{"id":107514,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/","title":{"rendered":"Comarch ERP XL integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Comarch ERP XL<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Comarch ERP XL integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Comarch ERP XL integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Comarch ERP XL ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Comarch ERP XL, izmantojot pa\u0161a Comarch saskarnes:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Uz SkyPlanner tiek p\u0101rs\u016bt\u012bti ra\u017eo\u0161anas pas\u016bt\u012bjumi (zlecenia produkcyjne) ar procesiem un oper\u0101cij\u0101m, tehnolo\u0123ijas, darba centri, resursi, preces, kr\u0101jumi un iepirkuma pas\u016bt\u012bjumi.<\/li>\n\n\n<li>Pl\u0101notais s\u0101kuma un beigu laiks tiek ierakst\u012bts atpaka\u013c katr\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101, izmantojot XL API.<\/li>\n\n\n<li>Ja izv\u0113laties \u0161o iesp\u0113ju, operatoru laika uzskaites ieraksti tiek nos\u016bt\u012bti atpaka\u013c k\u0101 oper\u0101ciju izpildes dati.<\/li>\n\n\n<li>SkyPlanner webhook pazi\u0146ojumi nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu Comarch ERP XL videi un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. \u0160is ce\u013cvedis paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las iesaist\u012bties vai pa\u0161i veidot risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"comarch-erp-xl-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Comarch ERP XL integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Comarch nor\u0101da tr\u012bs veidus, k\u0101 sazin\u0101ties ar ERP XL: &#8220;DCOM, direct database connection (SQL Client), REST API&#8221; (DCOM, tie\u0161s savienojums ar datub\u0101zi (SQL Client), REST API) (<a href=\"https:\/\/www.comarch.pl\/erp\/xl\/\">Comarch, tulkots<\/a>). Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai izmanto divus no tiem:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>XL API (CDN_API.DLL).<\/strong> &#8220;These functions are collected in the CDN_API.DLL library, installed together with the whole Comarch ERP XL system.&#8221; (\u0160\u012bs funkcijas ir apkopotas CDN_API.DLL bibliot\u0113k\u0101, kas tiek instal\u0113ta kop\u0101 ar visu Comarch ERP XL sist\u0113mu.) (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/xl017-wykorzystanie-api-erp-xl\/\">Comarch pal\u012bdz\u012bba, tulkots<\/a>) \u0100r\u0113ja programma piesak\u0101s ar XLLogin, izsauc funkcijas, kas izmanto vienu un to pa\u0161u sesiju, un izrakst\u0101s ar XLLogout. Katrai strukt\u016brai ir lauks <strong>Wersja<\/strong>, kas nosaka j\u016bsu ERP XL laidienam atbilsto\u0161o parametru kopas versiju.<\/li>\n\n\n<li><strong>ERP XL Web REST API.<\/strong> Comarch ERP XL Web 2026.0 nodro\u0161ina REST mikropakalpojumus: &#8220;Each RestAPI microservice exposes its own interactive documentation at the \/swagger endpoint.&#8221; (Katram RestAPI mikropakalpojumam ir sava interakt\u012bv\u0101 dokument\u0101cija galapunkt\u0101 \/swagger.) (<a href=\"https:\/\/pomoc.comarch.pl\/xlweb\/index.php\/dokumentacja\/modyfikacja-systemu\/\">Comarch pal\u012bdz\u012bba, tulkots<\/a>)<\/li>\n\n<\/ol>\n\n\n<p>Tie\u0161s <strong>SQL Client<\/strong> savienojums nodro\u0161ina las\u012b\u0161anas piek\u013cuvi ERP XL datub\u0101zei, lai nolas\u012btu pamatdatus un pas\u016bt\u012bjumus, saska\u0146ojot to ar j\u016bsu IT komandu un Comarch partneri.<\/p>\n\n\n<h3 class=\"wp-block-heading\">XL API funkcijas ra\u017eo\u0161anai<\/h3>\n\n\n<p>Comarch dokument\u0101cij\u0101 aprakst\u012btas \u0161\u0101das ra\u017eo\u0161anas funkcijas (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/xl128-przyklady-zastosowania-api-w-produkcji\/\">XL128<\/a>):<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Joma<\/th><th>Funkcija<\/th><th>Darb\u012bba<\/th><\/tr><\/thead><tbody><tr><td>Tehnolo\u0123ijas<\/td><td>XLNowaTechnologia, XLNowaCzynnoscTechnologia, XLNowaFunkcjaCzynnoscTechnologia, XLNowyZasobCzynnoscTechnologia<\/td><td>Izveido tehnolo\u0123iju vai oper\u0101ciju, piesaista oper\u0101cijai darba centru, materi\u0101lu vai produktu<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumi<\/td><td>XLNoweZlecenieProd<\/td><td>Izveido ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumi<\/td><td>XLZamknijZlecenieProd<\/td><td>Pl\u0101no, p\u0101rpl\u0101no, veic nor\u0113\u0137inu vai sl\u0113dz ra\u017eo\u0161anas pas\u016bt\u012bjumu atbilsto\u0161i izv\u0113l\u0113tajam darb\u012bbas kodam<\/td><\/tr><tr><td>Oper\u0101cijas<\/td><td>XLDodajCzynnoscDoProcesuProd, XLDodajZasobDoProcesuProd<\/td><td>Pievieno ra\u017eo\u0161anas procesam oper\u0101ciju vai resursu<\/td><\/tr><tr><td>Grafiks<\/td><td>XLDodajTerminDoProcesuProd<\/td><td>Pievieno oper\u0101cijai datumu interv\u0101lu: IdCzynnosci, TerminOd, TerminDo<\/td><\/tr><tr><td>Izpilde<\/td><td>XLDodajRealizacjeOperacjiProd, XLProdZmienIloscRealizacji<\/td><td>Pievieno pas\u016bt\u012bjumam oper\u0101cijas izpildes ierakstu, maina izpild\u012bto daudzumu<\/td><\/tr><tr><td>Dokumenti<\/td><td>XLProdObiektyDoDokumentow, XLProdGenerujDokumentyDlaObiektow<\/td><td>Izveido RW un PW dokumentus ra\u017eo\u0161anas objektiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un piek\u013cuve<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>XL API.<\/strong> Integr\u0101cija piesak\u0101s datub\u0101z\u0113 k\u0101 ERP XL operators, izmantojot XLLogin, un sa\u0146em sesiju turpm\u0101kajiem izsaukumiem. DLL darbojas Windows dator\u0101, kur\u0101 instal\u0113ts ERP XL, t\u0101p\u0113c atpaka\u013cierakstes pakalpojums darbojas j\u016bsu t\u012bkl\u0101 l\u012bdz\u0101s ERP XL.<\/li>\n\n\n<li><strong>REST API.<\/strong> Piek\u013cuve tiek konfigur\u0113ta katrai ERP XL Web instal\u0101cijai atsevi\u0161\u0137i; katra mikropakalpojuma izsaukumi ir aprakst\u012bti t\u0101 Swagger lap\u0101.<\/li>\n\n\n<li><strong>SQL las\u012b\u0161ana.<\/strong> J\u016bsu IT komandas apstiprin\u0101ts datub\u0101zes konts ar tikai las\u012b\u0161anas ties\u012bb\u0101m.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru Authorization-Token galven\u0113 (SkyPlanner Settings &gt; API), un API ir dokument\u0113ts Swagger\/OpenAPI. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim aprakst\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska datu nolas\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>P\u0101rbaud\u012btaj\u0101 Comarch ERP XL dokument\u0101cij\u0101 nav nor\u0101d\u012bti izejo\u0161ie webhook pazi\u0146ojumi. Pa\u0161a Comarch APS ielasa datus, kad pl\u0101not\u0101js nospie\u017e &#8220;Aktualizuj dane z ERP&#8221; (atjaunin\u0101t datus no ERP) (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">Comarch APS pal\u012bdz\u012bba<\/a>).<\/p>\n\n\n<p>T\u0101p\u0113c ERP XL dati tiek nolas\u012bti periodiski. Lai atrastu jaunus darbus, nolasa datus, atlasot atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un jaun\u0101k\u0101s izmai\u0146as. Nolas\u012b\u0161anas bie\u017eumu nosaka katrai ra\u017eotnei atsevi\u0161\u0137i: ra\u017eo\u0161anas pas\u016bt\u012bjumiem tas var b\u016bt ik p\u0113c da\u017e\u0101m min\u016bt\u0113m, bet kr\u0101jumiem \u2014 reizi stund\u0101.<\/p>\n\n\n<p>SkyPlanner nos\u016bta webhook pazi\u0146ojumus, mainoties st\u0101voklim vai grafikam, t\u0101p\u0113c ierakst\u012b\u0161anu atpaka\u013c ierosina notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu atbilst\u012bbas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Comarch ERP XL objekts (saskarne)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Karty towar\u00f3w, m\u0113rvien\u012bbas (nolas\u012b\u0161ana ar REST vai SQL)<\/td><td>Produkti un materi\u0101li<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam periodiska nolas\u012b\u0161ana<\/td><\/tr><tr><td>Technologia: oper\u0101cijas, materi\u0101li, pusfabrik\u0101ti un produkti katrai oper\u0101cijai<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, materi\u0101li katram procesa posmam<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 veicot izmai\u0146as<\/td><\/tr><tr><td>Technologia oper\u0101cijas: darba centri, resursi, laiki<\/td><td>Procesa posmi ar to ilgumu, p\u0101rregul\u0113\u0161anas un nosl\u0113guma darbu laiku<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 veicot izmai\u0146as<\/td><\/tr><tr><td>Gniazda robocze un zasoby (iek\u0101rtas, instrumenti, darbinieki)<\/td><td>Darba centri, darba centru grupas, instrumenti, person\u0101ls<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 reti<\/td><\/tr><tr><td>Kalendarze i okresy, przestoje i awarie<\/td><td>Mai\u0146as, \u0101rpusdarba laiks un d\u012bkst\u0101ves<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Katru dienu vai atsevi\u0161\u0137a mai\u0146u uztur\u0113\u0161ana SkyPlanner<\/td><\/tr><tr><td>Zlecenia produkcyjne (ZP) ar procesiem, oper\u0101cij\u0101m, materi\u0101liem, izpildes termi\u0146u un priorit\u0101ti<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Nolas\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Kr\u0101jumi katr\u0101 noliktav\u0101<\/td><td>Kr\u0101jumu atlikumi<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Nolas\u012b\u0161ana reizi stund\u0101 vai grafika sast\u0101d\u012b\u0161anas laik\u0101<\/td><\/tr><tr><td>Zam\u00f3wienia zakupu (ZZ) ar pieg\u0101des datumiem<\/td><td>Iepirkuma pas\u016bt\u012bjumi, ien\u0101ko\u0161ie materi\u0101li p\u0113c pieg\u0101des datuma<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Nolas\u012b\u0161ana reizi stund\u0101 vai grafika sast\u0101d\u012b\u0161anas laik\u0101<\/td><\/tr><tr><td>Oper\u0101ciju termi\u0146i: TerminOd, TerminDo (XLDodajTerminDoProcesuProd)<\/td><td>Katra ra\u017eo\u0161anas uzdevuma pl\u0101notais s\u0101kums un beigas<\/td><td>SkyPlanner \u2192 ERP XL<\/td><td>Mainoties grafikam, izmantojot SkyPlanner webhook pazi\u0146ojumu<\/td><\/tr><tr><td>Realizacja operacji (XLDodajRealizacjeOperacjiProd)<\/td><td>Laika uzskaites ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 ERP XL<\/td><td>P\u0113c katra apstiprin\u0101juma vai katr\u0101 mai\u0146\u0101, ja \u0161\u012b iesp\u0113ja ir izv\u0113l\u0113ta<\/td><\/tr><tr><td>Nav ERP XL<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, ra\u017eo\u0161anas uzdevumi vair\u0101kiem operatoriem, alternat\u012bvas iek\u0101rtas un person\u0101ls<\/td><td>Uztur\u0113\u0161ana SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet preces, tehnolo\u0123ijas, darba centrus, resursus un kalend\u0101rus. P\u0101rdom\u0101ti nosakiet, k\u0101 darba centriem j\u0101atbilst SkyPlanner resursiem: darba centrs ar \u010detr\u0101m iek\u0101rt\u0101m k\u013c\u016bst par vienu darba centru grupu vai \u010detriem darba centriem. ERP XL resursos iek\u013cautie instrumenti SkyPlanner tiek model\u0113ti k\u0101 instrumenti ar ierobe\u017eotu pieejam\u012bbu, bet darbinieki \u2014 k\u0101 person\u0101ls ar mai\u0146\u0101m.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m un materi\u0101liem, k\u0101 ar\u012b atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad iepirkuma pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c ERP.<\/strong> Kad pl\u0101no\u0161anas dzinis iepl\u0101no vai p\u0101rvieto oper\u0101ciju, SkyPlanner webhook pazi\u0146ojums aktiviz\u0113 atpaka\u013cierakstes servisu. Tas izsauc XLDodajTerminDoProcesuProd ar oper\u0101cijas TerminOd un TerminDo v\u0113rt\u012bb\u0101m, lai katrai ZP oper\u0101cijai b\u016btu nor\u0101d\u012bts SkyPlanner pl\u0101notais s\u0101kums un beigas.<\/p>\n\n\n<p><strong>4. Izpildes apstiprin\u0101jumi ra\u017eotn\u0113.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un laika uzskaites ieraksti uztur grafiku aktu\u0101lu. J\u016bs izv\u0113laties, vai faktisko laiku nos\u016bt\u012bt atpaka\u013c uz ERP. Ja j\u0101, serviss pievieno izpildes ierakstus ar XLDodajRealizacjeOperacjiProd, savuk\u0101rt RW un PW dokumenti tiek veidoti atbilsto\u0161i j\u016bsu ERP XL noteikumiem. Ja da\u017eos darba centros izmantojat Comarch MES, katrai oper\u0101cijai atst\u0101jiet tikai vienu izpildes datu avotu.<\/p>\n\n\n<p><strong>5. Datu p\u0101rvald\u012bbas un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms darba s\u0101k\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Artikuli, tehnolo\u0123ijas, daudzumi, ZP statuss, izmaksu apr\u0113\u0137ins<\/td><td>Comarch ERP XL<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiks, resursu pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161anas laiku matrica, pras\u012bbas instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as, kalend\u0101ri un d\u012bkst\u0101ves<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Izpildes ieraksti, RW un PW dokumenti<\/td><td>Comarch ERP XL \u2014 dati tiek ievad\u012bti taj\u0101 vai nos\u016bt\u012bti no SkyPlanner laika uzskaites ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas ieraksta oper\u0101ciju datumus. Ja ERP XL autom\u0101tisk\u0101 p\u0101rpl\u0101no\u0161ana vai Comarch APS joproj\u0101m ieraksta termi\u0146us tajos pa\u0161os ra\u017eo\u0161anas pas\u016bt\u012bjumos, atsp\u0113jojiet \u0161o funkciju pas\u016bt\u012bjumiem, kuru grafikus sast\u0101da SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas darbu s\u0101kuma. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot no ERP XL CSV vai Excel form\u0101t\u0101 eksport\u0113tus darba centrus, tehnolo\u0123ijas un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu atbilst\u012bba.<\/strong> Apstipriniet datu atbilst\u012bbas tabulu, datu p\u0101rvald\u012bbas noteikumus, sinhroniz\u0101cijas bie\u017eumu un to, vai izpildes ieraksti tiks nos\u016bt\u012bti atpaka\u013c uz ERP.<\/li>\n\n\n<li><strong>Piek\u013cuve ERP XL.<\/strong> Izveidojiet integr\u0101cijas operatoru, iestatiet las\u012b\u0161anas savienojumu un izvietojiet atpaka\u013cierakstes servisu dator\u0101, kur\u0101 instal\u0113ta ERP XL. Vispirms p\u0101rbaudiet darb\u012bbu datub\u0101zes kopij\u0101.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 datu iel\u0101de.<\/strong> Artikuli, tehnolo\u0123ijas, darba centri, resursi, kalend\u0101ri.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Periodiska datu piepras\u012b\u0161ana ar filtriem un atk\u0101rtotiem m\u0113\u0123in\u0101jumiem.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti, operatoru skaits katram ra\u017eo\u0161anas uzdevumam un alternat\u012bv\u0101s iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c ERP.<\/strong> SkyPlanner webhook pazi\u0146ojumu aktiviz\u0113ti XLDodajTerminDoProcesuProd izsaukumi, k\u0101 ar\u012b izpildes ierakstu nos\u016bt\u012b\u0161ana, ja t\u0101 izv\u0113l\u0113ta.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Izmantojiet SkyPlanner paral\u0113li pa\u0161reiz\u0113jam pl\u0101nam, sal\u012bdziniet datumus un labojiet pamatdatus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana.<\/strong> Kad dati sakr\u012bt, iesl\u0113dziet atpaka\u013cieraksti.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-comarch-erp-xl-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot integr\u0101ciju ar Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Manu\u0101li ievad\u012bta jauda.<\/strong> Darba centra jauda ERP XL ir lietot\u0101ja noteikts skaitlis, kam nor\u0101da pie\u013caujamo noslodzi procentos. Savuk\u0101rt SkyPlanner nosaka jaudu p\u0113c faktiskaj\u0101m mai\u0146\u0101m un resursiem, t\u0101p\u0113c r\u016bp\u012bgi iestatiet mai\u0146as un procentu\u0101lo v\u0113rt\u012bbu vairs neizmantojiet.<\/li>\n\n\n<li><strong>Resursi ar neierobe\u017eotu jaudu.<\/strong> ERP XL nep\u0101rbauda noslodzi resursiem, kas atz\u012bm\u0113ti k\u0101 resursi ar neierobe\u017eotu jaudu. Katram no tiem izlemiet, vai SkyPlanner tas b\u016bs darba centrs ar ierobe\u017eotu jaudu.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anai nodotie pas\u016bt\u012bjumi.<\/strong> ERP XL nep\u0101rpl\u0101no ra\u017eo\u0161anai nodot\u0101s oper\u0101cijas, ja vien nav atz\u012bm\u0113ta opcija &#8220;Przesu\u0144 na zwolnionych&#8221;. Vienojieties, k\u0101 SkyPlanner datumi tiks piem\u0113roti ra\u017eo\u0161anai nodotajiem pas\u016bt\u012bjumiem, un izmantojiet Running Time Lock, lai fiks\u0113tu tuv\u0101ko stundu darbus.<\/li>\n\n\n<li><strong>Strukt\u016bru versijas.<\/strong> XL API strukt\u016br\u0101s ir lauks Wersja. Iestatiet t\u0101 v\u0113rt\u012bbu atbilsto\u0161i savai ERP XL versijai un p\u0113c katras ikgad\u0113j\u0101s jaunin\u0101\u0161anas veiciet atk\u0101rtotu test\u0113\u0161anu.<\/li>\n\n\n<li><strong>Polij\u0101 lietot\u0101s m\u0113rvien\u012bbas un laiki.<\/strong> Import\u0113jot oper\u0101ciju laikus un kalend\u0101ra m\u0113rvien\u012bbas, tie j\u0101p\u0101rr\u0113\u0137ina prec\u012bzi, cit\u0101di visi ilgumi b\u016bs nepareizi.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-comarch-erp-xl-i\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 un uztur integr\u0101ciju ar Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c t\u0101s darb\u012bbas s\u0101k\u0161anas.<\/strong> Atbalsts attiecas uz saska\u0146oto datu las\u012b\u0161anu un XL API izsaukumiem. Katr\u0101 ra\u017eotn\u0113 Comarch ERP XL izmanto cit\u0101di, un \u0161\u012bs zin\u0101\u0161anas tiek liktas liet\u0101 konfigur\u0113\u0161an\u0101.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b j\u016bsu Comarch partneris.<\/strong> Partneris p\u0101rzina j\u016bsu konfigur\u0101ciju, licenc\u0113\u0161anu un XL API un kop\u0101 ar SkyPlanner komandu var izveidot operatoru, iestat\u012bt las\u012b\u0161anas savienojumu un sagatavot datoru atpaka\u013cierakstes servisam.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var t\u0101l\u0101k att\u012bst\u012bt integr\u0101ciju,<\/strong> izmantojot SkyPlanner REST API ar API pilnvaru. Lai s\u0101ktu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz\u0113s. Nor\u0101d\u012bjumi ir pieejami <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un nor\u0113\u0137inoties ik m\u0113nesi. Integr\u0101cijas cenu pied\u0101v\u0101jam iepriek\u0161 kop\u0101 ar j\u016bsu pl\u0101nu, \u0146emot v\u0113r\u0101 j\u016bsu procesu un vajadz\u012bbas. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, inform\u0101ciju par <a href=\"\/lv\/integracija\/erp\/comarch-erp-xl\/razosanas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anu ar Comarch ERP XL, \u0146emot v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu<\/a>, <a href=\"\/lv\/integracija\/erp\/comarch-erp-xl\/\">Comarch ERP XL lapu<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013cu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana ir p\u0101rg\u0101jusi no Excel izkl\u0101jlap\u0101m uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 darba stundas, un jaun\u0101 uzdevumu rinda ra\u017eo\u0161anas l\u012bnij\u0101 non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas ra\u017eotn\u0113 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na sagatavo\u0161ana trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas paletiz\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us uz priek\u0161u<\/b><span>p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner veido uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku dro\u0161s iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un uz piepras\u012bjumiem main\u012bt grafiku, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad atbild da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner \u013cauj mums p\u0101rskat\u012bt jaudu un padara pl\u0101no\u0161anu prognoz\u0113jamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko vielu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums ir bijis 100% visu SkyPlanner izmanto\u0161anas laiku \u2014 kop\u0161 2021. gada.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Comarch ERP XL ir API darbam ar ra\u017eo\u0161anas pas\u016bt\u012bjumiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. XL API (CDN_API.DLL) veido ra\u017eo\u0161anas pas\u016bt\u012bjumus, pl\u0101no un p\u0101rpl\u0101no tos ar XLZamknijZlecenieProd, pievieno oper\u0101ciju datumus ar XLDodajTerminDoProcesuProd un re\u0123istr\u0113 izpildi ar XLDodajRealizacjeOperacjiProd. Comarch ERP XL Web papildus pied\u0101v\u0101 REST mikroservisus, kas dokument\u0113ti Swagger.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">Ar XLDodajTerminDoProcesuProd, kas katrai ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijai pievieno datumu interv\u0101lu (TerminOd, TerminDo). SkyPlanner t\u012bmek\u013ca aiz\u0137ere aktiviz\u0113 \u0161o izsaukumu ikreiz, kad main\u0101s grafiks.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Comarch ERP XL atbalsta t\u012bmek\u013ca aiz\u0137eres?<\/summary>\n<p class=\"sp-faq__a\">Izejo\u0161\u0101s t\u012bmek\u013ca aiz\u0137eres nav dokument\u0113tas, t\u0101p\u0113c integr\u0101cija periodiski pieprasa datus no ERP XL p\u0113c katrai ra\u017eotnei noteikta grafika. Pa\u0161a SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as uzreiz, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Comarch partnerim pied\u0101v\u0101t Comarch APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner \u2014 ja klients v\u0113las da\u017eu ned\u0113\u013cu laik\u0101 ieg\u016bt grafiku, kas \u0146em v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu un autom\u0101tiski atjaunin\u0101s. Comarch APS ir atsevi\u0161\u0137a lietotne ar savu PostgreSQL datub\u0101zi, integratoru un licences atsl\u0113gu. T\u0101 sinhroniz\u0113jas p\u0113c pl\u0101not\u0101ja klik\u0161\u0137a, un katrai oper\u0101cijai p\u0101rregul\u0113\u0161anas laiks ir viena fiks\u0113ta v\u0113rt\u012bba (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">Comarch APS pal\u012bdz\u012bba<\/a>). SkyPlanner ir m\u0101ko\u0146programmat\u016bra, kas autom\u0101tiski p\u0101rpl\u0101no un pl\u0101no p\u0101rregul\u0113\u0161anu, instrumentus, brig\u0101des un materi\u0101lus; cena ir no 199 \u20ac m\u0113nes\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t datus no ERP XL CSV vai Excel form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Comarch ERP XL Comarch ERP XL integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Comarch ERP XL integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Comarch ERP XL ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Comarch ERP XL, izmantojot pa\u0161a Comarch saskarnes: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas &#8230; <a title=\"Comarch ERP XL integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/\" aria-label=\"Read more about Comarch ERP XL integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106470,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107514","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Comarch XL APS ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Savienojiet Comarch ERP XL ar SkyPlanner APS: XL API ra\u017eo\u0161anas funkcijas, ERP XL Web REST API, oper\u0101ciju datumu atpaka\u013cierakste, datu kart\u0113jums, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Comarch ERP XL integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienojiet Comarch ERP XL ar SkyPlanner APS: XL API ra\u017eo\u0161anas funkcijas, ERP XL Web REST API, oper\u0101ciju datumu atpaka\u013cierakste, datu kart\u0113jums, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/comarch-erp-xl\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/comarch-erp-xl\\\/integracijas-celvedis\\\/\",\"name\":\"Comarch XL APS ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Savienojiet Comarch ERP XL ar SkyPlanner APS: XL API ra\u017eo\u0161anas funkcijas, ERP XL Web REST API, oper\u0101ciju datumu atpaka\u013cierakste, datu kart\u0113jums, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/comarch-erp-xl\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/comarch-erp-xl\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/comarch-erp-xl\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Comarch ERP XL: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/comarch-erp-xl\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Comarch ERP XL integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Comarch XL APS ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Savienojiet Comarch ERP XL ar SkyPlanner APS: XL API ra\u017eo\u0161anas funkcijas, ERP XL Web REST API, oper\u0101ciju datumu atpaka\u013cierakste, datu kart\u0113jums, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Comarch ERP XL integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienojiet Comarch ERP XL ar SkyPlanner APS: XL API ra\u017eo\u0161anas funkcijas, ERP XL Web REST API, oper\u0101ciju datumu atpaka\u013cierakste, datu kart\u0113jums, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/","name":"Comarch XL APS ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Savienojiet Comarch ERP XL ar SkyPlanner APS: XL API ra\u017eo\u0161anas funkcijas, ERP XL Web REST API, oper\u0101ciju datumu atpaka\u013cierakste, datu kart\u0113jums, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Comarch ERP XL: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/"},{"@type":"ListItem","position":5,"name":"Comarch ERP XL integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Comarch ERP XL Comarch ERP XL integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Comarch ERP XL integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Comarch ERP XL ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Comarch ERP XL, izmantojot pa\u0161a Comarch saskarnes: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107514","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=107514"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107514\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106470"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=107514"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}