{"id":106615,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/sylob\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"sylob","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/","title":{"rendered":"SkyPlanner APS sist\u0113mai Sylob ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Sylob<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai Sylob ERP: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir Sylob ERP papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i faktiskajai iek\u0101rtu un person\u0101la jaudai. Tas pl\u0101no katras iek\u0101rtas, operatora un instrumenta noslodzi un materi\u0101lu izmanto\u0161anu. J\u016bs redzat, kur\u0101 darba centr\u0101 un kad tiek izpild\u012bts katrs ra\u017eo\u0161anas pas\u016bt\u012bjums (ordre de fabrication, OF), un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar Sylob ERP darbojas abos virzienos: no Sylob tiek sa\u0146emti OF ar to oper\u0101cij\u0101m, tehnolo\u0123iskie mar\u0161ruti (gammes), darba centri (centres de charge), kr\u0101jumi un iepirkuma pas\u016bt\u012bjumi. Savuk\u0101rt pl\u0101notie oper\u0101ciju datumi, darba centri un operatoru sniegtie izpildes dati tiek nos\u016bt\u012bti atpaka\u013c. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Sylob konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Visu resursu jaudas ierobe\u017eojumi vien\u0101 pl\u0101n\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Katras iek\u0101rtas, darbinieka un instrumenta grafiks tiek veidots atbilsto\u0161i pieejamajai jaudai, \u0146emot v\u0113r\u0101 faktisk\u0101s mai\u0146as, promb\u016btni un virsstundas. Darba centr\u0101 ar trim iek\u0101rt\u0101m paral\u0113li tiek izpild\u012bti tr\u012bs ra\u017eo\u0161anas uzdevumi, nep\u0101rslogojot nevienu iek\u0101rtu. Kad iek\u0101rtas jauda ir piln\u012bb\u0101 aiz\u0146emta, darbs tiek p\u0101rcelts uz citu iek\u0101rtu vai pie\u0161\u0137irts citam darbiniekam.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pieg\u0101des termi\u0146i, kurus varat apsol\u012bt.<\/p>\n\n\n<p class=\"fx-pain__b\">Katram OF tiek noteikts pl\u0101notais pabeig\u0161anas datums, balstoties uz faktisko jaudu. P\u0101rdo\u0161anas komanda klientiem sniedz atbildes p\u0113c pl\u0101na, nevis p\u0113c v\u0113lam\u0101 datuma, no kura grafiks apr\u0113\u0137in\u0101ts atpaka\u013c.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana izmai\u0146u gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja iek\u0101rta apst\u0101jas, ien\u0101k steidzams pas\u016bt\u012bjums vai ra\u017eo\u0161anas uzdevums tiek pabeigts agr\u0101k, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. P\u0101rpl\u0101no\u0161an\u0101 joproj\u0101m tiek iev\u0113rotas j\u016bsu noteikt\u0101s priorit\u0101tes un fiks\u0113t\u0101s poz\u012bcijas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner zina, cik ilga ir p\u0101rregul\u0113\u0161ana, p\u0101rejot no viena produkta uz otru, abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Pl\u0101no\u0161anas algoritms sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101d\u0101 sec\u012bb\u0101, lai zaud\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Koplietojamie instrumenti un brig\u0101des ir \u0146emti v\u0113r\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Veidne vai pal\u012bgier\u012bce, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek vienlaikus iepl\u0101nota citai. Uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs cilv\u0113ki, kuriem attiec\u012bgaj\u0101s mai\u0146\u0101s ir br\u012bvs laiks.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu pieejam\u012bba p\u0101rbaud\u012bta pirms darba s\u0101kuma.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner sast\u0101da grafiku, \u0146emot v\u0113r\u0101 Sylob kr\u0101jumus un atv\u0113rtos iepirkuma pas\u016bt\u012bjumus (commandes fournisseurs). Ra\u017eo\u0161anas uzdevums, kuram j\u0101gaida pieg\u0101d\u0101t\u0101ja pieg\u0101de, tiek iepl\u0101nots p\u0113c pieg\u0101des datuma, nevis non\u0101k pie iek\u0101rtas un apst\u0101jas materi\u0101lu tr\u016bkuma d\u0113\u013c.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Birojs redz progresu re\u0101llaik\u0101, un izpildes dati tiek nos\u016bt\u012bti atpaka\u013c uz Sylob.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0113\u0161anu re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu ietaupa 2 darba stundas, un jaun\u0101 darbu rinda ra\u017eo\u0161anas l\u012bniju sasniedz da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sagatavo\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermas r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, iepriek\u0161 ap 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, r\u012bkot\u0101jdirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la konstrukcijas un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens darbu vad\u012bt\u0101js divu viet\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no gaisa uz Piristeel jumta dro\u0161\u012bbas elementu r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis skaidri saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-sylob-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar Sylob ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Sylob nos\u016bta izpild\u0101mos darbus.<\/strong> Apstiprin\u0101tie OF ar to oper\u0101cij\u0101m, darba centriem, p\u0101rregul\u0113\u0161anas un izpildes laikiem tiek sa\u0146emti SkyPlanner kop\u0101 ar kr\u0101jumu un iepirkuma pas\u016bt\u012bjumu datiem.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus pl\u0101no\u0161anas dzinis da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju katr\u0101 darba centr\u0101 un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un izpildes dati tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> SkyPlanner ar webhook pal\u012bdz\u012bbu nos\u016bta katru grafika izmai\u0146u, tikl\u012bdz t\u0101 notiek. Pl\u0101notais s\u0101kums, beigas un darba centrs tiek ierakst\u012bti attiec\u012bgaj\u0101 OF oper\u0101cij\u0101 Sylob sist\u0113m\u0101, savuk\u0101rt operatoru darba laika ieraksti k\u013c\u016bst par ra\u017eo\u0161anas izpildes deklar\u0101cij\u0101m (d\u00e9clarations de production).<\/li>\n\n<\/ol>\n\n\n<p>Integr\u0101cija izmanto Sylob publisk\u0101s REST API saskarnes. SkyPlanner nolasa Sylob datus ar saglab\u0101tiem vaic\u0101jumiem, izmantojot Syst\u00e8me d&#8217;information API, un ieraksta datus atpaka\u013c ar Sylob darb\u012bbu kataloga darb\u012bb\u0101m, izmantojot Action API. Katr\u0101 ra\u017eotn\u0113 Sylob vaic\u0101jumi, tehnolo\u0123iskie mar\u0161ruti un darba centri ir konfigur\u0113ti at\u0161\u0137ir\u012bgi, t\u0101p\u0113c SkyPlanner komanda ievie\u0161anas laik\u0101 izveido j\u016bsu objektu atbilst\u012bbas un nodro\u0161ina integr\u0101cijas atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Integr\u0101cijas cenas pied\u0101v\u0101jums tiek sagatavots iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m. Ar\u012b j\u016bsu Sylob partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Vaic\u0101jumi, darb\u012bbas, autentifik\u0101cija un lauku atbilst\u012bbas ir izskaidrotas <a href=\"\/lv\/integracija\/erp\/sylob\/integracijas-celvedis\/\">Sylob ERP integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-sylob-erp-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101di dati tiek p\u0101rs\u016bt\u012bti starp Sylob ERP un SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Sylob ERP<\/th><th>SkyPlanner<\/th><th>Virziens<\/th><\/tr><\/thead><tbody><tr><td>Article (iep\u0113rkams vai ra\u017eojams)<\/td><td>Produkti un materi\u0101li<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Nomenclature (daudzl\u012bme\u0146u BOM)<\/td><td>Produkta strukt\u016bra un katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Gamme: oper\u0101cijas ar p\u0101rregul\u0113\u0161anas un izpildes laikiem<\/td><td>Procesa posmi ar ilgumu un p\u0101rregul\u0113\u0161anas laiku<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Centre de charge: resursu skaits, ned\u0113\u013cas grafiks (semaine type) un iz\u0146\u0113mumi<\/td><td>Darba centri, darba centru grupas, mai\u0146as un promb\u016btne<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Employ\u00e9s<\/td><td>Person\u0101ls un t\u0101 mai\u0146as<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Ordre de fabrication (OF) ar daudzumu un datumu, kad produkts ir nepiecie\u0161ams<\/td><td>Pas\u016bt\u012bjums un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146u un priorit\u0101ti<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Kr\u0101jumi pa atra\u0161an\u0101s viet\u0101m<\/td><td>Materi\u0101lu kr\u0101jumi<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Commande fournisseur ar paredzamo sa\u0146em\u0161anas datumu<\/td><td>Ien\u0101ko\u0161ie materi\u0101li to pieg\u0101des datum\u0101<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Op\u00e9ration d&#8217;ordre de fabrication: pl\u0101notais s\u0101kums, beigas, darba centrs<\/td><td>Katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un darba centrs<\/td><td>Atpaka\u013c uz Sylob<\/td><\/tr><tr><td>D\u00e9claration de production: p\u0101rregul\u0113\u0161anas laiks, izpildes laiks, sara\u017eotais daudzums, br\u0101\u0137is, oper\u0101cijas pabeig\u0161ana<\/td><td>Operatoru re\u0123istr\u0113tais darba laiks un daudzumi<\/td><td>Atpaka\u013c uz Sylob<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Sagatavo\u0161anas laiku matricas, instrumenti ar ierobe\u017eotu pieejam\u012bbu un alternat\u012bvie darba centri tiek uztur\u0113ti SkyPlanner un konfigur\u0113ti ievie\u0161anas laik\u0101.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-sylob-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no Sylob un ko papildus pied\u0101v\u0101 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sylob 9 aptver vair\u0101kus pl\u0101no\u0161anas l\u012bme\u0146us: PIC, PDP, neto vajadz\u012bbas (CBN), katra darba centra noslodzes pl\u0101nu un \u012bstermi\u0146a grafiku sast\u0101d\u012b\u0161anu. Sylob dokument\u0101cij\u0101 jaudas pl\u0101no\u0161ana ir aprakst\u012bta \u0161\u0101di:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Jaudas veids katram darba centram.<\/strong> Katram centre de charge tiek iestat\u012bta neierobe\u017eota vai ierobe\u017eota jauda. Ja jauda ir neierobe\u017eota, oper\u0101cijas tiek iepl\u0101notas tikai p\u0113c datumiem, kad produkcija ir nepiecie\u0161ama, un vair\u0101kas oper\u0101cijas var notikt vienlaikus. T\u0101p\u0113c noslodzes pl\u0101n\u0101 par\u0101d\u0101s p\u0101rslodze, kas pl\u0101not\u0101jam j\u0101izl\u012bdzina. (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/31038889\/SUPFOR+-+Centres+de+charge\">Forterro zin\u0101\u0161anu b\u0101ze<\/a>)<\/li>\n\n\n<li><strong>Ar ierobe\u017eotu jaudu \u2014 viena oper\u0101cija vienlaikus.<\/strong> &#8220;G\u00e9rer \u00e0 capacit\u00e9 finie implique qu&#8217;une seule op\u00e9ration est permise sur le centre de charge.&#8221; (Jaudas ierobe\u017eojumu iev\u0113ro\u0161ana noz\u012bm\u0113, ka darba centr\u0101 vienlaikus ir at\u013cauta tikai viena oper\u0101cija.)<\/li>\n\n\n<li><strong>S\u0101kum\u0101 \u2014 neierobe\u017eota jauda.<\/strong> Sylob apm\u0101c\u012bb\u0101s iesaka s\u0101kt ar neierobe\u017eotu jaudu, jo pl\u0101no\u0161anai ar jaudas ierobe\u017eojumiem ir vajadz\u012bgs \u012bpa\u0161i \u0161im darbam nor\u012bkots pl\u0101not\u0101js, uzticami tehniskie dati un ra\u017eo\u0161anas izpildes dati, kas tiek re\u0123istr\u0113ti gandr\u012bz re\u0101llaik\u0101.<\/li>\n\n\n<li><strong>Izmai\u0146as st\u0101jas sp\u0113k\u0101 p\u0113c apstiprin\u0101\u0161anas.<\/strong> Par pl\u0101no\u0161anas darb\u012bb\u0101m teikts: &#8220;Les modifications du planning sont r\u00e9percut\u00e9es en production uniquement lorsqu&#8217;elles sont valid\u00e9es.&#8221; (Pl\u0101na izmai\u0146as non\u0101k ra\u017eo\u0161an\u0101 tikai tad, kad pl\u0101not\u0101js t\u0101s apstiprina.) (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/1549041665\/Nouvelle+interface+de+planification\">Forterro<\/a>)<\/li>\n\n\n<li><strong>Optimiz\u0101cija atsevi\u0161\u0137\u0101 APS sist\u0113m\u0101.<\/strong> Ra\u017eo\u0161anas pl\u0101no\u0161anai, iev\u0113rojot jaudas un citus ierobe\u017eojumus un simul\u0113jot scen\u0101rijus, Sylob pied\u0101v\u0101 CADPLAN, &#8220;qui s&#8217;interface parfaitement \u00e0 l&#8217;ERP Sylob et le compl\u00e8te&#8221; (kas piln\u012bb\u0101 integr\u0113jas ar Sylob ERP un to papildina). (<a href=\"https:\/\/www.sylob.com\/fr\/fonctionnalites\/planification-aps\">Sylob<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>T\u0101tad ra\u017eotnei, kas v\u0113las vienotu visa ra\u017eo\u0161anas ceha grafiku atbilsto\u0161i pieejamajai jaudai, l\u012bdz\u0101s Sylob ir vajadz\u012bgs specializ\u0113ts grafiku sast\u0101d\u012b\u0161anas risin\u0101jums. Katrs solis ir izskaidrots rakst\u0101 <a href=\"\/lv\/integracija\/erp\/sylob\/razosanas-planosana\/\">Vai Sylob ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai?<\/a>, savuk\u0101rt metodes pamati \u2014 m\u016bsu <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">rokasgr\u0101mat\u0101 par ra\u017eo\u0161anas pl\u0101no\u0161anu ar jaudas ierobe\u017eojumiem<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"sylob-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sylob ERP \u0161obr\u012bd un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Pl\u0101no\u0161ana Sylob sist\u0113m\u0101 (plan de charge un darba centri ar ierobe\u017eotu jaudu)<\/th><th>Sylob ERP kop\u0101 ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>P\u0113c noklus\u0113juma neierobe\u017eota; centri ar ierobe\u017eotu jaudu izpilda vienu oper\u0101ciju vienlaikus<\/td><td>Tiek iev\u0113rota katras iek\u0101rtas, darbinieka un instrumenta pieejam\u0101 jauda un mai\u0146as<\/td><\/tr><tr><td>Grafiks<\/td><td>Tiek apr\u0113\u0137in\u0101ta noslodze, p\u0113c tam pl\u0101not\u0101js p\u0101rvieto un apstiprina oper\u0101cijas<\/td><td>Oper\u0101ciju grafiks da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Katras oper\u0101cijas p\u0101rregul\u0113\u0161anas laiks tehnolo\u0123iskaj\u0101 mar\u0161rut\u0101<\/td><td>Ra\u017eo\u0161anas uzdevumi sak\u0101rtoti t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu vismaz\u0101kais<\/td><\/tr><tr><td>Resursi<\/td><td>Resursu skaits katr\u0101 darba centr\u0101<\/td><td>Tiek iev\u0113rota instrumentu pieejam\u012bba; uzdevumiem, kam vajadz\u012bgi vair\u0101ki operatori, tiek pie\u0161\u0137irts person\u0101ls<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Pl\u0101nojot ar jaudas ierobe\u017eojumiem, var papildus \u0146emt v\u0113r\u0101 kritisko komponentu pieejam\u012bbu<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir pieejami kr\u0101jumos vai pieg\u0101d\u0101ti saska\u0146\u0101 ar iepirkuma pas\u016bt\u012bjumiem<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Noslodzes p\u0101rr\u0113\u0137ins, p\u0113c tam p\u0101rskat\u012b\u0161ana un apstiprin\u0101\u0161ana<\/td><td>Autopilot p\u0101rpl\u0101no atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Izpildes datu re\u0123istr\u0113\u0161ana Sylob vai Sylob Apps<\/td><td>Operatora uzdevumu rinda un darba re\u0123istr\u0113\u0161ana t\u0101lrun\u012b vai plan\u0161etdator\u0101; izpildes dati tiek nos\u016bt\u012bti atpaka\u013c uz Sylob<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"choose-skyplanner-over-cadplan-when\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Izv\u0113lieties SkyPlanner, nevis CADPLAN, ja<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>CADPLAN ir Sylob APS modulis. Forterro lietot\u0101ju apm\u0101c\u012bbas aptver t\u0101 tehnolo\u0123iskos datus (ra\u017eojamo izstr\u0101d\u0101jumu kodus, posmus, tehnolo\u0123iskos mar\u0161rutus), simul\u0101ciju defin\u0113\u0161anu ar OF atlasi un pie\u0146\u0113mumiem, standarta heiristikas un rezult\u0101ta interakt\u012bvu redi\u0123\u0113\u0161anu. (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/31033777\/Programmes+de+formation\">Forterro apm\u0101c\u012bbu programma<\/a>) Sylob \u0161\u012b modu\u013ca cenu nepublic\u0113. SkyPlanner sast\u0101da visas ra\u017eotnes grafiku no j\u016bsu Sylob OF, autom\u0101tiski to p\u0101rpl\u0101no un nodro\u0161ina darba inform\u0101ciju ar\u012b ra\u017eo\u0161anas ceh\u0101 \u2014 par publiski nor\u0101d\u012btu cenu.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u0113laties da\u017eu ned\u0113\u013cu laik\u0101 s\u0101kt str\u0101d\u0101t ar aktu\u0101lu grafiku.<\/strong> SkyPlanner ir m\u0101ko\u0146programmat\u016bra, kas darbojas l\u012bdz\u0101s Sylob ERP. 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 varat to p\u0101rbaud\u012bt ar saviem OF, un ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas darbu s\u0101kuma.<\/li>\n\n\n<li><strong>Pl\u0101ns main\u0101s katru dienu.<\/strong> Autopilot autom\u0101tiski p\u0101rpl\u0101no darbu p\u0113c katr\u0101m b\u016btisk\u0101m izmai\u0146\u0101m, un jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz Sylob. Pl\u0101not\u0101jam nav j\u0101defin\u0113 un j\u0101palai\u017e simul\u0101cija.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka izlaidi.<\/strong> P\u0101rregul\u0113\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts, cik ilga ir p\u0101reja no viena produkta uz otru katr\u0101 virzien\u0101. T\u0101 nosaka ra\u017eo\u0161anas uzdevumu sec\u012bbu ar vismaz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Instrumenti, brig\u0101des un materi\u0101li nosaka, ko ra\u017eot n\u0101kamo.<\/strong> Pl\u0101n\u0101 tiek \u0146emta v\u0113r\u0101 katras iek\u0101rtas, darbinieka un instrumenta ierobe\u017eot\u0101 pieejam\u012bba un materi\u0101lu daudzums. Uzdevumiem, kuros vajadz\u012bgi vair\u0101ki operatori, tiek iedal\u012bts nepiecie\u0161amais person\u0101ls, un tiek izmantoti alternat\u012bvi darba centri. Ra\u017eo\u0161anas uzdevumi s\u0101kas tikai tad, kad materi\u0101li ir pieejami noliktav\u0101 vai sa\u0146emti ar iepirkuma pas\u016bt\u012bjumu.<\/li>\n\n\n<li><strong>Operatoriem j\u0101str\u0101d\u0101 p\u0113c pl\u0101na.<\/strong> Mobile Confirmations par\u0101da katra operatora uzdevumu rindu t\u0101lrun\u012b vai plan\u0161et\u0113, un izpildes pazi\u0146ojumi tiek nos\u016bt\u012bti atpaka\u013c uz Sylob.<\/li>\n\n\n<li><strong>V\u0113laties zin\u0101t visas izmaksas jau s\u0101kum\u0101.<\/strong> No 199 \u20ac m\u0113nes\u012b. Divvirzienu integr\u0101ciju konfigur\u0113 un atbalsta SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet iek\u0101rtas, darbiniekus un mai\u0146as SkyPlanner vai import\u0113jiet \u0161os datus. Ir pieejama pal\u012bdz\u012bba darba uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet savus OF.<\/strong> Eksport\u0113jiet atv\u0113rtos OF un to oper\u0101cijas no Sylob vaic\u0101juma CSV vai Excel form\u0101t\u0101, import\u0113jiet tos un sal\u012bdziniet SkyPlanner grafiku ar savu pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Savienojiet ar Sylob ERP.<\/strong> SkyPlanner komanda piel\u0101go divvirzienu integr\u0101ciju j\u016bsu Sylob konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu p\u0113c darba uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa par izv\u0113l\u0113to pl\u0101nu tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi p\u0113c darba centru skaita. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, par pl\u0101no\u0161anas metodi lasiet sada\u013c\u0101 <a href=\"\/lv\/resursi\/kas-ir-razosanas-planosana\/\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/a>, bet citas ERP sist\u0113mas atrad\u012bsiet <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju p\u0101rskat\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais Sylob ERP papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 iek\u0101rtu un person\u0101la re\u0101lo jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Sylob ERP. Tas sa\u0146em OF, tehnolo\u0123iskos mar\u0161rutus, darba centrus, noliktavas atlikumus un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta pl\u0101notos oper\u0101ciju datumus, darba centrus un ra\u017eo\u0161anas izpildes pazi\u0146ojumus. Pl\u0101no\u0161an\u0101 tiek iev\u0113rota katras iek\u0101rtas, operatora un instrumenta ierobe\u017eot\u0101 pieejam\u012bba un materi\u0101lu daudzums. P\u0101rregul\u0113\u0161anas laiku matrica \u0146em v\u0113r\u0101 p\u0101rejas virzienu starp produktiem un sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161anas laiks b\u016btu vismaz\u0101kais. Autopilot autom\u0101tiski p\u0101rpl\u0101no darbu, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar Sylob ERP?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS integr\u0113jas ar Sylob ERP, izmantojot Sylob publisk\u0101s REST API saskarnes. Tas nolasa OF, oper\u0101cijas, darba centrus, noliktavas atlikumus un iepirkuma pas\u016bt\u012bjumus no saglab\u0101tiem vaic\u0101jumiem un nos\u016bta pl\u0101notos datumus un izpildes pazi\u0146ojumus atpaka\u013c, izmantojot Sylob darb\u012bbu katalogu. Pa\u0161a Sylob APS modulis ir CADPLAN. Integr\u0101ciju darba uzs\u0101k\u0161anas laik\u0101 konfigur\u0113 SkyPlanner komanda, vai ar\u012b to izveido j\u016bsu Sylob partneris vai izstr\u0101d\u0101t\u0101ji, izmantojot SkyPlanner REST API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sylob ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 re\u0101lo jaudu?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, katram darba centram atsevi\u0161\u0137i. Darba centram var iestat\u012bt ierobe\u017eotu jaudu, un tad taj\u0101 vienlaikus tiek veikta tikai viena oper\u0101cija. Sylob iesaka s\u0101kt ar neierobe\u017eotu jaudu, jo pl\u0101no\u0161anai ar ierobe\u017eotu jaudu ir vajadz\u012bgs \u012bpa\u0161i \u0161im darbam nor\u012bkots pl\u0101not\u0101js, uzticami tehniskie dati un izpildes pazi\u0146ojumi gandr\u012bz re\u0101llaik\u0101. Darbojoties l\u012bdz\u0101s Sylob, SkyPlanner APS vienlaikus pl\u0101no visas iek\u0101rtas, darbiniekus, instrumentus un materi\u0101lus, \u0146emot v\u0113r\u0101 to ierobe\u017eoto pieejam\u012bbu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Izv\u0113l\u0113ties CADPLAN vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izv\u0113lieties SkyPlanner, ja v\u0113laties visai ra\u017eotnei vienotu grafiku, kas \u0146em v\u0113r\u0101 re\u0101lo jaudu un autom\u0101tiski atjaunin\u0101s. CADPLAN pied\u0101v\u0101 pl\u0101not\u0101jam simul\u0101cijas, heiristikas un interakt\u012bvu redi\u0123\u0113\u0161anu, izmantojot savus ra\u017eo\u0161anas tehnolo\u0123ijas datus. SkyPlanner veido grafiku tie\u0161i no j\u016bsu Sylob OF, autom\u0101tiski p\u0101rpl\u0101no darbu p\u0113c katr\u0101m izmai\u0146\u0101m un pl\u0101no instrumentus, brig\u0101des, p\u0101rregul\u0113\u0161anu un materi\u0101lus. Operatori savu uzdevumu rindu redz t\u0101lrun\u012b. Izm\u0113\u0123in\u0101juma laik\u0101 varat apskat\u012bt savas ra\u017eo\u0161anas grafiku, pirms pie\u0146emat jebk\u0101du l\u0113mumu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j Sylob ra\u017eo\u0161anas vad\u012bbu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina Sylob ra\u017eo\u0161anas vad\u012bbu. Sylob joproj\u0101m p\u0101rvalda preces, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, CBN, iepirkumus, noliktavu, kvalit\u0101ti un finanses. SkyPlanner sast\u0101da OF grafiku atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta pl\u0101notos datumus un izpildes pazi\u0146ojumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 ra\u017eotnei, kas izmanto Sylob?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem un v\u0113l 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto uzdevumu rindu. Integr\u0101cijas pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadapm\u0101c\u012bbas un konfigur\u0113\u0161anas s\u0101kuma. Komanda izveido atbilst\u012bbu j\u016bsu tehnolo\u0123iskajiem mar\u0161rutiem un darba centriem, piesl\u0113dz OF un iepirkuma pas\u016bt\u012bjumu datu apmai\u0146u un nodro\u0161ina pl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms darba uzs\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Sylob ERP?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat izmantot savus Sylob OF, kas eksport\u0113ti CSV vai Excel form\u0101t\u0101. V\u0113l pirms integr\u0101cijas darbu s\u0101kuma j\u016bs redzat <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">savas ra\u017eo\u0161anas pl\u0101nu<\/a>, kur\u0101 \u0146emta v\u0113r\u0101 re\u0101l\u0101 iek\u0101rtu un person\u0101la jauda.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Sylob SkyPlanner APS sist\u0113mai Sylob ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai SkyPlanner APS ir Sylob ERP papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i faktiskajai iek\u0101rtu un person\u0101la jaudai. Tas pl\u0101no katras iek\u0101rtas, operatora un instrumenta noslodzi un materi\u0101lu izmanto\u0161anu. J\u016bs redzat, kur\u0101 darba centr\u0101 un kad tiek izpild\u012bts katrs ra\u017eo\u0161anas pas\u016bt\u012bjums (ordre &#8230; <a title=\"SkyPlanner APS sist\u0113mai Sylob ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai Sylob ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106615","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sylob ERP integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina Sylob ERP: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai Sylob ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina Sylob ERP: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sylob\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sylob\\\/\",\"name\":\"Sylob ERP integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildina Sylob ERP: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sylob\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sylob\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sylob\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Sylob ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sylob ERP integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai","description":"SkyPlanner APS papildina Sylob ERP: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai Sylob ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai","og_description":"SkyPlanner APS papildina Sylob ERP: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/","name":"Sylob ERP integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildina Sylob ERP: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sylob\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Sylob ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Sylob SkyPlanner APS sist\u0113mai Sylob ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un person\u0101la jaudai SkyPlanner APS ir Sylob ERP papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i faktiskajai iek\u0101rtu un person\u0101la jaudai. Tas pl\u0101no katras iek\u0101rtas, operatora un instrumenta noslodzi un materi\u0101lu izmanto\u0161anu. J\u016bs redzat, kur\u0101 darba centr\u0101 un kad tiek izpild\u012bts katrs ra\u017eo\u0161anas pas\u016bt\u012bjums (ordre&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106615"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106615\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}