{"id":107574,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/senior-erp\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/senior-erp\/integracijas-celvedis\/","title":{"rendered":"Senior ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Senior ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Senior ERP integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Senior ERP integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Senior Sistemas izstr\u0101d\u0101to Senior ERP (Gest\u00e3o Empresarial | ERP XT ar Senior X) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Senior ERP, izmantojot pa\u0161a Senior saskarnes:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus (OP) ar to posmiem, tehnolo\u0123iskos mar\u0161rutus (roteiros), resursus un resursu centrus, SKU, produktu strukt\u016bras, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Katra OP posma pl\u0101notais s\u0101kums un beigas, k\u0101 ar\u012b tam izv\u0113l\u0113tais resurss tiek ierakst\u012bti atpaka\u013c OP.<\/li>\n\n\n<li>Ja izv\u0113laties \u0161o iesp\u0113ju, operatoru darba laika ieraksti tiek nos\u016bt\u012bti atpaka\u013c k\u0101 apontamentos de produ\u00e7\u00e3o.<\/li>\n\n\n<li>Senior X Events Hub pazi\u0146o SkyPlanner par OP posma statusa mai\u0146u, savuk\u0101rt SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Senior ERP konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c ekspluat\u0101cijas s\u0101k\u0161anas. \u0160is ce\u013cvedis paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las iesaist\u012bties vai pa\u0161i veidot risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"senior-erp-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Senior ERP integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ERP XT ir hibr\u012bdsist\u0113ma. Senior dokument\u0101cij\u0101 teikts, ka Gest\u00e3o Empresarial XT &#8220;becomes a hybrid system: an on-premises (local) system with integration of cloud solutions&#8221; (k\u013c\u016bst par hibr\u012bdsist\u0113mu: lok\u0101li uzst\u0101d\u012btu sist\u0113mu ar integr\u0113tiem m\u0101ko\u0146risin\u0101jumiem) (<a href=\"https:\/\/documentacao.senior.com.br\/gestaoempresarialerp\/5.10.4\/xtended.htm\">Senior dokument\u0101cija, tulkojums<\/a>). Grafiku sast\u0101d\u012b\u0161anas risin\u0101jums izmanto tr\u012bs Senior saskarnes:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>G5 t\u012bmek\u013ca servisi (SOAP).<\/strong> Servisi darbojas j\u016bsu Senior server\u012b, un to nosaukumos nor\u0101d\u012bts modulis (com.senior.g5.co.&lt;module&gt;&#8230;). Katrs ir public\u0113ts tr\u012bs WSDL variantos: sapiens_Sync, sapiens_Async un sapiens_Scheduled. Ra\u017eo\u0161anas servisu vid\u016b ir <strong>com.senior.g5.co.mpr.pcp.ordemproducao<\/strong>, kas &#8220;calls the same production order generation routine&#8221; (izsauc to pa\u0161u ra\u017eo\u0161anas pas\u016bt\u012bjumu izveides proced\u016bru), ko izmanto ERP ekr\u0101ns (<a href=\"https:\/\/documentacao.senior.com.br\/gestaoempresarialerp\/5.10.4\/webservices\/com_senior_g5_co_mpr_pcp_ordemproducao.htm\">Senior dokument\u0101cija, tulkojums<\/a>), k\u0101 ar\u012b produktu (com.senior.g5.co.ger.cad.produto) un ra\u017eo\u0161anas uzskaites servisi.<\/li>\n\n\n<li><strong>Senior X Platform REST API<\/strong> adres\u0113 api.senior.com.br nodro\u0161ina piek\u013cuvi t\u0101m ERP datu jom\u0101m, kuras Senior dara pieejamas Senior X, piem\u0113ram, produktiem un p\u0101rdo\u0161anas pas\u016bt\u012bjumiem (<a href=\"https:\/\/documentacao.senior.com.br\/seniorxplatform\/manual-do-usuario\/erp\/mercado\/vendas\/integracao-pedido-venda-api.htm\">Senior dokument\u0101cija<\/a>).<\/li>\n\n\n<li><strong>Events Hub t\u012bmek\u013ca aiz\u0137eres.<\/strong> T\u0101s izveido Senior X sada\u013c\u0101 Tecnologia &gt; Customiza\u00e7\u00e3o &gt; Events Hub &gt; Webhooks. Ra\u017eo\u0161anas modulis public\u0113 notikumu <strong>erp_man\/pcp_programacaocontrole\/orderProductionStageChangeStatus<\/strong>, kad main\u0101s OP posma statuss (<a href=\"https:\/\/documentacao.senior.com.br\/fabrica-ao-vivo-x\/manual-do-usuario\/fabrica-ao-vivo-x\/cadastros\/\">Senior dokument\u0101cija<\/a>).<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un piek\u013cuve<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Senior X Platform.<\/strong> Integr\u0101cija piesak\u0101s ar POST piepras\u012bjumu uz platform.senior.com.br galapunktu \/t\/senior.com.br\/bridge\/1.0\/rest\/platform\/authentication\/actions\/Login, nor\u0101dot lietot\u0101ju form\u0101t\u0101 user@tenant. Atbild\u0113 tiek sa\u0146emts Bearer piek\u013cuves mar\u0137ieris un atjauno\u0161anas mar\u0137ieris. Ar lietotnes atsl\u0113g\u0101m var pieteikties, izmantojot loginWithKey (access key, secret, tenant). REST piepras\u012bjumos iek\u013cauj authorization galveni un client_id galveni. P\u0113d\u0113j\u0101 identific\u0113 pievienoto lietotni, kas re\u0123istr\u0113ta Senior API port\u0101l\u0101 un sasaist\u012bta ar lomu ERP sist\u0113m\u0101.<\/li>\n\n\n<li><strong>G5 t\u012bmek\u013ca servisi.<\/strong> Piepras\u012bjumos tiek iek\u013cauti lietot\u0101ja, paroles un \u0161ifr\u0113\u0161anas parametri. Izmantojot Senior X mar\u0137ieri, tas aizst\u0101j paroli (<a href=\"https:\/\/documentacao.senior.com.br\/tecnologia-senior-x\/manual-do-usuario\/integracoes\/web-services.htm\">Senior dokument\u0101cija<\/a>).<\/li>\n\n\n<li><strong>Piek\u013cuves ties\u012bbas.<\/strong> Integr\u0101cijai izveidojiet atsevi\u0161\u0137u Senior lietot\u0101ju ar piek\u013cuvi PCP, in\u017eeniertehniskajiem, kr\u0101jumu un iepirkumu datiem, kurus integr\u0101cija lasa un ieraksta.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API mar\u0137ieri Authorization-Token galven\u0113 (SkyPlanner Settings &gt; API). API dokument\u0101cija ir pieejama Swagger\/OpenAPI form\u0101t\u0101. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim izskaidroti pirmie piepras\u012bjumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodisk\u0101 aptauja<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Events Hub nodro\u0161ina notikumus no ra\u017eo\u0161anas ceha: kad main\u0101s OP posma statuss, t\u012bmek\u013ca aiz\u0137ere sasniedz SkyPlanner un grafiks tiek atjaunin\u0101ts. P\u0101r\u0113jos datus ieg\u016bst ar periodiskiem piepras\u012bjumiem. Jaunos darbus atrod, atlasot apstiprin\u0101tos un ra\u017eo\u0161anai nodotos OP un nesen\u0101s izmai\u0146as. Piepras\u012bjumu bie\u017eumu nosaka katrai ra\u017eotnei: OP datus var nolas\u012bt ik p\u0113c da\u017e\u0101m min\u016bt\u0113m, bet kr\u0101jumu datus \u2014 reizi stund\u0101.<\/p>\n\n\n<p>Kad main\u0101s st\u0101voklis vai grafiks, SkyPlanner nos\u016bta webhook pazi\u0146ojumus, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c aktiviz\u0113 notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Senior ERP objekts (saskarne)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>SKU: produto un deriva\u00e7\u00e3o, m\u0113rvien\u012bbas (G5 t\u012bmek\u013ca servisi vai Senior X ent\u012btijas)<\/td><td>Produkti un materi\u0101li<\/td><td>Senior \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam periodisk\u0101 aptauja<\/td><\/tr><tr><td>Produkta strukt\u016bra (engenharia do SKU)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>Senior \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Roteiro ar est\u00e1gios: sec\u012bba, atkar\u012bba no iepriek\u0161\u0113j\u0101 posma<\/td><td>Procesa so\u013ci noteikt\u0101 sec\u012bb\u0101<\/td><td>Senior \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Recurso: Tempo processo, Tempo setup, Tempo carga e descarga, Tempo transfer\u00eancia, Fator de carga<\/td><td>Darba centri, ilgumi, sagatavo\u0161anas un nosl\u0113guma darbu laiki, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>Senior \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, v\u0113l\u0101k \u2014 reti<\/td><\/tr><tr><td>Centro de recurso<\/td><td>Darba centru grupas<\/td><td>Senior \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam reti<\/td><\/tr><tr><td>Calend\u00e1rio: Feriados, ra\u017eo\u0161anas kalend\u0101rs katrai mai\u0146ai<\/td><td>Mai\u0146as un br\u012bvdienas<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Katru dienu vai atsevi\u0161\u0137a mai\u0146u uztur\u0113\u0161ana SkyPlanner<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o (Firme, Liberada) ar posmiem un materi\u0101liem<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Periodisk\u0101 aptauja ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>OP posma statuss (Events Hub orderProductionStageChangeStatus)<\/td><td>Ra\u017eo\u0161anas uzdevuma izpildes gaita<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Re\u0101llaik\u0101 ar t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>Estoque katram SKU<\/td><td>Kr\u0101jumu atlikumi<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Aptauja reizi stund\u0101 vai grafika sast\u0101d\u012b\u0161anas laik\u0101<\/td><\/tr><tr><td>Ordens de compra ar pieg\u0101des datumiem<\/td><td>Iepirkuma pas\u016bt\u012bjumi, sa\u0146emamie materi\u0101li p\u0113c pieg\u0101des datuma<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Periodiski piepras\u012bjumi reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>OP posms: pl\u0101notais s\u0101kums un beigas, resurss<\/td><td>Katra ra\u017eo\u0161anas uzdevuma pl\u0101notais s\u0101kums un beigas, pie\u0161\u0137irtais darba centrs<\/td><td>SkyPlanner \u2192 Senior<\/td><td>Mainoties grafikam, ar SkyPlanner t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>Apontamento de produ\u00e7\u00e3o: numOrp, codEtg, seqRot, qtdRel, qtdRfg, s\u0101kuma un beigu datums un laiks<\/td><td>Darba laika ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 Senior<\/td><td>P\u0113c katra apstiprin\u0101juma vai katr\u0101 mai\u0146\u0101, ja izv\u0113l\u0113ta \u0161\u012b iesp\u0113ja<\/td><\/tr><tr><td>Nav Senior ERP<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, ra\u017eo\u0161anas uzdevumi ar vair\u0101kiem operatoriem, alternat\u012bvas iek\u0101rtas un person\u0101ls<\/td><td>Uztur SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas scen\u0101riji<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet SKU, strukt\u016bras, roteiros, recursos, centros de recurso un ra\u017eo\u0161anas kalend\u0101ru. R\u016bp\u012bgi nosakiet resursu centru atbilst\u012bbu: centro de recurso ar \u010detr\u0101m iek\u0101rt\u0101m k\u013c\u016bst par vienu darba centru grupu vai \u010detriem darba centriem. Izmantojiet Fator de carga, lai noteiktu SkyPlanner darba centra efektivit\u0101ti vai mai\u0146as, bet ne abus.<\/p>\n\n\n<p><strong>2. OP sinhroniz\u0101cija.<\/strong> Nolasiet OP ar statusu Firme un Liberada kop\u0101 ar to posmiem un materi\u0101liem, k\u0101 ar\u012b atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. MRP joproj\u0101m var main\u012bt vai dz\u0113st OP ar statusu Planejada, t\u0101p\u0113c iek\u013caujiet tos grafik\u0101 tikai tad, ja v\u0113laties ieg\u016bt n\u0101kotnes p\u0101rskatu. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Kad pl\u0101no\u0161anas dzin\u0113js iepl\u0101no vai p\u0101rvieto posmu, SkyPlanner t\u012bmek\u013ca aiz\u0137ere ierosina datu ierakst\u012b\u0161anu atpaka\u013c. T\u0101 nosaka katra OP posma pl\u0101noto s\u0101kumu un beigas, k\u0101 ar\u012b izv\u0113l\u0113to resursu \u2014 tos pa\u0161us laukus, kurus pl\u0101not\u0101js redi\u0123\u0113 Programa\u00e7\u00e3o de produ\u00e7\u00e3o. Tv\u0113ruma noteik\u0161anas laik\u0101 SkyPlanner komanda ar jums un j\u016bsu Senior partneri vienojas par konkr\u0113to t\u012bmek\u013ca servisu.<\/p>\n\n\n<p><strong>4. Apstiprin\u0101jumi no ra\u017eo\u0161anas ceha.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un darba laika ieraksti nodro\u0161ina, ka grafiks ir aktu\u0101ls. J\u016bs izv\u0113laties, vai faktiskos laikus nos\u016bt\u012bt atpaka\u013c uz Senior. Ja izv\u0113laties to dar\u012bt, katrs apstiprin\u0101jums k\u013c\u016bst par apontamento de produ\u00e7\u00e3o attiec\u012bgaj\u0101 OP posm\u0101 ar sara\u017eoto daudzumu, br\u0101\u0137i un s\u0101kuma un beigu laiku. Senior pie\u0146em ra\u017eo\u0161anas uzskaites ierakstus tikai OP ar statusu Liberada vai Andamento. Ja ra\u017eo\u0161anas uzskaitei izmantojat F\u00e1brica ao Vivo, SkyPlanner t\u0101 viet\u0101 nolasa izpildes gaitu caur Events Hub.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms ekspluat\u0101cijas s\u0101k\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>SKU, strukt\u016bras, roteiros, OP daudzumi un statuss<\/td><td>Senior ERP<\/td><\/tr><tr><td>Posmu sec\u012bba, s\u0101kuma un beigu laiki, resursu pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161anas laiku matrica, pras\u012bbas instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas kalend\u0101rs un mai\u0146as<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Apontamentos, kr\u0101jumu kust\u012bba, izmaksu apr\u0113\u0137ins<\/td><td>Senior ERP; datus ievada tur vai nos\u016bta no SkyPlanner darba laika ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas ieraksta posmu datumus. Ja pl\u0101not\u0101ji joproj\u0101m nosaka to pa\u0161u OP sec\u012bbu Programa\u00e7\u00e3o de produ\u00e7\u00e3o vai Gantt diagramm\u0101, vienojieties, par kuriem OP atbild SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot no Senior CSV vai Excel form\u0101t\u0101 eksport\u0113tos resursus, roteiros un atv\u0113rtos OP.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu kart\u0113\u0161ana.<\/strong> Apstipriniet datu atbilst\u012bbas tabulu, datu p\u0101rvald\u012bbas noteikumus, sinhroniz\u0101cijas bie\u017eumu un to, vai apontamentos tiks nos\u016bt\u012bti atpaka\u013c.<\/li>\n\n\n<li><strong>Piek\u013cuve Senior.<\/strong> Izveidojiet integr\u0101cijas lietot\u0101ju, re\u0123istr\u0113jiet lietotni Senior API port\u0101l\u0101 un iesp\u0113jojiet G5 t\u012bmek\u013ca servisus un Events Hub t\u012bmek\u013ca aiz\u0137eri. Vispirms p\u0101rbaudiet darb\u012bbu testa datub\u0101z\u0113.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> SKU, strukt\u016bras, roteiros, recursos, centros de recurso, kalend\u0101rs.<\/li>\n\n\n<li><strong>OP un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Periodiski piepras\u012bjumi ar filtriem un atk\u0101rtotiem m\u0113\u0123in\u0101jumiem, k\u0101 ar\u012b posma statusa t\u012bmek\u013ca aiz\u0137ere.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu konfigur\u0113\u0161ana SkyPlanner.<\/strong> Sagatavo\u0161anas laiku matrica, instrumenti, katram ra\u017eo\u0161anas uzdevumam nepiecie\u0161amais operatoru skaits un alternat\u012bvas iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Posmu datumi un resursi no SkyPlanner t\u012bmek\u013ca aiz\u0137er\u0113m, k\u0101 ar\u012b apontamentos, ja izv\u0113l\u0113ta \u0161\u012b iesp\u0113ja.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Darbiniet SkyPlanner paral\u0113li pa\u0161reiz\u0113jam pl\u0101nam, sal\u012bdziniet datumus un izlabojiet pamatdatus.<\/li>\n\n\n<li><strong>Ekspluat\u0101cijas s\u0101k\u0161ana.<\/strong> Iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c, kad dati sakr\u012bt.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-senior-erp-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot Senior ERP integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u010cetri resursa laika parametri.<\/strong> Recurso glab\u0101 apstr\u0101des, sagatavo\u0161anas, iekrau\u0161anas un izkrau\u0161anas, k\u0101 ar\u012b p\u0101rvieto\u0161anas laiku. Iekrau\u0161anas un p\u0101rvieto\u0161anas laiks var b\u016bt materi\u0101lu apstr\u0101des laiks, nevis iek\u0101rtas darb\u012bbas laiks. Katram resursam nosakiet \u0161o parametru atbilst\u012bbu, cit\u0101di visi ilgumi b\u016bs nepareizi.<\/li>\n\n\n<li><strong>Viena sagatavo\u0161anas laika v\u0113rt\u012bba katram resursam.<\/strong> Senior parametrs Tempo setup satur vienu v\u0113rt\u012bbu. Ievie\u0161anas laik\u0101 izveidojiet SkyPlanner p\u0101rregul\u0113\u0161anas laiku matricu, balstoties uz faktiskaj\u0101m p\u0101rregul\u0113\u0161an\u0101m.<\/li>\n\n\n<li><strong>Produktu varianti.<\/strong> Senior sist\u0113m\u0101 SKU veido produkts kop\u0101 ar deriva\u00e7\u00e3o, un katram variantam roteiros var at\u0161\u0137irties. Iek\u013caujiet varianta kodu SkyPlanner produktu atsl\u0113g\u0101s.<\/li>\n\n\n<li><strong>OP statusi.<\/strong> Ra\u017eo\u0161anas uzskaites ierakstus var pievienot tikai OP ar statusu Liberada vai Andamento. Mainiet statusus Senior sist\u0113m\u0101 un \u013caujiet SkyPlanner sekot izmai\u0146\u0101m caur Events Hub.<\/li>\n\n\n<li><strong>Hibr\u012bda izvietojums.<\/strong> G5 t\u012bmek\u013ca servisi darbojas j\u016bsu Senior server\u012b, bet Events Hub \u2014 Senior X vid\u0113. Iepl\u0101nojiet t\u012bkla piek\u013cuvi abiem.<\/li>\n\n\n<li><strong>Skait\u013cu form\u0101ts.<\/strong> Senior t\u012bmek\u013ca pakalpojumi nepie\u0146em skait\u013cus ar t\u016bksto\u0161u atdal\u012bt\u0101jiem un pieprasa komatu k\u0101 decim\u0101latdal\u012bt\u0101ju. Nos\u016btiet skait\u013cus \u0161aj\u0101 form\u0101t\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-senior-erp-integ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 un uztur Senior ERP integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/strong> Tas aptver saska\u0146otos t\u012bmek\u013ca pakalpojumus, Senior X API un Events Hub webhook pazi\u0146ojumus. Katr\u0101 ra\u017eotn\u0113 Senior ERP izmanto at\u0161\u0137ir\u012bgi, un tie\u0161i \u0161eit noder komandas pieredze.<\/li>\n\n\n<li><strong>Var iesaist\u012bties ar\u012b j\u016bsu Senior partneris.<\/strong> Partneris p\u0101rzina j\u016bsu konfigur\u0101ciju, piel\u0101gojumus un licenc\u0113\u0161anas nosac\u012bjumus un kop\u0101 ar SkyPlanner komandu var izveidot integr\u0101cijas lietot\u0101ju, veikt re\u0123istr\u0101ciju API port\u0101l\u0101 un iestat\u012bt t\u012bmek\u013ca pakalpojumus.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var papildin\u0101t integr\u0101ciju,<\/strong> izmantojot SkyPlanner REST API un API pilnvaru. Lai s\u0101ktu darbu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz\u0113s. Nor\u0101d\u012bjumi ir pieejami <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, un taj\u0101 ir iek\u013cauti 5 darba centri. Nor\u0113\u0137ini notiek katru m\u0113nesi. Integr\u0101cijas cenas pied\u0101v\u0101jumu sagatavojam iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101na pied\u0101v\u0101jumu, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, inform\u0101ciju par <a href=\"\/lv\/integracija\/erp\/senior-erp\/razosanas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anu ar Senior ERP, iev\u0113rojot iek\u0101rtu un person\u0101la faktisko jaudu<\/a>, <a href=\"\/lv\/integracija\/erp\/senior-erp\/\">Senior ERP lapu<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju p\u0101rskatu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda l\u012bdz ra\u017eo\u0161anas l\u012bnijai non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 un vair\u0101k<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu p\u0101rvald\u0101m pavisam cit\u0101di, un m\u016bsu izpratne par ra\u017eo\u0161anas jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams re\u0101llaika p\u0101rskats par ra\u017eo\u0161anu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner mums ir v\u0113rt\u012bgs k\u0101 r\u012bks, kas labi noder ikdienas darb\u0101, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska slodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir strauji samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Senior ERP ir API darbam ar ra\u017eo\u0161anas pas\u016bt\u012bjumiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. G5 t\u012bmek\u013ca pakalpojums com.senior.g5.co.mpr.pcp.ordemproducao veido OP ar to pa\u0161u proced\u016bru, ko izmanto ERP saskarn\u0113, savuk\u0101rt citi G5 pakalpojumi nodro\u0161ina darbu ar produktiem un ra\u017eo\u0161anas izpildes datiem. Senior X Platform papildus pied\u0101v\u0101 REST API ar autentifik\u0101ciju, izmantojot Bearer pilnvaru, un Events Hub webhook pazi\u0146ojumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Senior ERP atbalsta webhook pazi\u0146ojumus?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Senior X Events Hub s\u016bta webhook pazi\u0146ojumus, tostarp orderProductionStageChangeStatus, kad main\u0101s OP posma statuss. SkyPlanner tos izmanto, lai re\u0101llaik\u0101 sekotu ra\u017eo\u0161anas gaitai, savuk\u0101rt SkyPlanner webhook pazi\u0146ojumi nos\u016bta grafika izmai\u0146as atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c Senior ERP?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner iestata katra OP posma pl\u0101noto s\u0101kumu, beigas un tam izv\u0113l\u0113to resursu. Tie ir tie pa\u0161i lauki, kurus pl\u0101not\u0101js redi\u0123\u0113 Programa\u00e7\u00e3o de produ\u00e7\u00e3o. Ikreiz, kad main\u0101s grafiks, SkyPlanner webhook pazi\u0146ojums ierosina datu ierakst\u012b\u0161anu atpaka\u013c. Tam izmanto savienojuma ce\u013cu, ko SkyPlanner komanda nosaka j\u016bsu Senior instal\u0101cijai, ievie\u0161anas laik\u0101 nosakot integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai integr\u0101cija darbojas ar Senior X un ERP XT?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. ERP XT darbojas j\u016bsu server\u012b un izmanto Senior X m\u0101ko\u0146pakalpojumus. Integr\u0101cij\u0101 tiek izmantoti G5 t\u012bmek\u013ca pakalpojumi server\u012b, k\u0101 ar\u012b Senior X API un Events Hub m\u0101kon\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat izmantot l\u012bdz 20 darba centriem un import\u0113t datus no Senior CSV vai Excel form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Senior ERP Senior ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Senior ERP integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Senior Sistemas izstr\u0101d\u0101to Senior ERP (Gest\u00e3o Empresarial | ERP XT ar Senior X) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Senior ERP, izmantojot pa\u0161a Senior saskarnes: &#8230; <a title=\"Senior ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/senior-erp\/integracijas-celvedis\/\" aria-label=\"Read more about Senior ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106499,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107574","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Senior ERP un APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem<\/title>\n<meta name=\"description\" content=\"Savienojiet Senior ERP ar SkyPlanner APS: Senior X Platform API, G5 t\u012bmek\u013cservisi, Events Hub webhooks, OP posmu atpaka\u013cieraksts, datu kart\u0113\u0161ana un projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/senior-erp\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Senior ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienojiet Senior ERP ar SkyPlanner APS: Senior X Platform API, G5 t\u012bmek\u013cservisi, Events Hub webhooks, OP posmu atpaka\u013cieraksts, datu kart\u0113\u0161ana un projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/senior-erp\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/senior-erp\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/senior-erp\\\/integracijas-celvedis\\\/\",\"name\":\"Senior ERP un APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Savienojiet Senior ERP ar SkyPlanner APS: Senior X Platform API, G5 t\u012bmek\u013cservisi, Events Hub webhooks, OP posmu atpaka\u013cieraksts, datu kart\u0113\u0161ana un projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/senior-erp\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/senior-erp\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/senior-erp\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Senior ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/senior-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Senior ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Senior ERP un APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","description":"Savienojiet Senior ERP ar SkyPlanner APS: Senior X Platform API, G5 t\u012bmek\u013cservisi, Events Hub webhooks, OP posmu atpaka\u013cieraksts, datu kart\u0113\u0161ana un projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/senior-erp\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Senior ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienojiet Senior ERP ar SkyPlanner APS: Senior X Platform API, G5 t\u012bmek\u013cservisi, Events Hub webhooks, OP posmu atpaka\u013cieraksts, datu kart\u0113\u0161ana un projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/senior-erp\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/senior-erp\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/senior-erp\/integracijas-celvedis\/","name":"Senior ERP un APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Savienojiet Senior ERP ar SkyPlanner APS: Senior X Platform API, G5 t\u012bmek\u013cservisi, Events Hub webhooks, OP posmu atpaka\u013cieraksts, datu kart\u0113\u0161ana un projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/senior-erp\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/senior-erp\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/senior-erp\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Senior ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/senior-erp\/"},{"@type":"ListItem","position":5,"name":"Senior ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Senior ERP Senior ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Senior ERP integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Senior Sistemas izstr\u0101d\u0101to Senior ERP (Gest\u00e3o Empresarial | ERP XT ar Senior X) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Senior ERP, izmantojot pa\u0161a Senior saskarnes:&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107574","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=107574"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107574\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106499"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=107574"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}