{"id":107282,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/","title":{"rendered":"Global Shop Solutions integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Global Shop Solutions<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Global Shop Solutions integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Global Shop Solutions integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Global Shop Solutions ERP ar SkyPlanner APS. Datu apmai\u0146a starp SkyPlanner un Global Shop notiek abos virzienos:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em Parts, BOMs, Routers ar to oper\u0101cij\u0101m, Workcenters un darba grupas, jaudas kalend\u0101rus, darbinieku datus, atv\u0113rtos Work Orders, materi\u0101lu vajadz\u012bbas un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Katras ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas pl\u0101notais s\u0101kuma un beigu laiks tiek nos\u016bt\u012bts atpaka\u013c kop\u0101 ar SkyPlanner pie\u0161\u0137irto Workcenter.<\/li>\n\n\n<li>Ja izv\u0113laties, operatoru darba laiku un sara\u017eoto daudzumu var nos\u016bt\u012bt atpaka\u013c un iegr\u0101matot k\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjuma darba uzskaiti.<\/li>\n\n\n<li>SkyPlanner webhook pazi\u0146ojumi nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Global Shop konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas darb\u0101. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem, Global Shop izstr\u0101d\u0101t\u0101jiem un IT komand\u0101m, kas v\u0113las piedal\u012bties ievie\u0161an\u0101 vai pa\u0161as izstr\u0101d\u0101t risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"global-shop-s-integration-tools\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Global Shop integr\u0101cijas r\u012bki<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ERP papla\u0161in\u0101\u0161anai un savieno\u0161anai ar cit\u0101m sist\u0113m\u0101m Global Shop izmanto savus r\u012bkus, nevis publisku REST API:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Global Application Builder (GAB) SDK.<\/strong> &#8220;The Global Application Builder (GAB) SDK allows you to tailor screens and create applications specific to your manufacturing processes&#8221; (Global Application Builder (GAB) SDK \u013cauj piel\u0101got ekr\u0101nus un veidot lietotnes j\u016bsu ra\u017eo\u0161anas procesiem) (<a href=\"https:\/\/www.globalshopsolutions.com\/tailored-erp-software-for-manufacturing\">Global Shop<\/a>). Produkta aprakst\u0101 nor\u0101d\u012btas iesp\u0113jas &#8220;Integrate with third-party APIs and office software suites&#8221; (integr\u0113t ar tre\u0161o pu\u0161u API un biroja programmat\u016bras komplektiem), &#8220;Manage data flow&#8221; (p\u0101rvald\u012bt datu pl\u016bsmu), &#8220;Automate processes&#8221; (automatiz\u0113t procesus), &#8220;Schedule reporting&#8221; (iepl\u0101not p\u0101rskatu sagatavo\u0161anu) un &#8220;Create custom ERP subsystems that integrate with the base package&#8221; (veidot piel\u0101gotas ERP apak\u0161sist\u0113mas, kas integr\u0113jas ar pamatpakotni) (<a href=\"https:\/\/www.globalshopsolutions.com\/hubfs\/pdfs\/product-sheets\/tailored-erp.pdf\">GAB produkta apraksts<\/a>). Global Shop piebilst: &#8220;GAB&#8217;s innovative use of business data objects removes the risk normally associated with extending your ERP system&#8221; (GAB novatorisk\u0101 biznesa datu objektu izmanto\u0161ana nov\u0113r\u0161 risku, kas parasti saist\u012bts ar ERP sist\u0113mas papla\u0161in\u0101\u0161anu) (<a href=\"https:\/\/www.globalshopsolutions.com\/blog\/global-shop-solutions-erp-software-sdk-allows-you-to-customize-and-accessorize\">Global Shop emu\u0101rs<\/a>). \u0160\u0101di tiek veidota integr\u0101cija ar SkyPlanner.<\/li>\n\n\n<li><strong>Global Shop pakalpojumi.<\/strong> Global Shop pied\u0101v\u0101 &#8220;Development as a Service (DaaS)&#8221; (izstr\u0101di k\u0101 pakalpojumu) un pal\u012bdz &#8220;Add Third-Party Integrations, Applications, Automations &amp; Software&#8221; (pievienot tre\u0161o pu\u0161u integr\u0101cijas, lietotnes, automatiz\u0101ciju un programmat\u016bru) (<a href=\"https:\/\/www.globalshopsolutions.com\/hubfs\/website-pdfs\/whitepapers\/global-shop-solutions-info-pack.pdf\">informat\u012bvie materi\u0101li<\/a>). Integr\u0101ciju katalog\u0101 pirc\u0113ji ir aicin\u0101ti apspriest &#8220;your specific integration needs&#8221; (savas konkr\u0113t\u0101s integr\u0101cijas vajadz\u012bbas) (<a href=\"https:\/\/www.globalshopsolutions.com\/software-application-integrations\">integr\u0101cijas<\/a>).<\/li>\n\n\n<li><strong>Eksports uz Excel un failiem.<\/strong> Global Shop integr\u0101ciju katalog\u0101 ir Microsoft Excel un Access, savuk\u0101rt GAB \u013cauj iepl\u0101not p\u0101rskatu izpildi. Lai izm\u0113\u0123in\u0101tu SkyPlanner, var izmantot eksport\u0113tus failus ar deta\u013c\u0101m, Routers, Workcenters un atv\u0113rtajiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner pus\u0113 REST API nolasa un ieraksta pas\u016bt\u012bjumus, produktus, materi\u0101lus, procesa posmus, darba laika ierakstus un iepirkuma pas\u016bt\u012bjumus. Autentifik\u0101cijai izmanto API pilnvaru galven\u0113 <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API), un API ir dokument\u0113ts Swagger\/OpenAPI. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim aprakst\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-the-pieces-connect\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas savienojums<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Dati no Global Shop.<\/strong> Iepl\u0101nots GAB process nolasa Work Orders, Router oper\u0101cijas un iepirkuma pas\u016bt\u012bjumus, kas main\u012bti kop\u0161 iepriek\u0161\u0113j\u0101s izpildes, un nos\u016bta tos uz SkyPlanner REST API. GAB var &#8220;Schedule processes and reports to run at regular intervals,&#8221; (iepl\u0101not procesu un p\u0101rskatu izpildi regul\u0101ros interv\u0101los), t\u0101p\u0113c ra\u017eo\u0161anas uzdevumi tiek sinhroniz\u0113ti ik p\u0113c da\u017e\u0101m min\u016bt\u0113m, bet pamatdati \u2014 reizi stund\u0101 vai katru nakti.<\/li>\n\n\n<li><strong>Dati uz Global Shop.<\/strong> Mainoties grafikam, SkyPlanner nos\u016bta t\u012bmek\u013ca aiz\u0137eres pazi\u0146ojumu, un pl\u0101notie datumi tiek nolas\u012bti no SkyPlanner REST API. GAB process ieraksta s\u0101kuma un beigu laiku atbilsto\u0161aj\u0101s ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cij\u0101s. Ievie\u0161anas tv\u0113ruma noteik\u0161anas laik\u0101 vienojas, vai GAB tie\u0161i sa\u0146ems t\u012bmek\u013ca aiz\u0137eres pazi\u0146ojumu vai nolas\u012bs izmai\u0146as ar \u012bsiem interv\u0101liem.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas cehs.<\/strong> SkyPlanner darba laika ieraksti ir pieejami, izmantojot REST API vai t\u012bmek\u013ca aiz\u0137eri. Ja izv\u0113laties, GAB tos iegr\u0101mato k\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjuma darba uzskaiti.<\/li>\n\n<\/ul>\n\n\n<p>Global Shop darbojas lok\u0101laj\u0101 infrastrukt\u016br\u0101, Global Shop Cloud (ko nodro\u0161ina Amazon Web Services) vai k\u0101 SaaS. Tv\u0113ruma noteik\u0161anas laik\u0101 ar j\u016bsu IT komandu vai Global Shop vienojas par GAB procesa izpildes vietu un t\u012bkla savienojumu ar SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Global Shop objekts<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Parts (deta\u013cu pamatdati), BOMs, daudzl\u012bme\u0146u BOMs<\/td><td>Produkti, materi\u0101li, produkta strukt\u016bra<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 mainoties datiem<\/td><\/tr><tr><td>Routers: darba, materi\u0101lu un \u0101rpakalpojumu oper\u0101cijas ar Workcenter un laikiem<\/td><td>Procesa posmi ar ilgumu un sagatavo\u0161anas laiku<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 mainoties datiem<\/td><\/tr><tr><td>Workcenters un darba grupas<\/td><td>Darba centri, darba centru grupas, alternat\u012bvie darba centri<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 reti<\/td><\/tr><tr><td>Jaudas kalend\u0101ri, darbinieki, mai\u0146as<\/td><td>Mai\u0146as, kalend\u0101ri, person\u0101ls<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>Katru dienu, vai ar\u012b mai\u0146as uztur atsevi\u0161\u0137i SkyPlanner<\/td><\/tr><tr><td>Work Orders: deta\u013ca, daudzums, izpildes termi\u0146\u0161, priorit\u0101te, saist\u012btais p\u0101rdo\u0161anas pas\u016bt\u012bjums<\/td><td>Pas\u016bt\u012bjumi ar izpildes termi\u0146iem un priorit\u0101t\u0113m<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>GAB process ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cijas: statuss, pabeigtais daudzums, atliku\u0161\u0101s stundas<\/td><td>Ra\u017eo\u0161anas uzdevumi katram procesa posmam<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>GAB process ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Materi\u0101lu vajadz\u012bbas, iepirkuma pas\u016bt\u012bjumi, \u0101rpakalpojumu pas\u016bt\u012bjumi<\/td><td>Materi\u0101lu vajadz\u012bbas, iepirkuma pas\u016bt\u012bjumi p\u0113c pieg\u0101des datuma<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>Reizi stund\u0101 vai grafika sast\u0101d\u012b\u0161anas laik\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas pl\u0101notais s\u0101kums un beigas, Workcenter<\/td><td>Katra posma pl\u0101notais s\u0101kums un beigas, iek\u0101rta un operators<\/td><td>SkyPlanner \u2192 Global Shop<\/td><td>Mainoties grafikam, ar SkyPlanner t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>Darba uzskaite: katras ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas laiks un daudzumi<\/td><td>Darba laika ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 Global Shop<\/td><td>P\u0113c katra apstiprin\u0101juma vai katr\u0101 mai\u0146\u0101, ja \u0161\u012b iesp\u0113ja izv\u0113l\u0113ta<\/td><\/tr><tr><td>SkyPlanner grafiku sast\u0101d\u012b\u0161anas noteikumi<\/td><td>Sagatavo\u0161anas laiku matrica, instrumenti ar ierobe\u017eotu pieejam\u012bbu, ra\u017eo\u0161anas uzdevumi ar vair\u0101kiem operatoriem<\/td><td>Uztur SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas scen\u0101riji<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet Parts, BOMs, Routers, Workcenters, darba grupas, jaudas kalend\u0101rus un darbinieku datus. R\u016bp\u012bgi kart\u0113jiet Workcenters: Workcenter ar \u010detr\u0101m vien\u0101d\u0101m iek\u0101rt\u0101m k\u013c\u016bst par darba centru grupu ar \u010detriem darba centriem, lai SkyPlanner sast\u0101d\u012btu darbu sec\u012bbu katrai iek\u0101rtai. Darba grupas tiek kart\u0113tas uz alternat\u012bvajiem darba centriem.<\/p>\n\n\n<p><strong>2. Ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet atv\u0113rtos Work Orders ar to oper\u0101cij\u0101m, materi\u0101lu vajadz\u012bbas un atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjum\u0101 nor\u0101d\u012btaj\u0101 pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered. \u0100rpakalpojumu oper\u0101cijas tiek att\u0113lotas k\u0101 posmi, kuriem nor\u0101d\u012bts tikai pas\u016bt\u012bjuma izpildes laiks.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Kad pl\u0101no\u0161anas dzin\u0113js iepl\u0101no vai p\u0101rvieto oper\u0101ciju, SkyPlanner t\u012bmek\u013ca aiz\u0137ere aktiviz\u0113 GAB. GAB ieraksta pl\u0101noto s\u0101kumu un beigas attiec\u012bgaj\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101, k\u0101 ar\u012b Workcenter, ja SkyPlanner ir p\u0101rc\u0113lis darbu uz citu iek\u0101rtu. Darbu izpildes sarakstos un APS skatos tad redzama SkyPlanner noteikt\u0101 sec\u012bba.<\/p>\n\n\n<p><strong>4. Apstiprin\u0101jumi no ra\u017eo\u0161anas ceha.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un darba laika ieraksti uztur grafiku aktu\u0101lu. J\u016bs izv\u0113laties, vai faktisko darba laiku nos\u016bt\u012bt atpaka\u013c uz Global Shop. Ja izv\u0113laties to dar\u012bt, katrs apstiprin\u0101jums k\u013c\u016bst par darba uzskaites ierakstu attiec\u012bgaj\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101. Ja ne, Shop Floor Data Collection paliek nemain\u012bts, un SkyPlanner nolasa izpildes gaitu no ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cij\u0101m.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms palai\u0161anas darb\u0101:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Parts, BOMs, Routers, daudzumi, izpildes termi\u0146i, ra\u017eo\u0161anas pas\u016bt\u012bjumu statuss<\/td><td>Global Shop<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiki, katras oper\u0101cijas iek\u0101rta un operators<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sagatavo\u0161anas laiku matrica, pras\u012bbas instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Jaudas kalend\u0101ri un mai\u0146as<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Darba uzskaite, materi\u0101lu izsnieg\u0161ana un sa\u0146em\u0161ana, izmaksu apr\u0113\u0137ins<\/td><td>Global Shop \u2014 datus ievada taj\u0101 vai iegr\u0101mato no SkyPlanner darba laika ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas ieraksta oper\u0101ciju datumus. Pl\u0101not\u0101ji p\u0101rvieto darbus SkyPlanner, un datumi tiek nos\u016bt\u012bti uz Global Shop. Ra\u017eo\u0161anas pas\u016bt\u012bjumiem, kuru grafikus sast\u0101da SkyPlanner, Global Shop APS vairs nedr\u012bkst veikt visp\u0101r\u0113ju p\u0101rpl\u0101no\u0161anu vai p\u0101rvietot darbus ar vilk\u0161anu un nome\u0161anu. Pret\u0113j\u0101 gad\u012bjum\u0101 abu sist\u0113mu pl\u0101ni s\u0101ks at\u0161\u0137irties.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Integr\u0101ciju parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas s\u0101kuma. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot no Global Shop Excel vai CSV form\u0101t\u0101 eksport\u0113tus Workcenters, Routers un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Tv\u0113ruma noteik\u0161ana.<\/strong> Vienojieties par datu kart\u0113\u0161anas tabulu, atbild\u012bbu par datiem, sinhroniz\u0101cijas interv\u0101liem un to, vai darba uzskaiti nos\u016bt\u012bt atpaka\u013c. Apstipriniet izvieto\u0161anas veidu (lok\u0101laj\u0101 infrastrukt\u016br\u0101, Cloud vai SaaS) un to, kas izstr\u0101d\u0101s GAB da\u013cu.<\/li>\n\n\n<li><strong>Piek\u013cuve.<\/strong> Izveidojiet SkyPlanner API pilnvaru un vienojieties par GAB izejo\u0161o t\u012bkla savienojumu.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Parts, BOMs, Routers, Workcenters, darba grupas, kalend\u0101ri un darbinieku dati.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas pas\u016bt\u012bjumu un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Iepl\u0101nots GAB process ar izmai\u0146u noteik\u0161anu, atk\u0101rtotiem m\u0113\u0123in\u0101jumiem un \u017eurnal\u0113\u0161anu.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> Sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits katram ra\u017eo\u0161anas uzdevumam un alternat\u012bvas iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Ar t\u012bmek\u013ca aiz\u0137er\u0113m aktiviz\u0113ta datu ierakst\u012b\u0161ana ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cij\u0101s un, ja \u0161\u012b iesp\u0113ja izv\u0113l\u0113ta, ar\u012b darba uzskaites datu nos\u016bt\u012b\u0161ana atpaka\u013c.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Izmantojiet SkyPlanner paral\u0113li pa\u0161reiz\u0113jam APS pl\u0101nam, sal\u012bdziniet datumus un labojiet pamatdatus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana.<\/strong> Kad dati sakr\u012bt, iesl\u0113dziet ierakst\u012b\u0161anu atpaka\u013c un p\u0101rtrauciet manu\u0101li p\u0101rpl\u0101not darbus, kuru grafiku sast\u0101da SkyPlanner.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-global-shop-solutions-inte\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot Global Shop Solutions integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Workcenter un iek\u0101rtas.<\/strong> Global Shop pl\u0101no darbu p\u0113c Workcenter un darba grupas. Nosakiet, kuri Workcenter ietver vair\u0101kas iek\u0101rtas, un sadaliet tos atsevi\u0161\u0137os SkyPlanner darba centros.<\/li>\n\n\n<li><strong>Tr\u012bs oper\u0101ciju veidi.<\/strong> Routers ietver materi\u0101lu, darbasp\u0113ka un \u0101rpakalpojumu oper\u0101cijas. Tikai darbasp\u0113ka oper\u0101cijas noslogo j\u016bsu jaudu. Materi\u0101lu oper\u0101cijas k\u013c\u016bst par materi\u0101lu vajadz\u012bb\u0101m, bet \u0101rpakalpojumi \u2014 par posmiem, kuriem \u0146em v\u0113r\u0101 tikai ilgumu.<\/li>\n\n\n<li><strong>Sagatavo\u0161anas un apstr\u0101des laiks.<\/strong> Nododiet sagatavo\u0161anas un apstr\u0101des laiku atsevi\u0161\u0137i, lai gad\u012bjumos, kad noz\u012bme ir darbu sec\u012bbai, sagatavo\u0161anas laiku matrica var\u0113tu aizst\u0101t fiks\u0113to sagatavo\u0161anas laiku.<\/li>\n\n\n<li><strong>Kalend\u0101ri.<\/strong> Global Shop uztur jaudas kalend\u0101rus ar izmai\u0146\u0101m konkr\u0113tos datumos. Izv\u0113lieties vienu sist\u0113mu, kur\u0101 uztur\u0113t mai\u0146u un br\u012bvdienu datus, cit\u0101di abi pl\u0101ni nesakrit\u012bs.<\/li>\n\n\n<li><strong>Darbinieki darba centros.<\/strong> Global Shop pl\u0101no darbinieku darbu atbilsto\u0161i vi\u0146u prasm\u0113m. Nosakot tv\u0113rumu, vienojieties, k\u0101 darbinieki tiks piesaist\u012bti SkyPlanner darba centriem.<\/li>\n\n\n<li><strong>Steidzam\u012bbas atz\u012bmes un priorit\u0101tes.<\/strong> Sasaistiet Global Shop priorit\u0101tes ar SkyPlanner priorit\u0101ti un Fast Track, lai steidzamie darbi saglab\u0101tu savu vietu grafik\u0101.<\/li>\n\n\n<li><strong>Atjaunin\u0101jumi.<\/strong> Global Shop Cloud ietver &#8220;Semi-annual upgrades.&#8221; (atjaunin\u0101jumus divreiz gad\u0101). P\u0113c katra atjaunin\u0101juma atk\u0101rtoti p\u0101rbaudiet GAB procesu.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-global-shop-inte\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 un uztur Global Shop integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas,<\/strong> aptverot saska\u0146otos objektus un sinhroniz\u0101cijas noteikumus. Katr\u0101 ra\u017eotn\u0113 Global Shop izmanto cit\u0101di, un \u0161\u012bs zin\u0101\u0161anas tiek \u0146emtas v\u0113r\u0101 konfigur\u0101cij\u0101.<\/li>\n\n\n<li><strong>Var iesaist\u012bties ar\u012b Global Shop pakalpojumu komanda.<\/strong> T\u0101s DaaS izstr\u0101d\u0101t\u0101ji p\u0101rzina GAB un j\u016bsu konfigur\u0101ciju un kop\u0101 ar SkyPlanner komandu var izveidot integr\u0101cijas Global Shop pusi.<\/li>\n\n\n<li><strong>J\u016bsu GAB izstr\u0101d\u0101t\u0101ji var turpin\u0101t integr\u0101cijas izstr\u0101di,<\/strong> izmantojot SkyPlanner REST API un API pilnvaru. Lai s\u0101ktu darbu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz\u0113s. Nor\u0101d\u012bjumi ir pieejami <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, ar ikm\u0113ne\u0161a nor\u0113\u0137iniem. Integr\u0101cijas cenu pied\u0101v\u0101jam iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, \u0146emot v\u0113r\u0101 j\u016bsu procesu un vajadz\u012bbas. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/integracija\/erp\/global-shop-solutions\/razosanas-planosana\/\">Global Shop Solutions ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot iek\u0101rtu un darbinieku faktisko jaudu<\/a>, <a href=\"\/lv\/integracija\/erp\/global-shop-solutions\/\">Global Shop Solutions lapu<\/a>, <a href=\"\/lv\/funkcijas\/\">SkyPlanner iesp\u0113jas<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013cu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ji, kas izmanto SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel izkl\u0101jlap\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 stundas darba laika, un jauna darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied z\u0101\u013cu ra\u017eotn\u0113 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Z\u0101\u013cu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner mums ir v\u0113rt\u012bgs ar to, ka tas ir r\u012bks, kas darbojas ikdien\u0101, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska noslodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un materi\u0101lu tr\u016bkuma izrais\u012bto ra\u017eo\u0161anas d\u012bkst\u0101vju ir k\u013cuvis iev\u0113rojami maz\u0101k.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Vair\u0101ki 1 000<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visai organiz\u0101cijai ir pieejams ra\u017eo\u0161anas p\u0101rskats re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Global Shop Solutions ir API?<\/summary>\n<p class=\"sp-faq__a\">Global Shop savienojas ar cit\u0101m sist\u0113m\u0101m, izmantojot savu Global Application Builder (GAB) SDK, kas var &#8220;integrate with third-party APIs,&#8221; (integr\u0113ties ar tre\u0161o pu\u0161u API), k\u0101 ar\u012b savus integr\u0101cijas pakalpojumus. SkyPlanner integr\u0101cij\u0101 Global Shop pus\u0113 izmanto GAB, bet otr\u0101 pus\u0113 \u2014 SkyPlanner REST API un t\u012bmek\u013ca aiz\u0137eres.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas ir GAB sist\u0113m\u0101 Global Shop Solutions?<\/summary>\n<p class=\"sp-faq__a\">Global Application Builder ir Global Shop SDK piel\u0101gotu ekr\u0101nu, lietot\u0146u un integr\u0101ciju izveidei. Tas str\u0101d\u0101 ar biznesa datu objektiem, var p\u0101rvald\u012bt datu pl\u016bsmu un palaist procesus p\u0113c grafika.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c Global Shop?<\/summary>\n<p class=\"sp-faq__a\">Katrai ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijai atsevi\u0161\u0137i. SkyPlanner t\u012bmek\u013ca aiz\u0137ere aktiviz\u0113 GAB, kas oper\u0101cij\u0101 ieraksta pl\u0101noto s\u0101kumu un beigas, k\u0101 ar\u012b Workcenter, ja SkyPlanner ir p\u0101rc\u0113lis darbu uz citu iek\u0101rtu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai integr\u0101cija darbojas ar Global Shop Cloud un SaaS?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. SkyPlanner ir m\u0101ko\u0146pakalpojums SaaS, kas savienojas ar Global Shop gan lok\u0101l\u0101 instal\u0101cij\u0101, gan Global Shop Cloud, gan SaaS vid\u0113. Nosakot ievie\u0161anas tv\u0113rumu, ar jums un Global Shop vienojamies par to, kur darbosies GAB puse un k\u0101ds b\u016bs t\u012bkla savienojums ar SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izstr\u0101d\u0101 integr\u0101cijas Global Shop pusi?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda konfigur\u0113 integr\u0101ciju un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas. Global Shop DaaS komanda vai j\u016bsu GAB izstr\u0101d\u0101t\u0101ji var izveidot vai papla\u0161in\u0101t GAB pusi, izmantojot SkyPlanner dokument\u0113to API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t Global Shop datus no Excel vai CSV failiem. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Global Shop Solutions Global Shop Solutions integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Global Shop Solutions integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Global Shop Solutions ERP ar SkyPlanner APS. Datu apmai\u0146a starp SkyPlanner un Global Shop notiek abos virzienos: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 &#8230; <a title=\"Global Shop Solutions integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/\" aria-label=\"Read more about Global Shop Solutions integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106354,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107282","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Global Shop APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem<\/title>\n<meta name=\"description\" content=\"Savienojiet Global Shop Solutions ar SkyPlanner APS: GAB SDK, REST API, webhooks, oper\u0101ciju datumu atpaka\u013cieraksts, darba uzskaite, datu kart\u0113\u0161ana, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Global Shop Solutions integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienojiet Global Shop Solutions ar SkyPlanner APS: GAB SDK, REST API, webhooks, oper\u0101ciju datumu atpaka\u013cieraksts, darba uzskaite, datu kart\u0113\u0161ana, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/global-shop-solutions\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/global-shop-solutions\\\/integracijas-celvedis\\\/\",\"name\":\"Global Shop APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Savienojiet Global Shop Solutions ar SkyPlanner APS: GAB SDK, REST API, webhooks, oper\u0101ciju datumu atpaka\u013cieraksts, darba uzskaite, datu kart\u0113\u0161ana, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/global-shop-solutions\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/global-shop-solutions\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/global-shop-solutions\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Global Shop Solutions: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/global-shop-solutions\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Global Shop Solutions integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Global Shop APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","description":"Savienojiet Global Shop Solutions ar SkyPlanner APS: GAB SDK, REST API, webhooks, oper\u0101ciju datumu atpaka\u013cieraksts, darba uzskaite, datu kart\u0113\u0161ana, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Global Shop Solutions integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienojiet Global Shop Solutions ar SkyPlanner APS: GAB SDK, REST API, webhooks, oper\u0101ciju datumu atpaka\u013cieraksts, darba uzskaite, datu kart\u0113\u0161ana, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/","name":"Global Shop APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Savienojiet Global Shop Solutions ar SkyPlanner APS: GAB SDK, REST API, webhooks, oper\u0101ciju datumu atpaka\u013cieraksts, darba uzskaite, datu kart\u0113\u0161ana, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Global Shop Solutions: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/"},{"@type":"ListItem","position":5,"name":"Global Shop Solutions integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Global Shop Solutions Global Shop Solutions integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Global Shop Solutions integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Global Shop Solutions ERP ar SkyPlanner APS. Datu apmai\u0146a starp SkyPlanner un Global Shop notiek abos virzienos: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=107282"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107282\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106354"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=107282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}