{"id":106644,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/karat\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"karat","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/","title":{"rendered":"SkyPlanner APS sist\u0113mai KARAT: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ KARAT<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai KARAT: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir KARAT papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un pl\u0101n\u0101 iek\u013cauj katru iek\u0101rtu, operatoru, instrumentu un materi\u0101lu. J\u016bs redzat, kur un kad tiek veikta katra oper\u0101cija, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as. SkyPlanner darbojas ar KARAT Software izstr\u0101d\u0101to IS KARAT gan lok\u0101l\u0101 instal\u0101cij\u0101, gan SaaS versij\u0101.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar KARAT darbojas abos virzienos: SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, datus par iek\u0101rt\u0101m, darba viet\u0101m, person\u0101lu un kr\u0101jumiem, k\u0101 ar\u012b iepirkuma pas\u016bt\u012bjumus. Savuk\u0101rt pl\u0101notie datumi un re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bti atpaka\u013c uz KARAT. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu KARAT iestat\u012bjumiem.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Re\u0101la darbu sec\u012bba katrai iek\u0101rtai.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner katra ra\u017eo\u0161anas pas\u016bt\u012bjuma katrai oper\u0101cijai pie\u0161\u0137ir konkr\u0113tu iek\u0101rtu un laiku. Pieejamo jaudu nosaka faktisk\u0101s mai\u0146as, promb\u016btnes un virsstundas, t\u0101p\u0113c pl\u0101nu j\u016bsu ceh\u0101 tie\u0161\u0101m var izpild\u012bt.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101kas p\u0101rregul\u0113\u0161anas izmaksas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner saglab\u0101 p\u0101rregul\u0113\u0161anas laiku starp katru produktu p\u0101ri abos virzienos. P\u0101rejot no gai\u0161as kr\u0101sas uz tum\u0161u, var pietikt ar \u012bsu skalo\u0161anu, savuk\u0101rt p\u0101rejai no tum\u0161as uz gai\u0161u vajadz\u012bga piln\u012bga t\u012br\u012b\u0161ana. Pl\u0101no\u0161anas algoritms sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101d\u0101 sec\u012bb\u0101, lai zaud\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ar\u012b cilv\u0113ku un instrumentu pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Ra\u017eo\u0161anas uzdevumam, kur\u0101 vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs cilv\u0113ki ar br\u012bvu laiku mai\u0146\u0101s. \u0160tance vai veidne, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek vienlaikus iepl\u0101nota cit\u0101. Ja iek\u0101rta ir aiz\u0146emta, darbs tiek p\u0101rcelts uz citu iek\u0101rtu vai pie cita darbinieka.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu kav\u0113jumi vairs neizjauc pl\u0101nu.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner katram materi\u0101lam p\u0101rbauda pieejamos kr\u0101jumus un gaid\u0101m\u0101s pieg\u0101des p\u0113c iepirkuma pas\u016bt\u012bjumiem. Ra\u017eo\u0161anas pas\u016bt\u012bjumu, kuram j\u0101gaida pieg\u0101d\u0101t\u0101ja pieg\u0101de, iepl\u0101no p\u0113c pieg\u0101des datuma, nevis s\u0101k izpild\u012bt un tad aptur ceh\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamu darbu un iek\u0101rtu boj\u0101jumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja iek\u0101rta apst\u0101jas vai pien\u0101k steidzams pas\u016bt\u012bjums, Autopilot p\u0101rpl\u0101no grafiku. J\u016bsu noteiktie fiks\u0113jumi un priorit\u0101tes joproj\u0101m tiek iev\u0113roti.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroja darbinieki redz progresu re\u0101llaik\u0101, un j\u016bs izv\u0113laties, vai faktiski pat\u0113r\u0113to laiku nos\u016bt\u012bt atpaka\u013c uz KARAT.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>darba pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem darba pas\u016bt\u012bjumu grafiki tiek sast\u0101d\u012bti autom\u0101tiski, un visa organiz\u0101cija redz ra\u017eo\u0161anas norisi re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja Anu J\u00e4rvinen pie robotiz\u0113tas palet\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku piem\u0113rots iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un atbildes uz piepras\u012bjumiem main\u012bt grafiku tagad sa\u0146em da\u017eu sekun\u017eu laik\u0101, nevis stund\u0101 vai ilg\u0101k.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-karat-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar KARAT<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>KARAT nos\u016bta izpild\u0101mos darbus.<\/strong> SkyPlanner sa\u0146em ra\u017eo\u0161anas r\u012bkojumus (v\u00fdrobn\u00ed p\u0159\u00edkazy) un ra\u017eo\u0161anas pas\u016bt\u012bjumus (v\u00fdrobn\u00ed zak\u00e1zky) ar to oper\u0101cij\u0101m, materi\u0101lu specifik\u0101cijas (kusovn\u00edky), tehnolo\u0123iskos mar\u0161rutus (technologick\u00e9 postupy), datus par iek\u0101rt\u0101m, darba viet\u0101m, person\u0101lu un kr\u0101jumiem, k\u0101 ar\u012b izsniegtos iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>SkyPlanner sast\u0101da grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzinis da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Pl\u0101notie s\u0101kuma un beigu datumi non\u0101k KARAT ra\u017eo\u0161anas datos, savuk\u0101rt re\u0123istr\u0113to darbu var nos\u016bt\u012bt k\u0101 oper\u0101ciju izpildes p\u0101rskatus, izmantojot KARAT darba izpildes re\u0123istr\u0101ciju termin\u0101\u013cos (termin\u00e1lov\u00e9 odv\u00e1d\u011bn\u00ed).<\/li>\n\n<\/ol>\n\n\n<p>KARAT joproj\u0101m ir j\u016bsu galven\u0101 uzskaites sist\u0113ma. Pre\u010du kart\u012btes, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, MRP, iepirkumi, noliktavas, pa\u0161izmaksas apr\u0113\u0137ini un finanses paliek turpat. SkyPlanner atbild par vienu: katras oper\u0101cijas sec\u012bbu un izpildes laiku uz katra resursa.<\/p>\n\n\n<p>KARAT savienojas ar \u0101r\u0113j\u0101m sist\u0113m\u0101m, izmantojot saska\u0146otas datu saskarnes un elektronisku datu apmai\u0146u XML form\u0101t\u0101 (<a href=\"https:\/\/www.karatsoftware.cz\/podpora-a-sluzby\/vyvoj-software-a-aplikaci\/\">KARAT Software<\/a>). Ar\u012b t\u0101 modulis darba izpildes re\u0123istr\u0101cijai termin\u0101\u013cos eksport\u0113 datus uz \u0101r\u0113ju sist\u0113mu un import\u0113 tos no t\u0101s, izmantojot saska\u0146otu saskarni. SkyPlanner \u0161os datu apmai\u0146as veidus izmanto abos virzienos. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta katru grafika izmai\u0146u uzreiz, savuk\u0101rt sinhroniz\u0101cijas bie\u017eumu ar KARAT nosaka katrai ra\u017eotnei atsevi\u0161\u0137i.<\/p>\n\n\n<p>Katr\u0101 ra\u017eotn\u0113 KARAT izmanto cit\u0101di, t\u0101p\u0113c SkyPlanner komanda ievie\u0161anas laik\u0101 konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu iestat\u012bjumiem un nodro\u0161ina atbalstu ar\u012b p\u0113c darba s\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavo iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesu un vajadz\u012bbas. Ar\u012b KARAT Software, j\u016bsu KARAT partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var izveidot integr\u0101ciju, izmantojot dokument\u0113to SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Datu pl\u016bsmas, lauku atbilst\u012bba un noteikumi datu ierakst\u012b\u0161anai atpaka\u013c KARAT ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/karat\/integracijas-celvedis\/\">KARAT integr\u0101cijas ce\u013cved\u012b ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-karat-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no KARAT un ko papildus pied\u0101v\u0101 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>KARAT ir savas pl\u0101no\u0161anas iesp\u0113jas. APS KARAT ir IS KARAT izv\u0113les komponents, kas apvieno pl\u0101no\u0161anu uz priek\u0161u un atpaka\u013c un darbojas Gantt diagramm\u0101 (<a href=\"https:\/\/www.karatsoftware.cz\/erp-karat\/planovani-a-rizeni-vyroby-aps\/\">APS KARAT<\/a>). KARAT Software t\u0101 darb\u012bbu apraksta \u0161\u0101di:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ierobe\u017eota vai neierobe\u017eota jauda.<\/strong> APS KARAT pl\u0101no gan ar ierobe\u017eotu, gan neierobe\u017eotu resursu jaudu un \u013cauj simul\u0113t, piem\u0113ram, resursu nomai\u0146u un rezerv\u0101ciju p\u0101rvieto\u0161anu Gantt diagramm\u0101.<\/li>\n\n\n<li><strong>Vair\u0101kas metodes.<\/strong> Ra\u017eo\u0161anas jaudas pl\u0101no\u0161ana uz priek\u0161u, atpaka\u013c vai kombin\u0113ti; pl\u0101no\u0161ana p\u0113c pas\u016bt\u012bjuma izpildes laika; person\u0101la, piem\u0113ram, tehnologu un konstruktoru, noslodzes pl\u0101no\u0161ana ar sv\u0113ruma koeficientiem; \u0161auro vietu pl\u0101no\u0161ana un ikdienas operat\u012bv\u0101 pl\u0101no\u0161ana.<\/li>\n\n\n<li><strong>Pl\u0101no\u0161ana ar eksport\u0113tiem datiem.<\/strong> Padzi\u013cin\u0101t\u0101 pl\u0101no\u0161ana izmanto datus, kas eksport\u0113ti no faktiskajiem ra\u017eo\u0161anas datiem. Pl\u0101not\u0101ji atsevi\u0161\u0137\u0101 modul\u012b veido pl\u0101na variantus un saglab\u0101 lab\u0101ko pl\u0101nu atpaka\u013c sist\u0113m\u0101, kam\u0113r sist\u0113ma turpina darboties p\u0113c s\u0101kotn\u0113j\u0101 pl\u0101na (<a href=\"https:\/\/www.karatsoftware.cz\/propojeni-pokrocileho-planovani-vyroby-aps-a-rizeni-dodavatelskeho-retezce-scm-v-is-karat\/\">KARAT par APS un SCM<\/a>).<\/li>\n\n\n<li><strong>Rezult\u0101ti tiek piem\u0113roti p\u0113c pl\u0101na sl\u0113g\u0161anas.<\/strong> Iek\u0101rtu jaudas dati un materi\u0101lu izsnieg\u0161anas un sa\u0146em\u0161anas piepras\u012bjumi tiek atjaunin\u0101ti p\u0113c da\u013c\u0113jo pl\u0101nu vai galven\u0101 pl\u0101na sl\u0113g\u0161anas.<\/li>\n\n<\/ul>\n\n\n<p>Gantt diagramm\u0101 pl\u0101not\u0101js var ar\u012b main\u012bt pl\u0101nu manu\u0101li. SkyPlanner papildus nodro\u0161ina aktu\u0101lu grafiku, kas vienm\u0113r iev\u0113ro katras iek\u0101rtas, darbinieka un instrumenta pieejam\u012bbas robe\u017eas, pl\u0101no p\u0101rregul\u0113\u0161anu atkar\u012bb\u0101 no darbu sec\u012bbas, p\u0101rbauda gaid\u0101m\u0101s materi\u0101lu pieg\u0101des un pats p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<p>Katrs solis un ierobe\u017eojums ir izskaidrots rakst\u0101 <a href=\"\/lv\/integracija\/erp\/karat\/razosanas-planosana\/\">Vai KARAT nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"karat-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">KARAT pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>APS KARAT<\/th><th>KARAT ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Katram resursam ierobe\u017eota vai neierobe\u017eota<\/td><td>Iev\u0113ro katras iek\u0101rtas, darbinieka un instrumenta pieejam\u012bbas robe\u017eas un faktisk\u0101s mai\u0146as<\/td><\/tr><tr><td>Dati<\/td><td>Pl\u0101no ar no ra\u017eo\u0161anas eksport\u0113tiem datiem; rezult\u0101tus saglab\u0101 atpaka\u013c p\u0113c pl\u0101na sl\u0113g\u0161anas<\/td><td>Izmanto aktu\u0101los pas\u016bt\u012bjumus un re\u0123istr\u0113to izpildes progresu<\/td><\/tr><tr><td>Pl\u0101ni<\/td><td>Pl\u0101not\u0101js veido variantus un lab\u0101ko saglab\u0101 atpaka\u013c sist\u0113m\u0101<\/td><td>Viens pl\u0101ns, ko Autopilot past\u0101v\u012bgi uztur aktu\u0101lu<\/td><\/tr><tr><td>Grafiks<\/td><td>Resursu rezerv\u0101cijas Gantt diagramm\u0101<\/td><td>Detaliz\u0113ta visu oper\u0101ciju sec\u012bba da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>Darbinieki<\/td><td>Person\u0101la noslodzes pl\u0101no\u0161ana ar sv\u0113ruma koeficientiem<\/td><td>Konkr\u0113ti operatori un vi\u0146u mai\u0146as; vair\u0101ku operatoru uzdevumiem pie\u0161\u0137irti visi vajadz\u012bgie darbinieki<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Pl\u0101no\u0161an\u0101 iek\u013cauti iepirktie materi\u0101li un v\u0113l nepieg\u0101d\u0101tie iepirkuma pas\u016bt\u012bjumi<\/td><td>Uzdevumi s\u0101kas, kad materi\u0101li ir pieejami kr\u0101jumos vai sa\u0146emti p\u0113c iepirkuma pas\u016bt\u012bjumiem; katra izmai\u0146a izraisa p\u0101rpl\u0101no\u0161anu<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Pl\u0101not\u0101js veic simul\u0101cijas, maina resursus vai p\u0101rvieto rezerv\u0101cijas<\/td><td>Autopilot p\u0101rpl\u0101no visu ra\u017eotni, iev\u0113rojot j\u016bsu priorit\u0101tes<\/td><\/tr><tr><td>Pl\u0101not\u0101ja skats<\/td><td>Gantt diagramma p\u0113c projekta, p\u0113c resursa vai \u0161aur\u0101s vietas re\u017e\u012bm\u0101<\/td><td>Interakt\u012bva Gantt diagramma: p\u0101rvietojiet uzdevumus, un pl\u0101ns paliek saska\u0146ots<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Darba izpildes re\u0123istr\u0101cija KARAT termin\u0101\u013cos<\/td><td>Operatori t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz savu uzdevumu rindu un re\u0123istr\u0113 darbu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis APS KARAT, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u0101nam vienm\u0113r j\u0101b\u016bt aktu\u0101lam.<\/strong> APS KARAT pl\u0101no ar eksport\u0113tiem datiem, kam\u0113r ra\u017eo\u0161ana turpin\u0101s p\u0113c s\u0101kotn\u0113j\u0101 pl\u0101na. SkyPlanner izmanto aktu\u0101los pas\u016bt\u012bjumus un re\u0123istr\u0113to izpildes progresu, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku p\u0113c katras b\u016btiskas izmai\u0146as.<\/li>\n\n\n<li><strong>Pl\u0101ns nedr\u012bkst p\u0101rsniegt re\u0101lo jaudu.<\/strong> SkyPlanner vienm\u0113r iev\u0113ro katra resursa pieejam\u012bbas robe\u017eas un par\u0101da re\u0101lo pabeig\u0161anas datumu. Balstoties uz to, varat main\u012bt priorit\u0101tes, iepl\u0101not virsstundas vai izv\u0113l\u0113ties citu iek\u0101rtu.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka izlaides apjomu.<\/strong> Sagatavo\u0161anas laiku matric\u0101 glab\u0101jas p\u0101rregul\u0113\u0161anas ilgums katram p\u0101rejas virzienam. Ra\u017eo\u0161anas uzdevumi tiek sak\u0101rtoti p\u0113c kr\u0101sas, gar\u0161as vai materi\u0101la t\u0101, lai kop\u0113jais sagatavo\u0161anas laiks b\u016btu vismaz\u0101kais.<\/li>\n\n\n<li><strong>Pl\u0101nu ierobe\u017eo gan operatori un instrumenti, gan gaid\u0101m\u0101s materi\u0101lu pieg\u0101des.<\/strong> Pl\u0101no\u0161an\u0101 iev\u0113ro katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bbas robe\u017eas. Uzdevumiem, kuriem vajadz\u012bgi vair\u0101ki operatori, pie\u0161\u0137ir visus nepiecie\u0161amos darbiniekus, izmanto alternat\u012bvus darba centrus un uzdevumus s\u0101k, kad materi\u0101li ir pieejami kr\u0101jumos vai sa\u0146emti p\u0113c iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Katram operatoram j\u0101str\u0101d\u0101 p\u0113c pl\u0101na.<\/strong> Mobile Confirmations par\u0101da aktu\u0101lo uzdevumu rindu t\u0101lrun\u012b vai plan\u0161etdator\u0101. Lietot\u0101ju skaits nav ierobe\u017eots: cena ir atkar\u012bga no darba centru, nevis lietot\u0101ju skaita.<\/li>\n\n\n<li><strong>V\u0113laties aktu\u0101lu grafiku da\u017eu ned\u0113\u013cu laik\u0101.<\/strong> SkyPlanner ir m\u0101ko\u0146programmat\u016bra, kas darbojas l\u012bdz\u0101s KARAT. 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat to p\u0101rbaud\u012bt ar saviem ra\u017eo\u0161anas pas\u016bt\u012bjumiem. Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet iek\u0101rtas un darba vietas no KARAT. Ir pieejama pal\u012bdz\u012bba darba s\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet no KARAT uz Excel atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas, import\u0113jiet tos SkyPlanner un sal\u012bdziniet ieg\u016bto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Savienojiet ar KARAT.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina atbalstu ar\u012b p\u0113c darba s\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa par pl\u0101nu tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a> vai apl\u016bkojiet <a href=\"\/lv\/integracija\/erp\/\">visas ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101ds ir lab\u0101kais KARAT papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar KARAT. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, iek\u0101rtu un darba vietu datus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus, savuk\u0101rt atpaka\u013c nos\u016bta pl\u0101notos datumus un re\u0123istr\u0113to darbu. Pl\u0101nojot tiek \u0146emti v\u0113r\u0101 katras iek\u0101rtas, operatora un instrumenta jaudas ierobe\u017eojumi un pieejamais materi\u0101lu daudzums. Iestat\u012b\u0161anas laiku matrica, kur\u0101 \u0146emts v\u0113r\u0101 p\u0101rejas virziens, sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai iestat\u012b\u0161anai vajadz\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai KARAT nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai?<\/summary>\n<p class=\"sp-faq__a\">Da\u013c\u0113ji. APS KARAT ir IS KARAT papildu komponents, kas \u013cauj pl\u0101not Gantt diagramm\u0101 ar ierobe\u017eotu vai neierobe\u017eotu jaudu. Pl\u0101not\u0101ji veido pl\u0101na variantus, izmantojot eksport\u0113tus ra\u017eo\u0161anas datus, un lab\u0101ko variantu saglab\u0101 atpaka\u013c sist\u0113m\u0101. SkyPlanner APS darbojas l\u012bdz\u0101s KARAT, izmanto aktu\u0101los datus, iev\u0113ro katras iek\u0101rtas, darbinieka un instrumenta jaudas ierobe\u017eojumus un pieejamo materi\u0101lu daudzumu un autom\u0101tiski p\u0101rpl\u0101no grafiku.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar KARAT?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar KARAT. Tas nolasa ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos mar\u0161rutus, resursus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus, izmantojot saska\u0146otu KARAT datu saskarni. Pl\u0101notos datumus un re\u0123istr\u0113to darbu tas ieraksta atpaka\u013c gan ar \u0161o pa\u0161u saskarni, gan ar KARAT termin\u0101\u013cu darba re\u0123istr\u0101cijas funkciju.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j KARAT ra\u017eo\u0161anas modu\u013cus?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina \u0161o modu\u013cu darb\u012bbu. KARAT p\u0101rzi\u0146\u0101 paliek pre\u010du kart\u012btes, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, MRP, iepirkumi, noliktavas, pa\u0161izmaksas apr\u0113\u0137ini un finanses. SkyPlanner sast\u0101da j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku atbilsto\u0161i faktiskajai jaudai un nos\u016bta datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Izv\u0113l\u0113ties APS KARAT vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja pl\u0101ns bie\u017ei main\u0101s un t\u0101 pamat\u0101 j\u0101b\u016bt aktu\u0101liem datiem. APS KARAT pl\u0101no\u0161anai izmanto no ra\u017eo\u0161anas eksport\u0113tus datus, un pl\u0101not\u0101ji veido un sal\u012bdzina variantus, pirms vienu no tiem saglab\u0101 atpaka\u013c sist\u0113m\u0101. SkyPlanner autom\u0101tiski p\u0101rpl\u0101no grafiku p\u0113c katr\u0101m izmai\u0146\u0101m, pl\u0101no p\u0101rregul\u0113\u0161anu, instrumentus, brig\u0101des un materi\u0101lus un katram operatoram t\u0101lrun\u012b par\u0101da vi\u0146a darbu rindu. Lietot\u0101ju skaits nav ierobe\u017eots. Bezmaksas izm\u0113\u0123in\u0101jum\u0101 to p\u0101rbaud\u012bsiet ar saviem KARAT pas\u016bt\u012bjumiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner ir pieejams \u010dehu valod\u0101?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Katrs lietot\u0101js var p\u0101rsl\u0113gt SkyPlanner saskarni uz \u010dehu valodu, lai pl\u0101not\u0101ji un operatori var\u0113tu str\u0101d\u0101t sav\u0101 valod\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner ra\u017eotnei, kas izmanto KARAT?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b par 5 darba centriem un v\u0113l 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto darbu rindu. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesiem un vajadz\u012bb\u0101m nor\u0101d\u0101m iepriek\u0161 kop\u0101 ar izv\u0113l\u0113t\u0101 pl\u0101na cenu, lai j\u016bs zin\u0101tu kop\u0113j\u0101s izmaksas v\u0113l pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar KARAT?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 tiek izmantoti j\u016bsu atv\u0113rtie KARAT ra\u017eo\u0161anas pas\u016bt\u012bjumi, kas eksport\u0113ti Excel fail\u0101. Jau pirms integr\u0101cijas darbu s\u0101kuma j\u016bs redz\u0113siet savas ra\u017eo\u0161anas <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">pl\u0101nu, kas atbilst faktiskajai iek\u0101rtu un darbinieku jaudai<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ KARAT SkyPlanner APS sist\u0113mai KARAT: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir KARAT papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un pl\u0101n\u0101 iek\u013cauj katru iek\u0101rtu, operatoru, instrumentu un materi\u0101lu. J\u016bs redzat, kur un kad tiek veikta katra oper\u0101cija, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas &#8230; <a title=\"SkyPlanner APS sist\u0113mai KARAT: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai KARAT: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106644","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>KARAT integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina KARAT: pl\u0101no\u0161ana re\u0101l\u0101s jaudas robe\u017e\u0101s, divvirzienu integr\u0101cija, katra iek\u0101rta, operators, instruments un materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai KARAT: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina KARAT: pl\u0101no\u0161ana re\u0101l\u0101s jaudas robe\u017e\u0101s, divvirzienu integr\u0101cija, katra iek\u0101rta, operators, instruments un materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/karat\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/karat\\\/\",\"name\":\"KARAT integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildina KARAT: pl\u0101no\u0161ana re\u0101l\u0101s jaudas robe\u017e\u0101s, divvirzienu integr\u0101cija, katra iek\u0101rta, operators, instruments un materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/karat\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/karat\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/karat\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai KARAT: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"KARAT integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","description":"SkyPlanner APS papildina KARAT: pl\u0101no\u0161ana re\u0101l\u0101s jaudas robe\u017e\u0101s, divvirzienu integr\u0101cija, katra iek\u0101rta, operators, instruments un materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai KARAT: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","og_description":"SkyPlanner APS papildina KARAT: pl\u0101no\u0161ana re\u0101l\u0101s jaudas robe\u017e\u0101s, divvirzienu integr\u0101cija, katra iek\u0101rta, operators, instruments un materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/","name":"KARAT integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildina KARAT: pl\u0101no\u0161ana re\u0101l\u0101s jaudas robe\u017e\u0101s, divvirzienu integr\u0101cija, katra iek\u0101rta, operators, instruments un materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/karat\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai KARAT: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ KARAT SkyPlanner APS sist\u0113mai KARAT: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir KARAT papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un pl\u0101n\u0101 iek\u013cauj katru iek\u0101rtu, operatoru, instrumentu un materi\u0101lu. J\u016bs redzat, kur un kad tiek veikta katra oper\u0101cija, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106644","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106644"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106644\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106644"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}