{"id":107398,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/divalto\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/integracijas-celvedis\/","title":{"rendered":"Divalto integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Divalto infinity<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Divalto integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Divalto integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m ir izskaidrots, k\u0101 savienot Divalto infinity ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Divalto, izmantojot pa\u0161a Divalto REST pakalpojumus:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>No Divalto tiek sa\u0146emti OF un s\u00e9quences OF, gammes, nomenclatures, articles, centres de charge, postes de travail, ressources, op\u00e9rateurs, outillages, kr\u0101jumu dati un pas\u016bt\u012bjumi pieg\u0101d\u0101t\u0101jiem.<\/li>\n\n\n<li>Katram OF un s\u00e9quence tiek nos\u016bt\u012bti atpaka\u013c pl\u0101notie s\u0101kuma un beigu datumi, k\u0101 ar\u012b jaunais centre vai poste, ja darbs p\u0101rcelts uz alternat\u012bvu resursu.<\/li>\n\n\n<li>Ja izv\u0113laties, atpaka\u013c var nos\u016bt\u012bt ar\u012b operatoru darba laiku un pabeigtos ciklus.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"divalto-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Divalto integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Divalto infinity API platform\u0101 \u0101r\u0113jai grafiku sast\u0101d\u012b\u0161anas sist\u0113mai ir pieejami tr\u012bs pamatelementi:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>RecordSql (ieb\u016bv\u0113tais REST).<\/strong> Nolasa Divalto tabulas, izmantojot deklar\u0113tus vaic\u0101jumu failus (DHOQ). \u0160\u0101di tiek nolas\u012bti OF, s\u00e9quences, gammes, articles, postes un kr\u0101jumu dati. Jauna vaic\u0101juma deklar\u0101cija var st\u0101ties sp\u0113k\u0101 l\u012bdz pat desmit min\u016b\u0161u laik\u0101 (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/10790043784\">Divalto RecordSql iestat\u012bjumi<\/a>).<\/li>\n\n\n<li><strong>WEBSERVICE_INFINITY (REST).<\/strong> Divalto t\u012bmek\u013ca pakalpojumi biznesa darb\u012bb\u0101m. Katr\u0101 izsaukum\u0101 ir JSON pamatda\u013ca ar darb\u012bbu WEB_SERVICE_INFINITY, piek\u013cuves pilnvaru un parametru virkni, kur\u0101 nor\u0101d\u012bta biznesa darb\u012bba, dossier un dati (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/12248449079\">izsaukuma form\u0101ts<\/a>). Ra\u017eo\u0161anas darb\u012bbas ietver <strong>create_dataxml<\/strong> (faila nodo\u0161ana ra\u017eo\u0161anas scrutateur), <strong>integration_dt<\/strong> (tehnisko datu izveide: komponenti, s\u00e9quences, ressources, outillages), kr\u0101jumu vaic\u0101jumus un articles izveidi (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/10516071762\">ra\u017eo\u0161anas darb\u012bbas<\/a>).<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas scrutateur.<\/strong> Divalto ra\u017eo\u0161anas modul\u012b tas uzrauga failus un import\u0113 XML failus. create_dataxml tam nodod base64 failu. Importa veidi ietver GG_DATES_ORDO pl\u0101notajiem datumiem, GG_TEMPS_IMPORT darba laikam, GG_FIN_DE_CYCLE pabeigtajiem cikliem, CO_MES_IMPORT MES datiem un GG_COMPOSANT_OM komponentu pat\u0113ri\u0146am (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/11074797569\">create_dataxml<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>Platform\u0101 Divalto SOAP pakalpojums vairs netiek atbalst\u012bts, t\u0101p\u0113c integr\u0101ciju veidojiet tikai ar REST.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Divalto pus\u0113.<\/strong> Integr\u0101cija nos\u016bta DLMT izveidot\u0101 konta lietot\u0101jv\u0101rdu un paroli uz Divalto API v\u0101rtejas galapunktu Authent\/Auth. T\u0101 sa\u0146em piek\u013cuves pilnvaru, kura saska\u0146\u0101 ar Divalto nor\u0101d\u012bto ir der\u012bga \u010detrdesmit piecas min\u016btes, t\u0101p\u0113c savienot\u0101js to atjauno ar taimeri. Pilnvara tiek nos\u016bt\u012bta katra biznesa darb\u012bbas izsaukuma JSON pamatda\u013c\u0101, nevis HTTP galven\u0113 (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/10550740818\">Divalto autentifik\u0101cija<\/a>).<\/li>\n\n\n<li><strong>SkyPlanner pus\u0113.<\/strong> REST API autentifik\u0101cijai izmanto API pilnvaru galven\u0113 Authorization-Token (SkyPlanner Settings &gt; API), un t\u0101 dokument\u0101cija ir pieejama Swagger\/OpenAPI. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim izskaidroti pirmie izsaukumi.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska datu piepras\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Divalto t\u012bmek\u013ca aiz\u0137eres ir ien\u0101ko\u0161as: \u0101r\u0113ja sist\u0113ma izsauc Divalto t\u012bmek\u013ca aiz\u0137eri, lai s\u0101ktu procesu. Divalto nor\u0101da, ka t\u012bmek\u013ca aiz\u0137ere nav paredz\u0113ta datu atgrie\u0161anai (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/10584162355\">Divalto t\u012bmek\u013ca aiz\u0137eres<\/a>). Divalto nes\u016bta izejo\u0161us notikumus.<\/p>\n\n\n<p>T\u0101p\u0113c Divalto dati tiek piepras\u012bti periodiski. Jauni darbi tiek ieg\u016bti ar RecordSql vaic\u0101jumiem, atlasot atv\u0113rtos OF un jaun\u0101k\u0101s izmai\u0146as. Bie\u017eumu nosaka katrai ra\u017eotnei atsevi\u0161\u0137i: OF datus var piepras\u012bt ik p\u0113c da\u017e\u0101m min\u016bt\u0113m, bet kr\u0101jumu datus \u2014 reizi stund\u0101.<\/p>\n\n\n<p>SkyPlanner nos\u016bta t\u012bmek\u013ca aiz\u0137eres pazi\u0146ojumus, kad main\u0101s st\u0101voklis vai grafiks, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c izraisa notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Divalto objekts (saskarne)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Articles, article raksturlielumi (RecordSql)<\/td><td>Produkti un materi\u0101li, produktu \u012bpa\u0161\u012bbas<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam periodiska datu piepras\u012b\u0161ana<\/td><\/tr><tr><td>Nomenclatures (komponenti)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Gammes: s\u00e9quences, op\u00e9rations standard, laiki, ressources, outillages<\/td><td>Procesa so\u013ci ar ilgumu, sagatavo\u0161anas un demont\u0101\u017eas laiku, instrumenti<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Ateliers, centres de charge, postes de travail<\/td><td>Darba centri, darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam reti<\/td><\/tr><tr><td>Op\u00e9rateurs un habilitations<\/td><td>Person\u0101ls un darba centri, kuros at\u013cauts str\u0101d\u0101t<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Poste kalend\u0101ri<\/td><td>Mai\u0146as un br\u012bvdienas<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>Katru dienu vai mai\u0146u uztur\u0113\u0161ana SkyPlanner<\/td><\/tr><tr><td>OF (BF) un s\u00e9quences OF (BH) ar izpildes termi\u0146iem un komponentiem<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>Datu piepras\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Kr\u0101jumi katram article un depot<\/td><td>Kr\u0101jumu atlikumi<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>Datu piepras\u012b\u0161ana reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>Pas\u016bt\u012bjumi pieg\u0101d\u0101t\u0101jiem ar pieg\u0101des datumiem<\/td><td>Iepirkuma pas\u016bt\u012bjumi, gaid\u0101mie materi\u0101li p\u0113c pieg\u0101des datuma<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>Datu piepras\u012b\u0161ana reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>GG_DATES_ORDO: OF s\u0101kums un beigas (BF.PLANDEBDH, BF.PLANFINDH), s\u00e9quence s\u0101kums un beigas (BH.PLANDEBDH, BH.PLANFINDH), CENTRE un POSTE<\/td><td>Katra ra\u017eo\u0161anas uzdevuma un so\u013ca pl\u0101notais s\u0101kums un beigas, pie\u0161\u0137irtais darba centrs<\/td><td>SkyPlanner \u2192 Divalto<\/td><td>Mainoties grafikam, ar SkyPlanner t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>GG_TEMPS_IMPORT: katras s\u00e9quence darba laiks<\/td><td>Laika uzskaites ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 Divalto<\/td><td>P\u0113c katra apstiprin\u0101juma vai katr\u0101 mai\u0146\u0101, ja \u0161\u012b iesp\u0113ja izv\u0113l\u0113ta<\/td><\/tr><tr><td>GG_FIN_DE_CYCLE: pabeigtie cikli<\/td><td>Sara\u017eotie daudzumi<\/td><td>SkyPlanner \u2192 Divalto<\/td><td>P\u0113c katra apstiprin\u0101juma, ja \u0161\u012b iesp\u0113ja izv\u0113l\u0113ta<\/td><\/tr><tr><td>Divalto nav<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, alternat\u012bvas iek\u0101rtas un person\u0101ls<\/td><td>Tiek uztur\u0113ti SkyPlanner<\/td><td>Iestata ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Deklar\u0113jiet RecordSql vaic\u0101jumus un nolasiet articles, nomenclatures, gammes, centres de charge, postes, op\u00e9rateurs, outillages un kalend\u0101rus. P\u0101rdom\u0101ti nosakiet, k\u0101 centres atbilst SkyPlanner resursiem: centre de charge ar \u010detriem postes k\u013c\u016bst par vienu darba centru grupu ar \u010detriem darba centriem.<\/p>\n\n\n<p><strong>2. OF sinhroniz\u0101cija.<\/strong> Nolasiet atv\u0113rtos OF ar to s\u00e9quences un komponentiem, k\u0101 ar\u012b atv\u0113rtos pas\u016bt\u012bjumus pieg\u0101d\u0101t\u0101jiem. SkyPlanner uzskata pas\u016bt\u012btos materi\u0101lus par pieejamiem iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumu atlikumus, kad pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered. Nolasiet galveno OF kop\u0101 ar t\u0101 apak\u0161-OF, jo Divalto p\u0101rpl\u0101no tikai galveno OF.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Kad pl\u0101no\u0161anas dzin\u0113js iepl\u0101no vai p\u0101rvieto ra\u017eo\u0161anas uzdevumu, SkyPlanner t\u012bmek\u013ca aiz\u0137ere izraisa create_dataxml izsaukumu. Fails ir GG_DATES_ORDO dokuments, kur\u0101 katram OF ir nor\u0101d\u012bts dossier, strukt\u016brvien\u012bba un OF numurs, pl\u0101notais s\u0101kuma un beigu datums, bet katrai s\u00e9quence \u2014 t\u0101s numurs, pl\u0101notais s\u0101kums un beigas, k\u0101 ar\u012b centre un poste, ja darbs p\u0101rcelts uz alternat\u012bvu resursu (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/221844758\">GG_DATES_ORDO form\u0101ts<\/a>). Divalto scrutateur import\u0113 \u0161os datus OF galven\u0113 un s\u00e9quence rind\u0101s.<\/p>\n\n\n<p><strong>4. Darba izpildes apstiprin\u0101jumi ra\u017eotn\u0113.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un laika uzskaites ieraksti nodro\u0161ina, ka grafiks ir aktu\u0101ls. J\u016bs izv\u0113laties, vai darba laiku nos\u016bt\u012bt atpaka\u013c uz Divalto. Ja j\u0101, darba laiks tiek nos\u016bt\u012bts GG_TEMPS_IMPORT failos, bet pabeigtie cikli \u2014 GG_FIN_DE_CYCLE failos. Ja n\u0113, darba laiku t\u0101pat k\u0101 l\u012bdz \u0161im ievada Divalto MES.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms darba s\u0101k\u0161anas produkcijas vid\u0113:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Articles, nomenclatures, gammes, OF daudzumi un statuss<\/td><td>Divalto<\/td><\/tr><tr><td>S\u00e9quence sec\u012bba, s\u0101kuma un beigu laiki, poste pie\u0161\u0137\u012brums<\/td><td>SkyPlanner<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161anas laiku matrica, pras\u012bbas instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Darba laiks, pat\u0113ri\u0146\u0161 un izpildes dati<\/td><td>Divalto \u2014 datus ievada tur vai nos\u016bta no SkyPlanner laika uzskaites ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu OF datumu ierakst\u012b\u0161anas avotu. Pl\u0101noto datumu ierakst\u012b\u0161an\u0101 SkyPlanner aizst\u0101j Opcenter APS un manu\u0101lo p\u0101rpl\u0101no\u0161anu. Ja izmantojat Opcenter APS, izsl\u0113dziet t\u0101 importu tiem OF, kuru grafikus sast\u0101da SkyPlanner, jo abas sist\u0113mas izmanto GG_DATES_ORDO.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas darbu s\u0101kuma. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot postes, gammes un atv\u0113rtos OF, kas no Divalto eksport\u0113ti CSV vai Excel form\u0101t\u0101.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu kart\u0113\u0161ana.<\/strong> Apstipriniet datu atbilst\u012bbas tabulu, atbild\u012bbu par datiem, sinhroniz\u0101cijas bie\u017eumu un to, vai darba laiks tiks nos\u016bt\u012bts atpaka\u013c.<\/li>\n\n\n<li><strong>Piek\u013cuve Divalto.<\/strong> Izveidojiet integr\u0101cijas kontu DLMT, deklar\u0113jiet RecordSql vaic\u0101jumus un aktiviz\u0113jiet ra\u017eo\u0161anas scrutateur. Vispirms p\u0101rbaudiet darb\u012bbu testa vid\u0113.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 datu iel\u0101de.<\/strong> Articles, nomenclatures, gammes, centres, postes, op\u00e9rateurs, outillages un kalend\u0101ri.<\/li>\n\n\n<li><strong>OF un pas\u016bt\u012bjumu pieg\u0101d\u0101t\u0101jiem sinhroniz\u0101cija.<\/strong> Periodiska datu piepras\u012b\u0161ana ar filtriem, dal\u012bjumu lap\u0101s un atk\u0101rtotiem m\u0113\u0123in\u0101jumiem.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> Sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits katram ra\u017eo\u0161anas uzdevumam un alternat\u012bvi postes vai darbinieki.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> GG_DATES_ORDO nos\u016bt\u012b\u0161ana ar create_dataxml, izmantojot SkyPlanner t\u012bmek\u013ca aiz\u0137eres, k\u0101 ar\u012b laika uzskaites datu nos\u016bt\u012b\u0161ana, ja t\u0101 izv\u0113l\u0113ta.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Izmantojiet SkyPlanner paral\u0113li pa\u0161reiz\u0113jam pl\u0101nam, sal\u012bdziniet datumus un labojiet pamatdatus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana.<\/strong> Kad dati sakr\u012bt, iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-divalto-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot Divalto integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Scrutateur iestat\u012bjumi.<\/strong> create_dataxml faili tiek sa\u0146emti tikai tad, ja ra\u017eo\u0161anas scrutateur ir akt\u012bvs, sada\u013c\u0101 Production dossier ir atz\u012bm\u0113ta MES izv\u0113les r\u016bti\u0146a un nor\u0101d\u012bts &#8220;Interfaces&#8221; ce\u013c\u0161.<\/li>\n\n\n<li><strong>Piek\u013cuves pilnvaras atjauno\u0161ana.<\/strong> Divalto piek\u013cuves pilnvarai ir \u012bss der\u012bguma termi\u0146\u0161 (skatiet sada\u013cu Autentifik\u0101cija). Atjaunojiet to pirms katras izsaukumu paketes.<\/li>\n\n\n<li><strong>Vaic\u0101jumu deklar\u0113\u0161ana.<\/strong> Jaunu vai main\u012btu RecordSql vaic\u0101jumu aktiviz\u0113\u0161ana aiz\u0146em da\u017eas min\u016btes. Deklar\u0113jiet tos pirms s\u0101kotn\u0113j\u0101s datu iel\u0101des.<\/li>\n\n\n<li><strong>Galvenais OF un pak\u0101rtotie OF.<\/strong> Divalto p\u0101rpl\u0101no tikai galveno OF. Pl\u0101nojiet pak\u0101rtotos OF k\u0101 apak\u0161produktus, lai galvenais pas\u016bt\u012bjums gaid\u012btu savus komponentus.<\/li>\n\n\n<li><strong>Article raksturlielumi.<\/strong> Divalto glab\u0101 article pl\u0101no\u0161anas \u012bpa\u0161\u012bbas desmit raksturlielumu laukos. Tos var \u0113rti sasaist\u012bt ar SkyPlanner produktu \u012bpa\u0161\u012bb\u0101m, ko izmanto sagatavo\u0161anas laiku matricai un opcijai &#8220;Allow similarity&#8221;.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-divalto-integrat\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 Divalto integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas<\/strong> attiec\u012bb\u0101 uz saska\u0146otajiem RecordSql vaic\u0101jumiem un t\u012bmek\u013ca pakalpju darb\u012bb\u0101m. Katra r\u016bpn\u012bca Divalto izmanto cit\u0101di, un \u0161aj\u0101 darb\u0101 tiek liktas liet\u0101 zin\u0101\u0161anas par \u0161\u012bm \u012bpatn\u012bb\u0101m.<\/li>\n\n\n<li><strong>Var iesaist\u012bties ar\u012b j\u016bsu Divalto partneris.<\/strong> Partneris p\u0101rzina j\u016bsu dossier, surcharges un iestat\u012bjumus un kop\u0101 ar SkyPlanner komandu var izveidot DLMT kontu, iestat\u012bt vaic\u0101jumus un scrutateur.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var papildin\u0101t integr\u0101ciju,<\/strong> izmantojot SkyPlanner REST API un API pilnvaru. Lai s\u0101ktu darbu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz. Nor\u0101d\u012bjumi pieejami <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem. Nor\u0113\u0137ini notiek katru m\u0113nesi. Integr\u0101cijas cenu pied\u0101v\u0101jam iepriek\u0161 kop\u0101 ar izv\u0113l\u0113to pl\u0101nu, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/integracija\/erp\/divalto\/razosanas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anu ar Divalto, iev\u0113rojot iek\u0101rtu un person\u0101la re\u0101lo jaudu<\/a>, <a href=\"\/lv\/integracija\/erp\/divalto\/\">Divalto lapu<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju p\u0101rskatu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadaliek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana \u013cauj ietaup\u012bt 2 darba stundas ned\u0113\u013c\u0101, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu ap\u0123\u0113rb\u0101 pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sagatavo\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner \u013cauj mums p\u0101rskat\u012bt jaudu un padara pl\u0101no\u0161anu prognoz\u0113jamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko vielu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums ir bijis 100% vis\u0101 SkyPlanner lieto\u0161anas laik\u0101 \u2014 kop\u0161 2021. gada.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner v\u0113rt\u012bba mums ir t\u0101, ka tas ir ikdien\u0101 noder\u012bgs r\u012bks, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska noslodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir b\u016btiski samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Divalto ir API darbam ar ra\u017eo\u0161anas pas\u016bt\u012bjumiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. RecordSql nolasa OF, s\u00e9quences un citas tabulas, izmantojot REST, savuk\u0101rt pakalpe WEBSERVICE_INFINITY izpilda ra\u017eo\u0161anas biznesa darb\u012bbas, piem\u0113ram, create_dataxml un integration_dt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Divalto atbalsta t\u012bmek\u013ca aiz\u0137eres?<\/summary>\n<p class=\"sp-faq__a\">Divalto t\u012bmek\u013ca aiz\u0137eres ir paredz\u0113tas tikai ien\u0101ko\u0161ajiem piepras\u012bjumiem un neatgrie\u017e datus. Integr\u0101cija periodiski pieprasa Divalto datus ar RecordSql atbilsto\u0161i katrai r\u016bpn\u012bcai iestat\u012btajam grafikam, savuk\u0101rt SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s rodas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c Divalto?<\/summary>\n<p class=\"sp-faq__a\">Izmantojot GG_DATES_ORDO XML failu, kas nos\u016bt\u012bts ar darb\u012bbu create_dataxml. Taj\u0101 ir katra OF un katras s\u00e9quence pl\u0101notie s\u0101kuma un beigu datumi, k\u0101 ar\u012b aizst\u0101jo\u0161ais centre vai poste, ja darbs tiek p\u0101rcelts. Failu import\u0113 Divalto ra\u017eo\u0161anas scrutateur.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai integr\u0101cijai ir nepiecie\u0161ams Opcenter APS?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner pats veic ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot iek\u0101rtu un person\u0101la re\u0101lo jaudu, un ieraksta pl\u0101notos datumus. Ja pa\u0161laik izmantojat Opcenter APS, SkyPlanner p\u0101r\u0146em OF datumu ierakst\u012b\u0161anu un k\u013c\u016bst par vien\u012bgo sist\u0113mu, kas tos ieraksta.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Divalto partnerim b\u016btu j\u0101pied\u0101v\u0101 Opcenter APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja klients v\u0113las da\u017eu ned\u0113\u013cu laik\u0101 s\u0101kt izmantot ra\u017eo\u0161anas grafiku, kas iev\u0113ro re\u0101lo jaudu un autom\u0101tiski atjaunin\u0101s. Divalto vid\u0113 Opcenter APS darbojas, kad pl\u0101not\u0101js to palai\u017e, un apmain\u0101s ar failiem, izmantojot Windows mapi (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/UDI107\/pages\/10530586641\">Divalto dokument\u0101cija<\/a>). SkyPlanner piesl\u0113dzas Divalto REST pakalp\u0113m, autom\u0101tiski p\u0101rpl\u0101no, pl\u0101no p\u0101rregul\u0113\u0161anu, instrumentus, brig\u0101des un materi\u0101lus un \u013cauj str\u0101d\u0101t neierobe\u017eotam lietot\u0101ju skaitam \u2014 no 199 \u20ac m\u0113nes\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t datus no Divalto CSV vai Excel failos. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Divalto infinity Divalto integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Divalto integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m ir izskaidrots, k\u0101 savienot Divalto infinity ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Divalto, izmantojot pa\u0161a Divalto REST pakalpojumus: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Divalto integr\u0101cijas saskarnes Divalto infinity API platform\u0101 &#8230; <a title=\"Divalto integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/integracijas-celvedis\/\" aria-label=\"Read more about Divalto integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106412,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107398","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Divalto APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Divalto infinity un SkyPlanner APS: RecordSql las\u012b\u0161ana, WEBSERVICE_INFINITY create_dataxml, GG_DATES_ORDO atpaka\u013cieraksts, datu kart\u0113\u0161ana un projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Divalto integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Divalto infinity un SkyPlanner APS: RecordSql las\u012b\u0161ana, WEBSERVICE_INFINITY create_dataxml, GG_DATES_ORDO atpaka\u013cieraksts, datu kart\u0113\u0161ana un projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/divalto\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/divalto\\\/integracijas-celvedis\\\/\",\"name\":\"Divalto APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Divalto infinity un SkyPlanner APS: RecordSql las\u012b\u0161ana, WEBSERVICE_INFINITY create_dataxml, GG_DATES_ORDO atpaka\u013cieraksts, datu kart\u0113\u0161ana un projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/divalto\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/divalto\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/divalto\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Divalto: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/divalto\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Divalto integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Divalto APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Divalto infinity un SkyPlanner APS: RecordSql las\u012b\u0161ana, WEBSERVICE_INFINITY create_dataxml, GG_DATES_ORDO atpaka\u013cieraksts, datu kart\u0113\u0161ana un projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Divalto integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Divalto infinity un SkyPlanner APS: RecordSql las\u012b\u0161ana, WEBSERVICE_INFINITY create_dataxml, GG_DATES_ORDO atpaka\u013cieraksts, datu kart\u0113\u0161ana un projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/integracijas-celvedis\/","name":"Divalto APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Divalto infinity un SkyPlanner APS: RecordSql las\u012b\u0161ana, WEBSERVICE_INFINITY create_dataxml, GG_DATES_ORDO atpaka\u013cieraksts, datu kart\u0113\u0161ana un projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Divalto: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/"},{"@type":"ListItem","position":5,"name":"Divalto integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Divalto infinity Divalto integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Divalto integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m ir izskaidrots, k\u0101 savienot Divalto infinity ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Divalto, izmantojot pa\u0161a Divalto REST pakalpojumus: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Divalto integr\u0101cijas saskarnes Divalto infinity API platform\u0101&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=107398"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107398\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106412"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=107398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}