{"id":106528,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/sage-100\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"sage-100","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/","title":{"rendered":"SkyPlanner APS sist\u0113mai Sage 100: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Sage 100<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai Sage 100: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir Sage 100 papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku pieejam\u012bbu un iepl\u0101no katru iek\u0101rtu, operatoru, r\u012bku un materi\u0101lu. Tas darbojas ar Sage 100 un moduli Production Management ASV un Kan\u0101d\u0101, k\u0101 ar\u012b ar Sage 100 un moduli Sage 100 Produktion V\u0101cij\u0101 un Austrij\u0101. J\u016bs redzat, kura oper\u0101cija, uz kuras iek\u0101rtas un kur\u0101 laik\u0101 tiek veikta, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Sage 100. Tiek sa\u0146emti ra\u017eo\u0161anas nor\u012bkojumi jeb Fertigungsauftr\u00e4ge, preces, kr\u0101jumi un iepirkuma pas\u016bt\u012bjumi. Atpaka\u013c tiek nos\u016bt\u012bti katras oper\u0101cijas pl\u0101notie datumi un re\u0123istr\u0113tais darba laiks. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Sage 100 konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Visi resursi vien\u0101 grafik\u0101, iev\u0113rojot katra pieejam\u012bbu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrai iek\u0101rtai, darbiniekam un r\u012bkam tiek sast\u0101d\u012bts grafiks atbilsto\u0161i re\u0101lajai pieejam\u012bbai, \u0146emot v\u0113r\u0101 mai\u0146as, promb\u016btni un virsstundas. Katrai oper\u0101cijai tiek noteikts s\u0101kuma laiks, beigu laiks un darba centrs. Ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs cilv\u0113ki ar br\u012bvu laiku mai\u0146\u0101s.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Darba centri vairs netiek p\u0101rslogoti.<\/p>\n\n\n<p class=\"fx-pain__b\">Sage 100 iepl\u0101no stundas darba centram jeb Arbeitsplatz. SkyPlanner katru oper\u0101ciju iepl\u0101no tikai tad un tur, kur ir pieejama gan iek\u0101rta, gan darbinieki, un Arcturus dzinis optimiz\u0113 visu pl\u0101nu da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anu.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner zina, cik laika nepiecie\u0161ams, lai p\u0101rregul\u0113tu iek\u0101rtu no viena produkta uz n\u0101kamo \u2014 abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Grafik\u0101 ra\u017eo\u0161anas uzdevumi tiek sak\u0101rtoti t\u0101, lai p\u0101rregul\u0113\u0161anai zaud\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu pieejam\u012bbas p\u0101rbaude pirms darba s\u0101kuma.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner nolasa no Sage 100 kr\u0101jumu datus un neizpild\u012btos iepirkuma pas\u016bt\u012bjumus. Ra\u017eo\u0161anas uzdevums, kuram j\u0101gaida pieg\u0101d\u0101t\u0101ja pieg\u0101de, tiek iepl\u0101nots p\u0113c \u0161\u012bs pieg\u0101des datuma.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamu pas\u016bt\u012bjumu un boj\u0101jumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja iek\u0101rta apst\u0101jas vai pien\u0101k steidzams pas\u016bt\u012bjums, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. Running Time Lock saglab\u0101 ies\u0101kto ra\u017eo\u0161anas uzdevumu vietu grafik\u0101, un p\u0101rpl\u0101no\u0161ana joproj\u0101m notiek atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaita ir redzama re\u0101llaik\u0101, un re\u0123istr\u0113tais laiks tiek nos\u016bt\u012bts atpaka\u013c uz Sage 100.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alah\u00e4rm\u00e4 r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums \u2014 iepriek\u0161 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un tagad grafiku sast\u0101d\u012b\u0161anai vajadz\u012bgs viens meistars divu viet\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner mums ir v\u0113rt\u012bgs t\u0101p\u0113c, ka tas ir r\u012bks, kas darbojas ikdien\u0101, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Met\u0101lapstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska slodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir strauji samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-sage-100-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar Sage 100<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Sage 100 nos\u016bta ra\u017eo\u0161anas darbus.<\/strong> Neizpild\u012btie ra\u017eo\u0161anas nor\u012bkojumi (ASV) jeb Fertigungsauftr\u00e4ge (V\u0101cij\u0101 un Austrij\u0101) non\u0101k SkyPlanner kop\u0101 ar to oper\u0101cij\u0101m jeb Arbeitsg\u00e4nge, darba centriem, prec\u0113m, kr\u0101jumiem un iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>SkyPlanner sast\u0101da grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzinis da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju konkr\u0113tai iek\u0101rtai un konkr\u0113tiem darbiniekiem un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Pl\u0101notie datumi non\u0101k atpaka\u013c katr\u0101 ra\u017eo\u0161anas nor\u012bkojuma oper\u0101cij\u0101 jeb Arbeitsgang. Operatoru laika uzskaites ieraksti tiek nos\u016bt\u012bti k\u0101 darba uzskaites ieraksti jeb R\u00fcckmeldungen, t\u0101p\u0113c Sage 100 izmaksu apr\u0113\u0137inos tiek izmantotas faktisk\u0101s stundas.<\/li>\n\n<\/ol>\n\n\n<p>Sage 100 paliek j\u016bsu galven\u0101 uzskaites sist\u0113ma. Preces, materi\u0101lu specifik\u0101cijas, iepirkumi, kr\u0101jumi un izmaksu apr\u0113\u0137ini paliek turpat, kur l\u012bdz \u0161im. SkyPlanner nosaka katras oper\u0101cijas sec\u012bbu un izpildes laiku katram resursam.<\/p>\n\n\n<p>Savienojums ar abiem produktiem tiek veidots at\u0161\u0137ir\u012bgi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Sage 100 (ASV un Kan\u0101da).<\/strong> SkyPlanner nolasa datus lielos apjomos, izmantojot ODBC, un ieraksta tos, izmantojot Sage 100 Business Object Interface (BOI). T\u0101 ir Sage nodro\u0161in\u0101ta saskarne tre\u0161o pu\u0161u piek\u013cuvei Sage 100 programm\u0101m. Atpaka\u013c tiek nos\u016bt\u012bti ra\u017eo\u0161anas nor\u012bkojumu oper\u0101ciju pl\u0101notie datumi, darba uzskaites ieraksti un izpildes dati. Failu importu un eksportu veic Visual Integrator uzdevumi.<\/li>\n\n\n<li><strong>Sage 100 (V\u0101cija un Austrija).<\/strong> Sage 100 darbojas uz Microsoft SQL Server, un t\u0101 iesp\u0113jas tiek papla\u0161in\u0101tas, izmantojot biznesa objektus, t\u0101pat k\u0101 Sage partneru risin\u0101jumos. Arbeitsgang datumi un R\u00fcckmeldungen tiek nos\u016bt\u012bti atpaka\u013c pa datu apmai\u0146as ce\u013cu, ko SkyPlanner komanda kop\u0101 ar j\u016bsu Sage partneri nosaka ievie\u0161anas tv\u0113ruma noteik\u0161anas laik\u0101.<\/li>\n\n<\/ul>\n\n\n<p>Katr\u0101 ra\u017eotn\u0113 Sage 100 tiek izmantots at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darba s\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m. Ar\u012b j\u016bsu Sage partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot integr\u0101ciju, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>). Izm\u0113\u0123in\u0101juma laik\u0101 s\u0101kat ar CSV vai Excel eksportu, pirms tiek veikti jebk\u0101di integr\u0101cijas darbi.<\/p>\n\n\n<p>Abu produktu objekti, datu lauku atbilst\u012bbu noteik\u0161ana un atpaka\u013crakst\u012b\u0161anas noteikumi ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/sage-100\/integracijas-celvedis\/\">Sage 100 integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-sage-100-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no Sage 100 un ko papildus nodro\u0161ina SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Sage 100 ASV un Kan\u0101d\u0101<\/strong> pl\u0101no ra\u017eo\u0161anas nor\u012bkojumus modul\u012b Production Management. Sage pal\u012bdz\u012bbas materi\u0101los \u0161\u012b metode aprakst\u012bta \u0161\u0101di:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Katrs ra\u017eo\u0161anas nor\u012bkojums tiek pl\u0101nots atsevi\u0161\u0137i.<\/strong> &#8220;The &#8220;infinite&#8221; loading technique is used to allow each work ticket to be scheduled independently.&#8221; (Tiek izmantota slodzes pl\u0101no\u0161ana bez jaudas ierobe\u017eojumiem, lai katru ra\u017eo\u0161anas nor\u012bkojumu var\u0113tu pl\u0101not neatkar\u012bgi.) (<a href=\"https:\/\/help-sage100.na.sage.com\/2025\/Subsystems\/PM\/PMConcepts\/Enhanced_Scheduling.htm\">Sage 100 pal\u012bdz\u012bba<\/a>)<\/li>\n\n\n<li><strong>Jaudu izsaka stund\u0101s dien\u0101 katram darba centram.<\/strong> &#8220;Each work center has a capacity, expressed in hours, that it can perform on a given day.&#8221; (Katram darba centram ir stund\u0101s izteikta jauda, ko tas var nodro\u0161in\u0101t konkr\u0113t\u0101 dien\u0101.) (<a href=\"https:\/\/help-sage100.na.sage.com\/2023\/Subsystems\/PM\/PMConcepts\/Determine_Work_Ctr_Cap.htm\">avots<\/a>)<\/li>\n\n\n<li><strong>Darba centrs ir viena vien\u012bba.<\/strong> Darba centru sast\u0101vs un loma ir aprakst\u012bta \u0161\u0101di: &#8220;of one or more persons or machines, and they are considered a single unit for capacity planning.&#8221; (Tie sast\u0101v no viena vai vair\u0101kiem cilv\u0113kiem vai iek\u0101rt\u0101m, un ra\u017eo\u0161anas jaudas pl\u0101no\u0161an\u0101 tos uzskata par vienu vien\u012bbu.) (<a href=\"https:\/\/help-sage100.na.sage.com\/2023\/Subsystems\/PM\/PMSetup\/Work_Center_Maint.htm\">avots<\/a>)<\/li>\n\n\n<li><strong>P\u0101rslodzi nov\u0113r\u0161 manu\u0101li.<\/strong> &#8220;Individual work orders can be rescheduled or the queue time can be increased to relieve overcommitted work centers.&#8221; (Lai mazin\u0101tu darba centru p\u0101rslodzi, var p\u0101rpl\u0101not atsevi\u0161\u0137us ra\u017eo\u0161anas pas\u016bt\u012bjumus vai palielin\u0101t gaid\u012b\u0161anas laiku rind\u0101.) (<a href=\"https:\/\/help-sage100.na.sage.com\/2022\/Subsystems\/WO\/ConceptTopics\/Infinite_Loading.htm\">avots<\/a>)<\/li>\n\n<\/ul>\n\n\n<p><strong>Sage 100 V\u0101cij\u0101 un Austrij\u0101<\/strong> pl\u0101no\u0161anai izmanto Sage 100 Produktion. Tas pied\u0101v\u0101 pl\u0101no\u0161anu no s\u0101kuma datuma un atpaka\u013c no beigu datuma, simul\u0101ciju un &#8220;Anzeige von Engpass-Positionen (Material und Kapazit\u00e4t)&#8221; (materi\u0101lu un jaudas \u0161auro vietu att\u0113lojumu). Detaliz\u0113tu pl\u0101no\u0161anu veic grafiskaj\u0101 Plantafel, ko Sage pied\u0101v\u0101 k\u0101 izv\u0113les papildpakotni: &#8220;Grafische Ressourcenplanung (Zusatzpaket)&#8221; (grafiska resursu pl\u0101no\u0161ana \u2014 papildpakotne). Plantafel pl\u0101not\u0101js p\u0101rvieto uzdevumus, tos velkot un nometot, un Sage 100 p\u0101rr\u0113\u0137ina pas\u016bt\u012bjumu un materi\u0101lu vajadz\u012bbas datumus. (<a href=\"https:\/\/onlinehilfe.sage.de\/onlinehilfe\/ol\/80\/abf\/leistungsumfang_produktion_doku.htm\">Sage pal\u012bdz\u012bba<\/a>, <a href=\"https:\/\/www.sage.com\/de-de\/produkte\/sage-100\/produktion\/\">Sage 100 Produktion<\/a>)<\/p>\n\n\n<p>Abos produktos pl\u0101not\u0101js izlemj, kurus darbus p\u0101rcelt. SkyPlanner paveic p\u0101r\u0113jo: katru oper\u0101ciju iepl\u0101no uz br\u012bvas iek\u0101rtas ar pieejamiem darbiniekiem un r\u012bkiem t\u0101d\u0101 sec\u012bb\u0101, lai sagatavo\u0161anas darba b\u016btu vismaz\u0101k, un autom\u0101tiski p\u0101rpl\u0101no grafiku.<\/p>\n\n\n<p>Visas iesp\u0113jas un ierobe\u017eojumi ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/sage-100\/razosanas-planosana\/\">Vai Sage 100 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sage-100-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage 100 pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Sage 100 Production Management vai Sage 100 Produktion<\/th><th>Sage 100 ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jaudas p\u0101rskats<\/td><td>Stundas katram darba centram dien\u0101 (ASV), slodzes un \u0161auro vietu att\u0113lojums (DE)<\/td><td>Katra oper\u0101cija laika skal\u0101 ar precizit\u0101ti l\u012bdz min\u016btei<\/td><\/tr><tr><td>P\u0101rslodze<\/td><td>Pl\u0101not\u0101js p\u0101rpl\u0101no ra\u017eo\u0161anas nor\u012bkojumus vai velkot p\u0101rvieto uzdevumus Plantafel<\/td><td>Dzinis iepl\u0101no darbus tikai tur, kur ir pieejama jauda<\/td><\/tr><tr><td>Resursi<\/td><td>Darba centri ar darbiniekiem vai iek\u0101rt\u0101m, Arbeitspl\u00e4tze<\/td><td>Iek\u0101rtas, konkr\u0113ti darbinieki un r\u012bki \u2014 visiem \u0146emta v\u0113r\u0101 re\u0101l\u0101 pieejam\u012bba<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Katras oper\u0101cijas sagatavo\u0161anas un izpildes laiks<\/td><td>Sagatavo\u0161anas laiku matrica: maz\u0101kais kop\u0113jais sagatavo\u0161anas laiks<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Materi\u0101lu vajadz\u012bbas un iepirkumu pl\u0101no\u0161ana<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir noliktav\u0101 vai pieg\u0101de ir sa\u0146emta<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>J\u0101maina grafiks vai j\u0101izstr\u0101d\u0101 jauns pl\u0101ns un p\u0113c tam v\u0113lreiz j\u0101p\u0101rbauda slodze<\/td><td>Autopilot p\u0101rpl\u0101no visu ra\u017eotni atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m<\/td><\/tr><tr><td>Pl\u0101not\u0101ja skats<\/td><td>Jaudas p\u0101rskats (ASV), Plantafel papildin\u0101jums (DE)<\/td><td>Interakt\u012bva Gantt diagramma: p\u0101rvietojot ra\u017eo\u0161anas uzdevumu, pl\u0101ns paliek saska\u0146ots<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Darba uzskaite vai Betriebsdatenerfassung<\/td><td>Operatori t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz savu uzdevumu rindu un re\u0123istr\u0113 darbu<\/td><\/tr><tr><td>Darba s\u0101k\u0161ana<\/td><td>Modu\u013cu un papildin\u0101jumu licences pie j\u016bsu Sage partnera<\/td><td>30 dienu izm\u0113\u0123in\u0101jums ar j\u016bsu eksport\u0113tajiem datiem, p\u0113c tam no 199 \u20ac m\u0113nes\u012b<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-sage-100-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101di dati tiek apmain\u012bti starp Sage 100 un SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Sage 100 (ASV)<\/th><th>Sage 100 (V\u0101cija, Austrija)<\/th><th>SkyPlanner<\/th><th>Virziens<\/th><\/tr><\/thead><tbody><tr><td>Ra\u017eo\u0161anas nor\u012bkojums<\/td><td>Fertigungsauftrag<\/td><td>Pas\u016bt\u012bjums<\/td><td>Sage 100 \u2192 SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas nor\u012bkojuma oper\u0101cijas, darb\u012bbu kodi<\/td><td>Arbeitsg\u00e4nge no Arbeitsplan<\/td><td>Ra\u017eo\u0161anas uzdevumi ar sagatavo\u0161anas un izpildes laikiem<\/td><td>Sage 100 \u2192 SkyPlanner<\/td><\/tr><tr><td>Darba centrs<\/td><td>Arbeitsplatz, Ressource<\/td><td>Darba centrs, darba centru grupa, person\u0101ls<\/td><td>Sage 100 \u2192 SkyPlanner<\/td><\/tr><tr><td>Prece, materi\u0101lu specifik\u0101cija<\/td><td>Artikel, St\u00fcckliste (Ressourcenliste)<\/td><td>Produkti, materi\u0101li, pusfabrik\u0101ti<\/td><td>Sage 100 \u2192 SkyPlanner<\/td><\/tr><tr><td>Kr\u0101jumu daudzumi<\/td><td>Lagerbestand<\/td><td>Kr\u0101jumu atlikumi<\/td><td>Sage 100 \u2192 SkyPlanner<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumi<\/td><td>Bestellungen<\/td><td>Iepirkuma pas\u016bt\u012bjumi ar pieg\u0101des datumiem<\/td><td>Sage 100 \u2192 SkyPlanner<\/td><\/tr><tr><td>Klientu pas\u016bt\u012bjumu datumi<\/td><td>Kundenauftr\u00e4ge, Liefertermine<\/td><td>Izpildes termi\u0146i un klienta priorit\u0101te<\/td><td>Sage 100 \u2192 SkyPlanner<\/td><\/tr><tr><td>Katras oper\u0101cijas pl\u0101notais s\u0101kums un beigas<\/td><td>Arbeitsgang-Termine<\/td><td>Grafik\u0101 noteiktais s\u0101kums, beigas, darba centrs<\/td><td>SkyPlanner \u2192 Sage 100<\/td><\/tr><tr><td>Darba laika ieraksti, izpildes dati<\/td><td>R\u00fcckmeldungen (Zeiten, Mengen)<\/td><td>Laika uzskaites ieraksti un izpildes apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 Sage 100<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sage-100-sage-200-and-sage-x3\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage 100, Sage 200 un Sage X3<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sage pied\u0101v\u0101 vair\u0101kas ERP sist\u0113mas ar l\u012bdz\u012bgiem nosaukumiem. ASV versija Sage 100 ir paredz\u0113ta ra\u017eot\u0101jiem un izplat\u012bt\u0101jiem ASV un Kan\u0101d\u0101 (<a href=\"https:\/\/www.sage.com\/en-us\/products\/sage-100\/distribution-and-manufacturing\/\">Sage<\/a>). Apvienot\u0101s Karalistes un \u012arijas ra\u017eot\u0101jiem, kuri izmanto Sage 200 Professional, paredz\u0113ta lapa <a href=\"\/lv\/integracija\/erp\/sage-200\/\">SkyPlanner integr\u0101cija ar Sage 200<\/a>. Liel\u0101kiem ra\u017eot\u0101jiem un uz\u0146\u0113mumiem ar vair\u0101k\u0101m ra\u017eotn\u0113m, kuri izmanto Sage X3, paredz\u0113ta lapa <a href=\"\/lv\/integracija\/erp\/sage-x3\/\">SkyPlanner integr\u0101cija ar Sage X3<\/a>. V\u0101cijas versija Sage 100 ir Sage Office Line p\u0113ctece, un \u0161\u012b lapa aptver ar\u012b to.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"skyplanner-compared-with-other-sage-100-scheduli\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner sal\u012bdzin\u0101jum\u0101 ar citiem Sage 100 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas risin\u0101jumiem<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Piem\u0113ri<\/th><th>Piem\u0113rot\u012bba<\/th><\/tr><\/thead><tbody><tr><td>Pl\u0101no\u0161ana Sage 100 sist\u0113m\u0101<\/td><td>Grafiku sast\u0101d\u012b\u0161ana modul\u012b Production Management (US), Plantafel papildin\u0101jums (DE)<\/td><td>Stundu pl\u0101no\u0161ana katram darba centram vai manu\u0101li p\u0101rvald\u0101ms pl\u0101no\u0161anas d\u0113lis; p\u0101rslodzi nov\u0113r\u0161 pl\u0101not\u0101js<\/td><\/tr><tr><td>Lok\u0101li uzst\u0101d\u0101mi ra\u017eo\u0161anas vad\u012bbas un APS papildin\u0101jumi<\/td><td>4APS, proMExS, PCT Produktionsleitstand (DE); Scanco Operations Management (US)<\/td><td>Uzst\u0101d\u0101mi pl\u0101no\u0161anas d\u0113\u013ci un MES risin\u0101jumi, ko pieg\u0101d\u0101t\u0101js konfigur\u0113 ievie\u0161anas projekta ietvaros<\/td><\/tr><tr><td>M\u0101ko\u0146a APS ar darbu izpildes vad\u012bbu ra\u017eo\u0161anas ceh\u0101<\/td><td>SkyPlanner APS<\/td><td>Katra resursa pieejam\u012bbas ierobe\u017eojumi, autom\u0101tiska p\u0101rpl\u0101no\u0161ana, operatoru lietotne, m\u0113ne\u0161a maksa<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis Sage 100 Plantafel, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u0113laties, lai sist\u0113ma nosaka darbu sec\u012bbu, nevis p\u0101rvietot uzdevumus uz pl\u0101no\u0161anas d\u0113\u013ca pa\u0161iem.<\/strong> Sage raksturo Plantafel k\u0101 pl\u0101no\u0161anas d\u0113li ar vilk\u0161anas un nome\u0161anas funkciju. Arcturus da\u017eu sekun\u017eu laik\u0101 pats iepl\u0101no katru Arbeitsgang tur, kur ir br\u012bva jauda.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka sara\u017eoto apjomu.<\/strong> Sagatavo\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts p\u0101rregul\u0113\u0161anas ilgums katram p\u0101rejas virzienam, un ra\u017eo\u0161anas uzdevumi grafik\u0101 tiek sak\u0101rtoti t\u0101, lai sagatavo\u0161anai b\u016btu vajadz\u012bgs p\u0113c iesp\u0113jas maz\u0101k laika.<\/li>\n\n\n<li><strong>Darbinieku un instrumentu pieejam\u012bba ierobe\u017eo pl\u0101nu.<\/strong> Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu. Vienam ra\u017eo\u0161anas uzdevumam vienlaikus var b\u016bt vajadz\u012bgi vair\u0101ki operatori, un, ja galvenais darba centrs ir aiz\u0146emts, tiek izmantoti alternat\u012bvi darba centri.<\/li>\n\n\n<li><strong>Pl\u0101ns main\u0101s vair\u0101kas reizes ned\u0113\u013c\u0101.<\/strong> Autopilot autom\u0101tiski p\u0101rpl\u0101no, Running Time Lock ne\u013cauj p\u0101rvietot jau s\u0101ktos darbus, un jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz Sage 100.<\/li>\n\n<\/ul>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja izmantojat ASV versiju Sage 100:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pa\u0161laik darba centru noslodzi izl\u012bdzin\u0101t manu\u0101li.<\/strong> Sage pl\u0101no\u0161ana bez jaudas ierobe\u017eojumiem atst\u0101j p\u0101rslodzes nov\u0113r\u0161anu pl\u0101not\u0101ja zi\u0146\u0101. SkyPlanner nekad neiepl\u0101no divus darbus vienai iek\u0101rtai vien\u0101 laik\u0101.<\/li>\n\n\n<li><strong>Viens darba centrs apvieno vair\u0101kas iek\u0101rtas un darbiniekus.<\/strong> SkyPlanner katrai iek\u0101rtai un katram operatoram sast\u0101da atsevi\u0161\u0137u laika grafiku, \u0146emot v\u0113r\u0101 faktisk\u0101s mai\u0146as un promb\u016btnes.<\/li>\n\n\n<li><strong>V\u0113laties ieg\u016bt grafiku da\u017eu ned\u0113\u013cu laik\u0101, nevis s\u0101kt modu\u013ca ievie\u0161anas projektu.<\/strong> Izm\u0113\u0123iniet risin\u0101jumu ar saviem darba uzdevumiem 30 dienu izm\u0113\u0123in\u0101juma period\u0101. Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadapm\u0101c\u012bbas un s\u0101kotn\u0113j\u0101s iestat\u012b\u0161anas s\u0101kuma.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez maks\u0101jumu kartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eotnes modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet \u0161os datus. S\u0101kotn\u0113j\u0101 iestat\u012b\u0161an\u0101 un apguv\u0113 ir pieejama pal\u012bdz\u012bba.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet uz Excel nepabeigtos darba uzdevumus vai Fertigungsauftr\u00e4ge kop\u0101 ar to oper\u0101cij\u0101m. Import\u0113jiet tos un sal\u012bdziniet SkyPlanner grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet Sage 100.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas s\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais Sage 100 papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Sage 100. Tas sa\u0146em darba uzdevumus vai Fertigungsauftr\u00e4ge, preces, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta oper\u0101ciju pl\u0101notos datumus un re\u0123istr\u0113to darba laiku. Pl\u0101nojot tiek \u0146emti v\u0113r\u0101 katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi. Sagatavo\u0161anas laiku matrica, kur\u0101 \u0146emts v\u0113r\u0101 p\u0101rejas virziens, sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai sagatavo\u0161anai vajadz\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika. Autopilot autom\u0101tiski p\u0101rpl\u0101no, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sage 100 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 faktisko jaudu?<\/summary>\n<p class=\"sp-faq__a\">P\u0113c pa\u0161a Sage teikt\u0101, ASV versijas Sage 100 Production Management sast\u0101da grafikus bez jaudas ierobe\u017eojumiem, un p\u0101rslogoto darba centru noslodzi samazina pl\u0101not\u0101js. V\u0101cijas versijas Sage 100 Produktion r\u0101da noslodzi un \u0161aur\u0101s vietas, savuk\u0101rt papildu modulis Plantafel \u013cauj pl\u0101not\u0101jam p\u0101rvietot uzdevumus velkot. SkyPlanner APS pievieno <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai<\/a>, aptverot katru oper\u0101ciju, iek\u0101rtu, darbinieku un instrumentu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar Sage 100?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar Sage 100. No ASV versijas Sage 100 tas nolasa darba uzdevumus, darba centrus, preces un iepirkuma pas\u016bt\u012bjumus, bet oper\u0101ciju pl\u0101notos datumus un darba laika ierakstus nos\u016bta atpaka\u013c caur Business Object Interface. No V\u0101cijas versijas Sage 100 tas nolasa Fertigungsauftr\u00e4ge, Arbeitsg\u00e4nge un Arbeitspl\u00e4tze, bet Arbeitsgang datumus un R\u00fcckmeldungen nos\u016bta atpaka\u013c pa datu apmai\u0146as ce\u013cu, ko s\u0101kotn\u0113j\u0101s iestat\u012b\u0161anas laik\u0101 SkyPlanner komanda nosaka kop\u0101 ar j\u016bsu Sage partneri. SkyPlanner ar webhook pazi\u0146ojumiem nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai izv\u0113l\u0113ties Sage 100 Plantafel vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izmantojiet Plantafel, ja v\u0113laties pl\u0101not manu\u0101li uz d\u0113\u013ca Sage 100 sist\u0113m\u0101. Izv\u0113lieties SkyPlanner, ja v\u0113laties, lai sist\u0113ma katram Arbeitsgang pie\u0161\u0137ir br\u012bvas iek\u0101rtas, darbiniekus un instrumentus, nosaka darbu sec\u012bbu ar p\u0113c iesp\u0113jas maz\u0101ku sagatavo\u0161anas laiku un autom\u0101tiski p\u0101rpl\u0101no. SkyPlanner nos\u016bta datumus atpaka\u013c uz Sage 100 Produktion.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuras Sage 100 versijas ir apskat\u012btas \u0161aj\u0101 lap\u0101?<\/summary>\n<p class=\"sp-faq__a\">Abas. ASV un Kan\u0101d\u0101 Sage 100 ir agr\u0101kais MAS 90 un MAS 200 ar moduli Production Management. V\u0101cij\u0101 un Austrij\u0101 Sage 100 ir Sage Office Line p\u0113ctece ar moduli Sage 100 Produktion. SkyPlanner darbojas ar ab\u0101m versij\u0101m, un integr\u0101cijai tiek izmantotas katra produkta saskarnes.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sage 100 sist\u0113m\u0101 kaut kas j\u0101instal\u0113?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner darbojas m\u0101kon\u012b l\u012bdz\u0101s Sage 100. Integr\u0101cijai tiek izmantotas Sage 100 jau pieejam\u0101s saskarnes: ASV versij\u0101 Sage 100 \u2014 Business Object Interface, bet V\u0101cijas versij\u0101 Sage 100 \u2014 SQL Server datub\u0101ze un ar j\u016bsu Sage partneri saska\u0146otais datu ierakst\u012b\u0161anas ce\u013c\u0161. SkyPlanner komanda to konfigur\u0113 kop\u0101 ar jums risin\u0101juma lieto\u0161anas uzs\u0101k\u0161anas laik\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 ra\u017eotnei, kas izmanto Sage 100?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem, k\u0101 ar\u012b 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu grafik\u0101 iepl\u0101noto darbu rindu. Integr\u0101cijas cenas pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar izv\u0113l\u0113to pl\u0101nu, lai pirms darba s\u0101k\u0161anas b\u016btu zin\u0101mas kop\u0113j\u0101s izmaksas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner var izm\u0113\u0123in\u0101t pirms integr\u0101cijas ar Sage 100?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat izmantot uz Excel eksport\u0113tus nepabeigtos darba uzdevumus vai Fertigungsauftr\u00e4ge. V\u0113l pirms integr\u0101cijas darbu s\u0101k\u0161anas redz\u0113siet savas ra\u017eo\u0161anas grafiku, kur\u0101 \u0146emta v\u0113r\u0101 faktisk\u0101 jauda. Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadapm\u0101c\u012bbas un s\u0101kotn\u0113j\u0101s iestat\u012b\u0161anas s\u0101kuma.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sources\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Avoti<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><a href=\"https:\/\/help-sage100.na.sage.com\/2025\/Subsystems\/PM\/PMConcepts\/Enhanced_Scheduling.htm\">Sage 100 Production Management, Enhanced Scheduling<\/a><\/li>\n\n\n<li><a href=\"https:\/\/help-sage100.na.sage.com\/2023\/Subsystems\/PM\/PMConcepts\/Determine_Work_Ctr_Cap.htm\">Sage 100 darba centra jauda<\/a><\/li>\n\n\n<li><a href=\"https:\/\/help-sage100.na.sage.com\/2023\/Subsystems\/PM\/PMSetup\/Work_Center_Maint.htm\">Sage 100 Work Center Maintenance<\/a><\/li>\n\n\n<li><a href=\"https:\/\/help-sage100.na.sage.com\/2022\/Subsystems\/WO\/ConceptTopics\/Infinite_Loading.htm\">Sage 100 pl\u0101no\u0161ana bez jaudas ierobe\u017eojumiem<\/a><\/li>\n\n\n<li>Sage 100 Produktion (V\u0101cija): https:\/\/onlinehilfe.sage.de\/onlinehilfe\/ol\/80\/abf\/leistungsumfang_produktion_doku.htm un https:\/\/www.sage.com\/de-de\/produkte\/sage-100\/produktion\/<\/li>\n\n\n<li><a href=\"https:\/\/www.sage.com\/en-us\/products\/sage-100\/distribution-and-manufacturing\/\">Sage 100 (ASV) produkta lapa<\/a><\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Sage 100 SkyPlanner APS sist\u0113mai Sage 100: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir Sage 100 papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku pieejam\u012bbu un iepl\u0101no katru iek\u0101rtu, operatoru, r\u012bku un materi\u0101lu. Tas darbojas ar Sage 100 un moduli Production Management ASV un Kan\u0101d\u0101, k\u0101 ar\u012b ar &#8230; <a title=\"SkyPlanner APS sist\u0113mai Sage 100: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai Sage 100: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106528","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sage 100 integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina Sage 100: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, cilv\u0113kam, r\u012bkam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai Sage 100: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina Sage 100: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, cilv\u0113kam, r\u012bkam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-100\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-100\\\/\",\"name\":\"Sage 100 integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildina Sage 100: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, cilv\u0113kam, r\u012bkam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-100\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-100\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-100\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Sage 100: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sage 100 integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai","description":"SkyPlanner APS papildina Sage 100: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, cilv\u0113kam, r\u012bkam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai Sage 100: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","og_description":"SkyPlanner APS papildina Sage 100: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, cilv\u0113kam, r\u012bkam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/","name":"Sage 100 integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildina Sage 100: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, cilv\u0113kam, r\u012bkam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-100\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Sage 100: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Sage 100 SkyPlanner APS sist\u0113mai Sage 100: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir Sage 100 papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku pieejam\u012bbu un iepl\u0101no katru iek\u0101rtu, operatoru, r\u012bku un materi\u0101lu. Tas darbojas ar Sage 100 un moduli Production Management ASV un Kan\u0101d\u0101, k\u0101 ar\u012b ar&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106528"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106528\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}