{"id":107108,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/visma-l7\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/integracijas-celvedis\/","title":{"rendered":"Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Visma L7<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Visma L7 APS integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Visma L7 integr\u0101cijas ce\u013cved\u012b partneri un IT komandas uzzin\u0101s, k\u0101 savienot Visma L7 ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Visma L7, izmantojot Visma L7 REST API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em darbu numurus (ty\u00f6numero), darba posmus (ty\u00f6nvaihe), resursus, izstr\u0101d\u0101jumu strukt\u016bras, deta\u013cas, materi\u0101lus, kr\u0101jumu atlikumus, p\u0101rdo\u0161anas un iepirkumu rindas.<\/li>\n\n\n<li>Katras darba kartes resursu, s\u0101kuma datumu, priorit\u0101ti, darbinieku un darba stundas pa dien\u0101m ieraksta atpaka\u013c, izmantojot <code>PUT \/manufphases\/<\/code>.<\/li>\n\n\n<li>Resursu kalend\u0101ra jaudu sinhroniz\u0113, izmantojot <code>POST \/resourceupdates\/<\/code>.<\/li>\n\n\n<li>L7 darba rind\u0101s re\u0123istr\u0113tos ra\u017eo\u0161anas notikumus nolasa, izmantojot <code>GET \/manufevents\/<\/code>.<\/li>\n\n\n<li>SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu L7 konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. Partneri un izstr\u0101d\u0101t\u0101ji var veidot savus risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-l7-s-rest-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Visma L7 REST API<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Saskarne <strong>Visma L7 &#8211; REST API<\/strong> ir dokument\u0113ta OpenAPI 3.0.3 form\u0101t\u0101 ar izmai\u0146u \u017eurn\u0101lu (<a href=\"https:\/\/demoltr1.visma.fi\/ltrws\/L7RESTapi\/\">dokument\u0101cija<\/a>). T\u0101 darbojas Visma LTR vid\u0113.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>B\u0101zes ce\u013c\u0161<\/strong> ir <code>\/ltrws\/REST\/L7<\/code> j\u016bsu LTR server\u012b \u2014 lok\u0101laj\u0101 infrastrukt\u016br\u0101 vai Visma mitin\u0101taj\u0101 lietojumprogrammu pakalpojum\u0101.<\/li>\n\n\n<li><strong>Licenc\u0113\u0161ana.<\/strong> Katrs galapunkts tiek licenc\u0113ts atsevi\u0161\u0137i. Grafika ierakst\u012b\u0161anai ar <code>PUT \/manufphases\/<\/code> nepiecie\u0161ama L7RMFPP licence, bet jaudas atjaunin\u0101\u0161anai \u2014 L7RMCAP. Ar\u012b nolas\u012b\u0161anas galapunktiem ir savas licences.<\/li>\n\n\n<li><strong>Lapo\u0161ana.<\/strong> Sarakstus sadala lap\u0101s ar <code>pageSize<\/code> un <code>recAfter<\/code>, bet filtr\u0113 ar <code>queryKey1<\/code>, <code>queryKey2<\/code> un <code>queryString<\/code>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Katr\u0101 L7 izsaukum\u0101 nos\u016bta divus mar\u0137ierus:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>hash<\/strong> nosaka datub\u0101zi un uz\u0146\u0113mumu.<\/li>\n\n\n<li><strong>token<\/strong> identific\u0113 API lietot\u0101ju.<\/li>\n\n<\/ol>\n\n\n<p>J\u016bsu LTR administrators izveido API lietot\u0101ju Visma LTR vid\u0113, piesaista to L7 uz\u0146\u0113mumam, pie\u0161\u0137ir profilus un izveido lietot\u0101ja mar\u0137ieri (<a href=\"https:\/\/demoltr1.visma.fi\/ltrws\/L7RESTapi\/\">darba s\u0101k\u0161ana<\/a>). Izmantojiet atsevi\u0161\u0137u integr\u0101cijas lietot\u0101ju un pie\u0161\u0137iriet tam tikai integr\u0101cijai nepiecie\u0161am\u0101s ties\u012bbas.<\/p>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API mar\u0137ieri, ko nos\u016bta galven\u0113 <code>Authorization-Token<\/code>. To izveido sada\u013c\u0101 Settings &gt; API. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim aprakst\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-modifiedafter\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Izmai\u0146u noteik\u0161ana: modifiedAfter<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>L7 REST API nav t\u012bmek\u013ca aiz\u0137eru. Izmai\u0146as nolasa ar periodiskiem piepras\u012bjumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>L7 failu uztur\u0113\u0161anas sada\u013c\u0101 (Tiedostohuolto) iesl\u0113dziet izmai\u0146u re\u0123istr\u0113\u0161anu (DBLOG) tabul\u0101m, kuras integr\u0101cija nolasa, piem\u0113ram, darba kar\u0161u un deta\u013cu tabul\u0101m.<\/li>\n\n\n<li>Izsauciet nolas\u012b\u0161anas galapunktus, nor\u0101dot <code>modifiedAfter<\/code> v\u0113rt\u012bb\u0101 p\u0113d\u0113j\u0101s izpildes laiku. Dz\u0113stie ieraksti tiek atgriezti ar dz\u0113\u0161anas atz\u012bmi, t\u0101p\u0113c atceltie darbi tiek iz\u0146emti no grafika.<\/li>\n\n\n<li>Veiciet piepras\u012bjumus ik p\u0113c da\u017e\u0101m min\u016bt\u0113m. Kad main\u0101s st\u0101voklis vai grafiks, SkyPlanner nos\u016bta t\u012bmek\u013ca aiz\u0137eres pazi\u0146ojumu, t\u0101p\u0113c atpaka\u013cierakstu aktiviz\u0113 notikumi.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Visma L7 objekts (galapunkts)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Tuote (<code>GET \/products\/<\/code>)<\/td><td>Produkti un materi\u0101li<\/td><td>L7 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 mainoties datiem<\/td><\/tr><tr><td>Deta\u013cas, kas piesaist\u012btas darba numuram (<code>GET \/manufcomponents\/<\/code>)<\/td><td>Apak\u0161produkti<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Periodiski piepras\u012bjumi ar modifiedAfter<\/td><\/tr><tr><td>Materi\u0101lu vajadz\u012bbas (<code>GET \/manufmaterials\/<\/code>)<\/td><td>Katram ra\u017eo\u0161anas uzdevumam nepiecie\u0161amie materi\u0101li<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Periodiski piepras\u012bjumi ar modifiedAfter<\/td><\/tr><tr><td>Resursu (KRYH) koks ar iek\u0101rtu skaitu (<code>GET \/manufresources\/<\/code>)<\/td><td>Darba centri un darba centru grupas<\/td><td>L7 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, turpm\u0101k reti<\/td><\/tr><tr><td>Katra posma darba karte (TSUUNR) (<code>GET \/manufphases\/<\/code>)<\/td><td>Katra darba centra ra\u017eo\u0161anas uzdevumi (procesa posmi)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Piepras\u012bjumi ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Kr\u0101jumu atlikumi (<code>GET \/stockbalances\/<\/code>)<\/td><td>Kr\u0101jumi<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Periodiski piepras\u012bjumi<\/td><\/tr><tr><td>Iepirkumu rindas (<code>GET \/purchaserows\/<\/code>)<\/td><td>Iepirkumu pas\u016bt\u012bjumi ar pieg\u0101des datumiem<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Periodiski piepras\u012bjumi<\/td><\/tr><tr><td>P\u0101rdo\u0161anas pas\u016bt\u012bjumi un rindas (<code>GET \/salesorders\/<\/code>, <code>GET \/salesrows\/<\/code>)<\/td><td>Izpildes termi\u0146i, klienta priorit\u0101te<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Periodiski piepras\u012bjumi<\/td><\/tr><tr><td>Ra\u017eo\u0161anas notikumi (<code>GET \/manufevents\/<\/code>)<\/td><td>Katra ra\u017eo\u0161anas uzdevuma izpildes gaita<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Periodiski piepras\u012bjumi<\/td><\/tr><tr><td>Darba kartes lauki resource, startDate, priority, person, schedulingDays (<code>PUT \/manufphases\/<\/code>)<\/td><td>Pl\u0101notais darba centrs, s\u0101kums, sec\u012bba un darba stundas pa dien\u0101m<\/td><td>SkyPlanner \u2192 L7<\/td><td>Mainoties grafikam, ar SkyPlanner webhook<\/td><\/tr><tr><td>Resursu kalend\u0101ra jauda (<code>POST \/resourceupdates\/<\/code>)<\/td><td>Mai\u0146u jauda<\/td><td>SkyPlanner \u2192 L7<\/td><td>Mainoties mai\u0146\u0101m<\/td><\/tr><tr><td>SkyPlanner iestat\u012btie grafika sast\u0101d\u012b\u0161anas noteikumi<\/td><td>At\u013cautie darba centri, p\u0101rregul\u0113\u0161anas laiku matrica, instrumenti, darbinieki<\/td><td>Uztur SkyPlanner vid\u0113<\/td><td>Iestata ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet resursu koku un katrai iek\u0101rtai piesaistiet atsevi\u0161\u0137u SkyPlanner darba centru. Ja vienam L7 resursam ir vair\u0101kas iek\u0101rtas, izveidojiet katrai savu darba centru un resursam \u2014 darba centru grupu. Nolasiet izstr\u0101d\u0101jumus un to strukt\u016bras ar darba posmiem.<\/p>\n\n\n<p><strong>2. Darbu numuru sinhroniz\u0101cija.<\/strong> Nolasiet atv\u0113rt\u0101s darba kartes ar <code>GET \/manufphases\/<\/code> un p\u0113c tam atjauniniet t\u0101s, izmantojot <code>modifiedAfter<\/code>. Nolasiet katram darba numuram piesaist\u012bt\u0101s deta\u013cas un materi\u0101lu vajadz\u012bbas, k\u0101 ar\u012b kr\u0101jumu atlikumus un iepirkumu rindas, lai posma s\u0101kumu pl\u0101notu ne agr\u0101k par attiec\u012bg\u0101s iepirkuma rindas pieg\u0101des datumu.<\/p>\n\n\n<p><strong>3. Grafika atpaka\u013cieraksts.<\/strong> Katram posmam, ko pl\u0101no\u0161anas dzin\u0113js iepl\u0101nojis vai p\u0101rvietojis, SkyPlanner izsauc <code>PUT \/manufphases\/<\/code>. Piepras\u012bjuma pamattekst\u0101 katrai darba kartei ir viens <code>workSheet<\/code> ieraksts ar \u0161\u0101diem laukiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>number<\/code> \u2014 darba karte; <code>resource<\/code> \u2014 izv\u0113l\u0113tais resurss<\/li>\n\n\n<li><code>startDate<\/code> un <code>priority<\/code> \u2014 lai L7 darba rind\u0101s b\u016btu redzama SkyPlanner noteikt\u0101 sec\u012bba<\/li>\n\n\n<li><code>person<\/code> \u2014 ja iepl\u0101nots konkr\u0113ts operators<\/li>\n\n\n<li><code>schedulingDays<\/code> \u2014 pl\u0101not\u0101s darba stundas katr\u0101 datum\u0101<\/li>\n\n<\/ul>\n\n\n<p>L7 saglab\u0101 \u0101r\u0113jas sist\u0113mas noteikto priorit\u0101ti nemain\u012btu (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Jarjesta-paivan-tyot-toimi\">avots<\/a>), t\u0101p\u0113c sec\u012bba darba rind\u0101s saglab\u0101jas.<\/p>\n\n\n<p><strong>4. Jaudas sinhroniz\u0101cija.<\/strong> Kad SkyPlanner vid\u0113 main\u0101s mai\u0146as, br\u012bvdienas vai virsstundas, ar <code>POST \/resourceupdates\/<\/code> jauno jaudu ieraksta L7 resursu kalend\u0101r\u0101. L7 noslodzes skati tad atbilst pl\u0101nam.<\/p>\n\n\n<p><strong>5. Ra\u017eo\u0161anas izpildes gaita.<\/strong> Operatori turpina veikt ierakstus L7 darba rind\u0101s un Visma LTR vid\u0113, bet SkyPlanner nolasa notikumus ar <code>GET \/manufevents\/<\/code>. Operatori var ar\u012b apstiprin\u0101t darbu SkyPlanner Mobile Confirmations. Autopilot p\u0101rpl\u0101no grafiku p\u0113c datiem no jebkura no \u0161iem avotiem, un n\u0101kamaj\u0101 atpaka\u013cierakst\u0101 tiek nos\u016bt\u012bti jaunie laiki.<\/p>\n\n\n<p><strong>6. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms palai\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Izstr\u0101d\u0101jumi, strukt\u016bras, darba posmi, daudzumi, darba numura statuss<\/td><td>Visma L7<\/td><\/tr><tr><td>Posmu sec\u012bba, s\u0101kuma datumi, darba stundas pa dien\u0101m, resursa izv\u0113le<\/td><td>SkyPlanner<\/td><\/tr><tr><td>At\u013cautie darba centri, p\u0101rregul\u0113\u0161anas laiku matrica, instrumenti, darbinieki<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un promb\u016btnes<\/td><td>SkyPlanner; datus ieraksta L7 resursu kalend\u0101r\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas notikumi un kr\u0101jumu uzskaites ieraksti<\/td><td>Visma L7 darba rindas un LTR<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Galvenais konfliktu avots ir pa\u0161a L7 pl\u0101no\u0161ana. Vajadz\u012bbu apr\u0113\u0137ins un detaliz\u0113t\u0101 pl\u0101no\u0161ana var atk\u0101rtoti iepl\u0101not neblo\u0137\u0113tus posmus. Izmantojiet \u0161\u012bs funkcijas tikai materi\u0101liem un rezerv\u0101cij\u0101m un nep\u0101rpl\u0101nojiet posmus, par kuriem atbild SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas darbu s\u0101kuma. Pirms tam 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 izmanto j\u016bsu datus \u2014 Excel eksportu ar darbu numuriem, posmiem un resursiem.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Tv\u0113ruma noteik\u0161ana.<\/strong> Saska\u0146ojiet datu kart\u0113\u0161anas tabulu, noteikumus par atbild\u012bbu par datiem un periodisko piepras\u012bjumu interv\u0101lu.<\/li>\n\n\n<li><strong>Piek\u013cuve un licences.<\/strong> Ieg\u0101d\u0101jieties licences projekt\u0101 iek\u013cautajiem REST galapunktiem. LTR administrators izveido API lietot\u0101ju, hash un token \u2014 v\u0113lams vispirms testa uz\u0146\u0113mum\u0101.<\/li>\n\n\n<li><strong>Izmai\u0146u re\u0123istr\u0113\u0161ana.<\/strong> Iesl\u0113dziet DBLOG tabul\u0101m, kuras nolas\u0101t.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Resursi, izstr\u0101d\u0101jumi, strukt\u016bras un darba posmi.<\/li>\n\n\n<li><strong>Darbu numuru sinhroniz\u0101cija.<\/strong> Periodiski piepras\u012bjumi ar modifiedAfter, dz\u0113\u0161anas apstr\u0101de un lapo\u0161ana.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner vid\u0113.<\/strong> At\u013cautie darba centri, p\u0101rregul\u0113\u0161anas laiku matrica, instrumenti un darbinieki.<\/li>\n\n\n<li><strong>Atpaka\u013cieraksts.<\/strong> <code>PUT \/manufphases\/<\/code> un <code>POST \/resourceupdates\/<\/code> p\u0101rbaude testa uz\u0146\u0113mum\u0101.<\/li>\n\n\n<li><strong>Paral\u0113la darb\u012bba un palai\u0161ana.<\/strong> Sal\u012bdziniet ar pa\u0161reiz\u0113jo pl\u0101nu, izlabojiet pamatdatus un p\u0113c tam iesl\u0113dziet atpaka\u013cierakstu ra\u017eo\u0161anas vid\u0113.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-visma-l7-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot Visma L7 integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Atsevi\u0161\u0137a licence katram galapunktam.<\/strong> Jau s\u0101kum\u0101 uzskaitiet visus galapunktus un pirms test\u0113\u0161anas ieg\u0101d\u0101jieties tiem licences.<\/li>\n\n\n<li><strong>Iek\u0101rtu skaits.<\/strong> Ja resurss ietver vair\u0101kas iek\u0101rtas, L7 sadala darbu starp t\u0101m (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Perustiedot-resurssit\">avots<\/a>). SkyPlanner sadaliet \u0161o resursu atsevi\u0161\u0137os darba centros, bet atpaka\u013c uz L7 rakstiet resursu, ko sagaida L7.<\/li>\n\n\n<li><strong>Stundas pa dien\u0101m.<\/strong> L7 saglab\u0101 pl\u0101nu k\u0101 stundu skaitu katram datumam. SkyPlanner nos\u016bta <code>schedulingDays<\/code> datus, kuros stundu summa atbilst posma ilgumam.<\/li>\n\n\n<li><strong>R\u016bpn\u012bcas kalend\u0101rs.<\/strong> Aizpildiet to piln\u012bb\u0101, jo nepiln\u012bbu d\u0113\u013c posmi tiek p\u0101rcelti uz pag\u0101tni (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Tehdaskalenteri\">avots<\/a>).<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas pas\u016bt\u012bjumi noliktavas kr\u0101jumiem.<\/strong> <code>mainNumber<\/code>, <code>subNumber<\/code>, <code>rowNumber<\/code> un <code>newQuantity<\/code> izmanto tikai, lai main\u012btu daudzumu pas\u016bt\u012bjum\u0101 noliktavas kr\u0101jumiem. Klientu pas\u016bt\u012bjumiem \u0161os laukus neiek\u013caujiet.<\/li>\n\n\n<li><strong>N\u0101kam\u0101 ERP sist\u0113ma.<\/strong> Visma ir p\u0101rtraucis jaunu L7 funkciju izstr\u0101di, un produkta lieto\u0161ana beidzas 2028. gada beig\u0101s (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/\">Visma pazi\u0146ojums<\/a>). Glab\u0101jiet grafiku sast\u0101d\u012b\u0161anas noteikumus SkyPlanner, nevis L7 laukos, lai tie saglab\u0101tos, p\u0101rejot uz citu ERP sist\u0113mu.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-visma-l7-integration-who-configures-and-supp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 Visma L7 integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Darbs ietver datu kart\u0113\u0161anas piel\u0101go\u0161anu j\u016bsu resursiem, darba posmiem un L7 konfigur\u0101cijai. Tas ietver ar\u012b SkyPlanner glab\u0101tos grafiku sast\u0101d\u012b\u0161anas noteikumus: at\u013cautos darba centrus, p\u0101rregul\u0113\u0161anas laiku matricu, instrumentus un darbiniekus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c palai\u0161anas.<\/strong> Katr\u0101 r\u016bpn\u012bc\u0101 L7 izmanto cit\u0101di, un konfigur\u0101cij\u0101 tiek \u0146emtas v\u0113r\u0101 \u0161\u012bs \u012bpatn\u012bbas.<\/li>\n\n\n<li><strong>Var iesaist\u012bties ar\u012b j\u016bsu Visma partneris.<\/strong> Partneris p\u0101rzina j\u016bsu L7 un LTR konfigur\u0101ciju un var par\u016bp\u0113ties par API lietot\u0101ju, licenc\u0113m un testa uz\u0146\u0113mumu. SkyPlanner nodro\u0161ina REST API, Swagger\/OpenAPI dokument\u0101ciju un t\u012bmek\u013ca aiz\u0137eres.<\/li>\n\n\n<li><strong>Ar\u012b j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot savus risin\u0101jumus,<\/strong> izmantojot to pa\u0161u dokument\u0113to REST API un API mar\u0137ieri. Lai s\u0101ktu, pietiek ar API mar\u0137ieri, un vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz SkyPlanner komanda.<\/li>\n\n<\/ol>\n\n\n<p>Kad aizst\u0101siet L7, to pa\u0161u SkyPlanner konfigur\u0101ciju var\u0113siet savienot ar jauno ERP sist\u0113mu. Skatiet lapas par <a href=\"\/lv\/integracija\/erp\/business-central\/\">Business Central<\/a>, <a href=\"\/lv\/integracija\/erp\/visma-net\/\">Visma Net<\/a>, <a href=\"\/lv\/integracija\/erp\/lemonsoft\/\">Lemonsoft<\/a>, <a href=\"\/lv\/integracija\/erp\/monitor-erp\/\">Monitor ERP<\/a> un <a href=\"\/lv\/integracija\/erp\/odoo\/\">Odoo<\/a>.<\/p>\n\n\n<p>SkyPlanner cena s\u0101kas no 199 \u20ac m\u0113nes\u012b ar ikm\u0113ne\u0161a nor\u0113\u0137iniem, un taj\u0101 ir iek\u013cauti 5 darba centri. Integr\u0101cijas cenu apr\u0113\u0137in\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un pied\u0101v\u0101jam kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai pirms darba s\u0101k\u0161anas j\u016bs zin\u0101tu visas izmaksas.<\/p>\n\n\n<p>Uzziniet, k\u0101das ir L7 ieb\u016bv\u0113t\u0101s pl\u0101no\u0161anas iesp\u0113jas sal\u012bdzin\u0101jum\u0101 ar SkyPlanner, rakst\u0101 <a href=\"\/lv\/integracija\/erp\/visma-l7\/razosanas-planosana\/\">Vai Visma L7 pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu?<\/a> P\u0101rskatu atrad\u012bsiet <a href=\"\/lv\/integracija\/erp\/visma-l7\/\">Visma L7 lap\u0101<\/a>, bet citas sist\u0113mas \u2014 <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span> autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams re\u0101llaika p\u0101rskats par ra\u017eo\u0161anu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermes r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, iepriek\u0161 \u2014 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, r\u012bkot\u0101jdirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la konstrukcijas un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens darba vad\u012bt\u0101js, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU pieg\u0101des \u0137\u0113des speci\u0101lists Kalle Kalliom\u00e4ki elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda ra\u017eo\u0161anas l\u012bniju sasniedz da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sagatavo\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Visma L7 ir API ra\u017eo\u0161anas datiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Visma L7 REST API platform\u0101 Visma LTR nodro\u0161ina piek\u013cuvi darba posmiem, resursiem, deta\u013c\u0101m, materi\u0101liem, ra\u017eo\u0161anas notikumiem, produktiem, kr\u0101jumu atlikumiem, p\u0101rdo\u0161anas rind\u0101m un iepirkumu rind\u0101m. Katram galapunktam ir vajadz\u012bga atsevi\u0161\u0137a licence, un LTR administrators izveido API lietot\u0101ju un pilnvaras.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 grafiks tiek ierakst\u012bts atpaka\u013c Visma L7?<\/summary>\n<p class=\"sp-faq__a\">Ar <code>PUT \/manufphases\/<\/code>, kas katrai darba kart\u012btei atjaunina resursu, s\u0101kuma datumu, priorit\u0101ti, darbinieku un pl\u0101noto stundu skaitu katram datumam. <code>POST \/resourceupdates\/<\/code> ieraksta jaudu resursu kalend\u0101r\u0101. L7 saglab\u0101 \u0101r\u0113ji pie\u0161\u0137irto priorit\u0101ti, t\u0101p\u0113c darbu rindas atbilst SkyPlanner noteiktajai sec\u012bbai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Visma L7 atbalsta t\u012bmek\u013ca aiz\u0137eres?<\/summary>\n<p class=\"sp-faq__a\">T\u012bmek\u013ca aiz\u0137eres dokument\u0101cij\u0101 nav aprakst\u012btas. Iesl\u0113dziet izmai\u0146u re\u0123istr\u0113\u0161anu integr\u0101cijas tv\u0113rum\u0101 iek\u013cautaj\u0101m tabul\u0101m un periodiski pieprasiet datus, izmantojot <code>modifiedAfter<\/code>. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar Visma L7?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar Visma L7, izmantojot L7 REST API, un Visma sav\u0101 <a href=\"https:\/\/vismal7.fi\/integraatiot\/\">L7 integr\u0101ciju lap\u0101<\/a> ir nor\u0101d\u012bjis Skycode un SkyPlanner. Integr\u0101ciju ievie\u0161anas laik\u0101 konfigur\u0113 SkyPlanner komanda.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izveido Visma L7 integr\u0101ciju?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda ievie\u0161anas laik\u0101 piel\u0101go divvirzienu integr\u0101ciju j\u016bsu L7 konfigur\u0101cijai un nodro\u0161ina atbalstu p\u0113c palai\u0161anas. Ar\u012b j\u016bsu Visma partneris vai izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API. Lai s\u0101ktu, pietiek ar API pilnvaru.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat izmantot l\u012bdz 20 darba centriem un import\u0113t datus no L7 Excel vai CSV form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Visma L7 Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai \u0160aj\u0101 Visma L7 integr\u0101cijas ce\u013cved\u012b partneri un IT komandas uzzin\u0101s, k\u0101 savienot Visma L7 ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Visma L7, izmantojot Visma L7 REST API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu &#8230; <a title=\"Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/integracijas-celvedis\/\" aria-label=\"Read more about Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106267,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107108","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Visma L7 un SkyPlanner APS: L7 REST API Visma LTR vid\u0113, galve\u0146u mar\u0137ieri, modifiedAfter sinhroniz\u0101cija, darba kar\u0161u atpaka\u013cieraksts un datu kart\u0113\u0161ana.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\" \/>\n<meta property=\"og:description\" content=\"Visma L7 un SkyPlanner APS: L7 REST API Visma LTR vid\u0113, galve\u0146u mar\u0137ieri, modifiedAfter sinhroniz\u0101cija, darba kar\u0161u atpaka\u013cieraksts un datu kart\u0113\u0161ana.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-l7\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-l7\\\/integracijas-celvedis\\\/\",\"name\":\"Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Visma L7 un SkyPlanner APS: L7 REST API Visma LTR vid\u0113, galve\u0146u mar\u0137ieri, modifiedAfter sinhroniz\u0101cija, darba kar\u0161u atpaka\u013cieraksts un datu kart\u0113\u0161ana.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-l7\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-l7\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-l7\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS Visma L7 sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-l7\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Visma L7 un SkyPlanner APS: L7 REST API Visma LTR vid\u0113, galve\u0146u mar\u0137ieri, modifiedAfter sinhroniz\u0101cija, darba kar\u0161u atpaka\u013cieraksts un datu kart\u0113\u0161ana.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","og_description":"Visma L7 un SkyPlanner APS: L7 REST API Visma LTR vid\u0113, galve\u0146u mar\u0137ieri, modifiedAfter sinhroniz\u0101cija, darba kar\u0161u atpaka\u013cieraksts un datu kart\u0113\u0161ana.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/integracijas-celvedis\/","name":"Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Visma L7 un SkyPlanner APS: L7 REST API Visma LTR vid\u0113, galve\u0146u mar\u0137ieri, modifiedAfter sinhroniz\u0101cija, darba kar\u0161u atpaka\u013cieraksts un datu kart\u0113\u0161ana.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS Visma L7 sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/"},{"@type":"ListItem","position":5,"name":"Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Visma L7 Visma L7 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai \u0160aj\u0101 Visma L7 integr\u0101cijas ce\u013cved\u012b partneri un IT komandas uzzin\u0101s, k\u0101 savienot Visma L7 ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Visma L7, izmantojot Visma L7 REST API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=107108"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107108\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106267"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=107108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}