{"id":106934,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/","title":{"rendered":"QAD Adaptive ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">QAD Adaptive ERP integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 QAD Adaptive ERP integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot QAD Adaptive ERP, tostarp agr\u0101k\u0101s QAD Enterprise Edition un MFG\/PRO instal\u0101cijas, ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar QAD Adaptive ERP, izmantojot pa\u0161a QAD saskarnes:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas, artikulus, produktu strukt\u016bras, tehnolo\u0123iskos procesus, darba centrus, ra\u017eotnes kalend\u0101rus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Grafik\u0101 noteiktie palai\u0161anas un izpildes termi\u0146i tiek nos\u016bt\u012bti atpaka\u013c uz Work Order Maintenance (16.1).<\/li>\n\n\n<li>Operatoru darba laika ieraksti tiek nos\u016bt\u012bti atpaka\u013c uz Labor Feedback by Work Order (16.20.1), bet sara\u017eotie daudzumi \u2014 uz Work Order Receipt (16.11).<\/li>\n\n\n<li>SkyPlanner webhook pazi\u0146ojumi nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu QAD videi un sniedz atbalstu ar\u012b p\u0113c darba s\u0101k\u0161anas. \u0160is ce\u013cvedis paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties integr\u0101cij\u0101 vai pa\u0161i izstr\u0101d\u0101t risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QAD integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QAD pied\u0101v\u0101 tr\u012bs veidus, k\u0101 piesl\u0113gt \u0101r\u0113ju grafiku sast\u0101d\u012b\u0161anas sist\u0113mu:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QAD QXtend Inbound (QXI).<\/strong> QAD to raksturo \u0161\u0101di: &#8220;a Web services-based, SOAP-compliant, XML framework, enabling complete platform-independent access to QAD Enterprise Applications business functionality.&#8221; (XML ietvars, kas balst\u012bts uz t\u012bmek\u013ca pakalpojumiem, atbilst SOAP un nodro\u0161ina piln\u012bgu, no platformas neatkar\u012bgu piek\u013cuvi QAD Enterprise Applications biznesa funkcij\u0101m.) Katrs piepras\u012bjums ir <strong>QDoc<\/strong>, kas izpilda QAD programmu ar t\u0101d\u0101m pa\u0161\u0101m datu p\u0101rbaud\u0113m k\u0101 t\u0101s ekr\u0101nform\u0101, un uz katru piepras\u012bjumu tiek sa\u0146emts atbildes QDoc. Pieejamo QDoc vid\u016b ir <code>maintainItemMaster<\/code>, <code>maintainRouting<\/code> un <code>maintainPurchaseOrder<\/code>. Programm\u0101m, kur\u0101m nav gatava QDoc, QAD r\u012bks <strong>QGen<\/strong> izveido izv\u0113lnes programmas kart\u0113jumu: &#8220;QGen is used to map custom programs or QAD Enterprise Applications programs that do not have released QDoc schemas and events files.&#8221; (QGen izmanto piel\u0101gotu programmu vai t\u0101du QAD Enterprise Applications programmu kart\u0113\u0161anai, kur\u0101m nav pieejamu QDoc sh\u0113mu un notikumu failu.) Ar\u012b pats QAD izmanto \u0161o pieeju: &#8220;QAD Production Scheduler uses QAD QXtend to update work orders.&#8221; (QAD Production Scheduler izmanto QAD QXtend ra\u017eo\u0161anas pas\u016bt\u012bjumu atjaunin\u0101\u0161anai.) (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/2370949\/Qxtend_UG_v0110.pdf\/093456b1-c885-de26-7e61-754987199fa7?t=1634559415409&amp;download=true\">QXtend ce\u013cvedis<\/a>)<\/li>\n\n\n<li><strong>QAD QXtend Outbound (QXO).<\/strong> QXO &#8220;exports user-configurable business objects as XML QDocs out of QAD products.&#8221; (eksport\u0113 lietot\u0101ja konfigur\u0113jamus biznesa objektus no QAD produktiem XML QDoc form\u0101t\u0101.) Standarta biznesa objekti ir Item, Product Structure, Routing, Work Center, Department, Inventory Transaction un Inventory Status.<\/li>\n\n\n<li><strong>Biznesa dokumentu REST API.<\/strong> S\u0101kot ar Adaptive ERP 2022.1, &#8220;Query REST APIs are now available for business documents,&#8221; (biznesa dokumentiem ir pieejami vaic\u0101jumu REST API) ar filtr\u0113\u0161anu, k\u0101rto\u0161anu, dal\u012b\u0161anu lap\u0101s un da\u013c\u0113ju datu atlasi. \u0160o API dokument\u0101cija ir pieejama Swagger j\u016bsu ERP instanc\u0113 (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/159231649\/QAD_Adaptive_ERP_Web_UI_RN_v2022_1.pdf\/602f6b29-ef47-decd-4825-127b06b25b16?t=1670945442202&amp;download=true\">versijas piez\u012bmes<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>Datu ierakst\u012b\u0161anu nodro\u0161ina QXtend. Datu las\u012b\u0161anu nodro\u0161ina QXO un vaic\u0101jumu REST API.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un licenc\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>QXtend Inbound.<\/strong> Ja sa\u0146\u0113m\u0113jam ir iesl\u0113gts Require Authentication, katrs QDoc ietver Session ID vai QAD lietot\u0101jv\u0101rdu un paroli. Pirms programmas izpildes QXI p\u0101rbauda lietot\u0101ja piek\u013cuves ties\u012bbas izv\u0113lnei.<\/li>\n\n\n<li><strong>Integr\u0101cijas lietot\u0101js.<\/strong> Izveidojiet atsevi\u0161\u0137u QAD lietot\u0101ju ar piek\u013cuvi tikai t\u0101m izv\u0113lnes programm\u0101m, kuras izsauc integr\u0101cija: Work Order Maintenance, Labor Feedback by Work Order, Work Order Receipt un pamatdatu programm\u0101m.<\/li>\n\n\n<li><strong>QXtend licence.<\/strong> QXtend licenc\u0113 atbilsto\u0161i a\u0123entu un sa\u0146\u0113m\u0113ju skaitam. QAD ce\u013cved\u012b nor\u0101d\u012bts, ka t\u012bmek\u013ca pakalpojumu datu apmai\u0146a ar \u0101r\u0113ju lietotni nav bezmaksas, t\u0101p\u0113c p\u0101rbaudiet QXtend licenci pirms projekta s\u0101kuma.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru galven\u0113 <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API). API ir dokument\u0113ts Swagger\/OpenAPI. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim izskaidroti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-change-data\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un datu izmai\u0146as<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QXtend Outbound ir QAD meh\u0101nisms datu izmai\u0146u apstr\u0101dei. &#8220;A change occurs to watched data in QAD Enterprise Applications. Change notifications are written out to the qxevents database.&#8221; (QAD Enterprise Applications uzraudz\u012btajos datos notiek izmai\u0146as. Pazi\u0146ojumi par izmai\u0146\u0101m tiek ierakst\u012bti qxevents datub\u0101z\u0113.) P\u0113c tam QXO izveido QDoc un nog\u0101d\u0101 tos &#8220;to a directory location where the subscriber polls for and picks up new QDocs,&#8221; (uz direktoriju, kuru abonents periodiski p\u0101rbauda un no kuras sa\u0146em jaunos QDoc) vai t\u012bmek\u013ca pakalpojumam, kas sa\u0146em piepras\u012bjumus nor\u0101d\u012btaj\u0101 URL.<\/p>\n\n\n<p>SkyPlanner k\u0101 t\u012bmek\u013ca pakalpojums abon\u0113 QXO public\u0113tos datus, bet p\u0101r\u0113jos datus periodiski pieprasa caur vaic\u0101jumu REST API. Work Order nav standarta QXO biznesa objektu vid\u016b, t\u0101p\u0113c integr\u0101cij\u0101 vai nu pievieno QXO biznesa objektu ra\u017eo\u0161anas pas\u016bt\u012bjumu tabul\u0101m (<code>wo_mstr<\/code>, <code>wr_route<\/code>), vai ar\u012b ik p\u0113c da\u017e\u0101m min\u016bt\u0113m pieprasa ra\u017eo\u0161anas pas\u016bt\u012bjumus caur vaic\u0101jumu REST API.<\/p>\n\n\n<p>Kad main\u0101s statuss vai grafiks, SkyPlanner nos\u016bta t\u012bmek\u013ca aiz\u0137eres pazi\u0146ojumu, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c QAD ierosina notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>QAD objekts (programma, saskarne)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Artikuli (Item Master Maintenance 1.4.1; QXO Item)<\/td><td>Produkti un materi\u0101li<\/td><td>QAD \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101 caur QXO<\/td><\/tr><tr><td>Produktu strukt\u016bras (13.5; QXO Product Structure)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>QAD \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101 caur QXO<\/td><\/tr><tr><td>Tehnolo\u0123iskie procesi (14.13.1; QXO Routing): laiks rind\u0101, sagatavo\u0161anas, izpildes, gaid\u012b\u0161anas un p\u0101rvieto\u0161anas laiks<\/td><td>Procesa so\u013ci ar ilgumu, sagatavo\u0161anas un nosl\u0113guma darbu laiku<\/td><td>QAD \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101 caur QXO<\/td><\/tr><tr><td>Darba centri (14.5) un noda\u013cas (14.1; QXO Work Center, Department)<\/td><td>Darba centri, darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>QAD \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam reti<\/td><\/tr><tr><td>Ra\u017eotnes un darba centru kalend\u0101ri<\/td><td>Mai\u0146as un br\u012bvdienas<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Katru dienu vai atsevi\u0161\u0137i uztur\u0113tas mai\u0146as SkyPlanner sist\u0113m\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumi (16.1) ar to tehnolo\u0123iskajiem procesiem (16.13.13) un komponentiem<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Piel\u0101gots QXO objekts vai REST piepras\u012bjumi ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Kr\u0101jumi (QXO Inventory Status, Inventory Transaction)<\/td><td>Kr\u0101jumu atlikumi<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Izmai\u0146u gad\u012bjum\u0101 vai reizi stund\u0101<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumi ar pieg\u0101des termi\u0146iem<\/td><td>Iepirkuma pas\u016bt\u012bjumi, ien\u0101ko\u0161ie materi\u0101li p\u0113c pieg\u0101des datuma<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Piepras\u012bjumi reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumu palai\u0161anas un izpildes termi\u0146i (Work Order Maintenance 16.1, QXtend Inbound QDoc)<\/td><td>Katra pas\u016bt\u012bjuma pl\u0101notais s\u0101kums un beigas<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Mainoties grafikam, ar SkyPlanner webhook pal\u012bdz\u012bbu<\/td><\/tr><tr><td>Labor Feedback by Work Order (16.20.1): katras oper\u0101cijas sagatavo\u0161anas un izpildes laiks<\/td><td>Laika uzskaites ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 QAD<\/td><td>P\u0113c katra apstiprin\u0101juma vai reizi mai\u0146\u0101, ja izv\u0113l\u0113ta \u0161\u0101da nos\u016bt\u012b\u0161ana<\/td><\/tr><tr><td>Work Order Receipt (16.11)<\/td><td>Sara\u017eotie daudzumi<\/td><td>SkyPlanner \u2192 QAD<\/td><td>P\u0113c katra apstiprin\u0101juma, ja izv\u0113l\u0113ta \u0161\u0101da nos\u016bt\u012b\u0161ana<\/td><\/tr><tr><td>QAD nav<\/td><td>Sagatavo\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, alternat\u012bvas iek\u0101rtas un person\u0101ls<\/td><td>Uztur SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet artikulus, produktu strukt\u016bras, tehnolo\u0123iskos procesus, darba centrus un kalend\u0101rus caur QXO vai vaic\u0101jumu REST API. R\u016bp\u012bgi nosakiet darba centru atbilst\u012bbu: darba centrs ar \u010detr\u0101m iek\u0101rt\u0101m k\u013c\u016bst par vienu darba centru grupu vai \u010detriem darba centriem. Ar\u012b atk\u0101rtot\u0101s ra\u017eo\u0161anas l\u012bnijas no Production Line Maintenance var att\u0113lot k\u0101 darba centrus.<\/p>\n\n\n<p><strong>2. Ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet apstiprin\u0101tos pl\u0101notos un ra\u017eo\u0161an\u0101 palaistos pas\u016bt\u012bjumus kop\u0101 ar to tehnolo\u0123iskajiem procesiem un komponentiem, k\u0101 ar\u012b atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjum\u0101 nor\u0101d\u012btaj\u0101 pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad iepirkuma pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered.<\/p>\n\n\n<p>Sast\u0101diet grafikus ra\u017eo\u0161anas pas\u016bt\u012bjumiem, nevis MRP pl\u0101notajiem pas\u016bt\u012bjumiem. Vispirms QAD sist\u0113m\u0101 pl\u0101notajiem pas\u016bt\u012bjumiem j\u0101k\u013c\u016bst par apstiprin\u0101tiem pl\u0101notiem vai ra\u017eo\u0161an\u0101 palaistiem pas\u016bt\u012bjumiem.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c QAD.<\/strong> Kad pl\u0101no\u0161anas dzin\u0113js ievieto vai p\u0101rvieto pas\u016bt\u012bjumu grafik\u0101, SkyPlanner t\u012bmek\u013ca aiz\u0137ere ierosina QXtend Inbound QDoc izpildi programm\u0101 Work Order Maintenance (16.1). Palai\u0161anas datums tiek iestat\u012bts atbilsto\u0161i pirmajai grafik\u0101 iepl\u0101notajai oper\u0101cijai, bet izpildes termi\u0146\u0161 \u2014 p\u0113d\u0113jai. QXtend izpilda programmu ar pa\u0161a QAD datu p\u0101rbaud\u0113m un atgrie\u017e atbildes QDoc, kuru p\u0101rbauda integr\u0101cija.<\/p>\n\n\n<p>Katras iek\u0101rtas oper\u0101ciju sec\u012bba paliek SkyPlanner, un operatori to sa\u0146em caur Mobile Confirmations. T\u0101d\u0113j\u0101di integr\u0101ciju neietekm\u0113 QAD aizliegums main\u012bt tehnolo\u0123isko procesu ra\u017eo\u0161an\u0101 palaistiem pas\u016bt\u012bjumiem.<\/p>\n\n\n<p><strong>4. Apstiprin\u0101jumi no ra\u017eotnes.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un darba laika ieraksti uztur grafiku aktu\u0101lu. J\u016bs izv\u0113laties, vai faktiskos darba laikus nos\u016bt\u012bt atpaka\u013c uz QAD. Ja izv\u0113laties tos nos\u016bt\u012bt, katras oper\u0101cijas sagatavo\u0161anas un izpildes laiks non\u0101k Labor Feedback by Work Order, bet sara\u017eotie daudzumi \u2014 Work Order Receipt. Pret\u0113j\u0101 gad\u012bjum\u0101 darba laiku ievada QAD t\u0101pat k\u0101 l\u012bdz \u0161im.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms darba s\u0101k\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Artikuli, produktu strukt\u016bras, tehnolo\u0123iskie procesi, daudzumi, ra\u017eo\u0161anas pas\u016bt\u012bjumu statuss<\/td><td>QAD<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiki, iek\u0101rtu pie\u0161\u0137\u012brums<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumu palai\u0161anas un izpildes termi\u0146i<\/td><td>SkyPlanner ieraksta, QAD glab\u0101<\/td><\/tr><tr><td>Sagatavo\u0161anas laiku matrica, pras\u012bbas attiec\u012bb\u0101 uz instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Darba laiks, komponentu izsnieg\u0161ana un sara\u017eot\u0101s produkcijas sa\u0146em\u0161ana<\/td><td>QAD; datus ievada tur vai nos\u016bta no SkyPlanner darba laika ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas ieraksta ra\u017eo\u0161anas pas\u016bt\u012bjumu datumus. SkyPlanner darb\u012bbai nav vajadz\u012bgs QAD grafiku sast\u0101d\u012b\u0161anas modulis. Pas\u016bt\u012bjumiem, kuru grafikus sast\u0101da SkyPlanner, datumus ieraksta SkyPlanner, aizst\u0101jot grafiku sast\u0101d\u012b\u0161anas darbvietas vai citas pl\u0101no\u0161anas sist\u0113mas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Projekta galvenie posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot no QAD CSV vai Excel form\u0101t\u0101 eksport\u0113tus darba centrus, tehnolo\u0123iskos procesus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu kart\u0113\u0161ana.<\/strong> Apstipriniet datu kart\u0113\u0161anas tabulu, atbild\u012bbas noteikumus, tv\u0113rum\u0101 iek\u013caut\u0101s ra\u017eotnes un dom\u0113nus, sinhroniz\u0101cijas bie\u017eumu un to, vai darba laika datus nos\u016bt\u012bs atpaka\u013c uz QAD.<\/li>\n\n\n<li><strong>Piek\u013cuve QAD.<\/strong> Izveidojiet integr\u0101cijas lietot\u0101ju, p\u0101rbaudiet QXtend licenci un konfigur\u0113jiet QXtend sa\u0146\u0113m\u0113ju un QXO abonentu. Vispirms p\u0101rbaudiet darb\u012bbu testa dom\u0113n\u0101.<\/li>\n\n\n<li><strong>QDoc konfigur\u0113\u0161ana.<\/strong> Izmantojiet gatavos QDoc, ja tie ir pieejami. Vajadz\u012bbas gad\u012bjum\u0101 ar QGen \u0123ener\u0113jiet QDoc programm\u0101m Work Order Maintenance, Labor Feedback by Work Order un Work Order Receipt.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Artikuli, produktu strukt\u016bras, tehnolo\u0123iskie procesi, darba centri un kalend\u0101ri.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> QXO notikumi vai periodiski REST piepras\u012bjumi ar filtriem, dal\u012b\u0161anu lap\u0101s un atk\u0101rtotiem m\u0113\u0123in\u0101jumiem.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu konfigur\u0113\u0161ana SkyPlanner.<\/strong> Sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits katram ra\u017eo\u0161anas uzdevumam un alternat\u012bv\u0101s iek\u0101rtas vai person\u0101ls.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c QAD un paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Nos\u016btiet datumus, izmantojot SkyPlanner t\u012bmek\u013ca aiz\u0137eres, darbiniet risin\u0101jumu paral\u0113li pa\u0161reiz\u0113jam pl\u0101nam, sal\u012bdziniet datumus un labojiet pamatdatus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana.<\/strong> Kad dati sakr\u012bt, iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c QAD.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-qad-adaptive-erp-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot integr\u0101ciju ar QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Atk\u0101rtota CRP palai\u0161ana.<\/strong> CRP p\u0101rpl\u0101no visas atlas\u012bto ra\u017eo\u0161anas pas\u016bt\u012bjumu nepabeigt\u0101s oper\u0101cijas. QAD saglab\u0101 manu\u0101li ievad\u012btos datumus tikai tad, ja &#8220;you also adjusted the work order release and due date to match,&#8221; (ir atbilsto\u0161i piel\u0101gots ar\u012b ra\u017eo\u0161anas pas\u016bt\u012bjuma izlai\u0161anas datums un izpildes termi\u0146\u0161), un tie\u0161i \u0161os datumus ieraksta SkyPlanner. Palaidiet CRP p\u0113c datu ierakst\u012b\u0161anas atpaka\u013c QAD vai izsl\u0113dziet no CRP pas\u016bt\u012bjumus, kuriem grafiku sast\u0101da SkyPlanner.<\/li>\n\n\n<li><strong>Izlaisto pas\u016bt\u012bjumu tehnolo\u0123iskos procesus main\u012bt nevar.<\/strong> &#8220;Once the work order status is Exploded, Allocated, or Released, no more changes can be made to the routing.&#8221; (Kad ra\u017eo\u0161anas pas\u016bt\u012bjuma statuss ir Exploded, Allocated vai Released, t\u0101 tehnolo\u0123isko procesu vairs nevar main\u012bt.) Nolasiet tehnolo\u0123isko procesu pas\u016bt\u012bjuma izlai\u0161anas br\u012bd\u012b un mainiet to tikai pl\u0101notajiem vai stingri pl\u0101notajiem pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Tehnolo\u0123isk\u0101 procesa laika m\u0113rvien\u012bbas.<\/strong> Sagatavo\u0161anas un izpildes laiks veido noslodzi, savuk\u0101rt &#8220;queue, wait, and move times are excluded from load calculations.&#8221; (Laiks rind\u0101, gaid\u012b\u0161anas laiks un p\u0101rvieto\u0161anas laiks netiek iek\u013cauts noslodzes apr\u0113\u0137inos.) SkyPlanner model\u0113jiet \u0161os laikus k\u0101 posmus, kuriem ir tikai ilgums, un p\u0101rbaudiet, vai izpildes laiks nor\u0101d\u012bts vienai vien\u012bbai vai visam pas\u016bt\u012bjumam.<\/li>\n\n\n<li><strong>QXtend caurlaidsp\u0113ja.<\/strong> QAD br\u012bdina: &#8220;UI API adapter performance may be unacceptable when processing high volumes of data or real-time transactions.&#8221; (Apstr\u0101d\u0101jot lielus datu apjomus vai re\u0101llaika transakcijas, UI API adaptera veiktsp\u0113ja var b\u016bt nepie\u0146emama.) S\u016btiet paket\u0113s tikai main\u012btos pas\u016bt\u012bjumus un izmantojiet standarta QDocs, ja tie ir pieejami.<\/li>\n\n\n<li><strong>Dom\u0113ni un ra\u017eotnes.<\/strong> QAD instal\u0101cij\u0101s ar vair\u0101kiem dom\u0113niem darba centri un ra\u017eo\u0161anas pas\u016bt\u012bjumi tiek glab\u0101ti atsevi\u0161\u0137i katram dom\u0113nam un ra\u017eotnei. Katrai projekta tv\u0113rum\u0101 iek\u013cautajai ra\u017eotnei piesaistiet atsevi\u0161\u0137u darba centru grupu.<\/li>\n\n\n<li><strong>Atk\u0101rtot\u0101s un diskr\u0113t\u0101s ra\u017eo\u0161anas apvienojums.<\/strong> Advanced Repetitive l\u012bnij\u0101s izmanto atk\u0101rtot\u0101s ra\u017eo\u0161anas grafikus, nevis ra\u017eo\u0161anas pas\u016bt\u012bjumus. Nosakot tv\u0113rumu, izlemiet, kur\u0101m l\u012bnij\u0101m grafikus sast\u0101d\u012bs SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-qad-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 QAD integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c palai\u0161anas,<\/strong> aptverot saska\u0146otos QDocs, QXO abonementus un REST vaic\u0101jumus. Katr\u0101 ra\u017eotn\u0113 QAD izmanto cit\u0101di, un konfigur\u0101cij\u0101 tiek \u0146emtas v\u0113r\u0101 \u0161\u012bs \u012bpatn\u012bbas.<\/li>\n\n\n<li><strong>Var iesaist\u012bties ar\u012b j\u016bsu QAD partneris.<\/strong> Partneris p\u0101rzina j\u016bsu dom\u0113nus, piel\u0101gojumus un licenc\u0113\u0161anas nosac\u012bjumus un kop\u0101 ar SkyPlanner komandu var iestat\u012bt QXtend, QGen QDocs un integr\u0101cijas lietot\u0101ju.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var papla\u0161in\u0101t integr\u0101ciju,<\/strong> izmantojot SkyPlanner REST API un API piek\u013cuves pilnvaru. Lai s\u0101ktu, pietiek ar API piek\u013cuves pilnvaru; vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz\u0113s SkyPlanner komanda. Integr\u0101cijas dokument\u0101cija ir pieejama sada\u013c\u0101 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un maks\u0101jot katru m\u0113nesi. Integr\u0101cijas cenu pied\u0101v\u0101jam iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, inform\u0101ciju par <a href=\"\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/\">QAD Adaptive ERP ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot faktisko iek\u0101rtu un darbinieku jaudu<\/a>, <a href=\"\/lv\/integracija\/erp\/qad-adaptive-erp\/\">QAD Adaptive ERP lapu<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju p\u0101rskatu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel izkl\u0101jlap\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana \u013cauj ietaup\u012bt 2 darba stundas katru ned\u0113\u013cu, un jaun\u0101 darbu rinda l\u012bdz ra\u017eo\u0161anas l\u012bnijai non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sagatavo\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>ra\u017eo\u0161anas pas\u016bt\u012bjumu autom\u0101tiski sast\u0101d\u012bti grafiki<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki tiek sast\u0101d\u012bti autom\u0101tiski, un vis\u0101 uz\u0146\u0113mum\u0101 ir pieejams ra\u017eo\u0161anas p\u0101rskats re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel jumtu dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bca Kauhav\u0101 no putna lidojuma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis lab\u0101k saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu skaidr\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumtu dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai QAD Adaptive ERP ir API darbam ar ra\u017eo\u0161anas pas\u016bt\u012bjumiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. QXtend Inbound izpilda Work Order Maintenance un ra\u017eo\u0161anas ceha programmas, izmantojot SOAP un XML QDocs. Ja nav pieejams izlaists QDoc, to \u0123ener\u0113 ar QGen. Biznesa dokumentu REST API papildus nodro\u0161ina piek\u013cuvi vaic\u0101jumiem ar filtr\u0113\u0161anu un rezult\u0101tu dal\u012b\u0161anu lap\u0101s.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai QAD atbalsta t\u012bmek\u013ca aiz\u0137eres?<\/summary>\n<p class=\"sp-faq__a\">QAD datu izmai\u0146u apstr\u0101dei izmanto QXtend Outbound: tabulu trigeri re\u0123istr\u0113 izmai\u0146as, un QXO nos\u016bta QDocs uz t\u012bmek\u013ca pakalpojuma URL vai direktoriju, kuru periodiski p\u0101rbauda. Savuk\u0101rt SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as uzreiz, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c QAD?<\/summary>\n<p class=\"sp-faq__a\">Ar QXtend Inbound QDoc, izmantojot Work Order Maintenance (16.1), kas iestata ra\u017eo\u0161anas pas\u016bt\u012bjuma izlai\u0161anas datumu un izpildes termi\u0146u atbilsto\u0161i SkyPlanner grafikam. QAD p\u0101rbauda QDoc p\u0113c tiem pa\u0161iem noteikumiem k\u0101 ekr\u0101nform\u0101 ievad\u012btos datus un atgrie\u017e atbildes QDoc.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 operatoru apstiprin\u0101jumi non\u0101k QAD?<\/summary>\n<p class=\"sp-faq__a\">Sagatavo\u0161anas un izpildes laiku re\u0123istr\u0113 ar Labor Feedback by Work Order (16.20.1), bet pabeigto daudzumu \u2014 ar Work Order Receipt (16.11). Abos gad\u012bjumos izmanto QXtend Inbound QDocs. Par datu ierakst\u012b\u0161anu atpaka\u013c QAD lemj, nosakot tv\u0113rumu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai QAD partnerim vajadz\u0113tu pied\u0101v\u0101t QAD Advanced Scheduling vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner \u2014 ja klients str\u0101d\u0101 ar diskr\u0113t\u0101s ra\u017eo\u0161anas pas\u016bt\u012bjumiem un da\u017eu ned\u0113\u013cu laik\u0101 v\u0113las ieg\u016bt darbam gatavu grafiku, kur\u0101 iev\u0113rota faktisk\u0101 jauda. QAD raksturo Advanced Scheduling k\u0101 grafiku katrai ra\u017eotnei pa atsevi\u0161\u0137\u0101m l\u012bnij\u0101m un pied\u0101v\u0101 to kop\u0101 ar DSCP Production Planning un Redzone (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">QAD<\/a>). SkyPlanner savienojas ar QXtend starpniec\u012bbu, pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu, autom\u0101tiski p\u0101rpl\u0101no un nodro\u0161ina neierobe\u017eotu lietot\u0101ju skaitu \u2014 no 199 \u20ac m\u0113nes\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t datus no QAD CSV vai Excel form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ QAD Adaptive ERP QAD Adaptive ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 QAD Adaptive ERP integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot QAD Adaptive ERP, tostarp agr\u0101k\u0101s QAD Enterprise Edition un MFG\/PRO instal\u0101cijas, ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar QAD Adaptive ERP, izmantojot pa\u0161a &#8230; <a title=\"QAD Adaptive ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/\" aria-label=\"Read more about QAD Adaptive ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106180,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106934","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>QAD APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"QAD Adaptive ERP\u2192SkyPlanner APS: QXtend Inbound QDocs\u2192Work Order Maintenance; QXtend Outbound notikumi, darba laika dati, kart\u0113\u0161ana, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"QAD Adaptive ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"QAD Adaptive ERP\u2192SkyPlanner APS: QXtend Inbound QDocs\u2192Work Order Maintenance; QXtend Outbound notikumi, darba laika dati, kart\u0113\u0161ana, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/integracijas-celvedis\\\/\",\"name\":\"QAD APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"QAD Adaptive ERP\u2192SkyPlanner APS: QXtend Inbound QDocs\u2192Work Order Maintenance; QXtend Outbound notikumi, darba laika dati, kart\u0113\u0161ana, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"QAD Adaptive ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"QAD APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"QAD Adaptive ERP\u2192SkyPlanner APS: QXtend Inbound QDocs\u2192Work Order Maintenance; QXtend Outbound notikumi, darba laika dati, kart\u0113\u0161ana, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"QAD Adaptive ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"QAD Adaptive ERP\u2192SkyPlanner APS: QXtend Inbound QDocs\u2192Work Order Maintenance; QXtend Outbound notikumi, darba laika dati, kart\u0113\u0161ana, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/","name":"QAD APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"QAD Adaptive ERP\u2192SkyPlanner APS: QXtend Inbound QDocs\u2192Work Order Maintenance; QXtend Outbound notikumi, darba laika dati, kart\u0113\u0161ana, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/"},{"@type":"ListItem","position":5,"name":"QAD Adaptive ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ QAD Adaptive ERP QAD Adaptive ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 QAD Adaptive ERP integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot QAD Adaptive ERP, tostarp agr\u0101k\u0101s QAD Enterprise Edition un MFG\/PRO instal\u0101cijas, ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar QAD Adaptive ERP, izmantojot pa\u0161a&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106934","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106934"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106934\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106180"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106934"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}