{"id":106557,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/delmiaworks\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"delmiaworks","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/","title":{"rendered":"SkyPlanner APS sist\u0113mai DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ DELMIAWorks<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai DELMIAWorks (IQMS): <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums ERP sist\u0113mai DELMIAWorks, kas agr\u0101k bija paz\u012bstama k\u0101 IQMS. Tas veido grafiku atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai, katrai presei, veidnei, operatoram un materi\u0101lam paredzot konkr\u0113tu laiku. Arcturus optimiz\u0113 visu pl\u0101nu da\u017eu sekun\u017eu laik\u0101, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar DELMIAWorks. No DELMIAWorks tiek sa\u0146emti ra\u017eo\u0161anas pas\u016bt\u012bjumi, Bills of Manufacturing ar deta\u013cu apstr\u0101des oper\u0101cij\u0101m, darba centri, instrumenti un veidnes, kr\u0101jumu nomenklat\u016bra un iepirkuma pas\u016bt\u012bjumi. Atpaka\u013c tiek nos\u016bt\u012bti pl\u0101notie s\u0101kuma un beigu datumi, pie\u0161\u0137irtais darba centrs, ra\u017eo\u0161anas uzskaites ieraksti un uzdevumiem uzskait\u012btais darba laiks. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu DELMIAWorks konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b, un taj\u0101 ir iek\u013cauti 5 darba centri. Katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un ietver l\u012bdz 20 darba centriem un visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katrai presei \u2014 izpild\u0101ma darbu sec\u012bba.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner katru ra\u017eo\u0161anas pas\u016bt\u012bjumu iepl\u0101no konkr\u0113tai presei, ekstr\u016bderim vai mont\u0101\u017eas \u0161\u016bnai konkr\u0113t\u0101 laik\u0101. Pieejamo jaudu nosaka mai\u0146as, promb\u016btnes un virsstundas, t\u0101p\u0113c pl\u0101ns atbilst tam, ko ra\u017eo\u0161anas cehs sp\u0113j izpild\u012bt.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101kas veid\u0146u un kr\u0101su mai\u0146as izmaksas.<\/p>\n\n\n<p class=\"fx-pain__b\">Iestat\u012b\u0161anas laika matric\u0101 ir nor\u0101d\u012bts p\u0101rregul\u0113\u0161anas ilgums starp katru produktu p\u0101ri abos virzienos. P\u0101reja no zil\u0101s kr\u0101sas uz sarkano var aiz\u0146emt 30 min\u016btes, savuk\u0101rt no sarkan\u0101s uz zilo \u2014 60 min\u016btes, jo cilindrs ir piln\u012bb\u0101 j\u0101izt\u012bra. Arcturus izv\u0113las sec\u012bbu, kur\u0101 vis\u0101s pres\u0113s kop\u0101 tiek zaud\u0113ts vismaz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Veid\u0146u pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Veidne, kas tiek izmantota vien\u0101 pres\u0113, nekad netiek vienlaikus iepl\u0101nota citai presei. Da\u017e\u0101du deta\u013cu izgatavo\u0161ana kop\u0113j\u0101 veidn\u0113 tiek pl\u0101nota k\u0101 viens ra\u017eo\u0161anas uzdevums. Ja priorit\u0101r\u0101 prese ir aiz\u0146emta, darbs tiek p\u0101rcelts uz citu presi, kurai \u0161\u012b veidne ir piem\u0113rota.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Brig\u0101\u017eu darbu pl\u0101no kop\u0101 ar iek\u0101rtu darbu.<\/p>\n\n\n<p class=\"fx-pain__b\">Ra\u017eo\u0161anas uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs darbinieki, kuri attiec\u012bgaj\u0101 mai\u0146\u0101 ir pieejami. Veid\u0146u uzst\u0101d\u012bt\u0101ju, procesu tehni\u0137u un preses operatoru darbs tiek pl\u0101nots vienot\u0101 pl\u0101n\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Polim\u0113ru izejvielas un ielikt\u0146i pien\u0101k pirms darba s\u0101kuma.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner katram materi\u0101lam p\u0101rbauda kr\u0101jumu atlikumu un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Ra\u017eo\u0161anas pas\u016bt\u012bjums, kas gaida polim\u0113ru izejvielu pieg\u0101di, tiek iepl\u0101nots p\u0113c pieg\u0101des datuma, nevis palaists ra\u017eo\u0161an\u0101 un p\u0113c tam aptur\u0113ts pie preses.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana boj\u0101jumu un steidzamu pas\u016bt\u012bjumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja prese apst\u0101jas boj\u0101juma d\u0113\u013c vai pien\u0101k steidzams pas\u016bt\u012bjums, Autopilot p\u0101rpl\u0101no grafiku. Running Time Lock fiks\u0113 tuv\u0101ko stundu darbus, t\u0101p\u0113c jau uzst\u0101d\u012bt\u0101s veidnes paliek sav\u0101s viet\u0101s.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katrs operators redz darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Operatori redz n\u0101kamos ra\u017eo\u0161anas uzdevumus t\u0101lrun\u012b vai plan\u0161etdator\u0101 un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Lietot\u0101ju skaits nav ierobe\u017eots, t\u0101p\u0113c visas mai\u0146as str\u0101d\u0101 p\u0113c viena pl\u0101na.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0113\u0161anu re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu ietaupa 2 darba stundas, un jaun\u0101 darbu rinda ra\u017eo\u0161anas l\u012bniju sasniedz da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sagatavo\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 un vair\u0101k<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anu tagad kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un viss uz\u0146\u0113mums redz ra\u017eo\u0161anas norisi re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner \u013cauj mums p\u0101rskat\u012bt jaudas un padara pl\u0101no\u0161anu paredzamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko vielu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Vis\u0101 SkyPlanner lieto\u0161anas laik\u0101 kop\u0161 2021. gada pieg\u0101\u017eu savlaic\u012bgums ir bijis 100%.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-delmiaworks-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar DELMIAWorks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>DELMIAWorks nos\u016bta datus par darbu.<\/strong> SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, Bills of Manufacturing ar deta\u013cu apstr\u0101des oper\u0101cij\u0101m, darba centrus, instrumentus un veidnes, kr\u0101jumu nomenklat\u016bru, kr\u0101jumu atlikumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu katrai presei un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi, preses un re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Pl\u0101notie s\u0101kuma un beigu datumi un pie\u0161\u0137irtais darba centrs tiek ierakst\u012bti DELMIAWorks ra\u017eo\u0161anas pas\u016bt\u012bjumos. Der\u012bg\u0101s deta\u013cas tiek re\u0123istr\u0113tas ra\u017eo\u0161anas uzskaites ierakstos, bet iestat\u012b\u0161anas un izpildes laiks \u2014 k\u0101 uzdevumiem uzskait\u012btais darba laiks.<\/li>\n\n<\/ol>\n\n\n<p>DELMIAWorks paliek j\u016bsu galven\u0101 uzskaites sist\u0113ma. Kr\u0101jumu nomenklat\u016bra, materi\u0101lu specifik\u0101cijas, MRP, iepirkumi, kvalit\u0101tes vad\u012bba, RealTime uzraudz\u012bba, pa\u0161izmaksas apr\u0113\u0137ini un gr\u0101matved\u012bba paliek turpat. SkyPlanner atbild par vienu lietu: katra ra\u017eo\u0161anas pas\u016bt\u012bjuma sec\u012bbu un izpildes laiku, piesaistot tam presi, veidni un operatoru.<\/p>\n\n\n<p>SkyPlanner nolasa DELMIAWorks datus, izmantojot DELMIAWorks WebAPI, kam ir pieejami REST un GraphQL SDK. Dati tiek ierakst\u012bti atpaka\u013c, izmantojot WebAPI REST kontrollerus: Manufacturing WorkOrders kontrolleris nodod katra ra\u017eo\u0161anas pas\u016bt\u012bjuma pl\u0101notos datumus un darba centru, AddProductionRecords re\u0123istr\u0113 der\u012bg\u0101s deta\u013cas, bet Time &amp; Attendance uzdevumu izsaukumi re\u0123istr\u0113 darba laiku. Ievie\u0161anas gait\u0101, nosakot tv\u0113rumu, vienojas par konkr\u0113tajiem ra\u017eo\u0161anas pas\u016bt\u012bjuma laukiem. SkyPlanner webhook pazi\u0146ojumi nos\u016bta katru grafika izmai\u0146u uzreiz, bet DELMIAWorks sinhroniz\u0101cijas bie\u017eumu nosaka katrai ra\u017eotnei atsevi\u0161\u0137i.<\/p>\n\n\n<p>Katra ra\u017eotne izmanto DELMIAWorks at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju caur REST API atbilsto\u0161i j\u016bsu konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c palai\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavo iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Ar\u012b j\u016bsu DELMIAWorks partneris vai izstr\u0101d\u0101t\u0101ji var izveidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n\n<p>WebAPI kontrolleri, datu kart\u0113\u0161ana un atpaka\u013cierakstes noteikumi ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/delmiaworks\/integracijas-celvedis\/\">DELMIAWorks APS integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-delmiaworks-schedules-and-what-skyplanner-a\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no DELMIAWorks un ko papildus pied\u0101v\u0101 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>DELMIAWorks veido grafiku, iev\u0113rojot pieejam\u0101s jaudas ierobe\u017eojumus. T\u0101 Advanced Planning and Scheduling modulis ir &#8220;a core component&#8221; (ERP sist\u0113mas pamatkomponents), un Dassault <a href=\"https:\/\/www.solidworks.com\/product\/delmiaworks\/manufacturing-erp\/manufacturing\/scheduling\/aps-software\/\">APS lap\u0101<\/a> ir aprakst\u012bta t\u0101 darb\u012bba:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Noslodzi pl\u0101no p\u0113c noteikumiem.<\/strong> Auto Load izvieto &#8220;work orders based on priority and &#8220;runs the best&#8221; machine information.&#8221; (ra\u017eo\u0161anas pas\u016bt\u012bjumus atbilsto\u0161i priorit\u0101tei un inform\u0101cijai par piem\u0113rot\u0101ko iek\u0101rtu). Noteikumi tiek defin\u0113ti Bill of Manufacturing l\u012bmen\u012b.<\/li>\n\n\n<li><strong>Materi\u0101lu un instrumentu tr\u016bkumu nor\u0101da iz\u0146\u0113mumu sarakstos.<\/strong> &#8220;Exceptions lists&#8221; (iz\u0146\u0113mumu saraksti) par\u0101da &#8220;materials and tools or other constraints associated with a work order that will be unavailable or need to be expedited.&#8221; (ar ra\u017eo\u0161anas pas\u016bt\u012bjumu saist\u012btos materi\u0101lus un instrumentus, kas neb\u016bs pieejami vai kuru pieg\u0101de j\u0101pa\u0101trina, k\u0101 ar\u012b citus ierobe\u017eojumus). Pamatojoties uz sarakstu, pl\u0101not\u0101js veic vajadz\u012bg\u0101s darb\u012bbas.<\/li>\n\n\n<li><strong>Tuv\u0101k\u0101 perioda grafiks ir aizsarg\u0101ts.<\/strong> &#8220;User-defined &#8220;time fences&#8221; protect the current schedule against repositioning.&#8221; (Lietot\u0101ja noteiktas laika robe\u017eas aizsarg\u0101 pa\u0161reiz\u0113jo grafiku pret darbu p\u0101rvieto\u0161anu.)<\/li>\n\n\n<li><strong>Jaudu v\u0113rt\u0113 apkopot\u0101 l\u012bmen\u012b.<\/strong> &#8220;Rough Cut Capacity Tools&#8221; (jaudas s\u0101kotn\u0113j\u0101s nov\u0113rt\u0113\u0161anas r\u012bki) sal\u012bdzina &#8220;work center daily and weekly required hours to available hours.&#8221; (darba centram dien\u0101 un ned\u0113\u013c\u0101 nepiecie\u0161am\u0101s stundas ar pieejamaj\u0101m stund\u0101m).<\/li>\n\n<\/ul>\n\n\n<p>Ikdien\u0101 pl\u0101not\u0101js p\u0101rvelk ra\u017eo\u0161anas pas\u016bt\u012bjumus starp darba centriem, lai izl\u012bdzin\u0101tu noslodzi, un p\u0113c izmai\u0146\u0101m atk\u0101rtoti palai\u017e Update Schedule un Auto Load. SkyPlanner papildus optimiz\u0113 visu pl\u0101nu: Arcturus vienlaikus nosaka visu ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bbu vis\u0101s pres\u0113s, vien\u0101 apr\u0113\u0137in\u0101 \u0146emot v\u0113r\u0101 p\u0101rregul\u0113\u0161anas virzienu, veid\u0146u pieejam\u012bbas ierobe\u017eojumus, brig\u0101\u017eu nokomplekt\u0113\u0161anu un gaid\u0101m\u0101s materi\u0101lu pieg\u0101des. P\u0113c tam Autopilot uztur pl\u0101nu aktu\u0101lu.<\/p>\n\n\n<p>Darb\u012bbas un to, kur\u0101 br\u012bd\u012b grafiku sast\u0101d\u012b\u0161anas r\u012bks atmaks\u0101jas, skatiet rakst\u0101 <a href=\"\/lv\/integracija\/erp\/delmiaworks\/razosanas-planosana\/\">Vai DELMIAWorks pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"delmiaworks-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">DELMIAWorks pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>DELMIAWorks APS<\/th><th>DELMIAWorks ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Grafiks katram darba centram t\u0101 jaudas ietvaros; aptuvenas p\u0101rbaudes pa dien\u0101m un ned\u0113\u013c\u0101m<\/td><td>Katras preses, darbinieka un veidnes pieejam\u012bbas ierobe\u017eojumi, faktisk\u0101s mai\u0146as un konkr\u0113ts laiks<\/td><\/tr><tr><td>Sec\u012bba<\/td><td>Auto Load p\u0113c priorit\u0101tes un &#8220;runs best&#8221; (piem\u0113rot\u0101k\u0101) darba centra<\/td><td>Arcturus optimiz\u0113 visu pl\u0101nu da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Iestat\u012b\u0161anas veidnes un kontrolsaraksti n\u0101kamajai iestat\u012b\u0161anai<\/td><td>Iestat\u012b\u0161anas laika matrica: zils\u2192sarkans 30 min, sarkans\u2192zils 60 min; minim\u0101ls kop\u0113jais iestat\u012b\u0161anas laiks<\/td><\/tr><tr><td>Veidnes un instrumenti<\/td><td>Instrumentu izmanto\u0161anas konflikti nor\u0101d\u012bti iz\u0146\u0113mumu sarakstos<\/td><td>Veidnes un instrumenti tiek rezerv\u0113ti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/td><\/tr><tr><td>Brig\u0101des<\/td><td>Darbasp\u0113ka jauda tiek sal\u012bdzin\u0101ta ar normat\u012bvu<\/td><td>Ra\u017eo\u0161anas uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs attiec\u012bgaj\u0101 mai\u0146\u0101 pieejami darbinieki<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Materi\u0101lu iz\u0146\u0113mumu saraksts, p\u0113c kura pl\u0101not\u0101js pa\u0101trina pieg\u0101des<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir noliktav\u0101 vai sa\u0146emti ar iepirkuma pas\u016bt\u012bjumiem<\/td><\/tr><tr><td>Tuv\u0101k\u0101 perioda pl\u0101ns<\/td><td>Laika robe\u017eas aizsarg\u0101 pa\u0161reiz\u0113jo grafiku<\/td><td>Running Time Lock fiks\u0113 tuv\u0101ko stundu darbus<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Update Schedule un Auto Load, p\u0113c tam manu\u0101la p\u0101rvieto\u0161ana<\/td><td>Autopilot p\u0101rpl\u0101no, iev\u0113rojot j\u016bsu priorit\u0101tes un fiks\u0113tos darbus<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Shopworks un RealTime pie preses<\/td><td>Operatori ar\u012b redz savu darbu rindu un re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101; neierobe\u017eots lietot\u0101ju skaits<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"delmiaworks-scheduling-software-and-add-ons-comp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">DELMIAWorks grafiku sast\u0101d\u012b\u0161anas programmat\u016bras un papildin\u0101jumu sal\u012bdzin\u0101jums<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Kas tas ir<\/th><th>Kad piem\u0113rots<\/th><\/tr><\/thead><tbody><tr><td>DELMIAWorks APS<\/td><td>DELMIAWorks ieb\u016bv\u0113tais grafiks pieejam\u0101s jaudas ietvaros, Auto Load un jaudas pl\u0101no\u0161anas r\u012bki<\/td><td>Par pl\u0101no\u0161anas paneli atbild viens pl\u0101not\u0101js, un p\u0101rregul\u0113\u0161ana ir vienk\u0101r\u0161a<\/td><\/tr><tr><td>DELMIA Ortems<\/td><td>Atsevi\u0161\u0137s Dassault risin\u0101jums uz\u0146\u0113muma pl\u0101no\u0161anai un grafiku sast\u0101d\u012b\u0161anai, kas savienots ar ERP un MES<\/td><td>Centr\u0101l\u0101 pl\u0101no\u0161anas komanda vada vair\u0101ku ra\u017eot\u0146u optimiz\u0101cijas projektu<\/td><\/tr><tr><td>R\u012bki darbu izpildei p\u0113c priorit\u0101t\u0113m (piem\u0113ram, LillyWorks)<\/td><td>Laik\u0101 izpl\u0101nota grafika viet\u0101 \u2014 darbu saraksti, kas sak\u0101rtoti p\u0113c pas\u016bt\u012bjumu izpildes riska<\/td><td>Ra\u017eotnei, kas str\u0101d\u0101 p\u0113c individu\u0101liem pas\u016bt\u012bjumiem, vajadz\u012bgs priorit\u0101\u0161u saraksts, nevis darbu sec\u012bba ar prec\u012bziem laikiem<\/td><\/tr><tr><td>M\u0101ko\u0146vides APS ar API savienojumu (SkyPlanner APS)<\/td><td>P\u0101rl\u016bk\u0101 pieejams grafiku sast\u0101d\u012b\u0161anas r\u012bks ar divvirzienu DELMIAWorks ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101ciju<\/td><td>Grafikam j\u0101optimiz\u0113jas autom\u0101tiski, j\u0101b\u016bt aktu\u0101lam un pieejamam katram operatoram<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis DELMIAWorks APS, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u0113laties optimiz\u0113t visu pl\u0101nu.<\/strong> Auto Load iev\u0113ro priorit\u0101tes un noteikumus par piem\u0113rot\u0101ko iek\u0101rtu (&#8220;runs best&#8221;). Arcturus optimiz\u0113 visu pl\u0101nu da\u017eu sekun\u017eu laik\u0101, savuk\u0101rt Autopilot to p\u0101rpl\u0101no p\u0113c katras b\u016btiskas izmai\u0146as.<\/li>\n\n\n<li><strong>Veid\u0146u un kr\u0101su mai\u0146a nosaka sara\u017eoto apjomu.<\/strong> Iestat\u012b\u0161anas laiku matric\u0101 katram produktu p\u0101rim var nor\u0101d\u012bt at\u0161\u0137ir\u012bgu p\u0101rregul\u0113\u0161anas laiku abos p\u0101rejas virzienos. Sist\u0113ma izv\u0113las sec\u012bbu ar vismaz\u0101ko kop\u0113jo iestat\u012b\u0161anas laiku.<\/li>\n\n\n<li><strong>Veidnes, brig\u0101des un sve\u0137i ierobe\u017eo pl\u0101nu tikpat liel\u0101 m\u0113r\u0101 k\u0101 preses.<\/strong> Vienots pl\u0101no\u0161anas dzin\u0113js \u0146em v\u0113r\u0101 katras preses, darbinieka, veidnes un materi\u0101la ierobe\u017eoto pieejam\u012bbu. Uzdevumiem, kam vajadz\u012bgi vair\u0101ki operatori, tiek nodro\u0161in\u0101ts nepiecie\u0161amais darbinieku skaits, un darbi s\u0101kas, kad materi\u0101ls ir pieejams.<\/li>\n\n\n<li><strong>Probl\u0113mu saraksti aiz\u0146em p\u0101r\u0101k daudz pl\u0101not\u0101ja laika.<\/strong> SkyPlanner pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 nepieejamus instrumentus un materi\u0101lu kav\u0113jumus, nevis tikai iek\u013cauj tos sarakst\u0101, lai k\u0101ds tos atrisin\u0101tu.<\/li>\n\n\n<li><strong>Katram operatoram j\u0101str\u0101d\u0101 p\u0113c pl\u0101na.<\/strong> Mobile Confirmations nodro\u0161ina aktu\u0101lo darbu rindu t\u0101lrun\u012b vai plan\u0161etdator\u0101, un lietot\u0101ju skaits nav ierobe\u017eots: cena ir atkar\u012bga no darba centru, nevis lietot\u0101ju skaita.<\/li>\n\n\n<li><strong>V\u0113laties vienu skaidru cenu.<\/strong> No 199 \u20ac m\u0113nes\u012b. Divvirzienu integr\u0101cijas cena tiek nor\u0101d\u012bta iepriek\u0161, un t\u0101s atbalstu nodro\u0161ina SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet SkyPlanner preses, veidnes, darbiniekus un mai\u0146as vai import\u0113jiet darba centrus no DELMIAWorks. Ir pieejama pal\u012bdz\u012bba darba s\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet no DELMIAWorks uz Excel nepabeigtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas, import\u0113jiet tos SkyPlanner un sal\u012bdziniet izveidoto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet DELMIAWorks.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu p\u0113c ekspluat\u0101cijas s\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa par abonementu tiek iekas\u0113ta katru m\u0113nesi atbilsto\u0161i darba centru skaitam. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, izlasiet <a href=\"\/lv\/resursi\/kas-ir-razosanas-planosana\/\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas ce\u013cvedi<\/a> vai apskatiet <a href=\"\/lv\/integracija\/erp\/\">visas ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais grafiku sast\u0101d\u012b\u0161anas papildin\u0101jums DELMIAWorks?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar DELMIAWorks. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, komplekt\u0101cijas sarakstus (BOM), darba centrus, veidnes, kr\u0101jumu poz\u012bcijas un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta pl\u0101notos datumus, darba centrus, ra\u017eo\u0161anas uzskaites ierakstus un darbasp\u0113ka uzskaites datus. Pl\u0101no\u0161an\u0101 tiek \u0146emta v\u0113r\u0101 katras preses, operatora, veidnes un materi\u0101la ierobe\u017eot\u0101 pieejam\u012bba. Iestat\u012b\u0161anas laiku matrica, kas \u0146em v\u0113r\u0101 p\u0101rejas virzienu, sak\u0101rto veid\u0146u un kr\u0101su mai\u0146u t\u0101, lai kop\u0113jais iestat\u012b\u0161anas laiks b\u016btu vismaz\u0101kais. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai DELMIAWorks pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 faktisko jaudu?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. DELMIAWorks APS veido grafiku atbilsto\u0161i katra darba centra jaudai. Auto Load iedala darbus p\u0113c priorit\u0101tes un piem\u0113rot\u0101k\u0101s iek\u0101rtas, ir pieejamas laika robe\u017eas un instrumentu un materi\u0101lu probl\u0113mu saraksti. SkyPlanner APS papildus nodro\u0161ina visa pl\u0101na optimiz\u0101ciju, vienlaikus \u0146emot v\u0113r\u0101 visu pre\u0161u, veid\u0146u, brig\u0101\u017eu un materi\u0101lu ierobe\u017eoto pieejam\u012bbu, k\u0101 ar\u012b autom\u0101tisku p\u0101rpl\u0101no\u0161anu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kura grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar DELMIAWorks?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar DELMIAWorks, izmantojot DELMIAWorks WebAPI. SkyPlanner nolasa ra\u017eo\u0161anas pas\u016bt\u012bjumus, komplekt\u0101cijas sarakstus (BOM), darba centrus, kr\u0101jumu poz\u012bcijas un iepirkuma pas\u016bt\u012bjumus, izmantojot REST kontrollerus. Pl\u0101notie datumi un darba centri tiek nos\u016bt\u012bti atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumiem, izmantojot Manufacturing WorkOrders kontrolleri, der\u012bgo deta\u013cu dati \u2014 izmantojot AddProductionRecords, bet darbasp\u0113ka uzskaites dati \u2014 izmantojot Time &amp; Attendance uzdevumu izsaukumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai mums izv\u0113l\u0113ties DELMIAWorks APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izv\u0113lieties SkyPlanner, ja grafikam j\u0101optimiz\u0113jas autom\u0101tiski un sara\u017eoto apjomu ierobe\u017eo p\u0101rregul\u0113\u0161ana, veidnes, brig\u0101des un materi\u0101li. DELMIAWorks APS iedala ra\u017eo\u0161anas pas\u016bt\u012bjumus p\u0113c noteikumiem un par\u0101da instrumentu un materi\u0101lu probl\u0113mas pl\u0101not\u0101jam risin\u0101mo iz\u0146\u0113mumu sarakst\u0101. SkyPlanner t\u0101s atrisina vienot\u0101 pl\u0101n\u0101, autom\u0101tiski p\u0101rpl\u0101no un nodro\u0161ina katram operatoram vi\u0146a darbu rindu t\u0101lrun\u012b. Lietot\u0101ju skaits nav ierobe\u017eots. Bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat par to p\u0101rliecin\u0101ties, izmantojot savus DELMIAWorks ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai DELMIAWorks ir tas pats, kas IQMS?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Dassault Systemes ieg\u0101d\u0101j\u0101s IQMS un p\u0101rd\u0113v\u0113ja t\u0101 EnterpriseIQ ERP par DELMIAWorks. SkyPlanner darbojas ar pa\u0161reiz\u0113j\u0101m DELMIAWorks versij\u0101m, izmantojot WebAPI.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j DELMIAWorks MRP vai RealTime?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina to darb\u012bbu. DELMIAWorks joproj\u0101m nodro\u0161ina kr\u0101jumu, komplekt\u0101cijas sarakstu (BOM), MRP, iepirkumu un kvalit\u0101tes p\u0101rvald\u012bbu, k\u0101 ar\u012b pre\u0161u uzraudz\u012bbu ar RealTime. SkyPlanner sast\u0101da ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku atbilsto\u0161i faktiskajai jaudai un nos\u016bta datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner ra\u017eotnei, kas izmanto DELMIAWorks?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem un 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto darbu rindu, piem\u0113ram, prese. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesiem un vajadz\u012bb\u0101m nor\u0101d\u0101m iepriek\u0161 kop\u0101 ar abonementa cenu, lai piln\u0101s izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c tam, kad s\u0101kta sagatavo\u0161an\u0101s darbam ar sist\u0113mu. Komanda sist\u0113m\u0101 nosaka atbilst\u012bbas j\u016bsu pres\u0113m, veidn\u0113m un oper\u0101cij\u0101m, piesl\u0113dz ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumus un nos\u016bta pl\u0101notos datumus atpaka\u013c. Pirms ekspluat\u0101cijas s\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar DELMIAWorks?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat izmantot savu nepabeigto DELMIAWorks ra\u017eo\u0161anas pas\u016bt\u012bjumu eksportu Excel form\u0101t\u0101. V\u0113l pirms integr\u0101cijas darbu s\u0101k\u0161anas redz\u0113siet savu pre\u0161u <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101nu, kas atbilst to faktiskajai jaudai<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ DELMIAWorks SkyPlanner APS sist\u0113mai DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums ERP sist\u0113mai DELMIAWorks, kas agr\u0101k bija paz\u012bstama k\u0101 IQMS. Tas veido grafiku atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai, katrai presei, veidnei, operatoram un materi\u0101lam paredzot konkr\u0113tu laiku. Arcturus optimiz\u0113 visu pl\u0101nu &#8230; <a title=\"SkyPlanner APS sist\u0113mai DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106557","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>DELMIAWorks integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i pieejamajai jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c pieejam\u0101s jaudas, divvirzienu integr\u0101cija. Katra prese, veidne, operators. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c pieejam\u0101s jaudas, divvirzienu integr\u0101cija. Katra prese, veidne, operators. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/delmiaworks\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/delmiaworks\\\/\",\"name\":\"DELMIAWorks integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i pieejamajai jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildina DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c pieejam\u0101s jaudas, divvirzienu integr\u0101cija. Katra prese, veidne, operators. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/delmiaworks\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/delmiaworks\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/delmiaworks\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"DELMIAWorks integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i pieejamajai jaudai","description":"SkyPlanner APS papildina DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c pieejam\u0101s jaudas, divvirzienu integr\u0101cija. Katra prese, veidne, operators. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai","og_description":"SkyPlanner APS papildina DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c pieejam\u0101s jaudas, divvirzienu integr\u0101cija. Katra prese, veidne, operators. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/","name":"DELMIAWorks integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i pieejamajai jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildina DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c pieejam\u0101s jaudas, divvirzienu integr\u0101cija. Katra prese, veidne, operators. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/delmiaworks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ DELMIAWorks SkyPlanner APS sist\u0113mai DELMIAWorks (IQMS): ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums ERP sist\u0113mai DELMIAWorks, kas agr\u0101k bija paz\u012bstama k\u0101 IQMS. Tas veido grafiku atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai, katrai presei, veidnei, operatoram un materi\u0101lam paredzot konkr\u0113tu laiku. Arcturus optimiz\u0113 visu pl\u0101nu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106557","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106557"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106557\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}