{"id":107690,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/","title":{"rendered":"DELMIAWorks integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ DELMIAWorks<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">DELMIAWorks integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 DELMIAWorks integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot DELMIAWorks, agr\u0101ko IQMS, ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar DELMIAWorks, izmantojot DELMIAWorks WebAPI:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, ra\u017eo\u0161anas specifik\u0101cijas ar deta\u013cu apstr\u0101des oper\u0101cij\u0101m, darba centrus, instrumentus un veidnes, kr\u0101jumu nomenklat\u016bru, kr\u0101jumu atlikumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Pl\u0101notie s\u0101kuma un beigu datumi, k\u0101 ar\u012b pie\u0161\u0137irtais darba centrs tiek ierakst\u012bti atpaka\u013c ra\u017eo\u0161anas pas\u016bt\u012bjumos.<\/li>\n\n\n<li>Der\u012bgo deta\u013cu daudzumu var iegr\u0101matot ra\u017eo\u0161anas uzskait\u0113, bet iestat\u012b\u0161anas un izpildes laiku \u2014 k\u0101 uzdevumiem pat\u0113r\u0113to darba laiku modul\u012b Time &amp; Attendance.<\/li>\n\n\n<li>SkyPlanner webhook pazi\u0146ojumi nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu DELMIAWorks videi, izmantojot REST API, un nodro\u0161ina atbalstu ar\u012b p\u0113c palai\u0161anas ekspluat\u0101cij\u0101. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties integr\u0101cijas izveid\u0113 vai veidot savus risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"delmiaworks-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">DELMIAWorks integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>DELMIAWorks dokument\u0101cij\u0101 nor\u0101d\u012bts: &#8220;WebAPI includes both the API SDK for GRAPHQL APIs and WebAPI SDK for REST APIs&#8221; (WebAPI ietver gan API SDK darbam ar GRAPHQL API, gan WebAPI SDK darbam ar REST API) (<a href=\"https:\/\/www.3ds.com\/assets\/invest\/2022-03\/delmiaworks-webapi-graphql-rest-api-datasheet.pdf\">WebAPI datu lapa<\/a>). REST da\u013ca ir sadal\u012bta modu\u013cos un kontrolleros. Ra\u017eo\u0161anas grafiku integr\u0101cij\u0101 izmanto \u0161\u0101dus modu\u013cus un kontrollerus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Manufacturing WorkOrders:<\/strong> WorkOrder, WorkOrders, ScheduledWorkOrders, UnscheduledWorkOrders, CreateWorkOrder, UpdateWorkOrder, UpdateWorkOrderEx, WorkOrderReleases, InventoryItemsForWorkOrder, SalesOrdersForWorkOrder.<\/li>\n\n\n<li><strong>Manufacturing Schedule:<\/strong> RunAutoLoad, RemoveFromSchedule, NextSetup, GetSetupTemplateChecklists.<\/li>\n\n\n<li><strong>Manufacturing WorkCenters:<\/strong> WorkCenter, WorkCenters, WorkCenterDetails, RunningWorkOrder, PMEquipment.<\/li>\n\n\n<li><strong>Manufacturing BOM:<\/strong> BillOfMaterials, BomLabor, PartOperations, StandardOperations, BOMComponents.<\/li>\n\n\n<li><strong>Manufacturing Inventory:<\/strong> InventoryItems, AddProductionRecords, InventoryProductionReportsByWorkOrder.<\/li>\n\n\n<li><strong>Manufacturing Realtime:<\/strong> GetWorkCenterSchedule, ActualCavity, GetSetupTime, RealTimeData.<\/li>\n\n\n<li><strong>Manufacturing Downtime:<\/strong> AddDownTime, CloseDownTime.<\/li>\n\n\n<li><strong>PO Receiving:<\/strong> POs, POLineItems, POReleaseItems, POReceipts.<\/li>\n\n\n<li><strong>Time &amp; Attendance:<\/strong> TimeClock (LogInOut, TaskClockLogin), Tasks (ClockInTATask, ClockOutTATask, UpdateGoodParts), EmployeeCalendar.<\/li>\n\n<\/ul>\n\n\n<p>GraphQL SDK ir piem\u0113rots datu nolas\u012b\u0161anai liel\u0101 apjom\u0101, piem\u0113ram, s\u0101kotn\u0113jai nomenklat\u016bras un BOM iel\u0101dei. Visas ierakst\u012b\u0161anas darb\u012bbas veic REST kontrolleri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un licenc\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>DELMIAWorks pus\u0113 izveidojiet atsevi\u0161\u0137u integr\u0101cijas lietot\u0101ju un p\u0101rliecinieties, ka j\u016bsu vid\u0113 ir licenc\u0113ts un instal\u0113ts WebAPI. Modulis Realtime nodro\u0161ina AuthToken kontrolleri, un WebAPI sesiju atver ar integr\u0101cijas lietot\u0101ja piek\u013cuves datiem. J\u016bsu DELMIAWorks partneris apstiprin\u0101s konkr\u0113tajai versijai nepiecie\u0161amo konfigur\u0101ciju.<\/p>\n\n\n<p>SkyPlanner pus\u0113 katra izsaukuma galven\u0113 <code>Authorization-Token<\/code> tiek nos\u016bt\u012bts API mar\u0137ieris. To varat izveidot SkyPlanner sada\u013c\u0101 Settings &gt; API. Lai s\u0101ktu izstr\u0101di, pietiek ar API mar\u0137ieri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska datu piepras\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner nos\u016bta webhook pazi\u0146ojumu par katru grafika izmai\u0146u, t\u0101p\u0113c dati tiek ierakst\u012bti atpaka\u013c DELMIAWorks l\u012bdz ar pl\u0101na izmai\u0146\u0101m.<\/p>\n\n\n<p>Lai sa\u0146emtu DELMIAWorks izmai\u0146as, periodiski pieprasiet datus no WebAPI. Nolasiet ScheduledWorkOrders un UnscheduledWorkOrders ik p\u0113c da\u017e\u0101m min\u016bt\u0113m, bet iepirkuma pas\u016bt\u012bjumus un kr\u0101jumu nomenklat\u016bru \u2014 ret\u0101k. Partnera \u012bstenot\u0101 projekt\u0101 IQAlert, DELMIAWorks ieb\u016bv\u0113tais br\u012bdin\u0101jumu un darb\u012bbu dzinis, var aktiviz\u0113t darb\u012bbas, rea\u0123\u0113jot uz notikumiem.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu atbilst\u012bbas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>DELMIAWorks objekts (saskarne)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Kr\u0101jumu nomenklat\u016bra (InventoryItems)<\/td><td>Produkti un materi\u0101li<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam periodiska datu piepras\u012b\u0161ana<\/td><\/tr><tr><td>Ra\u017eo\u0161anas specifik\u0101cija, BOM komponenti (BillOfMaterials, BOMComponents)<\/td><td>Produkta strukt\u016bra, katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Deta\u013cu apstr\u0101des oper\u0101cijas, standarta oper\u0101cijas, BOM darbasp\u0113ka dati (PartOperations, BomLabor)<\/td><td>Procesa so\u013ci ar ilgumu, iestat\u012b\u0161anas laiku un operatoru skaitu<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Darba centri: preses, ekstr\u016bderi, ra\u017eo\u0161anas \u0161\u016bnas (WorkCenters, WorkCenterDetails)<\/td><td>Darba centri, darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam reti<\/td><\/tr><tr><td>Instrumenti un veidnes, veidnes da\u017e\u0101du deta\u013cu vienlaic\u012bgai izgatavo\u0161anai, ligzdas (BOM, ActualCavity)<\/td><td>Instrumenti k\u0101 ierobe\u017eoti resursi, daudzums vien\u0101 cikl\u0101<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Shop Calendar, darbinieku kalend\u0101rs (EmployeeCalendar)<\/td><td>Mai\u0146as, person\u0101ls, promb\u016btnes<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Katru dienu vai savas mai\u0146as SkyPlanner vid\u0113<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumi un to izpildes da\u013cas (WorkOrders, ScheduledWorkOrders, UnscheduledWorkOrders)<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Datu piepras\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Katras nomenklat\u016bras vien\u012bbas atlikums noliktav\u0101 (InventoryItems)<\/td><td>Kr\u0101jumu atlikumi<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Datu piepras\u012b\u0161ana katru stundu vai grafika sast\u0101d\u012b\u0161anas laik\u0101<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumi un to pieg\u0101des da\u013cas (POs, POReleaseItems)<\/td><td>Iepirkuma pas\u016bt\u012bjumi, ien\u0101ko\u0161ie materi\u0101li p\u0113c pieg\u0101des datuma<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Datu piepras\u012b\u0161ana katru stundu vai grafika sast\u0101d\u012b\u0161anas laik\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma s\u0101kuma un beigu datumi, darba centrs (kontrolleris Manufacturing WorkOrders)<\/td><td>Pl\u0101notais s\u0101kums un beigas, pie\u0161\u0137irtais darba centrs<\/td><td>SkyPlanner \u2192 DELMIAWorks<\/td><td>Grafika izmai\u0146u gad\u012bjum\u0101, izmantojot SkyPlanner webhook pazi\u0146ojumu<\/td><\/tr><tr><td>Ra\u017eo\u0161anas uzskaites ieraksti: der\u012bgo deta\u013cu daudzums katram ra\u017eo\u0161anas pas\u016bt\u012bjumam (AddProductionRecords)<\/td><td>Apstiprin\u0101jumos nor\u0101d\u012btie izgatavotie daudzumi<\/td><td>SkyPlanner \u2192 DELMIAWorks<\/td><td>P\u0113c katra apstiprin\u0101juma, ja \u0161\u012b iesp\u0113ja ir izv\u0113l\u0113ta<\/td><\/tr><tr><td>Uzdevumiem pat\u0113r\u0113tais darba laiks (ClockInTATask, ClockOutTATask)<\/td><td>Laika uzskaites ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 DELMIAWorks<\/td><td>P\u0113c katra apstiprin\u0101juma vai katras mai\u0146as, ja \u0161\u012b iesp\u0113ja ir izv\u0113l\u0113ta<\/td><\/tr><tr><td>Nav DELMIAWorks<\/td><td>Iestat\u012b\u0161anas laiku matrica, alternat\u012bv\u0101s preses un person\u0101ls<\/td><td>Uztur\u0113ti SkyPlanner vid\u0113<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas mode\u013ci<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet kr\u0101jumu nomenklat\u016bru, BOM, deta\u013cu apstr\u0101des oper\u0101cijas, darba centrus un veidnes. R\u016bp\u012bgi izveidojiet darba centru atbilst\u012bbu: katra prese ir viens darba centrs, savuk\u0101rt preses, kur\u0101m der viena izm\u0113ra veidnes, apvieno darba centru grup\u0101 k\u0101 alternat\u012bvas.<\/p>\n\n\n<p><strong>2. Ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m un materi\u0101liem, k\u0101 ar\u012b atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. SkyPlanner uzskata pas\u016bt\u012btos sve\u0137us un ielikt\u0146us par pieejamiem iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumu atlikumus, kad iepirkuma pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Kad pl\u0101no\u0161anas dzinis ievieto vai p\u0101rvieto ra\u017eo\u0161anas pas\u016bt\u012bjumu grafik\u0101, SkyPlanner webhook pazi\u0146ojums aktiviz\u0113 pas\u016bt\u012bjuma atjaunin\u0101\u0161anu ar kontrolleri Manufacturing WorkOrders. Atjaunin\u0101jum\u0101 nos\u016bta pl\u0101notos s\u0101kuma un beigu datumus un SkyPlanner izv\u0113l\u0113to darba centru. Konkr\u0113tos laukus un to, k\u0101 Finite Schedule panelis atspogu\u013cos \u0161o lauku v\u0113rt\u012bbas, nosaka ievie\u0161anas laik\u0101, veicot tv\u0113ruma noteik\u0161anu.<\/p>\n\n\n<p><strong>4. Apstiprin\u0101jumi no ra\u017eotnes.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un grafiks tiek atjaunin\u0101ts atbilsto\u0161i laika uzskaites ierakstiem. J\u016bs izv\u0113laties, vai faktiskos datus ierakst\u012bt atpaka\u013c. Ja j\u0101, der\u012bgo deta\u013cu daudzumu nos\u016bta uz AddProductionRecords, bet darba laiku \u2014 ar Time &amp; Attendance uzdevumu izsaukumiem. Ja n\u0113, RealTime un Shopworks turpina uzskaiti t\u0101pat k\u0101 l\u012bdz \u0161im, un SkyPlanner nolasa izpildes gaitu no DELMIAWorks.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms palai\u0161anas ekspluat\u0101cij\u0101:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Nomenklat\u016bra, BOM, ciklu ilgums, ligzdas, ra\u017eo\u0161anas pas\u016bt\u012bjumu daudzumi un statuss<\/td><td>DELMIAWorks<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bba, s\u0101kuma un beigu laiks, pie\u0161\u0137irt\u0101 prese<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Iestat\u012b\u0161anas laiku matrica, pras\u012bbas attiec\u012bb\u0101 uz veidn\u0113m un operatoriem, alternat\u012bv\u0101s preses<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Sara\u017eotais daudzums, br\u0101\u0137is, darba laiks un materi\u0101lu izsnieg\u0161ana<\/td><td>DELMIAWorks \u2014 datus re\u0123istr\u0113 tur vai iegr\u0101mato no SkyPlanner laika uzskaites ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas ieraksta ra\u017eo\u0161anas pas\u016bt\u012bjumu datumus. Darba centriem, kuru grafikus sast\u0101da SkyPlanner, izsl\u0113dziet Auto Load, tostarp visas IQAlert darb\u012bbas, kas palai\u017e Update Schedule un Auto Load. Lai \u0161iem darba centriem fiks\u0113tu tuv\u0101k\u0101 perioda grafiku, izmantojiet SkyPlanner funkciju Running Time Lock, nevis DELMIAWorks laika robe\u017eu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta so\u013ci<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Integr\u0101cijas ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot no DELMIAWorks CSV vai Excel form\u0101t\u0101 eksport\u0113tus darba centrus, BOM un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu atbilst\u012bba.<\/strong> Vienojieties par datu atbilst\u012bbas tabulu, datu p\u0101rvald\u012bbas atbild\u012bbu, sinhroniz\u0101cijas bie\u017eumu un to, vai ra\u017eo\u0161anas un darba laika dati tiks ierakst\u012bti atpaka\u013c.<\/li>\n\n\n<li><strong>Piek\u013cuve DELMIAWorks.<\/strong> Izveidojiet integr\u0101cijas lietot\u0101ju un p\u0101rliecinieties par WebAPI licenci. Vispirms veiciet p\u0101rbaudes testa datub\u0101z\u0113.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 datu iel\u0101de.<\/strong> Artikuli, BOM, deta\u013cu oper\u0101cijas, darba centri, veidnes un kalend\u0101ri.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Periodiski piepras\u012bjumi ar filtriem un atk\u0101rtotiem m\u0113\u0123in\u0101jumiem.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> Iestatiet sagatavo\u0161anas laiku matricu, veidnes k\u0101 instrumentus, operatoru skaitu katram ra\u017eo\u0161anas uzdevumam, k\u0101 ar\u012b alternat\u012bv\u0101s preses un person\u0101lu.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Ra\u017eo\u0161anas pas\u016bt\u012bjumu atjaunin\u0101\u0161ana p\u0113c SkyPlanner webhook pazi\u0146ojumiem, k\u0101 ar\u012b ra\u017eo\u0161anas un darba laika datu re\u0123istr\u0113\u0161ana, ja t\u0101 izv\u0113l\u0113ta.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Darbiniet SkyPlanner l\u012bdztekus pa\u0161reiz\u0113jam Finite Schedule, sal\u012bdziniet datumus un izlabojiet pamatdatus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana.<\/strong> Darba centros, kuriem tiek sast\u0101d\u012bts grafiks, izsl\u0113dziet Auto Load un iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-delmiaworks-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot DELMIAWorks integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Veidnes vair\u0101kiem artikuliem.<\/strong> Viena veidne vien\u0101 cikl\u0101 izgatavo vair\u0101kus artikulus. Model\u0113jiet \u0161\u0101du ra\u017eo\u0161anas ciklu k\u0101 vienu ra\u017eo\u0161anas uzdevumu, kur\u0101 tiek izgatavoti visi \u0161ie artikuli, lai veidne tiktu rezerv\u0113ta tikai vienreiz.<\/li>\n\n\n<li><strong>Veidnes ligzdas.<\/strong> Ja k\u0101da ligzda ir blo\u0137\u0113ta, faktiskais ligzdu skaits var at\u0161\u0137irties no standarta. Izlemiet, vai ilguma apr\u0113\u0137inos izmantot standarta skaitu vai RealTime lauka ActualCavity v\u0113rt\u012bbu.<\/li>\n\n\n<li><strong>Veidnes un preses sader\u012bba.<\/strong> Ne katra veidne ir piem\u0113rota katrai presei. SkyPlanner nor\u0101diet katrai veidnei pie\u013caujam\u0101s preses k\u0101 alternat\u012bvas, lai darbs tiktu p\u0101rcelts tikai uz piem\u0113rotu presi.<\/li>\n\n\n<li><strong>Kr\u0101su un materi\u0101lu mai\u0146a.<\/strong> Sagatavo\u0161anas laiku matric\u0101 ievadiet faktiskos izt\u012br\u012b\u0161anas un veid\u0146u mai\u0146as laikus katram p\u0101rejas virzienam. Piem\u0113ram, p\u0101reja no zilas kr\u0101sas uz sarkanu var aiz\u0146emt 30 min\u016btes, bet no sarkanas uz zilu \u2014 60.<\/li>\n\n\n<li><strong>Auto Load un laika robe\u017eas.<\/strong> Ja datumus ieraksta divas pl\u0101no\u0161anas sist\u0113mas, rodas konflikti. Pirms darba s\u0101k\u0161anas atsp\u0113jojiet abus meh\u0101nismus darba centros, kuru grafikus sast\u0101da SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-delmiaworks-inte\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 un uztur DELMIAWorks integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas,<\/strong> aptverot saska\u0146otos WebAPI kontrollerus. Katr\u0101 r\u016bpn\u012bc\u0101 DELMIAWorks izmanto at\u0161\u0137ir\u012bgi, un konfigur\u0101cij\u0101 tiek \u0146emtas v\u0113r\u0101 \u0161\u012bs \u012bpatn\u012bbas.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b j\u016bsu DELMIAWorks partneris.<\/strong> Partneris p\u0101rzina j\u016bsu versiju, piel\u0101gotos laukus un licenc\u0113\u0161anu un kop\u0101 ar SkyPlanner komandu var iestat\u012bt integr\u0101cijas lietot\u0101ju un WebAPI.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var papla\u0161in\u0101t integr\u0101ciju,<\/strong> izmantojot SkyPlanner REST API ar API pilnvaru galven\u0113 <code>Authorization-Token<\/code>. Vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz SkyPlanner komanda. Pla\u0161\u0101ka inform\u0101cija ir pieejama <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, ietverot 5 darba centrus un veicot ikm\u0113ne\u0161a nor\u0113\u0137inus. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 kop\u0101 ar j\u016bsu abon\u0113\u0161anas pl\u0101nu, \u0146emot v\u0113r\u0101 j\u016bsu procesu un vajadz\u012bbas. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/integracija\/erp\/delmiaworks\/razosanas-planosana\/\">DELMIAWorks ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai iek\u0101rtu un person\u0101la jaudai<\/a>, <a href=\"\/lv\/integracija\/erp\/delmiaworks\/\">DELMIAWorks lapu<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju p\u0101rskatu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana ir p\u0101rg\u0101jusi no Excel izkl\u0101jlap\u0101m uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 stundas darba laika, un jaun\u0101 uzdevumu rinda ra\u017eo\u0161anas l\u012bniju sasniedz da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na sagatavo\u0161ana trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alah\u00e4rm\u00e4 r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, pieaugums no aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens meistars, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja Anu J\u00e4rvinen pie robotiz\u0113tas \u0161\u016bnas produkcijas krau\u0161anai uz palet\u0113m Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku piem\u0113rots iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un atbildes uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad sa\u0146emamas da\u017e\u0101s sekund\u0113s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuru DELMIAWorks API izmanto SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">DELMIAWorks WebAPI. SkyPlanner nolasa datus ar REST kontrolleriem vai apjom\u012bgai nolas\u012b\u0161anai izmanto GraphQL SDK. Datus atpaka\u013c ieraksta ar REST kontrolleriem: ra\u017eo\u0161anas pas\u016bt\u012bjumus atjaunina ar WorkOrders kontrolleri, k\u0101 ar\u012b izmanto AddProductionRecords un Time &amp; Attendance uzdevumu izsaukumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101dus datus SkyPlanner ieraksta atpaka\u013c DELMIAWorks?<\/summary>\n<p class=\"sp-faq__a\">Katra ra\u017eo\u0161anas pas\u016bt\u012bjuma pl\u0101notos s\u0101kuma un beigu datumus un pie\u0161\u0137irto darba centru. Ja izv\u0113laties, der\u012bg\u0101s deta\u013cas tiek re\u0123istr\u0113tas ra\u017eo\u0161anas ierakstos, bet sagatavo\u0161anas un izpildes laiks \u2014 k\u0101 uzdevumam pat\u0113r\u0113tais darba laiks.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai integr\u0101cija darbojas ar IQMS EnterpriseIQ?<\/summary>\n<p class=\"sp-faq__a\">DELMIAWorks ir pa\u0161reiz\u0113jais IQMS EnterpriseIQ nosaukums. Integr\u0101cija izmanto WebAPI, t\u0101p\u0113c iz\u0161\u0137iro\u0161i ir tas, vai j\u016bsu versij\u0101 WebAPI ir instal\u0113ts un licenc\u0113ts. J\u016bsu partneris to apstiprina tv\u0113ruma noteik\u0161anas laik\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 tiek apstr\u0101d\u0101tas veidnes un veidnes vair\u0101kiem artikuliem?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner veidnes tiek model\u0113tas k\u0101 instrumenti ar ierobe\u017eotu pieejam\u012bbu, t\u0101p\u0113c viena veidne nekad neatrodas div\u0101s pres\u0113s vienlaikus. Ra\u017eo\u0161ana ar vair\u0101kiem artikuliem paredz\u0113tu veidni ir viens ra\u017eo\u0161anas uzdevums, kur\u0101 tiek izgatavoti visi t\u0101s artikuli. Katrai veidnei pie\u013caujam\u0101s preses tiek nor\u0101d\u012btas k\u0101 alternat\u012bvas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas j\u0101dara ar Auto Load?<\/summary>\n<p class=\"sp-faq__a\">Izsl\u0113dziet Auto Load darba centros, kuru grafikus sast\u0101da SkyPlanner, un atsp\u0113jojiet ar\u012b IQAlert darb\u012bbas, kas palai\u017e Auto Load. \u0160ajos darba centros ra\u017eo\u0161anas pas\u016bt\u012bjumu datumus turpm\u0101k ieraksta tikai SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izstr\u0101d\u0101 integr\u0101ciju?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas. Ar\u012b j\u016bsu DELMIAWorks partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot SkyPlanner REST API ar API pilnvaru.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ DELMIAWorks DELMIAWorks integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 DELMIAWorks integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot DELMIAWorks, agr\u0101ko IQMS, ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar DELMIAWorks, izmantojot DELMIAWorks WebAPI: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu DELMIAWorks videi, &#8230; <a title=\"DELMIAWorks integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/\" aria-label=\"Read more about DELMIAWorks integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106557,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107690","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>DELMIAWorks APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem<\/title>\n<meta name=\"description\" content=\"Savienojiet DELMIAWorks (IQMS) ar SkyPlanner APS: WebAPI REST un GraphQL, WorkOrders atjaunin\u0101\u0161ana, ra\u017eo\u0161anas un darba laika uzskaite, datu kart\u0113\u0161ana.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"DELMIAWorks integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienojiet DELMIAWorks (IQMS) ar SkyPlanner APS: WebAPI REST un GraphQL, WorkOrders atjaunin\u0101\u0161ana, ra\u017eo\u0161anas un darba laika uzskaite, datu kart\u0113\u0161ana.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/delmiaworks\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/delmiaworks\\\/integracijas-celvedis\\\/\",\"name\":\"DELMIAWorks APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Savienojiet DELMIAWorks (IQMS) ar SkyPlanner APS: WebAPI REST un GraphQL, WorkOrders atjaunin\u0101\u0161ana, ra\u017eo\u0161anas un darba laika uzskaite, datu kart\u0113\u0161ana.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/delmiaworks\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/delmiaworks\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/delmiaworks\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/delmiaworks\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"DELMIAWorks integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"DELMIAWorks APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","description":"Savienojiet DELMIAWorks (IQMS) ar SkyPlanner APS: WebAPI REST un GraphQL, WorkOrders atjaunin\u0101\u0161ana, ra\u017eo\u0161anas un darba laika uzskaite, datu kart\u0113\u0161ana.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"DELMIAWorks integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienojiet DELMIAWorks (IQMS) ar SkyPlanner APS: WebAPI REST un GraphQL, WorkOrders atjaunin\u0101\u0161ana, ra\u017eo\u0161anas un darba laika uzskaite, datu kart\u0113\u0161ana.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/","name":"DELMIAWorks APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Savienojiet DELMIAWorks (IQMS) ar SkyPlanner APS: WebAPI REST un GraphQL, WorkOrders atjaunin\u0101\u0161ana, ra\u017eo\u0161anas un darba laika uzskaite, datu kart\u0113\u0161ana.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/"},{"@type":"ListItem","position":5,"name":"DELMIAWorks integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ DELMIAWorks DELMIAWorks integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 DELMIAWorks integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot DELMIAWorks, agr\u0101ko IQMS, ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar DELMIAWorks, izmantojot DELMIAWorks WebAPI: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu DELMIAWorks videi,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107690","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=107690"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107690\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106557"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=107690"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}