek\u0101rta) vai darbasp\u0113ks (main d&#8217;\u0153uvre). (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/31038889\/SUPFOR+-+Centres+de+charge\">Forterro zin\u0101\u0161anu b\u0101ze<\/a>)<\/p>\n\n\n<p>Jaudu nosaka \u0161\u0101di iestat\u012bjumu lauki:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Nombre de ressources<\/strong>: iek\u0101rtu vai cilv\u0113ku skaits. Jaudu apr\u0113\u0137ina, resursu skaitu reizinot ar kalend\u0101r\u0101 paredz\u0113taj\u0101m stund\u0101m.<\/li>\n\n\n<li><strong>Capacit\u00e9 maximum<\/strong>: robe\u017ev\u0113rt\u012bba, kuru p\u0101rsniedzot, darba centrs tiek uzskat\u012bts par p\u0101rslogotu. Noslodzes pl\u0101n\u0101 t\u0101 kalpo k\u0101 vizu\u0101ls br\u012bdin\u0101jums.<\/li>\n\n\n<li><strong>Attente amont \/ Attente aval<\/strong>: gaid\u012b\u0161anas laiks stund\u0101s pirms oper\u0101cijas un pirms n\u0101kam\u0101s oper\u0101cijas \u2014 transport\u0113\u0161anai, \u017e\u0101v\u0113\u0161anai vai dzes\u0113\u0161anai.<\/li>\n\n\n<li><strong>Semaine type<\/strong>: standarta darba ned\u0113\u013ca ar iz\u0146\u0113mumiem, kas pagarina vai sa\u012bsina darba laiku vai maina resursu skaitu.<\/li>\n\n\n<li><strong>Type de capacit\u00e9<\/strong>: neierobe\u017eota jauda vai viena no trim ierobe\u017eotas jaudas v\u0113rt\u012bb\u0101m.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">3. Neto vajadz\u012bbas (CBN)<\/h3>\n\n\n<p>Sylob apr\u0113\u0137ina neto vajadz\u012bbas (CBN) un bruto vajadz\u012bbas (CBB) un sasaista pl\u0101na izmai\u0146as ar iepirkumiem un ra\u017eo\u0161anu. (<a href=\"https:\/\/www.sylob.com\/fr\/fonctionnalites\/planification-ordonnancement\">Sylob<\/a>) Sylob sast\u0101da grafiku atpaka\u013cvirzien\u0101: &#8220;Sylob planifie au plus tard.&#8221; (Sylob pl\u0101no uz v\u0113l\u0101ko iesp\u0113jamo laiku.) Oper\u0101cijas iepl\u0101no p\u0113c iesp\u0113jas v\u0113l\u0101k, tuv\u0101k datumam, kad nepiecie\u0161ams rezult\u0101ts.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Noslodzes pl\u0101ns (plan de charge)<\/h3>\n\n\n<p>Noslodzes apr\u0113\u0137ins izvieto ra\u017eo\u0161anas pas\u016bt\u012bjumu (OF) oper\u0101cijas darba centros. Ja jauda ir <strong>neierobe\u017eota<\/strong>, Sylob \u0146em v\u0113r\u0101 tikai vajadz\u012bbu datumus, un &#8220;Plusieurs op\u00e9rations peuvent \u00eatre r\u00e9alis\u00e9es en m\u00eame temps&#8221; (vair\u0101kas oper\u0101cijas var veikt vienlaikus). Noslodzes pl\u0101n\u0101 k\u013c\u016bst redzamas p\u0101rslodzes, un pl\u0101not\u0101js t\u0101s izl\u012bdzina. Noslodzes pl\u0101ns &#8220;fonctionne en simulation&#8221; (darbojas simul\u0101cijas re\u017e\u012bm\u0101), lai p\u0101rbaud\u012btu pie\u0146\u0113mumus katram darba centram un nor\u0101d\u012btu uz komponentu kav\u0113jumiem, neizpild\u0101miem pas\u016bt\u012bjumiem un tr\u016bksto\u0161iem instrumentiem.<\/p>\n\n\n<p>Forterro p\u0101rstr\u0101d\u0101ja noslodzes pl\u0101nu Sylob 9 versij\u0101. K\u0101 nor\u0101da pats uz\u0146\u0113mums, iepriek\u0161\u0113j\u0101 versija bija &#8220;plus d&#8217;un outil de visualisation plut\u00f4t qu&#8217;un outil de planification dynamique&#8221; (dr\u012bz\u0101k vizualiz\u0101cijas, nevis dinamiskas pl\u0101no\u0161anas r\u012bks), un t\u0101s viet\u0101 bie\u017ei izmantoja Excel. (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/31041349\/Plan+de+charge+et+diagramme+de+Gantt\">Forterro<\/a>) Tagad pl\u0101not\u0101js var skat\u012bt noslodzi veidojo\u0161o OF sarakstu, kas sak\u0101rtots p\u0113c laika rezerv\u0113m un priorit\u0101t\u0113m, p\u0101rb\u012bd\u012bt pas\u016bt\u012bjumus un apstiprin\u0101t izmai\u0146as.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Ra\u017eo\u0161anas pl\u0101no\u0161ana ar ierobe\u017eotu jaudu<\/h3>\n\n\n<p>Ja jauda ir <strong>ierobe\u017eota<\/strong>, &#8220;une seule op\u00e9ration est permise sur le centre de charge&#8221; (darba centr\u0101 at\u013cauta tikai viena oper\u0101cija vienlaikus), un darba centru uzskata par \u0161auro vietu. Tr\u012bs ierobe\u017eotas jaudas v\u0113rt\u012bbas nosaka darbinieku darba pl\u0101no\u0161anas veidu: bez darbinieku pl\u0101no\u0161anas, ar vienu darbinieku visai oper\u0101cijai vai ar vair\u0101kiem darbiniekiem, kuri str\u0101d\u0101 sec\u012bgi. Pl\u0101not\u0101js izmanto darb\u012bbu &#8220;Planifier \u00e0 capacit\u00e9 finie&#8221; (pl\u0101not ar ierobe\u017eotu jaudu), lai nevienas divas oper\u0101cijas nep\u0101rkl\u0101tos.<\/p>\n\n\n<p>Uz\u0146\u0113muma iestat\u012bjumos var pievienot kritisko komponentu pieejam\u012bbas ierobe\u017eojumu pl\u0101no\u0161anai ar ierobe\u017eotu jaudu. (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/1683521552\">Forterro<\/a>)<\/p>\n\n\n<p>Kop\u0161 laidiena 2025.Q4.1 l\u012bdz\u0101s eso\u0161aj\u0101m darb\u012bb\u0101m ir pieejama jauna \u2014 &#8220;Planifier les op\u00e9rations dans un Gantt&#8221; (pl\u0101not oper\u0101cijas Gantt diagramm\u0101). T\u0101s pamat\u0101 ir iepriek\u0161 veikts noslodzes apr\u0113\u0137ins. Pl\u0101not\u0101js var p\u0101rvietot oper\u0101cijas ar vilk\u0161anu un nome\u0161anu, main\u012bt darba centru vai resursu skaitu, fiks\u0113t oper\u0101ciju vai visu OF un p\u0101rpl\u0101not OF uz agr\u0101ko vai v\u0113l\u0101ko iesp\u0113jamo laiku. &#8220;Les modifications du planning sont r\u00e9percut\u00e9es en production uniquement lorsqu&#8217;elles sont valid\u00e9es&#8221; (pl\u0101na izmai\u0146as ra\u017eo\u0161an\u0101 st\u0101jas sp\u0113k\u0101 tikai p\u0113c apstiprin\u0101\u0161anas). (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/1549041665\/Nouvelle+interface+de+planification\">Forterro<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. CADPLAN \u2014 APS risin\u0101jums<\/h3>\n\n\n<p>Grafiku optimiz\u0101cijai Sylob pied\u0101v\u0101 CADPLAN: &#8220;la solution logicielle param\u00e9trable CADPLAN, qui s&#8217;interface parfaitement \u00e0 l&#8217;ERP Sylob et le compl\u00e8te&#8221; (konfigur\u0113jams programmat\u016bras risin\u0101jums CADPLAN, kas nevainojami savienojas ar Sylob ERP un to papildina). Sylob apraksta &#8220;un algorithme d&#8217;ordonnancement \u00e0 capacit\u00e9 finie sous contraintes&#8221; (grafiku sast\u0101d\u012b\u0161anas algoritmu, kas iev\u0113ro pieejamo jaudu un ierobe\u017eojumus), neierobe\u017eotu skaitu ra\u017eo\u0161anas uzs\u0101k\u0161anas scen\u0101riju un Gantt vai saraksta skatu. M\u0113r\u0137is ir samazin\u0101t p\u0101rregul\u0113\u0161anas laiku un instrumentu mai\u0146u skaitu. (<a href=\"https:\/\/www.sylob.com\/fr\/fonctionnalites\/planification-aps\">Sylob<\/a>)<\/p>\n\n\n<p>Forterro CADPLAN lietot\u0101ju apm\u0101c\u012bbas aptver ra\u017eo\u0161anas sist\u0113mu, ra\u017eotnes, darba laiku un resursus, k\u0101 ar\u012b tehnolo\u0123iskos datus: ra\u017eojamo izstr\u0101d\u0101jumu kodus, f\u0101zes, uzdevumus un tehnolo\u0123iskos procesus. Taj\u0101s m\u0101ca defin\u0113t simul\u0101cijas, atlasot OF un nosakot pie\u0146\u0113mumus, veikt \u012bstermi\u0146a un vid\u0113ja termi\u0146a apr\u0113\u0137inus, izl\u012bdzin\u0101t noslodzi, izmantot standarta heiristikas un interakt\u012bvi redi\u0123\u0113t rezult\u0101tu. Apm\u0101c\u012bbu dal\u012bbniekiem jau j\u0101p\u0101rzina ERP tehniskie dati. (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/31033777\/Programmes+de+formation\">Forterro apm\u0101c\u012bbu programma<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas paliek pl\u0101not\u0101ja zi\u0146\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sylob dokument\u0101cij\u0101 skaidri nor\u0101da savas pl\u0101no\u0161anas iesp\u0113ju robe\u017eas:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>S\u0101kum\u0101 \u2014 neierobe\u017eota jauda.<\/strong> &#8220;Dans la pratique, privil\u00e9gier le type de capacit\u00e9 \\&#8221;Infinie\\&#8221; dans un premier temps.&#8221; (Praks\u0113 s\u0101kum\u0101 ieteicams izv\u0113l\u0113ties jaudas tipu \u201cNeierobe\u017eota\u201d.) Sylob iesaka s\u0101kt ar neierobe\u017eotu jaudu. Pl\u0101no\u0161anai ar ierobe\u017eotu jaudu vajadz\u012bgs &#8220;un ordonnanceur d\u00e9di\u00e9&#8221; (\u012bpa\u0161i \u0161im darbam nor\u012bkots pl\u0101not\u0101js), \u013coti uzticami tehniskie dati un ra\u017eo\u0161anas izpildes uzskaite gandr\u012bz re\u0101llaik\u0101. (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/31038889\/SUPFOR+-+Centres+de+charge\">Forterro<\/a>)<\/li>\n\n\n<li><strong>Neierobe\u017eotas jaudas re\u017e\u012bm\u0101 darbus izvieto, ne\u0146emot v\u0113r\u0101 jaudu.<\/strong> Pa\u0161a Sylob piem\u0113r\u0101 tr\u012bs OF, kuru izpilde paredz\u0113ta vien\u0101 un taj\u0101 pa\u0161\u0101 dien\u0101, tiek iepl\u0101noti vien\u0101 darba centr\u0101 &#8220;sans tenir compte de la capacit\u00e9 du centre de charge&#8221; (ne\u0146emot v\u0113r\u0101 darba centra jaudu), un centrs ir p\u0101rslogots.<\/li>\n\n\n<li><strong>Viena oper\u0101cija darba centr\u0101 ar ierobe\u017eotu jaudu.<\/strong> \u0160\u0101d\u0101 darba centr\u0101 vienlaikus veic vienu oper\u0101ciju, un Sylob to uzskata par \u0161auro vietu.<\/li>\n\n\n<li><strong>Jauda k\u0101 br\u012bdin\u0101juma slieksnis.<\/strong> Capacit\u00e9 maximum nor\u0101da uz p\u0101rslodzi noslodzes pl\u0101n\u0101. To nov\u0113r\u0161 pl\u0101not\u0101js.<\/li>\n\n\n<li><strong>Pl\u0101not\u0101js apstiprina katru izmai\u0146u.<\/strong> Pl\u0101na izmai\u0146as ra\u017eo\u0161an\u0101 st\u0101jas sp\u0113k\u0101 tikai p\u0113c apstiprin\u0101\u0161anas, un jaunaj\u0101 Gantt saskarn\u0113 p\u0113d\u0113jo izmai\u0146u nevar atsaukt. Forterro iesaka izmai\u0146as apstiprin\u0101t darba gait\u0101.<\/li>\n\n\n<li><strong>Jaunaj\u0101 Gantt v\u0113l nav noslodzes r\u0101d\u012bt\u0101ju.<\/strong> &#8220;Les notions de charge utilis\u00e9e et charge disponible ne sont pas pr\u00e9sentes sur cette version d&#8217;interface (\u00e0 l&#8217;\u00e9tude).&#8221; (\u0160aj\u0101 saskarnes versij\u0101 izmantot\u0101 un pieejam\u0101 jauda netiek att\u0113lota; \u0161\u012b iesp\u0113ja tiek izskat\u012bta.) Gantt saskarn\u0113 2025.Q4.1 izmantot\u0101 un pieejam\u0101 jauda nav redzama.<\/li>\n\n\n<li><strong>Vair\u0101kas pl\u0101no\u0161anas programmas.<\/strong> Forterro uzskaita atsevi\u0161\u0137as darb\u012bbas noslodzei, grafiku sast\u0101d\u012b\u0161anai, pl\u0101no\u0161anai ar ierobe\u017eotu jaudu, darbinieku darba un projektu pl\u0101no\u0161anai. Uz\u0146\u0113mums nor\u0101da, ka pirms jaun\u0101s saskarnes ievie\u0161anas neviena no t\u0101m nebija &#8220;simple et ergonomique&#8221; (vienk\u0101r\u0161a un \u0113rti lietojama).<\/li>\n\n<\/ul>\n\n\n<p>CADPLAN pievieno optimiz\u0101cijas iesp\u0113jas, ta\u010du ar\u012b tam ir savi ierobe\u017eojumi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Atsevi\u0161\u0137s r\u012bks ar saviem datiem.<\/strong> Sylob apraksta CADPLAN k\u0101 ar ERP savienotu risin\u0101jumu, kuram ir savi tehnolo\u0123iskie dati un apr\u0113\u0137inu noteikumi.<\/li>\n\n\n<li><strong>Simul\u0101cijas vada pl\u0101not\u0101js.<\/strong> Public\u0113t\u0101 darbpl\u016bsma paredz defin\u0113t simul\u0101ciju, atlas\u012bt OF, noteikt pie\u0146\u0113mumus, palaist apr\u0113\u0137inu un p\u0113c tam redi\u0123\u0113t rezult\u0101tu.<\/li>\n\n\n<li><strong>Nav publisku nosac\u012bjumu.<\/strong> Sylob nepublic\u0113 CADPLAN cenu vai licences nosac\u012bjumus.<\/li>\n\n<\/ul>\n\n\n<p>Ja visas ra\u017eotnes grafiks netiek sast\u0101d\u012bts atbilsto\u0161i faktiskajai jaudai, rodas p\u0101rslogoti darba centri, vajadz\u012bbu datumi tiek noteikti, pie\u0146emot, ka jauda ir br\u012bvi pieejama, un Excel tiek uztur\u0113ts paral\u0113ls pl\u0101ns.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-sylob-erp-s-own-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar Sylob ERP pl\u0101no\u0161anas iesp\u0113j\u0101m<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar Sylob noslodzes pl\u0101nu un darba centriem ar ierobe\u017eotu jaudu pietiek, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Ra\u017eotnes jaudu ierobe\u017eo viens vai divi darba centri, bet p\u0101r\u0113jos ir br\u012bva jauda.<\/li>\n\n\n<li>Katr\u0101 \u0161auraj\u0101 viet\u0101 vienlaikus veic vienu oper\u0101ciju.<\/li>\n\n\n<li>Izpildes laiki ir gari, un pietiek noslodzi p\u0101rskat\u012bt reizi ned\u0113\u013c\u0101.<\/li>\n\n\n<li>Pl\u0101not\u0101js apstiprina pl\u0101nu un nosaka ra\u017eo\u0161anas uzdevumu sec\u012bbu pie iek\u0101rtas.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161ana, koplietojami instrumenti un materi\u0101lu sa\u0146em\u0161ana nenosaka darbu sec\u012bbu.<\/li>\n\n<\/ul>\n\n\n<p>Ja izmantojat CADPLAN, p\u0101rbaudiet to p\u0113c t\u0101l\u0101k nor\u0101d\u012btajiem krit\u0113rijiem. Lai kuru grafiku sast\u0101d\u012b\u0161anas risin\u0101jumu izv\u0113l\u0113tos, par oper\u0101ciju datumiem j\u0101atbild vienai sist\u0113mai.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs risin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i faktiskajai jaudai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar noslodzes pl\u0101nu vairs nepietiek, ja uz j\u016bsu ra\u017eotni attiecas vair\u0101ki no \u0161iem apgalvojumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Pieg\u0101des kav\u0113jas, lai gan atpaka\u013cvirzien\u0101 apr\u0113\u0137in\u0101tie vajadz\u012bbu datumi \u0161\u0137ita atbilsto\u0161i.<\/li>\n\n\n<li>Mainoties ra\u017eojumu sortimentam, main\u0101s ar\u012b \u0161aur\u0101s vietas.<\/li>\n\n\n<li>Darba centros ir vair\u0101kas iek\u0101rtas, un katrai j\u0101sast\u0101da savs grafiks.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no iepriek\u0161 ra\u017eot\u0101 produkta.<\/li>\n\n\n<li>Vair\u0101kas iek\u0101rtas izmanto vienas un t\u0101s pa\u0161as veidnes, \u0161tanc\u0113\u0161anas instrumentus vai pal\u012bgier\u012bces.<\/li>\n\n\n<li>Pl\u0101nu ierobe\u017eo darbinieku pieejam\u012bba, mai\u0146as un promb\u016btne, un da\u017eiem ra\u017eo\u0161anas uzdevumiem vienlaikus vajadz\u012bgi vair\u0101ki operatori.<\/li>\n\n\n<li>Tas, kad tiek sa\u0146emti ar iepirkuma pas\u016bt\u012bjumiem pas\u016bt\u012btie materi\u0101li, nosaka, kuru ra\u017eo\u0161anas uzdevumu var s\u0101kt.<\/li>\n\n\n<li>Steidzami pas\u016bt\u012bjumi un iek\u0101rtu boj\u0101jumi liek p\u0101rpl\u0101not ra\u017eo\u0161anu vair\u0101kas reizes ned\u0113\u013c\u0101.<\/li>\n\n\n<li>Operatoriem t\u0101lrun\u012b vai plan\u0161etdator\u0101 j\u0101redz sava uzdevumu rinda.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<p>P\u0101rrun\u0101jiet katru punktu ar visiem pieg\u0101d\u0101t\u0101jiem, ar\u012b CADPLAN:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Visu resursu ierobe\u017eojumi vienlaikus<\/strong>: j\u0101\u0146em v\u0113r\u0101 katras iek\u0101rtas, operatora un instrumenta pieejam\u012bba un mai\u0146as, nevis tikai viena \u0161aur\u0101 vieta.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiku matrica<\/strong>: p\u0101rejai no viena produkta uz citu vajadz\u012bgais laiks ir atkar\u012bgs no sec\u012bbas un abos virzienos at\u0161\u0137iras. \u0160os laikus izmanto, lai samazin\u0101tu kop\u0113jo p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/strong>, lai viena pal\u012bgier\u012bce nekad netiktu iepl\u0101nota div\u0101m iek\u0101rt\u0101m vienlaikus.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas uzdevumi, kam vajadz\u012bgi vair\u0101ki operatori<\/strong>, pie\u0161\u0137irot tos cilv\u0113kiem, kuri attiec\u012bgaj\u0101s mai\u0146\u0101s ir pieejami.<\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161ana atbilsto\u0161i materi\u0101lu pieejam\u012bbai<\/strong>, \u0146emot v\u0113r\u0101 gan kr\u0101jumus, gan gaid\u0101m\u0101s pieg\u0101des p\u0113c iepirkuma pas\u016bt\u012bjumiem, nevis tikai kr\u0101jumus.<\/li>\n\n\n<li><strong>Alternat\u012bvas iek\u0101rtas un darbinieki<\/strong>, ko pl\u0101no\u0161anas dzin\u0113js izmanto, kad prim\u0101rais resurss ir aiz\u0146emts.<\/li>\n\n\n<li><strong>Autom\u0101tiska p\u0101rpl\u0101no\u0161ana<\/strong>, ra\u017eo\u0161anai virzoties uz priek\u0161u vai mainoties pas\u016bt\u012bjumiem, pl\u0101not\u0101jam nedefin\u0113jot un nepalai\u017eot simul\u0101ciju.<\/li>\n\n\n<li><strong>Operatoru uzdevumu rindas<\/strong> t\u0101lrun\u012b vai plan\u0161etdator\u0101, izpildes zi\u0146ojumu datus atspogu\u013cojot pl\u0101n\u0101.<\/li>\n\n\n<li><strong>Izm\u0113\u0123in\u0101jums ar saviem OF<\/strong> pirms jebk\u0101da l\u0113muma par licenci vai projektu.<\/li>\n\n\n<li><strong>Skaidri noteikta datu ierakst\u012b\u0161ana atpaka\u013c Sylob.<\/strong> Pl\u0101notie datumi j\u0101ieraksta OF oper\u0101cij\u0101s, bet izpildes zi\u0146ojumi \u2014 taj\u0101s pa\u0161\u0101s oper\u0101cij\u0101s. Vienojieties, kura sist\u0113ma nosaka oper\u0101ciju datumus.<\/li>\n\n<\/ul>\n\n\n<p>Risin\u0101jumus var iedal\u012bt tr\u012bs grup\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>CADPLAN<\/strong> ir APS modulis, ko Sylob savieno ar ERP sist\u0113mu.<\/li>\n\n\n<li><strong>Ceha darbu grafiku sast\u0101d\u012b\u0161anas r\u012bki<\/strong> no Francijas pieg\u0101d\u0101t\u0101jiem, kas nolasa OF no ERP sist\u0113mas.<\/li>\n\n\n<li><strong>M\u0101ko\u0146a APS ar ra\u017eo\u0161anas izpildes funkcij\u0101m<\/strong> \u2014 \u0161aj\u0101 grup\u0101 ietilpst SkyPlanner \u2014 darbojas l\u012bdz\u0101s Sylob un autom\u0101tiski sast\u0101da grafiku visiem resursiem. \u0160ie risin\u0101jumi past\u0101v\u012bgi p\u0101rpl\u0101no darbu, mainoties ra\u017eo\u0161anas situ\u0101cijai, un nodro\u0161ina operatoriem piek\u013cuvi grafikam.<\/li>\n\n<\/ul>\n\n\n<p>Visu \u0161o risin\u0101jumu pamat\u0101 eso\u0161\u0101 metode ir izskaidrota m\u016bsu <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ce\u013cved\u012b par ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101da ir SkyPlanner loma<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS nodro\u0161ina visu \u0161aj\u0101 sarakst\u0101 min\u0113to. Katra darba centra, cilv\u0113ka un instrumenta pieejam\u012bba tiek uzskat\u012bta par ierobe\u017eotu. Sylob darba centrs ar trim iek\u0101rt\u0101m k\u013c\u016bst par triju darba centru grupu, kur katram ir sava uzdevumu rinda. Arcturus AI dzin\u0113js da\u017e\u0101s sekund\u0113s izveido oper\u0101ciju l\u012bme\u0146a grafiku, sak\u0101rtojot t\u0101s atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m un izpildes termi\u0146iem.<\/p>\n\n\n<p>P\u0101rregul\u0113\u0161anas laiku matric\u0101 glab\u0101jas laiki p\u0101rejai starp produktu p\u0101riem abos virzienos, piem\u0113ram, no zil\u0101 uz sarkano \u2014 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Dzin\u0113js izv\u0113las sec\u012bbu ar maz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku. Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, vienam ra\u017eo\u0161anas uzdevumam vienlaikus var b\u016bt vajadz\u012bgi vair\u0101ki operatori, un dzin\u0113js izmanto alternat\u012bvas iek\u0101rtas vai darbiniekus, ja prim\u0101rais resurss nav pieejams.<\/p>\n\n\n<p>Sast\u0101dot grafiku atbilsto\u0161i materi\u0101lu pieejam\u012bbai, sist\u0113ma model\u0113 turpm\u0101kos kr\u0101jumus p\u0113c Sylob kr\u0101jumu datiem un atv\u0113rtajiem iepirkuma pas\u016bt\u012bjumiem (pas\u016bt\u012bjumiem pieg\u0101d\u0101t\u0101jiem). Pas\u016bt\u012btais materi\u0101ls tiek uzskat\u012bts par pieejamu t\u0101 pieg\u0101des datum\u0101, t\u0101p\u0113c darbs tiek iepl\u0101nots tikai tad, kad materi\u0101ls ir pieejams.<\/p>\n\n\n<p>Mainoties ra\u017eo\u0161anas situ\u0101cijai, Autopilot autom\u0101tiski p\u0101rpl\u0101no darbu, iev\u0113rojot j\u016bsu fiks\u0113tos ierobe\u017eojumus un priorit\u0101tes, tostarp Running Time Lock. Pl\u0101not\u0101ji redi\u0123\u0113 ra\u017eo\u0161anas uzdevumus interakt\u012bv\u0101 Gantt laika skal\u0101. Operatori redz savu uzdevumu rindu un re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations, Production Timer un Quick Log Mode.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis CADPLAN, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Darba grafiks j\u0101ievie\u0161 da\u017eu ned\u0113\u013cu laik\u0101.<\/strong> SkyPlanner ir m\u0101ko\u0146programmat\u016bra, kas darbojas l\u012bdz\u0101s Sylob ERP un nolasa eso\u0161os OF un tehnolo\u0123iskos procesus. Izm\u0113\u0123in\u0101juma laik\u0101 varat to p\u0101rbaud\u012bt ar saviem OF un s\u0101kt lietot ra\u017eo\u0161an\u0101 da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma.<\/li>\n\n\n<li><strong>Pl\u0101nam j\u0101atjaunojas pa\u0161am.<\/strong> Saska\u0146\u0101 ar public\u0113to CADPLAN darbpl\u016bsmu atlas\u012btiem OF tiek veiktas pl\u0101not\u0101ja defin\u0113tas simul\u0101cijas. Autopilot autom\u0101tiski p\u0101rpl\u0101no darbu p\u0113c katr\u0101m b\u016btisk\u0101m izmai\u0146\u0101m.<\/li>\n\n\n<li><strong>Pl\u0101nu ierobe\u017eo ikviena resursa pieejam\u012bba.<\/strong> Sylob darba centros ar ierobe\u017eotu jaudu vienlaikus izpilda vienu oper\u0101ciju. SkyPlanner vienlaikus \u0146em v\u0113r\u0101 katras iek\u0101rtas, cilv\u0113ka un instrumenta ierobe\u017eoto pieejam\u012bbu. Vien\u0101 grafik\u0101 tiek izmantota p\u0101rregul\u0113\u0161anas laiku matrica un \u0146emti v\u0113r\u0101 uzdevumi ar vair\u0101kiem operatoriem, alternat\u012bvie darba centri un pieg\u0101des p\u0113c iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Operatoriem j\u0101str\u0101d\u0101 p\u0113c aktu\u0101l\u0101s uzdevumu rindas.<\/strong> Mobile Confirmations nodro\u0161ina katram operatoram aktu\u0101lo uzdevumu rindu t\u0101lrun\u012b vai plan\u0161etdator\u0101, un izpildes zi\u0146ojumi tiek nos\u016bt\u012bti atpaka\u013c uz Sylob.<\/li>\n\n<\/ul>\n\n\n<p>S\u0101ciet <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jumu<\/a> ar atv\u0113rto OF eksportu CSV vai Excel form\u0101t\u0101 (l\u012bdz 20 darba centriem, kred\u012btkarte nav vajadz\u012bga). P\u0113c tam cena ir no 199 \u20ac m\u0113nes\u012b, ietverot 5 darba centrus. Integr\u0101cijas cenu nosaka iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas, kop\u0101 ar izv\u0113l\u0113to abon\u0113\u0161anas pl\u0101nu. Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma.<\/p>\n\n\n<p>SkyPlanner integr\u0101cija ar Sylob ERP darbojas abos virzienos: SkyPlanner sa\u0146em OF, tehnolo\u0123iskos procesus, darba centrus, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta pl\u0101notos oper\u0101ciju datumus un ra\u017eo\u0161anas izpildes zi\u0146ojumus. Integr\u0101ciju ievie\u0161anas laik\u0101 konfigur\u0113 SkyPlanner komanda, vai ar\u012b to izveido j\u016bsu Sylob partneris vai izstr\u0101d\u0101t\u0101ji, izmantojot dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>P\u0101rskatu lasiet lap\u0101 <a href=\"\/lv\/integracija\/erp\/sylob\/\">SkyPlanner darbam ar Sylob ERP<\/a>, tehnisko inform\u0101ciju \u2014 <a href=\"\/lv\/integracija\/erp\/sylob\/integracijas-celvedis\/\">Sylob ERP integr\u0101cijas ce\u013cved\u012b<\/a>, bet inform\u0101ciju par cit\u0101m sist\u0113m\u0101m \u2014 <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un komut\u0101cijas iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 darba stundas, un jaun\u0101 uzdevumu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sagatavo\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams ra\u017eo\u0161anas p\u0101rskats re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas palet\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Pap\u012brs p\u0101rtikas iepako\u0161anai<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un uz piepras\u012bjumiem main\u012bt grafiku, kuru izskat\u012b\u0161ana agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad atbild da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sylob ERP ir grafiku sast\u0101d\u012b\u0161anas r\u012bks?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Sylob 9 nodro\u0161ina slodzes pl\u0101nu katram darba centram, \u012bstermi\u0146a grafiku sast\u0101d\u012b\u0161anu Gantt diagramm\u0101, ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai darba centros, kuriem iestat\u012bta ierobe\u017eota jauda, un darbinieku darba pl\u0101no\u0161anu. CADPLAN ir Sylob APS modulis optimiz\u0113tu grafiku sast\u0101d\u012b\u0161anai, iev\u0113rojot ierobe\u017eojumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar ko Sylob at\u0161\u0137iras neierobe\u017eota un ierobe\u017eota jauda?<\/summary>\n<p class=\"sp-faq__a\">Darba centr\u0101 ar neierobe\u017eotu jaudu oper\u0101cijas tiek iepl\u0101notas vajadz\u012bgajos datumos, un vair\u0101kas var notikt vienlaikus, t\u0101p\u0113c slodzes pl\u0101n\u0101 ir redzamas p\u0101rslodzes. Darba centr\u0101 ar ierobe\u017eotu jaudu vienlaikus notiek tikai viena oper\u0101cija, un pl\u0101not\u0101js to iepl\u0101no ar funkciju &#8220;Planifier \u00e0 capacit\u00e9 finie&#8221; (pl\u0101not atbilsto\u0161i ierobe\u017eotai jaudai). Sylob iesaka s\u0101kt ar neierobe\u017eotu jaudu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai CADPLAN ir da\u013ca no Sylob ERP?<\/summary>\n<p class=\"sp-faq__a\">Sylob pied\u0101v\u0101 CADPLAN k\u0101 savu APS moduli un nor\u0101da, ka tas ir savienots ar ERP sist\u0113mu. Tam ir savi ra\u017eo\u0161anas meto\u017eu dati, simul\u0101ciju apr\u0113\u0137ini un heiristikas, un Forterro organiz\u0113 atsevi\u0161\u0137as apm\u0101c\u012bbas t\u0101 lietot\u0101jiem un administratoriem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner var darboties l\u012bdz\u0101s Sylob ERP bez CADPLAN?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. SkyPlanner tie\u0161i iepl\u0101no Sylob OF un ieraksta pl\u0101notos datumus atpaka\u013c OF oper\u0101cij\u0101s. Pirms ra\u017eo\u0161anas uzdevuma iepl\u0101no\u0161anas tas ar\u012b p\u0101rbauda Sylob kr\u0101jumus un atv\u0113rtos iepirkuma pas\u016bt\u012bjumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Sylob ERP?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet atv\u0113rtos OF, oper\u0101cijas un darba centrus no Sylob vaic\u0101juma CSV vai Excel form\u0101t\u0101 un import\u0113jiet tos 30 dienu izm\u0113\u0123in\u0101juma laik\u0101. Kred\u012btkarte nav vajadz\u012bga. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Sylob Vai Sylob ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Sylob pl\u0101no\u0161anas un CADPLAN sal\u012bdzin\u0101jums ar SkyPlanner APS J\u0101, katram darba centram atsevi\u0161\u0137i. Sylob 9 katru darba centru (centre de charge) var pl\u0101not ar neierobe\u017eotu vai ierobe\u017eotu jaudu. Ja jauda ir ierobe\u017eota, darba centr\u0101 vienlaikus veic tikai vienu &#8230; <a title=\"Vai Sylob ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Sylob pl\u0101no\u0161anas un CADPLAN sal\u012bdzin\u0101jums ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/razosanas-planosana\/\" aria-label=\"Read more about Vai Sylob ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Sylob pl\u0101no\u0161anas un CADPLAN sal\u012bdzin\u0101jums ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106615,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107777","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai Sylob ERP pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i pieejamajai jaudai?<\/title>\n<meta name=\"description\" content=\"Sylob 9 darba centrus pl\u0101no ar neierobe\u017eotu vai ierobe\u017eotu jaudu. CADPLAN ir t\u0101 APS. K\u0101 darbojas Sylob pl\u0101no\u0161ana, kur ir t\u0101s robe\u017eas un ko izv\u0113l\u0113ties.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Sylob ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Sylob pl\u0101no\u0161anas un CADPLAN sal\u012bdzin\u0101jums ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Sylob 9 darba centrus pl\u0101no ar neierobe\u017eotu vai ierobe\u017eotu jaudu. CADPLAN ir t\u0101 APS. K\u0101 darbojas Sylob pl\u0101no\u0161ana, kur ir t\u0101s robe\u017eas un ko izv\u0113l\u0113ties.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sylob\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sylob\\\/razosanas-planosana\\\/\",\"name\":\"Vai Sylob ERP pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i pieejamajai jaudai?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Sylob 9 darba centrus pl\u0101no ar neierobe\u017eotu vai ierobe\u017eotu jaudu. CADPLAN ir t\u0101 APS. K\u0101 darbojas Sylob pl\u0101no\u0161ana, kur ir t\u0101s robe\u017eas un ko izv\u0113l\u0113ties.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sylob\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sylob\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sylob\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Sylob ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sylob\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Sylob ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Sylob pl\u0101no\u0161anas un CADPLAN sal\u012bdzin\u0101jums ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai Sylob ERP pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i pieejamajai jaudai?","description":"Sylob 9 darba centrus pl\u0101no ar neierobe\u017eotu vai ierobe\u017eotu jaudu. CADPLAN ir t\u0101 APS. K\u0101 darbojas Sylob pl\u0101no\u0161ana, kur ir t\u0101s robe\u017eas un ko izv\u0113l\u0113ties.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Sylob ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Sylob pl\u0101no\u0161anas un CADPLAN sal\u012bdzin\u0101jums ar SkyPlanner APS","og_description":"Sylob 9 darba centrus pl\u0101no ar neierobe\u017eotu vai ierobe\u017eotu jaudu. CADPLAN ir t\u0101 APS. K\u0101 darbojas Sylob pl\u0101no\u0161ana, kur ir t\u0101s robe\u017eas un ko izv\u0113l\u0113ties.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/razosanas-planosana\/","name":"Vai Sylob ERP pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i pieejamajai jaudai?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Sylob 9 darba centrus pl\u0101no ar neierobe\u017eotu vai ierobe\u017eotu jaudu. CADPLAN ir t\u0101 APS. K\u0101 darbojas Sylob pl\u0101no\u0161ana, kur ir t\u0101s robe\u017eas un ko izv\u0113l\u0113ties.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Sylob ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/"},{"@type":"ListItem","position":5,"name":"Vai Sylob ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Sylob pl\u0101no\u0161anas un CADPLAN sal\u012bdzin\u0101jums ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Sylob Vai Sylob ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Sylob pl\u0101no\u0161anas un CADPLAN sal\u012bdzin\u0101jums ar SkyPlanner APS J\u0101, katram darba centram atsevi\u0161\u0137i. Sylob 9 katru darba centru (centre de charge) var pl\u0101not ar neierobe\u017eotu vai ierobe\u017eotu jaudu. Ja jauda ir ierobe\u017eota, darba centr\u0101 vienlaikus veic tikai vienu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107777","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=107777"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107777\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106615"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=107777"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}