{"id":107050,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/applus\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/integracijas-celvedis\/","title":{"rendered":"APplus integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ APplus<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">APplus integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 integr\u0101cijas ce\u013cved\u012b APplus partneriem un IT komand\u0101m ir izskaidrots, k\u0101 savienot APplus ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar APplus, izmantojot pa\u0161a Asseco saskarnes:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Uz SkyPlanner tiek p\u0101rs\u016bt\u012bti ra\u017eo\u0161anas pas\u016bt\u012bjumi (Fertigungsauftr\u00e4ge) ar to oper\u0101cij\u0101m (Arbeitsg\u00e4nge), tehnolo\u0123iskie mar\u0161ruti (Arbeitspl\u00e4ne), materi\u0101lu specifik\u0101cijas (St\u00fccklisten), jaudas vien\u012bbas (Kapazit\u00e4tsstellen un Kapazit\u00e4tseinheiten), instrumenti (Betriebsmittel), kr\u0101jumi un iepirkuma pas\u016bt\u012bjumi.<\/li>\n\n\n<li>Katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un jaudas vien\u012bba tiek ierakst\u012bti atpaka\u013c ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101.<\/li>\n\n\n<li>Ja izv\u0113laties, operatoru darba laika ierakstus var nos\u016bt\u012bt atpaka\u013c k\u0101 pas\u016bt\u012bjuma BDE zi\u0146ojumus.<\/li>\n\n\n<li>SkyPlanner webhook pazi\u0146ojumi nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu APplus konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties integr\u0101cijas izveid\u0113 vai pa\u0161i veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"applus-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">APplus integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>APplus nodro\u0161ina \u0161\u0101das iesp\u0113jas \u0101r\u0113jas grafiku sast\u0101d\u012b\u0161anas sist\u0113mas piesl\u0113g\u0161anai:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>APplus t\u012bmek\u013ca servisi.<\/strong> APplus pamat\u0101 ir t\u012bmek\u013ca servisu arhitekt\u016bra. Asseco nor\u0101da, ka visas grafiku sast\u0101d\u012b\u0161anai nepiecie\u0161am\u0101s funkcijas ir pieejamas tie\u0161i internet\u0101 un t\u0101s var izmantot klientu un pieg\u0101d\u0101t\u0101ju IT sist\u0113mas (<a href=\"https:\/\/www.applus-erp.de\/en\/solutions\/erp-features\/e-business\/\">Asseco<\/a>). \u0160is ir galvenais veids, k\u0101 nolas\u012bt ra\u017eo\u0161anas datus un ierakst\u012bt pl\u0101notos datumus.<\/li>\n\n\n<li><strong>Business Integration Framework.<\/strong> Kop\u0161 APplus 6.3 \u0161is ietvars \u013cauj piesl\u0113gt tre\u0161o pu\u0161u sist\u0113mas bez programm\u0113\u0161anas, izmantojot piel\u0101gojamas datu strukt\u016bras (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/it-business-2016-asseco-stellt-neue-produktversion-applus-63-vor\/\">Asseco<\/a>). Izmantojiet to, lai noteiktu APplus objektu atbilst\u012bbu SkyPlanner REST API datu strukt\u016br\u0101m.<\/li>\n\n\n<li><strong>Universal Cloud Connector.<\/strong> Tas tika pievienots APplus 7.1, lai savienotu partneru risin\u0101jumus un SaaS pakalpojumus ar APplus, nodro\u0161inot augstu p\u0101rs\u016bt\u012bto datu dro\u0161\u012bbu (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/asseco-veroeffentlicht-applus-71\/\">Asseco<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>APplus 10 versij\u0101 Flow Mode palai\u017e procesus noteiktos laikos vai tad, kad iest\u0101jas konkr\u0113ti notikumi, bez manu\u0101l\u0101m darb\u012bb\u0101m (<a href=\"https:\/\/www.applus-erp.de\/en\/new-version\/\">Asseco<\/a>). Nosakot ievie\u0161anas tv\u0113rumu, vienojas, kuru no \u0161iem savienojuma veidiem izmantos katram objektam.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un piek\u013cuve<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>APplus pus\u0113.<\/strong> Integr\u0101cija darbojas ar atsevi\u0161\u0137u APplus tehnisk\u0101 lietot\u0101ja kontu, kura ties\u012bbas ir ierobe\u017eotas l\u012bdz objektiem, ko integr\u0101cija nolasa un ieraksta. J\u016bsu APplus partneris izveido lietot\u0101ju un konfigur\u0113 piek\u013cuvi t\u012bmek\u013ca servisiem.<\/li>\n\n\n<li><strong>T\u012bkls.<\/strong> APplus darbojas lok\u0101li vai mitin\u0101t\u0101 vid\u0113 (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">Fakti par APplus<\/a>). Integr\u0101cija piek\u013c\u016bst sist\u0113mai pa j\u016bsu IT komandas vai mitin\u0101\u0161anas pakalpojuma sniedz\u0113ja at\u013cauto savienojumu.<\/li>\n\n\n<li><strong>SkyPlanner pus\u0113.<\/strong> REST API autentifik\u0101cijai izmanto API pilnvaru, kas izveidota sada\u013c\u0101 Settings &gt; API un tiek nos\u016bt\u012bta galven\u0113 <code>Authorization-Token<\/code>. API dokument\u0101cija ir pieejama Swagger\/OpenAPI form\u0101t\u0101, savuk\u0101rt <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim izskaidroti pirmie izsaukumi.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodisk\u0101 aptauja<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>APplus pus\u0113 integr\u0101cija periodiski pieprasa t\u012bmek\u013ca servisiem atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un jaun\u0101k\u0101s izmai\u0146as, vai ar\u012b Business Integration Framework nos\u016bta izmai\u0146as uz SkyPlanner. Bie\u017eumu nosaka katrai ra\u017eotnei atsevi\u0161\u0137i: pas\u016bt\u012bjumiem tas var b\u016bt ik p\u0113c da\u017e\u0101m min\u016bt\u0113m, bet kr\u0101jumiem \u2014 reizi stund\u0101.<\/p>\n\n\n<p>Kad main\u0101s st\u0101voklis vai grafiks, SkyPlanner nos\u016bta webhook pazi\u0146ojumus, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c APplus aktiviz\u0113 notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>APplus objekts<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Artikuli (Artikel), m\u0113rvien\u012bbas<\/td><td>Produkti un materi\u0101li<\/td><td>APplus \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam periodisk\u0101 aptauja<\/td><\/tr><tr><td>Materi\u0101lu specifik\u0101cijas (St\u00fccklisten, Strukturst\u00fccklisten)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>APplus \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Tehnolo\u0123iskie mar\u0161ruti (Arbeitspl\u00e4ne) ar oper\u0101cij\u0101m, sagatavo\u0161anas un izpildes laikiem<\/td><td>Procesa so\u013ci ar ilgumu, sagatavo\u0161anas un nosl\u0113guma darbu laikiem<\/td><td>APplus \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Jaudas centri un vien\u012bbas (Kapazit\u00e4tsstellen, Kapazit\u00e4tseinheiten)<\/td><td>Darba centru grupas un darba centri, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>APplus \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, v\u0113l\u0101k \u2014 reti<\/td><\/tr><tr><td>Person\u0101la pieejam\u0101 jauda<\/td><td>Person\u0101ls un t\u0101 mai\u0146as<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Katru dienu vai mai\u0146as uztur atsevi\u0161\u0137i SkyPlanner sist\u0113m\u0101<\/td><\/tr><tr><td>Instrumenti un pal\u012bgier\u012bces (Betriebsmittel)<\/td><td>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/td><td>APplus \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumi (Fertigungsauftr\u00e4ge) ar oper\u0101cij\u0101m un materi\u0101liem<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Periodisk\u0101 aptauja ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Noliktav\u0101 eso\u0161ie kr\u0101jumi<\/td><td>Kr\u0101jumu atlikumi<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Aptauja reizi stund\u0101 vai grafika sast\u0101d\u012b\u0161anas laik\u0101<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumi (Bestellungen) ar pieg\u0101des datumiem<\/td><td>Iepirkuma pas\u016bt\u012bjumi, ien\u0101ko\u0161ie materi\u0101li p\u0113c pieg\u0101des datuma<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Aptauja reizi stund\u0101 vai grafika sast\u0101d\u012b\u0161anas laik\u0101<\/td><\/tr><tr><td>Katras ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas pl\u0101notais s\u0101kums, beigas un jaudas vien\u012bba<\/td><td>Katra ra\u017eo\u0161anas uzdevuma s\u0101kums un beigas grafik\u0101<\/td><td>SkyPlanner \u2192 APplus<\/td><td>Mainoties grafikam, ar SkyPlanner webhook pazi\u0146ojumu<\/td><\/tr><tr><td>BDE zi\u0146ojumi: katras oper\u0101cijas laiks un daudzums, darbinieks<\/td><td>Darba laika ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 APplus<\/td><td>Ar katru apstiprin\u0101jumu vai reizi mai\u0146\u0101, ja \u0161\u012b iesp\u0113ja izv\u0113l\u0113ta<\/td><\/tr><tr><td>Nav APplus<\/td><td>Sagatavo\u0161anas laiku matrica, operatoru skaits katram ra\u017eo\u0161anas uzdevumam, alternat\u012bv\u0101s iek\u0101rtas un person\u0101ls<\/td><td>Tiek uztur\u0113ts SkyPlanner<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas scen\u0101riji<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Izmantojot APplus t\u012bmek\u013ca servisus, nolasiet artikulus, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, jaudas centrus un vien\u012bbas, Betriebsmittel un person\u0101la pieejamo jaudu. R\u016bp\u012bgi nosakiet atbilst\u012bbu: viena Kapazit\u00e4tsstelle ar \u010detr\u0101m Kapazit\u00e4tseinheiten k\u013c\u016bst par vienu darba centru grupu ar \u010detriem darba centriem.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m un materi\u0101liem, k\u0101 ar\u012b atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. SkyPlanner uzskata pas\u016bt\u012btos materi\u0101lus par pieejamiem iepirkuma pas\u016bt\u012bjum\u0101 nor\u0101d\u012btaj\u0101 pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad pas\u016bt\u012bjumam pie\u0161\u0137ir statusu Delivered. Iepirkuma priek\u0161likumi paliek APplus Disposition, l\u012bdz tie k\u013c\u016bst par pas\u016bt\u012bjumiem.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c APplus.<\/strong> Kad pl\u0101no\u0161anas dzin\u0113js ievieto oper\u0101ciju grafik\u0101 vai to p\u0101rvieto, SkyPlanner webhook pazi\u0146ojums aktiviz\u0113 APplus atjaunin\u0101\u0161anu, izmantojot tv\u0113ruma noteik\u0161anas laik\u0101 saska\u0146oto savienojumu \u2014 t\u012bmek\u013ca servisus vai Business Integration Framework. Ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101 tiek ierakst\u012bts attiec\u012bg\u0101s oper\u0101cijas pl\u0101notais s\u0101kums, pl\u0101not\u0101s beigas un jaudas vien\u012bba, lai APplus pl\u0101no\u0161anas panel\u012b b\u016btu redzama SkyPlanner noteikt\u0101 sec\u012bba.<\/p>\n\n\n<p><strong>4. Ceha pas\u016bt\u012bjumu nodo\u0161ana izpildei.<\/strong> Pl\u0101not\u0101js turpina nodot ceha pas\u016bt\u012bjumus (Werkstattauftr\u00e4ge) izpildei APplus sist\u0113m\u0101, tagad jau ar SkyPlanner noteiktajiem datumiem. Izpildei nodotie pas\u016bt\u012bjumi un to statuss tiek p\u0101rs\u016bt\u012bti atpaka\u013c uz SkyPlanner n\u0101kamaj\u0101 sinhroniz\u0101cij\u0101.<\/p>\n\n\n<p><strong>5. Darba izpildes apstiprin\u0101jumi ceh\u0101.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un darba laika ieraksti nodro\u0161ina grafika aktualit\u0101ti. J\u016bs izv\u0113laties, vai faktiskos laikus nos\u016bt\u012bt atpaka\u013c. Ja izv\u0113laties tos nos\u016bt\u012bt, katras oper\u0101cijas laiks un daudzums tiek ierakst\u012bti pas\u016bt\u012bjum\u0101 k\u0101 BDE zi\u0146ojumi. Ja joproj\u0101m izmantojat sv\u012btrkodu BDE, SkyPlanner t\u0101 viet\u0101 nolasa zi\u0146ojumus no APplus.<\/p>\n\n\n<p><strong>6. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms darb\u012bbas uzs\u0101k\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Artikuli, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, daudzumi, pas\u016bt\u012bjumu statuss, ceha pas\u016bt\u012bjumu nodo\u0161ana izpildei<\/td><td>APplus<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiki, jaudas vien\u012bbu pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sagatavo\u0161anas laiku matrica, operatoru skaits, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Betriebsmittel pamatdati<\/td><td>APplus; pieejam\u012bbu laika gait\u0101 pl\u0101no SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>BDE zi\u0146ojumi, materi\u0101lu izsnieg\u0161ana un sa\u0146em\u0161ana<\/td><td>APplus; ievada taj\u0101 vai p\u0101rs\u016bta no SkyPlanner darba laika ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas ierakst\u012bs oper\u0101ciju datumus. Ja darbojas PPS grafiku sast\u0101d\u012b\u0161ana vai datumus ieraksta Feinplanung vai APplus APS, atsp\u0113jojiet \u0161o funkciju pas\u016bt\u012bjumiem, kuru grafikus sast\u0101da SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas darbu s\u0101kuma. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot no APplus CSV vai Excel form\u0101t\u0101 eksport\u0113t\u0101s jaudas vien\u012bbas, tehnolo\u0123iskos mar\u0161rutus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Kart\u0113\u0161ana.<\/strong> Apstipriniet kart\u0113\u0161anas tabulu, atbild\u012bbu par datiem, sinhroniz\u0101cijas bie\u017eumu un to, vai BDE zi\u0146ojumi tiks nos\u016bt\u012bti atpaka\u013c.<\/li>\n\n\n<li><strong>Piek\u013cuve APplus.<\/strong> Izveidojiet tehnisko lietot\u0101ju, kop\u0101 ar savu APplus partneri iesp\u0113jojiet t\u012bmek\u013ca servisus un vispirms veiciet p\u0101rbaudes testa sist\u0113m\u0101.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Artikuli, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, jaudas centri un vien\u012bbas, Betriebsmittel, person\u0101ls.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Periodiska aptauja ar filtriem, dal\u012bjumu lap\u0101s un atk\u0101rtotiem m\u0113\u0123in\u0101jumiem vai datu nos\u016bt\u012b\u0161ana ar Business Integration Framework.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> Iestatiet sagatavo\u0161anas laiku matricu, instrumentus, operatoru skaitu katram ra\u017eo\u0161anas uzdevumam un alternat\u012bv\u0101s iek\u0101rtas vai darbiniekus.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Oper\u0101ciju datumi no SkyPlanner webhook pazi\u0146ojumiem un, ja izv\u0113laties, ar\u012b BDE zi\u0146ojumi.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Izmantojiet SkyPlanner l\u012bdztekus pa\u0161reiz\u0113jam pl\u0101no\u0161anas panelim, sal\u012bdziniet datumus un labojiet pamatdatus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana.<\/strong> Iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c, kad dati sakr\u012bt.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-applus-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot APplus integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Resursi ar ierobe\u017eotu un neierobe\u017eotu jaudu.<\/strong> APplus da\u017eus resursus var pl\u0101not, neierobe\u017eojot to jaudu. SkyPlanner katra darba centra jauda ir ierobe\u017eota, t\u0101p\u0113c import\u0113jot p\u0101rbaudiet katra centra mai\u0146as un efektivit\u0101tes r\u0101d\u012bt\u0101jus.<\/li>\n\n\n<li><strong>Izmantotie pl\u0101no\u0161anas l\u012bme\u0146i.<\/strong> P\u0101rbaudiet, vai Feinplanung vai APplus APS ir licenc\u0113ts un tiek izmantots, un nosakiet vienu sist\u0113mu, kas ierakst\u012bs datumus.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas dokumenti un sv\u012btrkodi.<\/strong> BDE zi\u0146ojumus re\u0123istr\u0113 pas\u016bt\u012bjumiem, kuriem ir izdruk\u0101ti ra\u017eo\u0161anas dokumenti. Vienojieties, vai pas\u016bt\u012bjumu nodo\u0161ana ra\u017eo\u0161anai un dokumentu druk\u0101\u0161ana ar\u012b turpm\u0101k notiks APplus, k\u0101 l\u012bdz \u0161im.<\/li>\n\n\n<li><strong>Sagatavo\u0161anas un izpildes laika m\u0113rvien\u012bbas.<\/strong> Import\u0113jot p\u0101rr\u0113\u0137iniet sagatavo\u0161anas un izpildes laikus, izmantojot pareizo m\u0113rvien\u012bbu un apr\u0113\u0137ina b\u0101zi, cit\u0101di visi ilgumi b\u016bs nepareizi.<\/li>\n\n\n<li><strong>\u0100rpakalpojumu oper\u0101cijas.<\/strong> Apak\u0161uz\u0146\u0113m\u0113ju veikt\u0101s oper\u0101cijas aiz\u0146em laiku, bet nenoslogo j\u016bsu jaudu. Model\u0113jiet t\u0101s k\u0101 posmus, kuriem nor\u0101d\u012bts tikai ilgums.<\/li>\n\n\n<li><strong>Pie pakalpojuma sniedz\u0113ja mitin\u0101tas instal\u0101cijas.<\/strong> Ja izmantojat mitin\u0101to versiju, savlaic\u012bgi vienojieties ar mitin\u0101\u0161anas pakalpojuma sniedz\u0113ju par t\u012bkla savienojumu ar t\u012bmek\u013ca pakalpojumiem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-applus-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 APplus integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas<\/strong> attiec\u012bb\u0101 uz saska\u0146otajiem t\u012bmek\u013ca pakalpojumiem un datu atbilst\u012bb\u0101m. Katr\u0101 ra\u017eotn\u0113 APplus tiek izmantots cit\u0101di, un \u0161\u012bs zin\u0101\u0161anas tiek \u0146emtas v\u0113r\u0101 konfigur\u0101cij\u0101.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b j\u016bsu APplus partneris.<\/strong> Partneris p\u0101rzina j\u016bsu piel\u0101gojumus, lietot\u0101ju ties\u012bbas un Business Integration Framework iestat\u012bjumus un var nodro\u0161in\u0101t piek\u013cuvi kop\u0101 ar SkyPlanner komandu.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var veidot papildu risin\u0101jumus,<\/strong> izmantojot SkyPlanner REST API un API pilnvaru. Lai s\u0101ktu darbu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz\u0113s. Integr\u0101cijas dokument\u0101cija ir pieejama sada\u013c\u0101 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b ar ikm\u0113ne\u0161a nor\u0113\u0137iniem; cen\u0101 ir iek\u013cauti 5 darba centri. Integr\u0101cijas cenas pied\u0101v\u0101jumu sagatavojam iepriek\u0161 kop\u0101 ar izv\u0113l\u0113t\u0101 pl\u0101na pied\u0101v\u0101jumu, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/integracija\/erp\/applus\/razosanas-planosana\/\">APplus ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai<\/a>, <a href=\"\/lv\/integracija\/erp\/applus\/\">APplus lapu<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013cu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 uzdevumu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas darba \u0161\u016bnas produkcijas krau\u0161anai uz palet\u0113m Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us uz priek\u0161u<\/b><span>p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir visas ra\u017eo\u0161anas pl\u0101no\u0161anas pamats un nodro\u0161ina t\u0101s uzticam\u012bbu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku piem\u0113rots iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un uz grafika izmai\u0146u piepras\u012bjumiem, kuru izskat\u012b\u0161ana iepriek\u0161 aiz\u0146\u0113ma stundu vai ilg\u0101k, tagad atbild da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner mums ir v\u0113rt\u012bgs k\u0101 r\u012bks, kas darbojas ikdien\u0101, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska slodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101vju skaits materi\u0101lu tr\u016bkuma d\u0113\u013c ir strauji samazin\u0101jies.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai APplus ir API darbam ar ra\u017eo\u0161anas pas\u016bt\u012bjumiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. APplus pamat\u0101 ir t\u012bmek\u013ca pakalpojumu arhitekt\u016bra, un Asseco nor\u0101da, ka klientu un pieg\u0101d\u0101t\u0101ju IT sist\u0113mas var tie\u0161i izmantot t\u0101 grafiku sast\u0101d\u012b\u0161anas funkcijas. Business Integration Framework savieno tre\u0161o pu\u0161u sist\u0113mas, izmantojot piel\u0101gojamas datu strukt\u016bras, savuk\u0101rt Universal Cloud Connector savieno SaaS risin\u0101jumus ar APplus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c APplus?<\/summary>\n<p class=\"sp-faq__a\">P\u0113c katras grafika izmai\u0146as SkyPlanner webhook ierosina pl\u0101not\u0101 s\u0101kuma, pl\u0101noto beigu un jaudas resursa atjaunin\u0101\u0161anu katrai ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijai. Atjaunin\u0101\u0161ana notiek, izmantojot APplus t\u012bmek\u013ca pakalpojumus vai Business Integration Framework. Datu apmai\u0146as ce\u013cu nosaka, veicot tv\u0113ruma noteik\u0161anu ievie\u0161anas laik\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner var nos\u016bt\u012bt BDE zi\u0146ojumus uz APplus?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, ja izv\u0113laties \u0161o iesp\u0113ju. SkyPlanner re\u0123istr\u0113tie operatoru darba laiki tiek nos\u016bt\u012bti k\u0101 BDE zi\u0146ojumi ar laiku un daudzumu katrai pas\u016bt\u012bjuma oper\u0101cijai. Ra\u017eotn\u0113s, kur\u0101s saglab\u0101 BDE uzskaiti ar sv\u012btrkodiem, SkyPlanner \u0161os zi\u0146ojumus nolasa, nevis nos\u016bta.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai APplus partnerim vajadz\u0113tu pied\u0101v\u0101t APplus APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja klients v\u0113las da\u017eu ned\u0113\u013cu laik\u0101 ieg\u016bt izmantojamu ra\u017eo\u0161anas grafiku, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. APplus APS ir APplus integr\u0113ts partnera produkts, kas paredz\u0113ts sagatavo\u0161anas laiku matric\u0101m ar vair\u0101kiem instrumentiem un vair\u0101ku resursu pl\u0101no\u0161anai (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>). SkyPlanner nodro\u0161ina \u0161\u012bs iesp\u0113jas, savienojas ar APplus t\u012bmek\u013ca pakalpojumiem, autom\u0101tiski p\u0101rpl\u0101no un \u013cauj str\u0101d\u0101t neierobe\u017eotam lietot\u0101ju skaitam \u2014 no 199 \u20ac m\u0113nes\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai integr\u0101cija darbojas ar mitin\u0101to APplus versiju?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. APplus var darboties lok\u0101li vai k\u0101 mitin\u0101ta versija, un SkyPlanner savienojas ar ab\u0101m, izmantojot t\u012bmek\u013ca pakalpojumus. Veicot tv\u0113ruma noteik\u0161anu, t\u012bkla savienojumu saska\u0146o ar j\u016bsu IT komandu vai mitin\u0101\u0161anas pakalpojuma sniedz\u0113ju.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat izmantot l\u012bdz 20 darba centriem, import\u0113t datus no APplus CSV vai Excel form\u0101t\u0101 un izmantot visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ APplus APplus integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 integr\u0101cijas ce\u013cved\u012b APplus partneriem un IT komand\u0101m ir izskaidrots, k\u0101 savienot APplus ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar APplus, izmantojot pa\u0161a Asseco saskarnes: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu APplus konfigur\u0101cijai &#8230; <a title=\"APplus integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/integracijas-celvedis\/\" aria-label=\"Read more about APplus integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106238,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107050","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>APplus APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"APplus un SkyPlanner APS: t\u012bmek\u013ca servisi, Business Integration Framework, BDE zi\u0146ojumi, datu kart\u0113\u0161ana, oper\u0101ciju datu atgrie\u0161ana un projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"APplus integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"APplus un SkyPlanner APS: t\u012bmek\u013ca servisi, Business Integration Framework, BDE zi\u0146ojumi, datu kart\u0113\u0161ana, oper\u0101ciju datu atgrie\u0161ana un projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/applus\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/applus\\\/integracijas-celvedis\\\/\",\"name\":\"APplus APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"APplus un SkyPlanner APS: t\u012bmek\u013ca servisi, Business Integration Framework, BDE zi\u0146ojumi, datu kart\u0113\u0161ana, oper\u0101ciju datu atgrie\u0161ana un projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/applus\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/applus\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/applus\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai APplus: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/applus\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"APplus integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"APplus APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"APplus un SkyPlanner APS: t\u012bmek\u013ca servisi, Business Integration Framework, BDE zi\u0146ojumi, datu kart\u0113\u0161ana, oper\u0101ciju datu atgrie\u0161ana un projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"APplus integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"APplus un SkyPlanner APS: t\u012bmek\u013ca servisi, Business Integration Framework, BDE zi\u0146ojumi, datu kart\u0113\u0161ana, oper\u0101ciju datu atgrie\u0161ana un projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/integracijas-celvedis\/","name":"APplus APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"APplus un SkyPlanner APS: t\u012bmek\u013ca servisi, Business Integration Framework, BDE zi\u0146ojumi, datu kart\u0113\u0161ana, oper\u0101ciju datu atgrie\u0161ana un projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai APplus: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/"},{"@type":"ListItem","position":5,"name":"APplus integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ APplus APplus integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 integr\u0101cijas ce\u013cved\u012b APplus partneriem un IT komand\u0101m ir izskaidrots, k\u0101 savienot APplus ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar APplus, izmantojot pa\u0161a Asseco saskarnes: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu APplus konfigur\u0101cijai&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107050","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=107050"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/107050\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106238"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=107050"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}