{"id":106586,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/sap-business-bydesign\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"sap-business-bydesign","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/","title":{"rendered":"SkyPlanner APS sist\u0113mai SAP Business ByDesign: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ SAP Business ByDesign<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai SAP Business ByDesign: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir SAP Business ByDesign ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 faktisko jaudu un iepl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu konkr\u0113t\u0101 laik\u0101. Arcturus optimiz\u0113 visu pl\u0101nu da\u017e\u0101s sekund\u0113s, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar SAP Business ByDesign darbojas abos virzienos. SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, Production Models ar to Bills of Material un Bills of Operations, iek\u0101rtu un darbasp\u0113ka resursus, materi\u0101lus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus. Pl\u0101notie s\u0101kuma datumi un galvenais resurss tiek nos\u016bt\u012bti atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumiem, savuk\u0101rt apstiprin\u0101tie daudzumi un pabeigtie uzdevumi \u2014 uz ra\u017eo\u0161anas partij\u0101m. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju j\u016bsu ByDesign videi.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b, un taj\u0101 ir iek\u013cauti 5 darba centri. Katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un ietver l\u012bdz 20 darba centriem un visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Re\u0101la darbu sec\u012bba katrai iek\u0101rtai.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner iepl\u0101no katru oper\u0101ciju konkr\u0113tai iek\u0101rtai konkr\u0113t\u0101 laik\u0101, nevis vienk\u0101r\u0161i iedala to k\u0101d\u0101 ned\u0113\u013c\u0101. Pieejamo jaudu nosaka mai\u0146as, promb\u016btnes un virsstundas, t\u0101p\u0113c izveidoto pl\u0101nu cehs var izpild\u012bt.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101kas p\u0101rregul\u0113\u0161anas izmaksas.<\/p>\n\n\n<p class=\"fx-pain__b\">P\u0101rregul\u0113\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts p\u0101rejas laiks starp katru produktu p\u0101ri abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Arcturus izv\u0113las sec\u012bbu ar vismaz\u0101kajiem laika zudumiem.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ar\u012b cilv\u0113ku un instrumentu pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Ra\u017eo\u0161anas uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs cilv\u0113ki ar br\u012bvu laiku mai\u0146\u0101s. Ja stiprin\u0101jums vai veidne tiek izmantota vien\u0101 iek\u0101rt\u0101, to nekad neiepl\u0101no citai iek\u0101rtai vienlaikus. Ja iek\u0101rta ir aiz\u0146emta, darbu p\u0101rce\u013c uz alternat\u012bvu iek\u0101rtu vai pie cita darbinieka.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101li pien\u0101k pirms darba s\u0101kuma.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rbauda katra materi\u0101la kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Ra\u017eo\u0161anas pas\u016bt\u012bjumu, kuram j\u0101gaida pieg\u0101d\u0101t\u0101ja pieg\u0101de, iepl\u0101no p\u0113c pieg\u0101des datuma, nevis nodod izpildei un p\u0113c tam aptur ceh\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamu pas\u016bt\u012bjumu un boj\u0101jumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Kad iek\u0101rta apst\u0101jas vai pien\u0101k steidzams pas\u016bt\u012bjums, Autopilot p\u0101rpl\u0101no grafiku. Running Time Lock fiks\u0113 tuv\u0101ko stundu darbu pl\u0101nu, lai netrauc\u0113tu darbu ceh\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161et\u0113 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Lietot\u0101ju skaits nav ierobe\u017eots, un izpildes apstiprin\u0101jumi tiek nos\u016bt\u012bti atpaka\u013c uz ra\u017eo\u0161anas partij\u0101m ByDesign sist\u0113m\u0101.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel jumta dro\u0161\u012bbas elementu r\u016bpn\u012bca Kauhav\u0101 no putna lidojuma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad savlaic\u012bgo pieg\u0101\u017eu \u012bpatsvars sasniedza 99,2%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alah\u00e4rm\u00e4 r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums iepriek\u0161\u0113jo aptuveni 50% viet\u0101<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad divu meistaru viet\u0101 vajadz\u012bgs viens.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-sap-business-bydesign-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar SAP Business ByDesign<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>ByDesign nos\u016bta veicamos darbus.<\/strong> SkyPlanner sa\u0146em izpildei nodotos ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m, Production Models, Bills of Material un Bills of Operations, iek\u0101rtu un darbasp\u0113ka resursus, materi\u0101lus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju katram resursam un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi, resursi un izpildes apstiprin\u0101jumi tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Katr\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101 tiek atjaunin\u0101ts pl\u0101notais s\u0101kums un galvenais resurss. Apstiprin\u0101tie daudzumi, br\u0101\u0137is un pabeigtie uzdevumi tiek re\u0123istr\u0113ti ra\u017eo\u0161anas partij\u0101.<\/li>\n\n<\/ol>\n\n\n<p>SAP Business ByDesign joproj\u0101m ir j\u016bsu galven\u0101 uzskaites sist\u0113ma. Materi\u0101li, Production Models, Supply Planning, iepirkumi, kr\u0101jumi, pa\u0161izmaksas apr\u0113\u0137ini un finanses paliek turpat. SkyPlanner atbild par vienu lietu: katras oper\u0101cijas sec\u012bbu un izpildes laiku katrai iek\u0101rtai, darbiniekam un instrumentam.<\/p>\n\n\n<p>SkyPlanner nolasa ByDesign datus, izmantojot SAP public\u0113tos A2X t\u012bmek\u013ca pakalpojumus, piem\u0113ram, Query Production Orders, Query Production Model un Query Purchase Orders, k\u0101 ar\u012b piel\u0101gotus OData pakalpojumus. Datu ierakst\u012b\u0161anai atpaka\u013c tas izmanto divus public\u0113tus pakalpojumus. Manage Production Orders iestata EarliestStartPeriod un oper\u0101cijas MainResourceID. Manage Production Lots re\u0123istr\u0113 apstiprin\u0101tos daudzumus, br\u0101\u0137i un pabeigtos uzdevumus. SkyPlanner ar webhook pazi\u0146ojumiem nos\u016bta katru grafika izmai\u0146u uzreiz, tikl\u012bdz t\u0101 notiek, savuk\u0101rt ByDesign sinhroniz\u0101cijas bie\u017eumu nosaka katrai ra\u017eotnei atsevi\u0161\u0137i.<\/p>\n\n\n<p>Katrs uz\u0146\u0113mums izmanto ByDesign at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju j\u016bsu videi, izmantojot REST API, un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b j\u016bsu SAP ByDesign partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n\n<p>T\u012bmek\u013ca pakalpojumi, datu lauku atbilst\u012bba un atpaka\u013crakst\u012b\u0161anas noteikumi ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/sap-business-bydesign\/integracijas-celvedis\/\">SAP ByDesign APS integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-sap-bydesign-schedules-and-what-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no SAP ByDesign un ko pievieno SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SAP Business ByDesign pl\u0101no materi\u0101lus un p\u0101rbauda jaudu apkopot\u0101 l\u012bmen\u012b. SAP pal\u012bdz\u012bbas dokument\u0101cij\u0101 ir nor\u0101d\u012bti \u0161\u0101di ierobe\u017eojumi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u0101no\u0161anas apr\u0113\u0137ins neierobe\u017eo resursu jaudu.<\/strong> &#8220;The planning run schedules production proposals based on infinite resources using the location calendar.&#8221; (Pl\u0101no\u0161anas apr\u0113\u0137ins iepl\u0101no ra\u017eo\u0161anas priek\u0161likumus, pie\u0146emot neierobe\u017eotu resursu pieejam\u012bbu un izmantojot attiec\u012bg\u0101s vietas kalend\u0101ru.) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/2754875d2d2a403f95e58a41a9c7d6de\/2ceab4f1722d10149ffdbd617d89688f.html\">SAP pal\u012bdz\u012bba, Load Leveling<\/a>)<\/li>\n\n\n<li><strong>Jauda tiek pl\u0101nota aptuveni.<\/strong> &#8220;In rough-cut planning, capacity is typically checked in buckets, such as days, weeks, or months.&#8221; (Aptuvenaj\u0101 pl\u0101no\u0161an\u0101 jaudu parasti p\u0101rbauda pa laika interv\u0101liem, piem\u0113ram, dien\u0101m, ned\u0113\u013c\u0101m vai m\u0113ne\u0161iem.) Pl\u0101no\u0161anas oper\u0101cijai nepiecie\u0161am\u0101 jauda tiek vienm\u0113r\u012bgi sadal\u012bta no t\u0101s s\u0101kuma l\u012bdz beig\u0101m. (<a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/2754875d2d2a403f95e58a41a9c7d6de\/2cb65fd0722d1014b0658b613e1bd8b3.html\">SAP pal\u012bdz\u012bba, Capacity Planning<\/a>)<\/li>\n\n\n<li><strong>Load Leveling j\u0101palai\u017e manu\u0101li, un tas darbojas tikai noteikt\u0101 pl\u0101no\u0161anas period\u0101.<\/strong> Pl\u0101not\u0101js to palai\u017e skat\u0101 Resource Load. &#8220;If the available capacity is not sufficient, the planning operation is infinitely scheduled in the first bucket after the load leveling horizon.&#8221; (Ja pieejam\u0101s jaudas nepietiek, pl\u0101no\u0161anas oper\u0101cija tiek iepl\u0101nota pirmaj\u0101 interv\u0101l\u0101 p\u0113c slodzes izl\u012bdzin\u0101\u0161anas perioda beig\u0101m, ne\u0146emot v\u0113r\u0101 jaudas ierobe\u017eojumus.)<\/li>\n\n\n<li><strong>Sec\u012bbu nosaka ceh\u0101.<\/strong> &#8220;The dispatching of operations on resources to fulfill several production orders is normally determined on the shop floor.&#8221; (Oper\u0101ciju sadali starp resursiem vair\u0101ku ra\u017eo\u0161anas pas\u016bt\u012bjumu izpildei parasti nosaka ra\u017eo\u0161anas ceh\u0101.)<\/li>\n\n\n<li><strong>Tiek \u0146emti v\u0113r\u0101 tikai galvenie resursi.<\/strong> Par ra\u017eo\u0161anas pas\u016bt\u012bjumiem ir nor\u0101d\u012bts: &#8220;The availability of main resources is considered for scheduling.&#8221; (Sast\u0101dot grafiku, tiek \u0146emta v\u0113r\u0101 galveno resursu pieejam\u012bba.) SAP sarakst\u0101 ar faktoriem, ko \u0146em v\u0113r\u0101 pas\u016bt\u012bjumu grafiku sast\u0101d\u012b\u0161an\u0101, min\u0113ti tikai galvenie resursi: to pieejam\u012bba resursu kalend\u0101r\u0101 un pl\u0101notais izmanto\u0161anas ilgums. (<a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/2754875d2d2a403f95e58a41a9c7d6de\/2cc8cd4c722d101484e1917e19a9e2cd.html\">SAP pal\u012bdz\u012bba, Production Orders<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner pievieno detaliz\u0113to pl\u0101no\u0161anu, ko ByDesign atst\u0101j ceha zi\u0146\u0101: tas nosaka katras oper\u0101cijas sec\u012bbu atbilsto\u0161i faktiskajai jaudai, vienlaikus \u0146emot v\u0113r\u0101 operatorus, instrumentus, p\u0101rregul\u0113\u0161anu un gaid\u0101mos materi\u0101lus. Jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumiem, t\u0101p\u0113c ByDesign pl\u0101no\u0161ana, iepirkumi un finan\u0161u uzskaite balst\u0101s uz re\u0101lo grafiku.<\/p>\n\n\n<p>Visi so\u013ci un ierobe\u017eojumi ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/sap-business-bydesign\/razosanas-planosana\/\">Vai SAP ByDesign nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-bydesign-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP ByDesign \u0161obr\u012bd un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>SAP ByDesign Supply Planning<\/th><th>SAP ByDesign ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Pl\u0101no\u0161anas apr\u0113\u0137ins bez jaudas ierobe\u017eojumiem; aptuvena jaudas pl\u0101no\u0161ana pa mai\u0146\u0101m, dien\u0101m, ned\u0113\u013c\u0101m vai m\u0113ne\u0161iem<\/td><td>Katras iek\u0101rtas, darbinieka un instrumenta pieejam\u012bba ir ierobe\u017eota; tiek \u0146emtas v\u0113r\u0101 faktisk\u0101s mai\u0146as un konkr\u0113ti izpildes laiki<\/td><\/tr><tr><td>Sec\u012bba<\/td><td>Oper\u0101ciju sadali nosaka ra\u017eo\u0161anas ceh\u0101<\/td><td>Arcturus optimiz\u0113 visu pl\u0101nu da\u017e\u0101s sekund\u0113s<\/td><\/tr><tr><td>P\u0101rslodze<\/td><td>Pl\u0101not\u0101js palai\u017e Load Leveling; darbi, kuriem nepietiek jaudas, tiek iepl\u0101noti p\u0113c noteikt\u0101 perioda beig\u0101m bez jaudas ierobe\u017eojumiem<\/td><td>Katra oper\u0101cija tiek iepl\u0101nota tur, kur ir pieejama jauda<\/td><\/tr><tr><td>Resursi<\/td><td>Sast\u0101dot pas\u016bt\u012bjumu grafiku, tiek \u0146emti v\u0113r\u0101 galvenie resursi<\/td><td>Iek\u0101rtu, operatoru un instrumentu pieejam\u012bba ir ierobe\u017eota; uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs cilv\u0113ki<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Sagatavo\u0161anas un demont\u0101\u017eas darb\u012bbas sarakst\u0101 Bill of Operations<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica: zils\u2192sarkans 30 min, sarkans\u2192zils 60 min; maz\u0101kais kop\u0113jais sagatavo\u0161anas laiks<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Pl\u0101no\u0161anas apr\u0113\u0137ins izveido priek\u0161likumus neatkar\u012bgi no iek\u0101rtu darba laika<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad ir pieejami kr\u0101jumi vai pien\u0101k iepirkuma pas\u016bt\u012bjumu pieg\u0101des<\/td><\/tr><tr><td>Tuv\u0101k\u0101 laika pl\u0101ns<\/td><td>Fiks\u0113tie priek\u0161likumi netiek p\u0101rcelti<\/td><td>Running Time Lock fiks\u0113 tuv\u0101ko stundu darbu pl\u0101nu<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Atk\u0101rtoti j\u0101palai\u017e pl\u0101no\u0161anas apr\u0113\u0137ins un Load Leveling<\/td><td>Autopilot p\u0101rpl\u0101no atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Task Control un ra\u017eo\u0161anas izpildes apstiprin\u0101jumi ByDesign sist\u0113m\u0101<\/td><td>Operatori redz savu uzdevumu rindu un re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161et\u0113; lietot\u0101ju skaits nav ierobe\u017eots<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"sap-bydesign-scheduling-software-and-add-ons-com\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP ByDesign grafiku sast\u0101d\u012b\u0161anas programmat\u016bras un papildin\u0101jumu sal\u012bdzin\u0101jums<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Kas tas ir<\/th><th>Kad piem\u0113rots<\/th><\/tr><\/thead><tbody><tr><td>ByDesign Supply Planning un Load Leveling<\/td><td>Pl\u0101no\u0161anas apr\u0113\u0137ins bez jaudas ierobe\u017eojumiem, aptuvena jaudas pl\u0101no\u0161ana pa interv\u0101liem un interakt\u012bva slodzes izl\u012bdzin\u0101\u0161ana skat\u0101 Resource Load<\/td><td>Jums vajadz\u012bgi materi\u0101lu sag\u0101des priek\u0161likumi un ned\u0113\u013cas p\u0101rskats par p\u0101rslogotajiem resursiem<\/td><\/tr><tr><td>APS programmat\u016bras komplekti (piem\u0113ram, PlanetTogether, Delfoi Planner)<\/td><td>Atsevi\u0161\u0137a grafiku sast\u0101d\u012b\u0161anas programmat\u016bra, ko ievie\u0161anas projekt\u0101 savieno ar ByDesign<\/td><td>Pl\u0101no\u0161anas komanda izmanto grafiku sast\u0101d\u012b\u0161anas r\u012bku k\u0101 atsevi\u0161\u0137u lietotni<\/td><\/tr><tr><td>Piepras\u012bjum\u0101 balst\u012btas pl\u0101no\u0161anas platformas (piem\u0113ram, b2wise)<\/td><td>Dro\u0161\u012bbas kr\u0101jumu un kontroles punktu pl\u0101no\u0161ana, izmantojot SAP datus<\/td><td>Galven\u0101 probl\u0113ma ir dro\u0161\u012bbas kr\u0101jumi, nevis darbu sec\u012bba iek\u0101rt\u0101s<\/td><\/tr><tr><td>M\u0101ko\u0146a APS ar API savienojumu (SkyPlanner APS)<\/td><td>P\u0101rl\u016bk\u0101 pieejams grafiku sast\u0101d\u012b\u0161anas r\u012bks ar divvirzienu sinhroniz\u0101ciju ar ByDesign ra\u017eo\u0161anas pas\u016bt\u012bjumiem<\/td><td>Grafikam pa\u0161am j\u0101optimiz\u0113jas, j\u0101b\u016bt aktu\u0101lam un pieejamam katram operatoram<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis ByDesign Load Leveling, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Jums vajadz\u012bga darbu sec\u012bba, nevis tikai laika interv\u0101ls.<\/strong> ByDesign p\u0101rbauda jaudu pa mai\u0146\u0101m, dien\u0101m, ned\u0113\u013c\u0101m vai m\u0113ne\u0161iem. Arcturus iepl\u0101no katru oper\u0101ciju konkr\u0113tai iek\u0101rtai konkr\u0113t\u0101 laik\u0101.<\/li>\n\n\n<li><strong>Pl\u0101ns main\u0101s vair\u0101kas reizes ned\u0113\u013c\u0101.<\/strong> Autopilot autom\u0101tiski p\u0101rpl\u0101no darbu p\u0113c katras b\u016btiskas izmai\u0146as, un jaunie s\u0101kuma datumi tiek nos\u016bt\u012bti atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Pl\u0101nu ierobe\u017eo operatoru un instrumentu pieejam\u012bba.<\/strong> Sast\u0101dot ra\u017eo\u0161anas pas\u016bt\u012bjumu grafikus, ByDesign \u0146em v\u0113r\u0101 galvenos resursus. SkyPlanner vienlaikus iev\u0113ro katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumus un nor\u012bko darbiniekus uzdevumiem, kuros vajadz\u012bgi vair\u0101ki operatori.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka sara\u017eoto apjomu.<\/strong> Sagatavo\u0161anas laiku matric\u0101 glab\u0101jas p\u0101rregul\u0113\u0161anas ilgums katram p\u0101rejas virzienam, un darbi tiek sak\u0101rtoti sec\u012bb\u0101 ar vismaz\u0101ko kop\u0113jo sagatavo\u0161anas laiku.<\/li>\n\n\n<li><strong>Katram operatoram j\u0101str\u0101d\u0101 p\u0113c pl\u0101na.<\/strong> Mobile Confirmations \u013cauj skat\u012bt aktu\u0101lo darbu rindu t\u0101lrun\u012b vai plan\u0161etdator\u0101. Lietot\u0101ju skaits nav ierobe\u017eots: cena ir atkar\u012bga no darba centru, nevis lietot\u0101ju skaita.<\/li>\n\n\n<li><strong>J\u016bs v\u0113laties vienu m\u0113ne\u0161a maksu.<\/strong> No 199 \u20ac m\u0113nes\u012b. Divvirzienu integr\u0101cijas cenu uzzin\u0101siet iepriek\u0161, un t\u0101s atbalstu nodro\u0161ina SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez maks\u0101jumu kartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eotnes modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet iek\u0101rtu un darbasp\u0113ka resursus no ByDesign. Pieejama pal\u012bdz\u012bba darba uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas no ByDesign uz Excel, import\u0113jiet tos SkyPlanner un sal\u012bdziniet izveidoto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet SAP Business ByDesign.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Abon\u0113\u0161anas maksu apr\u0113\u0137ina katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. Pla\u0161\u0101k skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, izlasiet <a href=\"\/lv\/resursi\/advanced-planning-and-scheduling\/\">progres\u012bv\u0101s pl\u0101no\u0161anas un grafiku sast\u0101d\u012b\u0161anas ce\u013cvedi<\/a> vai apskatiet <a href=\"\/lv\/integracija\/erp\/\">visas ERP integr\u0101cijas<\/a>. Izmantojat citu SAP sist\u0113mu? Apskatiet <a href=\"\/lv\/integracija\/erp\/sap-business-one\/\">SkyPlanner risin\u0101jumu SAP Business One<\/a> un <a href=\"\/lv\/integracija\/erp\/sap-s4hana\/\">SkyPlanner risin\u0101jumu SAP S\/4HANA<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais SAP Business ByDesign papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar SAP Business ByDesign. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, Production Models, resursus, materi\u0101lus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus. Pl\u0101notie s\u0101kuma datumi un galvenie resursi tiek nos\u016bt\u012bti atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumiem, bet izpildes apstiprin\u0101jumi \u2014 uz ra\u017eo\u0161anas partij\u0101m. Tiek iev\u0113roti katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SAP ByDesign nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo jaudu?<\/summary>\n<p class=\"sp-faq__a\">Ne atsevi\u0161\u0137u iek\u0101rtu l\u012bmen\u012b. ByDesign pl\u0101no\u0161anas apr\u0113\u0137in\u0101 jaudas ierobe\u017eojumi netiek \u0146emti v\u0113r\u0101, un jaudu p\u0101rbauda apkopoti pa laika interv\u0101liem. Load Leveling ir interakt\u012bvs solis, kas p\u0101rslodzes da\u013cu p\u0113c sava pl\u0101no\u0161anas perioda iepl\u0101no bez jaudas ierobe\u017eojumiem. SAP pal\u012bdz\u012bbas dokument\u0101cij\u0101 oper\u0101ciju nor\u012bko\u0161ana izpildei ir atst\u0101ta ra\u017eo\u0161anas ceha zi\u0146\u0101. SkyPlanner APS darbojas l\u012bdz\u0101s ByDesign un sast\u0101da grafiku, iev\u0113rojot katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar SAP Business ByDesign?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar SAP Business ByDesign, izmantojot SAP publiskotos t\u012bmek\u013ca pakalpojumus. Ra\u017eo\u0161anas pas\u016bt\u012bjumus, Production Models, resursus, materi\u0101lus un iepirkuma pas\u016bt\u012bjumus tas nolasa, izmantojot Query pakalpojumus un piel\u0101gotu OData. EarliestStartPeriod un oper\u0101cijas MainResourceID tas ieraksta ar Manage Production Orders pal\u012bdz\u012bbu, bet izpildes apstiprin\u0101jumus \u2014 ar Manage Production Lots.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai mums izv\u0113l\u0113ties ByDesign Load Leveling vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izv\u0113lieties SkyPlanner, ja katrai iek\u0101rtai vajadz\u012bga darbu sec\u012bba, kas tiek autom\u0101tiski atjaunin\u0101ta. Load Leveling izl\u012bdzina slodzi pa laika interv\u0101liem skat\u0101 Resource Load, kad pl\u0101not\u0101js to palai\u017e, savuk\u0101rt ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku sast\u0101d\u012b\u0161an\u0101 tiek \u0146emti v\u0113r\u0101 tikai galvenie resursi. SkyPlanner katrai oper\u0101cijai nosaka prec\u012bzu izpildes laiku, kop\u012bgi pl\u0101no operatorus, instrumentus, p\u0101rregul\u0113\u0161anu un materi\u0101lus un autom\u0101tiski p\u0101rpl\u0101no darbu. Turpiniet izmantot Supply Planning materi\u0101lu sag\u0101des priek\u0161likumiem, bet oper\u0101ciju grafiku uzticiet SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j ByDesign Supply Planning vai Production Control?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina \u0161os risin\u0101jumus. ByDesign p\u0101rzi\u0146\u0101 paliek materi\u0101li, Production Models, pl\u0101no\u0161anas apr\u0113\u0137ini, iepirkumi, kr\u0101jumi, izmaksu apr\u0113\u0137ini un finanses. SkyPlanner sast\u0101da izpildei apstiprin\u0101to ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai \u0161\u012b ir t\u0101 pati integr\u0101cija, kas SAP Business One vai SAP S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Katrai SAP ERP sist\u0113mai ir savas API saskarnes, un SkyPlanner piesl\u0113dzas katrai atsevi\u0161\u0137i. Apskatiet <a href=\"\/lv\/integracija\/erp\/sap-business-one\/\">SkyPlanner risin\u0101jumu SAP Business One<\/a> un <a href=\"\/lv\/integracija\/erp\/sap-s4hana\/\">SkyPlanner risin\u0101jumu SAP S\/4HANA<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 uz\u0146\u0113mumam, kas izmanto ByDesign?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem un 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto darbu rindu. Integr\u0101cijas cenas pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar abon\u0113\u0161anas pied\u0101v\u0101jumu, lai pirms darba uzs\u0101k\u0161anas b\u016btu zin\u0101mas visas izmaksas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilgu laiku aiz\u0146em ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c darba uzs\u0101k\u0161anas procesa s\u0101kuma. Komanda izveido j\u016bsu resursu un Bills of Operations datu atbilst\u012bbu starp sist\u0113m\u0101m, piesl\u0113dz ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumus un nodro\u0161ina pl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms darb\u012bbas uzs\u0101k\u0161anas visu p\u0101rbauda, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar ByDesign?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat izmantot savus atv\u0113rtos ByDesign ra\u017eo\u0161anas pas\u016bt\u012bjumus, kas eksport\u0113ti uz Excel. Pirms jebk\u0101du integr\u0101cijas darbu s\u0101kuma redz\u0113siet savas ra\u017eotnes <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101nu, kur\u0101 iev\u0113roti re\u0101l\u0101s jaudas ierobe\u017eojumi<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ SAP Business ByDesign SkyPlanner APS sist\u0113mai SAP Business ByDesign: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai SkyPlanner APS ir SAP Business ByDesign ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 faktisko jaudu un iepl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu konkr\u0113t\u0101 laik\u0101. Arcturus optimiz\u0113 visu pl\u0101nu da\u017e\u0101s sekund\u0113s, un Autopilot autom\u0101tiski &#8230; <a title=\"SkyPlanner APS sist\u0113mai SAP Business ByDesign: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai SAP Business ByDesign: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106586","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SAP ByDesign integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c faktisk\u0101s jaudas<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildin\u0101jums SAP ByDesign: pl\u0101no katru iek\u0101rtu, cilv\u0113ku, instrumentu un materi\u0101lu p\u0113c faktisk\u0101s jaudas. Divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai SAP Business ByDesign: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildin\u0101jums SAP ByDesign: pl\u0101no katru iek\u0101rtu, cilv\u0113ku, instrumentu un materi\u0101lu p\u0113c faktisk\u0101s jaudas. Divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-bydesign\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-bydesign\\\/\",\"name\":\"SAP ByDesign integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c faktisk\u0101s jaudas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildin\u0101jums SAP ByDesign: pl\u0101no katru iek\u0101rtu, cilv\u0113ku, instrumentu un materi\u0101lu p\u0113c faktisk\u0101s jaudas. Divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-bydesign\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-bydesign\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-bydesign\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai SAP Business ByDesign: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SAP ByDesign integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c faktisk\u0101s jaudas","description":"SkyPlanner APS papildin\u0101jums SAP ByDesign: pl\u0101no katru iek\u0101rtu, cilv\u0113ku, instrumentu un materi\u0101lu p\u0113c faktisk\u0101s jaudas. Divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai SAP Business ByDesign: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai","og_description":"SkyPlanner APS papildin\u0101jums SAP ByDesign: pl\u0101no katru iek\u0101rtu, cilv\u0113ku, instrumentu un materi\u0101lu p\u0113c faktisk\u0101s jaudas. Divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/","name":"SAP ByDesign integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c faktisk\u0101s jaudas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildin\u0101jums SAP ByDesign: pl\u0101no katru iek\u0101rtu, cilv\u0113ku, instrumentu un materi\u0101lu p\u0113c faktisk\u0101s jaudas. Divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-bydesign\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai SAP Business ByDesign: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ SAP Business ByDesign SkyPlanner APS sist\u0113mai SAP Business ByDesign: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai SkyPlanner APS ir SAP Business ByDesign ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 faktisko jaudu un iepl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu konkr\u0113t\u0101 laik\u0101. Arcturus optimiz\u0113 visu pl\u0101nu da\u017e\u0101s sekund\u0113s, un Autopilot autom\u0101tiski&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106586","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106586"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106586\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106586"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}