{"id":106905,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/","title":{"rendered":"Vai QAD Adaptive ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai? CRP, l\u012bniju grafiki un SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai QAD Adaptive ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai? <span class=\"hl\">CRP, l\u012bniju grafiki un SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Da\u013c\u0113ji. QAD Adaptive ERP r\u012bk\u0101 Advanced Repetitive Line Schedule Workbench pl\u0101no ra\u017eo\u0161anas l\u012bniju noslodzi, nep\u0101rsniedzot to jaudu. Diskr\u0113t\u0101s ra\u017eo\u0161anas pas\u016bt\u012bjumu noslodzi par\u0101da Capacity Requirements Planning (CRP), kas pl\u0101no atpaka\u013c no izpildes termi\u0146iem un p\u0101rslodzes nov\u0113r\u0161anu atst\u0101j pl\u0101not\u0101ja zi\u0146\u0101. Oper\u0101ciju sec\u012bbas pl\u0101no\u0161anai QAD pied\u0101v\u0101 atsevi\u0161\u0137u produktu \u2014 QAD Advanced Scheduling. Ra\u017eotnes, kur\u0101s katra iek\u0101rta, darbinieks, instruments un materi\u0101ls <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">j\u0101iepl\u0101no atbilsto\u0161i faktiskajai pieejam\u012bbai un jaudai<\/a>, l\u012bdz\u0101s QAD izmanto SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 rakst\u0101 izmantotas QAD Enterprise Edition 2020 un 2021 lietot\u0101ja rokasgr\u0101matas \u2014 jaun\u0101k\u0101s publiski pieejam\u0101s. QAD Adaptive ERP ir \u0161\u012bs pa\u0161as ERP sist\u0113mas pa\u0161reiz\u0113jais nosaukums; iepriek\u0161 t\u0101 bija paz\u012bstama ar\u012b k\u0101 Enterprise Edition, QAD Cloud ERP un MFG\/PRO.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-qad-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 QAD pl\u0101no jaudu \u2014 soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Ra\u017eo\u0161anas jaudas pamatdati<\/h3>\n\n\n<p>Jaudas pl\u0101no\u0161anas pamats ir <strong>Work Center Maintenance (14.5)<\/strong>, kur darba centri tiek grup\u0113ti, izmantojot <strong>Department Maintenance (14.1)<\/strong>. Darba centra jaudu apr\u0113\u0137ina, reizinot iek\u0101rtu vai darbinieku skaitu ar ra\u017eo\u0161anas kalend\u0101r\u0101 nor\u0101d\u012btaj\u0101m stund\u0101m. <strong>Routing Maintenance (14.13.1)<\/strong> glab\u0101 izstr\u0101d\u0101juma oper\u0101cijas, katrai nor\u0101dot <strong>rindas, p\u0101rregul\u0113\u0161anas, izpildes, gaid\u012b\u0161anas un p\u0101rvieto\u0161anas<\/strong> laiku. Komponenti ir nor\u0101d\u012bti <strong>Product Structure Maintenance (13.5)<\/strong>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. MRP un ra\u017eo\u0161anas pas\u016bt\u012bjumi<\/h3>\n\n\n<p>MRP izveido pl\u0101notos pas\u016bt\u012bjumus. Ar <strong>Work Order Maintenance (16.1)<\/strong> un <strong>Work Order Release\/Print (16.7)<\/strong> tos nodod izpildei k\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjumus. Katr\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101 tiek nokop\u0113ts standarta tehnolo\u0123iskais process, ko var main\u012bt sada\u013c\u0101 <strong>Work Order Routing Maintenance (16.13.13)<\/strong>. Ta\u010du QAD skaidri nor\u0101da ierobe\u017eojumu: &#8220;Once the work order status is Exploded, Allocated, or Released, no more changes can be made to the routing.&#8221; (Kad ra\u017eo\u0161anas pas\u016bt\u012bjuma statuss ir Exploded, Allocated vai Released, tehnolo\u0123isko procesu vairs nevar main\u012bt.) (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/207142422\/Manufacturing_UG_v2020EE.pdf\/a61c043d-f21c-631a-4a2e-c0c2d152294c?t=1600374319852&amp;download=true\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Capacity Requirements Planning: pl\u0101no\u0161ana atpaka\u013c no izpildes termi\u0146a<\/h3>\n\n\n<p>P\u0113c MRP palai\u017e <strong>Recalculate Capacity Plan (24.1)<\/strong>. Tas izv\u0113r\u0161 pl\u0101noto, apstiprin\u0101ti pl\u0101noto un izpildei nodoto pas\u016bt\u012bjumu tehnolo\u0123iskos procesus un nosaka katras oper\u0101cijas datumus. QAD CRP lo\u0123iku apraksta \u0161\u0101di: &#8220;takes the due date of an order or repetitive schedule and schedules each of its operations from the last operation in the order routing or process backward to the first one.&#8221; (Par pamatu \u0146em pas\u016bt\u012bjuma vai atk\u0101rtot\u0101s ra\u017eo\u0161anas grafika izpildes termi\u0146u un iepl\u0101no oper\u0101cijas atpaka\u013cgait\u0101 \u2014 no tehnolo\u0123isk\u0101 procesa p\u0113d\u0113j\u0101s oper\u0101cijas l\u012bdz pirmajai.)<\/p>\n\n\n<p>Noslodz\u0113 ieskaita tikai p\u0101rregul\u0113\u0161anas un izpildes laiku. &#8220;Queue, wait, and move times are excluded from load calculations.&#8221; (Rindas, gaid\u012b\u0161anas un p\u0101rvieto\u0161anas laiku noslodzes apr\u0113\u0137inos neiek\u013cauj.) Visa oper\u0101cijas noslodze tiek attiecin\u0101ta uz vienu dienu: &#8220;The system assigns the entire load for an operation to its scheduled start date.&#8221; (Sist\u0113ma visu oper\u0101cijas noslodzi pie\u0161\u0137ir t\u0101s pl\u0101notajam s\u0101kuma datumam.) <strong>Input\/Output Inquiry (24.4)<\/strong> un <strong>Input\/Output Report (24.5)<\/strong> sal\u012bdzina pl\u0101noto un faktisko noslodzi. (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/207142422\/Manufacturing_UG_v2020EE.pdf\/a61c043d-f21c-631a-4a2e-c0c2d152294c?t=1600374319852&amp;download=true\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Advanced Repetitive: l\u012bniju noslodze atbilsto\u0161i jaudai<\/h3>\n\n\n<p>Atk\u0101rtot\u0101s ra\u017eo\u0161anas uz\u0146\u0113mumi defin\u0113 l\u012bnijas sada\u013c\u0101 <strong>Production Line Maintenance (18.22.1.1)<\/strong> un sast\u0101da to grafikus r\u012bk\u0101 <strong>Line Schedule Workbench (18.22.1.10)<\/strong>. QAD rokasgr\u0101mata m\u0113r\u0137i apraksta \u0161\u0101di: &#8220;Run a production line with repetitive schedules, forward scheduled to capacity limits.&#8221; (Darbin\u0101t ra\u017eo\u0161anas l\u012bniju p\u0113c atk\u0101rtot\u0101s ra\u017eo\u0161anas grafikiem, pl\u0101nojot uz priek\u0161u l\u012bdz jaudas robe\u017e\u0101m.) R\u012bks nosaka, k\u0101d\u0101 sec\u012bb\u0101 uz l\u012bnijas ra\u017eot paredz\u0113tos daudzumus, \u0146emot v\u0113r\u0101 p\u0101rregul\u0113\u0161anu, un rezult\u0101tu saglab\u0101 k\u0101 atk\u0101rtot\u0101s ra\u017eo\u0161anas grafikus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Grafiku sast\u0101d\u012b\u0161anas r\u012bki<\/h3>\n\n\n<p><strong>Master Scheduling Workbench<\/strong> un <strong>Production Scheduling Workbench<\/strong> \u013cauj ra\u017eo\u0161anas l\u012bnij\u0101s pl\u0101not diskr\u0113t\u0101s un atk\u0101rtot\u0101s ra\u017eo\u0161anas izstr\u0101d\u0101jumus. QAD nor\u0101da: &#8220;the PSW lets you schedule discrete and repetitive items on production lines,&#8221; (PSW \u013cauj pl\u0101not diskr\u0113t\u0101s un atk\u0101rtot\u0101s ra\u017eo\u0161anas izstr\u0101d\u0101jumus ra\u017eo\u0161anas l\u012bnij\u0101s), nosakot to sec\u012bbu dienas un mai\u0146as ietvaros. Par abiem r\u012bkiem QAD nor\u0101da: &#8220;are .NET UI-only scheduling tools,&#8221; (tie ir grafiku sast\u0101d\u012b\u0161anas r\u012bki, kas pieejami tikai .NET saskarn\u0113). Uz abiem attiecas ar\u012b pras\u012bba: &#8220;require an active Maintenance license before you can access them.&#8221; (Lai tiem piek\u013c\u016btu, nepiecie\u0161ama akt\u012bva Maintenance licence.) (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/209256556\/PlanningSchedWorkbench_AG_v2021EE.pdf\/7adcba49-8b72-8124-9855-08b01a009d86?t=1632916378957&amp;download=true\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. QAD atsevi\u0161\u0137ie pl\u0101no\u0161anas produkti<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>QAD Advanced Scheduling<\/strong>, kas ieviests 2024. gad\u0101, pl\u0101no ra\u017eo\u0161anas darbus &#8220;on a sequence-sensitive continuous time-line (Gantt chart)&#8221; (nep\u0101rtraukt\u0101 laika skal\u0101, kur \u0146emta v\u0113r\u0101 oper\u0101ciju sec\u012bba (Gantt diagramm\u0101)) (<a href=\"https:\/\/www.qad.com\/blog\/2024\/06\/what-to-know-about-qad-advanced-scheduling\">QAD blogs<\/a>). QAD rezult\u0101tu raksturo k\u0101 &#8220;a minute-by-minute, line-by-line optimized production schedule for each plant.&#8221; (Katrai ra\u017eotnei izveidots ra\u017eo\u0161anas grafiks, kas optimiz\u0113ts pa min\u016bt\u0113m un pa l\u012bnij\u0101m.)<\/li>\n\n\n<li><strong>QAD DSCP Production Planning<\/strong> veido vair\u0101ku ra\u017eot\u0146u ra\u017eo\u0161anas pl\u0101nu, \u0146emot v\u0113r\u0101 ierobe\u017eojumus.<\/li>\n\n\n<li><strong>QAD Redzone<\/strong> ir QAD risin\u0101jums darbinieku digit\u0101lai sadarb\u012bbai, kas sa\u0146em datus no grafika.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas paliek pl\u0101not\u0101ja zi\u0146\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>P\u0101rslodze.<\/strong> CRP par\u0101da noslodzi attiec\u012bb\u0101 pret jaudu. &#8220;If a work center or machine is over- or under-loaded, you can modify either its capacity or the timing or amount of the load.&#8221; (Ja darba centrs vai iek\u0101rta ir p\u0101rslogota vai nepietiekami noslogota, var main\u012bt t\u0101s jaudu, noslodzes laiku vai apjomu.)<\/li>\n\n\n<li><strong>Manu\u0101li ievad\u012btie datumi tiek p\u0101rrakst\u012bti.<\/strong> &#8220;When you run CRP, all open operations for selected work orders are rescheduled. That means that if you have manually adjusted your operation start and stop dates, they will probably be changed unless you also adjusted the work order release and due date to match.&#8221; (Palai\u017eot CRP, visas atlas\u012bto ra\u017eo\u0161anas pas\u016bt\u012bjumu nepabeigt\u0101s oper\u0101cijas tiek p\u0101rpl\u0101notas. T\u0101d\u0113\u013c manu\u0101li piel\u0101gotie oper\u0101ciju s\u0101kuma un beigu datumi, visticam\u0101k, tiks main\u012bti, ja vien tiem neb\u016bs pieska\u0146ots ar\u012b ra\u017eo\u0161anas pas\u016bt\u012bjuma nodo\u0161anas izpildei datums un izpildes termi\u0146\u0161.)<\/li>\n\n\n<li><strong>Visa noslodze vien\u0101 dien\u0101.<\/strong> Oper\u0101cij\u0101m, kas ilgst vair\u0101kas dienas, visu noslodzi attiecina uz s\u0101kuma datumu, t\u0101p\u0113c dienas noslodzes skat\u0101 redzams strauj\u0161 k\u0101pums un p\u0113c tam kritums.<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjuma izpildes laiku r\u0113\u0137ina p\u0113c vid\u0113j\u0101 daudzuma.<\/strong> Ja pas\u016bt\u012bjumu daudzumi at\u0161\u0137iras no izpildes laika apr\u0113\u0137in\u0101 izmantot\u0101 vid\u0113j\u0101 daudzuma, &#8220;CRP may schedule the start date for an order&#8217;s first operation before the release date for that order.&#8221; (CRP var iepl\u0101not pas\u016bt\u012bjuma pirm\u0101s oper\u0101cijas s\u0101kumu pirms \u0161\u0101 pas\u016bt\u012bjuma nodo\u0161anas izpildei datuma.)<\/li>\n\n\n<li><strong>Izpildei nodoto pas\u016bt\u012bjumu tehnolo\u0123iskie procesi ir fiks\u0113ti.<\/strong> Kad statuss ir Exploded, Allocated vai Released, tehnolo\u0123isko procesu vairs nevar main\u012bt.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiks nav atkar\u012bgs no sec\u012bbas.<\/strong> Katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai ir viens p\u0101rregul\u0113\u0161anas laiks neatkar\u012bgi no t\u0101, kas uz iek\u0101rtas ra\u017eots iepriek\u0161.<\/li>\n\n\n<li><strong>Pl\u0101no\u0161anas r\u012bki tikai vien\u0101 saskarn\u0113.<\/strong> MSW un PSW darbojas tikai .NET saskarn\u0113.<\/li>\n\n<\/ul>\n\n\n<p>Avoti: <a href=\"https:\/\/connect.qad.com\/documents\/2370665\/207142422\/Manufacturing_UG_v2020EE.pdf\/a61c043d-f21c-631a-4a2e-c0c2d152294c?t=1600374319852&amp;download=true\">QAD lietot\u0101ja rokasgr\u0101mata par ra\u017eo\u0161anu<\/a>, <a href=\"https:\/\/connect.qad.com\/documents\/2370665\/209256556\/PlanningSchedWorkbench_AG_v2021EE.pdf\/7adcba49-8b72-8124-9855-08b01a009d86?t=1632916378957&amp;download=true\">Planning and Scheduling Workbench rokasgr\u0101mata<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-qad-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar QAD ieb\u016bv\u0113to grafiku sast\u0101d\u012b\u0161anu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar QAD pamatfunkcij\u0101m pietiek, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Jums ir atk\u0101rtot\u0101s ra\u017eo\u0161anas l\u012bnijas un to grafikus sast\u0101d\u0101t ar Line Schedule Workbench vai PSW.<\/li>\n\n\n<li>Lai apsol\u012btu pieg\u0101des termi\u0146us, jums pietiek ar CRP ned\u0113\u013cas noslodzes skatu katram darba centram.<\/li>\n\n\n<li>Darba centra iek\u0101rtas ir savstarp\u0113ji aizvietojamas, un operatoru pieejam\u012bba neierobe\u017eo izlaidi.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161ana ir \u012bsa vai nav atkar\u012bga no iepriek\u0161 ra\u017eot\u0101 izstr\u0101d\u0101juma.<\/li>\n\n\n<li>Izpildei nodoto ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bba p\u0113c to s\u0101k\u0161anas main\u0101s reti.<\/li>\n\n<\/ul>\n\n\n<p>Ja tas atbilst j\u016bsu situ\u0101cijai, uzturiet tehnolo\u0123iskos procesus, darba centru jaudu un ra\u017eo\u0161anas kalend\u0101rus atbilsto\u0161i realit\u0101tei un palaidiet CRP p\u0113c katras MRP izpildes.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas iev\u0113ro faktisko jaudu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar pamata r\u012bkiem vairs nepietiek, ja uz jums attiecas vair\u0101ki no \u0161iem punktiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Pieg\u0101des kav\u0113jas, lai gan CRP r\u0101da pie\u0146emamu noslodzi pa ned\u0113\u013c\u0101m.<\/li>\n\n\n<li>Pl\u0101not\u0101ji p\u0113c katras CRP izpildes no jauna ievada oper\u0101ciju datumus vai uztur faktisko sec\u012bbu izkl\u0101jlap\u0101.<\/li>\n\n\n<li>J\u016bs izpild\u0101t diskr\u0113t\u0101s ra\u017eo\u0161anas pas\u016bt\u012bjumus neliel\u0101s partij\u0101s uz daudz\u0101m iek\u0101rt\u0101m.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no iepriek\u0161 ra\u017eot\u0101 izstr\u0101d\u0101juma.<\/li>\n\n\n<li>Operatori, mai\u0146as un darbinieku promb\u016btne ierobe\u017eo izlaidi tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas.<\/li>\n\n\n<li>\u0160tances, veidnes vai pal\u012bgier\u012bces tiek p\u0101rvietotas starp iek\u0101rt\u0101m vai pres\u0113m.<\/li>\n\n\n<li>Materi\u0101lu kav\u0113jumi nosaka, kuru ra\u017eo\u0161anas uzdevumu var s\u0101kt.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Visu resursu jaudas ierobe\u017eojumu iev\u0113ro\u0161ana vienlaikus:<\/strong> katrai iek\u0101rtai, darbiniekam un instrumentam, nevis tikai darba centra kop\u0113jiem r\u0101d\u012bt\u0101jiem.<\/li>\n\n\n<li><strong>Sec\u012bbas noteik\u0161ana oper\u0101ciju l\u012bmen\u012b<\/strong> p\u0113c priorit\u0101t\u0113m un izpildes termi\u0146iem.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiku matrica<\/strong>, kur\u0101 laiki ir atkar\u012bgi no sec\u012bbas un var at\u0161\u0137irties katr\u0101 p\u0101rejas virzien\u0101.<\/li>\n\n\n<li><strong>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/strong> un <strong>ra\u017eo\u0161anas uzdevumi, kuros piedal\u0101s vair\u0101ki operatori<\/strong>.<\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161ana, \u0146emot v\u0113r\u0101 materi\u0101lus<\/strong> un p\u0101rbaudot kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>Autom\u0101tiska p\u0101rpl\u0101no\u0161ana<\/strong>, mainoties izpildes gaitai vai pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Skaidra datu apmai\u0146a ar QAD.<\/strong> Datu las\u012b\u0161ana caur QXtend Outbound vai biznesa dokumentu REST API un rakst\u012b\u0161ana caur QXtend Inbound sada\u013c\u0101 Work Order Maintenance. Katram pieg\u0101d\u0101t\u0101jam jaut\u0101jiet, kurus QDocs tas izmanto un kas nodro\u0161ina integr\u0101cijas atbalstu p\u0113c ievie\u0161anas.<\/li>\n\n<\/ul>\n\n\n<p>Pla\u0161\u0101k par \u0161o metodi lasiet <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">rokasgr\u0101mat\u0101 par ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kur noder SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS nov\u0113r\u0161 visus iepriek\u0161 min\u0113tos tr\u016bkumus. Tiek iev\u0113roti katra darba centra, darbinieka un instrumenta jaudas ierobe\u017eojumi. Arcturus AI dzin\u0113js da\u017eu sekun\u017eu laik\u0101 izveido grafiku oper\u0101ciju l\u012bmen\u012b, nosakot sec\u012bbu p\u0113c ra\u017eo\u0161anas uzdevuma priorit\u0101tes, pabeig\u0161anas datuma, klienta priorit\u0101tes, Fast Track un Dynamic Priorities.<\/p>\n\n\n<p>P\u0101rregul\u0113\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts p\u0101rejas laiks starp katru izstr\u0101d\u0101jumu p\u0101ri abos virzienos, un dzin\u0113js izv\u0113las sec\u012bbu ar maz\u0101ko p\u0101rregul\u0113\u0161anas laiku. Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, vienu ra\u017eo\u0161anas uzdevumu vienlaikus var veikt vair\u0101ki darbinieki, un darbs tiek p\u0101rcelts uz alternat\u012bv\u0101m iek\u0101rt\u0101m vai darbiniekiem, ja prim\u0101rais resurss nav pieejams.<\/p>\n\n\n<p>Sast\u0101dot grafiku p\u0113c materi\u0101lu pieejam\u012bbas, sist\u0113ma model\u0113 turpm\u0101kos kr\u0101jumus, balstoties uz eso\u0161ajiem kr\u0101jumiem un gaid\u0101majiem iepirkuma pas\u016bt\u012bjumiem. T\u0101d\u0113j\u0101di ra\u017eo\u0161anas uzdevums tiek iepl\u0101nots tad, kad tam ir pieejami materi\u0101li. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, savuk\u0101rt Running Time Lock fiks\u0113 tuv\u0101ko stundu ra\u017eo\u0161anas uzdevumus, lai netrauc\u0113tu darbu ceh\u0101. Operatori re\u0123istr\u0113 paveikto t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations, Production Timer un Quick Log Mode.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis QAD Advanced Scheduling un grafiku sast\u0101d\u012b\u0161anas r\u012bkus, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>J\u016bs pl\u0101nojat diskr\u0113t\u0101s ra\u017eo\u0161anas pas\u016bt\u012bjumus iek\u0101rt\u0101m un darbiniekiem.<\/strong> QAD raksturo Advanced Scheduling k\u0101 grafiku katrai ra\u017eotnei pa atsevi\u0161\u0137\u0101m l\u012bnij\u0101m. SkyPlanner nosaka katras oper\u0101cijas sec\u012bbu katrai iek\u0101rtai, operatoram un instrumentam.<\/li>\n\n\n<li><strong>CRP past\u0101v\u012bgi maina j\u016bsu datumus.<\/strong> SkyPlanner ieraksta savam grafikam atbilsto\u0161us ra\u017eo\u0161anas pas\u016bt\u012bjuma nodo\u0161anas izpildei datumus un izpildes termi\u0146us. Tie\u0161i \u0161o nosac\u012bjumu QAD nor\u0101da k\u0101 nepiecie\u0161amu, lai CRP izpildes laik\u0101 saglab\u0101tu datumus.<\/li>\n\n\n<li><strong>Sec\u012bbu nosaka p\u0101rregul\u0113\u0161ana, instrumenti, brig\u0101des un materi\u0101li.<\/strong> Vien\u0101 grafik\u0101 tiek \u0146emta v\u0113r\u0101 p\u0101rregul\u0113\u0161anas laiku matrica, instrumentu ierobe\u017eot\u0101 pieejam\u012bba, ra\u017eo\u0161anas uzdevumi ar vair\u0101kiem operatoriem, alternat\u012bvi darba centri un iepirkuma pas\u016bt\u012bjumu pieg\u0101des.<\/li>\n\n\n<li><strong>Pl\u0101not\u0101ji un operatori str\u0101d\u0101 p\u0101rl\u016bkprogramm\u0101.<\/strong> QAD pl\u0101no\u0161anas darba vides darbojas tikai .NET saskarn\u0113. SkyPlanner lietot\u0101ju skaits nav ierobe\u017eots, un Mobile Confirmations \u013cauj skat\u012bt darbu rindu jebkur\u0101 t\u0101lrun\u012b vai plan\u0161etdator\u0101.<\/li>\n\n\n<li><strong>V\u0113laties s\u0101kt str\u0101d\u0101t ar grafiku da\u017eu ned\u0113\u013cu laik\u0101.<\/strong> Izm\u0113\u0123in\u0101juma laik\u0101 p\u0101rbaudiet SkyPlanner ar saviem QAD ra\u017eo\u0161anas pas\u016bt\u012bjumiem un s\u0101ciet to lietot ra\u017eo\u0161an\u0101 da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas s\u0101kuma.<\/li>\n\n<\/ul>\n\n\n<p>S\u0101ciet <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jumu<\/a> ar Excel fail\u0101 eksport\u0113tiem atv\u0113rtajiem QAD ra\u017eo\u0161anas pas\u016bt\u012bjumiem (l\u012bdz 20 darba centriem, bez maks\u0101jumu kartes). P\u0113c tam cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un nor\u0113\u0137inoties katru m\u0113nesi. Integr\u0101cijas cenu apr\u0113\u0137in\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un pied\u0101v\u0101jam kop\u0101 ar abon\u0113\u0161anas pl\u0101nu.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar QAD Adaptive ERP, izmantojot QAD QXtend. SkyPlanner komanda to konfigur\u0113 ievie\u0161anas laik\u0101, savuk\u0101rt j\u016bsu partneris vai izstr\u0101d\u0101t\u0101ji var izmantot dokument\u0113to <a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">REST API<\/a>. Skatiet lapu <a href=\"\/lv\/integracija\/erp\/qad-adaptive-erp\/\">SkyPlanner lieto\u0161anai ar QAD Adaptive ERP<\/a>, <a href=\"\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/\">QAD Adaptive ERP integr\u0101cijas ce\u013cvedi<\/a> vai visas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU pieg\u0101des \u0137\u0113des speci\u0101lists Kalle Kalliom\u00e4ki elektrosadales pane\u013cu ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales pane\u013ci un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu ap\u0123\u0113rb\u0101 pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas ra\u017eotn\u0113 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Z\u0101\u013cu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja Anu J\u00e4rvinen pie robotiz\u0113tas pale\u0161u krau\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us uz priek\u0161u<\/b><span>p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner veido uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku piem\u0113rots iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un atbildes uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad sa\u0146em da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner mums ir v\u0113rt\u012bgs k\u0101 r\u012bks, kas darbojas ikdien\u0101, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska slodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir strauji samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai QAD CRP pl\u0101no, neierobe\u017eojot slodzi ar pieejamo jaudu?<\/summary>\n<p class=\"sp-faq__a\">CRP neierobe\u017eo slodzi ar pieejamo jaudu. Tas pl\u0101no oper\u0101cijas atpaka\u013c no pas\u016bt\u012bjuma izpildes termi\u0146a un par\u0101da slodzi sal\u012bdzin\u0101jum\u0101 ar jaudu. P\u0101rslodzi nov\u0113r\u0161 pl\u0101not\u0101js, mainot jaudu vai p\u0101rce\u013cot slodzi uz citu laiku.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas ir QAD Line Schedule Workbench?<\/summary>\n<p class=\"sp-faq__a\">T\u0101 ir Advanced Repetitive programma (18.22.1.10), kas pl\u0101no ra\u017eo\u0161anas l\u012bniju darbu uz priek\u0161u, iev\u0113rojot jaudas ierobe\u017eojumus un \u0146emot v\u0113r\u0101 p\u0101rregul\u0113\u0161anu. T\u0101 paredz\u0113ta atk\u0101rtotas ra\u017eo\u0161anas grafikiem l\u012bnij\u0101s, nevis diskr\u0113t\u0101s ra\u017eo\u0161anas pas\u016bt\u012bjumu pl\u0101no\u0161anai da\u017e\u0101d\u0101s iek\u0101rt\u0101s.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai QAD Advanced Scheduling ietilpst QAD Adaptive ERP?<\/summary>\n<p class=\"sp-faq__a\">QAD pied\u0101v\u0101 Advanced Scheduling k\u0101 atsevi\u0161\u0137u produktu, kas ieviests 2024. gad\u0101, un prezent\u0113 to kop\u0101 ar DSCP Production Planning un QAD Redzone. Adaptive ERP pamatfunkcionalit\u0101t\u0113 pl\u0101no\u0161anu nodro\u0161ina MRP, CRP un Advanced Repetitive.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai QAD \u0146em v\u0113r\u0101 no sec\u012bbas atkar\u012bgus p\u0101rregul\u0113\u0161anas laikus?<\/summary>\n<p class=\"sp-faq__a\">Atk\u0101rtotas ra\u017eo\u0161anas l\u012bnij\u0101s \u2014 izmantojot Line Schedule Workbench p\u0101rregul\u0113\u0161anas funkcijas. Diskr\u0113t\u0101s ra\u017eo\u0161anas pas\u016bt\u012bjumiem katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai ir viens p\u0101rregul\u0113\u0161anas laiks. SkyPlanner sagatavo\u0161anas laiku matric\u0101 tiek glab\u0101ti p\u0101rregul\u0113\u0161anas laiki starp produktu p\u0101riem abos virzienos, un ra\u017eo\u0161anas uzdevumi tiek sak\u0101rtoti t\u0101, lai \u0161os laikus samazin\u0101tu l\u012bdz minimumam.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar QAD?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 import\u0113jiet no QAD atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos procesus un darba centrus Excel vai CSV form\u0101t\u0101 un sal\u012bdziniet grafiku ar pa\u0161reiz\u0113jo pl\u0101nu. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ QAD Adaptive ERP Vai QAD Adaptive ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai? CRP, l\u012bniju grafiki un SkyPlanner APS Da\u013c\u0113ji. QAD Adaptive ERP r\u012bk\u0101 Advanced Repetitive Line Schedule Workbench pl\u0101no ra\u017eo\u0161anas l\u012bniju noslodzi, nep\u0101rsniedzot to jaudu. Diskr\u0113t\u0101s ra\u017eo\u0161anas pas\u016bt\u012bjumu noslodzi par\u0101da Capacity Requirements Planning (CRP), kas pl\u0101no atpaka\u013c &#8230; <a title=\"Vai QAD Adaptive ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai? CRP, l\u012bniju grafiki un SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/\" aria-label=\"Read more about Vai QAD Adaptive ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai? CRP, l\u012bniju grafiki un SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106180,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106905","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai QAD Adaptive ERP pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i jaudai?<\/title>\n<meta name=\"description\" content=\"QAD CRP pl\u0101no atpaka\u013c no termi\u0146a; p\u0101rslodzi risina pl\u0101not\u0101js. QAD iesp\u0113jas, Line Schedule Workbench un kad vajadz\u012bgs APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai QAD Adaptive ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai? CRP, l\u012bniju grafiki un SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"QAD CRP pl\u0101no atpaka\u013c no termi\u0146a; p\u0101rslodzi risina pl\u0101not\u0101js. QAD iesp\u0113jas, Line Schedule Workbench un kad vajadz\u012bgs APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/razosanas-planosana\\\/\",\"name\":\"Vai QAD Adaptive ERP pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i jaudai?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"QAD CRP pl\u0101no atpaka\u013c no termi\u0146a; p\u0101rslodzi risina pl\u0101not\u0101js. QAD iesp\u0113jas, Line Schedule Workbench un kad vajadz\u012bgs APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai QAD Adaptive ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai? CRP, l\u012bniju grafiki un SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai QAD Adaptive ERP pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i jaudai?","description":"QAD CRP pl\u0101no atpaka\u013c no termi\u0146a; p\u0101rslodzi risina pl\u0101not\u0101js. QAD iesp\u0113jas, Line Schedule Workbench un kad vajadz\u012bgs APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai QAD Adaptive ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai? CRP, l\u012bniju grafiki un SkyPlanner APS","og_description":"QAD CRP pl\u0101no atpaka\u013c no termi\u0146a; p\u0101rslodzi risina pl\u0101not\u0101js. QAD iesp\u0113jas, Line Schedule Workbench un kad vajadz\u012bgs APS.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/","name":"Vai QAD Adaptive ERP pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i jaudai?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"QAD CRP pl\u0101no atpaka\u013c no termi\u0146a; p\u0101rslodzi risina pl\u0101not\u0101js. QAD iesp\u0113jas, Line Schedule Workbench un kad vajadz\u012bgs APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/"},{"@type":"ListItem","position":5,"name":"Vai QAD Adaptive ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai? CRP, l\u012bniju grafiki un SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ QAD Adaptive ERP Vai QAD Adaptive ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai? CRP, l\u012bniju grafiki un SkyPlanner APS Da\u013c\u0113ji. QAD Adaptive ERP r\u012bk\u0101 Advanced Repetitive Line Schedule Workbench pl\u0101no ra\u017eo\u0161anas l\u012bniju noslodzi, nep\u0101rsniedzot to jaudu. Diskr\u0113t\u0101s ra\u017eo\u0161anas pas\u016bt\u012bjumu noslodzi par\u0101da Capacity Requirements Planning (CRP), kas pl\u0101no atpaka\u013c&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106905","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106905"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106905\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106180"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106905"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}