{"id":106412,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/divalto\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"divalto","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/","title":{"rendered":"SkyPlanner APS sist\u0113mai Divalto: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Divalto infinity<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai Divalto: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir Divalto infinity papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un pl\u0101no katru iek\u0101rtu, operatoru, instrumentu un materi\u0101lu. J\u016bs redzat, kura OF oper\u0101cija kur\u0101 poste de travail tiks veikta un kad. Mainoties situ\u0101cijai ra\u017eo\u0161an\u0101, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Divalto. No Divalto tiek sa\u0146emti ra\u017eo\u0161anas pas\u016bt\u012bjumi (OF) un to s\u00e9quences, gammes, nomenclatures, articles, centres de charge, postes de travail, op\u00e9rateurs, outillages, k\u0101 ar\u012b kr\u0101jumi un pas\u016bt\u012bjumi pieg\u0101d\u0101t\u0101jiem. Atpaka\u013c tiek nos\u016bt\u012bti katra OF un s\u00e9quence pl\u0101notie s\u0101kuma un beigu datumi, k\u0101 ar\u012b re\u0123istr\u0113tais laiks un pabeigtie cikli. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu Divalto iestat\u012bjumiem.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katram OF tiek atv\u0113l\u0113ts pieejams laika interv\u0101ls konkr\u0113t\u0101 poste.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner iepl\u0101no katru s\u00e9quence konkr\u0113t\u0101 poste de travail un konkr\u0113t\u0101 laik\u0101. Jaudu nosaka mai\u0146as, promb\u016btnes un virsstundas, un tiek \u0146emti v\u0113r\u0101 ar\u012b citi OF taj\u0101 pa\u0161\u0101 poste. Rezult\u0101ts ir pl\u0101ns, ko j\u016bsu ra\u017eo\u0161anas cehs var izpild\u012bt.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101kas p\u0101rregul\u0113\u0161anas izmaksas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner glab\u0101 p\u0101rregul\u0113\u0161anas laiku katram produktu p\u0101rim abos p\u0101rejas virzienos. P\u0101rejot no tum\u0161as kr\u0101sas uz gai\u0161u, vajadz\u012bga piln\u012bga t\u012br\u012b\u0161ana, bet no gai\u0161as uz tum\u0161u \u2014 tikai \u012bsa skalo\u0161ana. Pl\u0101no\u0161anas dzin\u0113js sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai zaud\u0113tu vismaz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ar\u012b cilv\u0113ku un instrumentu pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja s\u00e9quence vajadz\u012bgi tr\u012bs operatori, tai tiek pie\u0161\u0137irti tr\u012bs darbinieki ar br\u012bvu laiku mai\u0146\u0101s. Veidne vai pal\u012bgier\u012bce, ko izmanto vien\u0101 poste, nekad netiek vienlaikus rezerv\u0113ta cit\u0101. Ja poste ir aiz\u0146emts, uzdevums tiek p\u0101rcelts uz alternat\u012bvu poste vai pie cita darbinieka.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">S\u0101kumu nosaka materi\u0101lu pieejam\u012bba, nevis pl\u0101not\u0101ja atmi\u0146a.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rbauda katras sast\u0101vda\u013cas kr\u0101jumus un neizpild\u012btos pas\u016bt\u012bjumus pieg\u0101d\u0101t\u0101jiem. Ra\u017eo\u0161anas uzdevums, kuram j\u0101gaida pieg\u0101de, tiek iepl\u0101nots p\u0113c \u0161\u012bs pieg\u0101des datuma.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamu pas\u016bt\u012bjumu un boj\u0101jumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja iek\u0101rta apst\u0101jas vai pien\u0101k steidzams pas\u016bt\u012bjums, Autopilot p\u0101rpl\u0101no grafiku. J\u016bsu noteiktie blo\u0137\u0113jumi un priorit\u0101tes paliek sp\u0113k\u0101, un jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz Divalto.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kam\u0101s s\u00e9quences un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaita ir redzama re\u0101llaik\u0101, un j\u016bs izv\u0113laties, vai laiku un pabeigtos ciklus nos\u016bt\u012bt atpaka\u013c uz Divalto.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel jumta dro\u0161\u012bbas elementu r\u016bpn\u012bca Kauhav\u0101 no putna lidojuma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad savlaic\u012bgo pieg\u0101\u017eu \u012bpatsvars sasniedza 99,2%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja Anu J\u00e4rvinen pie robotiz\u0113tas palet\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Pap\u012brs p\u0101rtikas iepako\u0161anai<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un atbildes uz piepras\u012bjumiem main\u012bt grafiku tagad sa\u0146em da\u017eu sekun\u017eu laik\u0101, nevis stund\u0101 vai ilg\u0101k.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-divalto-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar Divalto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Divalto nos\u016bta veicamos darbus.<\/strong> SkyPlanner sa\u0146em OF un to s\u00e9quences, gammes, nomenclatures, articles, centres de charge, postes de travail, op\u00e9rateurs, outillages, k\u0101 ar\u012b kr\u0101jumus un pas\u016bt\u012bjumus pieg\u0101d\u0101t\u0101jiem.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzin\u0113js da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru s\u00e9quence un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Katra OF un s\u00e9quence pl\u0101notie s\u0101kuma un beigu datumi tiek nos\u016bt\u012bti atpaka\u013c uz Divalto. Ja darbs p\u0101rcelts uz alternat\u012bvu resursu, tiek nos\u016bt\u012bts ar\u012b jaunais centre de charge vai poste. Var nos\u016bt\u012bt ar\u012b re\u0123istr\u0113to laiku un pabeigtos ciklus.<\/li>\n\n<\/ol>\n\n\n<p>Divalto joproj\u0101m ir j\u016bsu pamatuzskaites sist\u0113ma. Articles, nomenclatures, gammes, CBN, iepirkumi, kr\u0101jumi, pa\u0161izmaksas apr\u0113\u0137ini un finanses paliek turpat. SkyPlanner atbild par vienu lietu: katras s\u00e9quence izpildes sec\u012bbu un laiku katram resursam.<\/p>\n\n\n<p>SkyPlanner nolasa Divalto datus, izmantojot RecordSql REST servisu. Datu nos\u016bt\u012b\u0161anai atpaka\u013c tiek izmantots Divalto WEBSERVICE_INFINITY REST serviss: darb\u012bba create_dataxml ievieto failu GG_DATES_ORDO ar pl\u0101notajiem OF un s\u00e9quence datumiem ra\u017eo\u0161anas scrutateur, savuk\u0101rt faili GG_TEMPS_IMPORT un GG_FIN_DE_CYCLE nodod laika un izpildes datus. Tas ir tas pats importa form\u0101ts, ko Divalto izmanto pl\u0101noto datumu sa\u0146em\u0161anai no grafiku sast\u0101d\u012b\u0161anas sist\u0113mas. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta katru grafika izmai\u0146u uzreiz, bet sinhroniz\u0101cijas bie\u017eumu ar Divalto nosaka katrai ra\u017eotnei atsevi\u0161\u0137i.<\/p>\n\n\n<p>Katr\u0101 ra\u017eotn\u0113 Divalto izmanto at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu iestat\u012bjumiem un nodro\u0161ina atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesu un vajadz\u012bbas. Ar\u012b j\u016bsu Divalto partneris vai izstr\u0101d\u0101t\u0101ji var izveidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Servisi, XML form\u0101ti un datu lauku atbilst\u012bbas ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/divalto\/integracijas-celvedis\/\">Divalto integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-divalto-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no Divalto un k\u0101das iesp\u0113jas pievieno SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Divalto infinity aptver visu ra\u017eo\u0161anas ciklu: OF palai\u0161anu no pas\u016bt\u012bjuma vai CBN, jalonnement, plan de charge, integr\u0113tu MES un darba laika uzskaiti ra\u017eo\u0161anas ceh\u0101. <a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/UDI107\/pages\/460427287\">Divalto dokument\u0101cij\u0101<\/a> ir noteiktas pamata pl\u0101no\u0161anas iesp\u0113ju robe\u017eas:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Jalonnement pie\u0146em neierobe\u017eotu jaudu.<\/strong> Divalto to nor\u0101da nep\u0101rprotami: &#8220;Il s&#8217;agit d&#8217;un jalonnement \u00e0 CAPACITE INFINIE, raisonnement logiquement appliqu\u00e9 par les ERP.&#8221; (T\u0101 ir termi\u0146u pl\u0101no\u0161ana ar neierobe\u017eotu jaudu \u2014 lo\u0123ika, ko izmanto ERP sist\u0113mas.)<\/li>\n\n\n<li><strong>Citi OF taj\u0101 pa\u0161\u0101 poste netiek \u0146emti v\u0113r\u0101.<\/strong> Apr\u0113\u0137in\u0101 nosaka poste teor\u0113tisko jaudu &#8220;sans tenir compte des autres charges induites par d&#8217;autres OF \u00e0 la m\u00eame date et sur le m\u00eame poste ou centre.&#8221; (ne\u0146emot v\u0113r\u0101 citu OF rad\u012bto noslodzi taj\u0101 pa\u0161\u0101 datum\u0101 un taj\u0101 pa\u0161\u0101 darba viet\u0101 vai centr\u0101).<\/li>\n\n\n<li><strong>Plan de charge r\u0101da noslodzi, nevis izpildes sec\u012bbu.<\/strong> Tas &#8220;illustre la charge induite par le portefeuille des OF sur les diff\u00e9rents centres de charge et postes de travail&#8221; (atspogu\u013co OF kopuma rad\u012bto noslodzi da\u017e\u0101dos noslodzes centros un darba viet\u0101s) pa dien\u0101m, ned\u0113\u013c\u0101m vai m\u0113ne\u0161iem (<a href=\"https:\/\/www.divalto.com\/logiciel-erp\/gpao\/planification\/\">Divalto pl\u0101no\u0161ana<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>Ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai Divalto nodro\u0161ina ar Ordonnancement Opcenter APS \u2014 Siemens Opcenter APS grafiku sast\u0101d\u012b\u0161anas sist\u0113mu (agr\u0101k Preactor), kas piesl\u0113gta izv\u0113lnei Production. Divalto eksport\u0113 ateliers, centres de charge, postes, ressources, op\u00e9rateurs, outillages un OF. Pl\u0101not\u0101js palai\u017e Opcenter APS un import\u0113 pl\u0101notos datumus atpaka\u013c. Divalto nor\u0101da: &#8220;Opcenter APS est donc d\u00e9clench\u00e9 par l&#8217;utilisateur&#8221; (t\u0101tad Opcenter APS palai\u017e lietot\u0101js) (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/UDI107\/pages\/10530586641\">Divalto dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Visi so\u013ci ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/divalto\/razosanas-planosana\/\">Vai Divalto nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/a> J\u0113dzienu skaidrojumu atrad\u012bsiet rakst\u0101 par <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"divalto-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Divalto pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Divalto jalonnement un plan de charge<\/th><th>Divalto ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Neierobe\u017eota: katru OF iepl\u0101no poste kalend\u0101r\u0101 atsevi\u0161\u0137i<\/td><td>Katras iek\u0101rtas, darbinieka un instrumenta pieejam\u012bba ir ierobe\u017eota, \u0146emot v\u0113r\u0101 faktisk\u0101s mai\u0146as<\/td><\/tr><tr><td>Grafiks<\/td><td>OF datumi p\u0113c gamme, noslodze pa dien\u0101m, ned\u0113\u013c\u0101m vai m\u0113ne\u0161iem<\/td><td>Detaliz\u0113ta katras s\u00e9quence izpildes sec\u012bba da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Katra OF s\u00e9quences iepl\u0101no poste kalend\u0101r\u0101, vienu OF p\u0113c otra<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica: maz\u0101kais kop\u0113jais p\u0101rregul\u0113\u0161anas laiks<\/td><\/tr><tr><td>Darbinieki un instrumenti<\/td><td>Op\u00e9rateurs un outillages pamatdatos<\/td><td>Konkr\u0113ti operatori ar mai\u0146\u0101m; instrumenti k\u0101 ierobe\u017eoti koplietojami resursi; s\u00e9quences ar vair\u0101kiem operatoriem<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>CBN iesaka OF un pas\u016bt\u012bjumus pieg\u0101d\u0101t\u0101jiem<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir pieejami kr\u0101jumos vai sa\u0146emti no pieg\u0101d\u0101t\u0101jiem<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Galven\u0101 OF termi\u0146u p\u0101rpl\u0101no\u0161ana<\/td><td>Autopilot p\u0101rpl\u0101no visu ra\u017eotni atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m<\/td><\/tr><tr><td>Uzs\u0101ktais darbs<\/td><td>Datumi tiek kori\u0123\u0113ti p\u0113c laika re\u0123istr\u0113\u0161anas<\/td><td>Pl\u0101ns \u0146em v\u0113r\u0101 re\u0123istr\u0113to izpildes gaitu; Running Time Lock blo\u0137\u0113 grafiku tuv\u0101kaj\u0101m stund\u0101m<\/td><\/tr><tr><td>Pl\u0101not\u0101ja skats<\/td><td>Gantt diagramma OF p\u0101rvald\u012bb\u0101, plan de charge<\/td><td>Interakt\u012bva Gantt diagramma: p\u0101rvietojiet ra\u017eo\u0161anas uzdevumus, un pl\u0101ns paliek saska\u0146ots<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Integr\u0113ta MES un laika uzskaite<\/td><td>Operatori redz savu uzdevumu rindu un re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-divalto\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties grafiku sast\u0101d\u012b\u0161anas sist\u0113mu darbam ar Divalto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Divalto pamata pl\u0101no\u0161ana ir piem\u0113rota ra\u017eotnei, kurai vajadz\u012bgi OF datumi, kas apr\u0113\u0137in\u0101ti p\u0113c gammes, un p\u0101rskats par katra centre de charge noslodzi. Ja postes tiek iepl\u0101nots vair\u0101k darba, nek\u0101 tie sp\u0113j paveikt, vajadz\u012bga izpildes sec\u012bba atbilsto\u0161i re\u0101lajai jaudai. Tad faktisk\u0101 izv\u0113le ir starp Ordonnancement Opcenter APS un SkyPlanner APS.<\/p>\n\n\n<p>Opcenter APS ir Siemens grafiku sast\u0101d\u012b\u0161anas sist\u0113ma uz\u0146\u0113mumiem. Divalto to piesl\u0113dz ar failu apmai\u0146u: izv\u0113les r\u016bti\u0146a &#8220;ordonnancement&#8221; kart\u012bt\u0113 Production palai\u017e scrutateur, un apmai\u0146as mape ir &#8220;un chemin Windows qui pointe vers le dossier contenant les fichiers .PRCDF&#8221; (Windows ce\u013c\u0161 uz mapi ar .PRCDF failiem). Datus ievada &#8220;par le biais de scripts d&#8217;importation&#8221; (ar importa skriptiem), kurus integrators var piel\u0101got. Ultimate pl\u0101no\u0161anas l\u012bmeni no Standard at\u0161\u0137ir grup\u0113\u0161anas noteikumi, piem\u0113ram, p\u0113c kr\u0101sas vai materi\u0101la. (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/UDI107\/pages\/10530586641\">Divalto dokument\u0101cija<\/a>)<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis Opcenter APS, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u0101nam j\u0101atjaunojas autom\u0101tiski.<\/strong> Divalto vid\u0113 Opcenter APS darbojas tad, kad pl\u0101not\u0101js to palai\u017e, un p\u0113c tam datumi tiek import\u0113ti. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku p\u0113c katras b\u016btiskas izmai\u0146as, un jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz Divalto ar GG_DATES_ORDO.<\/li>\n\n\n<li><strong>V\u0113laties m\u0101ko\u0146programmat\u016bru, nevis apmai\u0146as mapi.<\/strong> SkyPlanner piesl\u0113dzas, izmantojot Divalto REST servisus. Nevienam nav manu\u0101li j\u0101eksport\u0113 un j\u0101import\u0113 dati, un nav j\u0101uztur Opcenter importa skripti. Varat to p\u0101rbaud\u012bt ar saviem OF 30 dienu izm\u0113\u0123in\u0101jum\u0101, un ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c t\u0101s uzs\u0101k\u0161anas.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka j\u016bsu izlaidi.<\/strong> Divalto grup\u0113\u0161anas noteikumus p\u0113c kr\u0101sas vai materi\u0101la paredz Ultimate l\u012bmen\u012b. SkyPlanner p\u0101rregul\u0113\u0161anas laiku matrica glab\u0101 p\u0101rejas laikus starp produktiem katr\u0101 virzien\u0101, bet &#8220;Allow similarity&#8221; grup\u0113 ra\u017eo\u0161anas uzdevumus p\u0113c k\u0101das paz\u012bmes, piem\u0113ram, instrumenta.<\/li>\n\n\n<li><strong>Pl\u0101nu ierobe\u017eo gan operatori, gan instrumenti, gan materi\u0101li.<\/strong> Katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bba ir ierobe\u017eota. Pl\u0101nojot s\u00e9quences, kam vajadz\u012bgi vair\u0101ki operatori, t\u0101m pie\u0161\u0137ir vajadz\u012bgos darbiniekus un izmanto ar\u012b alternat\u012bvus postes. Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir pieejami kr\u0101jumos vai sa\u0146emti no pieg\u0101d\u0101t\u0101jiem.<\/li>\n\n\n<li><strong>Katram operatoram j\u0101str\u0101d\u0101 p\u0113c pl\u0101na.<\/strong> Mobile Confirmations par\u0101da aktu\u0101lo uzdevumu rindu katr\u0101 t\u0101lrun\u012b vai plan\u0161etdator\u0101. Lietot\u0101ju skaits nav ierobe\u017eots: cena ir atkar\u012bga no darba centru, nevis lietot\u0101ju skaita.<\/li>\n\n\n<li><strong>V\u0113laties vienu m\u0113ne\u0161a maksu.<\/strong> No 199 \u20ac m\u0113nes\u012b, ar divvirzienu integr\u0101ciju, ko konfigur\u0113 un uztur SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Model\u0113jiet savu ra\u017eo\u0161anu.<\/strong> Izveidojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet savus Divalto centres de charge un postes de travail. Ir pieejama pal\u012bdz\u012bba ievie\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet savus OF.<\/strong> Eksport\u0113jiet atv\u0113rtos OF un to s\u00e9quences no Divalto uz Excel, import\u0113jiet tos SkyPlanner un sal\u012bdziniet ieg\u016bto ra\u017eo\u0161anas grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet Divalto.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darba s\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a> vai iepaz\u012bstieties ar <a href=\"\/lv\/integracija\/erp\/\">vis\u0101m ERP integr\u0101cij\u0101m<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais Divalto papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Divalto infinity. Tas sa\u0146em OF un s\u00e9quences, gammes, nomenclatures, postes de travail, op\u00e9rateurs, outillages, kr\u0101jumu datus un pas\u016bt\u012bjumus pieg\u0101d\u0101t\u0101jiem. Atpaka\u013c tiek nos\u016bt\u012bti pl\u0101notie OF un s\u00e9quence datumi, pat\u0113r\u0113tais laiks un izpildes dati. Pl\u0101nojot tiek \u0146emta v\u0113r\u0101 katras iek\u0101rtas, operatora un instrumenta ierobe\u017eot\u0101 pieejam\u012bba, k\u0101 ar\u012b pieejamais materi\u0101lu daudzums. P\u0101rregul\u0113\u0161anas laiku matrica \u0146em v\u0113r\u0101 p\u0101rejas virzienu starp ra\u017eo\u0161anas uzdevumiem un sak\u0101rto tos t\u0101, lai p\u0101rregul\u0113\u0161anai vajadz\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika. Ja ra\u017eo\u0161an\u0101 rodas izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Divalto nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/summary>\n<p class=\"sp-faq__a\">Da\u013c\u0113ji. K\u0101 nor\u0101da pats Divalto, t\u0101 jalonnement funkcija pl\u0101no, pie\u0146emot neierobe\u017eotu jaudu. Pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai nodro\u0161ina Ordonnancement Opcenter APS, ko pl\u0101not\u0101js palai\u017e no izv\u0113lnes Production, eksport\u0113jot un import\u0113jot failus. SkyPlanner APS darbojas l\u012bdz\u0101s Divalto, pl\u0101no darbu atbilsto\u0161i katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la re\u0101lajai pieejam\u012bbai un autom\u0101tiski p\u0101rpl\u0101no grafiku.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kura ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar Divalto?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar Divalto infinity. Tas nolasa OF, s\u00e9quences, gammes, articles, postes un kr\u0101jumu datus, izmantojot RecordSql REST pakalpojumu. Pl\u0101notos OF un s\u00e9quence datumus tas ieraksta atpaka\u013c, izmantojot WEBSERVICE_INFINITY darb\u012bbu create_dataxml un failu GG_DATES_ORDO. Ja izv\u0113laties, atpaka\u013c tiek nos\u016bt\u012bts ar\u012b pat\u0113r\u0113tais laiks un pabeigtie cikli.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j Divalto GPAO?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina GPAO. Divalto joproj\u0101m p\u0101rvalda articles, nomenclatures, gammes, CBN, OF izveidi, iepirkumus, kr\u0101jumus, pa\u0161izmaksas apr\u0113\u0137inus un finanses. SkyPlanner iepl\u0101no j\u016bsu OF atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ko izv\u0113l\u0113ties \u2014 Opcenter APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja v\u0113laties da\u017eu ned\u0113\u013cu laik\u0101 s\u0101kt izmantot re\u0101lajai jaudai atbilsto\u0161u ra\u017eo\u0161anas grafiku, kas autom\u0101tiski atjaunin\u0101s. Divalto vid\u0113 Opcenter APS palai\u017e pl\u0101not\u0101js, un failu apmai\u0146a notiek Windows map\u0113. Grup\u0113\u0161anas noteikumi p\u0113c kr\u0101sas vai materi\u0101la ir pieejami Ultimate kl\u0101st\u0101. SkyPlanner ir m\u0101ko\u0146programmat\u016bra, kas izmanto Divalto REST pakalpojumus un autom\u0101tiski p\u0101rpl\u0101no grafiku. T\u0101 pl\u0101no p\u0101rregul\u0113\u0161anu, instrumentus, brig\u0101des un materi\u0101lus un katram operatoram nodro\u0161ina savu darba rindu bez lietot\u0101ju skaita ierobe\u017eojuma. Bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat par to p\u0101rliecin\u0101ties ar saviem OF.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 ra\u017eotnei, kas izmanto Divalto?<\/summary>\n<p class=\"sp-faq__a\">Cena ir no 199 \u20ac m\u0113nes\u012b, un taj\u0101 ir iek\u013cauti 5 darba centri. Par katru papildu darba centru j\u0101maks\u0101 20 \u20ac m\u0113nes\u012b. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto darbu rindu. Integr\u0101cijas cenu apr\u0113\u0137in\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un pied\u0101v\u0101jam kop\u0101 ar abonementu, lai pirms darba s\u0101k\u0161anas j\u016bs zin\u0101tu kop\u0113j\u0101s izmaksas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai tas darbojas gan ar Divalto m\u0101kon\u012b, gan ar lok\u0101li instal\u0113tu Divalto?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. SkyPlanner ir m\u0101ko\u0146pakalpojums, un integr\u0101cijai tiek izmantoti Divalto REST pakalpojumi. Nosakot projekta tv\u0113rumu, SkyPlanner komanda apstiprina j\u016bsu instal\u0101cijai izmantojamo galapunktu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadprocesa s\u0101kuma. Komanda nosaka, k\u0101 j\u016bsu centres de charge, postes un gammes atbilst SkyPlanner datiem, piesl\u0113dz OF un pas\u016bt\u012bjumus pieg\u0101d\u0101t\u0101jiem un nodro\u0161ina pl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms darba s\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Divalto?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 izmanto j\u016bsu atv\u0113rtos Divalto OF, kas eksport\u0113ti Excel fail\u0101. V\u0113l pirms integr\u0101cijas darbu s\u0101k\u0161anas redz\u0113siet savas ra\u017eo\u0161anas <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">grafiku, kas atbilst re\u0101lajai iek\u0101rtu un darbinieku jaudai<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Divalto infinity SkyPlanner APS sist\u0113mai Divalto: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir Divalto infinity papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un pl\u0101no katru iek\u0101rtu, operatoru, instrumentu un materi\u0101lu. J\u016bs redzat, kura OF oper\u0101cija kur\u0101 poste de travail tiks veikta un kad. Mainoties situ\u0101cijai ra\u017eo\u0161an\u0101, &#8230; <a title=\"SkyPlanner APS sist\u0113mai Divalto: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai Divalto: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106412","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Divalto integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina Divalto: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai Divalto: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina Divalto: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/divalto\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/divalto\\\/\",\"name\":\"Divalto integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildina Divalto: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/divalto\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/divalto\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/divalto\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Divalto: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Divalto integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","description":"SkyPlanner APS papildina Divalto: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai Divalto: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","og_description":"SkyPlanner APS papildina Divalto: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/","name":"Divalto integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildina Divalto: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/divalto\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Divalto: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Divalto infinity SkyPlanner APS sist\u0113mai Divalto: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir Divalto infinity papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un pl\u0101no katru iek\u0101rtu, operatoru, instrumentu un materi\u0101lu. J\u016bs redzat, kura OF oper\u0101cija kur\u0101 poste de travail tiks veikta un kad. Mainoties situ\u0101cijai ra\u017eo\u0161an\u0101,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106412","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106412"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106412\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106412"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}