{"id":106847,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/","title":{"rendered":"Vai Oracle Fusion Cloud nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojam Work Order Scheduling un Production Scheduling"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Oracle Fusion Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Oracle Fusion Cloud nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? <span class=\"hl\">Skaidrojam Work Order Scheduling un Production Scheduling<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Pa\u0161\u0101 Oracle Fusion Cloud Manufacturing \u2014 n\u0113. Oracle nor\u0101da, ka ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku sast\u0101d\u012b\u0161anas dzinis ne\u0146em v\u0113r\u0101 ierobe\u017eojumus un pie\u0146em, ka jauda ir neierobe\u017eota. Grafikus atbilsto\u0161i pieejamajai jaudai sast\u0101da Oracle Production Scheduling \u2014 Supply Chain Planning pied\u0101v\u0101jum\u0101 iek\u013cauta darba zona. Savuk\u0101rt Supply Planning pl\u0101no jaudu pa laika periodiem. Ra\u017eot\u0101ji, kuriem vair\u0101k\u0101s r\u016bpn\u012bc\u0101s <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">j\u0101pl\u0101no darbs, \u0146emot v\u0113r\u0101 katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la re\u0101lo pieejam\u012bbu<\/a>, l\u012bdz\u0101s Oracle Fusion Cloud izmanto SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Raksts balst\u012bts uz Oracle 26C dokument\u0101ciju. Oracle E-Business Suite bija savi, sen\u0101ki grafiku sast\u0101d\u012b\u0161anas produkti, savuk\u0101rt Oracle NetSuite ir cita ERP sist\u0113ma. T\u0101p\u0113c, pirms pa\u013caujaties uz k\u0101d\u0101 lap\u0101 las\u012bto, p\u0101rbaudiet, par kuru produktu taj\u0101 ir runa.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-oracle-fusion-cloud-plans-production-step-by\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 Oracle Fusion Cloud pl\u0101no ra\u017eo\u0161anu \u2014 soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Ra\u017eo\u0161anas pamatdati<\/h3>\n\n\n<p>Oracle Fusion Cloud Manufacturing jaudas uzskaites pamat\u0101 ir <strong>darba centri<\/strong> un <strong>ra\u017eo\u0161anas resursi<\/strong>. Resurss ir iek\u0101rta vai darbasp\u0113ks ar savu kalend\u0101ru un mai\u0146\u0101m. <strong>Darba defin\u012bcij\u0101s<\/strong> ir nor\u0101d\u012btas preces ra\u017eo\u0161anas oper\u0101cijas. Katrai oper\u0101cijai ir uzskait\u012bti t\u0101s <strong>oper\u0101cijas resursi<\/strong>, to pat\u0113ri\u0146\u0161 un Basis Type, k\u0101 ar\u012b <strong>oper\u0101cijas materi\u0101li<\/strong>. Komponenti tiek ieg\u016bti no <strong>pre\u010du strukt\u016br\u0101m<\/strong> modul\u012b Product Information Management.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki: p\u0113c b\u016bt\u012bbas bez ierobe\u017eojumiem<\/h3>\n\n\n<p>Izveidojot <strong>ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/strong>, Fusion tam sast\u0101da grafiku. Oracle skaidri apraksta dzin\u0113ja darb\u012bbu: &#8220;Oracle Manufacturing uses unconstrained scheduling engine in the background to schedule work orders during create and certain update actions.&#8221; (Oracle Manufacturing fon\u0101 izmanto grafiku sast\u0101d\u012b\u0161anas dzin\u0113ju bez ierobe\u017eojumiem, lai pl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumus to izveides un noteiktu atjaunin\u0101\u0161anas darb\u012bbu laik\u0101.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faumf\/how-work-orders-are-scheduled.html\">avots<\/a>)<\/p>\n\n\n<p>Resursu datumus apr\u0113\u0137ina p\u0113c resursa pat\u0113ri\u0146a, oper\u0101cijas resursa un resursa kalend\u0101ra. No tiem izriet oper\u0101ciju datumi un p\u0113c tam \u2014 ra\u017eo\u0161anas pas\u016bt\u012bjuma datumi. Taj\u0101 pa\u0161\u0101 lap\u0101 nor\u0101d\u012bts ar\u012b jaudas pie\u0146\u0113mums: &#8220;resources are assumed to have infinite capacity and the scheduling engine disregards loads on the resources from other work orders.&#8221; (Tiek pie\u0146emts, ka resursu jauda ir neierobe\u017eota, un grafiku sast\u0101d\u012b\u0161anas dzin\u0113js ne\u0146em v\u0113r\u0101 citu ra\u017eo\u0161anas pas\u016bt\u012bjumu rad\u012bto resursu noslodzi.)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Pl\u0101no\u0161ana uz priek\u0161u, atpaka\u013c un no atskaites oper\u0101cijas<\/h3>\n\n\n<p>Ra\u017eo\u0161anas pas\u016bt\u012bjumu pl\u0101no uz priek\u0161u no s\u0101kuma datuma vai atpaka\u013c no pabeig\u0161anas datuma. Daudzums ietekm\u0113 ilgumu tikai tad, ja resursa Basis Type v\u0113rt\u012bba ir Variable. REST darb\u012bba <code>midpointRescheduleWorkOrderOperation<\/code> par atskaites punktu izmanto vienu oper\u0101ciju: Oracle &#8220;backward schedules the resources for operations that already occurred, and forward schedules the resources for subsequent operations.&#8221; (Jau notiku\u0161o oper\u0101ciju resursus pl\u0101no atpaka\u013c, bet turpm\u0101ko oper\u0101ciju resursus \u2014 uz priek\u0161u.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/op-workorders-action-midpointrescheduleworkorderoperation-post.html\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Supply Planning: jauda pa laika periodiem<\/h3>\n\n\n<p>Oracle Supply Planning var izveidot pl\u0101nu, kur\u0101 \u0146emti v\u0113r\u0101 ierobe\u017eojumi. Tas &#8220;respects constraints by moving orders to earlier time buckets or offloading to an alternate resource, work definition, or supply source.&#8221; (Iev\u0113ro ierobe\u017eojumus, p\u0101rce\u013cot pas\u016bt\u012bjumus uz agr\u0101kiem laika periodiem vai p\u0101rdalot tos alternat\u012bvam resursam, darba defin\u012bcijai vai pieg\u0101des avotam.) Ja ar to nepietiek, &#8220;the constrained supply plan, as a last resort, overloads resource and supplier capacity to meet demands on time.&#8221; (Pieg\u0101des pl\u0101ns ar ierobe\u017eojumiem k\u0101 p\u0113d\u0113jo risin\u0101jumu p\u0101rslogo resursu un pieg\u0101d\u0101t\u0101ju jaudu, lai savlaic\u012bgi apmierin\u0101tu piepras\u012bjumu.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fausp\/overview-of-constraint-based-supply-planning.html\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Oracle Production Scheduling: pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/h3>\n\n\n<p>Oracle Production Scheduling ir r\u012bks ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i re\u0101lajai jaudai. Oracle t\u0101 uzdevumu apraksta \u0161\u0101di: &#8220;Using Oracle Production Scheduling, you can consider resource capacity constraints and the changeovers on resources that occur throughout production.&#8221; (Ar Oracle Production Scheduling var \u0146emt v\u0113r\u0101 resursu jaudas ierobe\u017eojumus un resursu p\u0101rregul\u0113\u0161anu ra\u017eo\u0161anas gait\u0101.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/why-you-use-production-scheduling.html\">avots<\/a>)<\/p>\n\n\n<p>To iesp\u0113jo k\u0101 darba zonu sada\u013c\u0101 &#8220;Offering: Supply Chain Planning&#8221; (Pied\u0101v\u0101jums: Supply Chain Planning) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/how-to-enable-the-production-scheduling-work-area.html\">avots<\/a>). P\u0113c tam pl\u0101not\u0101js str\u0101d\u0101 ar vienu grafiku katrai pl\u0101no\u0161anas organiz\u0101cijai:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Solis<\/th><th>Kas notiek<\/th><\/tr><\/thead><tbody><tr><td>Grafika iestat\u012bjumi<\/td><td>Organiz\u0101cijai nosaka pl\u0101no\u0161anas periodu, nemain\u0101mo periodu un nodo\u0161anas izpildei periodu<\/td><\/tr><tr><td>Datu atsvaidzin\u0101\u0161ana<\/td><td>No SCM ieg\u016bst aktu\u0101los ra\u017eo\u0161anas pas\u016bt\u012bjumus, kr\u0101jumu atlikumus, pieg\u0101des un piepras\u012bjumu<\/td><\/tr><tr><td>Grafika apr\u0113\u0137in\u0101\u0161ana<\/td><td>Sast\u0101da grafiku atbilsto\u0161i re\u0101lajai jaudai un p\u0101rregul\u0113\u0161anas noteikumiem<\/td><\/tr><tr><td>Grafika kori\u0123\u0113\u0161ana<\/td><td>Piem\u0113ro pl\u0101not\u0101ja veikt\u0101s izmai\u0146as Gantt diagramm\u0101 vai izpildes sarakst\u0101<\/td><\/tr><tr><td>Nodo\u0161ana izpildei<\/td><td>Ieraksta ra\u017eo\u0161anas pas\u016bt\u012bjumu un oper\u0101ciju datumus, k\u0101 ar\u012b izv\u0113l\u0113tos resursus atpaka\u013c modul\u012b Manufacturing<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Visu ciklu var izpild\u012bt ar\u012b ar REST resursu <code>productionSchedulingPlans<\/code>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas paliek pl\u0101not\u0101ja p\u0101rzi\u0146\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pamata grafiku sast\u0101d\u012b\u0161ana ne\u0146em v\u0113r\u0101 citus pas\u016bt\u012bjumus.<\/strong> Fusion Manufacturing nosaka katra ra\u017eo\u0161anas pas\u016bt\u012bjuma datumus, pie\u0146emot neierobe\u017eotu jaudu. Oracle nor\u0101da, ka tas &#8220;potentially plans to execute production for multiple work orders simultaneously.&#8221; (Var iepl\u0101not vair\u0101ku ra\u017eo\u0161anas pas\u016bt\u012bjumu vienlaic\u012bgu izpildi.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/why-you-use-production-scheduling.html\">avots<\/a>)<\/li>\n\n\n<li><strong>Supply Planning pl\u0101no pa laika periodiem.<\/strong> Pl\u0101ni ar ierobe\u017eojumiem p\u0101rce\u013c pas\u016bt\u012bjumus starp laika periodiem un k\u0101 p\u0113d\u0113jo risin\u0101jumu p\u0101rslogo jaudu.<\/li>\n\n\n<li><strong>Viens grafiks katrai organiz\u0101cijai.<\/strong> Production Scheduling apr\u0113\u0137ina atsevi\u0161\u0137u grafiku katrai pl\u0101no\u0161anas organiz\u0101cijai.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana iek\u0101rt\u0101m ar vienu pieejamo vien\u012bbu.<\/strong> &#8220;Changeover rules are applied only on resources that have resource type set to equipment and default units available set to 1.&#8221; (P\u0101rregul\u0113\u0161anas noteikumus piem\u0113ro tikai iek\u0101rtu resursiem, kuriem p\u0113c noklus\u0113juma pieejama viena vien\u012bba.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/changeover-rules.html\">avots<\/a>)<\/li>\n\n\n<li><strong>Nodo\u0161anai izpildei ir noteikts periods.<\/strong> &#8220;Only work orders within the release horizon specified in the schedule options will be released.&#8221; (Izpildei nodod tikai tos ra\u017eo\u0161anas pas\u016bt\u012bjumus, kas ietilpst grafika iestat\u012bjumos nor\u0101d\u012btaj\u0101 nodo\u0161anas period\u0101.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/use_case_manage_production_schedule.html\">avots<\/a>)<\/li>\n\n\n<li><strong>Pirms nodo\u0161anas izpildei atsvaidziniet datus.<\/strong> &#8220;If the schedule isn&#8217;t refreshed after the previous release, changes to the schedule for some work orders might not be released.&#8221; (Ja p\u0113c iepriek\u0161\u0113j\u0101s nodo\u0161anas izpildei grafiks nav atsvaidzin\u0101ts, da\u017eu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafika izmai\u0146as var netikt nodotas izpildei.) Ra\u017eo\u0161anas pas\u016bt\u012bjumus status\u0101 Pending Approval neatjaunina, un Supply Planning pl\u0101notos pas\u016bt\u012bjumus nenodod izpildei. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/release-analysis-and-actions.html\">avots<\/a>)<\/li>\n\n\n<li><strong>Ciklu vada pl\u0101not\u0101js.<\/strong> Refresh, Solve, Repair un Release ir darb\u012bbas, ko veic pl\u0101not\u0101js vai izpilda iepl\u0101noti sist\u0113mas uzdevumi.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-oracle-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar Oracle ieb\u016bv\u0113tajiem grafiku sast\u0101d\u012b\u0161anas r\u012bkiem<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar Oracle Fusion Cloud pa\u0161a r\u012bkiem pietiek, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>P\u0113c izpildes ilguma un resursu pat\u0113ri\u0146a apr\u0113\u0137in\u0101tie ra\u017eo\u0161anas pas\u016bt\u012bjumu datumi ir pietiekami prec\u012bzi, lai j\u016bs var\u0113tu sol\u012bt termi\u0146us.<\/li>\n\n\n<li>Jaudas sastr\u0113gumi rodas reti, un viens pl\u0101not\u0101js var manu\u0101li nov\u0113rst grafika p\u0101rkl\u0101\u0161anos.<\/li>\n\n\n<li>J\u016bs jau izmantojat Supply Chain Planning, un par katru pl\u0101no\u0161anas organiz\u0101ciju atbild centr\u0101la pl\u0101no\u0161anas komanda.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anai ir noz\u012bme galvenok\u0101rt atsevi\u0161\u0137\u0101s iek\u0101rt\u0101s.<\/li>\n\n\n<li>Katra r\u016bpn\u012bca pl\u0101no patst\u0101v\u012bgi, un operatoriem ra\u017eotn\u0113 nav j\u0101redz aktu\u0101l\u0101 darbu sec\u012bba.<\/li>\n\n<\/ul>\n\n\n<p>Ja tas atbilst j\u016bsu situ\u0101cijai, uzturiet darba defin\u012bcijas un resursu kalend\u0101rus k\u0101rt\u012bb\u0101 un atsvaidziniet datus pirms katras nodo\u0161anas izpildei.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas \u0146em v\u0113r\u0101 re\u0101lo jaudu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar ieb\u016bv\u0113taj\u0101m iesp\u0113j\u0101m vairs nepietiek, ja uz jums attiecas vair\u0101ki no \u0161iem punktiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Pieg\u0101des kav\u0113jas, lai gan pa laika periodiem skat\u012bts pieg\u0101des pl\u0101ns \u0161\u0137iet izpild\u0101ms.<\/li>\n\n\n<li>P\u0113c katra steidzama pas\u016bt\u012bjuma vai iek\u0101rtas boj\u0101juma pl\u0101not\u0101ji izkl\u0101jlap\u0101s p\u0101rk\u0101rto ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bbu.<\/li>\n\n\n<li>L\u012bnij\u0101s, brig\u0101d\u0113s vai resursos ar vair\u0101k\u0101m vien\u012bb\u0101m p\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no iepriek\u0161 ra\u017eot\u0101 produkta.<\/li>\n\n\n<li>Operatoru pieejam\u012bba, mai\u0146as un promb\u016btne ierobe\u017eo izlaidi tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas.<\/li>\n\n\n<li>\u0160tances, veidnes vai pal\u012bgier\u012bces p\u0101rvieto starp iek\u0101rt\u0101m.<\/li>\n\n\n<li>Darbs p\u0101riet no vienas r\u016bpn\u012bcas uz citu, un katrai r\u016bpn\u012bcai j\u0101redz p\u0101r\u0113jo darbs.<\/li>\n\n\n<li>J\u016bs izmantojat Fusion Manufacturing bez Supply Chain Planning.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Ko mekl\u0113t risin\u0101jum\u0101<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vienlaikus \u0146em v\u0113r\u0101 visu resursu re\u0101lo pieejam\u012bbu:<\/strong> iek\u0101rtas, cilv\u0113kus un instrumentus, nevis apkopotu jaudu pa periodiem.<\/li>\n\n\n<li><strong>Sec\u012bbas noteik\u0161ana oper\u0101ciju l\u012bmen\u012b<\/strong> p\u0113c priorit\u0101t\u0113m un izpildes termi\u0146iem.<\/li>\n\n\n<li><strong>Sagatavo\u0161anas laiku matrica<\/strong> ar katram darba centram nor\u0101d\u012btiem asimetriskiem p\u0101rregul\u0113\u0161anas laikiem, kas atkar\u012bgi no darbu sec\u012bbas.<\/li>\n\n\n<li><strong>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/strong> un <strong>ra\u017eo\u0161anas uzdevumi vair\u0101kiem operatoriem<\/strong>.<\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161ana atbilsto\u0161i materi\u0101lu pieejam\u012bbai<\/strong>, p\u0101rbaudot kr\u0101jumu atlikumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>Vair\u0101ku r\u016bpn\u012bcu pl\u0101no\u0161ana<\/strong> vien\u0101 grafik\u0101.<\/li>\n\n\n<li><strong>Autom\u0101tiska grafika p\u0101rpl\u0101no\u0161ana<\/strong>, mainoties darba gaitai vai pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Sak\u0101rtota datu apmai\u0146a ar Oracle.<\/strong> Datu las\u012b\u0161ana un rakst\u012b\u0161ana, izmantojot Oracle Fusion Cloud SCM REST API, un pl\u0101noto oper\u0101ciju datumu ierakst\u012b\u0161ana ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101. Katram pieg\u0101d\u0101t\u0101jam jaut\u0101jiet, k\u0101dus API resursus tas izsauc un kas nodro\u0161in\u0101s integr\u0101cijas atbalstu p\u0113c ievie\u0161anas.<\/li>\n\n<\/ul>\n\n\n<p>Pla\u0161\u0101k par metodi lasiet <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ce\u013cved\u012b par ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101da ir SkyPlanner loma<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS nov\u0113r\u0161 katru no iepriek\u0161 min\u0113tajiem tr\u016bkumiem. Pl\u0101no\u0161an\u0101 tiek iev\u0113rota katra darba centra, cilv\u0113ka un instrumenta re\u0101l\u0101 pieejam\u012bba. Arcturus AI dzin\u0113js da\u017eu sekun\u017eu laik\u0101 izveido grafiku oper\u0101ciju l\u012bmen\u012b, nosakot sec\u012bbu p\u0113c ra\u017eo\u0161anas uzdevuma priorit\u0101tes, pabeig\u0161anas datuma, klienta priorit\u0101tes, Fast Track un Dynamic Priorities.<\/p>\n\n\n<p>Sagatavo\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts p\u0101rregul\u0113\u0161anas laiks starp katru produktu p\u0101ri abos virzienos, un dzin\u0113js izv\u0113las sec\u012bbu ar vismaz\u0101ko sagatavo\u0161anai nepiecie\u0161amo laiku. Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, vienu ra\u017eo\u0161anas uzdevumu vienlaikus var veikt vair\u0101ki cilv\u0113ki, un, ja pamatiek\u0101rta vai nor\u012bkotais darbinieks nav pieejams, darbs tiek p\u0101rcelts uz alternat\u012bv\u0101m iek\u0101rt\u0101m vai citiem darbiniekiem. R\u016bpn\u012bcas vien\u0101 pl\u0101n\u0101 tiek att\u0113lotas k\u0101 darba centru grupas, \u0146emot v\u0113r\u0101 p\u0101rvieto\u0161anas laiku starp t\u0101m.<\/p>\n\n\n<p>Pl\u0101nojot p\u0113c materi\u0101lu pieejam\u012bbas, sist\u0113ma model\u0113 turpm\u0101kos kr\u0101jumu atlikumus, \u0146emot v\u0113r\u0101 eso\u0161os kr\u0101jumus un gaid\u0101m\u0101s pieg\u0101des p\u0113c iepirkuma pas\u016bt\u012bjumiem. T\u0101d\u0113j\u0101di ra\u017eo\u0161anas uzdevums tiek iepl\u0101nots uz laiku, kad tam ir pieejams materi\u0101ls. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, ja ra\u017eo\u0161an\u0101 notiek izmai\u0146as, savuk\u0101rt Running Time Lock fiks\u0113 tuv\u0101ko stundu darbus, lai netrauc\u0113tu darbu ceh\u0101. Operatori re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations, Production Timer un Quick Log Mode.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis Oracle Production Scheduling, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Izmantojat Fusion Manufacturing bez Supply Chain Planning.<\/strong> Oracle pied\u0101v\u0101 Production Scheduling k\u0101 da\u013cu no Supply Chain Planning. SkyPlanner sast\u0101da j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafikus l\u012bdz\u0101s jau izmantotajam Manufacturing.<\/li>\n\n\n<li><strong>Grafiks aptver vair\u0101k nek\u0101 vienu ra\u017eotni.<\/strong> Production Scheduling veido grafiku katrai pl\u0101no\u0161anas organiz\u0101cijai atsevi\u0161\u0137i. SkyPlanner pl\u0101no visas ra\u017eotnes kop\u0101.<\/li>\n\n\n<li><strong>Darbu sec\u012bbu nosaka p\u0101rregul\u0113\u0161ana, instrumenti, brig\u0101des un materi\u0101li.<\/strong> Sagatavo\u0161anas laiku matrica darbojas katr\u0101 darba centr\u0101. Vien\u0101 grafik\u0101 tiek \u0146emts v\u0113r\u0101 ierobe\u017eots instrumentu skaits, uzdevumi ar vair\u0101kiem operatoriem, alternat\u012bvi darba centri un pieg\u0101des p\u0113c iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Pl\u0101nam j\u0101atjaunojas pa\u0161am.<\/strong> Autopilot p\u0101rpl\u0101no darbu p\u0113c katras b\u016btiskas izmai\u0146as, un nav j\u0101veic Refresh un Release cikls.<\/li>\n\n\n<li><strong>Pl\u0101nam j\u0101b\u016bt redzamam katram operatoram.<\/strong> SkyPlanner lietot\u0101ju skaits nav ierobe\u017eots, un ar Mobile Confirmations darbu rinda ir pieejama katr\u0101 t\u0101lrun\u012b vai plan\u0161etdator\u0101.<\/li>\n\n<\/ul>\n\n\n<p>S\u0101ciet ar atv\u0113rto Oracle ra\u017eo\u0161anas pas\u016bt\u012bjumu eksportu Excel form\u0101t\u0101 un izmantojiet <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jumu<\/a> (l\u012bdz 20 darba centriem, bez kred\u012btkartes). P\u0113c tam cena ir no 199 \u20ac m\u0113nes\u012b ar iek\u013cautiem 5 darba centriem un ikm\u0113ne\u0161a nor\u0113\u0137iniem. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m, vienlaikus ar j\u016bsu abon\u0113\u0161anas pl\u0101na pied\u0101v\u0101jumu.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Oracle Fusion Cloud, izmantojot SCM REST API. SkyPlanner komanda to konfigur\u0113 ievie\u0161anas laik\u0101, un j\u016bsu partneris vai izstr\u0101d\u0101t\u0101ji var izmantot dokument\u0113to <a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">REST API<\/a>. Skatiet lapu <a href=\"\/lv\/integracija\/erp\/oracle-fusion-cloud\/\">SkyPlanner darbam ar Oracle Fusion Cloud<\/a>, <a href=\"\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/\">Oracle Fusion Cloud integr\u0101cijas ce\u013cvedi<\/a> vai visas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101cijas<\/a>. Izmantojat NetSuite? Skatiet <a href=\"\/lv\/integracija\/erp\/netsuite\/\">SkyPlanner darbam ar NetSuite<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0113\u0161anu re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jauna darbu rinda ra\u017eo\u0161anas l\u012bnij\u0101 non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermas ra\u017eotn\u0113\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, iepriek\u0161 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, r\u012bkot\u0101jdirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un tagad grafiku sast\u0101d\u012b\u0161anai pietiek ar vienu darbu vad\u012bt\u0101ju agr\u0101ko divu viet\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner sniedz mums p\u0101rskat\u0101mu inform\u0101ciju par jaudu un padara pl\u0101no\u0161anu paredzamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko produktu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Vis\u0101 SkyPlanner lieto\u0161anas laik\u0101 kop\u0161 2021. gada pieg\u0101\u017eu savlaic\u012bgums ir bijis 100%.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Oracle Fusion Manufacturing nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Oracle nor\u0101da, ka ra\u017eo\u0161anas pas\u016bt\u012bjumu grafikus sast\u0101da pl\u0101no\u0161anas dzin\u0113js bez ierobe\u017eojumiem: tas pie\u0146em, ka jauda ir neierobe\u017eota, un ne\u0146em v\u0113r\u0101 citu ra\u017eo\u0161anas pas\u016bt\u012bjumu rad\u012bto slodzi. Ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai nodro\u0161ina Oracle Production Scheduling.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Oracle Production Scheduling ir da\u013ca no Fusion Manufacturing?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Oracle nodro\u0161ina Production Scheduling k\u0101 darba apgabalu Supply Chain Planning pied\u0101v\u0101jum\u0101. No taj\u0101 izveidotajiem grafikiem datumi tiek nodoti atpaka\u013c uz Manufacturing ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ir at\u0161\u0137ir\u012bba starp Oracle Supply Planning un Production Scheduling?<\/summary>\n<p class=\"sp-faq__a\">Supply Planning pl\u0101no pieg\u0101des pa laika interv\u0101liem un pl\u0101no\u0161an\u0101 ar ierobe\u017eojumiem k\u0101 gal\u0113jo risin\u0101jumu pie\u013cauj jaudas p\u0101rslodzi. Production Scheduling nosaka, k\u0101d\u0101 sec\u012bb\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjumi izmanto resursus vien\u0101 pl\u0101no\u0161anas organiz\u0101cij\u0101, un nodod izpildei datumus, kas ietilpst nodo\u0161anas period\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Oracle Fusion Cloud \u0146em v\u0113r\u0101 no darbu sec\u012bbas atkar\u012bgus sagatavo\u0161anas laikus?<\/summary>\n<p class=\"sp-faq__a\">Production Scheduling to nodro\u0161ina ar p\u0101rregul\u0113\u0161anas noteikumiem iek\u0101rtu resursiem, kuriem pieejama viena vien\u012bba. SkyPlanner sagatavo\u0161anas laiku matric\u0101 katram darba centram tiek glab\u0101ti p\u0101rregul\u0113\u0161anas laiki starp produktu p\u0101riem abos virzienos, un ra\u017eo\u0161anas uzdevumi tiek sak\u0101rtoti t\u0101, lai \u0161os laikus samazin\u0101tu l\u012bdz minimumam.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0113\u0161anas ar Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 import\u0113jiet no Oracle atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus, darbu defin\u012bcijas un darba centrus Excel vai CSV form\u0101t\u0101 un sal\u012bdziniet izveidoto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Oracle Fusion Cloud Vai Oracle Fusion Cloud nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojam Work Order Scheduling un Production Scheduling Pa\u0161\u0101 Oracle Fusion Cloud Manufacturing \u2014 n\u0113. Oracle nor\u0101da, ka ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku sast\u0101d\u012b\u0161anas dzinis ne\u0146em v\u0113r\u0101 ierobe\u017eojumus un pie\u0146em, ka jauda ir neierobe\u017eota. Grafikus atbilsto\u0161i pieejamajai jaudai &#8230; <a title=\"Vai Oracle Fusion Cloud nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojam Work Order Scheduling un Production Scheduling\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/\" aria-label=\"Read more about Vai Oracle Fusion Cloud nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojam Work Order Scheduling un Production Scheduling\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106151,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106847","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai?<\/title>\n<meta name=\"description\" content=\"Oracle Fusion Manufacturing pl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus bez jaudas ierobe\u017eojumiem. Ko papildina Production Scheduling un Supply Planning, un kad vajadz\u012bga APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Oracle Fusion Cloud nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojam Work Order Scheduling un Production Scheduling\" \/>\n<meta property=\"og:description\" content=\"Oracle Fusion Manufacturing pl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus bez jaudas ierobe\u017eojumiem. Ko papildina Production Scheduling un Supply Planning, un kad vajadz\u012bga APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/razosanas-planosana\\\/\",\"name\":\"Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Oracle Fusion Manufacturing pl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus bez jaudas ierobe\u017eojumiem. Ko papildina Production Scheduling un Supply Planning, un kad vajadz\u012bga APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Oracle Fusion Cloud nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojam Work Order Scheduling un Production Scheduling\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai?","description":"Oracle Fusion Manufacturing pl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus bez jaudas ierobe\u017eojumiem. Ko papildina Production Scheduling un Supply Planning, un kad vajadz\u012bga APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Oracle Fusion Cloud nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojam Work Order Scheduling un Production Scheduling","og_description":"Oracle Fusion Manufacturing pl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus bez jaudas ierobe\u017eojumiem. Ko papildina Production Scheduling un Supply Planning, un kad vajadz\u012bga APS?","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/","name":"Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Oracle Fusion Manufacturing pl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus bez jaudas ierobe\u017eojumiem. Ko papildina Production Scheduling un Supply Planning, un kad vajadz\u012bga APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/"},{"@type":"ListItem","position":5,"name":"Vai Oracle Fusion Cloud nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojam Work Order Scheduling un Production Scheduling"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Oracle Fusion Cloud Vai Oracle Fusion Cloud nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai? Skaidrojam Work Order Scheduling un Production Scheduling Pa\u0161\u0101 Oracle Fusion Cloud Manufacturing \u2014 n\u0113. Oracle nor\u0101da, ka ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku sast\u0101d\u012b\u0161anas dzinis ne\u0146em v\u0113r\u0101 ierobe\u017eojumus un pie\u0146em, ka jauda ir neierobe\u017eota. Grafikus atbilsto\u0161i pieejamajai jaudai&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106847","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106847"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106847\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106151"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106847"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}