{"id":107340,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/cegid\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/cegid\/integracijas-celvedis\/","title":{"rendered":"Cegid integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Cegid<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Cegid integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Cegid integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Cegid ra\u017eo\u0161anas ERP sist\u0113mas ar SkyPlanner APS. Vispirms apl\u016bkots Cegid PMI, p\u0113c tam \u2014 Cegid Primavera un Cegid Ekon. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Cegid, izmantojot pa\u0161a Cegid saskarnes:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em OF (ordres de fabrication, ordens de fabrico, \u00f3rdenes de fabricaci\u00f3n) ar to oper\u0101cij\u0101m, tehnolo\u0123iskajiem mar\u0161rutiem, materi\u0101lu specifik\u0101cij\u0101m, darba centriem un iek\u0101rt\u0101m, k\u0101 ar\u012b artikulus, kr\u0101jumu datus un pas\u016bt\u012bjumus pieg\u0101d\u0101t\u0101jiem.<\/li>\n\n\n<li>Katras OF oper\u0101cijas pl\u0101notais s\u0101kuma un beigu datums tiek nos\u016bt\u012bts atpaka\u013c uz Cegid.<\/li>\n\n\n<li>Ja izv\u0113laties, operatoru darba laiku var nos\u016bt\u012bt atpaka\u013c k\u0101 pointages (PMI), Di\u00e1rios de Trabalho (Primavera) vai imputaciones (Ekon).<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"cegid-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cegid integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Cegid PMI.<\/strong> Cegid nodro\u0161ina PMI Web API: &#8220;Facilitez les \u00e9changes s\u00e9curis\u00e9s avec vos applications externes gr\u00e2ce \u00e0 la mise \u00e0 disposition de Web API depuis votre gestion de production Cegid.&#8221; (Atvieglojiet dro\u0161u datu apmai\u0146u ar \u0101r\u0113j\u0101m lietotn\u0113m, izmantojot Web API no Cegid ra\u017eo\u0161anas vad\u012bbas sist\u0113mas.) Web API nodro\u0161ina, ka Manufacturing PMI darb\u012bbas noteikumi tiek iev\u0113roti ar\u012b \u0101r\u0113j\u0101s lietotn\u0113s (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). PMI pied\u0101v\u0101 ar\u012b EDI, standartiz\u0113tus XML failus tehnisko datu sa\u0146em\u0161anai no CAD un p\u0101rskatu \u0123eneratoru ar eksportu uz Excel. Eksports uz Excel ir \u0101tr\u0101kais veids, k\u0101 ieg\u016bt datus izm\u0113\u0123in\u0101jumam.<\/p>\n\n\n<p><strong>Cegid Primavera.<\/strong> PRIMAVERA ERP V10 API &#8220;allows third party applications to perform both data query and writing operations&#8221; (\u013cauj tre\u0161o pu\u0161u lietotn\u0113m gan vaic\u0101t, gan ierakst\u012bt datus) un aptver visus produkta modu\u013cus (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/api-documentation\/\">V10 API dokument\u0101cija<\/a>). Web API ir dokument\u0113ta un izsaucama Swagger vid\u0113, atsevi\u0161\u0137i pa modu\u013ciem (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Web API Swagger<\/a>). Modulis Produ\u00e7\u00e3o (GPR) aptver fichas t\u00e9cnicas, neto vajadz\u012bbas, OF palai\u0161anu, Planeamento, ra\u017eo\u0161anas uzskaiti un Di\u00e1rios de Trabalho (<a href=\"https:\/\/v10api.primaverabss.com\/html\/api\/producao\/toc.html\">Produ\u00e7\u00e3o uzzi\u0146a<\/a>). Galvenie pakalpojumi grafiku sast\u0101d\u012b\u0161anai:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>IGprBSOrdensFabrico<\/strong> nolasa ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas (GprBEOFOperacao).<\/li>\n\n\n<li><strong>IGprBSPlaneamento<\/strong> iel\u0101d\u0113 OF pl\u0101no\u0161anai un atjaunina pl\u0101not\u0101s oper\u0101cijas ar <strong>ActualizaPlaneamentoOperacao<\/strong>.<\/li>\n\n\n<li><strong>IGprBSCentrosTrabalho<\/strong>, <strong>IGprBSPostosTrabalho<\/strong>, <strong>IGprBSOperadores<\/strong> un <strong>IGprBSRoteiros<\/strong> nolasa attiec\u012bgi centros de trabalho, postos, operadores un roteiros datus.<\/li>\n\n\n<li><strong>IGprBSDiariosTrabalho<\/strong> re\u0123istr\u0113 darbu ar <strong>IniciaPicagem<\/strong> un <strong>TerminaPicagem<\/strong>.<\/li>\n\n<\/ul>\n\n\n<p><strong>Cegid Ekon XRP Industria.<\/strong> Cegid nor\u0101da, ka Ekon var savienot ar cit\u0101m uz\u0146\u0113muma vad\u012bbas sist\u0113m\u0101m (<a href=\"https:\/\/www.cegid.com\/ib\/es\/productos\/software-gestion-produccion-industrial\/erp-fabricacion\/\">Cegid Ekon<\/a>). SkyPlanner komanda tv\u0113ruma noteik\u0161anas laik\u0101 izv\u0113las saskarni j\u016bsu Ekon instal\u0101cijai.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un licenc\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Cegid PMI.<\/strong> Tv\u0113ruma noteik\u0161anas laik\u0101 kop\u0101 ar j\u016bsu Cegid partneri j\u016bsu PMI instal\u0101cij\u0101 tiek iesp\u0113jota integr\u0101cijai nepiecie\u0161am\u0101 Web API piek\u013cuve.<\/li>\n\n\n<li><strong>Cegid Primavera.<\/strong> Katrai Web API ent\u012btijai ir pieejama Login metode, kas atgrie\u017e Bearer pilnvaru ar sesijas atsl\u0113gu. Pilnvaru atjauno, izmantojot token galapunktu (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Web API Swagger<\/a>). Integr\u0101cijas lietot\u0101jam ir vajadz\u012bgas Produ\u00e7\u00e3o licences t\u0101m jom\u0101m, kuru funkcijas tas izsauc.<\/li>\n\n\n<li><strong>SkyPlanner pus\u0113.<\/strong> REST API autentifik\u0101cijai izmanto API pilnvaru Authorization-Token galven\u0113 (SkyPlanner Settings &gt; API). Dokument\u0101cija ir pieejama Swagger\/OpenAPI. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim izskaidroti pirmie izsaukumi.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska aptauja<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Cegid dati tiek ieg\u016bti ar periodisku aptauju. Jaunos darbus atlasa ar vaic\u0101jumiem, kuros filtr\u0113 atv\u0113rtos OF un nesen\u0101s izmai\u0146as. Aptaujas bie\u017eumu nosaka katrai ra\u017eotnei: OF datus var piepras\u012bt ik p\u0113c da\u017e\u0101m min\u016bt\u0113m, bet kr\u0101jumu datus \u2014 reizi stund\u0101.<\/p>\n\n\n<p>Mainoties st\u0101voklim vai grafikam, SkyPlanner nos\u016bta webhook pazi\u0146ojumus, t\u0101p\u0113c datu atpaka\u013cieraksti ierosina notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Cegid objekts (PMI \/ Primavera)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Articles \/ artigos<\/td><td>Produkti un materi\u0101li<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam periodiska aptauja<\/td><\/tr><tr><td>Nomenclatures \/ fichas t\u00e9cnicas, componentes<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Gammes un oper\u0101cijas \/ roteiros, opera\u00e7\u00f5es<\/td><td>Procesa so\u013ci ar ilgumu, sagatavo\u0161anas un nosl\u0113guma darbu laiku<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Postes de charge un iek\u0101rtas \/ centros de trabalho, postos de trabalho<\/td><td>Darba centri, darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam reti<\/td><\/tr><tr><td>Salari\u00e9s \/ operadores<\/td><td>Person\u0101ls<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Kalend\u0101ri \/ exce\u00e7\u00f5es de capacidade<\/td><td>Mai\u0146as un br\u012bvdienas<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Katru dienu vai mai\u0146as uztur atsevi\u0161\u0137i SkyPlanner sist\u0113m\u0101<\/td><\/tr><tr><td>Ferramentas e moldes (Primavera)<\/td><td>Instrumenti k\u0101 ierobe\u017eoti resursi<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Apstiprin\u0101tie un pl\u0101notie OF \/ ordens de fabrico ar oper\u0101cij\u0101m<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Aptauja ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Kr\u0101jumi pa artikuliem un noliktav\u0101m<\/td><td>Kr\u0101jumu atlikumi<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Aptauja reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>Pas\u016bt\u012bjumi pieg\u0101d\u0101t\u0101jiem ar pieg\u0101des datumiem<\/td><td>Iepirkuma pas\u016bt\u012bjumi, ien\u0101ko\u0161ie materi\u0101li p\u0113c pieg\u0101des datuma<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Aptauja reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>OF oper\u0101cijas pl\u0101notais s\u0101kums un beigas \/ GprBEOFOperacao DataIniPrevista, DataFimPrevista, izmantojot ActualizaPlaneamentoOperacao<\/td><td>Katra so\u013ca pl\u0101notais s\u0101kums un beigas, pie\u0161\u0137irtais darba centrs<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>Mainoties grafikam, ar SkyPlanner webhook pazi\u0146ojumu<\/td><\/tr><tr><td>Pointages \/ Di\u00e1rios de Trabalho (IniciaPicagem, TerminaPicagem)<\/td><td>Darba laika ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>P\u0113c katra apstiprin\u0101juma vai katras mai\u0146as, ja \u0161\u012b iesp\u0113ja izv\u0113l\u0113ta<\/td><\/tr><tr><td>Cegid nav pieejams<\/td><td>Sagatavo\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi (PMI), alternat\u012bvas iek\u0101rtas un person\u0101ls<\/td><td>Uztur SkyPlanner sist\u0113m\u0101<\/td><td>Iestata ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas mode\u013ci<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Pamatdatu s\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Nolasiet artikulus, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, darba centrus, iek\u0101rtas, operatorus un kalend\u0101rus. R\u016bp\u012bgi nosakiet postes atbilst\u012bbu: poste de charge ar \u010detr\u0101m iek\u0101rt\u0101m k\u013c\u016bst par vienu darba centru grupu ar \u010detriem darba centriem.<\/p>\n\n\n<p><strong>2. OF sinhroniz\u0101cija.<\/strong> Nolasiet apstiprin\u0101tos OF ar to oper\u0101cij\u0101m un komponentiem, k\u0101 ar\u012b atv\u0113rtos pas\u016bt\u012bjumus pieg\u0101d\u0101t\u0101jiem. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumu atlikumus, kad pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered. Tv\u0113ruma noteik\u0161anas laik\u0101 izlemiet, vai grafik\u0101 iek\u013caut ar\u012b pl\u0101notos OF (OF pr\u00e9visionnels) vai tikai apstiprin\u0101tos OF.<\/p>\n\n\n<p><strong>3. Grafika datu atpaka\u013cierakste.<\/strong> Kad pl\u0101no\u0161anas dzinis ievieto vai p\u0101rvieto ra\u017eo\u0161anas uzdevumu, SkyPlanner webhook pazi\u0146ojums ierosina datu ierakst\u012b\u0161anu Cegid. PMI sist\u0113m\u0101 pl\u0101notos s\u0101kuma un beigu datumus ieraksta OF oper\u0101cij\u0101s, izmantojot Web API un iev\u0113rojot PMI darb\u012bbas noteikumus. Primavera integr\u0101cija izsauc IGprBSPlaneamento.ActualizaPlaneamentoOperacao, nododot oper\u0101ciju, centro de trabalho un pl\u0101noto s\u0101kumu un beigas. T\u0101d\u0113j\u0101di ordem de fabrico oper\u0101cij\u0101 tiek atjaunin\u0101ti DataIniPrevista un DataFimPrevista.<\/p>\n\n\n<p><strong>4. Darba izpildes apstiprin\u0101jumi ceh\u0101.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un darba laika ieraksti nodro\u0161ina aktu\u0101lu grafiku. J\u016bs izv\u0113laties, vai darba laiku nos\u016bt\u012bt atpaka\u013c uz Cegid. Ja j\u0101, PMI to sa\u0146em k\u0101 pointages, bet Primavera \u2014 k\u0101 Di\u00e1rios de Trabalho ierakstus, izmantojot IniciaPicagem un TerminaPicagem. Ja n\u0113, darba laiku t\u0101pat k\u0101 l\u012bdz \u0161im re\u0123istr\u0113 Cegid ar sv\u012btrkodu.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms darba s\u0101k\u0161anas produkcijas vid\u0113:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Artikuli, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, OF daudzumi un statuss<\/td><td>Cegid<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiki, iek\u0101rtu pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sagatavo\u0161anas laiku matrica, pras\u012bbas instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Darba laiks, pat\u0113ri\u0146\u0161 un izpilde<\/td><td>Cegid \u2014 datus ievada taj\u0101 vai nos\u016bta no SkyPlanner darba laika ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas ieraksta OF datumus. SkyPlanner p\u0101r\u0146em pl\u0101noto datumu ierakst\u012b\u0161anu no PMI pl\u0101no\u0161anas apr\u0113\u0137iniem un Primavera pl\u0101no\u0161anas algoritma. OF pas\u016bt\u012bjumiem, kuru grafiku sast\u0101da SkyPlanner, vairs nepalaidiet \u0161os pl\u0101no\u0161anas apr\u0113\u0137inus, lai abas sist\u0113mas nep\u0101rrakst\u012btu viena otras datus.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot no Cegid CSV vai Excel form\u0101t\u0101 eksport\u0113tus postes, gammes un atv\u0113rtos OF.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu kart\u0113\u0161ana.<\/strong> Apstipriniet kart\u0113\u0161anas tabulu, noteikumus par to, kura sist\u0113ma p\u0101rvalda datus, sinhroniz\u0101cijas bie\u017eumu un to, vai laika uzskaites dati tiks nos\u016bt\u012bti atpaka\u013c.<\/li>\n\n\n<li><strong>Piek\u013cuve Cegid.<\/strong> Izveidojiet integr\u0101cijas lietot\u0101ju un p\u0101rbaudiet ra\u017eo\u0161anas objektiem nepiecie\u0161am\u0101s ties\u012bbas un licences. Vispirms veiciet p\u0101rbaudi testa uz\u0146\u0113mum\u0101.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Articles, nomenclatures, gammes, postes de charge, iek\u0101rtas, operatori un kalend\u0101ri.<\/li>\n\n\n<li><strong>OF un pas\u016bt\u012bjumu pieg\u0101d\u0101t\u0101jiem sinhroniz\u0101cija.<\/strong> Periodiski piepras\u012bjumi ar filtriem, lapo\u0161anu un atk\u0101rtotiem m\u0113\u0123in\u0101jumiem.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> Iestatiet sagatavo\u0161anas laiku matricu, instrumentus, operatoru skaitu katram ra\u017eo\u0161anas uzdevumam un alternat\u012bv\u0101s iek\u0101rtas vai darbiniekus.<\/li>\n\n\n<li><strong>Grafika datu atpaka\u013cierakste.<\/strong> Pl\u0101notos oper\u0101ciju datumus ieraksta, izmantojot SkyPlanner webhook pazi\u0146ojumus; ja izv\u0113l\u0113ts, nos\u016bta ar\u012b laika uzskaites datus.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Izmantojiet SkyPlanner l\u012bdztekus pa\u0161reiz\u0113jam pl\u0101nam, sal\u012bdziniet datumus un labojiet pamatdatus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana.<\/strong> Kad dati sakr\u012bt, iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-cegid-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot Cegid integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Apstiprin\u0101tie un pl\u0101notie OF.<\/strong> PMI izveido abus, balstoties uz CBN. Pl\u0101noto OF iek\u013cau\u0161ana grafik\u0101 par\u0101da turpm\u0101ko noslodzi, ta\u010du datumus ierakstiet atpaka\u013c tikai apstiprin\u0101tajos OF.<\/li>\n\n\n<li><strong>No pl\u0101no\u0161anas izsl\u0113gtas oper\u0101cijas.<\/strong> Primavera oper\u0101ciju var atz\u012bm\u0113t k\u0101 nepl\u0101nojamu (NaoSujeitaPlaneamento). Ierakstot datus atpaka\u013c, \u0161\u012bs oper\u0101cijas izlaidiet.<\/li>\n\n\n<li><strong>Iek\u0101rtas un operatora laiks.<\/strong> Primavera katrai oper\u0101cijai atsevi\u0161\u0137i glab\u0101 iek\u0101rtas laiku un operatora laiku. Kart\u0113jiet abus, lai ra\u017eo\u0161anas uzdevumiem, kuros vajadz\u012bgi vair\u0101ki operatori, tiktu pie\u0161\u0137irts pareizais darbinieku skaits.<\/li>\n\n\n<li><strong>Oper\u0101ciju p\u0101rkl\u0101\u0161an\u0101s.<\/strong> Primavera oper\u0101cij\u0101m ir p\u0101rkl\u0101\u0161an\u0101s koeficients. Sasaistiet to ar SkyPlanner posmu laika iestat\u012bjumiem, cit\u0101di grafik\u0101 starp oper\u0101cij\u0101m b\u016bs ilg\u0101ka gaid\u012b\u0161ana nek\u0101 ra\u017eotn\u0113.<\/li>\n\n\n<li><strong>Cegid ERP produkts.<\/strong> PMI, Primavera un Ekon izmanto at\u0161\u0137ir\u012bgas saskarnes. Vispirms preciz\u0113jiet produktu un versiju. Ja izmantojat Cegid XRP Flex, skatiet <a href=\"\/lv\/integracija\/erp\/acumatica\/integracijas-celvedis\/\">Acumatica integr\u0101cijas rokasgr\u0101matu<\/a>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-cegid-integratio\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 Cegid integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas<\/strong> attiec\u012bb\u0101 uz saska\u0146otajiem Cegid API izsaukumiem. Katr\u0101 ra\u017eotn\u0113 Cegid izmanto at\u0161\u0137ir\u012bgi, un konfigur\u0101cij\u0101 tiek \u0146emtas v\u0113r\u0101 \u0161\u012bs \u012bpatn\u012bbas.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b j\u016bsu Cegid partneris.<\/strong> Partneris p\u0101rzina j\u016bsu konfigur\u0101ciju, piel\u0101gojumus un licences un kop\u0101 ar SkyPlanner komandu var izveidot integr\u0101cijas lietot\u0101ju un iestat\u012bt API piek\u013cuvi.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var papla\u0161in\u0101t integr\u0101ciju,<\/strong> izmantojot SkyPlanner REST API un API pilnvaru. Darba s\u0101k\u0161anai pietiek ar API pilnvaru, un vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz SkyPlanner komanda. Dokument\u0101cija pieejama sada\u013c\u0101 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un nor\u0113\u0137inoties katru m\u0113nesi. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m, kop\u0101 ar izv\u0113l\u0113to pl\u0101nu. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/integracija\/erp\/cegid\/razosanas-planosana\/\">Cegid ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu<\/a>, <a href=\"\/lv\/integracija\/erp\/cegid\/\">Cegid lapu<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013cu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadalietaises<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda ra\u017eo\u0161anas l\u012bniju sasniedz da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu ap\u0123\u0113rb\u0101 pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas \u0161\u016bnas produkcijas krau\u0161anai uz palet\u0113m Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 P\u0101rtikas iepako\u0161anai piem\u0113rots pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u. Atbildes uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad tiek sniegtas da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner sniedz mums p\u0101rskatu par jaudu un padara pl\u0101no\u0161anu paredzamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko vielu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Vis\u0101 SkyPlanner lieto\u0161anas laik\u0101 kop\u0161 2021. gada pieg\u0101\u017eu savlaic\u012bgums ir bijis 100%.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Cegid PMI ir API?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Cegid nodro\u0161ina PMI Web API dro\u0161ai datu apmai\u0146ai ar \u0101r\u0113j\u0101m lietotn\u0113m, saglab\u0101jot Manufacturing PMI biznesa noteikumus. SkyPlanner to izmanto, lai nolas\u012btu OF un ierakst\u012btu pl\u0101notos datumus un pointages.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Cegid Primavera ir API ra\u017eo\u0161anas pas\u016bt\u012bjumiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. PRIMAVERA V10 API atbalsta datu las\u012b\u0161anu un rakst\u012b\u0161anu visos modu\u013cos. Produ\u00e7\u00e3o modulis nodro\u0161ina piek\u013cuvi ordens de fabrico, Planeamento ar ActualizaPlaneamentoOperacao un Di\u00e1rios de Trabalho.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c Cegid?<\/summary>\n<p class=\"sp-faq__a\">PMI katras OF oper\u0101cijas datumi tiek ierakst\u012bti, izmantojot Web API. Primavera izmanto IGprBSPlaneamento.ActualizaPlaneamentoOperacao, kas iestata ordem de fabrico oper\u0101cijas pl\u0101noto s\u0101kumu un beigas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Cegid atbalsta t\u012bmek\u013ca aiz\u0137eres?<\/summary>\n<p class=\"sp-faq__a\">Integr\u0101cija periodiski pieprasa datus no Cegid p\u0113c katrai ra\u017eotnei noteikta grafika. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek, t\u0101p\u0113c datumi non\u0101k Cegid uzreiz p\u0113c katras p\u0101rpl\u0101no\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Cegid partnerim ieteikt Cegid ieb\u016bv\u0113to pl\u0101no\u0161anu vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja klientam j\u0101\u0146em v\u0113r\u0101 ne tikai iek\u0101rtu un kr\u0101jumu ierobe\u017eojumi. Ar\u012b Cegid iesaka piesl\u0113gt uzlabotus pl\u0101no\u0161anas r\u012bkus, lai \u0146emtu v\u0113r\u0101 papildu ierobe\u017eojumus (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). SkyPlanner pl\u0101no operatorus, instrumentus, iek\u0101rtu sagatavo\u0161anu un materi\u0101lus, autom\u0101tiski p\u0101rpl\u0101no un \u013cauj str\u0101d\u0101t neierobe\u017eotam lietot\u0101ju skaitam \u2014 no 199 \u20ac m\u0113nes\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t datus no Cegid CSV vai Excel form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Cegid Cegid integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Cegid integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Cegid ra\u017eo\u0161anas ERP sist\u0113mas ar SkyPlanner APS. Vispirms apl\u016bkots Cegid PMI, p\u0113c tam \u2014 Cegid Primavera un Cegid Ekon. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Cegid, izmantojot pa\u0161a Cegid saskarnes: skyplanner.ai &#8230; <a title=\"Cegid integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/cegid\/integracijas-celvedis\/\" aria-label=\"Read more about Cegid integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106383,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107340","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cegid APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Savienojiet Cegid PMI un Cegid Primavera ar SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento atpaka\u013cierakste, datu sasaiste, aptauja un projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/cegid\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cegid integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienojiet Cegid PMI un Cegid Primavera ar SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento atpaka\u013cierakste, datu sasaiste, aptauja un projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/cegid\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/cegid\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/cegid\\\/integracijas-celvedis\\\/\",\"name\":\"Cegid APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Savienojiet Cegid PMI un Cegid Primavera ar SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento atpaka\u013cierakste, datu sasaiste, aptauja un projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/cegid\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/cegid\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/cegid\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS Cegid sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/cegid\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Cegid integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cegid APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Savienojiet Cegid PMI un Cegid Primavera ar SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento atpaka\u013cierakste, datu sasaiste, aptauja un projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/cegid\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Cegid integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienojiet Cegid PMI un Cegid Primavera ar SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento atpaka\u013cierakste, datu sasaiste, aptauja un projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/cegid\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/cegid\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/cegid\/integracijas-celvedis\/","name":"Cegid APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Savienojiet Cegid PMI un Cegid Primavera ar SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento atpaka\u013cierakste, datu sasaiste, aptauja un projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/cegid\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/cegid\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/cegid\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS Cegid sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/cegid\/"},{"@type":"ListItem","position":5,"name":"Cegid integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Cegid Cegid integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Cegid integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Cegid ra\u017eo\u0161anas ERP sist\u0113mas ar SkyPlanner APS. Vispirms apl\u016bkots Cegid PMI, p\u0113c tam \u2014 Cegid Primavera un Cegid Ekon. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Cegid, izmantojot pa\u0161a Cegid saskarnes: skyplanner.ai&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=107340"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107340\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106383"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=107340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}