{"id":107603,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/sage-100\/razosanas-planosana\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/razosanas-planosana\/","title":{"rendered":"Vai Sage 100 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojums par Production Management un Sage 100 Produktion"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Sage 100<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Sage 100 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? <span class=\"hl\">Skaidrojums par Production Management un Sage 100 Produktion<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">N\u0113, ja ar to saprot pl\u0101no\u0161anas r\u012bku, kas katrai oper\u0101cijai atrod laiku, kad ir pieejama vajadz\u012bg\u0101 jauda. \u0160is nosaukums ir diviem at\u0161\u0137ir\u012bgiem produktiem. ASV Sage 100 Production Management katru darba uzdevumu iepl\u0101no ar metodi, ko Sage sauc par &#8220;infinite&#8221; (bezgal\u012bgu) noslogo\u0161anu, bet p\u0101rslogoto darba centru slodzi samazina pl\u0101not\u0101js. V\u0101cijas Sage 100 Produktion par\u0101da slodzi un \u0161aur\u0101s vietas, savuk\u0101rt papildus pieejam\u0101 Plantafel \u013cauj pl\u0101not\u0101jam p\u0101rvietot uzdevumus pl\u0101no\u0161anas panel\u012b, tos p\u0101rvelkot. Ra\u017eotnes, kur\u0101m vajadz\u012bga <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la faktiskajai pieejam\u012bbai<\/a>, l\u012bdz\u0101s Sage 100 izmanto SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"first-which-sage-100-do-you-run\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Vispirms \u2014 kuru Sage 100 j\u016bs izmantojat?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Sage 100 ASV un Kan\u0101d\u0101<\/strong> agr\u0101k bija paz\u012bstams k\u0101 MAS 90 un MAS 200. Ra\u017eo\u0161anu p\u0101rvalda modul\u012b Production Management, kura pamat\u0101 ir darba uzdevumi, veidnes, darb\u012bbu kodi un darba centri. Production Management aizst\u0101ja agr\u0101ko Work Order moduli.<\/p>\n\n\n<p><strong>Sage 100 V\u0101cij\u0101 un Austrij\u0101<\/strong> ir Sage Office Line un Sage New Classic p\u0113ctecis. Ra\u017eo\u0161anu p\u0101rvalda modul\u012b Sage 100 Produktion, kura pamat\u0101 ir Ressourcenlisten, Fertigungsauftr\u00e4ge un Arbeitspl\u00e4tze. Sage to pied\u0101v\u0101 Basic, Professional un Enterprise pakotn\u0113s (<a href=\"https:\/\/www.sage.com\/de-de\/produkte\/sage-100\/produktion\/\">Sage 100 Produktion<\/a>).<\/p>\n\n\n<p>Abiem produktiem ir kop\u012bgs nosaukums un pieg\u0101d\u0101t\u0101js, ta\u010du ne programmat\u016bras kods. T\u0101l\u0101k katrs skaidrots atsevi\u0161\u0137i, izmantojot t\u0101 terminolo\u0123iju.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-us-sage-100-production-management-schedules\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 ASV Sage 100 Production Management sast\u0101da grafikus \u2014 soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Darba centri<\/h3>\n\n\n<p>Sada\u013c\u0101 Work Center Maintenance nor\u0101da gaid\u012b\u0161anas laiku rind\u0101, efektivit\u0101ti procentos, darbinieku vai iek\u0101rtu skaitu, pieejam\u0101s stundas katr\u0101 ned\u0113\u013cas dien\u0101 un nestr\u0101d\u0101\u0161anas periodus. Sage defin\u0113 darba centru k\u0101 &#8220;one or more persons or machines&#8221; (vienu vai vair\u0101kus cilv\u0113kus vai iek\u0101rtas) un nor\u0101da: &#8220;they are considered a single unit for capacity planning and detailed work assignments.&#8221; (ra\u017eo\u0161anas jaudas pl\u0101no\u0161an\u0101 un detaliz\u0113t\u0101 darbu sadal\u0113 tos uzskata par vienu vien\u012bbu). (<a href=\"https:\/\/help-sage100.na.sage.com\/2023\/Subsystems\/PM\/PMSetup\/Work_Center_Maint.htm\">avots<\/a>)<\/p>\n\n\n<p>Jaudu izsaka k\u0101 dien\u0101 pieejamo stundu skaitu. &#8220;Each work center has a capacity, expressed in hours, that it can perform on a given day.&#8221; (Katram darba centram ir stund\u0101s izteikta jauda, ko tas var nodro\u0161in\u0101t konkr\u0113taj\u0101 dien\u0101.) Sage to apr\u0113\u0137ina, attiec\u012bg\u0101s dienas standarta darba stundas reizinot ar efektivit\u0101tes procentu. (<a href=\"https:\/\/help-sage100.na.sage.com\/2023\/Subsystems\/PM\/PMConcepts\/Determine_Work_Ctr_Cap.htm\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Veidnes un darba uzdevumi<\/h3>\n\n\n<p>Darba uzdevuma veidn\u0113 ir ietverti izpildes so\u013ci. Katram ir darb\u012bbas kods, kas nor\u0101da uz darba centru. No \u0161\u012bs veidnes izveido darba uzdevumu \u2014 pas\u016bt\u012bjumu produkta ra\u017eo\u0161anai. Sage rokasgr\u0101mat\u0101 Work Order lietot\u0101jiem par\u0101d\u012bta veco un jauno terminu atbilst\u012bba: work order k\u013c\u016bst par work ticket, routing \u2014 par template, bet operation code \u2014 par activity code. (<a href=\"https:\/\/docs.sage.com\/docs\/en\/customer\/100erp\/2022\/open\/SwitchingFromWOtoPM.pdf\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Enhanced Scheduling<\/h3>\n\n\n<p>Bez Enhanced Scheduling so\u013cu datumus nosaka p\u0113c darba uzdevum\u0101 ievad\u012btajiem datumiem. Lai tos apr\u0113\u0137in\u0101tu, j\u0101atver Production Management Options un ciln\u0113 Schedule j\u0101izpilda nor\u0101de: &#8220;select the Enable Enhanced Scheduling check box.&#8221; (atz\u012bm\u0113jiet izv\u0113les r\u016bti\u0146u Enable Enhanced Scheduling). (<a href=\"https:\/\/help-sage100.na.sage.com\/2024\/Subsystems\/PM\/PMSetupProcedures\/Set_Up_Enhanced_Scheduling.htm\">avots<\/a>)<\/p>\n\n\n<p>Enhanced Scheduling &#8220;uses the forward or backward scheduling method to determine when each step of a work ticket should be started and how long each step takes to complete.&#8221; (izmanto pl\u0101no\u0161anu uz priek\u0161u vai atpaka\u013c, lai noteiktu katra darba uzdevuma so\u013ca s\u0101kumu un izpildes ilgumu). Pl\u0101nojot uz priek\u0161u, atskaites punkts ir ra\u017eo\u0161anas s\u0101kuma datums. Pl\u0101nojot atpaka\u013c \u2014 izpildes termi\u0146\u0161.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Noslogo\u0161ana bez jaudas ierobe\u017eojumiem<\/h3>\n\n\n<p>\u0160\u012b ir b\u016btisk\u0101k\u0101 sist\u0113mas uzb\u016bves izv\u0113le. Sage pal\u012bdz\u012bb\u0101 teikts: &#8220;The &#8220;infinite&#8221; loading technique is used to allow each work ticket to be scheduled independently.&#8221; (Noslogo\u0161anu bez jaudas ierobe\u017eojumiem izmanto, lai katru darba uzdevumu var\u0113tu iepl\u0101not neatkar\u012bgi.) (<a href=\"https:\/\/help-sage100.na.sage.com\/2025\/Subsystems\/PM\/PMConcepts\/Enhanced_Scheduling.htm\">avots<\/a>) Agr\u0101k\u0101 Work Order modu\u013ca pal\u012bdz\u012bb\u0101 skaidrots, ka tiek pl\u0101nots &#8220;each work order as if it were the only work order in the shop,&#8221; (katrs ra\u017eo\u0161anas pas\u016bt\u012bjums t\u0101, it k\u0101 tas b\u016btu vien\u012bgais pas\u016bt\u012bjums ceh\u0101), un piebilsts: &#8220;care must be taken not to overload the work centers.&#8221; (j\u0101uzman\u0101s, lai nep\u0101rslogotu darba centrus). (<a href=\"https:\/\/help-sage100.na.sage.com\/2022\/Subsystems\/WO\/ConceptTopics\/Infinite_Loading.htm\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Slodzes p\u0101rbaude un p\u0101rslodzes nov\u0113r\u0161ana<\/h3>\n\n\n<p>Work Center Capacity Inquiry par\u0101da &#8220;commitments against work centers in three formats: daily, weekly, and detail.&#8221; (darba centriem iepl\u0101noto slodzi tr\u012bs skatos: pa dien\u0101m, pa ned\u0113\u013c\u0101m un detaliz\u0113ti). (<a href=\"https:\/\/docs.sage.com\/docs\/en\/customer\/100erp\/2023\/open\/WhatsNew_2023.pdf\">Jaunumi 2023<\/a>) Ja darba centram iepl\u0101nots vair\u0101k darba, nek\u0101 tas sp\u0113j izpild\u012bt, Sage pied\u0101v\u0101 manu\u0101lu risin\u0101jumu: &#8220;Individual work orders can be rescheduled or the queue time can be increased to relieve overcommitted work centers.&#8221; (Lai samazin\u0101tu p\u0101rslogoto darba centru slodzi, var p\u0101rpl\u0101not atsevi\u0161\u0137us ra\u017eo\u0161anas pas\u016bt\u012bjumus vai palielin\u0101t gaid\u012b\u0161anas laiku rind\u0101.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-german-sage-100-produktion-plans-step-by-ste\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 pl\u0101no V\u0101cijas Sage 100 Produktion \u2014 soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Ressourcenliste<\/h3>\n\n\n<p>Galvenais objekts ir Ressourcenliste. Sage nor\u0101da, ka tas ietver &#8220;alle f\u00fcr die Herstellung eines Artikels notwendigen Ressourcen und Arbeitsabl\u00e4ufe&#8221; (visus izstr\u0101d\u0101juma ra\u017eo\u0161anai nepiecie\u0161amos resursus un darba procesus): St\u00fcckliste, Arbeitsplan, instrumentu sarakstu un apak\u0161uz\u0146\u0113m\u0113jiem nododamos darbus. Katrai Arbeitsgang oper\u0101cijai nor\u0101da sagatavo\u0161anas un vien\u012bbas izgatavo\u0161anas laiku, daudzuma koeficientus, laika rezerves un gaid\u012b\u0161anas laiku. (<a href=\"https:\/\/onlinehilfe.sage.de\/onlinehilfe\/ol\/80\/abf\/leistungsumfang_produktion_doku.htm\">Sage pal\u012bdz\u012bba<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Fertigungssteuerung<\/h3>\n\n\n<p>Standarta modulis nodro\u0161ina pl\u0101no\u0161anu uz priek\u0161u un atpaka\u013c, pl\u0101no\u0161anu tie\u0161i laik\u0101, grafika simul\u0101ciju, ra\u017eo\u0161anas priek\u0161likumus, pas\u016bt\u012bjumu apvieno\u0161anu vai sadal\u012b\u0161anu un integr\u0113tu materi\u0101lu pl\u0101no\u0161anu. Tas pied\u0101v\u0101 ar\u012b &#8220;Anzeige von Engpass-Positionen (Material und Kapazit\u00e4t)&#8221; (materi\u0101lu un jaudas \u0161auro vietu att\u0113lojumu), k\u0101 ar\u012b izpild\u0101m\u012bbas p\u0101rbaudi.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Katra Arbeitsplatz slodze<\/h3>\n\n\n<p>&#8220;Mit der integrierten Arbeitsplatzauslastung k\u00f6nnen Sie unter Einbeziehung flexibler Zeitr\u00e4ume die aktuelle Belastung Ihrer Arbeitspl\u00e4tze und Maschinen grafisch und tabellarisch einsehen.&#8221; (Integr\u0113tais darba centru noslodzes skats \u013cauj skat\u012bt darba centru un iek\u0101rtu pa\u0161reiz\u0113jo slodzi grafikos un tabul\u0101s, br\u012bvi izv\u0113loties periodus.) Darba centru un iek\u0101rtu pa\u0161reiz\u0113j\u0101 slodze ir redzama grafik\u0101 vai tabul\u0101.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Plantafel<\/h3>\n\n\n<p>Grafiskais pl\u0101no\u0161anas panelis ir &#8220;Grafische Ressourcenplanung (Zusatzpaket)&#8221; (grafisk\u0101 resursu pl\u0101no\u0161ana \u2014 papildpakotne). Tas r\u0101da Gantt diagrammu katram resursam: darbiniekam, iek\u0101rtai vai apak\u0161uz\u0146\u0113m\u0113jam. &#8220;Mittels Drag &amp; Drop k\u00f6nnen Sie die T\u00e4tigkeiten verschieben, und in Sekundenschnelle werden die Auftr\u00e4ge und der Materialbedarf neu terminiert.&#8221; (Darb\u012bbas var p\u0101rvietot, t\u0101s p\u0101rvelkot, un da\u017eu sekun\u017eu laik\u0101 pas\u016bt\u012bjumiem un materi\u0101lu vajadz\u012bb\u0101m tiek noteikti jauni datumi.) Pl\u0101not\u0101js p\u0101rvieto uzdevumus, bet Sage 100 p\u0101rr\u0113\u0137ina pas\u016bt\u012bjumu un materi\u0101lu nepiecie\u0161am\u012bbas datumus. Sage Produktion lap\u0101 Grafische Ressourcenplanung\/Leitstand ir nor\u0101d\u012bts k\u0101 papildiesp\u0113ja katr\u0101 pakotn\u0113 (<a href=\"https:\/\/www.sage.com\/de-de\/produkte\/sage-100\/produktion\/\">avots<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas joproj\u0101m j\u0101veic pl\u0101not\u0101jam<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>ASV: katru darba uzdevumu pl\u0101no atsevi\u0161\u0137i.<\/strong> Noslogo\u0161ana bez jaudas ierobe\u017eojumiem ne\u0146em v\u0113r\u0101 citus uzdevumus taj\u0101 pa\u0161\u0101 darba centr\u0101.<\/li>\n\n\n<li><strong>ASV: p\u0101rslodze j\u0101nov\u0113r\u0161 manu\u0101li.<\/strong> Sage pied\u0101v\u0101 p\u0101rpl\u0101not darba uzdevumus vai palielin\u0101t gaid\u012b\u0161anas laiku rind\u0101.<\/li>\n\n\n<li><strong>ASV: viens darba centrs \u2014 viens kop\u012bgs stundu apjoms.<\/strong> Vair\u0101k\u0101m iek\u0101rt\u0101m un darbiniekiem vien\u0101 darba centr\u0101 ir kop\u012bgs dienas stundu skaits. Sage pal\u012bdz\u012bb\u0101 nav aprakst\u012bts ne atsevi\u0161\u0137as iek\u0101rtas grafiks, ne sagatavo\u0161anas laiku matrica, ne instrumentu pieejam\u012bbas ierobe\u017eojumi.<\/li>\n\n\n<li><strong>V\u0101cija: panel\u012b uzdevumus p\u0101rvieto, tos p\u0101rvelkot.<\/strong> Plantafel p\u0101rr\u0113\u0137ina pas\u016bt\u012bjumu datumus p\u0113c tam, kad pl\u0101not\u0101js p\u0101rvieto uzdevumu. Sage neapraksta autom\u0101tisku izpildes sec\u012bbas noteik\u0161anu.<\/li>\n\n\n<li><strong>V\u0101cija: pl\u0101no\u0161anas panelis ir papildpakotne.<\/strong> Grafische Ressourcenplanung ir Zusatzpaket, t\u0101p\u0113c pamatmodulis par\u0101da slodzi un \u0161aur\u0101s vietas bez \u0161\u012b pane\u013ca.<\/li>\n\n\n<li><strong>Abos produktos: p\u0101rregul\u0113\u0161anas laiku nor\u0101da katram solim.<\/strong> Sagatavo\u0161anas laiki ir piesaist\u012bti solim vai Arbeitsgang. Sage dokument\u0101cij\u0101 nav aprakst\u012bta p\u0101rregul\u0113\u0161ana starp produktiem, kas b\u016btu atkar\u012bga no to izpildes sec\u012bbas.<\/li>\n\n\n<li><strong>Abos produktos: p\u0113c katr\u0101m izmai\u0146\u0101m slodze j\u0101sabalans\u0113 no jauna.<\/strong> P\u0113c steidzama pas\u016bt\u012bjuma vai iek\u0101rtas boj\u0101juma pl\u0101not\u0101jam slodze j\u0101p\u0101rskata v\u0113lreiz.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-sage-100-s-own-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar Sage 100 pl\u0101no\u0161anas iesp\u0113j\u0101m<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar Sage 100 grafiku sast\u0101d\u012b\u0161anu pietiek, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Pl\u0101nu nosaka viens vai divi darba centri, kas veido \u0161aur\u0101s vietas, bet p\u0101r\u0113j\u0101 ceh\u0101 ir br\u012bva jauda.<\/li>\n\n\n<li>Izpildes laiki ir gari, un l\u0113mumu pie\u0146em\u0161anai pietiek ar katra darba centra dienas vai ned\u0113\u013cas slodzi.<\/li>\n\n\n<li>Darbu sec\u012bbu pie iek\u0101rtas nosaka meistars.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161ana nav atkar\u012bga no t\u0101, k\u0101ds produkts ra\u017eots iepriek\u0161.<\/li>\n\n\n<li>Darbinieki, instrumenti un materi\u0101lu pien\u0101k\u0161anas laiks nemaina darbu sec\u012bbu.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas \u0146em v\u0113r\u0101 re\u0101lo jaudu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar Sage 100 pl\u0101no\u0161anas iesp\u0113j\u0101m vairs nepietiek, ja uz j\u016bsu ra\u017eotni attiecas vair\u0101ki no \u0161iem apst\u0101k\u013ciem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Pl\u0101not\u0101js katru ned\u0113\u013cu stund\u0101m ilgi p\u0101rpl\u0101no darba uzdevumus vai p\u0101rvieto tos Plantafel panel\u012b.<\/li>\n\n\n<li>Pieg\u0101des kav\u0113jas, lai gan katra darba centra dienas slodze izskat\u0101s pie\u0146emama.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no iepriek\u0161 ra\u017eot\u0101 produkta.<\/li>\n\n\n<li>Operatoru pieejam\u012bba, mai\u0146as un promb\u016btne ierobe\u017eo pl\u0101nu tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas.<\/li>\n\n\n<li>Vair\u0101kas iek\u0101rtas izmanto vienus un tos pa\u0161us \u0161tanc\u0113\u0161anas instrumentus, veidnes vai stiprin\u0101\u0161anas pal\u012bgier\u012bces.<\/li>\n\n\n<li>Materi\u0101lu pieejam\u012bba nosaka, kuru ra\u017eo\u0161anas uzdevumu var s\u0101kt.<\/li>\n\n\n<li>Steidzami pas\u016bt\u012bjumi un iek\u0101rtu boj\u0101jumi liek p\u0101rpl\u0101not ra\u017eo\u0161anu vair\u0101kas reizes ned\u0113\u013c\u0101.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161ana oper\u0101ciju l\u012bmen\u012b<\/strong> \u2014 katram solim vai Arbeitsgang ir noteikts s\u0101kums, beigas un darba centrs.<\/li>\n\n\n<li><strong>Visu resursu pieejam\u012bbas ierobe\u017eojumu vienlaic\u012bga iev\u0113ro\u0161ana<\/strong> \u2014 gan iek\u0101rt\u0101m, gan darbiniekiem, gan instrumentiem.<\/li>\n\n\n<li><strong>Autom\u0101tiska p\u0101rslodzes nov\u0113r\u0161ana<\/strong>, nevis tikai jaudas p\u0101rskats vai panelis, kur\u0101 slodze j\u0101sabalans\u0113 manu\u0101li.<\/li>\n\n\n<li><strong>Sagatavo\u0161anas laiku matrica<\/strong>, kas \u0146em v\u0113r\u0101 no sec\u012bbas atkar\u012bgus, asimetriskus p\u0101rregul\u0113\u0161anas laikus.<\/li>\n\n\n<li><strong>Instrumentu pl\u0101no\u0161ana k\u0101 koplietojamiem resursiem ar ierobe\u017eotu pieejam\u012bbu<\/strong> un iesp\u0113ja pl\u0101not ra\u017eo\u0161anas uzdevumus, kuriem vienlaikus vajadz\u012bgi vair\u0101ki operatori.<\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161ana, iev\u0113rojot materi\u0101lu pieejam\u012bbu<\/strong>, ar kr\u0101jumu un gaid\u0101mo iepirkuma pas\u016bt\u012bjumu p\u0101rbaudi.<\/li>\n\n\n<li><strong>Skaidrs datu apmai\u0146as risin\u0101jums ar Sage 100.<\/strong> Noskaidrojiet, k\u0101 pieg\u0101d\u0101t\u0101js j\u016bsu Sage 100 sist\u0113m\u0101 nolasa darba uzdevumus vai Fertigungsauftr\u00e4ge un ieraksta datumus atpaka\u013c.<\/li>\n\n<\/ul>\n\n\n<p>Risin\u0101jumus var iedal\u012bt tr\u012bs grup\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u0101no\u0161ana pa\u0161\u0101 Sage 100<\/strong>: Enhanced Scheduling ASV un Plantafel papildin\u0101jums V\u0101cij\u0101. P\u0101rslodzi nov\u0113r\u0161 pl\u0101not\u0101js.<\/li>\n\n\n<li><strong>Lok\u0101li uzst\u0101d\u0101mi Leitstand un APS papildin\u0101jumi<\/strong>, kurus instal\u0113 l\u012bdz\u0101s Sage 100 un konfigur\u0113 pieg\u0101d\u0101t\u0101ja \u012bstenot\u0101 projekt\u0101.<\/li>\n\n\n<li><strong>M\u0101ko\u0146a APS ar darbu izpildi ceh\u0101<\/strong> \u2014 \u0161aj\u0101 grup\u0101 ietilpst SkyPlanner. Tas l\u012bdz\u0101s Sage 100 autom\u0101tiski sast\u0101da grafiku katram resursam, p\u0101rpl\u0101no to atbilsto\u0161i izmai\u0146\u0101m ra\u017eo\u0161an\u0101 un nodod grafiku operatoru r\u012bc\u012bb\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101du lomu pilda SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS nov\u0113r\u0161 visus iepriek\u0161 min\u0113tos tr\u016bkumus. Katra darba centra jauda ir ierobe\u017eota, un Arcturus AI dzin\u0113js da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju. Iek\u0101rtas, darbiniekus, instrumentus un materi\u0101lus pl\u0101no kop\u0101 vien\u0101 dzin\u0113j\u0101. Darba centru ar \u010detr\u0101m iek\u0101rt\u0101m att\u0113lo k\u0101 \u010detrus atsevi\u0161\u0137us darba centrus vai vienu darba centru grupu, un katrai iek\u0101rtai ir sava laika skala.<\/p>\n\n\n<p>Sagatavo\u0161anas laiku matric\u0101 glab\u0101jas p\u0101rregul\u0113\u0161anas laiks starp katru produktu p\u0101ri abos virzienos, un dzin\u0113js izv\u0113las sec\u012bbu ar vismaz\u0101ko sagatavo\u0161anas laiku. Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, un vienam ra\u017eo\u0161anas uzdevumam var b\u016bt vajadz\u012bgi vair\u0101ki operatori vienlaikus. Ja iek\u0101rta vai darbinieks nav pieejams, dzin\u0113js izmanto j\u016bsu nor\u0101d\u012bt\u0101s alternat\u012bvas.<\/p>\n\n\n<p>Sast\u0101dot ra\u017eo\u0161anas grafiku atbilsto\u0161i materi\u0101lu pieejam\u012bbai, sist\u0113ma model\u0113 n\u0101kotnes kr\u0101jumus, balstoties uz eso\u0161ajiem kr\u0101jumiem un gaid\u0101maj\u0101m pieg\u0101d\u0113m p\u0113c iepirkuma pas\u016bt\u012bjumiem. Pas\u016bt\u012btais materi\u0101ls tiek uzskat\u012bts par pieejamu t\u0101 pieg\u0101des datum\u0101, t\u0101p\u0113c darbus iepl\u0101no tikai tad, kad materi\u0101ls ir pieejams.<\/p>\n\n\n<p>Kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, iev\u0113rojot j\u016bsu fiks\u0113tos elementus un priorit\u0101tes. Pl\u0101not\u0101ji kori\u0123\u0113 ra\u017eo\u0161anas uzdevumus Gantt laika skal\u0101, bet operatori re\u0123istr\u0113 paveikto t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> darba centru noslodzes izl\u012bdzin\u0101\u0161ana vai uzdevumu p\u0101rvieto\u0161ana ar peli Plantafel panel\u012b ik ned\u0113\u013cu aiz\u0146em vair\u0101kas stundas.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rregul\u0113\u0161ana, koplietojamie instrumenti vai uzdevumi, kam vajadz\u012bgi vair\u0101ki operatori, nosaka, kuru darbu var s\u0101kt n\u0101kamo.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> da\u017eu ned\u0113\u013cu laik\u0101 v\u0113laties ieg\u016bt darbam gatavu ra\u017eo\u0161anas grafiku, kas iev\u0113ro re\u0101lo iek\u0101rtu un darbinieku jaudu un darbojas kop\u0101 ar jau izmantoto Sage 100.<\/p>\n\n\n<p>S\u0101ciet ar savu atv\u0113rto darba uzdevumu kar\u0161u vai Fertigungsauftr\u00e4ge eksportu Excel form\u0101t\u0101 un izmantojiet <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jumu<\/a> (l\u012bdz 20 darba centriem, bez kred\u012btkartes). P\u0113c tam cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus. Nor\u0113\u0137ini notiek katru m\u0113nesi, un abonementu var atcelt jebkur\u0101 laik\u0101. Integr\u0101cijas cenu nosak\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un nor\u0101d\u0101m kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas v\u0113l pirms darba s\u0101k\u0161anas. Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadapm\u0101c\u012bbas un s\u0101kotn\u0113j\u0101s iestat\u012b\u0161anas s\u0101kuma.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Sage 100. No ASV Sage 100 tiek sa\u0146emtas darba uzdevumu kartes, darba centri, preces un iepirkuma pas\u016bt\u012bjumi, savuk\u0101rt pl\u0101notie oper\u0101ciju datumi un darba laika ieraksti tiek nos\u016bt\u012bti atpaka\u013c caur Business Object Interface. No V\u0101cijas Sage 100 tiek sa\u0146emti Fertigungsauftr\u00e4ge, Arbeitsg\u00e4nge un Arbeitspl\u00e4tze, savuk\u0101rt Arbeitsgang datumi un R\u00fcckmeldungen tiek nos\u016bt\u012bti atpaka\u013c pa datu apmai\u0146as ce\u013cu, ko ievie\u0161anas tv\u0113ruma noteik\u0161anas laik\u0101 saska\u0146o ar j\u016bsu Sage partneri. SkyPlanner komanda ievie\u0161anas laik\u0101 konfigur\u0113 integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. J\u016bsu Sage partneris vai uz\u0146\u0113muma izstr\u0101d\u0101t\u0101ji var izmantot dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>), autentifik\u0101cijai izmantojot tikai API mar\u0137ieri.<\/p>\n\n\n<p>Par to, k\u0101 sist\u0113mas sadarbojas, lasiet lap\u0101 <a href=\"\/lv\/integracija\/erp\/sage-100\/\">SkyPlanner risin\u0101jums Sage 100 lietot\u0101jiem<\/a> vai uzreiz atveriet <a href=\"\/lv\/integracija\/erp\/sage-100\/integracijas-celvedis\/\">Sage 100 integr\u0101cijas rokasgr\u0101matu<\/a>. Izmantojat Sage 200 vai Sage X3? Skatiet <a href=\"\/lv\/integracija\/erp\/sage-200\/\">Sage 200<\/a> un <a href=\"\/lv\/integracija\/erp\/sage-x3\/\">Sage X3<\/a> lapas. Citas ERP sist\u0113mas atrad\u012bsiet <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no gaisa uz Piristeel jumta dro\u0161\u012bbas elementu r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis skaidri saskat\u012bt \u0161aur\u0101s vietas un ieviesis liel\u0101ku skaidr\u012bbu ra\u017eo\u0161anas vad\u012bb\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas elementi un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visa organiz\u0101cija redz ra\u017eo\u0161anas situ\u0101ciju re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sage 100 ir ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas r\u012bks?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, abos produktos. ASV Sage 100 Production Management ir pieejams Enhanced Scheduling, kas apr\u0113\u0137ina oper\u0101ciju datumus uz priek\u0161u vai atpaka\u013c, ne\u0146emot v\u0113r\u0101 jaudas ierobe\u017eojumus. V\u0101cijas Sage 100 Produktion pied\u0101v\u0101 grafiku sast\u0101d\u012b\u0161anu uz priek\u0161u un atpaka\u013c, \u0161auro vietu att\u0113lojumu un papildu grafisko Plantafel paneli. Abos produktos p\u0101rslodzi nov\u0113r\u0161 pl\u0101not\u0101js.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sage 100 Enhanced Scheduling nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un darbinieku jaudu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Sage pal\u012bdz\u012bbas dokument\u0101cij\u0101 t\u0101 d\u0113v\u0113ta par &#8220;infinite&#8221; (bez jaudas ierobe\u017eojumiem) noslodzes pl\u0101no\u0161anas metodi, kas katru darba uzdevuma karti iepl\u0101no neatkar\u012bgi no p\u0101r\u0113j\u0101m. P\u0113c tam Work Center Capacity Inquiry par\u0101da iepl\u0101noto noslodzi, un pl\u0101not\u0101js p\u0101rpl\u0101no kartes vai pievieno gaid\u012b\u0161anas laiku rind\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sage 100 Plantafel pl\u0101no ra\u017eo\u0161anu, iev\u0113rojot jaudas ierobe\u017eojumus?<\/summary>\n<p class=\"sp-faq__a\">Plantafel ir grafisks panelis, kur\u0101 pl\u0101not\u0101js p\u0101rvieto uzdevumus ar vilk\u0161anu un nome\u0161anu, bet Sage 100 attiec\u012bgi maina pas\u016bt\u012bjumu un materi\u0101lu vajadz\u012bbu datumus. Savuk\u0101rt ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas iev\u0113ro jaudas ierobe\u017eojumus, pats iepl\u0101no katru oper\u0101ciju laik\u0101, kad ir br\u012bva jauda, un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sage 100 \u0146em v\u0113r\u0101 no darbu sec\u012bbas atkar\u012bgus sagatavo\u0161anas laikus?<\/summary>\n<p class=\"sp-faq__a\">Sage 100 glab\u0101 sagatavo\u0161anas un izpildes laiku katrai oper\u0101cijai jeb Arbeitsgang. SkyPlanner APS to papildina ar sagatavo\u0161anas laiku matricu. Taj\u0101 glab\u0101jas p\u0101rregul\u0113\u0161anas laiki starp produktu p\u0101riem (no zila uz sarkanu \u2014 30 min\u016btes, no sarkana uz zilu \u2014 60), un ra\u017eo\u0161anas uzdevumi tiek sak\u0101rtoti sec\u012bb\u0101, kas \u0161os laikus samazina l\u012bdz minimumam.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 SkyPlanner APS savieno ar Sage 100?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Sage 100, un SkyPlanner komanda to konfigur\u0113 ievie\u0161anas laik\u0101. ASV Sage 100 savienojumam izmanto Business Object Interface un ODBC. V\u0101cijas Sage 100 datus nolasa no t\u0101 SQL Server datub\u0101zes, bet datu ierakst\u012b\u0161anas veidu saska\u0146o ar j\u016bsu Sage partneri. Pl\u0101notie datumi tiek nos\u016bt\u012bti atpaka\u013c katrai oper\u0101cijai, un SkyPlanner ar webhook pazi\u0146ojumiem nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Sage 100?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet atv\u0113rt\u0101s darba uzdevumu kartes vai Fertigungsauftr\u00e4ge un resursus Excel form\u0101t\u0101, import\u0113jiet tos SkyPlanner 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 un sal\u012bdziniet izveidoto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu. Kred\u012btkarte nav vajadz\u012bga. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Sage 100 Vai Sage 100 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojums par Production Management un Sage 100 Produktion N\u0113, ja ar to saprot pl\u0101no\u0161anas r\u012bku, kas katrai oper\u0101cijai atrod laiku, kad ir pieejama vajadz\u012bg\u0101 jauda. \u0160is nosaukums ir diviem at\u0161\u0137ir\u012bgiem produktiem. ASV Sage 100 Production Management katru &#8230; <a title=\"Vai Sage 100 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojums par Production Management un Sage 100 Produktion\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/razosanas-planosana\/\" aria-label=\"Read more about Vai Sage 100 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojums par Production Management un Sage 100 Produktion\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106528,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107603","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai Sage 100 pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/title>\n<meta name=\"description\" content=\"Sage 100 ASV pl\u0101no bez jaudas ierobe\u017eojumiem, V\u0101cij\u0101 \u2014 ar manu\u0101lu Plantafel. K\u0101 abi darbojas, kas j\u0101veic pl\u0101not\u0101jam un kad vajag APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Sage 100 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojums par Production Management un Sage 100 Produktion\" \/>\n<meta property=\"og:description\" content=\"Sage 100 ASV pl\u0101no bez jaudas ierobe\u017eojumiem, V\u0101cij\u0101 \u2014 ar manu\u0101lu Plantafel. K\u0101 abi darbojas, kas j\u0101veic pl\u0101not\u0101jam un kad vajag APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-100\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-100\\\/razosanas-planosana\\\/\",\"name\":\"Vai Sage 100 pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i re\u0101lajai jaudai?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Sage 100 ASV pl\u0101no bez jaudas ierobe\u017eojumiem, V\u0101cij\u0101 \u2014 ar manu\u0101lu Plantafel. K\u0101 abi darbojas, kas j\u0101veic pl\u0101not\u0101jam un kad vajag APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-100\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-100\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-100\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Sage 100: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-100\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Sage 100 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojums par Production Management un Sage 100 Produktion\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai Sage 100 pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i re\u0101lajai jaudai?","description":"Sage 100 ASV pl\u0101no bez jaudas ierobe\u017eojumiem, V\u0101cij\u0101 \u2014 ar manu\u0101lu Plantafel. K\u0101 abi darbojas, kas j\u0101veic pl\u0101not\u0101jam un kad vajag APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Sage 100 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojums par Production Management un Sage 100 Produktion","og_description":"Sage 100 ASV pl\u0101no bez jaudas ierobe\u017eojumiem, V\u0101cij\u0101 \u2014 ar manu\u0101lu Plantafel. K\u0101 abi darbojas, kas j\u0101veic pl\u0101not\u0101jam un kad vajag APS.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/razosanas-planosana\/","name":"Vai Sage 100 pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i re\u0101lajai jaudai?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Sage 100 ASV pl\u0101no bez jaudas ierobe\u017eojumiem, V\u0101cij\u0101 \u2014 ar manu\u0101lu Plantafel. K\u0101 abi darbojas, kas j\u0101veic pl\u0101not\u0101jam un kad vajag APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Sage 100: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/"},{"@type":"ListItem","position":5,"name":"Vai Sage 100 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojums par Production Management un Sage 100 Produktion"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Sage 100 Vai Sage 100 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojums par Production Management un Sage 100 Produktion N\u0113, ja ar to saprot pl\u0101no\u0161anas r\u012bku, kas katrai oper\u0101cijai atrod laiku, kad ir pieejama vajadz\u012bg\u0101 jauda. \u0160is nosaukums ir diviem at\u0161\u0137ir\u012bgiem produktiem. ASV Sage 100 Production Management katru&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107603","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=107603"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107603\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106528"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=107603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}