{"id":106760,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/xero\/integracijas-celvedis\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/integracijas-celvedis\/","title":{"rendered":"Xero integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Xero<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Xero integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Xero integr\u0101cijas ce\u013cved\u012b Xero konsultantiem un IT komand\u0101m skaidrots, k\u0101 savienot Xero ar SkyPlanner APS. SkyPlanner apmain\u0101s ar datiem ar Xero abos virzienos, izmantojot Xero Accounting API un Projects API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>No Xero tiek sa\u0146emti kontakti, kr\u0101jumu uzskait\u0113 iek\u013caut\u0101s preces ar to atlikumiem, pie\u0146emtie pied\u0101v\u0101jumi un iepirkuma pas\u016bt\u012bjumi ar paredz\u0113tajiem sa\u0146em\u0161anas datumiem.<\/li>\n\n\n<li>Pl\u0101notais pabeig\u0161anas datums tiek nos\u016bt\u012bts atpaka\u013c uz Xero k\u0101 piez\u012bme katra pied\u0101v\u0101juma v\u0113stur\u0113.<\/li>\n\n\n<li>Pabeigtie pas\u016bt\u012bjumi tiek nos\u016bt\u012bti atpaka\u013c k\u0101 p\u0101rdo\u0161anas r\u0113\u0137inu melnraksti ar pied\u0101v\u0101juma rind\u0101m un atsauci, bet pied\u0101v\u0101juma statuss tiek main\u012bts uz Invoiced.<\/li>\n\n\n<li>Projektu darbos re\u0123istr\u0113t\u0101s stundas tiek nos\u016bt\u012btas atpaka\u013c k\u0101 Xero Projects laika uzskaites ieraksti.<\/li>\n\n\n<li>Xero t\u012bmek\u013ca aiz\u0137eres zi\u0146o par kontaktu un r\u0113\u0137inu izmai\u0146\u0101m, savuk\u0101rt SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Xero ir gr\u0101matved\u012bbas programmat\u016bra, t\u0101p\u0113c taj\u0101 nav materi\u0101lu specifik\u0101ciju, tehnolo\u0123isko procesu, iek\u0101rtu vai ra\u017eo\u0161anas pas\u016bt\u012bjumu. Darba centri, procesa so\u013ci, mai\u0146as un sagatavo\u0161anas laiki tiek uztur\u0113ti SkyPlanner. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju ar j\u016bsu Xero organiz\u0101ciju un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. \u0160is ce\u013cvedis ir paredz\u0113ts konsultantiem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties ievie\u0161an\u0101 vai pa\u0161i veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-xero-accounting-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Xero Accounting API<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Xero ir vienots m\u0101ko\u0146produkts ar vair\u0101ku nomnieku arhitekt\u016bru, un visas organiz\u0101cijas izmanto vienu un to pa\u0161u API. Accounting API ir REST API ar JSON vai XML atbalstu adres\u0113 <code>https:\/\/api.xero.com\/api.xro\/2.0\/<\/code>. Katr\u0101 izsaukum\u0101 organiz\u0101cija tiek nor\u0101d\u012bta galven\u0113 <code>Xero-tenant-id<\/code>. (<a href=\"https:\/\/developer.xero.com\/documentation\/api\/accounting\/overview\">avots<\/a>)<\/p>\n\n\n<p>Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai vajadz\u012bgie galapunkti:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pamatdati:<\/strong> <code>\/Contacts<\/code> (klienti un pieg\u0101d\u0101t\u0101ji), <code>\/Items<\/code> (Code, IsTrackedAsInventory, QuantityOnHand).<\/li>\n\n\n<li><strong>Piepras\u012bjums:<\/strong> <code>\/Quotes<\/code> (Status ACCEPTED, LineItems), bet ra\u017eotn\u0113m, kas vispirms izraksta r\u0113\u0137inu, \u2014 <code>\/Invoices<\/code> ar Type ACCREC.<\/li>\n\n\n<li><strong>Apg\u0101de:<\/strong> <code>\/PurchaseOrders<\/code> (DeliveryDate, ExpectedArrivalDate, LineItems ar ItemCode).<\/li>\n\n\n<li><strong>Datu ierakst\u012b\u0161ana atpaka\u013c:<\/strong> <code>\/Quotes\/{QuoteID}\/History<\/code>, <code>\/Invoices<\/code>, <code>\/Quotes<\/code> un Projects API adres\u0113 <code>https:\/\/api.xero.com\/projects.xro\/2.0\/projects\/{projectId}\/time<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>Visi sarakstu galapunkti pie\u0146em galveni <code>If-Modified-Since<\/code>, t\u0101p\u0113c katr\u0101 sinhroniz\u0101cij\u0101 tiek nolas\u012bti tikai main\u012btie dati. Ieraksti tiek veidoti un atjaunin\u0101ti paket\u0113s. Materi\u0101lu specifik\u0101cij\u0101m, tehnolo\u0123iskajiem procesiem un ra\u017eo\u0161anas pas\u016bt\u012bjumiem galapunktu nav.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-scopes-and-limits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija, piek\u013cuves tv\u0113rumi un ierobe\u017eojumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Xero izmanto OAuth 2.0. Xero administrators vienreiz piesak\u0101s sist\u0113m\u0101, apstiprina lietotni un izv\u0113las organiz\u0101ciju. Lietotne pieprasa <code>offline_access<\/code>, lai uztur\u0113tu savienojumu ar atsvaidzin\u0101\u0161anas pilnvar\u0101m. (<a href=\"https:\/\/developer.xero.com\/documentation\/guides\/oauth2\/scopes\/\">avots<\/a>)<\/p>\n\n\n<p>Xero aizst\u0101j pla\u0161os piek\u013cuves tv\u0113rumus ar detaliz\u0113t\u0101kiem, un jaunaj\u0101m lietotn\u0113m tiek pie\u0161\u0137irti detaliz\u0113tie tv\u0113rumi. Integr\u0101cijai ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ir vajadz\u012bgi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>accounting.invoices<\/code> \u2014 pied\u0101v\u0101jumiem, r\u0113\u0137iniem, iepirkuma pas\u016bt\u012bjumiem un prec\u0113m<\/li>\n\n\n<li><code>accounting.contacts<\/code> \u2014 klientiem un pieg\u0101d\u0101t\u0101jiem<\/li>\n\n\n<li><code>accounting.settings.read<\/code> \u2014 pre\u010du iestat\u012bjumiem<\/li>\n\n\n<li><code>projects<\/code> \u2014 laika uzskaites ierakstiem<\/li>\n\n\n<li><code>offline_access<\/code><\/li>\n\n<\/ul>\n\n\n<p>Xero ierobe\u017eo izsaukumu skaitu katrai organiz\u0101cijai (vienlaic\u012bgi, min\u016bt\u0113 un dien\u0101) un katrai lietotnei. Ja lietotne p\u0101rsniedz ierobe\u017eojumu, Xero atgrie\u017e HTTP 429 ar galveni <code>Retry-After<\/code>. Dienas limits un pievienoto organiz\u0101ciju skaits ir atkar\u012bgs no lietotnes partnera l\u012bme\u0146a. Abi ir nor\u0101d\u012bti Xero <a href=\"https:\/\/developer.xero.com\/documentation\/guides\/oauth2\/limits\/\">API ierobe\u017eojumu lap\u0101<\/a>. T\u012bmek\u013ca aiz\u0137eres, nolas\u012b\u0161ana ar <code>If-Modified-Since<\/code> un ierakst\u012b\u0161ana paket\u0113s \u013cauj integr\u0101cijai ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai darboties ar lielu rezervi l\u012bdz \u0161iem limitiem.<\/p>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru galven\u0113 <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API). API ir dokument\u0113ts Swagger\/OpenAPI. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim aprakst\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"webhooks\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">T\u012bmek\u013ca aiz\u0137eres<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>&#8220;Webhooks allow you to subscribe to certain events that happen in Xero.&#8221; (T\u012bmek\u013ca aiz\u0137eres \u013cauj abon\u0113t noteiktus Xero notikumus.) (<a href=\"https:\/\/developer.xero.com\/documentation\/guides\/webhooks\/overview\/\">avots<\/a>) Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai svar\u012bgie notikumi ir Contact un Invoice \u2014 katram no tiem ir CREATE un UPDATE.<\/p>\n\n\n<p>K\u0101 t\u0101s darbojas:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Viena t\u012bmek\u013ca aiz\u0137ere katrai lietotnei aptver visas pievienot\u0101s organiz\u0101cijas.<\/li>\n\n\n<li>Katr\u0101 pieg\u0101d\u0101taj\u0101 zi\u0146ojum\u0101 ir notikumu mas\u012bvs ar resursa ID un notikuma tipu. P\u0113c tam sa\u0146\u0113m\u0113js nolasa pa\u0161u resursu.<\/li>\n\n\n<li>Katrs pieg\u0101d\u0101tais zi\u0146ojums ir parakst\u012bts ar galveni <code>x-xero-signature<\/code>, kas izveidota, izmantojot lietotnes t\u012bmek\u013ca aiz\u0137eres atsl\u0113gu. Pirms zi\u0146ojumu pieg\u0101des s\u0101k\u0161anas Xero nos\u016bta p\u0101rbaudi &#8220;Intent to receive&#8221; (gatav\u012bba sa\u0146emt).<\/li>\n\n\n<li>Xero atk\u0101rto neveiksm\u012bg\u0101s pieg\u0101des un atsp\u0113jo t\u012bmek\u013ca aiz\u0137eri, ja k\u013c\u016bmes turpin\u0101s. T\u0101p\u0113c sa\u0146\u0113m\u0113js \u0101tri nos\u016bta atbildi un apstr\u0101di veic p\u0113c tam.<\/li>\n\n<\/ul>\n\n\n<p>Pied\u0101v\u0101jumiem, prec\u0113m un iepirkuma pas\u016bt\u012bjumiem nav t\u012bmek\u013ca aiz\u0137eru notikumu. SkyPlanner tos nolasa ar \u012bsiem periodisk\u0101s aptaujas interv\u0101liem, izmantojot <code>If-Modified-Since<\/code>. Ja nekas nav main\u012bjies, katram ent\u012btijas veidam ir vajadz\u012bgs viens izsaukums.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Xero objekts (galapunkts)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Contact, IsCustomer (<code>\/Contacts<\/code>)<\/td><td>Customer (<code>external_identifier<\/code>, <code>delivery_priority<\/code>)<\/td><td>Xero \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 sa\u0146emot t\u012bmek\u013ca aiz\u0137eres pazi\u0146ojumu<\/td><\/tr><tr><td>Item ar kr\u0101jumu uzskaiti vai bez t\u0101s, ar QuantityOnHand (<code>\/Items<\/code>)<\/td><td>Produkti un materi\u0101li, kr\u0101jumi<\/td><td>Xero \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 ar <code>If-Modified-Since<\/code><\/td><\/tr><tr><td>Quote ar Status ACCEPTED un LineItems (<code>\/Quotes<\/code>)<\/td><td>Order (<code>external_order_number<\/code>, <code>delivery_date<\/code>), ra\u017eo\u0161anas uzdevumi katrai rindai<\/td><td>Xero \u2192 SkyPlanner<\/td><td>Periodiska aptauja ar <code>If-Modified-Since<\/code><\/td><\/tr><tr><td>Invoice ar Type ACCREC (ra\u017eotn\u0113m, kas vispirms izraksta r\u0113\u0137inu) (<code>\/Invoices<\/code>)<\/td><td>Pas\u016bt\u012bjums un ra\u017eo\u0161anas uzdevumi<\/td><td>Xero \u2192 SkyPlanner<\/td><td>Re\u0101llaik\u0101 ar t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>PurchaseOrder ar ExpectedArrivalDate vai DeliveryDate (<code>\/PurchaseOrders<\/code>)<\/td><td>Ien\u0101ko\u0161ais materi\u0101ls (<code>estimated_delivery_date<\/code>)<\/td><td>Xero \u2192 SkyPlanner<\/td><td>Periodiska aptauja ar <code>If-Modified-Since<\/code><\/td><\/tr><tr><td>Piez\u012bme pied\u0101v\u0101juma v\u0113stur\u0113 (PUT <code>\/Quotes\/{QuoteID}\/History<\/code>)<\/td><td>Pl\u0101notais pabeig\u0161anas datums<\/td><td>SkyPlanner \u2192 Xero<\/td><td>Mainoties grafikam<\/td><\/tr><tr><td>Invoice ar Type ACCREC, Status DRAFT, Reference = pied\u0101v\u0101juma numurs (POST <code>\/Invoices<\/code>)<\/td><td>Pabeigts pas\u016bt\u012bjums<\/td><td>SkyPlanner \u2192 Xero<\/td><td>Kad pas\u016bt\u012bjums ir pabeigts<\/td><\/tr><tr><td>Quote ar Status INVOICED (POST <code>\/Quotes<\/code>)<\/td><td>Pabeigts pas\u016bt\u012bjums<\/td><td>SkyPlanner \u2192 Xero<\/td><td>Kad r\u0113\u0137ins ir izveidots<\/td><\/tr><tr><td>Projects laika uzskaites ieraksts (POST <code>\/projects\/{projectId}\/time<\/code>)<\/td><td>Mobile Confirmations, laika uzskaites ieraksti<\/td><td>SkyPlanner \u2192 Xero<\/td><td>Re\u0123istr\u0113jot paveikto darbu<\/td><\/tr><tr><td>Xero nav pieejams<\/td><td>Darba centri, procesa so\u013ci, mai\u0146as, promb\u016btnes, sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits, alternat\u012bvie darba centri<\/td><td>Tiek uztur\u0113ti SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet kontaktus un preces pa lap\u0101m, p\u0113c tam \u2014 atv\u0113rtos iepirkuma pas\u016bt\u012bjumus un pie\u0146emtos pied\u0101v\u0101jumus. Izveidojiet klientus SkyPlanner, lauk\u0101 <code>external_identifier<\/code> nor\u0101dot Xero ContactID, bet produktiem un materi\u0101liem k\u0101 atsl\u0113gu izmantojiet preces kodu. P\u0113c tam izveidojiet to, k\u0101 Xero nav: darba centrus, procesa so\u013cus katram produktam, mai\u0146as, atva\u013cin\u0101jumus un sagatavo\u0161anas laikus. Procesa so\u013cus vis\u0101tr\u0101k var iel\u0101d\u0113t ar CSV vai Excel importu.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Periodiski aptauj\u0101jiet pied\u0101v\u0101jumus ar <code>If-Modified-Since<\/code>. Kad pied\u0101v\u0101juma statuss k\u013c\u016bst ACCEPTED, SkyPlanner izveido pas\u016bt\u012bjumu, lauk\u0101 <code>external_order_number<\/code> nor\u0101dot pied\u0101v\u0101juma numuru. V\u0113rt\u012bba lauk\u0101 <code>delivery_date<\/code> tiek ieg\u016bta no lauka, ko j\u016bsu ra\u017eotne izmanto sol\u012btajam pieg\u0101des datumam; \u0161o atbilst\u012bbu nosaka ievie\u0161anas laik\u0101. Katrai pied\u0101v\u0101juma rindai tiek izveidoti ra\u017eo\u0161anas uzdevumi atbilsto\u0161i produkta procesa so\u013ciem. Iepirkuma pas\u016bt\u012bjumu rindas k\u013c\u016bst par ien\u0101ko\u0161ajiem materi\u0101liem ar paredz\u0113to sa\u0146em\u0161anas datumu, t\u0101p\u0113c ra\u017eo\u0161anas uzdevumi gaida pieg\u0101di. Katru nakti piln\u012bb\u0101 nolasot atv\u0113rtos pied\u0101v\u0101jumus un iepirkuma pas\u016bt\u012bjumus, tiek uztvertas visas iepriek\u0161 nepaman\u012bt\u0101s izmai\u0146as.<\/p>\n\n\n<p><strong>3. Grafika un pabeig\u0161anas datu ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Rezult\u0101ti tiek ierakst\u012bti Xero ar trim izsaukumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>PUT <code>\/Quotes\/{QuoteID}\/History<\/code> pievieno piez\u012bmi ar pl\u0101noto pabeig\u0161anas datumu. Pie\u0146emt\u0101 pied\u0101v\u0101jum\u0101 dr\u012bkst main\u012bt tikai kontaktu un piez\u012bmes, t\u0101p\u0113c datums tiek saglab\u0101ts v\u0113stures piez\u012bm\u0113. (<a href=\"https:\/\/developer.xero.com\/documentation\/api\/accounting\/quotes\">avots<\/a>)<\/li>\n\n\n<li>Kad pas\u016bt\u012bjums ir pabeigts, POST <code>\/Invoices<\/code> izveido p\u0101rdo\u0161anas r\u0113\u0137inu ar Type ACCREC, Status DRAFT, pied\u0101v\u0101juma kontaktu un rind\u0101m, k\u0101 ar\u012b pied\u0101v\u0101juma numuru lauk\u0101 Reference. J\u016bsu gr\u0101matvedis to apstiprina un nos\u016bta, izmantojot Xero.<\/li>\n\n\n<li>POST <code>\/Quotes<\/code> ar QuoteID un Status INVOICED nosl\u0113dz pied\u0101v\u0101jumu. Accounting API at\u013cauj statusa mai\u0146u no Accepted uz Invoiced.<\/li>\n\n<\/ul>\n\n\n<p><strong>4. Darba izpildes apstiprin\u0101jumi ra\u017eotn\u0113 un projektu laika uzskaite.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations, Production Timer vai Quick Log Mode. Darba izpildes gaita uzreiz atjaunina grafiku, un Autopilot p\u0101rpl\u0101no atliku\u0161o darbu. Projektu darbiem SkyPlanner nos\u016bta stundas k\u0101 laika uzskaites ierakstus attiec\u012bgajam projekta uzdevumam, nor\u0101dot Xero lietot\u0101ju, datumu un ilgumu. (<a href=\"https:\/\/developer.xero.com\/documentation\/api\/projects\/time\">avots<\/a>)<\/p>\n\n\n<p><strong>5. Datu p\u0101rvald\u012bbas un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms palai\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Kontakti, preces, cenas, pied\u0101v\u0101jumi, iepirkuma pas\u016bt\u012bjumi, r\u0113\u0137ini, gr\u0101matved\u012bba<\/td><td>Xero<\/td><\/tr><tr><td>Darba centri, procesa so\u013ci, mai\u0146as, promb\u016btnes, sagatavo\u0161anas laiku matrica, instrumenti, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas uzdevumu sec\u012bba, s\u0101kuma un beigu laiks, darba centrs katram ra\u017eo\u0161anas uzdevumam<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Piez\u012bme par pl\u0101noto pabeig\u0161anu pied\u0101v\u0101jum\u0101<\/td><td>SkyPlanner, ieraksta Xero<\/td><\/tr><tr><td>R\u0113\u0137ina melnraksts par pabeigtiem pas\u016bt\u012bjumiem, projekt\u0101 nostr\u0101d\u0101tais laiks<\/td><td>Izveido SkyPlanner; p\u0113c apstiprin\u0101\u0161anas par datiem atbild Xero<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma. Pirms tam 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat izmantot savus datus \u2014 no Xero CSV form\u0101t\u0101 eksport\u0113tus kontaktus, produktus un atv\u0113rtos pied\u0101v\u0101jumus.<\/p>\n\n\n<p>Pats projekts ietver \u0161\u0101dus posmus:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Savieno\u0161ana.<\/strong> Xero administrators apstiprina SkyPlanner piek\u013cuvi un izv\u0113las organiz\u0101ciju.<\/li>\n\n\n<li><strong>Piepras\u012bjuma datu objekts.<\/strong> Vienojieties, vai ra\u017eo\u0161anu s\u0101ks apstiprin\u0101ti pied\u0101v\u0101jumi vai p\u0101rdo\u0161anas r\u0113\u0137ini.<\/li>\n\n\n<li><strong>Datu atbilst\u012bba.<\/strong> Nosakiet atbilst\u012bbu tabulu, pre\u010du kodus, r\u0113\u0137inos izmantojamos gr\u0101matved\u012bbas kontus, nodok\u013cu noklus\u0113juma iestat\u012bjumus un noteikumus par to, kura sist\u0113ma atbild par datiem.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Kontakti, preces, atv\u0113rtie iepirkuma pas\u016bt\u012bjumi un apstiprin\u0101tie pied\u0101v\u0101jumi.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas modelis.<\/strong> Darba centri, katra produkta procesa so\u013ci, mai\u0146as, sagatavo\u0161anas laiku matrica, instrumenti un operatoru skaits SkyPlanner sist\u0113m\u0101.<\/li>\n\n\n<li><strong>Sinhroniz\u0101cija.<\/strong> Webhook pazi\u0146ojumi kontaktiem un r\u0113\u0137iniem, periodiski pied\u0101v\u0101jumu, pre\u010du un iepirkuma pas\u016bt\u012bjumu piepras\u012bjumi ar <code>If-Modified-Since<\/code>, k\u0101 ar\u012b datu sal\u012bdzin\u0101\u0161ana katru nakti.<\/li>\n\n\n<li><strong>Datu rakst\u012b\u0161ana atpaka\u013c.<\/strong> Vispirms pied\u0101v\u0101jumu piez\u012bmes, p\u0113c tam r\u0113\u0137inu melnraksti un pied\u0101v\u0101jumu statusi, tad projektos nostr\u0101d\u0101tais laiks, ja to uzskaita.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana un darba s\u0101k\u0161ana.<\/strong> Sal\u012bdziniet SkyPlanner datumus ar pa\u0161reiz\u0113jo pl\u0101nu, l\u016bdziet gr\u0101matvedim p\u0101rbaud\u012bt pirmos r\u0113\u0137inu melnrakstus un p\u0113c tam iesl\u0113dziet datu rakst\u012b\u0161anu atpaka\u013c.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-xero-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot Xero integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Xero nav ra\u017eo\u0161anas datu objektu.<\/strong> Katra produkta procesa so\u013cus glab\u0101jiet SkyPlanner, sasaistot tos ar Xero preces kodu. Pre\u010du kodus nemainiet.<\/li>\n\n\n<li><strong>Pied\u0101v\u0101jumiem nav webhook pazi\u0146ojumu.<\/strong> Pieprasiet tos ar <code>If-Modified-Since<\/code> \u012bsos interv\u0101los, iev\u0113rojot min\u016btes un dienas ierobe\u017eojumus.<\/li>\n\n\n<li><strong>Apstiprin\u0101ti pied\u0101v\u0101jumi ir blo\u0137\u0113ti.<\/strong> P\u0113c apstiprin\u0101\u0161anas var main\u012bt tikai kontaktinform\u0101ciju un piez\u012bmes, t\u0101p\u0113c sol\u012bto datumu nolasa vienreiz \u2014 apstiprin\u0101\u0161anas br\u012bd\u012b. Pl\u0101noto datumu ieraksta v\u0113stures piez\u012bm\u0113.<\/li>\n\n\n<li><strong>Kr\u0101jumu atlikumi main\u0101s atbilsto\u0161i r\u0113\u0137iniem.<\/strong> Prec\u0113m ar kr\u0101jumu uzskaiti Xero maina atlikumu, izmantojot p\u0101rdo\u0161anas r\u0113\u0137inus, pieg\u0101d\u0101t\u0101ju r\u0113\u0137inus un kred\u012btr\u0113\u0137inus. Vienojieties ar gr\u0101matvedi, k\u0101 uzskait\u012bt gatavo produkciju un izlietotos materi\u0101lus.<\/li>\n\n\n<li><strong>Projektu laika uzskaitei vajadz\u012bgi Xero lietot\u0101ji.<\/strong> Katrs laika uzskaites ieraksts ir piesaist\u012bts Xero lietot\u0101jam. Izlemiet, kuru operatoru nostr\u0101d\u0101to laiku nodot Xero Projects, bet p\u0101r\u0113jo uzskaiti atst\u0101jiet SkyPlanner.<\/li>\n\n\n<li><strong>Detaliz\u0113tas piek\u013cuves at\u013caujas.<\/strong> Jau s\u0101kum\u0101 pieprasiet detaliz\u0113tas piek\u013cuves at\u013caujas, jo pla\u0161\u0101s piek\u013cuves at\u013caujas tiek pak\u0101peniski atceltas.<\/li>\n\n\n<li><strong>Lietotnes l\u012bmenis.<\/strong> Partnera l\u012bmenis nosaka, cik organiz\u0101ciju lietotne var savienot un cik API izsaukumu dien\u0101 tai ir pieejams. Izv\u0113lieties l\u012bmeni atbilsto\u0161i ra\u017eot\u0146u skaitam.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-xero-integration-who-configures-and-supports\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Xero integr\u0101cija: kas to konfigur\u0113 un nodro\u0161ina atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Darbs aptver j\u016bsu preces, pied\u0101v\u0101jumus, iepirkuma pas\u016bt\u012bjumus un to, k\u0101 pabeigtie darbi non\u0101k l\u012bdz r\u0113\u0137inu izrakst\u012b\u0161anai. Tiek pievienoti dati, ko Xero neglab\u0101: darba centri, procesa so\u013ci, mai\u0146as, sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits un alternat\u012bvie resursi.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas.<\/strong> Katr\u0101 ra\u017eotn\u0113 preces, pied\u0101v\u0101jumus un kr\u0101jumus Xero sist\u0113m\u0101 iestata at\u0161\u0137ir\u012bgi, un \u0161\u012bs zin\u0101\u0161anas tiek izmantotas konfigur\u0113\u0161an\u0101.<\/li>\n\n\n<li><strong>Integr\u0101ciju var izveidot j\u016bsu Xero konsultants vai integr\u0101cijas partneris.<\/strong> SkyPlanner nodro\u0161ina REST API, Swagger\/OpenAPI dokument\u0101ciju un webhook pazi\u0146ojumus.<\/li>\n\n\n<li><strong>Ar\u012b j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot savus risin\u0101jumus,<\/strong> izmantojot API pilnvaru. Lai s\u0101ktu, pietiek ar API pilnvaru, un vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz SkyPlanner komanda. Produkta dokument\u0101cija, tostarp par iepirkuma pas\u016bt\u012bjumiem un produktu un materi\u0101lu API, ir pieejama <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un nor\u0113\u0137inoties katru m\u0113nesi. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai piln\u0101s izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a> un <a href=\"\/lv\/funkcijas\/\">funkcijas<\/a>, bet par to, ko Xero nodro\u0161ina pats, lasiet rakst\u0101 <a href=\"\/lv\/integracija\/erp\/xero\/razosanas-planosana\/\">Vai Xero \u013cauj sast\u0101d\u012bt ra\u017eo\u0161anas grafikus?<\/a> P\u0101rskats ir pieejams <a href=\"\/lv\/integracija\/erp\/xero\/\">Xero lap\u0101<\/a>, bet citas sist\u0113mas atrad\u012bsiet <a href=\"\/lv\/integracija\/erp\/\">visu integr\u0101ciju sarakst\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana ir p\u0101rg\u0101jusi no Excel tabul\u0101m uz ra\u017eo\u0161anas optimiz\u0113\u0161anu re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jauna darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas ra\u017eotn\u0113 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cMums SkyPlanner ir v\u0113rt\u012bgs k\u0101 ikdien\u0101 noder\u012bgs r\u012bks, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska slodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir strauji samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>darba pas\u016bt\u012bjumu autom\u0101tiski iepl\u0101nota izpilde<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem darba pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams ra\u017eo\u0161anas p\u0101rskats re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Xero ir API ra\u017eo\u0161anas datiem?<\/summary>\n<p class=\"sp-faq__a\">Xero ir Accounting API un Projects API \u2014 abas ir REST saskarnes ar OAuth 2.0. T\u0101s aptver kontaktus, preces, pied\u0101v\u0101jumus, r\u0113\u0137inus, iepirkuma pas\u016bt\u012bjumus un laika uzskaites ierakstus. Ra\u017eo\u0161anas dati, piem\u0113ram, darba centri un procesa so\u013ci, tiek glab\u0101ti SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner var rakst\u012bt datus atpaka\u013c Xero?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. SkyPlanner pievieno pl\u0101noto pabeig\u0161anas datumu katra pied\u0101v\u0101juma v\u0113sturei, p\u0113c pas\u016bt\u012bjuma pabeig\u0161anas izveido p\u0101rdo\u0161anas r\u0113\u0137ina melnrakstu ar pied\u0101v\u0101juma rind\u0101m, maina pied\u0101v\u0101juma statusu uz Invoiced un nos\u016bta projektu laika uzskaites ierakstus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Xero nos\u016bta izmai\u0146as re\u0101llaik\u0101?<\/summary>\n<p class=\"sp-faq__a\">Xero webhook pazi\u0146ojumi aptver kontaktus un r\u0113\u0137inus. Izmantojot <code>If-Modified-Since<\/code>, SkyPlanner nolasa kop\u0161 p\u0113d\u0113j\u0101s sinhroniz\u0101cijas main\u012btos pied\u0101v\u0101jumus, preces un iepirkuma pas\u016bt\u012bjumus, k\u0101 ar\u012b katru nakti sal\u012bdzina datus, t\u0101p\u0113c jauns apstiprin\u0101ts pied\u0101v\u0101jums \u0101tri non\u0101k grafik\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>No kurienes ieg\u016bst materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos procesus un iek\u0101rtu datus, ja Xero to nav?<\/summary>\n<p class=\"sp-faq__a\">No SkyPlanner. Darba centrus, katra produkta procesa so\u013cus, mai\u0146as un sagatavo\u0161anas laikus iestat\u0101t vienreiz \u2014 manu\u0101li vai import\u0113jot CSV vai Excel failu. Katrs produkts ir sasaist\u012bts ar Xero preces kodu, t\u0101p\u0113c jauni apstiprin\u0101ti pied\u0101v\u0101jumi tiek iepl\u0101noti autom\u0101tiski.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jums \u013cauj izmantot l\u012bdz 20 darba centriem, import\u0113jot datus no Xero CSV form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas apjomu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Xero Xero integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Xero integr\u0101cijas ce\u013cved\u012b Xero konsultantiem un IT komand\u0101m skaidrots, k\u0101 savienot Xero ar SkyPlanner APS. SkyPlanner apmain\u0101s ar datiem ar Xero abos virzienos, izmantojot Xero Accounting API un Projects API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Xero ir gr\u0101matved\u012bbas programmat\u016bra, t\u0101p\u0113c &#8230; <a title=\"Xero integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/integracijas-celvedis\/\" aria-label=\"Read more about Xero integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106093,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106760","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Xero APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Xero savieno\u0161ana ar SkyPlanner APS: Accounting un Projects API, OAuth 2.0 tv\u0113rumi, webhooks, datu kart\u0113\u0161ana, r\u0113\u0137inu melnrakstu un projektu laika ierakste Xero.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Xero integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Xero savieno\u0161ana ar SkyPlanner APS: Accounting un Projects API, OAuth 2.0 tv\u0113rumi, webhooks, datu kart\u0113\u0161ana, r\u0113\u0137inu melnrakstu un projektu laika ierakste Xero.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/xero\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/xero\\\/integracijas-celvedis\\\/\",\"name\":\"Xero APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Xero savieno\u0161ana ar SkyPlanner APS: Accounting un Projects API, OAuth 2.0 tv\u0113rumi, webhooks, datu kart\u0113\u0161ana, r\u0113\u0137inu melnrakstu un projektu laika ierakste Xero.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/xero\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/xero\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/xero\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS un Xero: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/xero\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Xero integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Xero APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Xero savieno\u0161ana ar SkyPlanner APS: Accounting un Projects API, OAuth 2.0 tv\u0113rumi, webhooks, datu kart\u0113\u0161ana, r\u0113\u0137inu melnrakstu un projektu laika ierakste Xero.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Xero integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Xero savieno\u0161ana ar SkyPlanner APS: Accounting un Projects API, OAuth 2.0 tv\u0113rumi, webhooks, datu kart\u0113\u0161ana, r\u0113\u0137inu melnrakstu un projektu laika ierakste Xero.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/integracijas-celvedis\/","name":"Xero APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Xero savieno\u0161ana ar SkyPlanner APS: Accounting un Projects API, OAuth 2.0 tv\u0113rumi, webhooks, datu kart\u0113\u0161ana, r\u0113\u0137inu melnrakstu un projektu laika ierakste Xero.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS un Xero: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/"},{"@type":"ListItem","position":5,"name":"Xero integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Xero Xero integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Xero integr\u0101cijas ce\u013cved\u012b Xero konsultantiem un IT komand\u0101m skaidrots, k\u0101 savienot Xero ar SkyPlanner APS. SkyPlanner apmain\u0101s ar datiem ar Xero abos virzienos, izmantojot Xero Accounting API un Projects API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Xero ir gr\u0101matved\u012bbas programmat\u016bra, t\u0101p\u0113c&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106760","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106760"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106760\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106093"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106760"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}