{"id":106470,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/comarch-erp-xl\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"comarch-erp-xl","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/","title":{"rendered":"SkyPlanner APS sist\u0113mai Comarch ERP XL: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Comarch ERP XL<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai Comarch ERP XL: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir Comarch ERP XL papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kur un kad tiek veikta katra ra\u017eo\u0161anas pas\u016bt\u012bjuma (zlecenie produkcyjne) oper\u0101cija. Kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar Comarch ERP XL darbojas abos virzienos: SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123ijas ar to oper\u0101cij\u0101m, darba centrus un resursus, preces, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus. Atpaka\u013c tiek nos\u016bt\u012bti pl\u0101notie oper\u0101ciju datumi un re\u0123istr\u0113tie darba dati. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Comarch ERP XL konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Jaudu nosaka grafiks, nevis ar roku ievad\u012bts skaitlis.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrai iek\u0101rtai, darbiniekam un instrumentam ir grafiks, kur\u0101 pieejamais laiks ir ierobe\u017eots un \u0146emtas v\u0113r\u0101 faktisk\u0101s mai\u0146as, promb\u016btnes un virsstundas. Katrai oper\u0101cijai ir s\u0101kuma laiks, beigu laiks un darba centrs. Vairs nav j\u0101apl\u0113\u0161 perioda jauda un j\u0101pieskaita procentu\u0101la rezerve p\u0101rregul\u0113\u0161anai.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Iepl\u0101nota p\u0101rregul\u0113\u0161ana, p\u0101rejot no viena produkta uz citu.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner saglab\u0101 p\u0101rregul\u0113\u0161anas laiku katram produktu p\u0101rim abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Pl\u0101no\u0161anas dzin\u0113js sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161anai kopum\u0101 t\u0113r\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ar\u012b brig\u0101\u017eu un instrumentu pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek piesaist\u012bti tr\u012bs cilv\u0113ki ar br\u012bvu laiku mai\u0146\u0101. Veidne vai pal\u012bgier\u012bce, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek vienlaikus rezerv\u0113ta citai. Ja iek\u0101rta ir aiz\u0146emta, darbu p\u0101rce\u013c uz citu piem\u0113rotu iek\u0101rtu vai uztic citam darbiniekam.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu p\u0101rbaude pirms darba s\u0101kuma.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner nolasa kr\u0101jumu datus un atv\u0113rtos iepirkuma pas\u016bt\u012bjumus (zam\u00f3wienia zakupu) no Comarch ERP XL. Ra\u017eo\u0161anas pas\u016bt\u012bjumu, kuram j\u0101gaida pieg\u0101d\u0101t\u0101ja pieg\u0101de, iepl\u0101no p\u0113c \u0161\u012bs pieg\u0101des datuma.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamu pas\u016bt\u012bjumu un boj\u0101jumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja iek\u0101rta apst\u0101jas vai pien\u0101k steidzams pas\u016bt\u012bjums, Autopilot p\u0101rpl\u0101no grafiku. Arcturus da\u017eu sekun\u017eu laik\u0101 optimiz\u0113 visu pl\u0101nu, iev\u0113rojot j\u016bsu fiks\u0113tos grafika elementus un priorit\u0101tes.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 veik\u0161anas laik\u0101. Biroj\u0101 darba gaita ir redzama re\u0101llaik\u0101, un re\u0123istr\u0113tie darba dati tiek nos\u016bt\u012bti atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumu k\u0101 oper\u0101ciju izpildes dati.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alah\u00e4rm\u00e4 r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums \u2014 iepriek\u0161 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un tagad grafiku sast\u0101d\u012b\u0161anai vajadz\u012bgs viens meistars divu viet\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams re\u0101llaika p\u0101rskats par ra\u017eo\u0161anu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-comarch-erp-xl-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Comarch ERP XL nos\u016bta veicamos darbus.<\/strong> SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to procesiem un oper\u0101cij\u0101m, tehnolo\u0123ijas, darba centrus (gniazda robocze) un resursus (zasoby), preces, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzin\u0113js da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta katru grafika izmai\u0146u, tikl\u012bdz t\u0101 notiek.<\/li>\n\n\n<li><strong>Datumi un re\u0123istr\u0113tie darba dati tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Pl\u0101notais s\u0101kuma un beigu laiks tiek nos\u016bt\u012bts atpaka\u013c uz katru ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101ciju, izmantojot XL API funkciju XLDodajTerminDoProcesuProd. Operatoru re\u0123istr\u0113tais darba laiks tiek ierakst\u012bts k\u0101 oper\u0101ciju izpilde, izmantojot XLDodajRealizacjeOperacjiProd.<\/li>\n\n<\/ol>\n\n\n<p>Comarch ERP XL paliek j\u016bsu galven\u0101 datu uzskaites sist\u0113ma. Preces, tehnolo\u0123ijas, MRP, iepirkumi, kr\u0101jumi, RW un PW dokumenti un pa\u0161izmaksas apr\u0113\u0137ini paliek turpat, kur l\u012bdz \u0161im. SkyPlanner nosaka katras oper\u0101cijas sec\u012bbu un laiku katram resursam.<\/p>\n\n\n<p>Comarch nor\u0101da tr\u012bs veidus, k\u0101 izveidot savienojumu ar ERP XL: DCOM, tie\u0161s savienojums ar datub\u0101zi (SQL Client) un REST API (<a href=\"https:\/\/www.comarch.pl\/erp\/xl\/\">Comarch<\/a>). SkyPlanner nolasa ra\u017eo\u0161anas datus, izmantojot Comarch ERP XL Web REST API vai las\u012b\u0161anas savienojumu ar ERP XL datub\u0101zi. Datu ierakst\u012b\u0161anai atpaka\u013c tas izmanto XL API (CDN_API.DLL) \u2014 Comarch bibliot\u0113ku, kas \u013cauj no \u0101r\u0113j\u0101m sist\u0113m\u0101m pievienot tehnolo\u0123ijas, ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101ciju datumus un izpildes datus (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/xl128-przyklady-zastosowania-api-w-produkcji\/\">Comarch pal\u012bdz\u012bba<\/a>).<\/p>\n\n\n<p>Katr\u0101 ra\u017eotn\u0113 Comarch ERP XL tiek izmantots at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c darba s\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavo iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m. Ar\u012b j\u016bsu Comarch partneris vai pa\u0161u izstr\u0101d\u0101t\u0101ji var izveidot integr\u0101ciju, izmantojot dokument\u0113to SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Funkcijas, datu lauku atbilst\u012bbas un noteikumi datu ierakst\u012b\u0161anai atpaka\u013c ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/comarch-erp-xl\/integracijas-celvedis\/\">rokasgr\u0101mat\u0101 par Comarch ERP XL integr\u0101ciju ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-comarch-erp-xl-schedules-and-what-skyplanne\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no Comarch ERP XL un ko papildus sniedz SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Comarch ERP XL modulis Produkcja pl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus, izmantojot tehnolo\u0123ijas un resursu kalend\u0101rus. Tas zi\u0146o par konfliktiem un \u013cauj pl\u0101not\u0101jam p\u0101rvietot oper\u0101cijas Gantt diagramm\u0101. Comarch pal\u012bdz\u012bbas dokument\u0101cija par\u0101da, kur pl\u0101ns joproj\u0101m ir atkar\u012bgs no pl\u0101not\u0101ja v\u0113rt\u0113juma:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Darba centra jauda ir skaitlis, ko ievad\u0101t j\u016bs.<\/strong> Darba centra kart\u012btes aprakst\u0101 Comarch skaidro, ka jaudu &#8220;cannot always be stated so unambiguously&#8221; (ne vienm\u0113r var noteikt tik viennoz\u012bm\u012bgi), t\u0101p\u0113c &#8220;this field is left for the user to define.&#8221; (\u0161\u012b lauka v\u0113rt\u012bbu atst\u0101j lietot\u0101ja zi\u0146\u0101). (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/plan-obciazenia-gniazd-roboczych\/\">Comarch pal\u012bdz\u012bba, tulkojums<\/a>)<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anai atv\u0113l procentu\u0101lu laika da\u013cu.<\/strong> Pie\u013caujam\u0101s slodzes parametrs \u013cauj \u0161\u012bs jaudas ietvaros rezerv\u0113t &#8220;some % of time for downtime, changeovers etc.&#8221; (noteiktu % laika d\u012bkst\u0101v\u0113m, p\u0101rregul\u0113\u0161anai u. c.). (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/plan-obciazenia-gniazd-roboczych\/\">tas pats avots<\/a>)<\/li>\n\n\n<li><strong>Aptuven\u0101 pl\u0101no\u0161ana var p\u0101rsniegt period\u0101 pieejamo jaudu.<\/strong> Vien\u0101 no pl\u0101no\u0161anas variantiem oper\u0101cijas tiek iepl\u0101notas pa\u0161reiz\u0113j\u0101 period\u0101 pat tad, ja &#8220;the resource availability limit is exceeded&#8221; (ir p\u0101rsniegts resursa pieejam\u012bbas ierobe\u017eojums). (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/zlecenia-produkcyjne\/\">Comarch pal\u012bdz\u012bba<\/a>)<\/li>\n\n\n<li><strong>Resursu p\u0101rregul\u0113\u0161ana attiecas uz p\u0101reju starp darba centriem.<\/strong> P\u0101rregul\u0113\u0161anas iestat\u012bjums nosaka &#8220;the changeover time of the resource&#8217;s work center and the cost of that change&#8221; (resursa darba centra mai\u0146as laiku un \u0161\u012bs mai\u0146as izmaksas), nevis p\u0101reju no viena produkta uz n\u0101kamo. (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/gniazda-robocze-i-zasoby-kalendarze-i-okresy-przestoje-i-awarie\/\">Comarch pal\u012bdz\u012bba<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Detaliz\u0113tai oper\u0101ciju sec\u012bbas pl\u0101no\u0161anai Comarch p\u0101rdod Comarch APS \u2014 &#8220;a standalone application with its own interface and its own database (PSQL)&#8221; (atsevi\u0161\u0137u lietotni ar savu saskarni un savu datub\u0101zi (PSQL)) (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">Comarch APS pal\u012bdz\u012bba<\/a>). To instal\u0113 j\u016bsu server\u012b ar atsevi\u0161\u0137u licences atsl\u0113gu un integr\u0101cijas servisu.<\/p>\n\n\n<p>Visas iesp\u0113jas un ierobe\u017eojumi ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/comarch-erp-xl\/razosanas-planosana\/\">Vai Comarch ERP XL nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"comarch-erp-xl-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Comarch ERP XL pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Comarch ERP XL Produkcja<\/th><th>Comarch ERP XL ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Lietot\u0101ja noteikta jauda katram darba centram un periodam ar pie\u013caujam\u0101s slodzes %<\/td><td>Katrai iek\u0101rtai, darbiniekam un instrumentam grafik\u0101 \u0146emta v\u0113r\u0101 re\u0101l\u0101 pieejam\u012bba<\/td><\/tr><tr><td>Konflikti<\/td><td>Sist\u0113ma zi\u0146o par konfliktiem; pl\u0101not\u0101js p\u0101rpl\u0101no grafiku vai p\u0101rvieto oper\u0101cijas<\/td><td>Dzin\u0113js iepl\u0101no darbu tikai tur, kur ir pieejama jauda<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Procentu\u0101la laika rezerve; fiks\u0113ts laiks resursa p\u0101rcel\u0161anai starp darba centriem<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica: maz\u0101kais kop\u0113jais laiks p\u0101rej\u0101m starp produktiem<\/td><\/tr><tr><td>Darbinieki un instrumenti<\/td><td>Tehnolo\u0123ijas oper\u0101cijai piesaist\u012btie resursi<\/td><td>Konkr\u0113ti operatori ar mai\u0146\u0101m, uzdevumi vair\u0101kiem operatoriem, instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Izejvielu rezerv\u0101cijas, MRP ieteikumi<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir kr\u0101jumos vai sa\u0146emti p\u0113c iepirkuma pas\u016bt\u012bjumiem<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Atk\u0101rtota pl\u0101no\u0161anas palai\u0161ana vai p\u0101rpl\u0101no\u0161ana konfliktu nov\u0113r\u0161anai<\/td><td>Autopilot p\u0101rpl\u0101no visas ra\u017eotnes darbu, iev\u0113rojot j\u016bsu priorit\u0101tes<\/td><\/tr><tr><td>Pl\u0101not\u0101ja skats<\/td><td>Gantt diagramma pa resursiem vai darba centriem, noslodzes pl\u0101ns (PLZ)<\/td><td>Interakt\u012bva Gantt diagramma: p\u0101rvietojiet ra\u017eo\u0161anas uzdevumu, un pl\u0101ns joproj\u0101m ir saska\u0146ots<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Oper\u0101ciju izpildes re\u0123istr\u0113\u0161ana ERP XL vai Comarch MES<\/td><td>Operatori redz savu uzdevumu rindu un re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"comarch-erp-xl-scheduling-software-and-add-ons-c\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Grafiku sast\u0101d\u012b\u0161ana ar Comarch ERP XL: programmat\u016bras un papildin\u0101jumu sal\u012bdzin\u0101jums<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Kas tas ir<\/th><th>Kad piem\u0113rots<\/th><\/tr><\/thead><tbody><tr><td>Comarch ERP XL Produkcja<\/td><td>Pl\u0101no\u0161anas metodes, konfliktu p\u0101rskati, noslodzes pl\u0101ns un Gantt diagramma ERP XL vid\u0113<\/td><td>Jaudas noteik\u0161ana katram darba centram un periodam nodro\u0161ina pietiekamu precizit\u0101ti<\/td><\/tr><tr><td>Comarch APS<\/td><td>Atsevi\u0161\u0137a Comarch lietotne grafiku sast\u0101d\u012b\u0161anai ar savu PostgreSQL datub\u0101zi un licences atsl\u0113gu, ko instal\u0113 j\u016bsu server\u012b<\/td><td>V\u0113laties palikt pie Comarch produktiem un \u012bstenot risin\u0101jumu sav\u0101 infrastrukt\u016br\u0101<\/td><\/tr><tr><td>Polijas un V\u0101cijas pl\u0101no\u0161anas pane\u013ci (dFLEX Gantt, proMExS Leitstand)<\/td><td>Tre\u0161o pu\u0161u Gantt vai pl\u0101no\u0161anas pane\u013cu programmat\u016bra, kuras pieg\u0101d\u0101t\u0101ji nor\u0101da Comarch starp atbalst\u012btajiem ERP savienojumiem<\/td><td>Pl\u0101not\u0101js str\u0101d\u0101 ar pl\u0101no\u0161anas paneli, bie\u017ei izmantojot ar\u012b ra\u017eo\u0161anas ceh\u0101 sav\u0101ktos datus<\/td><\/tr><tr><td>M\u0101ko\u0146a APS ar API savienojumu (SkyPlanner APS)<\/td><td>P\u0101rl\u016bk\u0101 pieejams r\u012bks ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i re\u0101lajai jaudai ar divvirzienu sinhroniz\u0101ciju ar ERP XL ra\u017eo\u0161anas pas\u016bt\u012bjumiem<\/td><td>Grafikam pa\u0161am j\u0101atjaunojas un j\u0101b\u016bt pieejamam katram operatoram<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis Comarch APS, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u0113laties str\u0101d\u0101t ar aktu\u0101lu grafiku jau da\u017eu ned\u0113\u013cu laik\u0101, nevis \u012bstenot servera ievie\u0161anas projektu.<\/strong> Comarch APS ir vajadz\u012bga sava PostgreSQL datub\u0101ze, instal\u0113t\u0101js, integr\u0101cijas serviss l\u012bdz\u0101s ERP XL datub\u0101zei un licences atsl\u0113ga sist\u0113m\u0101 Comarch ERP Menad\u017cer Kluczy (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/comarch-aps-instalacja-2026-3\/\">Comarch APS instal\u0113\u0161ana<\/a>). SkyPlanner ir m\u0101ko\u0146programmat\u016bra, un ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma.<\/li>\n\n\n<li><strong>Pl\u0101nam j\u0101atjaunojas pa\u0161am.<\/strong> Comarch APS pl\u0101not\u0101js atjaunina datus ar komandu &#8220;Aktualizuj dane z ERP&#8221; (atjaunin\u0101t datus no ERP) un nos\u016bta izv\u0113l\u0113to variantu atpaka\u013c ar komandu &#8220;Wy\u015blij do ERP&#8221; (nos\u016bt\u012bt uz ERP) (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">Comarch APS pal\u012bdz\u012bba<\/a>). Autopilot autom\u0101tiski p\u0101rpl\u0101no darbu p\u0113c katr\u0101m b\u016btisk\u0101m izmai\u0146\u0101m, un SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta jaunos datumus uz cit\u0101m sist\u0113m\u0101m.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana ir atkar\u012bga no iepriek\u0161 ra\u017eot\u0101 produkta.<\/strong> Comarch APS izmanto p\u0101rregul\u0113\u0161anas laiku k\u0101 &#8220;a fixed value taken from the technology&#8221; (fiks\u0113tu v\u0113rt\u012bbu no tehnolo\u0123ijas) (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">tas pats avots<\/a>). SkyPlanner p\u0101rregul\u0113\u0161anas laiku matric\u0101 katram produktu p\u0101rim katr\u0101 p\u0101rejas virzien\u0101 ir savs laiks. Ra\u017eo\u0161anas uzdevumi tiek sak\u0101rtoti sec\u012bb\u0101 ar vismaz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Jums vajadz\u012bga optimiz\u0101cija, nevis noteikuma izv\u0113le.<\/strong> Comarch apraksta savas iepriek\u0161 defin\u0113t\u0101s metodes k\u0101 noteikumus, piem\u0113ram, pl\u0101not &#8220;the longest processes first&#8221; (vispirms ilg\u0101kos procesus), izmantojot rij\u012bgo algoritmu (<a href=\"https:\/\/www.comarch.pl\/erp\/system-aps\/\">Comarch<\/a>). Arcturus da\u017eu sekun\u017eu laik\u0101 optimiz\u0113 visu pl\u0101nu, \u0146emot v\u0113r\u0101 priorit\u0101tes, termi\u0146us, p\u0101rregul\u0113\u0161anu un katra resursa pieejamo jaudu.<\/li>\n\n\n<li><strong>Pl\u0101nu ierobe\u017eo ar\u012b brig\u0101\u017eu, instrumentu un materi\u0101lu pieejam\u012bba.<\/strong> Vienlaikus tiek \u0146emti v\u0113r\u0101 katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi. Uzdevumiem, kuros vajadz\u012bgi vair\u0101ki operatori, tiek iepl\u0101noti nepiecie\u0161amie darbinieki, un darbs s\u0101kas, kad materi\u0101li ir pieejami no kr\u0101jumiem vai pieg\u0101d\u0101ti saska\u0146\u0101 ar iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Katram operatoram j\u0101str\u0101d\u0101 p\u0113c pl\u0101na.<\/strong> Mobile Confirmations r\u0101da aktu\u0101lo darbu rindu t\u0101lrun\u012b vai plan\u0161etdator\u0101, un re\u0123istr\u0113tais darba laiks non\u0101k atpaka\u013c ERP XL k\u0101 oper\u0101cijas izpildes dati.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet darba centrus un resursus no ERP XL. Pieejams atbalsts lieto\u0161anas uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet no Comarch ERP XL atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas Excel vai CSV form\u0101t\u0101, import\u0113jiet tos un sal\u012bdziniet SkyPlanner sast\u0101d\u012bto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet Comarch ERP XL.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darba uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Abon\u0113\u0161anas maksa tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a> vai apskatiet <a href=\"\/lv\/integracija\/erp\/\">visas ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais Comarch ERP XL papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Comarch ERP XL. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123ijas, darba centrus, resursus, preces, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta pl\u0101notos oper\u0101ciju datumus un re\u0123istr\u0113tos darba datus. Pl\u0101nojot tiek iev\u0113roti katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi. P\u0101rregul\u0113\u0161anas laiku matrica, kur\u0101 \u0146emts v\u0113r\u0101 p\u0101rejas virziens, sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161anas laiks b\u016btu p\u0113c iesp\u0113jas maz\u0101ks. Autopilot autom\u0101tiski p\u0101rpl\u0101no darbu, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Comarch ERP XL nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 re\u0101lo jaudu?<\/summary>\n<p class=\"sp-faq__a\">Da\u013c\u0113ji. Modulis Produkcja p\u0101rbauda resursu noslodzi, zi\u0146o par konfliktiem un \u013cauj pl\u0101not\u0101jam p\u0101rvietot oper\u0101cijas Gantt diagramm\u0101. Darba centra jaudu lietot\u0101js nor\u0101da k\u0101 skaitlisku v\u0113rt\u012bbu attiec\u012bgajam periodam, bet p\u0101rregul\u0113\u0161anai paredz procentu\u0101lu rezervi. SkyPlanner APS papildina ERP XL, pl\u0101nojot darbu atbilsto\u0161i katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la faktiskajai pieejam\u012bbai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar Comarch ERP XL. Tas nolasa ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123ijas, resursus, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus, izmantojot ERP XL Web REST API vai las\u012b\u0161anas savienojumu ar datub\u0101zi, un ieraksta oper\u0101ciju datumus un izpildes datus atpaka\u013c, izmantojot XL API. Comarch pied\u0101v\u0101 ar\u012b savu Comarch APS, un tre\u0161o pu\u0161u Gantt un Leitstand risin\u0101jumu pieg\u0101d\u0101t\u0101ji nor\u0101da, ka pied\u0101v\u0101 savienojumus ar Comarch.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Izv\u0113l\u0113ties Comarch APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja v\u0113laties da\u017eu ned\u0113\u013cu laik\u0101 s\u0101kt str\u0101d\u0101t ar grafiku, kas atbilst re\u0101lajai jaudai un atjaunojas autom\u0101tiski. Comarch APS ir atsevi\u0161\u0137a lietotne, ko instal\u0113 j\u016bsu server\u012b un kurai ir sava datub\u0101ze un licences atsl\u0113ga. Pl\u0101not\u0101js manu\u0101li iel\u0101d\u0113 datus un nos\u016bta grafikus atpaka\u013c, bet katrai oper\u0101cijai ir viens fiks\u0113ts p\u0101rregul\u0113\u0161anas laiks. SkyPlanner ir m\u0101ko\u0146programmat\u016bra, kas autom\u0101tiski p\u0101rpl\u0101no darbu, nosaka p\u0101rregul\u0113\u0161anas sec\u012bbu p\u0113c produktu p\u0101riem un kop\u012bgi pl\u0101no brig\u0101des, instrumentus un materi\u0101lus. Bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat par to p\u0101rliecin\u0101ties ar saviem ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j moduli Produkcja?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner papildina \u0161o moduli. Comarch ERP XL joproj\u0101m p\u0101rvalda tehnolo\u0123ijas, ra\u017eo\u0161anas pas\u016bt\u012bjumus, MRP, rezerv\u0101cijas, RW un PW dokumentus un pa\u0161izmaksas apr\u0113\u0137inus. SkyPlanner sast\u0101da oper\u0101ciju grafiku atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta datumus atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai integr\u0101cija darbojas ar\u012b ar Comarch ERP XL m\u0101kon\u012b?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Comarch nodro\u0161ina ERP XL darb\u012bbu j\u016bsu serveros vai m\u0101kon\u012b ar att\u0101lin\u0101tu piek\u013cuvi. Lieto\u0161anas uzs\u0101k\u0161anas laik\u0101 SkyPlanner komanda izveido j\u016bsu videi atbilsto\u0161u savienojumu datu las\u012b\u0161anai un rakst\u012b\u0161anai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner ra\u017eotnei, kas izmanto Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem, papildus 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto uzdevumu rindu. Integr\u0101cijas cenu apr\u0113\u0137ina atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un nor\u0101da iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101na cenu, lai piln\u0101s izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat izmantot Excel vai CSV form\u0101t\u0101 eksport\u0113tus savus atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus. V\u0113l pirms integr\u0101cijas darbu s\u0101kuma j\u016bs redzat savas ra\u017eo\u0161anas <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">pl\u0101nu, kas atbilst re\u0101lajai iek\u0101rtu un darbinieku jaudai<\/a>. P\u0113c tam ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Comarch ERP XL SkyPlanner APS sist\u0113mai Comarch ERP XL: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir Comarch ERP XL papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kur un kad tiek veikta katra ra\u017eo\u0161anas pas\u016bt\u012bjuma (zlecenie &#8230; <a title=\"SkyPlanner APS sist\u0113mai Comarch ERP XL: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai Comarch ERP XL: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106470","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Comarch ERP XL integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina Comarch ERP XL: pl\u0101ns p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija iek\u0101rt\u0101m, cilv\u0113kiem, instrumentiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai Comarch ERP XL: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina Comarch ERP XL: pl\u0101ns p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija iek\u0101rt\u0101m, cilv\u0113kiem, instrumentiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/comarch-erp-xl\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/comarch-erp-xl\\\/\",\"name\":\"Comarch ERP XL integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildina Comarch ERP XL: pl\u0101ns p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija iek\u0101rt\u0101m, cilv\u0113kiem, instrumentiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/comarch-erp-xl\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/comarch-erp-xl\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/comarch-erp-xl\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Comarch ERP XL: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Comarch ERP XL integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas","description":"SkyPlanner APS papildina Comarch ERP XL: pl\u0101ns p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija iek\u0101rt\u0101m, cilv\u0113kiem, instrumentiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai Comarch ERP XL: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","og_description":"SkyPlanner APS papildina Comarch ERP XL: pl\u0101ns p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija iek\u0101rt\u0101m, cilv\u0113kiem, instrumentiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/","name":"Comarch ERP XL integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildina Comarch ERP XL: pl\u0101ns p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija iek\u0101rt\u0101m, cilv\u0113kiem, instrumentiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/comarch-erp-xl\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Comarch ERP XL: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Comarch ERP XL SkyPlanner APS sist\u0113mai Comarch ERP XL: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir Comarch ERP XL papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kur un kad tiek veikta katra ra\u017eo\u0161anas pas\u016bt\u012bjuma (zlecenie&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106470","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106470"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106470\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106470"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}