{"id":106992,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/psipenta\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/integracijas-celvedis\/","title":{"rendered":"PSIpenta integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ PSIpenta<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">PSIpenta integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 PSIpenta integr\u0101cijas ce\u013cved\u012b PSI partneriem un IT komand\u0101m izskaidrots, k\u0101 savienot PSIpenta\/ERP ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar PSIpenta, izmantojot pa\u0161a PSI saskarnes:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Uz SkyPlanner tiek p\u0101rs\u016bt\u012bti ra\u017eo\u0161anas pas\u016bt\u012bjumi (Fertigungsauftr\u00e4ge) ar to oper\u0101cij\u0101m (Arbeitsg\u00e4nge), tehnolo\u0123iskie mar\u0161ruti (Arbeitspl\u00e4ne), materi\u0101lu specifik\u0101cijas (St\u00fccklisten), darba centri, iek\u0101rtas, instrumenti (Betriebsmittel), kr\u0101jumi un iepirkuma pas\u016bt\u012bjumi.<\/li>\n\n\n<li>Katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un darba centrs tiek ierakst\u012bti atpaka\u013c ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101.<\/li>\n\n\n<li>Ja izv\u0113laties \u0161o iesp\u0113ju, operatoru darba laika ierakstus var nos\u016bt\u012bt atpaka\u013c k\u0101 BDE apstiprin\u0101jumus (R\u00fcckmeldungen).<\/li>\n\n\n<li>SkyPlanner ar webhook pazi\u0146ojumiem nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu PSIpenta videi un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c ekspluat\u0101cijas s\u0101k\u0161anas. \u0160is ce\u013cvedis paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties vai pa\u0161i veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"psipenta-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">PSIpenta integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>PSI pied\u0101v\u0101 tr\u012bs veidus, k\u0101 piesl\u0113gt \u0101r\u0113ju ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas sist\u0113mu (<a href=\"https:\/\/www.messe.de\/apollo\/hannover_messe_2020\/obs\/Binary\/A1002706\/1002706_02134036.pdf\">PSI bro\u0161\u016bra<\/a>):<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>PSIpenta\/ERP REST API.<\/strong> PSI nor\u0101da, ka PSIpenta\/ERP ir pieejamas REST un SOAP API saskarnes un ka visus PSIpenta komponentus var integr\u0113t eso\u0161aj\u0101 arhitekt\u016br\u0101, izmantojot RESTful t\u012bmek\u013ca pakalpojumus. \u0160is ir galvenais veids, k\u0101 nolas\u012bt ra\u017eo\u0161anas datus un ierakst\u012bt pl\u0101notos datumus.<\/li>\n\n\n<li><strong>PSIpenta\/BDE REST un SOAP API.<\/strong> Ra\u017eo\u0161anas datu uzskaites modulim ir sava API saskarne. To izmanto operatoru apstiprin\u0101jumu nos\u016bt\u012b\u0161anai.<\/li>\n\n\n<li><strong>PSIintegration.<\/strong> PSI standarta integr\u0101cijas sl\u0101nis PSIpenta modu\u013cu savieno\u0161anai. Tas darbojas p\u0113c centrmezgla principa, \u013cauj grafiski kart\u0113t zi\u0146ojumus adapteros un arhiv\u0113 katru zi\u0146ojumu datub\u0101z\u0113. Izmantojiet to, ja j\u016bsu vid\u0113 \u0101r\u0113j\u0101s sist\u0113mas jau ir piesl\u0113gtas ar t\u0101 starpniec\u012bbu.<\/li>\n\n<\/ol>\n\n\n<p>PSIpenta\/ERP 10 pied\u0101v\u0101 BPMN 2.0 darbpl\u016bsmas \u0101r\u0113jo sist\u0113mu integr\u0113\u0161anai; t\u0101s veido t\u012bmek\u013ca r\u012bk\u0101 Workflow Developer (<a href=\"https:\/\/www.psi.de\/en\/trends\/article\/psipenta-erp-10-from-software-upgrade-to-competitve-advantage\">PSI<\/a>). Darbpl\u016bsma var rea\u0123\u0113t uz izmai\u0146\u0101m PSIpenta un izsaukt SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un piek\u013cuve<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>PSIpenta pus\u0113.<\/strong> Integr\u0101cija darbojas ar \u012bpa\u0161i tai izveidotu tehnisko lietot\u0101ju, kura ties\u012bbas attiecas tikai uz nolas\u0101majiem un ierakst\u0101majiem objektiem. J\u016bsu PSI partneris izveido lietot\u0101ju un konfigur\u0113 API piek\u013cuvi j\u016bsu vid\u0113.<\/li>\n\n\n<li><strong>T\u012bkls.<\/strong> PSIpenta parasti darbojas uz\u0146\u0113muma lok\u0101laj\u0101 infrastrukt\u016br\u0101. Integr\u0101cija tai piek\u013c\u016bst j\u016bsu IT komandas at\u013cautaj\u0101 veid\u0101, piem\u0113ram, izmantojot public\u0113tu API galapunktu vai nelielu savienot\u0101jprogrammu j\u016bsu t\u012bkl\u0101.<\/li>\n\n\n<li><strong>SkyPlanner pus\u0113.<\/strong> REST API autentifik\u0101cijai izmanto API pilnvaru, kas izveidota sada\u013c\u0101 Settings &gt; API un tiek nos\u016bt\u012bta galven\u0113 <code>Authorization-Token<\/code>. API dokument\u0101cija ir pieejama Swagger\/OpenAPI form\u0101t\u0101, savuk\u0101rt <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim izskaidroti pirmie izsaukumi.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodisk\u0101 aptauja<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>PSIpenta pus\u0113 integr\u0101cija periodiski pieprasa no REST API datus par atv\u0113rtajiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem un jaun\u0101kaj\u0101m izmai\u0146\u0101m. Alternat\u012bvi izmai\u0146as uz SkyPlanner nos\u016bta BPMN darbpl\u016bsma vai PSIintegration zi\u0146ojums. Bie\u017eumu nosaka katrai ra\u017eotnei atsevi\u0161\u0137i: no da\u017eu min\u016b\u0161u interv\u0101la pas\u016bt\u012bjumiem l\u012bdz stundas interv\u0101lam kr\u0101jumiem.<\/p>\n\n\n<p>Kad main\u0101s st\u0101voklis vai grafiks, SkyPlanner nos\u016bta webhook pazi\u0146ojumus, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c aktiviz\u0113 notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>PSIpenta objekts<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Artikuli (Artikel), m\u0113rvien\u012bbas<\/td><td>Produkti un materi\u0101li<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam periodisk\u0101 aptauja<\/td><\/tr><tr><td>Daudzl\u012bme\u0146u materi\u0101lu specifik\u0101cijas (St\u00fccklisten)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Tehnolo\u0123iskie mar\u0161ruti (Arbeitspl\u00e4ne) ar oper\u0101cij\u0101m, sagatavo\u0161anas un izpildes laikiem<\/td><td>Procesa so\u013ci ar ilgumu, sagatavo\u0161anas un nosl\u0113guma darbu laikiem<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Darba centri (Arbeitspl\u00e4tze) un iek\u0101rtas<\/td><td>Darba centri, darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, v\u0113l\u0101k \u2014 reti<\/td><\/tr><tr><td>Instrumenti un pal\u012bgier\u012bces (Betriebsmittel)<\/td><td>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 mainoties datiem<\/td><\/tr><tr><td>Mai\u0146u kalend\u0101ri<\/td><td>Mai\u0146as un br\u012bvdienas<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Katru dienu vai atsevi\u0161\u0137a mai\u0146u uztur\u0113\u0161ana SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumi (Fertigungsauftr\u00e4ge) ar oper\u0101cij\u0101m un materi\u0101liem<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Periodisk\u0101 aptauja ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Noliktav\u0101 eso\u0161ie kr\u0101jumi<\/td><td>Kr\u0101jumu atlikumi<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Aptauja reizi stund\u0101 vai grafika sast\u0101d\u012b\u0161anas laik\u0101<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumi (Bestellungen) ar pieg\u0101des datumiem<\/td><td>Iepirkuma pas\u016bt\u012bjumi, ien\u0101ko\u0161ie materi\u0101li p\u0113c pieg\u0101des datuma<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Aptauja reizi stund\u0101 vai grafika sast\u0101d\u012b\u0161anas laik\u0101<\/td><\/tr><tr><td>Katras ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas pl\u0101notais s\u0101kums, beigas un darba centrs<\/td><td>Katra ra\u017eo\u0161anas uzdevuma s\u0101kums un beigas grafik\u0101<\/td><td>SkyPlanner \u2192 PSIpenta<\/td><td>Mainoties grafikam, ar SkyPlanner webhook pazi\u0146ojumu<\/td><\/tr><tr><td>BDE apstiprin\u0101jumi (R\u00fcckmeldungen): laiks un daudzums katrai oper\u0101cijai, darbinieks<\/td><td>Darba laika ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 PSIpenta<\/td><td>Ar katru apstiprin\u0101jumu vai reizi mai\u0146\u0101, ja \u0161\u012b iesp\u0113ja izv\u0113l\u0113ta<\/td><\/tr><tr><td>SkyPlanner grafiku sast\u0101d\u012b\u0161anas noteikumi<\/td><td>Sagatavo\u0161anas laiku matrica, operatoru skaits katram ra\u017eo\u0161anas uzdevumam, alternat\u012bv\u0101s iek\u0101rtas un person\u0101ls<\/td><td>Tiek uztur\u0113ts SkyPlanner<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas scen\u0101riji<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet deta\u013cas, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, darba centrus, iek\u0101rtas, Betriebsmittel un kalend\u0101rus, izmantojot PSIpenta\/ERP REST API. P\u0101rdom\u0101ti nosakiet darba centru atbilst\u012bbu: darba centrs ar \u010detr\u0101m iek\u0101rt\u0101m k\u013c\u016bst par vienu darba centru grupu vai \u010detriem darba centriem.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet izpildei nodotos ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m un materi\u0101liem, k\u0101 ar\u012b atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. SkyPlanner uzskata pas\u016bt\u012btos materi\u0101lus par pieejamiem iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered. Iepirkuma priek\u0161likumi paliek PSIpenta, l\u012bdz tie k\u013c\u016bst par pas\u016bt\u012bjumiem.<\/p>\n\n\n<p><strong>3. Grafika datu atpaka\u013cierakste.<\/strong> Kad pl\u0101no\u0161anas dzinis iepl\u0101no vai p\u0101rvieto oper\u0101ciju, SkyPlanner webhook pazi\u0146ojums aktiviz\u0113 PSIpenta\/ERP REST API izsaukumu. Tas ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101 atjaunina attiec\u012bg\u0101s oper\u0101cijas pl\u0101noto s\u0101kumu, pl\u0101not\u0101s beigas un darba centru. Pas\u016bt\u012bjuma datumus nosaka t\u0101 oper\u0101ciju datumi. J\u016bsu videi nepiecie\u0161amos resursus un laukus nosaka ievie\u0161anas tv\u0113ruma noteik\u0161anas laik\u0101.<\/p>\n\n\n<p><strong>4. Ra\u017eo\u0161anas izpildes apstiprin\u0101jumi.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un darba laika ieraksti uztur grafiku aktu\u0101lu. J\u016bs izv\u0113laties, vai faktisko laiku nos\u016bt\u012bt atpaka\u013c. Ja \u0161o iesp\u0113ju izmantojat, katras oper\u0101cijas laiks un daudzums tiek nos\u016bt\u012bts k\u0101 BDE apstiprin\u0101jums, izmantojot PSIpenta\/BDE API. Ja turpin\u0101t izmantot BDE termin\u0101\u013cus, SkyPlanner t\u0101 viet\u0101 nolasa apstiprin\u0101jumus no PSIpenta.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms ekspluat\u0101cijas s\u0101k\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Deta\u013cas, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, daudzumi, pas\u016bt\u012bjuma statuss<\/td><td>PSIpenta<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiks, iek\u0101rtu pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sagatavo\u0161anas laiku matrica, operatoru skaits, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Betriebsmittel pamatdati<\/td><td>PSIpenta; pieejam\u012bbu laika gait\u0101 pl\u0101no SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Apstiprin\u0101jumi, materi\u0101lu izsnieg\u0161ana un sa\u0146em\u0161ana<\/td><td>PSIpenta; datus ievada tur vai nos\u016bta no SkyPlanner darba laika ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas ieraksta oper\u0101ciju datumus. Ja ar\u012b Leitstand, Adaptive Planung vai MES Scheduling nosaka pl\u0101notos datumus, atsp\u0113jojiet \u0161o funkciju pas\u016bt\u012bjumiem, kuru grafikus sast\u0101da SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Integr\u0101ciju parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas s\u0101kuma. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot no PSIpenta CSV vai Excel form\u0101t\u0101 eksport\u0113tos darba centrus, tehnolo\u0123iskos mar\u0161rutus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu kart\u0113\u0161ana.<\/strong> Apstipriniet datu atbilst\u012bbas tabulu, atbild\u012bbu par datiem, sinhroniz\u0101cijas bie\u017eumu un to, vai apstiprin\u0101jumus nos\u016bt\u012bs atpaka\u013c.<\/li>\n\n\n<li><strong>Piek\u013cuve PSIpenta.<\/strong> Izveidojiet tehnisko lietot\u0101ju, kop\u0101 ar PSI partneri aktiviz\u0113jiet API piek\u013cuves ce\u013cus un vispirms p\u0101rbaudiet tos testa vid\u0113.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Deta\u013cas, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, darba centri, iek\u0101rtas, Betriebsmittel, kalend\u0101ri.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Periodiski datu piepras\u012bjumi ar filtriem, dal\u012bjumu lap\u0101s un atk\u0101rtotiem m\u0113\u0123in\u0101jumiem vai darbpl\u016bsmu aktiviz\u0113ti zi\u0146ojumi.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu konfigur\u0113\u0161ana SkyPlanner.<\/strong> Sagatavo\u0161anas laiku matrica, instrumenti, katram ra\u017eo\u0161anas uzdevumam nepiecie\u0161amais operatoru skaits un alternat\u012bvas iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika datu atpaka\u013cierakste.<\/strong> Oper\u0101ciju datumi no SkyPlanner webhook pazi\u0146ojumiem, k\u0101 ar\u012b BDE apstiprin\u0101jumi, ja izv\u0113laties \u0161o iesp\u0113ju.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Darbiniet SkyPlanner paral\u0113li pa\u0161reiz\u0113jam pl\u0101nam, sal\u012bdziniet datumus un izlabojiet pamatdatus.<\/li>\n\n\n<li><strong>Ekspluat\u0101cijas s\u0101k\u0161ana.<\/strong> Iesl\u0113dziet atpaka\u013cieraksti, kad dati sakr\u012bt.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-psipenta-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot PSIpenta integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Izmantotie modu\u013ci.<\/strong> P\u0101rbaudiet, kuri PSI pl\u0101no\u0161anas modu\u013ci ir licenc\u0113ti un darbojas. Katram modulim, kas ieraksta datumus, vajadz\u012bgs skaidrs noteikums.<\/li>\n\n\n<li><strong>Darba centrs vai iek\u0101rta.<\/strong> Izlemiet, vai SkyPlanner sast\u0101da grafikus darba centru vai iek\u0101rtu l\u012bmen\u012b, un iev\u0113rojiet \u0161o izv\u0113li abos datu apmai\u0146as virzienos.<\/li>\n\n\n<li><strong>Betriebsmittel.<\/strong> Pal\u012bgier\u012bces un instrumenti no Betriebsmittel saraksta SkyPlanner k\u013c\u016bst par instrumentiem ar ierobe\u017eotu pieejam\u012bbu, t\u0101p\u0113c oper\u0101cijai tiek rezerv\u0113ts ar\u012b t\u0101s instruments.<\/li>\n\n\n<li><strong>Sagatavo\u0161anas un izpildes laika m\u0113rvien\u012bbas.<\/strong> Import\u0113jot p\u0101rr\u0113\u0137iniet sagatavo\u0161anas un izpildes laikus, izmantojot pareiz\u0101s m\u0113rvien\u012bbas un apr\u0113\u0137ina b\u0101zi, cit\u0101di visi ilgumi b\u016bs nepareizi.<\/li>\n\n\n<li><strong>\u0100rpakalpojumu oper\u0101cijas.<\/strong> Apak\u0161uz\u0146\u0113m\u0113jiem nodot\u0101s oper\u0101cijas pat\u0113r\u0113 laiku, nevis j\u016bsu jaudu. Model\u0113jiet t\u0101s k\u0101 so\u013cus, kuriem nosaka tikai ilgumu.<\/li>\n\n\n<li><strong>S\u0101kt\u0101s oper\u0101cijas.<\/strong> Pirms katras grafika p\u0101rr\u0113\u0137in\u0101\u0161anas nolasiet izpildes gaitu no apstiprin\u0101jumiem, lai grafiks balst\u012btos uz jau paveikto. P\u0113c tam Running Time Lock fiks\u0113 tuv\u0101kaj\u0101s stund\u0101s paredz\u0113tos ra\u017eo\u0161anas uzdevumus.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-psipenta-integra\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 PSIpenta integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina t\u0101s atbalstu p\u0113c ekspluat\u0101cijas s\u0101k\u0161anas,<\/strong> aptverot saska\u0146otos API izsaukumus un zi\u0146ojumus. Katr\u0101 ra\u017eotn\u0113 PSIpenta izmanto cit\u0101di, un konfigur\u0101cij\u0101 tiek \u0146emtas v\u0113r\u0101 \u0161\u012bs \u012bpatn\u012bbas.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b j\u016bsu PSI partneris.<\/strong> Partneris p\u0101rzina j\u016bsu modu\u013cus, piel\u0101gotos laukus un PSIintegration konfigur\u0101ciju un kop\u0101 ar SkyPlanner komandu var nodro\u0161in\u0101t API piek\u013cuvi.<\/li>\n\n\n<li><strong>Ar\u012b j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus,<\/strong> izmantojot SkyPlanner REST API un API pilnvaru. Lai s\u0101ktu darbu, pietiek ar API pilnvaru, un vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz SkyPlanner komanda. Dokument\u0101cija pieejama sada\u013c\u0101 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un nor\u0113\u0137inoties katru m\u0113nesi. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavo iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar izv\u0113l\u0113to pl\u0101nu. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/integracija\/erp\/psipenta\/razosanas-planosana\/\">PSIpenta ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu<\/a>, <a href=\"\/lv\/integracija\/erp\/psipenta\/\">PSIpenta lapu<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju p\u0101rskatu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda l\u012bdz ra\u017eo\u0161anas l\u012bnijai non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner sniedz mums p\u0101rskatu par jaudu un padara pl\u0101no\u0161anu paredzamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko produktu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums ir bijis 100% vis\u0101 SkyPlanner lieto\u0161anas laik\u0101 \u2014 kop\u0161 2021. gada.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner v\u0113rt\u012bba mums ir t\u0101, ka tas ir r\u012bks, kas darbojas ikdien\u0101, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska slodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir strauji samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai PSIpenta ir API darbam ar ra\u017eo\u0161anas pas\u016bt\u012bjumiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. PSI nor\u0101da, ka PSIpenta\/ERP un PSIpenta\/BDE ir REST un SOAP API un ka visus PSIpenta komponentus var integr\u0113t, izmantojot RESTful t\u012bmek\u013ca pakalpojumus. PSIintegration nodro\u0161ina papildu integr\u0101cijas sl\u0101ni zi\u0146ojumu apmai\u0146ai starp modu\u013ciem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c PSIpenta?<\/summary>\n<p class=\"sp-faq__a\">Izmantojot PSIpenta\/ERP REST API. Ikreiz, kad grafiks main\u0101s, SkyPlanner webhook ierosina pl\u0101not\u0101 s\u0101kuma, pl\u0101noto beigu un darba centra atjaunin\u0101\u0161anu katrai ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner var nos\u016bt\u012bt izpildes apstiprin\u0101jumus uz PSIpenta BDE?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, ja izv\u0113laties \u0161\u0101du risin\u0101jumu. Operatoru darba laika ieraksti no SkyPlanner tiek nos\u016bt\u012bti caur PSIpenta\/BDE API k\u0101 BDE izpildes apstiprin\u0101jumi, nor\u0101dot katras oper\u0101cijas laiku un daudzumu. Savuk\u0101rt r\u016bpn\u012bc\u0101s, kur\u0101s saglab\u0101 BDE termin\u0101\u013cus, SkyPlanner nolasa \u0161os apstiprin\u0101jumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ko PSI partnerim vajadz\u0113tu ieteikt \u2014 PSIpenta Leitstand vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner \u2014 ja klients v\u0113las da\u017eu ned\u0113\u013cu laik\u0101 ieviest ra\u017eo\u0161anas pl\u0101no\u0161anu ar praktiski izmantojamu grafiku, kur\u0101 \u0146emta v\u0113r\u0101 faktisk\u0101 iek\u0101rtu un darbinieku jauda. Leitstand, Adaptive Planung un MES Scheduling ir atsevi\u0161\u0137i PSI modul\u0101r\u0101 produkta modu\u013ci (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\">PSI<\/a>). SkyPlanner savienojas caur PSIpenta\/ERP un BDE API, autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as, un pl\u0101no p\u0101rstat\u012b\u0161anu, instrumentus, brig\u0101des un materi\u0101lus. Lietot\u0101ju skaits nav ierobe\u017eots, un cena ir no 199 \u20ac m\u0113nes\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai integr\u0101cijai ir nepiecie\u0161ams PSIpenta\/MES?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner savienojas ar PSIpenta\/ERP un izpildes apstiprin\u0101jumu apmai\u0146ai \u2014 ar PSIpenta\/BDE. Operatori var re\u0123istr\u0113t paveikto darbu SkyPlanner t\u0101lrun\u012b vai plan\u0161etdator\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem, import\u0113t datus no PSIpenta CSV vai Excel form\u0101t\u0101 un lietot visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101kt izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ PSIpenta PSIpenta integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 PSIpenta integr\u0101cijas ce\u013cved\u012b PSI partneriem un IT komand\u0101m izskaidrots, k\u0101 savienot PSIpenta\/ERP ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar PSIpenta, izmantojot pa\u0161a PSI saskarnes: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu PSIpenta videi &#8230; <a title=\"PSIpenta integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/integracijas-celvedis\/\" aria-label=\"Read more about PSIpenta integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106209,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106992","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>PSIpenta APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Savienojiet PSIpenta ar SkyPlanner APS: PSIpenta\/ERP REST API, PSIintegration, BDE apstiprin\u0101jumi, datu kart\u0113\u0161ana, oper\u0101ciju atpaka\u013cierakste un projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PSIpenta integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienojiet PSIpenta ar SkyPlanner APS: PSIpenta\/ERP REST API, PSIintegration, BDE apstiprin\u0101jumi, datu kart\u0113\u0161ana, oper\u0101ciju atpaka\u013cierakste un projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/psipenta\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/psipenta\\\/integracijas-celvedis\\\/\",\"name\":\"PSIpenta APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Savienojiet PSIpenta ar SkyPlanner APS: PSIpenta\\\/ERP REST API, PSIintegration, BDE apstiprin\u0101jumi, datu kart\u0113\u0161ana, oper\u0101ciju atpaka\u013cierakste un projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/psipenta\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/psipenta\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/psipenta\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai PSIpenta: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/psipenta\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"PSIpenta integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"PSIpenta APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Savienojiet PSIpenta ar SkyPlanner APS: PSIpenta\/ERP REST API, PSIintegration, BDE apstiprin\u0101jumi, datu kart\u0113\u0161ana, oper\u0101ciju atpaka\u013cierakste un projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"PSIpenta integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienojiet PSIpenta ar SkyPlanner APS: PSIpenta\/ERP REST API, PSIintegration, BDE apstiprin\u0101jumi, datu kart\u0113\u0161ana, oper\u0101ciju atpaka\u013cierakste un projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/integracijas-celvedis\/","name":"PSIpenta APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Savienojiet PSIpenta ar SkyPlanner APS: PSIpenta\/ERP REST API, PSIintegration, BDE apstiprin\u0101jumi, datu kart\u0113\u0161ana, oper\u0101ciju atpaka\u013cierakste un projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai PSIpenta: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/"},{"@type":"ListItem","position":5,"name":"PSIpenta integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ PSIpenta PSIpenta integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 PSIpenta integr\u0101cijas ce\u013cved\u012b PSI partneriem un IT komand\u0101m izskaidrots, k\u0101 savienot PSIpenta\/ERP ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar PSIpenta, izmantojot pa\u0161a PSI saskarnes: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu PSIpenta videi&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106992","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106992"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106992\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106209"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106992"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}