{"id":106876,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/","title":{"rendered":"Oracle Fusion Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Oracle Fusion Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Oracle Fusion Cloud integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Oracle Fusion Cloud integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot Oracle Fusion Cloud Manufacturing ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Oracle Fusion Cloud, izmantojot pa\u0161a Oracle REST resursus:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas, darba defin\u012bcijas, darba centrus, ra\u017eo\u0161anas resursus, kalend\u0101rus, nomenklat\u016bras vien\u012bbas, to strukt\u016bras, kr\u0101jumu atlikumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Katras ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas pl\u0101notais s\u0101kuma un pabeig\u0161anas datums tiek nos\u016bt\u012bts atpaka\u013c.<\/li>\n\n\n<li>Operatoru apstiprin\u0101jumi tiek nos\u016bt\u012bti atpaka\u013c k\u0101 oper\u0101ciju un resursu dar\u012bjumi.<\/li>\n\n\n<li>SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Ganta diagramma ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu Oracle Fusion Cloud konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. \u0160is ce\u013cvedis paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties integr\u0101cijas izveid\u0113 vai pa\u0161i veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"oracle-fusion-cloud-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Oracle Fusion Cloud integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Oracle Fusion Cloud \u0101r\u0113jai grafiku sast\u0101d\u012b\u0161anas sist\u0113mai pied\u0101v\u0101 tr\u012bs datu apmai\u0146as veidus:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Oracle Fusion Cloud SCM REST API.<\/strong> Pamatce\u013c\u0161 ir <code>\/fscmRestApi\/resources\/11.13.18.05\/<\/code>. Grafiku sast\u0101d\u012b\u0161anas sist\u0113ma izmanto resursus <code>workOrders<\/code> (ar pak\u0101rtotajiem resursiem <code>WorkOrderOperation<\/code>, <code>WorkOrderOperationResource<\/code> un <code>WorkOrderOperationMaterial<\/code>), <code>processWorkOrders<\/code>, <code>workDefinitions<\/code>, <code>workCenters<\/code>, <code>productionResources<\/code>, <code>calendars<\/code>, <code>itemsV2<\/code>, <code>itemStructures<\/code> un <code>inventoryOnhandBalances<\/code>. Izpildes dati tiek nos\u016bt\u012bti uz <code>operationTransactions<\/code>, <code>resourceTransactions<\/code> un <code>materialTransactions<\/code>. Iepirkuma pas\u016bt\u012bjumi tiek sa\u0146emti no Procurement REST API resursa <code>purchaseOrders<\/code>. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/rest-endpoints.html\">REST galapunkti<\/a>)<\/li>\n\n\n<li><strong>File-Based Data Import (FBDI).<\/strong> Process Import Work Orders no veidnes izveido vai atjaunina ra\u017eo\u0161anas pas\u016bt\u012bjumus, to oper\u0101cijas un oper\u0101ciju resursus, savuk\u0101rt Import Work Order Resource Transactions iel\u0101d\u0113 resursu gr\u0101matojumus. Oracle skaidri nor\u0101da uz laika ierobe\u017eojumu: &#8220;This option isn&#8217;t suitable for importing manufacturing data on a real-time basis.&#8221; (\u0160\u012b iesp\u0113ja nav piem\u0113rota ra\u017eo\u0161anas datu import\u0113\u0161anai re\u0101llaik\u0101.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faips\/mfg-file-based-data-import-fbdi.html\">avots<\/a>)<\/li>\n\n\n<li><strong>Oracle Integration (OIC).<\/strong> Oracle integr\u0101cijas platforma nodro\u0161ina datu pl\u016bsmas starp Fusion un cit\u0101m sist\u0113m\u0101m. Oracle Integration integr\u0101cijas veidne rea\u0123\u0113 uz Oracle Fusion Cloud Manufacturing notikumu Work Order Status Change (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/paas\/integration-cloud\/sync-kanban-scm\/index.html\">avots<\/a>). Izmantojiet to, ja j\u016bsu uz\u0146\u0113mums jau lieto OIC.<\/li>\n\n<\/ol>\n\n\n<p>Aktu\u0101lu grafiku sast\u0101d\u012b\u0161anai galvenais datu apmai\u0146as veids ir REST. FBDI ir piem\u0113rots s\u0101kotn\u0113jai pamatdatu iel\u0101dei.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un piek\u013cuve<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Oracle REST dro\u0161\u012bba.<\/strong> &#8220;Fusion Applications REST APIs use a global Oracle Web Services Manager (OWSM) security policy called Multi Token Over SSL RESTful Service Policy.&#8221; (Fusion Applications REST API izmanto glob\u0101lu Oracle Web Services Manager (OWSM) dro\u0161\u012bbas politiku ar nosaukumu Multi Token Over SSL RESTful Service Policy.) T\u0101 atbalsta Basic autentifik\u0101ciju, izmantojot SSL, un autentifik\u0101ciju ar pilnvar\u0101m, piem\u0113ram, SAML 2.0 uzr\u0101d\u012bt\u0101ja pilnvaru. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/Quick_Start.html\">Darba s\u0101k\u0161ana<\/a>)<\/li>\n\n\n<li><strong>Integr\u0101cijas lietot\u0101js.<\/strong> Izveidojiet integr\u0101cijai atsevi\u0161\u0137u Oracle lietot\u0101ju. Pie\u0161\u0137iriet tam amata lomas ar nepiecie\u0161amaj\u0101m ties\u012bb\u0101m piek\u013c\u016bt ra\u017eo\u0161anas pas\u016bt\u012bjumiem, darba defin\u012bcij\u0101m, kr\u0101jumiem un dar\u012bjumiem, ierobe\u017eojot piek\u013cuvi l\u012bdz integr\u0101cijas tv\u0113rum\u0101 iek\u013cautaj\u0101m ra\u017eo\u0161anas organiz\u0101cij\u0101m.<\/li>\n\n\n<li><strong>Lapo\u0161ana.<\/strong> Oracle ierobe\u017eo ierakstu skaitu, ko atgrie\u017e viens SCM REST izsaukums, t\u0101p\u0113c nolas\u012b\u0161anai izmantojiet <code>limit<\/code> un <code>offset<\/code> un filtr\u0113jiet p\u0113c organiz\u0101cijas un statusa (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faips\/scm-rest-services.html\">avots<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru galven\u0113 <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API). API ir dokument\u0113ts Swagger\/OpenAPI. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim par\u0101d\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska datu piepras\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Dati no Oracle tiek piepras\u012bti periodiski. Filtr\u0113ti REST vaic\u0101jumi ieg\u016bst jaunus un main\u012btus ra\u017eo\u0161anas pas\u016bt\u012bjumus, izmai\u0146as pas\u016bt\u012bjumu nodo\u0161an\u0101 izpildei, kr\u0101jumu atlikumus un iepirkuma pas\u016bt\u012bjumus. Bie\u017eumu nosaka katrai ra\u017eotnei: ra\u017eo\u0161anas pas\u016bt\u012bjumus var nolas\u012bt ik p\u0113c da\u017e\u0101m min\u016bt\u0113m, bet kr\u0101jumus \u2014 reizi stund\u0101. Ja izmantojat Oracle Integration, notikums Work Order Status Change var izrais\u012bt t\u016bl\u012bt\u0113ju datu nolas\u012b\u0161anu.<\/p>\n\n\n<p>SkyPlanner nos\u016bta t\u012bmek\u013ca aiz\u0137eres, kad main\u0101s st\u0101voklis vai grafiks, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c Oracle izraisa notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Oracle Fusion Cloud objekts (REST resurss)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Nomenklat\u016bras vien\u012bbas (<code>itemsV2<\/code>), m\u0113rvien\u012bbas<\/td><td>Produkti un materi\u0101li<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam periodiska piepras\u012b\u0161ana<\/td><\/tr><tr><td>Nomenklat\u016bras vien\u012bbu strukt\u016bras (<code>itemStructures<\/code>)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Darba defin\u012bcijas (<code>workDefinitions<\/code>): oper\u0101cijas, oper\u0101ciju resursi, pat\u0113ri\u0146\u0161, Basis Type<\/td><td>Procesa so\u013ci ar ilgumu, sagatavo\u0161anas un nosl\u0113guma laiku<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Darba centri (<code>workCenters<\/code>), iek\u0101rtu un darbasp\u0113ka ra\u017eo\u0161anas resursi (<code>productionResources<\/code>)<\/td><td>Darba centri, darba centru grupas, person\u0101ls, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 reti<\/td><\/tr><tr><td>Kalend\u0101ri un mai\u0146as (<code>calendars<\/code>, mai\u0146u iz\u0146\u0113mumi)<\/td><td>Mai\u0146as un br\u012bvdienas<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Katru dienu vai atsevi\u0161\u0137a mai\u0146u p\u0101rvald\u012bba SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas organiz\u0101cijas<\/td><td>Darba centru grupas katrai ra\u017eotnei<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumi (<code>workOrders<\/code>, <code>processWorkOrders<\/code>) ar <code>WorkOrderOperation<\/code> un <code>WorkOrderOperationMaterial<\/code><\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Piepras\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Kr\u0101jumu atlikumi (<code>inventoryOnhandBalances<\/code>)<\/td><td>Kr\u0101jumu atlikumi<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Piepras\u012b\u0161ana reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumi (<code>purchaseOrders<\/code>) ar apsol\u012btajiem pieg\u0101des datumiem<\/td><td>Iepirkuma pas\u016bt\u012bjumi, ien\u0101ko\u0161ie materi\u0101li p\u0113c pieg\u0101des datuma<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Piepras\u012b\u0161ana reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td><code>WorkOrderOperation<\/code> <code>PlannedStartDate<\/code>, <code>PlannedCompletionDate<\/code> (PATCH)<\/td><td>Katra ra\u017eo\u0161anas uzdevuma pl\u0101notais s\u0101kums un beigas<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>Mainoties grafikam, ar SkyPlanner t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td><code>WorkOrderOperationResource<\/code> datumi (PATCH)<\/td><td>Resursu pie\u0161\u0137\u012brums katram ra\u017eo\u0161anas uzdevumam<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>Mainoties grafikam, ja \u0161\u012b iesp\u0113ja ir izv\u0113l\u0113ta<\/td><\/tr><tr><td><code>operationTransactions<\/code> (POST)<\/td><td>Pabeigtie daudzumi katr\u0101 oper\u0101cij\u0101<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>P\u0113c katra apstiprin\u0101juma<\/td><\/tr><tr><td><code>resourceTransactions<\/code> (POST)<\/td><td>Laika uzskaites ieraksti: darbinieku un iek\u0101rtu darba laiks<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>P\u0113c katra apstiprin\u0101juma vai katr\u0101 mai\u0146\u0101, ja \u0161\u012b iesp\u0113ja ir izv\u0113l\u0113ta<\/td><\/tr><tr><td>Nav Oracle Fusion Cloud<\/td><td>Sagatavo\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, alternat\u012bv\u0101s iek\u0101rtas un person\u0101ls<\/td><td>Tiek uztur\u0113ts SkyPlanner<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas sh\u0113mas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet nomenklat\u016bras vien\u012bbas, to strukt\u016bras, darba defin\u012bcijas, darba centrus, ra\u017eo\u0161anas resursus un kalend\u0101rus, izmantojot REST, vai vienreiz iel\u0101d\u0113jiet tos no FBDI izvilkumiem. R\u016bp\u012bgi izv\u0113lieties darba centru atbilst\u012bbu: darba centrs ar \u010detr\u0101m viena resursa iek\u0101rt\u0101m k\u013c\u016bst par vienu darba centru grupu vai \u010detriem darba centriem. Katra ra\u017eo\u0161anas organiz\u0101cija k\u013c\u016bst par darba centru grupu, t\u0101p\u0113c visas ra\u017eotnes ir iek\u013cautas vien\u0101 pl\u0101n\u0101.<\/p>\n\n\n<p><strong>2. Ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet izpildei nodotos un v\u0113l nenodotos ra\u017eo\u0161anas pas\u016bt\u012bjumus kop\u0101 ar to oper\u0101cij\u0101m un materi\u0101liem, k\u0101 ar\u012b atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered.<\/p>\n\n\n<p>Sast\u0101diet grafiku ra\u017eo\u0161anas pas\u016bt\u012bjumiem, nevis Supply Planning pl\u0101notajiem pas\u016bt\u012bjumiem. Vispirms pl\u0101notie pas\u016bt\u012bjumi Oracle sist\u0113m\u0101 j\u0101p\u0101rv\u0113r\u0161 par ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Kad pl\u0101no\u0161anas dzin\u0113js ievieto vai p\u0101rvieto ra\u017eo\u0161anas uzdevumu, SkyPlanner t\u012bmek\u013ca aiz\u0137ere ierosina PATCH piepras\u012bjumu uz <code>workOrders\/{WorkOrderId}\/child\/WorkOrderOperation\/{WorkOrderOperationId}<\/code> ar <code>PlannedStartDate<\/code> un <code>PlannedCompletionDate<\/code>. Sp\u0113k\u0101 ir Oracle noteikums: &#8220;The planned start date must not occur before the start date of the work order or after the finish date of the work order.&#8221; (Pl\u0101notais s\u0101kuma datums nedr\u012bkst b\u016bt pirms ra\u017eo\u0161anas pas\u016bt\u012bjuma s\u0101kuma datuma vai p\u0113c t\u0101 beigu datuma.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/op-workorders-workorderid-child-workorderoperation-workorderoperationid-patch.html\">avots<\/a>) T\u0101p\u0113c, ja jaunais grafiks p\u0101rsniedz \u0161\u012bs robe\u017eas, integr\u0101cija vispirms ar PATCH atjaunina ra\u017eo\u0161anas pas\u016bt\u012bjuma galvenes datumus un p\u0113c tam oper\u0101ciju datumus.<\/p>\n\n\n<p><strong>4. Izpildes apstiprin\u0101jumi ra\u017eotn\u0113.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un laika uzskaites ieraksti nodro\u0161ina grafika aktualit\u0101ti. Izpild\u012btos daudzumus nos\u016bta uz <code>operationTransactions<\/code>, bet darbinieku un iek\u0101rtu darba laiku \u2014 uz <code>resourceTransactions<\/code>. Ja j\u016bsu ra\u017eotne jau re\u0123istr\u0113 izpildi Oracle sist\u0113m\u0101, SkyPlanner t\u0101 viet\u0101 nolasa izpildes datus no t\u0101s.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms palai\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Nomenklat\u016bras vien\u012bbas, to strukt\u016bras, darba defin\u012bcijas, daudzumi, ra\u017eo\u0161anas pas\u016bt\u012bjuma statuss<\/td><td>Oracle Fusion Cloud<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiks, resursu pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sagatavo\u0161anas laiku matrica, pras\u012bbas instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Resursu, oper\u0101ciju un materi\u0101lu uzskaites ieraksti<\/td><td>Oracle \u2014 ieraksti ievad\u012bti turpat vai nos\u016bt\u012bti no SkyPlanner laika uzskaites<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas ieraksta oper\u0101ciju datumus. SkyPlanner nav vajadz\u012bga Oracle grafiku sast\u0101d\u012b\u0161anas darbvieta, t\u0101p\u0113c pl\u0101noto datumu ierakst\u012b\u0161an\u0101 tas aizst\u0101j Production Scheduling. Ja Production Scheduling joproj\u0101m nodod grafikus izpildei, nodaliet t\u0101 organiz\u0101cijas no t\u0101m, kur\u0101m grafikus sast\u0101da SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c darbu s\u0101kuma, ar\u012b lielos uz\u0146\u0113mumos. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot no Oracle CSV vai Excel form\u0101t\u0101 eksport\u0113tus darba centrus, darba defin\u012bcijas un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu atbilst\u012bbu defin\u0113\u0161ana.<\/strong> Apstipriniet atbilst\u012bbu tabulu, atbild\u012bbu par datiem, tv\u0113rum\u0101 iek\u013caut\u0101s organiz\u0101cijas, sinhroniz\u0101cijas bie\u017eumu un to, vai uzskaites ieraksti tiks nos\u016bt\u012bti atpaka\u013c.<\/li>\n\n\n<li><strong>Piek\u013cuve Oracle.<\/strong> Izveidojiet integr\u0101cijas lietot\u0101ju un lomas. Vispirms veiciet p\u0101rbaudes Oracle vid\u0113, kas nav produkcijas vide.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Nomenklat\u016bras vien\u012bbas, to strukt\u016bras, darba defin\u012bcijas, darba centri, ra\u017eo\u0161anas resursi, kalend\u0101ri.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Periodiska datu piepras\u012b\u0161ana ar filtriem, lappuso\u0161anu un atk\u0101rtotiem m\u0113\u0123in\u0101jumiem.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner sist\u0113m\u0101.<\/strong> Sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits katram ra\u017eo\u0161anas uzdevumam un alternat\u012bvas iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> SkyPlanner t\u012bmek\u013ca aiz\u0137eru ierosin\u0101ti PATCH piepras\u012bjumi, k\u0101 ar\u012b uzskaites ierakstu nos\u016bt\u012b\u0161ana, ja t\u0101 paredz\u0113ta.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Darbiniet SkyPlanner l\u012bdztekus pa\u0161reiz\u0113jam pl\u0101nam, sal\u012bdziniet datumus un labojiet pamatdatus.<\/li>\n\n\n<li><strong>Palai\u0161ana.<\/strong> Kad dati sakr\u012bt, iesl\u0113dziet atpaka\u013cierakst\u012b\u0161anu katrai ra\u017eotnei p\u0113c k\u0101rtas.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-oracle-fusion-cloud-integ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101 Oracle Fusion Cloud integr\u0101cij\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u0101not\u0101ja noklus\u0113juma darb\u012bba.<\/strong> Oracle pl\u0101no\u0161anas dzin\u0113js, kas ne\u0146em v\u0113r\u0101 jaudas ierobe\u017eojumus, tiek palaists, izveidojot ra\u017eo\u0161anas pas\u016bt\u012bjumu, k\u0101 ar\u012b veicot &#8220;certain update actions&#8221; (noteiktas atjaunin\u0101\u0161anas darb\u012bbas). P\u0101rbaudiet sav\u0101 vid\u0113, kuri atjaunin\u0101jumi p\u0101rr\u0113\u0137ina datumus, un nodro\u0161iniet, lai SkyPlanner oper\u0101ciju datumus ierakst\u012btu p\u0113d\u0113jais.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas pas\u016bt\u012bjumu laika robe\u017eas.<\/strong> Oper\u0101ciju datumiem j\u0101iek\u013caujas starp ra\u017eo\u0161anas pas\u016bt\u012bjuma s\u0101kuma un beigu datumu. Vispirms ar PATCH atjauniniet galveni.<\/li>\n\n\n<li><strong>Basis Type.<\/strong> Resursu pat\u0113ri\u0146\u0161 ir nor\u0101d\u012bts uz vienu vien\u012bbu tikai tad, ja Basis Type v\u0113rt\u012bba ir Variable. V\u0113rt\u012bba Fixed noz\u012bm\u0113 fiks\u0113tu laiku vienai oper\u0101cijai. Import\u0113\u0161anas laik\u0101 veiciet p\u0101rr\u0113\u0137inu, cit\u0101di visi ilgumi b\u016bs nepareizi.<\/li>\n\n\n<li><strong>Diskr\u0113t\u0101 un procesu ra\u017eo\u0161ana.<\/strong> Diskr\u0113taj\u0101 ra\u017eo\u0161an\u0101 izmanto <code>workOrders<\/code>, bet procesu ra\u017eo\u0161an\u0101 \u2014 <code>processWorkOrders<\/code>. Ja izmantojat abus ra\u017eo\u0161anas veidus, defin\u0113jiet atbilst\u012bbas abiem.<\/li>\n\n\n<li><strong>Lappuso\u0161ana.<\/strong> Oracle ierobe\u017eo ierakstu skaitu vien\u0101 REST piepras\u012bjum\u0101. Katr\u0101 vaic\u0101jum\u0101 izmantojiet lappuso\u0161anu un filtr\u0113jiet p\u0113c organiz\u0101cijas un statusa.<\/li>\n\n\n<li><strong>Ceturk\u0161\u0146a atjaunin\u0101jumi.<\/strong> Oracle atjaunina Fusion katru ceturksni. Nor\u0101diet ce\u013c\u0101 fiks\u0113tu REST versiju un p\u0113c katra atjaunin\u0101juma veiciet atk\u0101rtotas p\u0101rbaudes.<\/li>\n\n\n<li><strong>Statusu noteikumi.<\/strong> Ra\u017eo\u0161anas pas\u016bt\u012bjumiem ar statusu Pending Approval vai sl\u0113gtu statusu nedr\u012bkst pie\u0161\u0137irt jaunus datumus. Izsl\u0113dziet tos ar filtru datu nolas\u012b\u0161anas laik\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-oracle-fusion-cl\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 un uztur Oracle Fusion Cloud integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c palai\u0161anas,<\/strong> aptverot saska\u0146otos REST resursus un organiz\u0101cijas. Katra ra\u017eotne izmanto Oracle Fusion Cloud at\u0161\u0137ir\u012bgi, un konfigur\u0101cij\u0101 tiek liktas liet\u0101 zin\u0101\u0161anas par \u0161\u012bm \u012bpatn\u012bb\u0101m.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b j\u016bsu Oracle partneris.<\/strong> Partneris p\u0101rzina j\u016bsu organiz\u0101cijas, lomas un papla\u0161in\u0101jumus un kop\u0101 ar SkyPlanner komandu var iestat\u012bt integr\u0101cijas lietot\u0101ju, lomas un nepiecie\u0161am\u0101s Oracle Integration pl\u016bsmas.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var papla\u0161in\u0101t integr\u0101ciju,<\/strong> izmantojot SkyPlanner REST API un API pilnvaru. Lai s\u0101ktu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz\u0113s. Nor\u0101d\u012bjumus atrad\u012bsiet <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un veicot apmaksu katru m\u0113nesi. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 kop\u0101 ar j\u016bsu pl\u0101na pied\u0101v\u0101jumu, \u0146emot v\u0113r\u0101 j\u016bsu procesu un vajadz\u012bbas. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/\">Oracle Fusion Cloud ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu<\/a>, <a href=\"\/lv\/integracija\/erp\/oracle-fusion-cloud\/\">Oracle Fusion Cloud lapu<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013cu<\/a>. Izmantojat NetSuite? Skatiet <a href=\"\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/\">NetSuite integr\u0101cijas rokasgr\u0101matu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana ietaupa 2 darba stundas katru ned\u0113\u013cu, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas ra\u017eotn\u0113 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumta dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu skaidr\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161ana ietaupa l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki sast\u0101d\u012bti autom\u0101tiski<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki tiek sast\u0101d\u012bti autom\u0101tiski, un visa organiz\u0101cija redz ra\u017eo\u0161anas situ\u0101ciju re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Oracle Fusion Cloud ir API ra\u017eo\u0161anas pas\u016bt\u012bjumiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Oracle Fusion Cloud SCM REST API ir resurss <code>workOrders<\/code> ar oper\u0101ciju, resursu un materi\u0101lu pak\u0101rtotajiem resursiem, k\u0101 ar\u012b <code>processWorkOrders<\/code> procesu ra\u017eo\u0161anai. Tas atbalsta GET, POST un PATCH.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">Ar PATCH piepras\u012bjumu ra\u017eo\u0161anas pas\u016bt\u012bjuma pak\u0101rtotajam resursam <code>WorkOrderOperation<\/code>, iestatot <code>PlannedStartDate<\/code> un <code>PlannedCompletionDate<\/code>. Oper\u0101ciju datumiem j\u0101iek\u013caujas ra\u017eo\u0161anas pas\u016bt\u012bjuma datumu robe\u017e\u0101s, t\u0101p\u0113c vajadz\u012bbas gad\u012bjum\u0101 vispirms ar PATCH atjaunina galveni.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 operatoru izpildes apstiprin\u0101jumi non\u0101k Oracle sist\u0113m\u0101?<\/summary>\n<p class=\"sp-faq__a\">Izpild\u012btos daudzumus nos\u016bta uz <code>operationTransactions<\/code>, bet darbinieku un iek\u0101rtu darba laiku \u2014 uz <code>resourceTransactions<\/code>. Abi ir Fusion Manufacturing REST resursi, kas pie\u0146em POST piepras\u012bjumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Oracle Fusion Cloud atbalsta t\u012bmek\u013ca aiz\u0137eres?<\/summary>\n<p class=\"sp-faq__a\">Fusion public\u0113 biznesa notikumus, piem\u0113ram, Work Order Status Change, kurus var abon\u0113t Oracle Integration. Ja Oracle Integration netiek izmantots, integr\u0101cija periodiski pieprasa datus no REST API atbilsto\u0161i katrai ra\u017eotnei iestat\u012btajam interv\u0101lam. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Oracle partnerim pied\u0101v\u0101t Oracle Production Scheduling vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja klientam nepiecie\u0161ams vienots, autom\u0101tiski atjaunin\u0101ts grafiks vis\u0101m ra\u017eotn\u0113m, kur\u0101 \u0146emta v\u0113r\u0101 faktisk\u0101 iek\u0101rtu un darbinieku jauda. Production Scheduling tiek iesp\u0113jots Supply Chain Planning pied\u0101v\u0101juma ietvaros, sast\u0101da grafiku katrai pl\u0101no\u0161anas organiz\u0101cijai atsevi\u0161\u0137i un piem\u0113ro p\u0101rregul\u0113\u0161anas noteikumus tikai tiem iek\u0101rtu resursiem, kuros ir tikai viena iek\u0101rta (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/changeover-rules.html\">Oracle dokument\u0101cija<\/a>). SkyPlanner savienojas, izmantojot SCM REST API, autom\u0101tiski p\u0101rpl\u0101no, pl\u0101no p\u0101rregul\u0113\u0161anu, instrumentus, brig\u0101des un materi\u0101lus, k\u0101 ar\u012b \u013cauj str\u0101d\u0101t neierobe\u017eotam lietot\u0101ju skaitam \u2014 no 199 \u20ac m\u0113nes\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t datus no Oracle CSV vai Excel form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Oracle Fusion Cloud Oracle Fusion Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Oracle Fusion Cloud integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot Oracle Fusion Cloud Manufacturing ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Oracle Fusion Cloud, izmantojot pa\u0161a Oracle REST resursus: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku &#8230; <a title=\"Oracle Fusion Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/\" aria-label=\"Read more about Oracle Fusion Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106151,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106876","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Oracle Cloud APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem<\/title>\n<meta name=\"description\" content=\"Oracle Fusion Cloud un SkyPlanner APS: SCM REST API, workOrders PATCH oper\u0101ciju datumiem, oper\u0101ciju un resursu dar\u012bjumi, datu kart\u0113\u0161ana, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Oracle Fusion Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Oracle Fusion Cloud un SkyPlanner APS: SCM REST API, workOrders PATCH oper\u0101ciju datumiem, oper\u0101ciju un resursu dar\u012bjumi, datu kart\u0113\u0161ana, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/integracijas-celvedis\\\/\",\"name\":\"Oracle Cloud APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Oracle Fusion Cloud un SkyPlanner APS: SCM REST API, workOrders PATCH oper\u0101ciju datumiem, oper\u0101ciju un resursu dar\u012bjumi, datu kart\u0113\u0161ana, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Oracle Fusion Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Oracle Cloud APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","description":"Oracle Fusion Cloud un SkyPlanner APS: SCM REST API, workOrders PATCH oper\u0101ciju datumiem, oper\u0101ciju un resursu dar\u012bjumi, datu kart\u0113\u0161ana, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Oracle Fusion Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Oracle Fusion Cloud un SkyPlanner APS: SCM REST API, workOrders PATCH oper\u0101ciju datumiem, oper\u0101ciju un resursu dar\u012bjumi, datu kart\u0113\u0161ana, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/","name":"Oracle Cloud APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Oracle Fusion Cloud un SkyPlanner APS: SCM REST API, workOrders PATCH oper\u0101ciju datumiem, oper\u0101ciju un resursu dar\u012bjumi, datu kart\u0113\u0161ana, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/"},{"@type":"ListItem","position":5,"name":"Oracle Fusion Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Oracle Fusion Cloud Oracle Fusion Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Oracle Fusion Cloud integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot Oracle Fusion Cloud Manufacturing ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Oracle Fusion Cloud, izmantojot pa\u0161a Oracle REST resursus: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106876","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106876"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106876\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106151"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106876"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}