{"id":107748,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/","title":{"rendered":"SAP Business ByDesign integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ SAP Business ByDesign<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SAP Business ByDesign integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 SAP Business ByDesign integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m ir aprakst\u012bts, k\u0101 savienot ByDesign ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar ByDesign, izmantojot SAP public\u0113tos t\u012bmek\u013ca pakalpojumus:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em izpildei nodotos ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m, Production Models, Bills of Material un Bills of Operations, iek\u0101rtu un darbasp\u0113ka resursus, materi\u0101lus, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Katra ra\u017eo\u0161anas pas\u016bt\u012bjuma pl\u0101notais s\u0101kums un katras oper\u0101cijas galvenais resurss tiek nos\u016bt\u012bti atpaka\u013c uz ByDesign.<\/li>\n\n\n<li>Apstiprin\u0101tos daudzumus, br\u0101\u0137i un pabeigtos uzdevumus var ierakst\u012bt atpaka\u013c ra\u017eo\u0161anas partij\u0101s.<\/li>\n\n\n<li>SkyPlanner webhook pazi\u0146ojumi nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju ar j\u016bsu ByDesign vidi, izmantojot REST API, un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas darb\u0101. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las iesaist\u012bties vai pa\u0161i veidot risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-bydesign-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP ByDesign integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Katras versijas pieejamie ByDesign A2X SOAP t\u012bmek\u013ca pakalpojumi ir public\u0113ti <a href=\"https:\/\/help.sap.com\/doc\/a2b4c7ef61d64397b2b1d052082a8a08\/2608\/en-US\/IntegrationServices.html\">t\u012bmek\u013ca pakalpojumu API sarakst\u0101<\/a>. Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas integr\u0101cijai izmanto \u0161\u0101dus pakalpojumus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Manage Production Orders (ManageProductionOrderIn).<\/strong> READ_PROD_ORDER atgrie\u017e piepras\u012bto, agr\u0101ko un v\u0113l\u0101ko s\u0101kuma un beigu laiku, resursus ar pl\u0101noto un faktisko ilgumu, priorit\u0101ti, izpildes statusu un grafika statusu. MAINTAIN_BUNDLE_V2 atjaunina EarliestStartPeriod vai LatestEndPeriod, k\u0101 ar\u012b oper\u0101cijas MainResourceID (<a href=\"https:\/\/help.sap.com\/doc\/a2b4c7ef61d64397b2b1d052082a8a08\/2608\/en-US\/PSM_ISI_R_II_MANAGE_PROD_ORDER_IN.html\">SAP pal\u012bdz\u012bba<\/a>).<\/li>\n\n\n<li><strong>Manage Production Lots (ManageProductionLotsIn).<\/strong> MaintainBundle izveido vai atjaunina ra\u017eo\u0161anas uzdevumus. Katr\u0101 zi\u0146o\u0161anas punkt\u0101 tas \u013cauj nor\u0101d\u012bt apstiprin\u0101to daudzumu, br\u0101\u0137i un atz\u012bmi par apstiprin\u0101\u0161anas pabeig\u0161anu, pabeigt uzdevumu, nor\u0101dot darbinieku, kur\u0161 to izpild\u012bjis, un izpildes laiku, k\u0101 ar\u012b re\u0123istr\u0113t resursu izmantojumu (<a href=\"https:\/\/help.sap.com\/doc\/a2b4c7ef61d64397b2b1d052082a8a08\/2608\/en-US\/PSM_ISI_R_II_MANAGE_PROD_LOT_IN.html\">SAP pal\u012bdz\u012bba<\/a>).<\/li>\n\n\n<li><strong>Vaic\u0101jumu pakalpojumi.<\/strong> Query Production Orders, Query Production Lots, Query Production Model, Query Production Bill of Materials, Query Production Bill of Operations (ar\u012b p\u0113c resursa), Query Materials, Read Equipment Resources, Query Labour Resource, Query Purchase Orders, Query Identified Stocks un Determine Availability of Products.<\/li>\n\n\n<li><strong>OData.<\/strong> Piel\u0101goti OData pakalpojumi biznesa objektiem, k\u0101 ar\u012b OData piek\u013cuve datu avotiem un anal\u012btiskajiem p\u0101rskatiem. SAP nor\u0101da: &#8220;companies are fully empowered to decide which business objects&#8221; (uz\u0146\u0113mumi ir piln\u012bb\u0101 ties\u012bgi izlemt, kuri biznesa objekti) tiek padar\u012bti pieejami (<a href=\"https:\/\/help.sap.com\/doc\/7f6eeef4edc84312870d687b2ce0f3a1\/2608\/en-US\/IntegrationScenarios.html\">SAP integr\u0101cijas scen\u0101riji<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>Las\u012b\u0161anai izmantojiet Query pakalpojumus vai OData, bet vis\u0101m ierakst\u012b\u0161anas darb\u012bb\u0101m \u2014 abus Manage pakalpojumus.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un licenc\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ByDesign pus\u0113 izveidojiet SkyPlanner paredz\u0113tu sakaru sist\u0113mu un sakaru konfigur\u0101ciju izmantotajiem pakalpojumiem. Katrai konfigur\u0101cijai ir savs tehniskais lietot\u0101js. SAP dro\u0161\u012bbas rokasgr\u0101mat\u0101 lietojumprogrammu integr\u0101cijas autentifik\u0101cijai ir nor\u0101d\u012bts &#8220;user ID plus password, and the X.509 client certificate&#8221; (lietot\u0101ja ID un parole, k\u0101 ar\u012b attiec\u012bgais klienta sertifik\u0101ts) (<a href=\"https:\/\/help.sap.com\/doc\/e9674bba2e9f423da76f05c02c4a8554\/2608\/en-US\/Security_Guide_for_SAP_Business_ByDesign.pdf\">dro\u0161\u012bbas rokasgr\u0101mata<\/a>). OData var konfigur\u0113t OAuth 2.0. Katra pakalpojuma WSDL lejupiel\u0101d\u0113jiet no sakaru konfigur\u0101cijas vai Service Explorer.<\/p>\n\n\n<p>SkyPlanner pus\u0113 katra izsaukuma galven\u0113 <code>Authorization-Token<\/code> tiek iek\u013cauts API tokens. To izveido SkyPlanner sada\u013c\u0101 Settings &gt; API. Lai s\u0101ktu izstr\u0101di, pietiek ar API tokenu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska datu piepras\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner nos\u016bta webhook pazi\u0146ojumu par katru grafika izmai\u0146u, t\u0101p\u0113c dati tiek ierakst\u012bti atpaka\u013c ByDesign l\u012bdz ar pl\u0101na izmai\u0146\u0101m.<\/p>\n\n\n<p>Lai ieg\u016btu ByDesign izmai\u0146as, periodiski izsauciet Query pakalpojumus. Izpildei nodotos ra\u017eo\u0161anas pas\u016bt\u012bjumus un ra\u017eo\u0161anas partijas nolasiet ik p\u0113c da\u017e\u0101m min\u016bt\u0113m, bet materi\u0101lus, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus \u2014 ret\u0101k. Vaic\u0101jumu rezult\u0101ti tiek dal\u012bti lap\u0101s, izmantojot QueryHitsMaximumNumberValue un LastReturnedObjectID; noklus\u0113juma lapas lielums ir nor\u0101d\u012bts SAP <a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/34de7a7c1a7e43178141074817068fb1\/37faab74f63049d7816184add8077065.html\">t\u012bmek\u013ca pakalpojumu lap\u0101<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>ByDesign objekts (saskarne)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Materi\u0101li (Query Materials)<\/td><td>Produkti un materi\u0101li<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam periodiska nolas\u012b\u0161ana<\/td><\/tr><tr><td>Production Bill of Material (Query Production Bill of Materials)<\/td><td>Produkta strukt\u016bra, katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 mainoties datiem<\/td><\/tr><tr><td>Production Bill of Operations: oper\u0101cijas, Setup, Produce un Tear down darb\u012bbas (Query Production Bill of Operations)<\/td><td>Procesa posmi ar to ilgumu, sagatavo\u0161anas un nosl\u0113guma darbu laiku<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Production Model (Query Production Model)<\/td><td>Produkta tehnolo\u0123iskais process katr\u0101 ra\u017eotn\u0113<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Iek\u0101rtu resursi un resursu grupas (Read Equipment Resources)<\/td><td>Darba centri, darba centru grupas, instrumenti<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam reti<\/td><\/tr><tr><td>Darbasp\u0113ka resursi, darba laiks (Query Labour Resource)<\/td><td>Person\u0101ls un mai\u0146as<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Katru dienu vai neatkar\u012bga mai\u0146u uztur\u0113\u0161ana SkyPlanner<\/td><\/tr><tr><td>Izpildei nodotie ra\u017eo\u0161anas pas\u016bt\u012bjumi un oper\u0101cijas (Query Production Orders, READ_PROD_ORDER)<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Nolas\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas partijas un uzdevumi (Query Production Lots)<\/td><td>Ra\u017eo\u0161anas uzdevumu izpildes gaita<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Nolas\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Identific\u0113tie kr\u0101jumi, produktu pieejam\u012bba (Query Identified Stocks, Determine Availability of Products)<\/td><td>Kr\u0101jumu atlikumi<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Periodiska nolas\u012b\u0161ana ik stundu vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumi (Query Purchase Orders)<\/td><td>Iepirkuma pas\u016bt\u012bjumi, gaid\u0101mie materi\u0101li p\u0113c pieg\u0101des datuma<\/td><td>ByDesign \u2192 SkyPlanner<\/td><td>Periodiska nolas\u012b\u0161ana ik stundu vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>EarliestStartPeriod, oper\u0101cijas MainResourceID (Manage Production Orders, MAINTAIN_BUNDLE_V2)<\/td><td>Pl\u0101notais s\u0101kums, pie\u0161\u0137irtais darba centrs<\/td><td>SkyPlanner \u2192 ByDesign<\/td><td>Mainoties grafikam, ar SkyPlanner webhook pazi\u0146ojumu<\/td><\/tr><tr><td>Apstiprin\u0101tais daudzums, br\u0101\u0137is, uzdevuma pabeig\u0161ana (Manage Production Lots, MaintainBundle)<\/td><td>Darba laika ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 ByDesign<\/td><td>P\u0113c katra apstiprin\u0101juma vai katr\u0101 mai\u0146\u0101, ja \u0161\u012b iesp\u0113ja ir izv\u0113l\u0113ta<\/td><\/tr><tr><td>Nav ByDesign<\/td><td>Sagatavo\u0161anas laiku matrica, pras\u012bbas vair\u0101ku operatoru darbam, alternat\u012bv\u0101s iek\u0101rtas un person\u0101ls<\/td><td>Uztur SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet materi\u0101lus, Production Models, Bills of Material un Bills of Operations, iek\u0101rtu un darbasp\u0113ka resursus. R\u016bp\u012bgi nosakiet resursu atbilst\u012bbu: resursu grupa ar \u010detr\u0101m iek\u0101rt\u0101m k\u013c\u016bst par vienu darba centru grupu vai \u010detriem darba centriem. Iek\u0101rtu resursi, kas ir instrumenti, SkyPlanner k\u013c\u016bst par instrumentiem ar ierobe\u017eotu pieejam\u012bbu.<\/p>\n\n\n<p><strong>2. Ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet izpildei nodotos ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m un materi\u0101liem, k\u0101 ar\u012b atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. SkyPlanner uzskata pas\u016bt\u012btos materi\u0101lus par pieejamiem iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad pas\u016bt\u012bjumam ir iestat\u012bts statuss Delivered. Ra\u017eo\u0161anas priek\u0161likumi paliek ByDesign Supply Planning, l\u012bdz tie k\u013c\u016bst par ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Kad pl\u0101no\u0161anas dzinis ievieto pas\u016bt\u012bjumu grafik\u0101 vai p\u0101rvieto to, SkyPlanner webhook pazi\u0146ojums izsauc Manage Production Orders metodi MAINTAIN_BUNDLE_V2. T\u0101 iestata EarliestStartPeriod un SkyPlanner izv\u0113l\u0113t\u0101s oper\u0101cijas MainResourceID.<\/p>\n\n\n<p><strong>4. Ra\u017eotnes apstiprin\u0101jumi.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un darba laika ieraksti uztur grafiku aktu\u0101lu. J\u016bs izv\u0113laties, vai faktiskos datus ierakst\u012bt atpaka\u013c. Ja j\u0101, Manage Production Lots metode MaintainBundle ieraksta apstiprin\u0101to daudzumu, br\u0101\u0137i un pabeigto uzdevumu kop\u0101 ar t\u0101 izpild\u012bt\u0101ju. Ja n\u0113, apstiprin\u0101jumus ievada ByDesign t\u0101pat k\u0101 l\u012bdz \u0161im.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Pirms palai\u0161anas dokument\u0113jiet tos:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Materi\u0101li, Production Models, daudzumi, pas\u016bt\u012bjumu un partiju statusi<\/td><td>ByDesign<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiki, resursu pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161anas laiku matrica, pras\u012bbas instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Apstiprin\u0101jumi, pre\u010du kust\u012bba, izmaksu apr\u0113\u0137ins<\/td><td>ByDesign; datus ievada tur vai ieraksta no SkyPlanner darba laika ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas ieraksta pas\u016bt\u012bjumu datumus. Nepalaidiet Load Leveling resursiem, kuru grafikus sast\u0101da SkyPlanner, un p\u0101rbaudiet, vai pl\u0101no\u0161anas laik\u0101 netiek p\u0101rvietoti izpildei nodotie pas\u016bt\u012bjumi, par kuriem atbild SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot no ByDesign CSV vai Excel form\u0101t\u0101 eksport\u0113tos resursus, Bills of Operations un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu kart\u0113\u0161ana.<\/strong> Apstipriniet datu atbilst\u012bbas tabulu, atbild\u012bbas noteikumus, sinhroniz\u0101cijas bie\u017eumu un to, vai apstiprin\u0101jumus ierakst\u012bs atpaka\u013c.<\/li>\n\n\n<li><strong>Piek\u013cuve ByDesign.<\/strong> Izveidojiet sakaru sist\u0113mu un sakaru konfigur\u0101cijas un lejupiel\u0101d\u0113jiet WSDL failus. Vispirms veiciet p\u0101rbaudes sav\u0101 ByDesign testa vid\u0113.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Materi\u0101li, Production Models, Bills of Material un Bills of Operations, resursi, darba laiks.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Periodiska nolas\u012b\u0161ana ar dal\u012bjumu lap\u0101s, filtriem un atk\u0101rtotiem m\u0113\u0123in\u0101jumiem.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti, operatoru skaits katram ra\u017eo\u0161anas uzdevumam un alternat\u012bvas iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> SkyPlanner webhook pazi\u0146ojumu izrais\u012bti MAINTAIN_BUNDLE_V2 izsaukumi, k\u0101 ar\u012b partiju apstiprin\u0101jumi, ja \u0161\u012b iesp\u0113ja ir izv\u0113l\u0113ta.<\/li>\n\n\n<li><strong>Paral\u0113la test\u0113\u0161ana.<\/strong> Izmantojiet SkyPlanner, vienlaikus turpinot darbu p\u0113c pa\u0161reiz\u0113j\u0101 pl\u0101na, sal\u012bdziniet datumus un izlabojiet pamatdatus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana.<\/strong> Kad dati sakr\u012bt, iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-sap-bydesign-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot SAP ByDesign integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Viens datums katr\u0101 izsaukum\u0101.<\/strong> &#8220;The EarliestStartPeriod and the LatestEndPeriod cannot be updated together.&#8221; (EarliestStartPeriod un LatestEndPeriod nevar atjaunin\u0101t vienlaikus.) Rakstot datus atpaka\u013c, par atskaites punktu izmantojiet s\u0101kuma datumu.<\/li>\n\n\n<li><strong>Blo\u0137\u0113\u0161ana nav pieejama.<\/strong> A2X pakalpojumi nesaglab\u0101 st\u0101vokli, t\u0101p\u0113c, k\u0101 nor\u0101da SAP, nav iesp\u0113jams nodro\u0161in\u0101t ne transakciju, ne lo\u0123isko blo\u0137\u0113\u0161anu. Pirms katras ierakst\u012b\u0161anas v\u0113lreiz nolasiet pas\u016bt\u012bjumu un apstr\u0101d\u0101jiet konfliktus.<\/li>\n\n\n<li><strong>Pabeig\u0161anu nevar atsaukt.<\/strong> &#8220;Confirmation Finished Indicator cannot be unchecked once it is set.&#8221; (Kad Confirmation Finished Indicator ir atz\u012bm\u0113ts, \u0161o atz\u012bmi vairs nevar no\u0146emt.) Re\u0123istr\u0113jiet pabeig\u0161anu tikai tad, kad operators nosl\u0113dz uzdevumu.<\/li>\n\n\n<li><strong>Pamatresursi un papildu resursi.<\/strong> Sast\u0101dot grafiku, ByDesign \u0146em v\u0113r\u0101 pamatresursus. Operatorus un instrumentus, kas nor\u0101d\u012bti k\u0101 papildu resursi, model\u0113jiet SkyPlanner k\u0101 resursus ar ierobe\u017eotu jaudu, lai, sast\u0101dot grafiku, tiktu p\u0101rbaud\u012bta ar\u012b to pieejam\u012bba.<\/li>\n\n\n<li><strong>Sagatavo\u0161ana un demont\u0101\u017ea.<\/strong> Bills of Operations sagatavo\u0161ana un demont\u0101\u017ea ir nor\u0101d\u012btas k\u0101 aktivit\u0101tes. P\u0101rregul\u0113\u0161anas laikus, kas atkar\u012bgi no darbu sec\u012bbas, p\u0101rnesiet uz sagatavo\u0161anas laiku matricu.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-sap-bydesign-int\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 SAP ByDesign integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/strong> Tas attiecas uz saska\u0146otajiem t\u012bmek\u013ca pakalpojumiem un OData vaic\u0101jumiem. Katrs uz\u0146\u0113mums izmanto ByDesign at\u0161\u0137ir\u012bgi, un konfigur\u0101cij\u0101 tiek \u0146emtas v\u0113r\u0101 \u0161\u012bs zin\u0101\u0161anas.<\/li>\n\n\n<li><strong>Var iesaist\u012bties ar\u012b j\u016bsu SAP ByDesign partneris.<\/strong> Partneris p\u0101rzina j\u016bsu sist\u0113mas vidi, tv\u0113ruma noteik\u0161anu un papla\u0161in\u0101jumus un kop\u0101 ar SkyPlanner komandu var konfigur\u0113t Communication Arrangements.<\/li>\n\n\n<li><strong>Ar\u012b j\u016bsu izstr\u0101d\u0101t\u0101ji var papla\u0161in\u0101t integr\u0101ciju,<\/strong> izmantojot SkyPlanner REST API un API pilnvaru galven\u0113 <code>Authorization-Token<\/code>. Vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz SkyPlanner komanda. Nor\u0101d\u012bjumi ir pieejami <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un nor\u0113\u0137inoties katru m\u0113nesi. Integr\u0101cijas cenu pied\u0101v\u0101jam iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, inform\u0101ciju par <a href=\"\/lv\/integracija\/erp\/sap-business-bydesign\/razosanas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anu ar SAP ByDesign, iev\u0113rojot iek\u0101rtu un darbinieku faktisko jaudu<\/a>, <a href=\"\/lv\/integracija\/erp\/sap-business-bydesign\/\">SAP Business ByDesign lapu<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013cu<\/a>. Cit\u0101m SAP sist\u0113m\u0101m ir atsevi\u0161\u0137i ce\u013cve\u017ei: <a href=\"\/lv\/integracija\/erp\/sap-business-one\/\">SAP Business One<\/a> un <a href=\"\/lv\/integracija\/erp\/sap-s4hana\/\">SAP S\/4HANA<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel izkl\u0101jlap\u0101s uz ra\u017eo\u0161anas optimiz\u0113\u0161anu re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner \u013cauj mums p\u0101rskat\u012bt pieejamo jaudu un padara pl\u0101no\u0161anu prognoz\u0113jamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko produktu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums ir bijis 100% visu SkyPlanner lieto\u0161anas laiku \u2014 kop\u0161 2021. gada.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner v\u0113rt\u012bba mums ir t\u0101, ka tas ir ikdien\u0101 noder\u012bgs r\u012bks, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska noslodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir strauji samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101das SAP ByDesign API izmanto SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SAP public\u0113tos A2X t\u012bmek\u013ca pakalpojumus. Datu nolas\u012b\u0161anai izmanto Query pakalpojumus, piem\u0113ram, Query Production Orders un Query Purchase Orders, vai piel\u0101gotus OData vaic\u0101jumus. Datu ierakst\u012b\u0161anai izmanto Manage Production Orders un Manage Production Lots.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101dus datus SkyPlanner ieraksta atpaka\u013c ByDesign?<\/summary>\n<p class=\"sp-faq__a\">Katra ra\u017eo\u0161anas pas\u016bt\u012bjuma EarliestStartPeriod un oper\u0101cijas MainResourceID v\u0113rt\u012bbu. Ja izv\u0113laties, ra\u017eo\u0161anas partij\u0101 tiek re\u0123istr\u0113ti ar\u012b apstiprin\u0101tie daudzumi, br\u0101\u0137is un pabeigtie uzdevumi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ByDesign s\u016bta notikumus uz SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner ik p\u0113c da\u017e\u0101m min\u016bt\u0113m pieprasa datus par pas\u016bt\u012bjumiem un partij\u0101m no ByDesign Query pakalpojumiem. Pats SkyPlanner p\u0113c katr\u0101m grafika izmai\u0146\u0101m s\u016bta webhook pazi\u0146ojumus, kas ierosina datu ierakst\u012b\u0161anu atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 SkyPlanner autentific\u0113jas ByDesign?<\/summary>\n<p class=\"sp-faq__a\">Izmantojot Communication System un Communication Arrangement ar tehnisko lietot\u0101ju, k\u0101 aprakst\u012bts SAP dro\u0161\u012bbas ce\u013cved\u012b. Pa\u0161a SkyPlanner API izmanto API pilnvaru galven\u0113 <code>Authorization-Token<\/code>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ra\u017eo\u0161anas priek\u0161likumi non\u0101k SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner sast\u0101da grafiku izpildei nodotajiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem. Priek\u0161likumi paliek ByDesign Supply Planning, l\u012bdz tie k\u013c\u016bst par ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izveido integr\u0101ciju?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda to konfigur\u0113 ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Ar\u012b j\u016bsu SAP ByDesign partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var papla\u0161in\u0101t integr\u0101ciju, izmantojot SkyPlanner REST API un API pilnvaru.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ SAP Business ByDesign SAP Business ByDesign integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 SAP Business ByDesign integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m ir aprakst\u012bts, k\u0101 savienot ByDesign ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar ByDesign, izmantojot SAP public\u0113tos t\u012bmek\u013ca pakalpojumus: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner &#8230; <a title=\"SAP Business ByDesign integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/\" aria-label=\"Read more about SAP Business ByDesign integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106586,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107748","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SAP ByDesign APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem<\/title>\n<meta name=\"description\" content=\"Savienojiet SAP Business ByDesign ar SkyPlanner APS: A2X t\u012bmek\u013ca pakalpojumi, OData, datu kart\u0113\u0161ana, ierakste ar Manage Production Orders un Manage Production Lots.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SAP Business ByDesign integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienojiet SAP Business ByDesign ar SkyPlanner APS: A2X t\u012bmek\u013ca pakalpojumi, OData, datu kart\u0113\u0161ana, ierakste ar Manage Production Orders un Manage Production Lots.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-bydesign\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-bydesign\\\/integracijas-celvedis\\\/\",\"name\":\"SAP ByDesign APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Savienojiet SAP Business ByDesign ar SkyPlanner APS: A2X t\u012bmek\u013ca pakalpojumi, OData, datu kart\u0113\u0161ana, ierakste ar Manage Production Orders un Manage Production Lots.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-bydesign\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-bydesign\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-bydesign\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai SAP Business ByDesign: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-bydesign\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SAP Business ByDesign integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SAP ByDesign APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","description":"Savienojiet SAP Business ByDesign ar SkyPlanner APS: A2X t\u012bmek\u013ca pakalpojumi, OData, datu kart\u0113\u0161ana, ierakste ar Manage Production Orders un Manage Production Lots.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"SAP Business ByDesign integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienojiet SAP Business ByDesign ar SkyPlanner APS: A2X t\u012bmek\u013ca pakalpojumi, OData, datu kart\u0113\u0161ana, ierakste ar Manage Production Orders un Manage Production Lots.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/","name":"SAP ByDesign APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Savienojiet SAP Business ByDesign ar SkyPlanner APS: A2X t\u012bmek\u013ca pakalpojumi, OData, datu kart\u0113\u0161ana, ierakste ar Manage Production Orders un Manage Production Lots.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai SAP Business ByDesign: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/"},{"@type":"ListItem","position":5,"name":"SAP Business ByDesign integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ SAP Business ByDesign SAP Business ByDesign integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 SAP Business ByDesign integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m ir aprakst\u012bts, k\u0101 savienot ByDesign ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar ByDesign, izmantojot SAP public\u0113tos t\u012bmek\u013ca pakalpojumus: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107748","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=107748"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107748\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106586"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=107748"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}